rapid bus & light rail systems experience from santa...

94
Retrofitting Streets for Transit: Rapid Bus & Light Rail Systems Experience from Santa Monica Jeff Tumlin, Nelson\Nygaard Consulting Associates April 16, 2012 | APA Seminar

Upload: others

Post on 21-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Retrofitting Streets for Transit: Rapid Bus & Light Rail Systems

Experience from Santa Monica

Jeff Tumlin, Nelson\Nygaard Consulting Associates

April 16, 2012 | APA Seminar

Page 2: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

The Santa Monica Downtown Transit Mall

Page 3: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Flickr user: Derek Thomas LA

Page 4: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs
Page 5: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

The Downtown Transit Mall

Source: GoogleMaps

Page 6: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Flickr user: LA Wad

Page 7: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Flickr user: LA Wad

Page 8: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Flickr user: LA Wad

Page 9: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Re-branding the Big Blue Bus

Source: LAist.com

Page 10: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source:

City of Santa Monica

Page 11: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source:

City of Santa Monica

Page 12: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Re-branding the Big Blue Bus Experience

Source: Lorcan O'Herlihy Architects and Bruce

Page 13: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Lorcan O’Herlihy Architects / Bruce Mau Design

Page 14: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Street furniture studies

Source: Lorcan O’Herlihy Architects / Bruce Mau Design

9am 12pm 3pm

Page 15: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Lorcan O’Herlihy Architects / Bruce Mau Design

Page 16: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

The Expo Light Rail Extension

Page 17: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: ExpoLightRail

Page 18: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

1. No Build 2. Transportation System

Management 3. LRT 1 Expo ROW: Olympic

4. LRT 2 Expo ROW: Colorado

5. LRT 3 Venice: Olympic

6. LRT 4 Venice: Colorado

Expo Light Rail Alternatives

Source: Santa Monica Planning Commission, 2009

Page 19: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Raised track above grade

Track on Grade Raised track up to

35’above grade

Downtown Station 35’ +/-above grade

Olympic Alignment

On-grade Station at Bergamot

Lin

coln

4th

11

th

Split –Station at 17th

Bike path

17

th

Clo

verf

ield

26

th

Source: Santa Monica Planning Commission, 2009

Olympic Blvd Alignment Alternative: At-grade & above grade

Page 20: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Olympic Boulevard Alternative

Impacts

• Dual tracks in the median

• Left-turn lanes preserved

• Loss of all 44 Coral trees

• Loss of all on-street parking spaces (approximately

123 spaces)

Source: Santa Monica Planning Commission, 2009

Page 21: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Olympic Boulevard Rendering

Source: Santa Monica Planning Commission, 2009

Page 22: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Olympic Boulevard Downtown Station Rendering

Source: Santa Monica Planning Commission, 2009

Source: Santa Monica Planning Commission, 2009

Page 23: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Colorado Ave Alignment Alternative– At-Grade

Track on Grade

Downtown Station at grade

Bergamot Station

Colorado Alignment

Midtown 17th Street Station

Aerial over Cloverfield

Source: Santa Monica Planning Commission, 2009

Page 24: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

7’

Parking

Impacts

• Preserves on-street parking on north side - loss of approximately 75 spaces on south side

• Removal of one travel lane in each direction from 17th Street to 4th Street

80’ ROW

Colorado Avenue Alternative

Source: Santa Monica Planning Commission, 2009

Page 25: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Colorado Ave, Narrower Alternative

Source: Santa Monica Planning Commission, 2009

Page 26: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

•San Francisco’s Judah Street is the same width as Colorado Ave •Transit line down the middle •Parking on both sides

Measure twice, cut once…drawing on examples from San Francisco

Source: Santa Monica Planning Commission, 2009

Page 27: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Visioning Colorado Ave

Source: Santa Monica Planning Commission, 2009

Page 28: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Santa Monica Planning Commission, 2009

Comparison of LRT Alternatives

Page 29: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Colorado Ave Alternative Wins

LRT Alignment Capital

Costs

Project

Costs

Cost

Effectiveness

LRT 1

(Olympic Blvd.) $969,909,000 $1,353,375,000

$20.21 per annual hour

of user benefit

LRT 2

(Colorado Ave.)

$932, 423,000 $1,301,121,000 $20.01 per annual hour

of user benefit

…Savings ~ $52 million in project costs

~ 37.5 million in capital costs

+ keep on street parking

+ keep the Coral trees

+ easier transit accessibility Source: Santa Monica Planning Commission, 2009

Page 30: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Expo LRT Plans Today

Source: Expo Light Rail

Page 31: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Getting the station details right

Facilities Park and Ride

Transit

Connections •Santa Monica Big

Blue Bus line 1, 2, 3,

3-Rapid, 4, 5,7, 7-

Rapid, 8, 9, 10, 11

•Metro Los Angeles

bus line 20, 33,

534,704,720, 733,

920

Source: Expo Light Rail, 2011

Page 32: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 33: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 34: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 35: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 36: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 37: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 38: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Source: Expo Light Rail, 2011

Page 39: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Retrofitting cities of tomorrow

Source: Expo Light Rail, 2011

Page 40: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

NELSON\NYGAARD CONSULTING ASSOCIATES © 2012

Jeff Tumlin 116 New Montgomery Street, Suite 500

San Francisco, CA 94105 415. 284.1544

[email protected]

Page 41: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Ted Orosz AICP CTP

MTA New York

City Transit

April 16, 2012

Retrofitting Corridors for

Premium Transit

Page 42: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

They wanted a picture

Page 43: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

About 21 miles total length

Right-of-way varies 100’ - 120’

Street widths vary 55’ – 70’

Chicago Western Av Corridor

Page 44: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs
Page 45: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs
Page 46: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

9 miles from South Ferry to 125th

Street

Currently served by M15 bus

route

Over 54,000 weekday riders

Bus speeds have been declining

Ridership has been decreasing

Within ¼ mile:

537,000 residents

78% of households do not own a

car

57% of residents commute by

transit

M15 SBS: First/Second Avenues

Page 47: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• Over 10 miles of

dedicated bus lanes

– Red coloration, overhead

signs

– Camera Enforcement

• Off-board fare collection

• New low-floor 3-door

buses

• Longer Station Spacing

M15 SBS: Features

Page 48: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

M15 SBS: Features

Page 49: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Doubled the mileage of protected bike lanes in New York City.

Installed 50+ pedestrian refuge islands during 2010; more in 2011

M15 SBS: Features

Page 50: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

M15 SBS: Features

Page 51: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• Buses average

speed of 4.5 MPH

• 33,000 weekday

riders

• Severe Pedestrian

Crowding

• 6,000+ peds/hour

• Major Growth

Expected: Hudson

Yards

2 miles across Manhattan

Currently served by M34/M34A bus routes and

numerous commuter buses

M34 SBS: 34th Street

Page 52: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

34th Street SBS: Features

• Bus Lanes

− Curbside bus lanes

installed in 2008

− 2/3 of corridor will be

upgraded to offset bus

lanes 2012-13

• Off-board fare collection

• New low-floor buses

• Bus bulbs at 14 stations

• Limited TSP

Page 53: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

34th Street Final Design

Page 54: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• New bus lanes

−5.5 miles of offset bus

lanes – maintenance of

parking along entire

route

−Red coloration,

overhead signs

−Camera Enforcement

• Off-board fare collection

• New low-floor buses

• Transit Signal Priority

• Bus bulbs at 14 stations

B44 Nostrand Av SBS: Features

Page 55: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• Scheduled for 2013 –

coordinated with larger

capital project

• City is Federal Grant

Recipient ~$28M

• Travel Time: 20%

reduction in running

time anticipated

• Ridership: 10%

increase in ridership

anticipated

B44 SBS: Features

Page 56: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

B44 SBS: Rogers Av Current

Page 57: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

B44 SBS: Rogers Av Proposed

Page 58: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Busway

Page 59: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Curbside Busway

Page 60: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Curbside Busway

Page 61: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Curbside Busway

Page 62: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Curbside Busway

Page 63: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Busway

Page 64: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Center Median Bus Station

Page 65: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Curbside Bus Lane Alignment

Page 66: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Curb Bus Lanes on Arterial Street

Page 67: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Single Side Transitway Alignment

Page 68: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Transitway on Arterial

Page 69: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Lane Transitway

Page 70: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Two Way Transitway with Loading

Page 71: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Median Bus Lane Alignment

Page 72: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Median Bus Lane Alignment

Page 73: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Center Median Transitway: Cleveland

Page 74: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Center Median Transitway

Page 75: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Parking Accomodation

Page 76: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

One Lane Busway: Eugene, OR

Page 77: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Center Island Station: Eugene, OR

Page 78: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Station: Eugene, OR

Page 79: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Alignments for LRT/Streetcar

Page 80: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

LRT in Shared Lane

Page 81: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Street-Running LRT

Page 82: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

LRT in Shared Lane

Page 83: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Street-Running PCC Car

Page 84: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Street-Running LRT

Page 85: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

LRT in Shared Lane

Page 86: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Street-Running LRT

Page 87: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Modern Streetcar

Page 88: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

LRT on Transitway

Page 89: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Traffic Signal Priority

TSP with Bus Lanes is an

example of 2 + 2 = 5

Page 90: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Traffic Signal Priority: Cleveland

Page 91: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

Advanced Left from Right Lane

Page 92: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• Green time for Hylan Boulevard is limited at busy intersections

• Goal: Move as many vehicles as possible on green signal

• Issue: Weaving of cars and buses clogs the intersection

S79 SBS: Advanced Signal

Page 93: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

• Solution: Separate bus and car weaving before light turns green

• Reduced weaving allows more efficient (and safer) flow through

intersection

• Allows buses to avoid congestion without having a bus lane at a

major intersection.

S79 SBS: Advanced Signal

Page 94: Rapid Bus & Light Rail Systems Experience from Santa Monicamedia2.planning.org/APA2012/Presentations/S589... · Colorado Ave Alternative Wins LRT Alignment Capital Costs Project Costs

54

Many Thanks!

Ted Orosz

Director Long Range Bus Service Planning

MTA New York City Transit

[email protected]