rancangan pabrik singkat

Upload: zultri

Post on 25-Feb-2018

236 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    1/71

    DENGAN POLA KEMITRAANDENGAN POLA KEMITRAAN

    BERSAMABERSAMA

    PT.SANGIA KABAENA PERKASAPT.SANGIA KABAENA PERKASA

    ALAMAT: KABAENA KABUPATEN BOMBANAALAMAT: KABAENA KABUPATEN BOMBANA

    PROVINSI SULAWESI TENGGARA-PROVINSI SULAWESI TENGGARA-

    INDONESIAINDONESIA

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    2/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    3/71

    RANCANGANRANCANGAN

    INVESTASI PROYEK PENAMBANGAN DANINVESTASI PROYEK PENAMBANGAN DAN

    PEMBANGUNAN PABRIK (SMELTER) FERROPEMBANGUNAN PABRIK (SMELTER) FERRO

    NIKEL (SPONGE FeNi > 4% Ni) DENGANNIKEL (SPONGE FeNi > 4% Ni) DENGAN

    KAPASITAS PRODUKSI 10.000 TON PER BULANKAPASITAS PRODUKSI 10.000 TON PER BULAN

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    4/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    5/71

    ANALISIS DAN BIAYA INVESTASIANALISIS DAN BIAYA INVESTASI

    A. BIAYA INVESTASI AAL (INVESTASIA. BIAYA INVESTASI AAL (INVESTASI

    POKOK ! BUNGA MODAL ! INFLASIPOKOK ! BUNGA MODAL ! INFLASI

    INVESTASI SEBESAR RP. "#$ MILYARD.INVESTASI SEBESAR RP. "#$ MILYARD.

    B. PAYBACK PERIOD 11 BULAN 11 ARIB. PAYBACK PERIOD 11 BULAN 11 ARI

    C. PRAKIRAAN PENDAPTAN BERSI (NETTOC. PRAKIRAAN PENDAPTAN BERSI (NETTO

    PROFIT) YAKNI PADA TAUN KE III (TIGA)PROFIT) YAKNI PADA TAUN KE III (TIGA)

    SEBESAR USD 4&0.000.000' PER TAUN.SEBESAR USD 4&0.000.000' PER TAUN.

    D.D. MASA INVESTASI PROYEKMASA INVESTASI PROYEK 100 TAUN.100 TAUN.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    6/71

    ASSALAMU ALAIKUM WR.WB DANASSALAMU ALAIKUM WR.WB DANSALAM SEJAHTERA KITA SEMUA,SALAM SEJAHTERA KITA SEMUA,

    SEMOGA ALLAH SWT, DAPATSEMOGA ALLAH SWT, DAPAT

    MELIMPAHKAN RAHMAT, HIDAYAHMELIMPAHKAN RAHMAT, HIDAYAH

    SERTA KASIH SAYANGNYA KEPADASERTA KASIH SAYANGNYA KEPADA

    KITA SEKALIAN, DISERTAI DENGANKITA SEKALIAN, DISERTAI DENGAN

    IJINNYA DAPAT MERIDHOI KITAIJINNYA DAPAT MERIDHOI KITA

    SEKALIAN, SEHINGGA HASIL MEETINGSEKALIAN, SEHINGGA HASIL MEETING

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    7/71

    KAMI DARI PT. SANGIA KABAENA PERKASAKAMI DARI PT. SANGIA KABAENA PERKASA

    AKAN MEMPRESENTASEKAN KELAYAKANAKAN MEMPRESENTASEKAN KELAYAKAN

    INVESTASI BISNIS TAMBANG NIKEL DI PULAUINVESTASI BISNIS TAMBANG NIKEL DI PULAU

    KABAENA' YANG DI AKILI OLE KABAENA' YANG DI AKILI OLE

    DRS. SYAFRUDDIN YASIN SEBAGAI PENDIRIDRS. SYAFRUDDIN YASIN SEBAGAI PENDIRIPERUSAAAN PT. SANGIA KABAENA PERKASAPERUSAAAN PT. SANGIA KABAENA PERKASA

    DR. L.M. MASTARI' SE SEBAGAI AKILDR. L.M. MASTARI' SE SEBAGAI AKIL

    PERUSAAAN PT. SANGIA KABAENA PERKASAPERUSAAAN PT. SANGIA KABAENA PERKASA L.M. AMRIN' S. S*+' SEBAGAI AKIL PERUSAAAN L.M. AMRIN' S. S*+' SEBAGAI AKIL PERUSAAAN

    PT. SANGIA KABAENA PERKASAPT. SANGIA KABAENA PERKASA

    MUKTAR SEBAGAI AKIL PERUSAAAN MUKTAR SEBAGAI AKIL PERUSAAAN- PT. SANGIA KABAENA PERKASAPT. SANGIA KABAENA PERKASA

    DAPAT MEMAPARKAN RANCANGAN INVESTASIDAPAT MEMAPARKAN RANCANGAN INVESTASI

    DAN BISNIS PENAMBANGAN NIKEL DI PULAUDAN BISNIS PENAMBANGAN NIKEL DI PULAU

    KABAENA' KAB. BOMBANA SEBAGAI BERIKUT KABAENA' KAB. BOMBANA SEBAGAI BERIKUT

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    8/71

    VISI VISI

    DENGAN POLA INVESTASI KEMITRAANDENGAN POLA INVESTASI KEMITRAAN

    PENAMBANGAN YANG BERNUANSAPENAMBANGAN YANG BERNUANSA

    KEARIFAN LOKAL' MAKA PT. SANGIAKEARIFAN LOKAL' MAKA PT. SANGIA

    KABAENA PERKASA SEBAGAIKABAENA PERKASA SEBAGAIPERUSAAAN PUTRA DAERA ASLIPERUSAAAN PUTRA DAERA ASLI

    KABAENA YANG MEMILIKI OBSESIKABAENA YANG MEMILIKI OBSESI

    MEMBANGUN PABRIK NKEL' AKANMEMBANGUN PABRIK NKEL' AKAN

    MEN,ADI PERUSAAAN PENAMBANGANMEN,ADI PERUSAAAN PENAMBANGAN

    NIKEL TERBESAR DI SULAESINIKEL TERBESAR DI SULAESI

    TENGGARA.TENGGARA.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    9/71

    MISI MISI 1.1. MEMBANGUN KEMITRAAN INVESTASIMEMBANGUN KEMITRAAN INVESTASI

    ANTARA INVETOR (FUNDER)'ANTARA INVETOR (FUNDER)' PEMERINTAPEMERINTADAERA DAN MASYARAKATDAERA DAN MASYARAKAT LOKALLOKAL

    MELALUI ADA PERUSAAANMELALUI ADA PERUSAAAN

    PT. SANGIA KABAENA PERKASA.PT. SANGIA KABAENA PERKASA.

    $.$. PT. SANGIA KABAENA PERKASAPT. SANGIA KABAENA PERKASABERTEKAD MEMBANGUN PABRIK FERROBERTEKAD MEMBANGUN PABRIK FERRO

    NIKEL (SPONGE FeNi > 4% Ni) DENGANNIKEL (SPONGE FeNi > 4% Ni) DENGAN

    KAPASITAS PRODUKSI - 10.000 MT PERKAPASITAS PRODUKSI - 10.000 MT PER

    BULAN SEBAGAI SATUSATUNYABULAN SEBAGAI SATUSATUNYAPERUSAAAN PABRIK NIKEL TERBESARPERUSAAAN PABRIK NIKEL TERBESAR

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    10/71

    .. DENGAN TERBANGUNNYA PABRIK NIKELDENGAN TERBANGUNNYA PABRIK NIKEL

    DI PULAU KABAENA' MAKA PT. SANGIADI PULAU KABAENA' MAKA PT. SANGIA

    KABAENA PERKASA AKAN EKSIS SECARAKABAENA PERKASA AKAN EKSIS SECARAKONTINYU - 100 TAUN DAN INCOMEKONTINYU - 100 TAUN DAN INCOME

    PERKAPITA MASYARAKAT MENINGKATPERKAPITA MASYARAKAT MENINGKAT

    DARI PDRB'PAD' SERTA MENINGKATNYADARI PDRB'PAD' SERTA MENINGKATNYA

    KESE,ATERAAN MASYARAKAT DIKESE,ATERAAN MASYARAKAT DI

    SEGALA BIDANG.SEGALA BIDANG.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    11/71

    MAKSUD DAN TUJUANMAKSUD DAN TUJUAN

    MAKSUD MAKSUD

    1.1. UNTUK MENAARKAN KEPADA PIAK FUNDERUNTUK MENAARKAN KEPADA PIAK FUNDERSEBAGAI MITRA PERUSAAAN PT. SANGIASEBAGAI MITRA PERUSAAAN PT. SANGIAKABAENA PERKASA' DIMANA PIAK FUNDERKABAENA PERKASA' DIMANA PIAK FUNDER

    AKAN BERTINDAK SEBAGAI DIREKTUR FINANCEAKAN BERTINDAK SEBAGAI DIREKTUR FINANCEPADA PERUSAAAN PT. SANGIA KABAENAPADA PERUSAAAN PT. SANGIA KABAENAPERKASA' DENGAN PROSENTASE KEPEMILIKANPERKASA' DENGAN PROSENTASE KEPEMILIKANSAAM SEBESAR /0% (ENAM PULU PERSAAM SEBESAR /0% (ENAM PULU PERSERATUS). SEDANGKAN PIAK KONSULTANSERATUS). SEDANGKAN PIAK KONSULTANFUNDER YANG MENGA,UKAN PROYEK INIFUNDER YANG MENGA,UKAN PROYEK INI(PT.) KEPEMILIKAN SAAM SEBESAR 10%(PT.) KEPEMILIKAN SAAM SEBESAR 10%(SEPULU PER SERATUS). DAN PT. SANGIA(SEPULU PER SERATUS). DAN PT. SANGIAKABAENA PERKASA SEBESAR 0% (TIGA PULUKABAENA PERKASA SEBESAR 0% (TIGA PULUPER SERATUS).PER SERATUS).

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    12/71

    $.$. SEBAGAI STRATEGI UNTUKSEBAGAI STRATEGI UNTUK

    MENDIRIKANMEMBANGUN PABRIK NIKELMENDIRIKANMEMBANGUN PABRIK NIKEL

    (SMELTER) DI PULAU KABAENA' YANG(SMELTER) DI PULAU KABAENA' YANG

    MERUPAKAN SALA SATU PERUSAAANMERUPAKAN SALA SATU PERUSAAANTAMBANG NIKEL TERBESAR DI PULAU KABAENATAMBANG NIKEL TERBESAR DI PULAU KABAENA

    YANG MEMILIKI PABRIK ORE NIKEL (SMELTER)YANG MEMILIKI PABRIK ORE NIKEL (SMELTER)

    .. SUPAYA DAPAT MENGUASAI SEBAGIAN BESARSUPAYA DAPAT MENGUASAI SEBAGIAN BESARLAAN KUASA PENAMBANGAN (KP) YANG TELALAAN KUASA PENAMBANGAN (KP) YANG TELA

    MEMILIKI I,IN USAA PENAMBANGAN (IUP)MEMILIKI I,IN USAA PENAMBANGAN (IUP)

    PRODUKSI NIKEL DI PULAU KABAENA YANGPRODUKSI NIKEL DI PULAU KABAENA YANG

    ,UMLANYA SEBANYAK $ PERUSAAAN,UMLANYA SEBANYAK $ PERUSAAAN

    PEMEGANG IUP PRODUKSI NIKEL' DENGAN LUASPEMEGANG IUP PRODUKSI NIKEL' DENGAN LUASLAAN DIPERKIRAKAN 0.000 A' DANLAAN DIPERKIRAKAN 0.000 A' DAN

    DIPERKIRAKAN CADANGAN DEPOSIT NIKELDIPERKIRAKAN CADANGAN DEPOSIT NIKEL

    SEBANYAK "."00.000.000 METRICK TON.SEBANYAK "."00.000.000 METRICK TON.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    13/71

    TU,UAN TU,UAN 1.1. DENGAN POLA KEMITRAAN' PT. SANGIA KABAENADENGAN POLA KEMITRAAN' PT. SANGIA KABAENA

    PERKASA DENGAN PIAK FUNDER SEBAGAI FINANCE'PERKASA DENGAN PIAK FUNDER SEBAGAI FINANCE'

    MAKA PABRIK ORE NIKEL (SMELTER) DI PULAUMAKA PABRIK ORE NIKEL (SMELTER) DI PULAUKABAENA AKAN TERBANGUN.KABAENA AKAN TERBANGUN.

    $.$. DENGAN TERBANGUNNYA PABRIK ORE NIEL (SMELTER)DENGAN TERBANGUNNYA PABRIK ORE NIEL (SMELTER)DI PULAU KABAENA' MAKA PT. SANGIA KABAENADI PULAU KABAENA' MAKA PT. SANGIA KABAENAPERKASA AKAN DAPAT MENTAKE OVER LAANLAANPERKASA AKAN DAPAT MENTAKE OVER LAANLAAN

    KPIUP PRODUKSI NIKEL YANG ADA DI PULAUKPIUP PRODUKSI NIKEL YANG ADA DI PULAUKABAENA' MINIMAL 10 PERUSAAAN PEMEGANG KPKABAENA' MINIMAL 10 PERUSAAAN PEMEGANG KPIUP PRODUKSI NIKEL' SEDANGKAN SISANYA DARI $IUP PRODUKSI NIKEL' SEDANGKAN SISANYA DARI $PERUSAAAN PEMEGANG IUP PRODUKSI NIKEL' ATAUPERUSAAAN PEMEGANG IUP PRODUKSI NIKEL' ATAUSEBANYAK 1 PEMEGANG KPIUP NIKEL ADALASEBANYAK 1 PEMEGANG KPIUP NIKEL ADALASEBAGAI KONTRAK PRODUKSI ORE NIKEL DENGANSEBAGAI KONTRAK PRODUKSI ORE NIKEL DENGANCARA MEMBELI DARI TEMPAT PABRIK.CARA MEMBELI DARI TEMPAT PABRIK.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    14/71

    .. DENGAN BERINVESTASI MEMBANGUN PABRIK OREDENGAN BERINVESTASI MEMBANGUN PABRIK ORE

    NIKEL (SMELTER) DI PULAU KABAENA' MAKA AKANNIKEL (SMELTER) DI PULAU KABAENA' MAKA AKANTERBUKA LAPANGAN KER,A MASYARAKAT SECARATERBUKA LAPANGAN KER,A MASYARAKAT SECARA

    BESARBESARAN DAN AKAN TER,ADI MULTIBESARBESARAN DAN AKAN TER,ADI MULTI

    PLYAER EFFECT. INCOME PER KAPITAPLYAER EFFECT. INCOME PER KAPITA

    MASYARAKAT AKAN MENINGKAT YANG BERARTIMASYARAKAT AKAN MENINGKAT YANG BERARTI

    DUKUNGAN MASYARAKAT LOKAL KEPADA PT.DUKUNGAN MASYARAKAT LOKAL KEPADA PT.SANGIA KABAENA PERKASA AKAN SANGAT BESARSANGIA KABAENA PERKASA AKAN SANGAT BESAR

    PENGARUNYA' DI SAMPING AKAN DAPATPENGARUNYA' DI SAMPING AKAN DAPAT

    MENINGKATKAN PENDAPATAN ASLI DAERAMENINGKATKAN PENDAPATAN ASLI DAERA

    KABUPATEN BOMBANA YANG ,UMLANYA DAPATKABUPATEN BOMBANA YANG ,UMLANYA DAPAT

    MENCAPAI RATUSAN MILYAR PER TAUN.MENCAPAI RATUSAN MILYAR PER TAUN.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    15/71

    PROSPEK INVESTASIPROSPEK INVESTASI

    DAN PELUANG BISNISDAN PELUANG BISNIS

    TAMBANG NIKELTAMBANG NIKELDI PULAU KABAENADI PULAU KABAENA

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    16/71

    PENDAHULUANPENDAHULUAN

    PENGENALAN PULAU KABAENAPENGENALAN PULAU KABAENA

    PULAU KABAENA DAPAT DI TEMPU MELALUI PULAU KABAENA DAPAT DI TEMPU MELALUI

    ,AKARTA 2 KENDARI DENGAN ,ALUR PESAAT DAPAT,AKARTA 2 KENDARI DENGAN ,ALUR PESAAT DAPAT

    DI TEMPU DALAM ,ANGKA AKTU $ ,AM 43 MENITDI TEMPU DALAM ,ANGKA AKTU $ ,AM 43 MENIT(BERMALAM DI KENDARI' PAGI ARI BERANGKAT KE(BERMALAM DI KENDARI' PAGI ARI BERANGKAT KEBOMBANA)BOMBANA)

    DARI KENDARI KE IBUKOTA BOMBANA (RUMBIA) DAPATDARI KENDARI KE IBUKOTA BOMBANA (RUMBIA) DAPATDI TEMPU DENGAN TRANSPORTASI DARAT SELAMA DI TEMPU DENGAN TRANSPORTASI DARAT SELAMA ,AM (LANGSUNG MENU,U PELABUAN KASIPUTE,AM (LANGSUNG MENU,U PELABUAN KASIPUTEBOMBANA KE PULAU KABAENA)BOMBANA KE PULAU KABAENA)

    DARI RUMBIA IBUKOTA BOMBANA KE PULAU KABAENADARI RUMBIA IBUKOTA BOMBANA KE PULAU KABAENA

    DAPAT DI TEMPU DENGAN MENGGUNAKANDAPAT DI TEMPU DENGAN MENGGUNAKAN

    TRANSPORTASI LAUT SELAMA 4 ,AM' KALAU DENGANTRANSPORTASI LAUT SELAMA 4 ,AM' KALAU DENGANSPEED BOAT $ ,AMSPEED BOAT $ ,AM

    ,ALAN PINTAS DARI KENDARI KE KABAENA DAPAT DI,ALAN PINTAS DARI KENDARI KE KABAENA DAPAT DITEMPU DENGAN MENGGUNAKAN PESAAT ELIKOPTERTEMPU DENGAN MENGGUNAKAN PESAAT ELIKOPTERDALAM AKTU KURANG LEBI 13 MENITDALAM AKTU KURANG LEBI 13 MENIT

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    17/71

    KOTA SIKELI SEBAGAI PELABUAHAN YANGKOTA SIKELI SEBAGAI PELABUAHAN YANG

    MERUPAKAN IBUKOTA KECAMATANMERUPAKAN IBUKOTA KECAMATAN

    KABAENA BARATKABAENA BARAT

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    18/71

    GUNUNG WATUSANGIA SEBAGAIGUNUNG WATUSANGIA SEBAGAI

    GUNUNG KRAMAT DI PULAU KABAENAGUNUNG KRAMAT DI PULAU KABAENA

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    19/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    20/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    21/71

    GOOGLE MAP P. KABAENA.kmz

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    22/71

    ANALISA EKONOMIS DANANALISA EKONOMIS DAN

    ANALISA FINANSIALANALISA FINANSIAL

    I.I. ANALISA EKONOMISANALISA EKONOMIS1.11.1 INVESTASI PROYEKINVESTASI PROYEK RANCANGAN INVESTASI PROYEK ADALA RANCANGAN INVESTASI PROYEK ADALA

    A.A.MODAL KER,A UNTUK MEMPRODUKSI ORE NIKELMODAL KER,A UNTUK MEMPRODUKSI ORE NIKEL

    SEBANYAKSEBANYAK /00.000 METRICK TON PER BULAN./00.000 METRICK TON PER BULAN.B.B.PEMBELIAN LAANLAAN KPIUP PRODUKSI NIKELPEMBELIAN LAANLAAN KPIUP PRODUKSI NIKEL

    (TAKE OVER) SEBANYAK 3 (LIMA) PERUSAAAN(TAKE OVER) SEBANYAK 3 (LIMA) PERUSAAANTAMBANGTAMBANG PEMEGANG IUP PRODUKSI NIKEL YANGPEMEGANG IUP PRODUKSI NIKEL YANGADA DI PULAUADA DI PULAU KABAENA YAKNI KABAENA YAKNI

    PT. INTERNASIONAL MINING ,AYA DENGAN LUASPT. INTERNASIONAL MINING ,AYA DENGAN LUAS

    LAAN $."" A (YANG DAPAT DIOLADITAMBANGLAAN $."" A (YANG DAPAT DIOLADITAMBANG$00 A) DENGAN CADANGAN DEPOSIT ORE NIKEL$00 A) DENGAN CADANGAN DEPOSIT ORE NIKEL

    0.000.000 MMT (1'& UP SD $'3 UP) ATAU0.000.000 MMT (1'& UP SD $'3 UP) ATAU#.##0.000 TON FERRO NIKEL.#.##0.000 TON FERRO NIKEL.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    23/71

    PT. MARGO KARYA MANDIRI' DENGAN LUAS LAANPT. MARGO KARYA MANDIRI' DENGAN LUAS LAAN $.1$& A$.1$& A

    (( 400 A YANG DAPAT DIOLA UNTUK PENAMBANGAN)400 A YANG DAPAT DIOLA UNTUK PENAMBANGAN)

    DENGAN CADANGAN DEPOSIT ORE NIKEL /0.000.000 (KADARDENGAN CADANGAN DEPOSIT ORE NIKEL /0.000.000 (KADAR

    $'3 UP SD 3.$ UP) ATAU$'3 UP SD 3.$ UP) ATAU 13.340.000 METRICK TON FERRO13.340.000 METRICK TON FERRO

    NIKEL.NIKEL.

    PT. TIMA EPLONIM' DENGAN LUAS LAAN 400 A (PT. TIMA EPLONIM' DENGAN LUAS LAAN 400 A ( 0000

    A YANG DAPAT DIOLA UNTUK PENAMBANGAN) DENGANA YANG DAPAT DIOLA UNTUK PENAMBANGAN) DENGAN

    CADANGAN DEPOSIT NIKEL 5 /."00.000 METRICK TON ($'CADANGAN DEPOSIT NIKEL 5 /."00.000 METRICK TON ($'

    UP SD 4'$ UP). 43.000.000 MMT 5 11./33.000 TON.UP SD 4'$ UP). 43.000.000 MMT 5 11./33.000 TON.

    PT. BAANA MULTI ENERGI' DENGAN LUAS LAAN "&" A (PT. BAANA MULTI ENERGI' DENGAN LUAS LAAN "&" A (400 A YANG DAPAT DIOLA UNTUK PENAMBANGAN)400 A YANG DAPAT DIOLA UNTUK PENAMBANGAN)

    DENGAN CADANGAN DEPOSIT ORE NIKEL /0.000.000DENGAN CADANGAN DEPOSIT ORE NIKEL /0.000.000

    METRICK TON DENGAN KADAR 1.& UP SD .1 UP ATAUMETRICK TON DENGAN KADAR 1.& UP SD .1 UP ATAU

    SEBANYAKSEBANYAK 13.340.000 TON FERRO NIKEL.13.340.000 TON FERRO NIKEL.

    PT. TRIA ,AYA AGUNG' DENGAN LUAS LAAN 31$ A (PT. TRIA ,AYA AGUNG' DENGAN LUAS LAAN 31$ A ( 100 A100 AYANG DAPAT DIOLA UNTUK PENAMBANGAN DENGANYANG DAPAT DIOLA UNTUK PENAMBANGAN DENGAN

    SISTEM ,OINT OPERASIONAL) MAKA CADANGAN DEPOSITSISTEM ,OINT OPERASIONAL) MAKA CADANGAN DEPOSIT

    ORE NIKEL 3.000.000 M DENGAN KADAR $'3 UP SD 3'ORE NIKEL 3.000.000 M DENGAN KADAR $'3 UP SD 3'

    UP) ATAU SEBANYAK ".0/3.000 TON FERRO NIKELUP) ATAU SEBANYAK ".0/3.000 TON FERRO NIKEL

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    24/71

    TOTAL LUAS LAAN KPIUP PRODUKSI NIKEL YANGTOTAL LUAS LAAN KPIUP PRODUKSI NIKEL YANG

    TELA DITAKE OVER DAPAT DIOLA UNTUKTELA DITAKE OVER DAPAT DIOLA UNTUK

    PENAMBANGAN ORE NIKELPENAMBANGAN ORE NIKEL 1.400 A' DENGAN1.400 A' DENGAN

    CADANGAN DEPOSIT ORE NIKEL 5 $10.000.000 MTCADANGAN DEPOSIT ORE NIKEL 5 $10.000.000 MT

    DENGAN KADAR 1'$ UP SD 3' UP ATAU RATARATA $'3"DENGAN KADAR 1'$ UP SD 3' UP ATAU RATARATA $'3"

    UP. BILA DIOLA MELALUI PABRIK ORE NIKEL (SMELTER)UP. BILA DIOLA MELALUI PABRIK ORE NIKEL (SMELTER)

    YANG TELA DIBANGUN' MAKA AKAN MENGASILKANYANG TELA DIBANGUN' MAKA AKAN MENGASILKAN

    3".3#0.000 TON FERRO NIKEL.3".3#0.000 TON FERRO NIKEL.

    C.C. PERUSAAAN TAMBANG PEMEGANG KPIUP PRODUKSIPERUSAAAN TAMBANG PEMEGANG KPIUP PRODUKSI

    NIKEL YANG BELUM BEROPERASI DI ILAYA KABAENNIKEL YANG BELUM BEROPERASI DI ILAYA KABAENBER,UMLA 13 PERUSAAAN TAMBANG NIKEL. LUASBER,UMLA 13 PERUSAAAN TAMBANG NIKEL. LUAS

    LAAN YANG DAPAT DIOLA UNTUK PENAMBANGAN ORELAAN YANG DAPAT DIOLA UNTUK PENAMBANGAN ORE

    NIKELNIKEL ".000 A.".000 A.

    CADANGAN DEPOSIT ORE NIKEL (BERCAMPUR TANA)CADANGAN DEPOSIT ORE NIKEL (BERCAMPUR TANA)

    SEBESARSEBESAR 1.30.000.000 MTON (KADAR RATARATA1.30.000.000 MTON (KADAR RATARATA1'& UP). BILA DIOLA MELALUI PABRIK SMELTER FERRO1'& UP). BILA DIOLA MELALUI PABRIK SMELTER FERRO

    NIKEL YANG TELA DIBANGUN' MAKA AKANNIKEL YANG TELA DIBANGUN' MAKA AKAN

    MENGASILKAN BI,I NIKEL (FERRO NIKEL) SEBANYAKMENGASILKAN BI,I NIKEL (FERRO NIKEL) SEBANYAK

    $4.000.000 TON.$4.000.000 TON.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    25/71

    1.$1.$ KELAYAKAN INVESTASI PROYEKKELAYAKAN INVESTASI PROYEK

    PROYEK PERTAMBANGAN NIKEL INI MEMILIKIPROYEK PERTAMBANGAN NIKEL INI MEMILIKI

    LAAN AREAL PENAMBANGAN YANG DAPAT DIOLALAAN AREAL PENAMBANGAN YANG DAPAT DIOLASELUASSELUAS 10.400 A' YANG TERDIRI DARI LAAN KP10.400 A' YANG TERDIRI DARI LAAN KP

    IUP NIKEL YANG AKAN DITAKE OVER SELUASIUP NIKEL YANG AKAN DITAKE OVER SELUAS 1.4001.400

    A. SEDANGKAN 13 PERUSAAAN TAMBANGA. SEDANGKAN 13 PERUSAAAN TAMBANG

    PEMEGANG IUP NIKEL LAINNYA YANG AKAN DAPATPEMEGANG IUP NIKEL LAINNYA YANG AKAN DAPAT

    DIKONTRAK PRODUKSI RA MATERIAL (,OINTDIKONTRAK PRODUKSI RA MATERIAL (,OINT

    OPERASIONAL) SELUASOPERASIONAL) SELUAS ".000 A DENGAN RATA".000 A DENGAN RATA

    RATA KETINGGIANRATA KETINGGIAN $0 M INGGA /0 M.$0 M INGGA /0 M.

    SEDANGKAN KEDALAMAN DAPAT MENCAPAI 10 MSEDANGKAN KEDALAMAN DAPAT MENCAPAI 10 M

    INGGA $0 M DARI KAKI GUNUNG ATAU DATARANINGGA $0 M DARI KAKI GUNUNG ATAU DATARAN

    RENDA.RENDA.

    BILA TELA PRODUKSI' YANG DIOLEDITAMBANGBILA TELA PRODUKSI' YANG DIOLEDITAMBANG

    DENGAN RATARATA KETINGGIANKEDALAMANDENGAN RATARATA KETINGGIANKEDALAMAN 1313

    M' MAKA AKAN MENGASILKAN ORE NIKELM' MAKA AKAN MENGASILKAN ORE NIKEL

    (BERCAMPUR TANA) SEBANYAK 1.3/0.000.000(BERCAMPUR TANA) SEBANYAK 1.3/0.000.000

    MMETRICK TON DENGAN KADAR ANTARA 1'$ UPMMETRICK TON DENGAN KADAR ANTARA 1'$ UP

    INGGA 3' UP ATAU RATARATA $'3" UP.INGGA 3' UP ATAU RATARATA $'3" UP.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    26/71

    KALAU LUAS LAAN KPIUP PRODUKSI NIKEL YANGKALAU LUAS LAAN KPIUP PRODUKSI NIKEL YANG

    TELA DITAKE OVER YANG DAPAT DIOLA SELUASTELA DITAKE OVER YANG DAPAT DIOLA SELUAS

    1.400 A' MAKA CADANGAN ORE NIKELNYA1.400 A' MAKA CADANGAN ORE NIKELNYA

    SEBANYAKSEBANYAK $10.000.000 METRICK TON. DAN BILA$10.000.000 METRICK TON. DAN BILAMELAKUKAN PENGIRIMAN PEN,UALAN EPORT OREMELAKUKAN PENGIRIMAN PEN,UALAN EPORT ORE

    NIKEL SEBANYAK " BULAN /00.000 MT MAKA " NIKEL SEBANYAK " BULAN /00.000 MT MAKA "

    /00.000 MT 5 3.400.000 MT' SEINGGA CADANGAN/00.000 MT 5 3.400.000 MT' SEINGGA CADANGAN

    ORE NIKEL MASI TERSISA SEBESAR $04./00.000ORE NIKEL MASI TERSISA SEBESAR $04./00.000

    METRICK TON. KALAU DIOLA DENGAN PABRIKMETRICK TON. KALAU DIOLA DENGAN PABRIKSMELTER FERRO NIKEL DENGAN KAPASITASSMELTER FERRO NIKEL DENGAN KAPASITAS

    PRODUKSI 1.000 MT PER BULAN' MAKA ,ANGKAPRODUKSI 1.000 MT PER BULAN' MAKA ,ANGKA

    AKTU PRODUKSI SELAMA $0.4/0 BULAN ATAUAKTU PRODUKSI SELAMA $0.4/0 BULAN ATAU

    1.0#3 TAUN.1.0#3 TAUN.

    PROYEK PERTAMBANGAN DAN PENGOLAAN NIKELPROYEK PERTAMBANGAN DAN PENGOLAAN NIKELINI DENGAN PABRIK FERRO NIKEL YANG TELAINI DENGAN PABRIK FERRO NIKEL YANG TELA

    DIBANGUN' AKAN MENGASILKAN CAS INFLODIBANGUN' AKAN MENGASILKAN CAS INFLO

    TAUN PERTAMA INGGA TAUN KEDUA SETELATAUN PERTAMA INGGA TAUN KEDUA SETELA

    PENGIRIMAN EPORT ORE NIKEL SEBESAR RP.PENGIRIMAN EPORT ORE NIKEL SEBESAR RP.

    1.0&0.000.000.000'1.0&0.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    27/71

    DIPERKIRAKAN DARI CADANGAN DEPOSIT OREDIPERKIRAKAN DARI CADANGAN DEPOSIT ORE

    NIKEL SEBANYAK $04./00.000 METRICK TONNIKEL SEBANYAK $04./00.000 METRICK TON

    DENGAN KADAR RATARATA $'3" UP' MAKA AKANDENGAN KADAR RATARATA $'3" UP' MAKA AKAN

    MENGASILKAN BI,I NIKEL (FERRO NIKEL)MENGASILKAN BI,I NIKEL (FERRO NIKEL)

    SEBANYAK 3$.""1'4 TON DENGAN ARGASEBANYAK 3$.""1'4 TON DENGAN ARGA

    PEN,UALAN EPORT FERRO NIKEL SEARGA USDPEN,UALAN EPORT FERRO NIKEL SEARGA USD

    4.000' PER TON' MAKA AKAN MENGASILKAN CAS4.000' PER TON' MAKA AKAN MENGASILKAN CAS

    INFLO SEBESAR USD $11."/3./00' ATAU SEBESARINFLO SEBESAR USD $11."/3./00' ATAU SEBESAR

    RP. $.11"./3/.000.000'RP. $.11"./3/.000.000'

    PROYEK PENAMBANGAN DAN PENGOLAAN PABRIKPROYEK PENAMBANGAN DAN PENGOLAAN PABRIK

    FERRO NIKEL INI DIRENCANAKAN AKAN MENYERAPFERRO NIKEL INI DIRENCANAKAN AKAN MENYERAP

    INVESTASI POKOK SEBESAR RP. &00.000.000.000'INVESTASI POKOK SEBESAR RP. &00.000.000.000'

    DITAMBA BUNGA INVESTASI SELAMA SETAUNDITAMBA BUNGA INVESTASI SELAMA SETAUN

    1&% SEBESAR RP. 144.000.000.000' DITAMBA1&% SEBESAR RP. 144.000.000.000' DITAMBA

    INFLASI INVESTASI SEBESAR RP. $&.000.000.000'INFLASI INVESTASI SEBESAR RP. $&.000.000.000'

    SEINGGA TOTAL INVESTASI DITAMBA BUNGASEINGGA TOTAL INVESTASI DITAMBA BUNGA

    INVESTASI DITAMBA INFLASI INVESTASI' YANGINVESTASI DITAMBA INFLASI INVESTASI' YANG

    AKAN DIITUNG AKIR TAUN YAKNI PADA BULANAKAN DIITUNG AKIR TAUN YAKNI PADA BULAN

    KE II SEBESAR RP. "#$.000.000.000'KE II SEBESAR RP. "#$.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    28/71

    DENGAN ASUMSI BAA PROYEK INI DALAMDENGAN ASUMSI BAA PROYEK INI DALAM

    SETAUN SUDA AKAN MAMPU MEMBERIKANSETAUN SUDA AKAN MAMPU MEMBERIKAN

    INCOME UNTUK PERUSAAAN' DENGAN CASINCOME UNTUK PERUSAAAN' DENGAN CAS

    INFLO SEBESAR RP. 1.0&0.000.000.000'INFLO SEBESAR RP. 1.0&0.000.000.000'

    ADAPUN PEN,ELASAN MENGENAI PENGGUNAANADAPUN PEN,ELASAN MENGENAI PENGGUNAAN

    DANA INVESTASI TERSEBUT AKAN DI,ELASKANDANA INVESTASI TERSEBUT AKAN DI,ELASKAN

    LEBI LAN,UT.LEBI LAN,UT.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    29/71

    1.1. BIAYA INVESTASI PROYEKBIAYA INVESTASI PROYEK1..11..1 BIAYA MODAL KER,A UNTUK INVESTASIBIAYA MODAL KER,A UNTUK INVESTASI

    AAL ADALA SEBESAR RP.AAL ADALA SEBESAR RP.100.000.000.000' YANG TERDIRI DARI 100.000.000.000' YANG TERDIRI DARI

    A.A. BIAYA PEMBEBASAN LAAN MASYARAKAT UNTUKBIAYA PEMBEBASAN LAAN MASYARAKAT UNTUK

    PENAMBANGAN 4 (EMPAT) ,ALUR SELUAS 400 APENAMBANGAN 4 (EMPAT) ,ALUR SELUAS 400 A

    5 400 RP. 40.000.000' 5 1/.000.000.000'5 400 RP. 40.000.000' 5 1/.000.000.000'

    B.B. BIAYA PEMBUATAN ,ALAN OULING KE TEMPATBIAYA PEMBUATAN ,ALAN OULING KE TEMPATPENAMBANGAN KE 4 (EMPAT) ,ALUR DARI STOCKPENAMBANGAN KE 4 (EMPAT) ,ALUR DARI STOCK

    FILE' MASINGMASING KM 6 RP. 1.000.000.000FILE' MASINGMASING KM 6 RP. 1.000.000.000

    5 RP. 4.000.000.000'5 RP. 4.000.000.000'

    C.C. MODAL KER,A UNTUK MEMPRODUKSI SEBANYAKMODAL KER,A UNTUK MEMPRODUKSI SEBANYAK

    /00.000 METRICK TON PER BULAN SEBESAR/00.000 METRICK TON PER BULAN SEBESAR/00.000 MT USD &' 5 USD 4.&00.000' ATAU RP./00.000 MT USD &' 5 USD 4.&00.000' ATAU RP.

    4& MILYARD.4& MILYARD.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    30/71

    D.D. BIAYA PEMBEBASAN LAAN LOKASIBIAYA PEMBEBASAN LAAN LOKASI

    PEMBANGUNAN PABRIK SMELTER FERRO SELUASPEMBANGUNAN PABRIK SMELTER FERRO SELUAS

    $00 A' PEMBEBASAN LAAN SERTA PENIMBUNAN$00 A' PEMBEBASAN LAAN SERTA PENIMBUNAN

    DAN LAINLAIN SEBESAR RP. 1/.000.000.000'DAN LAINLAIN SEBESAR RP. 1/.000.000.000'

    E.E. BIAYA PERSIAPAN INFRASTUKTUR LAIN SEPERTIBIAYA PERSIAPAN INFRASTUKTUR LAIN SEPERTI

    LISTRIK' TANGKI BBM' BASE CAMP'LISTRIK' TANGKI BBM' BASE CAMP'

    PEMBANGUNAN GEDUNG LABORATORIUM U,IPEMBANGUNAN GEDUNG LABORATORIUM U,I

    SAMPEL DAN LAINLAIN SEBESAR RP.SAMPEL DAN LAINLAIN SEBESAR RP.

    1/.000.000.000'1/.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    31/71

    1..$1..$ BIAYA INVESTASI UNTUK MEMBANGUNBIAYA INVESTASI UNTUK MEMBANGUN

    PABRIK ORE NIKEL (SMELTER) DENGAN MESINPABRIK ORE NIKEL (SMELTER) DENGAN MESIN

    INDUK DAN MESIN PEMBANTU BESERTAINDUK DAN MESIN PEMBANTU BESERTA

    PERLENGKAPANNYA' SEBESAR RP.PERLENGKAPANNYA' SEBESAR RP./00.000.000.000' YANG TERDIRI DARI /00.000.000.000' YANG TERDIRI DARI

    A.A. MESIN INDUK UNTUK PRODUKS LENGKAP' DENGANMESIN INDUK UNTUK PRODUKS LENGKAP' DENGAN

    KAPASITAS 10.000 METRICK TON PER BULAN.KAPASITAS 10.000 METRICK TON PER BULAN.

    B.B. MESIN PEMBANTU DAN PERLENGKAPAN PRODUKSIMESIN PEMBANTU DAN PERLENGKAPAN PRODUKSI

    LAINNYA.LAINNYA.

    C.C. TUNGKU PEMBAKARANNYA DAN UTILITIESTUNGKU PEMBAKARANNYA DAN UTILITIES

    LAINNYA (FORKLIFT' DUMPTRUCK' DOSER' MESINLAINNYA (FORKLIFT' DUMPTRUCK' DOSER' MESIN

    GENSET' DLL).GENSET' DLL).

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    32/71

    1.41.4 BUNGA INVESTASIBUNGA INVESTASI1.4.11.4.1 TOTAL MODAL KER,A DAN MODAL INVESTASI SEBESARTOTAL MODAL KER,A DAN MODAL INVESTASI SEBESAR

    RP. &00.000.000.000'RP. &00.000.000.000'

    1.4.$1.4.$ BUNGA INVESTASI SEBESAR 1&% PER TAUN ,ADIBUNGA INVESTASI SEBESAR 1&% PER TAUN ,ADI

    BUNGA INVESTASI 5 1&% RP. &00.000.000.000 5 RP.BUNGA INVESTASI 5 1&% RP. &00.000.000.000 5 RP.

    144.000.000.000'144.000.000.000'

    1.31.3 INFLASI INVESTASIINFLASI INVESTASITINGKAT INFLASI INVESTASI YANG DIUKUR SECARATINGKAT INFLASI INVESTASI YANG DIUKUR SECARA

    FLAT SELAMA $ TAUN BERADA PADA ANGKA #% MAKAFLAT SELAMA $ TAUN BERADA PADA ANGKA #% MAKA

    DAPAT DIITUNG SEBAGAI BERIKUT DAPAT DIITUNG SEBAGAI BERIKUT

    TAHUNN

    INVESTASIXINFLASITINGKAT

    TAHUN2

    0.000800.000.00RP.X7%=

    .000,-28.000.000RP.=

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    33/71

    II.II. ANALISA FINANSIALANALISA FINANSIAL$.1$.1 BIAYA OPERASIONAL INVESTAS (CAS OUTFLO)BIAYA OPERASIONAL INVESTAS (CAS OUTFLO)

    PADA BULAN I SD BULAN IIIPADA BULAN I SD BULAN III

    $.1.1$.1.1 BIAYA OPERASIONAL MODAL KER,A UNTUKBIAYA OPERASIONAL MODAL KER,A UNTUKMEMPERODUKSI ORE NIKEL SEBANYAK /00.000MEMPERODUKSI ORE NIKEL SEBANYAK /00.000

    MT USD & 5 USD 4.&00.000 5 RP.MT USD & 5 USD 4.&00.000 5 RP.

    4&.000.000.000'4&.000.000.000'

    $.1.$$.1.$ BIAYA PEMBEBASAN LAAN MASYARAKAT SELUASBIAYA PEMBEBASAN LAAN MASYARAKAT SELUAS

    400 A 5 400 RP. 40.000.000 5 RP.400 A 5 400 RP. 40.000.000 5 RP.

    1/.000.000.000'1/.000.000.000'

    $.1.$.1. BIAYA PEMBUATAN ,ALAN OULING KE TEMPATBIAYA PEMBUATAN ,ALAN OULING KE TEMPAT

    PENAMBANGAN 4 (EMPAT) CABANG DARIPENAMBANGAN 4 (EMPAT) CABANG DARI

    STOCKFILE' MASINGMASING 6 KM 5 4 RP.STOCKFILE' MASINGMASING 6 KM 5 4 RP.

    1.000.000.000 5 RP. 4.000.000.000'1.000.000.000 5 RP. 4.000.000.000'

    $.1.4$.1.4 BIAYA PEMBEBASAN LAANBIAYA PEMBEBASAN LAAN $00 A SERTA BIAYA$00 A SERTA BIAYAPENIMBUNAN DLL SEBESAR RP. 1/.000.000.000'PENIMBUNAN DLL SEBESAR RP. 1/.000.000.000'

    $.1.3$.1.3 BIAYA INVESTGASI PEMBELIAN LAANLAAN KPBIAYA INVESTGASI PEMBELIAN LAANLAAN KP

    IUP PRODUKSI NIKEL (TAKE OVER) SEBANYAK 3IUP PRODUKSI NIKEL (TAKE OVER) SEBANYAK 3

    (LIMA) PERUSAAAN PEMEGANG IUP PRODUKSI'(LIMA) PERUSAAAN PEMEGANG IUP PRODUKSI'

    SEBESAR RP. 100.000.000.000'SEBESAR RP. 100.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    34/71

    $.1./$.1./BIAYA OPERASIONAL PEMBANGUNAN SARANA DANBIAYA OPERASIONAL PEMBANGUNAN SARANA DAN

    PRASARANA INFRASTRUKTUR LAINNYA SEBESARPRASARANA INFRASTRUKTUR LAINNYA SEBESAR

    RP. 1/.000.000.000'RP. 1/.000.000.000'

    TOTAL INVESTASI DAN MODAL KER,A (OUT CASTOTAL INVESTASI DAN MODAL KER,A (OUT CASFLO) PADA BULAN I SD BULAN KE III SEBESARFLO) PADA BULAN I SD BULAN KE III SEBESAR

    RP. $00.000.000.000'RP. $00.000.000.000'

    CAS OUTFLO PADA BULAN KE IV SEBESAR RP.CAS OUTFLO PADA BULAN KE IV SEBESAR RP.

    1&0.000.000.000' ADALA UNTUK MEMBAYAR1&0.000.000.000' ADALA UNTUK MEMBAYAR

    DON PAYMENT (DP 0%) PEMBANGUNANDON PAYMENT (DP 0%) PEMBANGUNANPABRIK SMELTER FERRO NIKEL.PABRIK SMELTER FERRO NIKEL.

    - CAS OUTFLO PADA BULAN KE VIII SEBESAR RP.CAS OUTFLO PADA BULAN KE VIII SEBESAR RP.

    $10.000.000.000' (3% RP. /00 MILYARD)$10.000.000.000' (3% RP. /00 MILYARD)

    LAN,UTAN PEMBAYARAN KONTRAK PEMBANGUNANLAN,UTAN PEMBAYARAN KONTRAK PEMBANGUNAN

    PABRIK SMELTER FERRO NIKEL TAAP KE II.PABRIK SMELTER FERRO NIKEL TAAP KE II.

    CAS OUTFLO PADA BULAN KE II SEBESAR RP.CAS OUTFLO PADA BULAN KE II SEBESAR RP.

    $10.000.000.000' (3% RP. /00 MILYARD)$10.000.000.000' (3% RP. /00 MILYARD)

    LAN,UTAN PEMBAYARAN KONTRAK PEMBANGUNANLAN,UTAN PEMBAYARAN KONTRAK PEMBANGUNAN

    PABRIK SMELTER FERRO NIKEL TAAP KE III.PABRIK SMELTER FERRO NIKEL TAAP KE III.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    35/71

    A.A. TOTAL AS OUTFLO PADA BULAN I SD BULAN KETOTAL AS OUTFLO PADA BULAN I SD BULAN KE

    II SEBESAR RP. &00.000.000.000'II SEBESAR RP. &00.000.000.000'

    B.B. BUNGA INVESTASI AKIR TAUN (1&% PER TAUN)BUNGA INVESTASI AKIR TAUN (1&% PER TAUN)

    SEBESAR RP. 144.000.000.000'SEBESAR RP. 144.000.000.000'

    C.C. INFLASI INVESTASI AKIR TAUN (#% DALAM $INFLASI INVESTASI AKIR TAUN (#% DALAM $

    TAUN) SEBESAR RP. $&.000.000.000'TAUN) SEBESAR RP. $&.000.000.000'

    AKIR TAUN' TOTAL INVESTASI AKAN DIITUNGAKIR TAUN' TOTAL INVESTASI AKAN DIITUNG

    (INVESTASI ! BUNGA ! INFLAS) SEBESAR RP.(INVESTASI ! BUNGA ! INFLAS) SEBESAR RP.

    "#$.000.000.000'"#$.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    36/71

    $.$$.$ PEMASUKAN PROYEK (CAS INFLO)PEMASUKAN PROYEK (CAS INFLO)$.$.1$.$.1 CAS INFLO TAUN I (BULAN KE IV SD BULAN KECAS INFLO TAUN I (BULAN KE IV SD BULAN KE

    II 5 " BULAN)' YAKNI II 5 " BULAN)' YAKNI

    PENDAPATAN BERSI (NETTO PROFIT) PER BULANPENDAPATAN BERSI (NETTO PROFIT) PER BULAN

    5 /00.000 MT USD $0 5 USD 1$.000.000' ATAU5 /00.000 MT USD $0 5 USD 1$.000.000' ATAUSEBESAR RP. 1$0.000.000.000'SEBESAR RP. 1$0.000.000.000'

    PENDAPATAN BERSI (NETTO PROFIT) AKIRPENDAPATAN BERSI (NETTO PROFIT) AKIR

    TAUN 5 " BULAN RP. 1$0.000.000.000 5 RP.TAUN 5 " BULAN RP. 1$0.000.000.000 5 RP.

    1.0&0.000.000.000'1.0&0.000.000.000'

    $.$.$$.$.$ CAS INFLO TAUN KE II (DUA).CAS INFLO TAUN KE II (DUA).NIIL. KARENA BERDASARKAN PERMEN MINERBANIIL. KARENA BERDASARKAN PERMEN MINERBA

    NO. # TAUN $01$ TENTANG PELARANGAN EPORTNO. # TAUN $01$ TENTANG PELARANGAN EPORT

    NIKEL' ARUS DIOLA MELALUI PABRIK (SMELTER)NIKEL' ARUS DIOLA MELALUI PABRIK (SMELTER)

    MEN,ADI FERRO NIKEL.MEN,ADI FERRO NIKEL.

    $.$.$.$. CAS INFLO TAUN KE III (TIGA) DANCAS INFLO TAUN KE III (TIGA) DAN

    SETERUSNYA INGGA 0 TAUN KE DEPAN.SETERUSNYA INGGA 0 TAUN KE DEPAN.

    KAPASITAS PRODUKSI SEBANYA 10.000 TON NIKELKAPASITAS PRODUKSI SEBANYA 10.000 TON NIKEL

    PER BULAN. ARGA PEN,UALAN EPORT FEEROPER BULAN. ARGA PEN,UALAN EPORT FEERO

    NIKEL SEARGA USD 4.000' PER TON 5 10.000 TONNIKEL SEARGA USD 4.000' PER TON 5 10.000 TON

    USD 4.000 5 USD 40.000.000 PER BULAN ATAU USD 4.000 5 USD 40.000.000 PER BULAN ATAU

    USD 4&0.000.000 PER TAUNUSD 4&0.000.000 PER TAUN

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    37/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    38/71

    .1.1 NPV (NET PRESENT VALUE)NPV (NET PRESENT VALUE)BERDASARAN METODE NPV DAPAT DITEMUKANBERDASARAN METODE NPV DAPAT DITEMUKAN

    ASIL SEBAGAI BERIKUT ASIL SEBAGAI BERIKUT

    X%INFLASIBUNGAINVESTASI

    ITAHUNFLOWCASHNETNPV

    ++

    =

    X%

    .00072.000.00010.000800.000.00

    0.000972.000.00-000.0001.080.000.NPV

    +

    =

    X%.00072.000.0009

    0.000108.000.00NPV =

    %11.11NPV =

    MAKA DAPAT DITARIK KESIMPULAN BAA PROYEMAKA DAPAT DITARIK KESIMPULAN BAA PROYE

    INI MEMILIKI NPV POSITIF BERARTI PROYEK INIINI MEMILIKI NPV POSITIF BERARTI PROYEK INI

    DAPAT DILAN,UTKAN KARENA DAPAT MEMBERIKANDAPAT DILAN,UTKAN KARENA DAPAT MEMBERIKAN

    KEUNTUNGAN BESAR BAGI PERUSAAAN.KEUNTUNGAN BESAR BAGI PERUSAAAN.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    39/71

    .$.$ IRR (INTERNAL RATE OF RETURN)IRR (INTERNAL RATE OF RETURN)DENGAN MENGGUNAKAN METODE IRR ASILNYADENGAN MENGGUNAKAN METODE IRR ASILNYA

    DAPAT DITEMUKAN SEBAGAI BERIKUT DAPAT DITEMUKAN SEBAGAI BERIKUT

    AL INI BERARTI NILAI IRR MENUN,UKKANAL INI BERARTI NILAI IRR MENUN,UKKAN

    PROSENTASE LEBI BESAR DARI OPERASIONAL'PROSENTASE LEBI BESAR DARI OPERASIONAL'

    SEINGGA DAPAT DIKATAKAN MAMPU UNTUKSEINGGA DAPAT DIKATAKAN MAMPU UNTUK

    MEMENUI INFLASI' BUNGA DAN OPERASIONAL'MEMENUI INFLASI' BUNGA DAN OPERASIONAL'

    SEINGGA PROYEK INI DAPAT DIKATAKAN LAYAKSEINGGA PROYEK INI DAPAT DIKATAKAN LAYAK

    UNTUK DILAKSANAKAN.UNTUK DILAKSANAKAN.

    100%XINVESTASIBUNGANPVIRR=

    100%X

    0.000172.000.00

    0.000108.000.00IRR=

    %79,2IRR=

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    40/71

    .. PAYBACK PERIODPAYBACK PERIOD

    DENGAN MENGGUNAKAN METODE PAYBACKDENGAN MENGGUNAKAN METODE PAYBACK

    PERIOD YAKNI MASA (AKTU) YANG DIPERLUKANPERIOD YAKNI MASA (AKTU) YANG DIPERLUKAN

    UNTUK MENGEMBALIKAN INVESTASI YANGUNTUK MENGEMBALIKAN INVESTASI YANG

    DITANAMKAN' BAIK UNTUK MEMBANGUN MAUPUNDITANAMKAN' BAIK UNTUK MEMBANGUN MAUPUN

    MEN,ALANKAN KEGIATANKEGIATANMEN,ALANKAN KEGIATANKEGIATAN

    OPERASIONAL PRODUKSI SELAMA UMUR PROYEK'OPERASIONAL PRODUKSI SELAMA UMUR PROYEK'

    MAKA DITEMUKAN ASIL SEBAGAI BERIKUT MAKA DITEMUKAN ASIL SEBAGAI BERIKUT

    1)1) PADA TAUN PERTAMA (KE1) YAKNI PADA BULANPADA TAUN PERTAMA (KE1) YAKNI PADA BULAN

    KE1 SD KE' MENGELUARKAN BIAYA INVESTASIKE1 SD KE' MENGELUARKAN BIAYA INVESTASI

    SEBESAR RP. $00.000.000.000' BULAN KE4 DANSEBESAR RP. $00.000.000.000' BULAN KE4 DAN

    SETERUSNYA MENGELUARKAN BIAYA INVESTASISETERUSNYA MENGELUARKAN BIAYA INVESTASI

    UNTUK PEMBANGUNAN PABRIK FERRO NIKELUNTUK PEMBANGUNAN PABRIK FERRO NIKEL

    SEBESAR RP. 400.000.000.000' AKIR TAUNSEBESAR RP. 400.000.000.000' AKIR TAUN

    PERTAMA (KE1)' DIPERITUNGKAN BIAYA BUNGAPERTAMA (KE1)' DIPERITUNGKAN BIAYA BUNGA

    DITAMBA BIAYA INFLASI SEBESAR RP.DITAMBA BIAYA INFLASI SEBESAR RP.

    1#$.000.000.000' SEINGGA TOTAL BIAYA1#$.000.000.000' SEINGGA TOTAL BIAYA

    INVESTASI SEBESAR RP. "#$.000.000.000'INVESTASI SEBESAR RP. "#$.000.000.000'

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    41/71

    $)$) PADA TAUN PERTAMA (KE1) YAKNI PADA BULANPADA TAUN PERTAMA (KE1) YAKNI PADA BULAN

    KE4 SD BULAN KE1$' DAPAT MENGASILKAN CASKE4 SD BULAN KE1$' DAPAT MENGASILKAN CAS

    INFLO SEBESAR RP. 1.0&0.000.000.000'INFLO SEBESAR RP. 1.0&0.000.000.000'

    )) TAUN PERTAMA PENDAPATAN BERSI SEBELUMTAUN PERTAMA PENDAPATAN BERSI SEBELUMPA,AK (NET BENEFIT) SEBESAR RP.PA,AK (NET BENEFIT) SEBESAR RP.

    1.0&0.000.000.000' MAKA KEUNTUNGAN ABSOLUT1.0&0.000.000.000' MAKA KEUNTUNGAN ABSOLUT

    (TOTAL PROFIT) SEBESAR RP. 10&.000.000.000'(TOTAL PROFIT) SEBESAR RP. 10&.000.000.000'

    MAKA MAKA

    PAYBACK PERIOD 5 0'11 ATAU 11 BULAN DENGANPAYBACK PERIOD 5 0'11 ATAU 11 BULAN DENGAN

    KATA LAIN SETELA &'1 KALI MELAKUKANKATA LAIN SETELA &'1 KALI MELAKUKANPENGIRIMAN EPORT ORE NIKEL' YAKNI PADA BULANPENGIRIMAN EPORT ORE NIKEL' YAKNI PADA BULAN

    KE11' TERMASUK MASA PERSIAPAN OPERASIKE11' TERMASUK MASA PERSIAPAN OPERASI

    INVESTASI SELAMAINVESTASI SELAMA BULAN. SEINGGA PAYBACK BULAN. SEINGGA PAYBACK

    PERIODNYA 11 BULAN 11 ARI. AL INI DAPATPERIODNYA 11 BULAN 11 ARI. AL INI DAPAT

    DIKATAKAN LEBI PENDEK DARI UMUR PROYEK.DIKATAKAN LEBI PENDEK DARI UMUR PROYEK.

    100%X000.000.000.972

    0.000108.000.00PERIO!PA"BACK =

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    42/71

    .4.4 BENEFIT COST RATIOBENEFIT COST RATIOBENEFIT COST RATIO' DIGUNAKAN SEBAGAI UKURANBENEFIT COST RATIO' DIGUNAKAN SEBAGAI UKURAN

    DARI PENILAIAN SUATU KELAYAKAN PEKER,AANDARI PENILAIAN SUATU KELAYAKAN PEKER,AAN

    PROYEK. DENGAN METODE BCR' ,IKA BCR > 1' MAKAPROYEK. DENGAN METODE BCR' ,IKA BCR > 1' MAKAPEKER,AAN PROYEK TERSEBUT LAYAK UNTUKPEKER,AAN PROYEK TERSEBUT LAYAK UNTUK

    DILAKSANAKAN.DILAKSANAKAN.

    UNTUK MENGITUNG BENEFIT COST RATIO DAPATUNTUK MENGITUNG BENEFIT COST RATIO DAPAT

    DIKETAUI SEBAGAI BERIKUT DIKETAUI SEBAGAI BERIKUT

    DARI PERITUNGAN TERSEBUT DI ATAS' MAKA PROYEKDARI PERITUNGAN TERSEBUT DI ATAS' MAKA PROYEK

    INVESTASI PENAMBANGAN DAN PENGOLAAN NIKELINVESTASI PENAMBANGAN DAN PENGOLAAN NIKEL

    INI' DAPAT DIANGGAP LAYAK UNTUK DIKER,AKAN'INI' DAPAT DIANGGAP LAYAK UNTUK DIKER,AKAN'

    KARENA ASILNYA MENUN,UKAN ANGKA BENEFIT COSTKARENA ASILNYA MENUN,UKAN ANGKA BENEFIT COST

    RATIO > 1.RATIO > 1.

    !ISCOUNTE!COSTTOTAL

    !ISCOUNTE!BENEFITGROSTOTAL

    OUTFLOW

    INFLOWRATIOCOSTBENEFIT ==

    0.000972.000.00

    000.0001.080.000.RATIOCOSTBENEFIT =

    1,11RATIOCOSTBENEFIT =

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    43/71

    ASIL PERITUNGAN ANALISIS FINANCIAL SECARAASIL PERITUNGAN ANALISIS FINANCIAL SECARA

    RINGKAS DAPAT DIURAIKAN SEBAGAI BERIKUT RINGKAS DAPAT DIURAIKAN SEBAGAI BERIKUT

    BERDASARKAN ASIL ANALISIS KELAYAKAN INVESTASIBERDASARKAN ASIL ANALISIS KELAYAKAN INVESTASI

    EKONOMIS' MAKA DAPAT DIKATAKAN LAYAK UNTUKEKONOMIS' MAKA DAPAT DIKATAKAN LAYAK UNTUK

    DIKER,AKAN' DAN DAPAT MEN,AN,IKAN UNTUK MEMBERIKANDIKER,AKAN' DAN DAPAT MEN,AN,IKAN UNTUK MEMBERIKAN

    KEUNTUNGAN YANG LEBI BESAR BAGI PERUSAAANKEUNTUNGAN YANG LEBI BESAR BAGI PERUSAAAN

    NONO ANALISISANALISISFINANSIALFINANSIAL

    NILAINILAI KETERANGANKETERANGAN

    1.1. NPVNPV RP. 10&.000.000.000RP. 10&.000.000.000

    ATAU 11'11%ATAU 11'11%LAYAKLAYAK

    $.$. IRRIRR /$'#"%/$'#"% LAYAKLAYAK

    .. PAYBACK PERIODPAYBACK PERIOD 11 BULAN 11 ARI11 BULAN 11 ARI LAYAKLAYAK

    4.4. BENEFIT COSTBENEFIT COST

    RATIO (BCR)RATIO (BCR)1'111'11 LAYAKLAYAK

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    44/71

    .3.3 ANALISIS RESIKOANALISIS RESIKO

    UNTUK MENGETAUI SKEMA RESIKO DARI PROYEKUNTUK MENGETAUI SKEMA RESIKO DARI PROYEKINI DENGAN MENGGUNAKAN STUDI KELAYAKANINI DENGAN MENGGUNAKAN STUDI KELAYAKAN

    MUNCUL EMPAT SKEMA RESIKO YANG DAPATMUNCUL EMPAT SKEMA RESIKO YANG DAPAT

    DI,ADIKAN ACUAN UNTUK MENGINDARIDI,ADIKAN ACUAN UNTUK MENGINDARI

    KERUGIAN DALAM PROSES PRODUKSI PROYEK INI.KERUGIAN DALAM PROSES PRODUKSI PROYEK INI.

    BERDASARKAN PROBABILITAS YANG DIGUNAKANBERDASARKAN PROBABILITAS YANG DIGUNAKAN

    MEMUNCULKAN SKENARIO PADA KISARAN $3%'MEMUNCULKAN SKENARIO PADA KISARAN $3%'

    30%' #3% DAN 100%' DIMANA KEEMPAT30%' #3% DAN 100%' DIMANA KEEMPAT

    SKENARIO INI BERPENGARUI PADA CASSKENARIO INI BERPENGARUI PADA CAS

    INFLO YANG DIDASARI DARI PERITUNGANINFLO YANG DIDASARI DARI PERITUNGAN

    KEUNTUNGAN PER TAUN.KEUNTUNGAN PER TAUN.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    45/71

    KESIMPULAN DAN SARANKESIMPULAN DAN SARAN

    A.A. KESIMPULAN KESIMPULAN

    SEBAGAI KESIMULAN DARI ANALISIS KELAYAKAN INVESTASISEBAGAI KESIMULAN DARI ANALISIS KELAYAKAN INVESTASIPENAMBANGAN ORE NIKEL DAN PEMBANGUNAN PABRIK (SMELTER)PENAMBANGAN ORE NIKEL DAN PEMBANGUNAN PABRIK (SMELTER)

    FERRO NIKEL' BEKER,ASAMA ANTARA PT. SANGIA KABAENAFERRO NIKEL' BEKER,ASAMA ANTARA PT. SANGIA KABAENA

    PERKASA' SEBAGAI ONER' DENGAN PERUSAAAN FUNDERS YANGPERKASA' SEBAGAI ONER' DENGAN PERUSAAAN FUNDERS YANG

    BERTINDAK SEBAGAI FINANCE' ADALA SEBAGAI BERIKUT BERTINDAK SEBAGAI FINANCE' ADALA SEBAGAI BERIKUT

    1.1. BIAYA INVESTASI AAL SEBAGAI MODAL KER,A UNTUKBIAYA INVESTASI AAL SEBAGAI MODAL KER,A UNTUK

    MELAKUKAN PENAMBANGAN DENGAN MEMPRODUKSI ORE NIKELMELAKUKAN PENAMBANGAN DENGAN MEMPRODUKSI ORE NIKELSEBANYAKSEBANYAK /00.000 MT PER BULAN SERTA PEMBEBASAN LAAN/00.000 MT PER BULAN SERTA PEMBEBASAN LAAN

    MASYARAKATULAYATMASYARAKATULAYAT $00 A UNTUK PERSIAPAN PEMBANGUNAN$00 A UNTUK PERSIAPAN PEMBANGUNAN

    PABRIK (SMELTER) FERRO NIKEL SEBESARPABRIK (SMELTER) FERRO NIKEL SEBESAR RP. 100 M.RP. 100 M.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    46/71

    $. BIAYA PEMBELIAN LAANLAAN KPIUPPRODUKSI NIKEL YANG BERLOKASI DI PULAUKABAENA SEBANYAK 3 (LIMA) PERUSAAAN

    TAMBANG NIKEL 6 RP. $0 MILYARD 5 3 6 RP. $0MILYARD 5 RP. 100 MILYARD.

    . BIAYA UNTUK PIAK KETIGA (KONTRAKTOR)PEMBANGUNAN PABRIK ORE NIKEL (SMELTER)FERRO NIKEL MEN,ADI SPONGE FeNi > 4% Ni

    DENGAN KAPASITAS PRODUKSI 10.000 TON PERBULAN SEBESAR RP. /00 MILYARD.

    4. INVESTASI AAL SEBESAR RP. &00 MILYARD'DITAMBA BUNGA MODAL SEBESAR RP. 144MILYARD' DITAMBA INFLASI INVESTASI SEBESARRP. $& MILYARD' MAKA TOTAL INVESTASI SEBESARRP. "#$ MILYARD.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    47/71

    3. PEMASUKAN PROYEK (CAS INFLO) PADATAUN PERTAMA SEBESAR RP.1.0&0.000.000.000' SEINGGA PAYBACK PERIOD

    PROYEK INI CUMA 11 BULAN 11 ARI.

    PADA TAUN KEIII ($014)' DENGAN SELESAINYAPEMBANGUNAN PABRIK (SMELTER) FERRO NIKEL'DENGAN KAPASITAS PRODUKSI 10.000 TON PERBULAN' MAKA AKAN MENGASILKAN CAS

    INFLO (KAS MASUK) SEBESAR 10.000 TON USD4.000 5 USD 40.000.000 ATAU SEBESAR RP. 400MILYARD PER BULAN ATAU SEBESAR RP. 4'&

    TRILLIUN PER TAUN.

    /. LUAS LAAN KPIUP PRODUKSI NIKEL YANG TELA

    DITAKE OVER DAN YANG DAPAT DIOLADITAMBANGSEKITAR 0% DARI TOTAL LUASNYA 5 1.400 A.CADANGAN DEPOSIT ORE NIKEL (BERCAMPUR TANA)SEBANYAK $10.000.000 METRICK TON DENGAN KADAR1'$ UP SD 3' UP ATAU RATARATA $'3" UP.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    48/71

    #.#. BILA DIOLA MELALUI PABRIK ORE NIKEL (SMELTER)BILA DIOLA MELALUI PABRIK ORE NIKEL (SMELTER)MEN,ADI FERRO NIKEL (SPONGE FeNi > 4% NI' MAKAMEN,ADI FERRO NIKEL (SPONGE FeNi > 4% NI' MAKAAKAN MENGASILKAN SEBANYAK 3".3#0.000 TON'AKAN MENGASILKAN SEBANYAK 3".3#0.000 TON'DENGAN ARGA PEN,UALAN EPORT USD 4.000 PER TON'DENGAN ARGA PEN,UALAN EPORT USD 4.000 PER TON'MAKA AKAN MENGASILKAN CAS INFLO SEBESAR USDMAKA AKAN MENGASILKAN CAS INFLO SEBESAR USD

    $&.$&0.000.000' DALAM ,ANGKA AKTU SELAMA$&.$&0.000.000' DALAM ,ANGKA AKTU SELAMA$0.4/0 BULAN ATAU 1.#03 TAUN' BILA KAPAISTAS$0.4/0 BULAN ATAU 1.#03 TAUN' BILA KAPAISTASPRODUKSI 10.000 TON PER BULAN DENGAN CADANGANPRODUKSI 10.000 TON PER BULAN DENGAN CADANGANDEPOSIT YANG TERSEDIA.DEPOSIT YANG TERSEDIA.

    &.&. SISTEM KER,ASAMANYA ADALA KEMITRAAN YANGSISTEM KER,ASAMANYA ADALA KEMITRAAN YANGSAMASAMA MEMILIKI 7CIENCE OF BELONGING8 DANSAMASAMA MEMILIKI 7CIENCE OF BELONGING8 DAN7CIENCE OF ACCOUNTABILITY8. UNTUK ITU STRUKTUR7CIENCE OF ACCOUNTABILITY8. UNTUK ITU STRUKTURDAN PEMEGANG SAAM DI PERUSAAAN PT. SANGIADAN PEMEGANG SAAM DI PERUSAAAN PT. SANGIAKABAENA PERKASA AKAN DINOTARISKAN KEMBALIKABAENA PERKASA AKAN DINOTARISKAN KEMBALIMEN,ADI MEN,ADI

    A.A. PIAK FUNDER PT. AKAN BERDINTAK SEBAGAIPIAK FUNDER PT. AKAN BERDINTAK SEBAGAIKOMISARIS UTAMA DAN DIREKTUR FINANCE (MEMEGANGKOMISARIS UTAMA DAN DIREKTUR FINANCE (MEMEGANGSENDIRI KEUANGAN PERUSAAAN) KOMPOSISI SAAMSENDIRI KEUANGAN PERUSAAAN) KOMPOSISI SAAMSEBESAR /0% (ENAM PULU PERSERATUR)' YAKNI /0%SEBESAR /0% (ENAM PULU PERSERATUR)' YAKNI /0% NETTO PROFIT' SETELA EARNING AFTER TA (EAT). NETTO PROFIT' SETELA EARNING AFTER TA (EAT).

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    49/71

    B.B. PIAK KONSULTAN FUNDER BERSAMA INTERNALPIAK KONSULTAN FUNDER BERSAMA INTERNAL

    AUDIT DARI AKUNTAN PUBLIK YAKNI PT. ' AKANAUDIT DARI AKUNTAN PUBLIK YAKNI PT. ' AKAN

    BERTINDAK SEBAGAI KONSULTAN FINANCING DANBERTINDAK SEBAGAI KONSULTAN FINANCING DANINTERNAL AUDITOR' DENGAN KOMPOSISI SAAMINTERNAL AUDITOR' DENGAN KOMPOSISI SAAM

    SEBESAR 10% (SEPULU PER SERATUS) YAKNI 10%SEBESAR 10% (SEPULU PER SERATUS) YAKNI 10%

    NETTO PROFIT SETELA EARNING AFTER TA (EAT). NETTO PROFIT SETELA EARNING AFTER TA (EAT).

    C.C. PIAK ONER PT. SANGIA KABAENA PERKASA AKANPIAK ONER PT. SANGIA KABAENA PERKASA AKAN

    BERTINDAK SEBAGAI DIREKTUR UTAMA' DIREKTURBERTINDAK SEBAGAI DIREKTUR UTAMA' DIREKTUROPERASIONALPRODUKSI' DIREKTUR ADMINISTRASIOPERASIONALPRODUKSI' DIREKTUR ADMINISTRASI

    UMUM DAN KEKARYAAN SERTA KOMISARIS' DENGANUMUM DAN KEKARYAAN SERTA KOMISARIS' DENGAN

    TUGAS MEN,ALANKAN MANA,EMEN DAN OPERASITUGAS MEN,ALANKAN MANA,EMEN DAN OPERASI

    PRODUKSI SERTA TERBANGUN DENGAN MASYARAKATPRODUKSI SERTA TERBANGUN DENGAN MASYARAKAT

    DAN PEMERINTA KABUPATEN DAN PROVINSIDAN PEMERINTA KABUPATEN DAN PROVINSIDENGAN KOMPOSISI SAAM SEBESAR 0% (TIGADENGAN KOMPOSISI SAAM SEBESAR 0% (TIGA

    PULU PER SERATUS) YAKNI 0% NETTO PROFITPULU PER SERATUS) YAKNI 0% NETTO PROFIT

    SETELA EARNING AFTER TA (EAT).SETELA EARNING AFTER TA (EAT).

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    50/71

    ".". SISTEM PENGELOLAAN DANA (ANGGARAN BIAYA)SISTEM PENGELOLAAN DANA (ANGGARAN BIAYA)ADALA 7TRANSPARAN8 ATAU 7OPEN BOOK8.ADALA 7TRANSPARAN8 ATAU 7OPEN BOOK8.

    CARA PENGELOLAANNYA ADALA CARA PENGELOLAANNYA ADALA

    PIAK DEAN DIREKSI PT. SANGIA KABAENAPIAK DEAN DIREKSI PT. SANGIA KABAENAPERKASA' MENGA,UKAN RANCANGAN ANGGARANPERKASA' MENGA,UKAN RANCANGAN ANGGARANBIAYA OPERASIONAL PRODUKSI DAN LAINLAIN'BIAYA OPERASIONAL PRODUKSI DAN LAINLAIN'KEPADA PIAK FUNDER SEBAGAI KOMISARISKEPADA PIAK FUNDER SEBAGAI KOMISARISUTAMA DAN DIREKTUR FINANCE SETELA KEDUAUTAMA DAN DIREKTUR FINANCE SETELA KEDUABELA PIAK DISEPAKATI' MAKA DI,ALANKANBELA PIAK DISEPAKATI' MAKA DI,ALANKAN

    SECARA TRANSPARANSI DAN OPEN BOOK.SECARA TRANSPARANSI DAN OPEN BOOK. BIAYA OPERASIONAL' PEMBEBASAN LAAN'BIAYA OPERASIONAL' PEMBEBASAN LAAN'MODAL KER,A UNTUK MEMPRODUKSI SEBANYAKMODAL KER,A UNTUK MEMPRODUKSI SEBANYAK/00.000 METRICK TON DAN LAINLAIN SEBESAR/00.000 METRICK TON DAN LAINLAIN SEBESARRP. 100 MILYARD.RP. 100 MILYARD.

    DAN BIAYA PEMBELIAN LAAN KPIUP PRODUKSIDAN BIAYA PEMBELIAN LAAN KPIUP PRODUKSI

    (TAKE OVER) SEBANYAK 3 (LIMA) PERUSAAAN(TAKE OVER) SEBANYAK 3 (LIMA) PERUSAAANTAMBANG' ADALA SEBESAR RP. 100 MILYARD.TAMBANG' ADALA SEBESAR RP. 100 MILYARD.

    TOTAL DANA PEMBIAYAAN DAN MODAL KER,ATOTAL DANA PEMBIAYAAN DAN MODAL KER,AYANG AKAN DIKELOLA OLE PT. SANGIA KABAENAYANG AKAN DIKELOLA OLE PT. SANGIA KABAENAPERKASA SEBESAR RP. $00 MILYARD.PERKASA SEBESAR RP. $00 MILYARD.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    51/71

    SEDANG DANA PEMBIAYAAN UNTUK PEMBANGUNANSEDANG DANA PEMBIAYAAN UNTUK PEMBANGUNANPABRIK (SMELTER) FERRO NIKEL) SPONGE FeNi >PABRIK (SMELTER) FERRO NIKEL) SPONGE FeNi >40% Ni' SEBESAR RP. /00 MILYARD AKAN DIKELOLA40% Ni' SEBESAR RP. /00 MILYARD AKAN DIKELOLAMANA,EMEN TERSENDIRI OLE PIAK FUNDERMANA,EMEN TERSENDIRI OLE PIAK FUNDER

    YAKNI PT. DENGAN KONTRAKTOR PABRIK DARIYAKNI PT. DENGAN KONTRAKTOR PABRIK DARICINA.CINA.

    10.10.DENGAN KEMAMPUAN PT. SANGIA KABAENA PERKASADENGAN KEMAMPUAN PT. SANGIA KABAENA PERKASAMEMBANGUN PABRIK FERRO NIKEL (SMELTER)MEMBANGUN PABRIK FERRO NIKEL (SMELTER)MEN,ADI SPONGE FeNi > 40% Ni' MAKA AKANMEN,ADI SPONGE FeNi > 40% Ni' MAKA AKAN

    MEN,ADI PERUSAAAN TERBESAR DI PULAUMEN,ADI PERUSAAAN TERBESAR DI PULAUKABAENA YANG AKAN MEMILIKI KER,ASAMA SECARAKABAENA YANG AKAN MEMILIKI KER,ASAMA SECARASIMBIOSIS MUTUALISMA DENGAN 13 INGGA $0SIMBIOSIS MUTUALISMA DENGAN 13 INGGA $0PERUSAAAN TAMBANG YANG ADA DI PULAUPERUSAAAN TAMBANG YANG ADA DI PULAUKABAENA SEBAGAI PEMASOK RA MATERIALKABAENA SEBAGAI PEMASOK RA MATERIAL(BAAN BAKU ORE NIKEL) KE PABRIK' SEINGGA(BAAN BAKU ORE NIKEL) KE PABRIK' SEINGGA

    KAPASITAS PRODUKSI PABRIK AKAN DITINGKATKANKAPASITAS PRODUKSI PABRIK AKAN DITINGKATKANMEN,ADIMEN,ADI 100.000 TON PER BULAN DENGAN100.000 TON PER BULAN DENGANANGGARAN DIPERKIRAKAN DAPAT MENCAPAI ANGGARAN DIPERKIRAKAN DAPAT MENCAPAI INGGA 4 TRILLIUN. DIPERKIRAKAN TAUNINGGA 4 TRILLIUN. DIPERKIRAKAN TAUNPRODUKSI ATAU TAUN KE3 (LIMA) DAPATPRODUKSI ATAU TAUN KE3 (LIMA) DAPATTERLAKSANA. TERLAKSANA.

    INSYA ALLA AMIN INSYA ALLA AMIN

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    52/71

    B.B. SARAN SARAN

    1.1. BILA PIAK FUNDER TELA MEMPELA,ARI DANBILA PIAK FUNDER TELA MEMPELA,ARI DAN

    BERMINAT UNTUK KER,ASAMA INVESTASI PROYEKBERMINAT UNTUK KER,ASAMA INVESTASI PROYEKPENAMBANGAN DAN PEMBANGUNAN PABRIK OREPENAMBANGAN DAN PEMBANGUNAN PABRIK ORENIKEL (SMELTER) MEN,ADI SPONGE FeNi > 4% NiNIKEL (SMELTER) MEN,ADI SPONGE FeNi > 4% NiDENGAN KAPASITAS PRODKSI 10.000 TON PER BULANDENGAN KAPASITAS PRODKSI 10.000 TON PER BULANMAKA KIRANYA PIAK FUNDER BERSAMA TIM ALIMAKA KIRANYA PIAK FUNDER BERSAMA TIM ALIGEOLOGI DAN PIAK PABRIK DARI CINA UNTUKGEOLOGI DAN PIAK PABRIK DARI CINA UNTUKMENINDAKLAN,UTI DENGAN MENIN,AU LAPANGAN.MENINDAKLAN,UTI DENGAN MENIN,AU LAPANGAN.

    $.$. SETELA PENIN,AUAN LOKASI DIMAKSUD'SETELA PENIN,AUAN LOKASI DIMAKSUD'DIARAPKAN SEGERA MEMBUAT MEMORANDUM OFDIARAPKAN SEGERA MEMBUAT MEMORANDUM OFUNDERSTANDING DENGAN PIAK PT. SANGIAUNDERSTANDING DENGAN PIAK PT. SANGIAKABAENA PERKASA SEKALIGUS DENGAN PERUBAANKABAENA PERKASA SEKALIGUS DENGAN PERUBAANAKTA NOTARIS PEMEGANG STRUKTUR DAN KOMPOSISIAKTA NOTARIS PEMEGANG STRUKTUR DAN KOMPOSISISAAM DI PT. SANGIA KABAENA PERKASA SEINGGASAAM DI PT. SANGIA KABAENA PERKASA SEINGGAPROYEK INI DAPAT DILAKSANAKAN SESUAI ,ADALPROYEK INI DAPAT DILAKSANAKAN SESUAI ,ADAL

    KESEPAKATAN BERSAMA.KESEPAKATAN BERSAMA.

    PENUTUPPENUTUP

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    53/71

    PENUTUPPENUTUP

    1. KAMI SANGAT MENYADARI BAA MATERI RANCANGAN INVESTASI1. KAMI SANGAT MENYADARI BAA MATERI RANCANGAN INVESTASI

    DAN BISNIS PENAMBANGAN NIKEL YANG KAMI SA,IKAN' MASIDAN BISNIS PENAMBANGAN NIKEL YANG KAMI SA,IKAN' MASI

    ,AU DARI KESEMPURNAAN. UNTUK ITU KAMI SANGAT,AU DARI KESEMPURNAAN. UNTUK ITU KAMI SANGAT

    MENGARAPKAN SARAN DAN KRITIK YANG SIFATNYA MEMBANGUNMENGARAPKAN SARAN DAN KRITIK YANG SIFATNYA MEMBANGUNKER,ASAMA YANG BAIK DEMI MENU,U PENYEMPURNAAN SEKALIGUSKER,ASAMA YANG BAIK DEMI MENU,U PENYEMPURNAAN SEKALIGUS

    PENGAMBILAN KEPUTUSAN DAN KEBI,AKAN YANG TEPAT.PENGAMBILAN KEPUTUSAN DAN KEBI,AKAN YANG TEPAT.

    $. SEKIRANYA PIAK FUNDER TERPANGGIL UNTUK BEKER,ASAMA$. SEKIRANYA PIAK FUNDER TERPANGGIL UNTUK BEKER,ASAMA

    DENGAN PT. SANGIA KABAENA PERKASA UNTUK BERINVESTASI DANDENGAN PT. SANGIA KABAENA PERKASA UNTUK BERINVESTASI DAN

    BISNIS PENAMBANGAN NIKEL DI PULAU KABAENA' MAKA PT. SANGIABISNIS PENAMBANGAN NIKEL DI PULAU KABAENA' MAKA PT. SANGIA

    KABAENA PERKASA BERSEDIA MERUBA STRUKTUR DANKABAENA PERKASA BERSEDIA MERUBA STRUKTUR DAN

    KEPENGURUSAN DEAN KOMISARIS DAN DEAN DIREKSI' DANKEPENGURUSAN DEAN KOMISARIS DAN DEAN DIREKSI' DANMENYERAKAN SAAM PERUSAAAN SEBESAR /0% KEPADA PIAKMENYERAKAN SAAM PERUSAAAN SEBESAR /0% KEPADA PIAK

    FUNDER DAN DIREKTUR FINANCE DIPEGANG SENDIRI OLE PIAKFUNDER DAN DIREKTUR FINANCE DIPEGANG SENDIRI OLE PIAK

    FUNDER.FUNDER.

    . AKIRNYA KESEMUANYA KITA SAMASAMA BERPASRA KEPADA. AKIRNYA KESEMUANYA KITA SAMASAMA BERPASRA KEPADA

    ALLA ST' KARENA MANUSIA ANYA MAMPU Me9:;

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    54/71

    GAMBAR DESAINGAMBAR DESAIN

    1 UNIT MESIN LENGKAP1 UNIT MESIN LENGKAP

    PABRIK ORE NIKELPABRIK ORE NIKELMENJADIMENJADI

    SPONGE FeNi > 4% NiSPONGE FeNi > 4% Ni

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    55/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    56/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    57/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    58/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    59/71

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    60/71

    I.I. MESIN INDUK DAN MESINMESIN INDUK DAN MESIN

    PEMBANTU' BERIKUTPEMBANTU' BERIKUT

    PERLENGKAPANNYA PERLENGKAPANNYA 1.1. Me+i; I;?@ ?;?@ 9*?@+i e;=@:Me+i; I;?@ ?;?@ 9*?@+i e;=@:@::+i:+ 10.000 *; PER BULAN@::+i:+ 10.000 *; PER BULAN

    $.$. Me+i; Pe:;? :; e9e;=@::;Me+i; Pe:;? :; e9e;=@::;

    9*?@+i :i;;:.9*?@+i :i;;:... T?;=@? Pe:@:9:;;: :; ?iiie+T?;=@? Pe:@:9:;;: :; ?iiie+

    :i;;: (F*9@i 2 T9?

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    61/71

    II.II. ASPEK SIPILASPEK SIPIL

    1.1. L?:+ :H:; :;= ie9?@:; ?;?@L?:+ :H:; :;= ie9?@:; ?;?@=e?;= :9i@ i;?@;:.=e?;= :9i@ i;?@;:.

    $.$. L?:+ :H:; :;= ie9?@:; ?;?@L?:+ :H:; :;= ie9?@:; ?;?@

    =?:;= H:+i 9*?@+i=?:;= H:+i 9*?@+i.. L?:+ :H:; :;= ie9?@:; ?;?@L?:+ :H:; :;= ie9?@:; ?;?@

    :9eH*?+e:9eH*?+e

    4.4. S*

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    62/71

    /./. ,:: 9i: 9*?

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    63/71

    III. ASPEK ORGANISASI III. ASPEK ORGANISASI

    1.1. S9?@?9 O9=:;i+:+i.S9?@?9 O9=:;i+:+i.

    $.$. ,?:H @:9::; :; :+i;=,?:H @:9::; :; :+i;=

    :+i;=:+i;= ,:::;;::+i;=:+i;= ,:::;;:

    :;= H:9?+ i+i:@:;:;= H:9?+ i+i:@:;

    .. K:i:+ Te;:=: Ke9: :;=K:i:+ Te;:=: Ke9: :;=

    i??H@:; e9:+?@ e;:=:i??H@:; e9:+?@ e;:=:

    :Hi;:.:Hi;:.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    64/71

    IV.IV. ASPEK KEUANGANASPEK KEUANGAN

    1.1. Ri;

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    65/71

    KETERANGANKETERANGAN

    1.1. LUAS LAAN AREAL TAMBANG NIKEL YANG DAPATLUAS LAAN AREAL TAMBANG NIKEL YANG DAPAT

    DIOLA (DITAMBANG) KEPADA 3 (LIMA)DIOLA (DITAMBANG) KEPADA 3 (LIMA)PERUSAAAN TAMBANG NIKEL YANG TELA DITAKEPERUSAAAN TAMBANG NIKEL YANG TELA DITAKE

    OVER' SELUAS 1.400 A' DENGAN CADANGANOVER' SELUAS 1.400 A' DENGAN CADANGAN

    DEPOSIT ORE NIKEL (BERCAMPUR TANA)DEPOSIT ORE NIKEL (BERCAMPUR TANA)

    SEBANYAK $10.000.000 METRICK TON (KADAR 1'$SEBANYAK $10.000.000 METRICK TON (KADAR 1'$

    UP 2 SD 3' UP) AKAN MENGASILKAN FERROUP 2 SD 3' UP) AKAN MENGASILKAN FERRO

    NIKEL SPONGE FeNi > 4% Ni SEBANYAK 3".3#0.000NIKEL SPONGE FeNi > 4% Ni SEBANYAK 3".3#0.000

    TON.TON.

    SEDANGKAN LUAS LAAN KPIUP PRODUKSI LAINSEDANGKAN LUAS LAAN KPIUP PRODUKSI LAIN

    SEBANYAK 13 PERUSAAAN PEMEGANG KPIUP'SEBANYAK 13 PERUSAAAN PEMEGANG KPIUP'

    SELUASSELUAS ".000 A DENGAN CADANGAN DEPOSIT".000 A DENGAN CADANGAN DEPOSIT

    ORE NIKEL DIPERKIRAKANORE NIKEL DIPERKIRAKAN 1.30.000.0001.30.000.000

    METRICK TON.METRICK TON.

    $.$. KADAR 1'$ UP INGGA 3' UP.KADAR 1'$ UP INGGA 3' UP.

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    66/71

    INFORMASI HARGA PENJUALANINFORMASI HARGA PENJUALAN

    EKSPORT ORE NIKELEKSPORT ORE NIKEL

    1.1. O9e Ni@e e;=:; @::9 1.3 U +::iO9e Ni@e e;=:; @::9 1.3 U +::i

    e;=:; 1'" U +eH:9=: e9@i+:9 :;:9:e;=:; 1'" U +eH:9=: e9@i+:9 :;:9:

    USD 4$ +::i e;=:; USD 30 e9USD 4$ +::i e;=:; USD 30 e9

    Me9i< T*;Me9i< T*;

    $.$. O9e Ni@e e;=:; @::9 $ U +::iO9e Ni@e e;=:; @::9 $ U +::i

    e;=:; $'" U +eH:9=: USD /4 +::ie;=:; $'" U +eH:9=: USD /4 +::i

    USD #0 e9 Me9i< T*;USD #0 e9 Me9i< T*;.. O9e Ni@e e;=:; @::9 U @e ::+O9e Ni@e e;=:; @::9 U @e ::+

    +eH:9=: USD &0 e9 Me9i< T*;+eH:9=: USD &0 e9 Me9i< T*;

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    67/71

    BIAYA PRODUKSI SERTA BEBAN RETRIBUSIBIAYA PRODUKSI SERTA BEBAN RETRIBUSI

    DAERAH DAN PAJAK EKSPORTDAERAH DAN PAJAK EKSPORT

    1.1. Bi:: P9*?@+i :: Pe9?+:H::; K*;9:@*9Bi:: P9*?@+i :: Pe9?+:H::; K*;9:@*9

    Mi;i;= +ee+:9 USD & e9 Me9i< T*;.Mi;i;= +ee+:9 USD & e9 Me9i< T*;.

    $.$. Be:; Re9i?+i :; ::@ D:e9:H' +ee+:9Be:; Re9i?+i :; ::@ D:e9:H' +ee+:9

    USD 1$ e9 Me9i< T*;.USD 1$ e9 Me9i< T*;.

    .. P::@ E@+*9 +ee+:9 $0 % ::? e9@i+:9P::@ E@+*9 +ee+:9 $0 % ::? e9@i+:9

    USD 1& e9 Me9i< T*;.USD 1& e9 Me9i< T*;.

    4.4. R*: :+:9:@: e9@i+:9 USD $ +::iR*: :+:9:@: e9@i+:9 USD $ +::iUSD e9 Me9i< T*;.USD e9 Me9i< T*;.

    O

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    68/71

    HORMAT KAMIHORMAT KAMI

    PT. SANGIA KABAENA PERKASAPT. SANGIA KABAENA PERKASA

    1.1. PARA PEMEGANG SAAMPARA PEMEGANG SAAM

    ERSANTY RAAYU SAFITRINAS YASINERSANTY RAAYU SAFITRINAS YASIN

    SEBAGAI DIREKTUR UTAMASEBAGAI DIREKTUR UTAMA

    DANAS MAPATA' B.S< SEBAGAI DIREKTURDANAS MAPATA' B.S< SEBAGAI DIREKTUR

    OPERASIONALOPERASIONAL

    SYAMSUL AYAR SEBAGAI DIREKTURSYAMSUL AYAR SEBAGAI DIREKTUR

    ADMINISTRASI DAN KEPEGAAIANADMINISTRASI DAN KEPEGAAIAN

    IDAYAT RUMBAYAN SEBAGAI KOMISARISIDAYAT RUMBAYAN SEBAGAI KOMISARIS

    $.$. PEMATERIPEMATERI D9+. SYAFRUDDIN YASIND9+. SYAFRUDDIN YASIN

    DR. ARIEF SETIAANDR. ARIEF SETIAAN

    D9H. L.M. MASTARID9H. L.M. MASTARI

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    69/71

    SEKIAN DAN TERIMA KASIHSEKIAN DAN TERIMA KASIH

    WASSALAMU ALAIKUM WR.WBWASSALAMU ALAIKUM WR.WB

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    70/71

    DAFTAR LAMPIRAN DOKUMENDAFTAR LAMPIRAN DOKUMEN

    1.1. LEGALITAS PERUSAHAAN PT. TRIAS JAYA AGUNGLEGALITAS PERUSAHAAN PT. TRIAS JAYA AGUNG

    2.2. LEGALITAS PERUSAHAAN PT. SANGIA KABAENA PERKASALEGALITAS PERUSAHAAN PT. SANGIA KABAENA PERKASA

    3.3. SK.KP-IUP PRODUKSI NIKEL PT TRIAS JAYA AGUNGSK.KP-IUP PRODUKSI NIKEL PT TRIAS JAYA AGUNG

    4.4. HASIL ANALISIS LABORATORIUM DARI GEOLOGI TENTANGHASIL ANALISIS LABORATORIUM DARI GEOLOGI TENTANG

    KADAR NIKEL PADA AREAL PT.TRIAS JAYA AGUNGKADAR NIKEL PADA AREAL PT.TRIAS JAYA AGUNG

    5.5. DATA PENGIRIMAN EXPORT BARANG OLEH PT. TRIAS JAYADATA PENGIRIMAN EXPORT BARANG OLEH PT. TRIAS JAYAAGUNGAGUNG

    6.6. TITIK KOORDINAT KP-KP-IUP EXPLORASI/PRODUKSITITIK KOORDINAT KP-KP-IUP EXPLORASI/PRODUKSI

    PERUSAHAAN TAMBANG NIKEL YANG DIRENCANAKAN UNTUKPERUSAHAAN TAMBANG NIKEL YANG DIRENCANAKAN UNTUK

    KERJA SAMA/NEGOSIASI TAKE OER !KERJA SAMA/NEGOSIASI TAKE OER !

    ". PT. INTERNASIONAL MINING JAYA". PT. INTERNASIONAL MINING JAYA#. PT. MARGO KARYA MANDIRI#. PT. MARGO KARYA MANDIRI

    $. PT. BAHANA MULTI ENERGI$. PT. BAHANA MULTI ENERGI

    %. PT. TIMAH EXPLOMIN%. PT. TIMAH EXPLOMIN

  • 7/25/2019 RANCANGAN PABRIK SINGKAT

    71/71

    LAMPIRAN DOKUMENLAMPIRAN DOKUMEN