rbi traing schedule.pdf

Upload: ananda27

Post on 14-Apr-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 RBI Traing Schedule.pdf

    1/2

    Risk Based Inspection

    Course #1508

    Course Details

    Length: 1 day

    Prerequisite: APM Framework - User

    Benefits: You will learn how to use Meridiums RiskBased Inspection module.

    Audience: General Users, Implementers,Administrators

    Overview

    MI Data Collection Stage

    You will learn about Meridiums Mechanical Integrity BestPractice and how it relates to Risk Based Inspection.You will access the Mechanical Integrity Dashboard andidentify assets due for RBI. You will view exiting Processand Design Data, Inspection History, and TM data.Finally, you will create a new RBI Component.

    MI Degradation Mechanisms Review Stage

    You will modify an RBI System by attaching a Reference

    Document and linking existing Potential DegradationMechanisms and RBI Components to it.

    MI Risk Assessment Stage

    You will view access RBI Analysis results and view theassociated Consequence and Degradation MechanismEvaluations. You will create a new RBI Analysis andcomplete Consequence and Degradation MechanismEvaluations. You will calculate the Analysis, performsimulations, and set its State to Risk Completed.

    MI Activi ty Planning & Execution Stage

    You will view existing Tasks and Recommendations andthen create new RBI Recommendations. You willconsolidate and approve Recommendations and linkthem to existing Inspection Tasks. Finally, you willcreate a new Inspection Task and Full Inspection, andadd Thickness Measurements.

    MI Activi ty Evaluation Stage

    You will learn how to evergreen an RBI Analysis.

    http://home.meridium.com/sites/Marketing/presentation_icons_and_images/Forms/Show%20All%20Images.aspx?RootFolder=/sites/Marketing/Presentation_Icons_and_Images/Presentation%20Icons%20Library%202010&View={C30D18FD-43BF-4794-A254-D6F38EC70756}
  • 7/29/2019 RBI Traing Schedule.pdf

    2/2

    Risk Based Inspection

    Course #1508

    AgendaIntroduction

    MI Best Practice WorkflowMI Data Collection Stage

    The Baseline Mechanical Integrity DashboardIdentifying Assets Due for RBIViewing Existing Process and Design DataViewing Existing Inspection HistoryViewing Existing TM DataCreating a New RBI ComponentMI Degradation Mechanisms Review Stage

    Modifying an RBI SystemAttaching a Reference Document to itLinking Potential Degradation Mechanisms to itLinking Existing RBI Components to itMI Risk Assessment Stage

    The RBI Criticality MatrixViewing Existing RBI Analysis ResultsViewing Consequence EvaluationsViewing Degradation Mechanism EvaluationsCreating an RBI AnalysisCompleting Consequence EvaluationsCompleting Degradation Mechanism EvaluationsCalculating an AnalysisWhat if and Future Risk SimulationsSetting the State to Risk Completed

    MI Activi ty Planning & Execution Stage

    Viewing Existing Tasks and RecommendationsAuto-generating RBI RecommendationsCreating an RBI Recommendation ManuallyConsolidating RecommendationsApproving RecommendationsLinking Recommendations to an Inspection TaskCreating a New Inspection TaskCreating a New Full InspectionAdding New Thickness MeasurementsMI Activ ity Evaluation Stage

    Evergreening RBI Analysis Results