rate analysis for dewatering
TRANSCRIPT
-
8/17/2019 Rate Analysis for Dewatering
1/4
Sl. No. Item
1
2 Installation
a Pipes
b Reducers, bends, well points, casing, etc
c Valves
d Labor for Installation
3Overhead & Misc
a Labor for Dewatering
b Temporary Construction
c Lighting
d aintenance of installation and Temp Constructions
e Demobilli!ation of e"uipment and, Installation, etc
f Contingencies
g ta#es
4Analysis
a
b Power Rating of e"uipment$%&'
Equiment !e"aterin# Equiment $!iesel%Electric%neumatic' use cost as er IS 11()*
Total ("uipment running hours at one location before shiftto other location
-
8/17/2019 Rate Analysis for Dewatering
2/4
c Total Cost$Cr'
d Residual value of pipes
e Cost of Dewatering$Rs)%&h'
-
8/17/2019 Rate Analysis for Dewatering
3/4
+nit ,uantity -ate Amount
hour
*os
*os
L+
manonth
L+
L+
L+
L+
L+
L+
h
P
-
8/17/2019 Rate Analysis for Dewatering
4/4
CR
CrCR)$p-h'
Cost of ("uipment $Ce' .Cost of Installation $C/' .Cost of overheads $Co'