    CHAPTER NO. 19

    PLUMBING SANITARY INSTALLATION

    & GAS FITTINGS

    DESCRIPTION OF ITEM:

    Item No. 1 Providing and fitting glazed earthen ware water closet European Type,

    excluding seat and cover.

    (i) White

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C. European Type 1.00 No. 840.00 each 840.00

    2 Rubber Sheet 0.222 Kg. 36.00 P. Kg. 7.99

    3 Bolts & Nuts 4.00 Nos. 16.00 each 64.00

    4 Cement 0.161 Bag 230.00 Bag 37.03

    5 Sand 0.40 Cft. 350.00 % Cft. 1.41

    6 Bajri 0.80 Cft. 1850.00 % Cft. 14.80

    Total 965.23

    Contractor's Profit & Overheads 20.00 Percent 193.05

    Total 1,158.28

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Skilled Cooly 1.00 No. 160.00 per day 160.00

    Total 330.00

    Sundries 10.00 Percent 33.00

    Total 363.00

    Contractor's Profit & Overheads 20.00 Percent 72.60

    Total 435.60

    ITEM RATES

    Labour rate for Each Rs. 108.90 Say 108.90

    Composite rate for Each Rs. 1267.18 Say 1267.20

    Page 1

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    2/107

    DESCRIPTION OF ITEM:

    Item No. 1 Providing and fitting glazed earthen ware water closet European Type,

    excluding seat and cover.

    (ii) Coloured

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C. European Type 1.00 No. 900.00 each 900.00

    2 Rubber Sheet 0.222 Kg. 36.00 P. Kg. 7.99

    3 Bolts & Nuts 4.00 Nos. 16.00 each 64.00

    4 Cement 0.161 Bag 230.00 Bag 37.03

    5 Sand 0.40 Cft. 350.00 % Cft. 1.41

    6 Bajri 0.80 Cft. 1850.00 % Cft. 14.80

    Total 1025.23

    Contractor's Profit & Overheads 20.00 Percent 205.05Total 1,230.28

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Skilled Cooly 1.00 No. 160.00 per day 160.00

    Total 330.00

    Sundries 10.00 Percent 33.00

    Total 363.00

    Contractor's Profit & Overheads 20.00 Percent 72.60

    Total 435.60

    ITEM RATES

    Labour rate for Each Rs. 108.90 Say 108.90

    Composite rate for Each Rs. 1339.18 Say 1339.20

    Page 2

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    3/107

    DESCRIPTION OF ITEM:

    Item No. 2 Providing and fixing double seat and cover only.

    (i) Bakelite.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Seat and cover double (Bakelite) 1.00 No. 275.00 each 275.00

    Total 275.00

    Contractor's Profit & Overheads 20.00 Percent 55.00

    Total 330.00

    LABOU For 48 Nos.

    1 Plumber 0.25 No. 170.00 per day 42.50

    Total 42.50

    Sundries 10.00 Percent 4.25

    Total 46.75

    Contractor's Profit & Overheads 20.00 Percent 9.35

    Total 56.10

    ITEM RATES

    Labour rate for Each Rs. 1.17 Say 1.15

    Composite rate for Each Rs. 331.17 Say 331.15

    Page 3

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    4/107

    DESCRIPTION OF ITEM:

    Item No. 2 Providing and fixing double seat and cover only.

    (ii) Plastic.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Seat and cover double (Plastic) 1.00 No. 150.00 each 150.00

    Total 150.00

    Contractor's Profit & Overheads 20.00 Percent 30.00

    Total 180.00

    LABOU For 48 Nos.

    1 Plumber 0.25 No. 170.00 per day 42.50

    Total 42.50

    Sundries 10.00 Percent 4.25

    Total 46.75

    Contractor's Profit & Overheads 20.00 Percent 9.35

    Total 56.10

    ITEM RATES

    Labour rate for Each Rs. 1.17 Say 1.15

    Composite rate for Each Rs. 181.17 Say 181.15

    Pa e 4

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    5/107

    DESCRIPTION OF ITEM:

    Item No. 3 Providing and fitting glazed earthen ware water closet, squatter type

    (orisa pattern) combined with foot rest.

    (i) White

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C Orisa pattern with foot rest 1.00 No. 675.00 each 675.00

    2 Cement 0.021 Bag 230.00 Bag 4.83

    3 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 680.03

    Contractor's Profit & Overheads 20.00 Percent 136.01

    Total 816.03

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.50 No. 140.00 per day 70.00

    Total 240.00

    Sundries 10.00 Percent 24.00

    Total 264.00

    Contractor's Profit & Overheads 20.00 Percent 52.80

    Total 316.80

    ITEM RATES

    Labour rate for Each Rs. 79.20 Say 79.20

    Composite rate for Each Rs. 895.23 Say 895.25

    Page 5

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    6/107

    Item No. 3 Providing and fitting glazed earthen ware water closet, squatter type

    (orisa pattern) combined with foot rest.

    (ii) Coloured.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C Orisa pattern with foot rest 1.00 No. 815.00 each 815.00

    coloured

    2 Cement 0.021 Bag 230.00 Bag 4.83

    3 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 820.03

    Contractor's Profit & Overheads 20.00 Percent 164.01

    Total 984.03

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.50 No. 140.00 per day 70.00

    Total 240.00

    Sundries 10.00 Percent 24.00

    Total 264.00

    Contractor's Profit & Overheads 20.00 Percent 52.80

    Total 316.80

    ITEM RATES

    Labour rate for Each Rs. 79.20 Say 79.20

    Composite rate for Each Rs. 1063.23 Say 1063.25

    Page 6

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    7/107

    DESCRIPTION OF ITEM:

    Item No. 4 Providing and fitting white glazed earthen ware water closet, squatter type

    with separate foot rest.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C. squatter type 1.00 No. 450.00 each 450.00

    2 Foot rest 2.00 Nos. 20.00 each 40.00

    Total 490.00

    Contractor's Profit & Overheads 20.00 Percent 98.00

    Total 588.00

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.002 Cooly un-skilled 0.50 No. 140.00 per day 70.00

    Total 240.00

    Sundries 10.00 Percent 24.00

    Total 264.00

    Contractor's Profit & Overheads 20.00 Percent 52.80

    Total 316.80

    ITEM RATES

    Labour rate for Each Rs. 79.20 Say 79.20

    Composite rate for Each Rs. 667.20 Say 667.20

    Page 7

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    8/107

    DESCRIPTION OF ITEM:

    Item No. 5 Providing and fitting water closet squatter type of terrazzo concrete.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.C. squatter type of terrazzo concrete 1.00 No. 175.00 each 175.00

    2 Cement 0.021 Bag 230.00 Bag 4.83

    3 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 180.03

    Contractor's Profit & Overheads 20.00 Percent 36.01

    Total 216.03

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.50 No. 140.00 per day 70.00

    Total 240.00

    Sundries 10.00 Percent 24.00

    Total 264.00

    Contractor's Profit & Overheads 20.00 Percent 52.80

    Total 316.80

    ITEM RATES

    Labour rate for Each Rs. 79.20 Say 79.20

    Composite rate for Each Rs. 295.23 Say 295.25

    Page 8

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    9/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    10/107

    DESCRIPTION OF ITEM:

    Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm

    (22" x 16"), including bracket set, waste pipe and waste coupling, etc.

    (ii) Coloured with padestal.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Earthen ware wash hand basin (coloured) 1.00 No. 1085.00 each 1085.00

    2 Pedestal 1.00 No. 250.00 each 250.00

    3 Waste coupling, Bracket Waste

    Pipe 1.00 No. 105.00 each 105.00

    Total 1440.00

    Contractor's Profit & Overheads 20.00 Percent 288.00

    Total 1,728.00

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 1.00 No. 140.00 per day 140.00

    Total 310.00

    Sundries 10.00 Percent 31.00

    Total 341.00

    Contractor's Profit & Overheads 20.00 Percent 68.20

    Total 409.20

    ITEM RATES

    Labour rate for Each Rs. 102.30 Say 102.30

    Composite rate for Each Rs. 1830.30 Say 1830.30

    Page 10

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    11/107

    DESCRIPTION OF ITEM:

    Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm

    (22" x 16"), including bracket set, waste pipe and waste coupling, etc.

    (iii) White without padestal.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 W.H. Basin 1.00 No. 635.00 each 635.00

    2 Waste coupling, Bracket, Waste Pipe 1.00 No. 105.00 each 105.00

    Total 740.00

    Contractor's Profit & Overheads 20.00 Percent 148.00

    Total 888.00

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 978.75 Say 978.75

    Page 11

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    12/107

    DESCRIPTION OF ITEM:

    Item No. 6 Providing and fitting glazed earthen ware wash hand basin 56 x 40 cm

    (22" x 16"), including bracket set, waste pipe and waste coupling, etc.

    (iv) Coloured without padestal.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Coloured W.H. Basin 1.00 No. 735.00 each 735.00

    2 Coupling, C.I. Bracket, Waste Pipe 1.00 No. 105.00 each 105.00

    Total 840.00

    Contractor's Profit & Overheads 20.00 Percent 168.00

    Total 1,008.00

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 1098.75 Say 1098.75

    Pa e 12

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    13/107

    DESCRIPTION OF ITEM:

    Item No. 7 Providing and fixing stainless steel sink with drain board, size 120 x 60 cm

    (48" x 24") including bracket set, waste pipe and waste coupling.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Stainless steel sink with drain

    board 120 x 60 cm (48" x 24") 1.00 No. 1600.00 each 1600.00

    2 Waste coupling 1.00 No. 75.00 each 75.00

    3 Waste pipe 1.00 No. 15.00 each 15.00

    4 Bracket 2.00 Nos. 25.00 each 50.00

    5 Cement 0.042 Bag 230.00 Bag 9.66

    6 Sand 0.130 Cft. 350.00 % Cft. 0.46

    Total 1750.12

    Contractor's Profit & Overheads 20.00 Percent 350.02Total 2,100.14

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 2190.89 Say 2190.90

    Page 13

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    14/107

    DESCRIPTION OF ITEM:

    Item No. 8 Providing and fitting terrazzo concrete sink 60 x 45 cm (24" x 18") with

    drain board of mosaic including bracket set waste pipe and waste coupling.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Terrazzo concrete sink

    60 x 45 cm (24" x 18") 1.00 No. 300.00 each 300.00

    2 C.I. Bracket 2.00 Nos. 25.00 each 50.00

    3 Waste coupling 1.00 No. 75.00 each 75.00

    4 Waste pipe 1.00 No. 15.00 each 15.00

    5 Cement 0.067 Bag 230.00 Bag 15.41

    6 Sand 0.280 Cft. 350.00 % Cft. 0.98

    Total 456.39

    Contractor's Profit & Overheads 20.00 Percent 91.28

    Total 547.67

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 638.42 Say 638.40

    Page 14

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    15/107

    DESCRIPTION OF ITEM:

    Item No. 9 Providing and fixing glazed earthen ware sink, including bracket set, waste

    pipe and waste coupling.

    (i) 60 x 45 cm (24" x 18")

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Glazed earthen ware sink 1.00 No. 520.00 each 520.00

    2 C.I. Bracket 2.00 Nos. 25.00 each 50.00

    3 Waste pipe 1.00 No. 15.00 each 15.00

    4 Waste coupling 1.00 No. 75.00 each 75.00

    5 Cement 0.053 Bag 230.00 Bag 12.19

    6 Sand 0.144 Cft. 350.00 % Cft. 0.50

    Total 672.69

    Contractor's Profit & Overheads 20.00 Percent 134.54

    Total 807.23

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 897.98 Say 898.00

    Page 15

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    16/107

    DESCRIPTION OF ITEM:

    Item No. 9 Providing and fixing glazed earthen ware sink, including bracket set, waste

    pipe and waste coupling.

    (ii) 37.5 x 45 cm (15" x 18")

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.E. Sink Size 37.5 x 45 cm

    (15" x 18") 1.00 No. 350.00 each 350.00

    2 Waste pipe 1.00 No. 15.00 each 15.00

    3 Waste coupling 1.00 No. 75.00 each 75.00

    4 C.I. Bracket 2.00 Nos. 25.00 each 50.00

    6 Cement 0.053 Bag 230.00 Bag 12.19

    7 Sand 0.144 Cft. 350.00 % Cft. 0.50

    Total 502.69

    Contractor's Profit & Overheads 20.00 Percent 100.54

    Total 603.23

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 693.98 Say 694.00

    Page 16

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    17/107

    DESCRIPTION OF ITEM:

    Item No. 10 Providing and fixing glazed earthen ware Flat Back Urinal.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.E. flat Back Urinal Complete set 1.00 No. 400.00 each 400.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw (75 mm) 3" long 2.00 Nos. 0.44 each 0.88

    Total 401.88

    Contractor's Profit & Overheads 20.00 Percent 80.38

    Total 482.26

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 56.10 Say 56.10

    Composite rate for Each Rs. 538.36 Say 538.35

    Page 17

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    18/107

    DESCRIPTION OF ITEM:

    Item No. 11 Providing and fitting glazed earthen ware low down flushing cistern 13.63

    litres (3 gallons) capacity, including bracket set, copper connection, etc.

    (i) White

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Low down flushing cistern 3 gallon

    or 13.63 litters 1.00 No. 700.00 each 700.00

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Copper connection with check nut 1.00 No. 30.00 each 30.00

    4 Cement 0.04 Bag 230.00 Bag 9.20

    5 Sand 0.23 Cft. 350.00 % Cft. 0.81

    Total 760.01

    Contractor's Profit & Overheads 20.00 Percent 152.00

    Total 912.01

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 1002.76 Say 1002.75

    Pa e 18

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    19/107

    DESCRIPTION OF ITEM:

    Item No. 11 Providing and fitting glazed earthen ware low down flushing cistern 13.63

    litres (3 gallons) capacity, including bracket set, copper connection, etc.

    (ii) Coloured

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Low down flushing cistern 1.00 No. 800.00 each 800.00

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Copper connection with check nut 1.00 No. 30.00 each 30.00

    4 Cement 0.04 Bag 230.00 Bag 9.20

    5 Sand 0.23 Cft. 350.00 % Cft. 0.81

    Total 860.01

    Contractor's Profit & Overheads 20.00 Percent 172.00Total 1,032.01

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 1122.76 Say 1122.75

    Page 19

    SC O O

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    20/107

    DESCRIPTION OF ITEM:

    Item No. 12 Providing and fitting plastic made low down flushing cistern 13.63 litres

    (3 gallons) capacity, including bracket set, copper connection, etc.,

    complete.

    Coloured & White.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Low down flushing cistern 1.00 No. 450.00 each 450.00

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Copper connection with check nut 1.00 No. 30.00 each 30.00

    4 Cement 0.04 Bag 230.00 Bag 9.20

    5 Sand 0.23 Cft. 350.00 % Cft. 0.81

    Total 510.01

    Contractor's Profit & Overheads 20.00 Percent 102.00

    Total 612.01

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each (White) Rs. 702.76 Say 702.75

    Composite rate for Each (Coloured) Rs. 687.45 Say 687.45

    Pa e 20

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    21/107

    DESCRIPTION OF ITEM:

    Item No. 13 Providing and fixing white enamelled cast iron low down flushing cistern

    13.63 litters (3 gallons) capacity, including bracket set, copper connection

    etc.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 White enamelled C.I low down

    flushing cistern 3 gallons or

    13.63 litters capacity including

    all assessaries. 1.00 No. 760.00 each 760.00

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Cement 0.021 Bag 230.00 Bag 4.83

    4 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 785.03Contractor's Profit & Overheads 20.00 Percent 157.01

    Total 942.03

    LABOU For 4 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 275.00

    Sundries 10.00 Percent 27.50

    Total 302.50

    Contractor's Profit & Overheads 20.00 Percent 60.50

    Total 363.00

    ITEM RATES

    Labour rate for Each Rs. 90.75 Say 90.75

    Composite rate for Each Rs. 1032.78 Say 1032.80

    Page 21

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    22/107

    DESCRIPTION OF ITEM:

    Item No. 14 Providing and fixing C.I. highlevel flushing cistern including cost of

    bracket set copper connection etc.

    (i) 13.63 litters (3 gallons) capacity.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I. High level flushing cistern 1.00 No. 580.00 each 580.00

    13.63 letters or 3 gallon

    capacity including

    accessories.

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Cement 0.021 Bag 230.00 Bag 4.83

    4 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 605.03

    Contractor's Profit & Overheads 20.00 Percent 121.01

    Total 726.03

    LABOU For 4 Nos.

    1 Plumber 1.10 Nos. 170.00 per day 187.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 292.00

    Sundries 10.00 Percent 29.20

    Total 321.20

    Contractor's Profit & Overheads 20.00 Percent 64.24

    Total 385.44

    ITEM RATES

    Labour rate for Each Rs. 96.36 Say 96.35

    Composite rate for Each Rs. 822.39 Say 822.40

    Page 22

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    23/107

    DESCRIPTION OF ITEM:

    Item No. 14 Providing and fixing C.I. highlevel flushing cistern including cost of

    bracket set copper connection etc.

    (ii) 4.55 liters (1 gallon) capacity.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I. High level flushing cistern 1.00 No. 432.00 each 432.00

    I/C all accessaries

    2 C.I. Bracket one pair 20.00 per pair 20.00

    3 Cement 0.021 Bag 230.00 Bag 4.83

    4 Sand 0.056 Cft. 350.00 % Cft. 0.20

    Total 457.03

    Contractor's Profit & Overheads 20.00 Percent 91.41Total 548.43

    LABOU For 4 Nos.

    1 Plumber 1.10 Nos. 170.00 per day 187.00

    2 Cooly un-skilled 0.75 No. 140.00 per day 105.00

    Total 292.00

    Sundries 10.00 Percent 29.20

    Total 321.20

    Contractor's Profit & Overheads 20.00 Percent 64.24

    Total 385.44

    ITEM RATES

    Labour rate for Each Rs. 96.36 Say 96.35

    Composite rate for Each Rs. 644.79 Say 644.80

    Page 23

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    24/107

    DESCRIPTION OF ITEM:

    Item No. 15 Providing and fixing, chromium plated soap dish.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Chromuim plated soap dish 1.00 No. 90.00 each 90.00

    2 Gutties Plastic 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 3/4" 2.00 Nos. 1.68 P. Doz 0.28

    Total 91.28

    Contractor's Profit & Overheads 20.00 Percent 18.26

    Total 109.54

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 5.61 Say 5.60

    Composite rate for Each Rs. 115.15 Say 115.15

    Page 24

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    25/107

    DESCRIPTION OF ITEM:

    Item No. 16 Providing and fitting, glazed earthen ware soap dish.

    (i) White.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Glazed earthen ware soap dish 1.00 No. 110.00 each 110.00

    2 Gutties Plastic 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 3/4" 2.00 Nos. 1.68 P. Doz 0.28

    Total 111.28

    Contractor's Profit & Overheads 20.00 Percent 22.26

    Total 133.54

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 5.61 Say 5.60

    Composite rate for Each Rs. 139.15 Say 139.15

    Pa e 25

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    26/107

    DESCRIPTION OF ITEM:

    Item No. 16 Providing and fitting, glazed earthen ware soap dish.

    (ii) Soap dish coloured.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Soap dish coloured 1.00 No. 120.00 each 120.00

    2 Gutties Plastic 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 3/4" 2.00 Nos. 1.68 P. Doz 0.28

    Total 121.28

    Contractor's Profit & Overheads 20.00 Percent 24.26

    Total 145.54

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 5.61 Say 5.60

    Composite rate for Each Rs. 151.15 Say 151.15

    Pa e 26

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    27/107

    DESCRIPTION OF ITEM:

    Item No. 17 Providing and fixing chromium plated toilet paper holder.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.P. Toilet holder 1.00 No. 90.00 each 90.00

    2 Gutties Plastic 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 3/4" 4.00 Nos. 1.68 P. Doz 0.56

    4 Cement 0.010 Bag 230.00 Bag 2.30

    5 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 94.07

    Contractor's Profit & Overheads 20.00 Percent 18.81

    Total 112.88

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 120.36 Say 120.35

    Pa e 27

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    28/107

    DESCRIPTION OF ITEM:

    Item No. 18 Providing and fixing chromium plated towel rail.

    (i) 60 cm (24") long and 2 cm (3/4") dia.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.P. Towel rail 1.00 No. 150.00 each 150.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 4.00 Nos. 1.68 P. Doz 0.56

    Total 151.56

    Contractor's Profit & Overheads 20.00 Percent 30.31

    Total 181.87

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 189.35 Say 189.35

    Page 28

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    29/107

    DESCRIPTION OF ITEM:

    Item No. 18 Providing and fixing chromium plated towel rail.

    (ii) 50 cm (20") long and 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.P. Towel rail 50 cm (20") long

    1.5 cm (" dia) 1.00 No. 100.00 each 100.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screws 4.00 Nos. 1.68 P. Doz 0.56

    Total 101.56

    Contractor's Profit & Overheads 20.00 Percent 20.31

    Total 121.87

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 129.35 Say 129.35

    Page 29

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    30/107

    DESCRIPTION OF ITEM:

    Item No. 19 Providing and fixing looking glass 55 x 40 cm (22" x 16") size and 5 mm

    thick first quality.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Looking glass 5 mm thick

    55 x 40 cm (22" x 16") 1.00 No. 328.00 each 328.00

    2 Gutties 4.00 Nos. 6.00 P. Doz 2.00

    3 Screw

    4.00 Nos. 1.68 P. Doz 0.56

    Total 330.56

    Contractor's Profit & Overheads 20.00 Percent 66.11

    Total 396.67

    LABOU For 16 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 14.03 Say 14.05

    Composite rate for Each Rs. 410.70 Say 410.70

    Page 30

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    31/107

    DESCRIPTION OF ITEM:

    Item No. 20 Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm thick

    glass.

    (i) With chromium plated brackets and railing.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Glass 60 x 13 cm (24" X 5")

    with 5 mm thick glass 1.00 No. 60.00 each 60.00

    2 Chromium plated brackets and railing 1.00 No. 50.00 each 50.00

    3 Screws 4.00 Nos. 1.68 P. Doz 0.56

    4 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    5 Cement 0.010 Bag 230.00 Bag 2.30

    6 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 114.07

    Contractor's Profit & Overheads 20.00 Percent 22.81

    Total 136.88

    LABOU For 16 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly skilled 0.25 No. 160.00 per day 40.00

    Total 210.00

    Sundries 10.00 Percent 21.00

    Total 231.00

    Contractor's Profit & Overheads 20.00 Percent 46.20

    Total 277.20

    ITEM RATES

    Labour rate for Each Rs. 17.33 Say 17.35

    Composite rate for Each Rs. 154.21 Say 154.20

    Page 31

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    32/107

    DESCRIPTION OF ITEM:

    Item No. 20 Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm thick

    glass.

    (ii) Glass Shelf only without chromium plated brackets and railing.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Glass Shelf 1.00 No. 60.00 each 60.00

    Total 60.00

    Contractor's Profit & Overheads 20.00 Percent 12.00

    Total 72.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 83.22 Say 83.20

    Page 32

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    33/107

    DESCRIPTION OF ITEM:

    Item No. 21 Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5") with

    chromium plated bracket and railing.

    (i) White.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.E. shelf 60 x 13 cm (24" x 5")

    with C.P bracket and railing. 1.00 No. 150.00 each 150.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw 4.00 Nos. 1.68 P. Doz 0.56

    4 Cement 0.010 Bag 230.00 Bag 2.30

    5 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 154.07Contractor's Profit & Overheads 20.00 Percent 30.81

    Total 184.88

    LABOU For 16 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly skilled 0.25 No. 160.00 per day 40.00

    Total 210.00

    Sundries 10.00 Percent 21.00

    Total 231.00

    Contractor's Profit & Overheads 20.00 Percent 46.20

    Total 277.20

    ITEM RATES

    Labour rate for Each Rs. 17.33 Say 17.35

    Composite rate for Each Rs. 202.21 Say 202.20

    Page 33

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    34/107

    DESCRIPTION OF ITEM:

    Item No. 21 Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5") with

    chromium plated bracket and railing.

    (ii) Coloured.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.E. shelf 60 x 13 cm (24" x 5")

    with C.P bracket and railing. 1.00 No. 160.00 each 160.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw 4.00 Nos. 1.68 P. Doz 0.56

    4 Cement 0.010 Bag 230.00 Bag 2.30

    5 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 164.07Contractor's Profit & Overheads 20.00 Percent 32.81

    Total 196.88

    LABOU For 16 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly skilled 0.25 No. 160.00 per day 40.00

    Total 210.00

    Sundries 10.00 Percent 21.00

    Total 231.00

    Contractor's Profit & Overheads 20.00 Percent 46.20

    Total 277.20

    ITEM RATES

    Labour rate for Each Rs. 17.33 Say 17.35

    Composite rate for Each Rs. 214.21 Say 214.20

    Page 34

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    35/107

    DESCRIPTION OF ITEM:

    Item No. 22 Providing and fitting.

    (i) Plastic soap dish.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Plastic soap dish 1.00 No. 40.00 each 40.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw 2.00 Nos. 1.68 P. Doz 0.28

    4 Cement 0.005 Bag 230.00 Bag 1.15

    5 Sand 0.030 Cft. 350.00 % Cft. 0.11

    Total 42.53

    Contractor's Profit & Overheads 20.00 Percent 8.51

    Total 51.04

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 5.61 Say 5.60

    Composite rate for Each Rs. 56.65 Say 56.65

    Page 35

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    36/107

    DESCRIPTION OF ITEM:

    Item No. 22 Providing and fitting.

    (ii) Plastic toilet paper holder.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Plastic toilet paper holder 1.00 No. 85.00 each 85.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw 4.00 Nos. 3.25 P. Doz 1.08

    4 Cement 0.010 Bag 230.00 Bag 2.30

    5 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 89.59

    Contractor's Profit & Overheads 20.00 Percent 17.92

    Total 107.51

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 114.99 Say 115.00

    Pa e 36

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    37/107

    DESCRIPTION OF ITEM:

    Item No. 22 Providing and fitting.

    (iii) Plastic towel rail.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Plastic towel rail 1.00 No. 60.00 each 60.00

    2 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    3 Screw 4.00 Nos. 3.25 P. Doz 1.08

    4 Cement 0.010 Bag 230.00 Bag 2.30

    5 Sand 0.06 Cft. 350.00 % Cft. 0.21

    Total 64.59

    Contractor's Profit & Overheads 20.00 Percent 12.92

    Total 77.51

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 84.99 Say 85.00

    Pa e 37

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    38/107

    DESCRIPTION OF ITEM:

    Item No. 22 Providing and fitting.

    (iv) Plastic Shelf with bracket and railing.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Plastic shelf with railing 1.00 No. 50.00 each 50.00

    2 Bracket 2.00 Nos. 2.00 each 4.00

    3 Gutties 2.00 Nos. 6.00 P. Doz 1.00

    4 Screw 4.00 Nos. 3.25 P. Doz 1.08

    5 Cement 0.004 Bag 230.00 Bag 0.92

    6 Sand 0.020 Cft. 350.00 % Cft. 0.07

    Total 57.07

    Contractor's Profit & Overheads 20.00 Percent 11.41

    Total 68.49

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 75.97 Say 75.95

    Page 38

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    39/107

    DESCRIPTION OF ITEM:

    Item No. 23 Providing and fixing chromium plated pillar - cock, heavy.

    (i) 2 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 2 cm (") Pillar Cock 1.00 No. 180.00 each 180.00

    Total 180.00

    Contractor's Profit & Overheads 20.00 Percent 36.00

    Total 216.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 223.48 Say 223.50

    Page 39

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    40/107

    DESCRIPTION OF ITEM:

    Item No. 23 Providing and fixing chromium plated pillar - cock, heavy.

    (ii) 1.5 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 15 cm (") Pillar Cock heavy 1.00 No. 150.00 each 150.00

    Total 150.00

    Contractor's Profit & Overheads 20.00 Percent 30.00

    Total 180.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 187.48 Say 187.50

    Page 40

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    41/107

    DESCRIPTION OF ITEM:

    Item No. 24 Providing and fixing chromium plated stop Cock Heavy.

    (i) 2 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 2 cm (") stop cock 1.00 No. 200.00 each 200.00

    Total 200.00

    Contractor's Profit & Overheads 20.00 Percent 40.00

    Total 240.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 247.48 Say 247.50

    Page 41

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    42/107

    DESCRIPTION OF ITEM:

    Item No. 24 Providing and fixing chromium plated stop Cock Heavy.

    (ii) 1.5 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 1.5 cm (") stop cock 1.00 No. 165.00 each 165.00

    Total 165.00

    Contractor's Profit & Overheads 20.00 Percent 33.00

    Total 198.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 205.48 Say 205.50

    Page 42

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    43/107

    DESCRIPTION OF ITEM:

    Item No. 25 Providing and fixing underground stop cock 13 mm (") with chromium

    plated cover.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Underground stop cock with chromium

    plated cover 1.00 No. 200.00 each 200.00

    2 Gutties 4.00 Nos. 6.00 P. Doz 2.00

    3 Screw 4.00 Nos. 1.68 P. Doz 0.56

    4 Cement 0.022 Bag 230.00 Bag 5.06

    5 Sand 0.060 Cft. 350.00 % Cft. 0.21

    Total 207.62

    Contractor's Profit & Overheads 20.00 Percent 41.52

    Total 249.14

    LABOU For 30 Nos.

    1 Plumber 1.25 No. 170.00 per day 212.50

    2 Cooly un-killed 0.25 No. 140.00 per day 35.00

    Total 247.50

    Sundries 10.00 Percent 24.75

    Total 272.25

    Contractor's Profit & Overheads 20.00 Percent 54.45

    Total 326.70

    ITEM RATES

    Labour rate for Each Rs. 10.89 Say 10.90

    Composite rate for Each Rs. 260.03 Say 260.05

    Page 43

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    44/107

    DESCRIPTION OF ITEM:

    Item No. 26 Providing and fixing chromium plated bib cock.

    (i) 2 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 2 cm (") bib cock 1.00 No. 150.00 each 150.00

    Total 150.00

    Contractor's Profit & Overheads 20.00 Percent 30.00

    Total 180.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 187.48 Say 187.50

    Page 44

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    45/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    46/107

    DESCRIPTION OF ITEM:

    Item No. 27 Providing and fixing chromium plated tee stop cock 1.5 cm (").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 1.5 cm (") Chromium plated

    tee stop cock 1.00 No. 85.00 each 85.00

    Total 85.00

    Contractor's Profit & Overheads 20.00 Percent 17.00

    Total 102.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 109.48 Say 109.50

    Page 46

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    47/107

    DESCRIPTION OF ITEM:

    Item No. 28 Providing and fixing, chromium plated shower rose.

    (i) 1.5 cm x 10 cm (" x 4")

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Chromium plated shower rose

    1.5 cm x 10 cm (" x 4") 1.00 No. 150.00 each 150.00

    Total 150.00

    Contractor's Profit & Overheads 20.00 Percent 30.00

    Total 180.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 187.48 Say 187.50

    Page 47

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    48/107

    DESCRIPTION OF ITEM:

    Item No. 28 Providing and fixing, chromium plated shower rose.

    (ii) 2 cm x 15 cm (" x 6")

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Chromium plated shower rose

    2 cm x 15 cm (" x 6") 1.00 No. 200.00 each 200.00

    Total 200.00

    Contractor's Profit & Overheads 20.00 Percent 40.00

    Total 240.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 247.48 Say 247.50

    Page 48

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    49/107

    DESCRIPTION OF ITEM:

    Item No. 29 Providing & Fixing, chromium plated mixing valve, for wash hand basin,

    sinks or shower.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Chromium plated mixing valve 1.00 No. 525.00 each 525.00

    Total 525.00

    Contractor's Profit & Overheads 20.00 Percent 105.00

    Total 630.00

    LABOU For 24 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 9.35 Say 9.35

    Composite rate for Each Rs. 639.35 Say 639.35

    Page 49

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    50/107

    DESCRIPTION OF ITEM:

    Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).

    (i) Peet valve 3 cm (1") dia.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Gun Metal Peet Valve 1.00 No. 265.00 each 265.00

    Total 265.00

    Contractor's Profit & Overheads 20.00 Percent 53.00

    Total 318.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 329.22 Say 329.20

    Page 50

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    51/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    52/107

    DESCRIPTION OF ITEM:

    Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).

    (iii) G.M. Peet Valve 5 cm (2" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.M. Peet Valve 5 cm (2" dia) 1.00 No. 380.00 each 380.00

    Total 380.00

    Contractor's Profit & Overheads 20.00 Percent 76.00

    Total 456.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 467.22 Say 467.20

    Page 52

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    53/107

    DESCRIPTION OF ITEM:

    Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).

    (iv) G.M. Peet Valve 6.5 cm (2") dia.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.M. Peet Valve 6.5 cm (2" dia) 1.00 No. 430.00 each 430.00

    Total 430.00

    Contractor's Profit & Overheads 20.00 Percent 86.00

    Total 516.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 527.22 Say 527.20

    Page 53

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    54/107

    DESCRIPTION OF ITEM:

    Item No. 30 Providing and fixing gun metal peet/gate valve (screwed).

    (v) G.M. Peet Valve 7.5 cm (3" dia)

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 G.M. Peet Valve 7.5 cm (3" dia) 1.00 No. 490.00 each 490.00

    Total 490.00

    Contractor's Profit & Overheads 20.00 Percent 98.00

    Total 588.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 599.22 Say 599.20

    Page 54

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    55/107

    DESCRIPTION OF ITEM:

    Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock

    1.5 cm (" dia).

    (i) Single way 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Cost of cock 1.00 No. 225.00 each 225.00

    Total 225.00

    Contractor's Profit & Overheads 20.00 Percent 45.00

    Total 270.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 277.48 Say 277.50

    Page 55

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    56/107

    DESCRIPTION OF ITEM:

    Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock

    1.5 cm (" dia).

    (ii) Two way 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Cost of cock 1.00 No. 325.00 each 325.00

    Total 325.00

    Contractor's Profit & Overheads 20.00 Percent 65.00

    Total 390.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 11.22 Say 11.20

    Composite rate for Each Rs. 401.22 Say 401.20

    Page 56

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    57/107

    DESCRIPTION OF ITEM:

    Item No. 31 Providing and fitting, Chromium plated or brass oxidised, swan neck cock

    1.5 cm (" dia).

    (iii) Three way 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Cost of cock 1.00 No. 425.00 each 425.00

    Total 425.00

    Contractor's Profit & Overheads 20.00 Percent 85.00

    Total 510.00

    LABOU For 15 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 14.96 Say 14.95

    Composite rate for Each Rs. 524.96 Say 524.95

    Page 57

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    58/107

    DESCRIPTION OF ITEM:

    Item No. 32 Providing and fixing, union brass cock.

    (i) 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Cost of cock 1.00 No. 52.00 each 52.00

    Total 52.00

    Contractor's Profit & Overheads 20.00 Percent 10.40

    Total 62.40

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 69.88 Say 69.90

    Page 58

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    59/107

    DESCRIPTION OF ITEM:

    Item No. 32 Providing and fixing, union brass cock.

    (ii) 2 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Cost of cock 1.00 No. 80.00 each 80.00

    Total 80.00

    Contractor's Profit & Overheads 20.00 Percent 16.00

    Total 96.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 7.48 Say 7.50

    Composite rate for Each Rs. 103.48 Say 103.50

    Page 59

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    60/107

    DESCRIPTION OF ITEM:

    Item No. 33 Providing and fixing floor trap of Cast Iron including concrete chamber

    all-round and C.I grating.

    (i) 10 x 5 cm (4" x 2").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I floor trap including grating

    size 10 x 5 cm (4" x 2") 1.00 No. 90.00 each 90.00

    2 Cement 0.065 Bag 230.00 Bag 14.95

    3 Sand 0.160 Cft. 350.00 % Cft. 0.56

    4 Crushed Stone 0.310 Cft. 1850.00 % Cft. 5.74

    Total 111.25

    Contractor's Profit & Overheads 20.00 Percent 22.25

    Total 133.49

    LABOU For 10 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 22.44 Say 22.45

    Composite rate for Each Rs. 155.93 Say 155.95

    Pa e 60

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    61/107

    DESCRIPTION OF ITEM:

    Item No. 33 Providing and fixing floor trap of Cast Iron including concrete chamber

    all-round and C.I grating.

    (ii) Floor trap size 10 x 7.5 cm (4" x 3").

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I floor trap including grating

    size 10 x 7.5 cm (4" x 3") 1.00 No. 105.00 each 105.00

    2 Cement 0.065 Bag 230.00 Bag 14.95

    3 Sand 0.160 Cft. 350.00 % Cft. 0.56

    4 Crushed Stone 0.310 Cft. 1850.00 % Cft. 5.74

    Total 126.25

    Contractor's Profit & Overheads 20.00 Percent 25.25

    Total 151.49

    LABOU For 10 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 22.44 Say 22.45

    Composite rate for Each Rs. 173.93 Say 173.95

    Pa e 61

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    62/107

    DESCRIPTION OF ITEM:

    Item No. 34 Providing and fitting P-trap including concrete chamber with cast iron

    gully grating.

    (i) Cast Iron 10 cm (4" dia)

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I. P-trap 10 cm (4" dia) 1.00 No. 135.00 each 135.00

    2 Cement 0.016 Bag 230.00 Bag 3.68

    3 Sand 0.040 Cft. 350.00 % Cft. 0.14

    4 Crushed Stone 0.081 Cft. 1850.00 % Cft. 1.50

    Total 140.32

    Contractor's Profit & Overheads 20.00 Percent 28.06

    Total 168.38

    LABOU For 12 Nos.

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 18.70 Say 18.70

    Composite rate for Each Rs. 187.08 Say 187.10

    Page 62

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    63/107

    DESCRIPTION OF ITEM:

    Item No. 34 Providing and fitting P-trap.

    (ii) Glazed 10 cm (4" dia)

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Glazed Pee trap 10 cm (4" dia) 1.00 No. 40.00 each 40.00

    2 Cement 0.016 Bag 230.00 Bag 3.68

    3 Sand 0.040 Cft. 350.00 % Cft. 0.14

    4 Crushed Stone 0.081 Cft. 1850.00 % Cft. 1.50

    Total 45.32

    Contractor's Profit & Overheads 20.00 Percent 9.06

    Total 54.38

    LABOU For 12 Nos.

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate for Each Rs. 18.70 Say 18.70

    Composite rate for Each Rs. 73.08 Say 73.10

    Pa e 63

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    64/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    65/107

    DESCRIPTION OF ITEM:

    Item No. 36 (i) Providing & fitting cast iron soil pipe with:

    (a) Lead caulked, yarn joint 10 cm (4") dia.

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 2 METRE)

    1 C.I Soil 10 cm (4") dia 2.00 Metre 350.00 per metre 700.00

    Cost of lead joint

    a) Lead 2.36 Kg. 20.00 Per Kg. 47.20

    b) Yarn

    c) Fuel wood 1.45 Kg. 2.75 Per Kg. 3.99

    Total 755.19

    Contractor's Profit & Overheads 20.00 Percent 151.04

    Total 906.23

    Material cost/metre

    906.23 = 453.11 453.11

    2

    LABOU For 20 Metre

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 2.00 Nos. 140.00 per day 280.00

    Total 450.00Sundries 10.00 Percent 45.00

    Total 495.00

    Contractor's Profit & Overheads 20.00 Percent 99.00

    Total 594.00

    ITEM RATES

    Labour rate per Metre Rs. 29.70 Say 29.70

    Labour rate per Ft. Rs. 9.05 Say 9.05

    Composite rate per Metre Rs. 482.81 Say 482.80

    Composite rate per Ft. Rs. 147.20 Say 147.20

    Pa e 65

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    66/107

    DESCRIPTION OF ITEM:

    Item No. 36 (i) Providing & fitting cast iron soil pipe with:

    (b) Lead caulked, yarn joint 5 cm (2") dia.

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 2 METRE)

    1 C.I Soil 5 cm (2") dia 2.00 Metre 200.00 per metre 400.00

    Cost of lead joint

    a) Lead 0.23 Kg. 20.00 Per Kg. 4.60

    b) Yarn

    c) Fuel wood 0.73 Kg. 2.75 Per Kg. 2.01

    Total 408.61

    Contractor's Profit & Overheads 20.00 Percent 81.72

    Total 490.33

    Material cost/metre

    449.46 = 224.73 245.1645

    2

    LABOU For 50 Metre

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 2.00 No. 140.00 per day 280.00

    Total 450.00

    Sundries 10.00 Percent 45.00Total 495.00

    Contractor's Profit & Overheads 20.00 Percent 99.00

    Total 594.00

    ITEM RATES

    Labour rate per Metre Rs. 11.88 Say 11.90

    Labour rate per Ft. Rs. 3.62 Say 3.60

    Composite rate per Metre Rs.

    257.04 Say 257.05

    Composite rate per Ft. Rs. 78.37 Say 78.35

    Page 66

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    67/107

    DESCRIPTION OF ITEM:

    Item No. 36 (ii) Cement caulked joint.

    (a) 10 cm (4") dia.

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 2 METRE)

    1 C.I Soil pipe 10 cm (4") dia 2.00 Meter 350.00 per metre 700.00

    2 Yarn 0.25 Lbs 16.00 Lbs 4.00

    3 Cement 0.022 Bag 230.00 Bag 5.06

    Total 709.06

    Contractor's Profit & Overheads 20.00 Percent 141.81

    Total 850.87

    Material cost per metre 425.44

    LABOU For 40 Metres

    1 Mason/Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50

    Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Metre Rs. 6.77 Say 6.75

    Labour rate per Ft. Rs. 2.06 Say 2.05

    Composite rate per metre Rs. 432.20 Say 432.20

    Composite rate per Ft. Rs. 131.77 Say 131.75

    Page 67

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    68/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    69/107

    DESCRIPTION OF ITEM:

    Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint, including all

    specials.

    (i) 6 cm i/d.

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    Rate Analysis for 3 Metre

    MATERIAL

    1 A.C Soil Pipe 3.00 Metre 57.80 per metre 173.40

    2 Specials @ 10% 17.34

    3 Yarn 0.25 Lbs 16.00 Lbs 4.00

    4 Cement 0.022 Bag 230.00 Bag 5.06

    Total 199.80

    Contractor's Profit & Overheads 20.00 Percent 39.96

    Total 239.76

    Material cost per metre 79.92

    LABOU For 50 Metre

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Metre Rs. 5.41 Say 5.40

    Labour rate per Ft. Rs. 1.65 Say 1.65

    Composite rate per Metre Rs.

    85.33 Say 85.35

    Composite rate per Ft. Rs. 26.02 Say 26.00

    Page 69

    SC O O

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    70/107

    DESCRIPTION OF ITEM:

    Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,

    including all specials.

    (ii) 7.5 cm (3" dia).

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 3 METRE

    1 A.C Soil Pipe 3.00 Metre 147.36 per metre 442.08

    2 Specials @ 10% 44.21

    3 Yarn 0.25 Lbs 16.00 Lbs 4.00

    4 Cement 0.022 Bag 230.00 Bag 5.06

    495.35

    Contractor's Profit & Overheads 20.00 Percent 99.07

    Total 594.42

    Material cost per metre 198.14

    LABOU For 45 Metre

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Metre Rs. 6.01 Say 6.00

    Labour rate per Ft. Rs. 1.83 Say 1.85

    Composite rate per Metre Rs. 204.15 Say 204.15

    Composite rate per Ft. Rs. 62.24 Say 62.25

    Page 70

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    71/107

    DESCRIPTION OF ITEM:

    Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,

    including all specials.

    (iii) 10 cm (4" dia).

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 3 METRE

    1 A.C Soil Pipe 4.00 Metre 215.89 per metre 863.56

    2 Specials @ 10% 86.36

    3 Yarn 0.31 Lbs 16.00 Lbs 4.96

    4 Cement 0.028 Bag 230.00 Bag 6.44

    961.32

    Contractor's Profit & Overheads 20.00 Percent 192.26

    Total 1,153.58

    Material cost per metre 288.39

    LABOU For 40 Metre

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Metre Rs. 6.77 Say 6.75

    Labour rate per Ft. Rs. 2.06 Say 2.05

    Composite rate per Metre Rs. 295.16 Say 295.15

    Composite rate per Ft. Rs. 89.99 Say 90.00

    Page 71

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    72/107

    DESCRIPTION OF ITEM:

    Item No. 37 Providing and fitting, A.C Soil pipe with cement caulked joint,

    including all specials.

    (iv) 15 cm (6" dia) A/C Soil Pipe.

    Detail Unit Rate (Metric) per R.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 4 METRE

    1 A.C Soil pipe 50 cm (6" dia) 4.00 Metre 300.58 per metre 1202.32

    2 Special at 10% 120.23

    3 Yarn 0.500 Lbs 16.00 Lbs 8.00

    4 Cement 0.044 Bag 230.00 Bag 10.12

    1340.67

    Contractor's Profit & Overheads 20.00 Percent 268.13

    Total 1,608.81

    Material cost per metre 402.20

    LABOU For 30 Metre

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Metre Rs. 9.02 Say 9.00

    Labour rate per Ft. Rs. 2.75 Say 2.75

    Composite rate per Metre Rs. 411.22 Say 411.20

    Composite rate per Ft. Rs. 125.37 Say 125.35

    Page 72

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    73/107

    DESCRIPTION OF ITEM:

    Item No. 38 Providing and fitting cast iron specials, such as tee bend, collar, cross, etc.

    plain type.

    (i) Lead Caulked Joint.

    Detail Unit Rate (British System) per Kg

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 5 KG.

    1 C.I. bend 100 mm (4" dia) 5.00 kg 30.00 per kg 150.00

    2 Lead 0.91 kg 20.00 per kg 18.20

    3 Fuel 2.91 kg 2.75 per kg 8.00

    4 Yarn 0.50 lbs 16.00 per lbs 8.00

    Total 184.20

    Contractor's Profit & Overheads 20.00 Percent 36.84

    Total cost for 5 kg 221.04

    Material cost per Kg 44.21

    LABOU FOR 60 NOS.

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Cooly un-skilled 1.20 Nos. 140.00 per day 168.00

    Total 338.00

    Sundries 10.00 Percent 33.80

    Total 371.80Contractor's Profit & Overheads 20.00 Percent 74.36

    Total 446.16

    ITEM RATES

    Labour rate per Kg Rs. 7.44 Say 7.45

    Composite rate per Kg Rs. 51.64 Say 51.65

    Page 73

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    74/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    75/107

    DESCRIPTION OF ITEM:

    Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.

    (i) 30 cm (12" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Manhole cover 30 cm (12" dia) 1.00 No. 120.00 each 120.00

    Total 120.00

    Contractor's Profit & Overheads 20.00 Percent 24.00

    Total 144.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 11.22 Say 11.20

    Composite rate per each Rs. 155.22 Say 155.20

    Page 75

    SC O O

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    76/107

    DESCRIPTION OF ITEM:

    Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.

    (ii) 45 cm (18" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I. manhole cover with frame 45 cm 1.00 No. 220.00 each 220.00

    (18" dia)

    Total 220.00

    Contractor's Profit & Overheads 20.00 Percent 44.00

    Total 264.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 11.22 Say 11.20

    Composite rate per each Rs. 275.22 Say 275.20

    Page 76

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    77/107

    DESCRIPTION OF ITEM:

    Item No. 39 Supply and fitting of cast iron Manhole cover with frame, etc. complete.

    (iii) C.I. Manhole cover 60 cm (24" dia)

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.I manhole cover with frame 60 cm (24" dia) 1.00 No. 400.00 each 400.00

    Total 400.00

    Contractor's Profit & Overheads 20.00 Percent 80.00

    Total 480.00

    LABOU For 15 Nos.

    1 2 1.00 No. 170.00 per day 170.00

    2 Helper (Cooly) 0.25 No. 140.00 per day 35.00

    Total 205.00

    Sundries 10.00 Percent 20.50

    Total 225.50

    Contractor's Profit & Overheads 20.00 Percent 45.10

    Total 270.60

    ITEM RATES

    Labour rate per Each Rs. 18.04 Say 18.05

    Composite rate per each Rs. 498.04 Say 498.05

    Page 77

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    78/107

    DESCRIPTION OF ITEM:

    Item No. 40 Providing and fitting R.C.C Pipe 10 cm (4" dia) including

    laying and jointing in trenches.

    Detail Unit Rate (British System) per L.M

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL FOR 2 METRE

    2.00 metre

    1 R.C.C pipe 10 cm (4" dia) 6.56 Rft 20.00 per Rft 131.20

    Total 131.20

    Contractor's Profit & Overheads 20.00 Percent 26.24

    Total 157.44

    Material cost per metre 78.72

    LABOU For 40 Metre

    1 Plumber 1.00 No. 170.00 per day 170.00

    2 Helper (Cooly) 2.00 Nos. 140.00 per day 280.00

    Total 450.00

    Sundries 10.00 Percent 45.00

    Total 495.00

    Contractor's Profit & Overheads 20.00 Percent 99.00

    Total 594.00

    ITEM RATES

    Labour rate per Metre Rs. 14.85 Say 14.85

    Labour rate per Ft. Rs. 4.53 Say 4.55

    Composite rate per Metre Rs. 93.57 Say 93.55

    Composite rate per Ft. Rs. 28.53 Say 28.55

    Page 78

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    79/107

    DESCRIPTION OF ITEM:

    Item No. 41 Providing and fitting chromium plated or oxidised gas Cock

    6 mm (" dia)

    (i) Single way.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Gas Cock of 6 mm (" dia) 1.00 No. 60.00 each 60.00

    Total 60.00

    Contractor's Profit & Overheads 20.00 Percent 12.00

    Total 72.00

    LABOU For 30 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 7.48 Say 7.50

    Composite rate per each Rs. 79.48 Say 79.50

    Page 79

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    80/107

    DESCRIPTION OF ITEM:

    Item No. 41 Providing and fitting chromium plated or oxidised gas Cock

    6 mm (" dia)

    (ii) Two way cock.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Gas Cock of 6 mm (" dia) 1.00 No. 65.00 each 65.00

    Total 65.00

    Contractor's Profit & Overheads 20.00 Percent 13.00

    Total 78.00

    LABOU For 20 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 11.22 Say 11.20

    Composite rate per each Rs. 89.22 Say 89.20

    Page 80

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    81/107

    DESCRIPTION OF ITEM:

    Item No. 41 Providing and fitting chromium plated or oxidised gas Cock

    6 mm (" dia)

    (iii) Three way cock.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Gas Cock of three way 1.00 No. 70.00 each 70.00

    Total 70.00

    Contractor's Profit & Overheads 20.00 Percent 14.00

    Total 84.00

    LABOU For 15 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 14.96 Say 14.95

    Composite rate per each Rs. 98.96 Say 98.95

    Page 81

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    82/107

    DESCRIPTION OF ITEM:

    Item No. 42 Providing and fitting nipple or bush 6 mm to 10 mm (" - 3/8") i/d.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Nipple or bush 6 mm to 10 mm

    (1/4" - 3/8") i/d. 1.00 No. 6.00 each 6.00

    Total 6.00

    Contractor's Profit & Overheads 20.00 Percent 1.20

    Total 7.20

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 5.61 Say 5.60

    Composite rate per each Rs. 12.81 Say 12.80

    Page 82

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    83/107

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    84/107

    DESCRIPTION OF ITEM:

    Item No. 43 Providing and fixing, brass gas cock.

    (ii) 2 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Brass gas cock 2 cm (" dia) 1.00 No. 75.00 each 75.00

    75.00

    Contractor's Profit & Overheads 20.00 Percent 15.00

    Total 90.00

    LABOU For 48 Nos.

    1 Plumber 0.25 No. 170.00 per day 42.50

    Total 42.50

    Sundries 10.00 Percent 4.25

    Total 46.75

    Contractor's Profit & Overheads 20.00 Percent 9.35

    Total 56.10

    ITEM RATES

    Labour rate per Each Rs. 1.17 Say 1.15

    Composite rate per each Rs. 91.17 Say 91.15

    Page 84

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    85/107

    DESCRIPTION OF ITEM:

    Item No. 44 Providing and fixing brass stop cock/bib cock.

    (i) 1.5 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Brass stop cock/bib cock. 1.00 No. 38.00 each 38.00

    Total 38.00

    Contractor's Profit & Overheads 20.00 Percent 7.60

    Total 45.60

    LABOU For 30 Nos.

    1 Plumber 0.25 No. 170.00 per day 42.50

    Total 42.50

    Sundries 10.00 Percent 4.25

    Total 46.75

    Contractor's Profit & Overheads 20.00 Percent 9.35

    Total 56.10

    ITEM RATES

    Labour rate per Each Rs. 1.87 Say 1.85

    Composite rate per each Rs. 47.47 Say 47.45

    Page 85

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    86/107

    DESCRIPTION OF ITEM:

    Item No. 44 Providing and fixing brass stop cock/bib cock.

    (ii) 2 cm (" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Brass stop cock/brass bib cock 1.00 No. 65.00 each 65.00

    Total 65.00

    Contractor's Profit & Overheads 20.00 Percent 13.00

    Total 78.00

    LABOU For 30 Nos.

    1 Plumber 0.25 No. 170.00 per day 42.50

    Total 42.50

    Sundries 10.00 Percent 4.25

    Total 46.75

    Contractor's Profit & Overheads 20.00 Percent 9.35

    Total 56.10

    ITEM RATES

    Labour rate per Each Rs. 1.87 Say 1.85

    Composite rate per each Rs. 79.87 Say 79.85

    Page 86

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    87/107

    DESCRIPTION OF ITEM:

    Item No. 45 Hoisting and placing in position precast R.C latrine seats.

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    LABOU For 8 Nos.

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    2 Coolies skilled 3.00 Nos. 160.00 per day 480.00

    Total 650.00

    Sundries 10.00 Percent 65.00

    Total 715.00

    Contractor's Profit & Overheads 20.00 Percent 143.00

    Total 858.00

    ITEM RATES

    Labour rate per Each Rs. 107.25 Say 107.25

    Page 87

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    88/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 1 Providing and fixing, chromium plated waste coupling.

    (i) 3 cm (1" dia)

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.P. coupling 3 cm (1" dia) 1.00 No. 70.00 each 70.00

    Total 70.00

    Contractor's Profit & Overheads 20.00 Percent 14.00

    Total 84.00

    LABOU For 20 Nos.

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 11.22 Say 11.20

    Composite rate per each Rs. 95.22 Say 95.20

    Page 88

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    89/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 1 Providing and fixing, chromium plated waste coupling.

    (ii) 4 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 C.P. coupling 4 cm (1" dia) 1.00 No. 75.00 each 75.00

    Total 75.00

    Contractor's Profit & Overheads 20.00 Percent 15.00

    Total 90.00

    LABOU For 20 Nos.

    1 Plumber/Mason 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 11.22 Say 11.20

    Composite rate per each Rs. 101.22 Say 101.20

    Page 89

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    90/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 2 Providing and fixing rubber plug with chain.

    (i) 3 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Rubber plug with chain 3 cm

    (1" dia) 1.00 No. 25.00 each 25.00

    Total 25.00

    Contractor's Profit & Overheads 20.00 Percent 5.00

    Total 30.00

    LABOU For 50 Nos.

    1 Plumber 0.10 No. 170.00 per day 17.00

    Total 17.00

    Sundries 10.00 Percent 1.70

    Total 18.70

    Contractor's Profit & Overheads 20.00 Percent 3.74

    Total 22.44

    ITEM RATES

    Labour rate per Each Rs. 0.45 Say 0.45

    Composite rate per each Rs. 30.45 Say 30.45

    Page 90

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    91/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 2 Providing and fixing rubber plug with chain.

    (ii) Rubber plug with chain 4 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 Rubber plug with chain 4 cm

    (1" dia) 1.00 No. 25.00 each 25.00

    Total 25.00

    Contractor's Profit & Overheads 20.00 Percent 5.00

    Total 30.00

    LABOU For 50 Nos.

    1 Plumber 0.10 No. 170.00 per day 17.00

    Total 17.00

    Sundries 10.00 Percent 1.70

    Total 18.70

    Contractor's Profit & Overheads 20.00 Percent 3.74

    Total 22.44

    ITEM RATES

    Labour rate per Each Rs. 0.45 Say 0.45

    Composite rate per each Rs. 30.45 Say 30.45

    Page 91

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    92/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 3 Providing and fixing waste pipe of PVC.

    (i) 3 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 P.V.C. waste pipe 3 cm (1" dia) 1.00 No. 12.00 each 12.00

    Total 12.00

    Contractor's Profit & Overheads 20.00 Percent 2.40

    Total 14.40

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 5.61 Say 5.60

    Composite rate per each Rs. 20.01 Say 20.00

    Page 92

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    93/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 3 Providing and fixing waste pipe of PVC.

    (ii) P.V.C Waste Pipe 4 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 P.V.C. waste pipe 4 cm (1" dia) 1.00 No. 15.00 each 15.00

    Total 15.00

    Contractor's Profit & Overheads 20.00 Percent 3.00

    Total 18.00

    LABOU For 40 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 5.61 Say 5.60

    Composite rate per each Rs. 23.61 Say 23.60

    Page 93

  • 8/9/2019 Rate analsis Chapter No. 19 Plumbing, Sanitary Installation & Gas Fittings)

    94/107

    REPL EMENT

    DESCRIPTION OF ITEM:

    Item No. 4 Providing and fixing flushing bend of P.V.C.

    (i) 3 cm (1" dia).

    Detail Unit Rate (British System) for Each

    Qty Rate Per Unit Amount (Rs.)

    MATERIAL

    1 P.V.C. flushing bend 3 cm (1" dia) 1.00 No. 18.00 each 18.00

    Total 18.00

    Contractor's Profit & Overheads 20.00 Percent 3.60

    Total 21.60

    LABOU For 45 Nos.

    1 Plumber 1.00 No. 170.00 per day 170.00

    Total 170.00

    Sundries 10.00 Percent 17.00

    Total 187.00

    Contractor's Profit & Overheads 20.00 Percent 37.40

    Total 224.40

    ITEM RATES

    Labour rate per Each Rs. 4.99 Say 5.00

    Composite rate per each Rs. 26.59 Say 26.60