rc w profile

Upload: rhandy-villanueva

Post on 06-Jul-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/17/2019 Rc w Profile

    1/62

      RCW CONSTRUCTION

    & DEVELOPMENTCORPORATION  

    INTERIOR FINISHING CO NTRACTORS

     

    Rm 508 Jovan

    Condominium

    Shaw Blvd cor

    Samat St

    Mandaluyong City

    Metro Manila

    Philippines

    Tel 63 2) 5337020

    Fax 63 2) 5333438

    E-mail [email protected]

    www.rcw.com.ph

  • 8/17/2019 Rc w Profile

    2/62

    INTRO U TION 

    From vision to reality...

    Designer’s Perspective (courtesy ofSteven J. Leach, Jr. + AssociatesManila) and completed view of theMain Banking Hall, Philippine Bankof Communications Head Office inManila.

    In this diverse and dynamic industry, we specialize in problem solving. The complexity of thebuilding process often derails the integrity of the conceptualized design. Through our part-nership with the Designer, the Architect, Suppliers, Product and Equipment Manufacturers,and the Customer, we continually strive to develop effective solutions to these otherwise in-

    tractable problems. The idea of partnership lies at the very heart of RCW CONSTRUC- 

    TION’s corporate philosophy.

    Each component in the building process, from the Customer to our engineers to the varioustrade specialists to the Designer and Architect, is a two-, three or four-way partnership inbuilding a cost effective, technically competent and aesthetically enduring structure.

    In a broad range of applications, from elegant corporate interiors to industrial buildings tohumble residences, we unceasingly stress value engineering, innovation, and above all, in-tegrity—cornerstones in any successful project delivery.

    In the light of this underlying philosophy, we eagerly look forward to continuing this partner-ship through the coming years.

  • 8/17/2019 Rc w Profile

    3/62

    R E P R E S E N T A T I V E C L I E N T S

    ASIA GLOBAL CROSSINGABACUS SECURITIES CORP.ABS-CBN FOUNDATION / BANTAY BATAABN – AMROAETNA LIFE INSURANCE INC.AIT TECHNOLOGIES, INC.ALLIANCE TEXTILE MILLSAMBERGRIS SOLUTIONS

    ANZ BANK APACARMSTRONG HOLDINGS, INC.ARMSTRONG SECURITIES INC.ASI SECURITIES, INC.ASIA SEC. EQUITIES, INC.ATLAS RESOURCES, INC.AUTHENTIC AMERICAN APPARELAUTOMATIC CENTREAVENTIS PHARMACEUTICALSAYALA AON RISK SERVICES, INC.AYALA PROPERTY MANAGEMENT CORP.BANGKO SENTRAL NG PILIPINASBASIC HOLDINGS COMMODITIES INC.BAXTER HEALTH CARE PHILS., INC.CALATAGAN GOLF & COUNTRY CLUBCALTEX PHILIPPINES, INC.CARMELRAY DEVELOPMENT CORP.CENTECH INTERNATIONAL, INC.CENTENNIAL CITY/AMARI COASTAL BAY DEV’T.CIBA GEIGYCOLLINS INTERNATIONAL TRADING CORP.CORNELL FOODS, INC.DBS BANK PHILIPPINES, INC.DEMMIK REALTY INC.DHL WORLDWIDE EXPRESS (PHILS) CORP.DISCOVERY CENTREDRAGON (FAREAST) LIMITEDEBC SECURITIES CORP.

    EQUITABLE BANKING CORP./EQUICOMEVERGREEN SECURITIESF. YAP SECURITIESFACE AND BODY CORP.FPD-SAVILLSGLAXO WELLCOME PHILIPPINES INC.GLOBAL LINK HOLDINGS CORP.GOLDSTAR SECURITIES, INC.GREEN CROSS, INC.GUOCO HOLDINGS, INC.GUOCO PROPERTY DEVELOPMENT, INC.INFONXX CALL CENTER ING BANK INTELLIGENT WAVE, INC.INTERNATIONAL FINANCE CORP. (IFC)

    INTERPORT RESOURCES CORP.ITALTELJ. BALLAS SECURITIESJ. WALTER THOMPSON (JWT)JAG & HAGGAR JEANS & SPORTSWEAR CORP.JARDINE LAND INC.JARDINE LLOYD THOMSONJONES LANG WOOTTONKAWASAKI GROUP OF COMPANIESKENNY ROGERS ROASTERS (PHILS.) INC.KUMON PHILIPPINES, INC.LA TONDEÑA DISTILLERS, INC.LEA FASHION PHILIPPINESXIC GLOBAL

    LUCKY RAYON PHILIPPINES INC.LUNDBECK MANILAMANDARIN ORIENTAL HOTELMANDARIN SECURITIES INC.MARIE FRANCE BODYLINE INTERNATIONALMARUBENI ENERGY SERVICES CORP.MARSMAN DRYSDALEMDR SECURITIES, INC.

    MICROSOFT PHILIPPINES INC.MINDSHARE MANILAMONACO MANUFACTURING CORP.MONDE NISSIN CORP., INC.MTV PHILIPPINES TENANCY

     NEGROS NAVIGATION INC. NEPTUNE ORIENT LINES (NOL) NOL MANAGEMENTOAKRIDGE PROPERTIES / DISCOVERY CENTREOCBC SECURITIESOGILVY & MATHER PHILIPPINES, INC.OILAND DEVELOPMENT CORP.ORACLE SYSTEMS (PHILS), INC.ORION BANK CORPORATIONPFIZER 

    PAN-ASIA SECURITIES CORP.PARIBAS ASIA EQUITY (PHILS.) INC.PHILIP MORRIS PHILIPPINES, INC.PHILIPPINE BANK OF COMMUNICATIONSPHILIPPINE REALTY & HOLDINGS CORP.PHILIPPINE STOCK EXCHANGEPHILIPPINE FOUNDATION FOR GLOBAL CONCERNPNB SECURITIESPLANTERS BANK PRA SOLUTION / NAVITAIRE, INC.PRIMARK PHILIPPINES, INC.PROCTER & GAMBLE PHILS.QSR CORP.QUEZON CITY HALLRASHID HUSSAIN HOLDINGS (PHILS) INC.

    RAYTHEON INTERNATIONALREGUS BUSINESS CENTREROLEX PHILIPPINESSAFEWAY PHILTECH, INC.SAN MIGUEL PACKAGINGSAN PASCUAL COGENERATION CO. (PHILS.)LTDSARA LEE PHILIPPINESSINO-PHILIPPINES ASSET MANAGEMENT INC.SIX CONTINENTS (SC RESERVATIONS PHILS., INC.SPL WORLDGROUPSTANDARD SECURITIES CORP.SUMMIT SECURITIES INC.SUNLIFE OF CANADASUPERIUS (CORPORATION) TENANCYSVENSON HAIR CENTER SWISS RE-INSURANCETAJIMA EMBROIDERY MACHINERIES PHIL. INC.TEXACO PHILIPPINES, INC.THOMSON ASIA PTE. LTD.THOMSON FINANCIALUCPB GENERAL INSURANCEUNISELL MARKETING CORP.UNITED STATES INFORMATION SERVICESVANTAGE SECURITIESWESTIN PHILIPPINE PLAZAWORLD BANK XAVIER SPORTS & COUNTRY CLUB

  • 8/17/2019 Rc w Profile

    4/62

     

     A PORTFOLIO OF

    COMPLETED PROJECTS

    RCW CONSTRUCTION

  • 8/17/2019 Rc w Profile

    5/62

      SC Reservations Philippines Inc. RCW CONSTRUCTION

    SC Reservations PhilippinesInc. is the call center for the Inter-Continental Hotels Group, a lead-ing global hospitality group, withover 3,300 hotels across nearly

    100 countries and territories. Thecall center primarily services itshotel reservations system and oc-cupies about 2,000 square metersat their new offices located at the28 and 29th floors of Tower 2 ofthe RCBC Plaza located along Ay-ala Avenue.

    The project is designed and proj-ect managed by the firm of DelRosario Design Group.

  • 8/17/2019 Rc w Profile

    6/62

    The GT Tower Pent-house was envisioned toservice high profile func-tions of the MetroBank

    Group. Located at thepenthouse level of the GTTower   along Ayala Ave-nue in Makati City, theproject was designed byWV Coscolluela & Asso-ciates  and project man-aged by Federal Land.

    GT Tower Penthouse RCW CONSTRUCTION

  • 8/17/2019 Rc w Profile

    7/62

    ANZ Bank (Banking Hall and Corporate office)RCW CONSTRUCTION

    Design : HBO+EMTB

    Project Management : Binswanger Philippines, Inc.

    Location : 23rd Flr, GT Tower, Ayala Avenue, Makati City

     Area : 1,200 sq.m.

  • 8/17/2019 Rc w Profile

    8/62

      World BankRCW CONSTRUCTION

    Designed by and project management bySteven J. Leach + Associates 

    Location : 20th Floor Taipan Bldg., Em-erald Avenue, Ortigas Center, Pasig City

     Area : 400 sq.m.

  • 8/17/2019 Rc w Profile

    9/62

      Chase Manhattan BankRCW CONSTRUCTION

    Designed by Group 3Design Studio, headed by ArchitectEdwin Gumila, thenew offices of Chase

    Manhattan Bank oc-cupies the thirty firstfloor of the PhilamlifeTower   located at theMakati Business Dis-trict. The design uti-tlized plasma filledglass for the meetingrooms and chief ex-ecutive office whichcan be switched fromclear to opaque. Proj-ect management was

    by GSPM HongKong, headed by Mr.Gerry Shirley.

  • 8/17/2019 Rc w Profile

    10/62

    RCW CONSTRUCTION Chase Manhattan Bank

  • 8/17/2019 Rc w Profile

    11/62

    World Bank RCW CONSTRUCTION

    The Philippine office of the International Bank for Recon-struction & Development is located at the 23rd floor of theTaipan Bldg within the Ortigas Business District. The Bankoccupies 960 square meters. Interior design and projectmanagement was conducted by the firm of Steven J.Leach, Jr + Associates. The designer’s use of narra tim-

    ber in hand rubbed oil finish along with glass and stainlesssteel enhances the institutional character of the client.

  • 8/17/2019 Rc w Profile

    12/62

      ABN-Amro Bank (Banking Hall)RCW CONSTRUCTION

    ABN-Amro, a majorDutch and global bankwith a strong regionalpresence, consolidated itsPhilippine offices, locating

    them on the 16th-19thfloors of the LKG Tower  along Ayala Avenue.Their offices house theABN-Amro SavingsBank, their off-shorebanking unit and broker-age offices. The mainbanking hall is located atthe ground floor and alsooccupies part of the firstbasement.

    Design was by the firm ofDavenport Campbelland project managementwas by Jones Lang La-Salle (Hong Kong).

  • 8/17/2019 Rc w Profile

    13/62

      DBS Bank (Head Office)RCW CONSTRUCTION

    DBS Bank  is the Philip-pine-owned bank of theDevelopment Bank of

    Singapore. The head of-fice occupies the 6, 7,mezzanine, ground andbasement levels of Tower2 of the Enterprise Cen-ter . The photos hereshow the main bankinghall located at the groundfloor.

    Design and project man-agement was by DesignProgrammers, Inc.

    headed by Ms. Mary El-len Teters Castillo. Me-chanical, Electrical, andPlumbings works was byH T E Integrated Serv-ices, Inc. 

  • 8/17/2019 Rc w Profile

    14/62

      Orion BankRCW CONSTRUCTION

    Orion Bank is a joint venture of Arm-strong Holdings  and the Tong YangGroup of Korea. Located at the groundand mezzanine floors of the ChathamBldg at the corner of Herrera and ValeroStreets, the bank occupies approximat-edly __ square meters. The ground floorhouses the main banking hall while themezzanine floor is occupied by Treas-ury and the Executive offices. The proj-ect is designed by Interior DesignerMargaret Go.

  • 8/17/2019 Rc w Profile

    15/62

    Philippine Bank of Communications RCW CONSTRUCTION

    The multi-phased project in-volves the renovation of the 7-storey head office building of

    the Philippine Bank of Com-munications located on JuanLuna St., Binondo, Manila. Thedesigner’s perspective belowshows the Main Banking Halland Lobby which is currentlyunder construction. The otherphotos show completed offices,work areas and the employeescanteen. Design is by the firmof Steven J Leach, Jr + Asso-ciates.

    Above.  View ofthe completedMain BankingHall and Lobby. 

  • 8/17/2019 Rc w Profile

    16/62

      ING Bank (Retail Banking)RCW CONSTRUCTION

    The 1995 liberalization of thebanking sector resulted in theentry of new foreign banks andexpansion of existing offshore

    units.

    ING Bank opened its first retailbranch at the ground floor ofthe prestigious Ayala TriangleTower 1 Building. Interior de-sign was by Steven J. LeachJr + Associates and projectmanagement was by AyalaProperty Management Corp.The bank’s corporate colors ofblue and red was skillfully inte-grated into the interior’s colorscheme. 

  • 8/17/2019 Rc w Profile

    17/62

    J. Walter Thompson Company, Inc.RCW CONSTRUCTION

    J. Walter Thompson is a major multinational advertisingfirm which is part of the WPP Group (UK), occupying the29th and 30th floors of the Enterprise Center. The inte-rior architecture is by BDG McColl (HK) headed by JohnScade and Judith Rainford and project management is by

    Jones Lang LaSalle (HK). The design is characterizedby its use of colored glass, stainless steel, cherry veneersand refreshing forms that highlight the company‘s crea-tive role.

  • 8/17/2019 Rc w Profile

    18/62

    RCW CONSTRUCTION J. Walter Thompson Company, Inc.

  • 8/17/2019 Rc w Profile

    19/62

      Ogilvy & Mather PhilippinesRCW CONSTRUCTION

    Designed by Davenport CampbellPhilipppines,  the new offices of re-nowned advertising multinational Ogilvy& Mather which in turn is part of theWPP group, occupies the fifteenth floor of

    the Philamlife Tower.. Noted for its play-ful colors and striking design elements,the fit-out aims to achieve an informal yetcreative environment.

  • 8/17/2019 Rc w Profile

    20/62

    RCW CONSTRUCTION Ogilvy & Mather Philippines

  • 8/17/2019 Rc w Profile

    21/62

      Navitaire Inc. (PRA Solutions)RCW CONSTRUCTION

    Formerly known as PRA Solu-tions, the technology consult-ing arm of Andersen Consult-ing is now renamed as Navi-taire and is located at the 16thfloor of the Philam Tower .

    The project was designed byDavenport Campbell to high-light group work within a col-laborative environment, yet freeflowing without appearance ofa rigid structure.

  • 8/17/2019 Rc w Profile

    22/62

     Fraser Serviced Residences at Forbes TowerRCW CONSTRUCTION

    The mock-up suite is located atthe 27th floor of the ForbesTower located along Valero St,Salcedo Village in Makati.

    Designed and project managedby the firm of Tema Interna-tional, the Singapore baseddesign firm headed by Mikeand Ruby Soh. The project is

     jointly owned by United Coco-nut Planters Bank (UCPB)and Seafrigate Properties(SG) with Fraser ServicedResidences Pte Ltd (SG) asthe operator. 

  • 8/17/2019 Rc w Profile

    23/62

    Occupying the 18th floorof the Philamlife Tower ,Regus  opened its 23rdbusiness center in the

     Asia Pacific region, offer-ing fully furnished, staffedand equipped offices in aprofessionally designedworking environment.

    Design and project man-agement was commis-sioned to the firm ofGoudie Associates. Thedesign is characterized bythe designer’s use ofstainless steel and filmed

    glass accented with natu-rally stained maple ve-neers.

    Regus Centres, Inc. RCW CONSTRUCTION

  • 8/17/2019 Rc w Profile

    24/62

    SPL WorldGroup Philippines, Inc.RCW CONSTRUCTION

    SPL WorldGroup is a global software company provid-ing software services for the utility industry with offices inNew York, London, Paris, Tel Aviv, Sidney and Mel-bourne. SPL occupies the 23rd floor of the  Yuchengco Tower  of the RCBC Plaza. The interior architecture is by

    SPACE (US) and project management is by DNA Con-sulting (HK) through Hailey Construction Corp. headedby Mr. Brian Parsons. 

  • 8/17/2019 Rc w Profile

    25/62

    RCW CONSTRUCTION XIC Global

    XIC Global is a call center venture of Oracle in thePhilippines and is designed by DNA Consulting(SG) and project management was by Hailey Con-struction Corp. XIC Global is located at the 22/f ofthe IBM Plaza located in Eastwood City in Libis, Qu-ezon City.

  • 8/17/2019 Rc w Profile

    26/62

      Primark Philippines Inc. RCW CONSTRUCTION

    Primark Philippines, a globalfinancial and business informa-tion company  primarily en-gaged in business data and re-search, occupies about 1,100

    square meters at their new of-fices located at the 20/F of theAyala FGU Tower locatedalong Ayala Avenue.

    Designed and project managedby the firm of Goudie Associ-ates, the interiors reflect amodern simplicity with its cleanlines and flowing curves.

  • 8/17/2019 Rc w Profile

    27/62

    Oil industry giant Texaco set up its Philippine officeto oversee its participationin the Malampaya gas

    field development andother investments in oilexploration. It is locatedat the 8/F of the AsianStar Building at the Filinvest Corporate Cityin Alabang.

    Design and project man-agement was commis-sioned to the firm ofGoudie Associates. Thedesign is characterized by

    the designer’s use ofstainless steel and filmedglass accented with fig-ured eucalyptus veneers.

    Texaco Philippines, Inc. RCW CONSTRUCTION

  • 8/17/2019 Rc w Profile

    28/62

      MindShare / Maximize RCW CONSTRUCTION

    Recently formed media compa-

    nies of J. Walter Thompson and

    Ogilvy and Mather , MindShare 

    and Maximize  occupies 440

    square meters at the 17th floor

    of the Philamlife Tower . De-

    signed by BDG McColl of HongKong, the office carries the dis-tinct identities of 2 offices withshared resources, such as thereception, pantry, conferencerooms and the library/breakoutroom. Project management was

    by Jones Lang LaSalle (Hong

    Kong).

  • 8/17/2019 Rc w Profile

    29/62

    Kumon Philippines Inc.RCW CONSTRUCTION

    Known for innovative educational techniques and ap-proaches in math and english, Kumon Philippines relo-cated to its new offices at the 19/F of the Philam Tower .Interiors was designed by Goudie Associates. The de-sign made extensive use of beech melamine backed mdf

    boards on the doors and joinery works.

  • 8/17/2019 Rc w Profile

    30/62

      Microsoft (Philippines) RCW CONSTRUCTION

    Software giant Micro-soft’s  Philippine office islocated at the 22/F Tower1 of the Enterprise Cen-

    tre.

    Design and project man-agement was commis-sioned to the firm of Ste-ven Leach Jr + Associ-ates. The design is char-acterized by the de-signer’s use of playfullcolors inspired by Micro-soft’s Windows logo.

  • 8/17/2019 Rc w Profile

    31/62

    Philip Morris Philippines, Inc.RCW CONSTRUCTION

    Philip Morris is a major multinational firm involved intobacco and food. Its Philippine office occupies the 27thfloor of the Enterprise Center. The interior architectureand project management is by the firm of Goudie Asso-ciates. The design is characterized by its use of glass,

    stainless steel, maple veneers and black granite.

    The photos show views of the Board Room, ReceptionLobby, the Meeting Rooms, Pantry, Offices and GeneralWork Areas.

  • 8/17/2019 Rc w Profile

    32/62

      Mandarin Oriental ManilaRCW CONSTRUCTION

    The Mandarin Hotel renovatedthe 3rd floor Ballroom, functionrooms and the elevator lobbyduring the 3rd quarter of 1998.

    Designed by the firm of HirschBedner Hongkong, the ball-room interiors shed its previouspainted panelling to exhibit therich textures of figured cherryveneer and tanguile timber.

    Project management was bythe Mandarin’s Mr. Llyod An-drukow. Quantity survey wasby WT Partnership Inc. 

  • 8/17/2019 Rc w Profile

    33/62

      Calatagan Golf Club RCW CONSTRUCTION

    Nestled in Calatagan, Batan-gas beside the Punta BaluarteBeach Club, the new 3-storeyclubhouse stands majesticallyon a hill overlooking the golfcourse. Architecture is by RPPayumo  and interior design isby the firm of Steven J Leach,Jr + Associates. Our firm isresponsible for the constructionof all public interiors while Le-

     jano Construction Inc. wasresponsible for the structuralshell and exterior finishing.

  • 8/17/2019 Rc w Profile

    34/62

    COMPANY PROFILE

    COMPANY NAME :  RCW CONSTRUCTION & DEVELOPMENT CORP.

    ADDRESS :  Rm. 508 5/F Jovan Condominium, Shaw Blvd cor Samat St.,

      Mandaluyong City

    TELEPHONES :  533-70-20 Trunk Line

      533-34-38 Fax No.

    DATE ESTABLISHED  :  April 29, 1987

    SEC REGISTRATION NO. :  140302

    TAX ACCT NO. :  041-000-060-411

    SSS REGISTRATION NO. :  03-8786073-0

    PCAB CONSTRUCTOR’S

    LICENSE :  Constructor’s License No. 11737

      Issued April 24, 1989

    :  Category “B”

      Classification :

      General Building (Principal)  General Engineering

      Sp-Electrical Works

    PRINCIPALS :   MICHAEL A.T. CHUA, Architect

      CARLOS N. ROXAS , Civil Engineer 

    MANAGING OFFICERS :  Michael A.T. Chua  - President

    Carlos N. Roxas - Vice-President - Operation

     

    Engr. Henry Fernandez - Engineering Services

    BANK REFERENCES :  METROBANK & TRUST CO.  Greenhills Crossroad Branch

      Greenhills Commercial Center 

      San Juan, Metro Manila

    : PHILIPPINE BANK OF COMMUNICATION

      San Miguel Avenue Branch

      G101 OMM CITRA Condominium, San Miguel Ave., Pasig City

  • 8/17/2019 Rc w Profile

    35/62

    ENGINEERING/SPECIALTY

    CONSULTANTS : ENGR. HENRY FERNANDEZ

      Structural Engineer 

    :  ERLINDA G. MENDOZA

      Sanitary Engineer 

    :  MANOLET ALCANTARA

      Electrical Engineer 

    :  GODOFREDO LIMBO

      Geodetic Engineer 

    :  Advance Geotechnical Eng’g Services/

      RICHARD C. TAN

      Soil/Geotechnical Investigations

    : EFREN S. CARLOS, JR.

      Electrical Engineer 

      Certified Fire and Explosion Investigator (USA)

      Certified Safety Practitioner – Department of Labor & Employment  Director – Phil. Society of Safety Engineers

    :  JOSEFINO DAVID

      Safety Engineer 

  • 8/17/2019 Rc w Profile

    36/62

  • 8/17/2019 Rc w Profile

    37/62

  • 8/17/2019 Rc w Profile

    38/62

  • 8/17/2019 Rc w Profile

    39/62

    L I S T O F P R O J E C T S

    CALL CENTER PROJECTS

    LIST OF ON-GOING CALL CENTER PROJECTS

    SITEL (PHILIPPINES) INC.

    PROPOSED SITEL CALL CENTER AND OFFICE FIT-OUT PROJECT

    (April – May 2004)Project Cost : P 20,500,000.00Location : 25th Floor Cyber One Bldg., Eastwood Cyberpark, Quezon City

    Design By : Adrianse Group Phils., Inc.

    Contact Person : Mr. Joseph Iric Mina

    Area : 1,200 Sqm.

    AMBERGRIS SOLUTIONS

    PROPOSED FIT-OUT WORKS (30TH

     FLOOR)

    (April 2004 – On-going)

    Project Cost : P 9,100,000.00

    Location : 30th Floor, Raffles Corporate Center 

    Design By : Asterisk, Inc.Contact Person : Mr. Fernando Amor Area : 1,200 Sqm.

    LIST OF COMPLETED CALL CENTER PROJECTS

    AMBERGRIS SOLUTIONS

    PROPOSED FIT-OUT WORKS (7TH

     & 18TH

     FLOORS)

    7th

    Floor

    (January – February 2004)

    Project Cost : P 12,060,677.41Area : 1,200 Sqm.

    18th

     Floor(October – December 2003)

    Project Cost : P 10,615,992.80

    Area : 1,200 Sqm.Location : 7th &18th Floor, Raffles Corporate Center 

    Design By : Asterisk, Inc.

    Contact Person : Mr. Fernando Amor 

    SIX CONTINENTS (SC RESERVATION PHILIPPINES, INC.)

    PROPOSED FIT-OUT WORKS

    (June 30 - October 2003)Project Cost : P 18,805,094.68

    Location : 28th

     & 29th

     Floors Tower 2 RCBC Plaza, Ayala Avenue, Makati CityDesign By : Del Rosario Design Group

    Contact Person : Arch. Fernando del RosarioArea : 2,000 Sqm.

    INFONXX CALL CENTER 

    PROPOSED FIT-OUT WORKS

    (July – September 2003)

    Project Cost : P 10,878,892.60

    Location : 14th Floors, RCBC Plaza, Tower 2, Ayala Avenue, Makati City

    Design By : Del Rosario Design Group

    Contact Person : Arch. Ronald Angeles Area : 2,480 Sqm.

  • 8/17/2019 Rc w Profile

    40/62

    APAC

    PROPOSED FIT-OUT WORKS

    (December 2003 – January 2004)

    Project Cost : P 7,775,000.00

    Location : 3F Bldg C. Northgate Cyberzone, Filinvest Corporate City, Alabang Muntinlupa

      Design By : Del Rosario Design Group

    Contact Person : Arch. Allan Joseph Lim

    Area : 1,000 Sqm.

    INTERIORS COMMERCIALS / OFFICES

    LIST OF ON-GOING PROJECTS 2004

    GENERAL MOTORS AUTOMOBILES PHILS INC.

    PROPOSED FIT-OUT WORKS

    (March – April 2004)

    Project Cost : P 3,117,000.00

    Location : 30th Floor Philamlife Tower, Paseo de Roxas, Makati City

    Design By : Asterisk, Inc.Contact Person : Arch. Fernando Amor Area : 450 Sqm.

    UNILEVER PHILIPPINES, INC.

    PROPOSED FIT-OUT WORKS

    (March – April 2004)

    Project Cost : P 3,051,887.27

    Location : 1351 United Nations Avenue, Manila

    Design By : HBO + EMTB

    Contact Person : Engr. Nelson Delos ReyesArea : 280 Sqm.

  • 8/17/2019 Rc w Profile

    41/62

    LIST OF COMPLETED PROJECTS 2003

    JAPANESE RESTAURANT

    PROPOSED JAPANESE RESTAURANT

    (June – October 2003)

    Project Cost : P 1,300,000.00

    Location : Unit 103 Gateway Center, Magallanes Village, Makati City

    Design By : New Success DesignContact Person : Mrs. Sylvia H. LopezArea : 160 Sqm.

    THOMSON FINANCIAL 17TH

    , 18TH

     & 20TH

     FLOORS

    PROPOSED FIT-OUT WORKS

    (Sept. 05, 2003 – Oct. 28, 2003)

    Project Cost : P 1,400,000.00

    Location : 17th, 18th & 20th Floors Ayala Life – FGU Bldg., Ayala Ave, Makati City

    Design By : Goudie Associates

    Contact Person : Mr. Freddie GalvesArea : 200 Sqm.

    SUPERIUS (CORPORATION) TENANCY

    PROPOSED FIT-OUT WORKS

    (July 21 - October 2003)

    Project Cost : P 3,785,040.00

    Location : Unit 805 Asian Star Building, Asean Drive, Filinvest Corporate City

      Alabang, Muntinlupa City

    Design By : Asterisk, Inc.

    Contact Person : Arch. Mia MangahasArea : 250 Sqm.

    PFIZER 

    PROPOSED PFIZER FIT-OUT WORKS

    (June 30 – August 2003)Project Cost : P 25,839,262.61

    Location : 32nd Floor Ayala Life-FGU Center, Ayala Avenue, Makati City

    Design By : HBO+EMTB

    Contact Person : Ms. Belle CustodioArea : 956 Sqm.

    MTV PHILIPPINES TENANCY

    PROPOSED FIT-OUT WORKS

    (May – August 2003)

    Project Cost : P 8,300,000.00

    Location : Unit C The Fort, Bonifacio Global City, Taguig, Metro Manila

    Design By : DNA Design Group PhilippinesContact Person : Ms. Mia Mangahas

    Area : 800 Sqm.

    ANZ BANK 

    PROPOSED FIT-OUT WORKS

    (June – August 2003)

    Project Cost : P 7,383,000.00

    Location : 23rd Floor, GT Tower, Ayala Avenue, Makati City

    Design By : HBO + EMTB

    Contact Person : Mr. Kim ChanArea : 1,200 Sqm.

  • 8/17/2019 Rc w Profile

    42/62

    WORLD BANK 

    PROPOSED WORLD BANK OFFICE EXPANSION

    (May - July 2003)

    Project Cost : P 6,500,000.00

    Location : 20th Floor Taipan Building, Ortigas Center, Pasig City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo G. Sioco

    Area : 400 Sq.m

    KUMON PHILIPPINES, INC.

    PROPOSED KUMON PHILS. OFFICE EXPANSION

    (June – August 2003)

    Project Cost : P 1,007,464.00

    Location : 19/F Philamlife Tower, Paseo de Roxas, Makati City

    Design By : Goudie Associates

    Contact Person : Ms. Marie Ann CheeArea : 180 Sq.m

    ASIA GLOBAL CROSSING

    PROPOSED FIT-OUT WORKS(June - August 2003)

    Project Cost : P 890,000.00

    Location : 18/F Tower I The Enterprise Center 6766 Ayala Ave., Makati City

    Design By : ADD + Consortium

    Contact Person : Arch. Zaldy delos Reyes

    Area : 200 Sq.m

    SAFEWAY PHILTECH, INC.

    PROPOSED FIT-OUT WORKS

    (May – August 2003)

    Project Cost : P 15,445,694.05Location : 21/F & 22/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati City

    Design By : DNA Design Group Phils., Inc.

    Contact Person : Ms. Mia MangahasArea : 1,954 Sq.m

    DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL GATEWAY)

    PROPOSED DHL GATEWAY

    (March - August 2003)

    Project Cost : P 22,300,000.00

    Location : R5 MaintenanceDesign By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo G. Sioco

    SPL OFFICE

    PROPOSED FIT-OUT WORKS

    (February – March 2003)

    Project Cost : P 3,676,235.00

    Location : 23/F Yuchengco Tower, RCBC Plaza, Ayala Avenue, Makati City

    Project Manager : Mr. Brian Parsons

      Ms. Mandy BenosaArea : 465 Sq.m

  • 8/17/2019 Rc w Profile

    43/62

    LUNDBECK MANILA

    PROPOSED FIT-OUT WORKS

    (March – April 2003)

    Project Cost : P 900,900.00

    Location : 3/F Ace Building Rada St., cor. Dela Rosa St., Makati City

    Design By : Innovation HK 

    Contact Person : Mr. John ScadeArea : 98 Sq.m

  • 8/17/2019 Rc w Profile

    44/62

    LIST OF COMPLETED PROJECTS 2002

    MARSMAN DRYSDALE

    PROPOSED FIT-OUT WORKS

    (September – November 2002)

    Project Cost : P 8,000,000.00

    Location : 45 Level Philamlife Tower, Paseo de Roxas, Makati City

    Design By : ADD + Consortium, Inc.Contact Person : Arch. Bong Libo

    MICROSOFT PHILS., INC.

    PROPOSED FIT-OUT WORKS

    (November – December 2002)

    Project Cost : P 1,163,000.00

    Location : 22/F Tower II The Enterprise Center 6766 Ayala Ave., Makati City

    Design By : HBO + EMTB Philippines, Inc.

    Contact Person : Ms. Belle Costudio

    MONDE NISSIN CORP., INC.

    PROPOSED FIT-OUT WORKS(June 27 – October 2002)

    Project Cost : P 7,000,000.00

    Location : 22nd & 23rd Floor 6750 Office Tower, Ayala Ave., Makati City

    Design By : ADD + Consortium

    Contact Person : Arch. Bong Libo

    SARA LEE PHILIPPINES

    PROPOSED FIT-OUT WORKS

    (October – December 2002)

    Project Cost : P 11,589,435.00

    Location : 24th & 25th Floor Insular Building, Alabang, Metro Manila

    Design By : DNA Design Group Phils., Inc.

    Contact Person : Ms. Mia Mangahas

    BANGKO SENTRAL NG PILIPINAS - CAFETERIA

    PROPOSED FIT-OUT WORKS

    (November 2002 – February 2003)

    Project Cost : P 25,607,804.66

    Location : 2/F Cafetorium Bldg. BSP Complex, P. Ocampo cor. A. Mabini, Malate, Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo G. Sioco

    DHL WORLDWIDE EXPRESS (PHILS.) CORPORATION (DHL TIMOG)

    PROPOSED DHL WAREHOUSE

    (June – August 2002)

    Project Cost : P 12,000,000.00

    Location : 99 Timog Avenue, Diliman, Quezon City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo G. Sioco

  • 8/17/2019 Rc w Profile

    45/62

    CORMANT TECHNOLOGY

    PROPOSED FIT-OUT WORKS

    (March – April 2002)

    Project Cost : P 1,575,000.00

    Location : 10F Net One Bldg. Fort Bonifacio Global City, Taguig, Metro Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Mr. Paul GoodisonArea : 150 Sqm.

    FIRMENICH

    PROPOSED FIT-OUT WORKS

    (March – April 2002)

    Project Cost : P 2,640,000.00

    Location : 2/F UPRC III Pasong Tamo Extension, Makati City

    Design By : Davenport Campbell, Inc.

    Contact Person : Ms. Belle CostudioArea : 500 Sqm.

    LINK2SUPPORT, INC.

    PROPOSED FIT-OUT WORKS

    (March – May 2002)Project Cost : P 10,000,000.00

    Location : 5/F Techno Plaza One, Eastwood City, Libis, Quezon City

    Design By : Goudie Associates

    Contact Person : Arch. Reynan CumpasArea : 1,300 Sqm.

    FRASER PLACE

    PROPOSED FIT-OUT WORKS

    (March – April 2002)

    Project Cost : P 3,924,050.85

    Location : The Forbes Tower, Valero Street, Makati City

    Design By : Tema InternationalContact Person : Arch. Ruby Socorro O. Bucoy-SohArea : 750 Sqm.

    HERBALIFE

    PROPOSED FIT-OUT WORKS

    (March – May 2002)

    Project Cost : P 5,950,000.00Location : G/F Royal Match Building, 6780 Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo G. SiocoArea : 500 Sqm.

  • 8/17/2019 Rc w Profile

    46/62

    LIST OF COMPLETED PROJECT 2001

    THOMSON FINANCIAL

    PROPOSED FIT-OUT WORKS

    (October – November 2001)

    Project Cost : P 6,821,600.00

    Location : 17th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. + AssociatesContact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)Area : 500 Sqm.

    DHL WORLDWIDE EXPRESS (PHILS) CORP.

    PROPOSED DHL PHILIPPINES WAREHOUSE

    (October - December 2001)

    Project Cost : P 10,200,000.00

    Location : M & N Square Building, C. Raymundo Ave., Pasig City

    Project Management : Bovis Lend Lease Projects Pte. Ltd.

    Design By : Steven J. Leach, Jr. + Associates (Consultants) Inc.

    Contact Person : Mr. Mike Fitspatrick / Chris WilliamsArea : 1,330 Sqm.

    ATR PROFESSIONAL ASSURANCE CORPORATION

    PROPOSED INTERIOR RENOVATION WORKS

    (October - December 2001)

    Project Cost : P 4,324,060.00

    Location : The Professional Tower, Boni Cor. EDSA, Mandaluyong City

    Design By : New Success Designs, Inc.

    Contact Person : Ms. Sylvia Heras Lopes (NSDI), Mr. Eulogio A. Mendoza (ATR)Area : 300 Sqm.

    ALDEX REALTY CORP.

    PROPOSED FIT-OUT WORKS

    (October - December 2001)

    Project Cost : P 2,850,000.00

    Location : 41/F Discovery Centre 25 ADB Avenue, Ortigas Centre, Pasig City

    Design By : Goudie Associates Manila Ltd. Co.

    Contact Person : Mr. Herman Son / Ms. Mary Ann Chee (Goudie)Area : 180 Sqm.

  • 8/17/2019 Rc w Profile

    47/62

    SPL WORLDGROUP

    PROPOSED FIT – OUT WORKS

    (August – October 2001)

    Project Cost : P 7,100,000.00

    Location : Level 23 Yuchengco Tower, Ayala Ave. cor. Gil Puyat Ave., Makati City

    Project Management By : Hailey Construction (Consultants) Corporation / DNA Consulting

    (HK) Ltd.

    Design By : SPACE (US)

    Contact Person : Mr. Brian ParsonsArea : 650 Sqm.

    REGUS BUSINESS CENTRE

    PROPOSED FIT – OUT WORKS

    (August – September 2001)

    Project Cost : P 14,321,272.48

    Location : 18F Philamlife Tower 8767 Paseo de Roxas, Makati City

    Design By : Goudie AssociatesContact Person : Mr. Reynan CumpasArea : 2,000 Sqm.

    PRA SOLUTION / NAVITAIRE, INC.PROPOSED NAVITAIRE OFFICE EXPANSION

    (July – August 2001)

    Project Cost : P 2,954,000

    Location : 16/F Philamlife Paseo de Roxas, Makati City

    Design By : Davenport Campbell, Inc.

    Contact Person : Mr.Tony Villarino, Jr.Area : 550 Sqm.

    GREEN CROSS INC.

    PROPOSED OFFICE RELOCATION

    (May - August 2001 )

    Project Cost : P 8,800,000.00Location : 14 & 15/F Common Goal Tower, Industry St., Alabang-Zapote Rd., Muntinlupa

    Design By : Goudie Associates, Ltd.

    Contact Person : Ms. Joanna CoArea : 740 Sqm.

    PLANTERS DEVELOPMENT BANK 

    PROPOSED EXTERIOR RENOVATION WORKS OF FRONT & BACK AREAS

    (June – August 2001)

    Project Cost : P 1,305,212.50

    Location : No. 314 Sen.Gil Puyat Avenue, Makati City

    Design By : New Success Design

    Contact Person : Ms.Sylvia Heras Lopez (NSDI), Mr.Leo Katigbak (Planters Bank)Area : 200 Sqm.

    ABS-CBN BANTAY BATA

    PROPOSED ABS-CBN BANTAY BATA OFFICE

    (July – August 2001)

    Project Cost : P 640,000.00

    Location : 2nd Floor ABS-CBN Building Mother Ignacia, Quezon City

    Design By : New Success Design

    Contact Person : Ms. Sylvia Heras LopezArea : 53 Sqm

  • 8/17/2019 Rc w Profile

    48/62

    XIC GLOBAL OFFICE

    PROPOSED FIT-OUT WORKS

    (March 01-30, 2001)

    Project Cost : P 4,467,643.00

    Location : 22nd Floor IBM Plaza,Eastwood City, Libis, Quezon City

    Design By : DNA Consulting (HK) Ltd.

    Contact Person : Ms. Grace Frias (XIC), Mr. Nick Torres (DGD)Area : 1,200 Sqm.

    PHILIPPINE FOUNDATION FOR GLOBAL CONCERNPROPOSED FIT-OUT WORKS

    (June 01-30, 2001)

    Project Cost : P 2,000,000.00

    Location : 43/F Philamlife Tower 8767 Paseo de Roxas, Makati City

    Design By : Imagination, Inc.

    Contact Person : Ms. Suzette CocuacoArea : 380 Sqm

    MARUBENI ENERGY SERVICES CORP.

    PROPOSED FIT-OUT WORKS

    (February – May, 2001)

    Project Cost : P 4,500,000.00Location : 36/F The Enterprise Center, Paseo de Roxas, Makati City

    Design By : Steven J.Leach, Jr. + Associates

    Contact Person : Engr. Romy Canlobo (Marubeni), Ms.Mina de Leon (SLA)Area : 330 Sqm.

    SAN MIGUEL PACKAGING

    PROPOSED FIT-OUT WORKS

    (May 15 – June 15, 2001)

    Project Cost : P 3,2000,000.00

    Location : 9th & 10th Floor San Miguel Bldg., Saint Francis Ave., Mandaluyong City

    Contact Person : Mr. Oliver Gorospe

    Area : 1,200 Sqm.

    KAWASAKI GROUP OF COMPANIES

    PROPOSED FIT-OUT WORKS

    (February 25 - May 2001)

    Project Cost : P 5,710,000.00

    Location : Makati Sky Plaza, Ayala Avenue, Makati City

    Design By : Goudie Associates

    Contact Person : Mr.Yasuhiza Nagata / Ms. Dezzie IslaArea : 948.39 Sqm.

    JARDINE LLOYD THOMSON

    PROPOSED OFFICE RELOCATION

    (March - April 2001)

    Project Cost : P 5,070,503.34

    Location : 25/F Philamlife Tower, 8767 Paseo de Roxas, Makati City

    Design By : Davenport Campbell, Inc.

    Contact Person : Mr. Kevin NormanArea : 650 Sqm.

  • 8/17/2019 Rc w Profile

    49/62

    PLANTERS BANK 

    PROPOSED FIT-OUT WORKS

    1. G/F BANKING HALL INTERIOR & FRONT EXTERIOR AREA RENOVATION

    (November – December 2000)

    2. SIDE & BACK AREAS EXTERIOR, ELEVATOR LOBBY & 3/F INTERIOR RENOVATION

    (January – March, 2001)

    Project Cost : P 2,567,900.00

      4,630,585.00

    Location : Planters Bank Building, Gil Puyat Avenue, Makati City

    Design By : New Success DesignContact Person : Ms. Sylvia Lopez (NSDI), Mr. Leo Katigbak (Planters)Area : 230 Sqm. / 820 Sqm.

    PBCOM CORPORATE BUSINESS CENTER (2ND

     FLOOR)

    PROPOSED FIT-OUT WORKS

    (April – June 2001)

    Project Cost : P 3,186,880.00

    Location : 2nd Floor PBCOM Tower, Ayala Avenue, Makati CityDesign By : Steven J. Leach, Jr. & Associates

    Contact Person : Arch. Lamberto G. MercadoArea : 200 Sqm.

    PBCOM CORPORATE BUSINESS CENTER (3RD

     FLOOR)

    PROPOSED FIT-OUT WORKS

    (April – June 2001)

    Project Cost : P 6,250,000.00

    Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. & Associates

    Contact Person : Arch. Lamberto G. MercadoArea : 600 Sqm.

    PBCOM CORPORATE BUSINESS CENTER (4TH FLOOR)

    PROPOSED FIT-OUT WORKS

    (April – June 2001)Project Cost : P 4,920,000.00

    Location : 3rd Floor PBCOM Tower, Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 600 Sqm.

    PBCOM CORPORATE BUSINESS CENTER (5TH

     FLOOR)

    PROPOSED FIT-OUT WORKS

    (April – June 2001)

    Project Cost : P 9,999,000.00

    Location : 5th Floor PBCOM Tower, Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. & AssociatesContact Person : Arch. Lamberto G. MercadoArea : 800 Sqm.

    MR. EDWARD GO

    PROPOSED INTERIOR RENOVATION WORK 

    (June 15 - July 15, 2001)

    Project Cost : P 1,616,488.00

    Location : Unit 16-A Pacific Plaza Tower South, Fort Bonifacio, Makati City

    Design By : New Success Design

    Contact Person : Ms. Sylvia Heras LopezArea : 250 Sqm

  • 8/17/2019 Rc w Profile

    50/62

    MR.& MRS. BUTCH ALBERT

    PROPOSED INTERIOR RENOVATION WORK 

    (May 25 – July 31, 2001)

    Project Cost : P 3,260,185.00

    Location : Unit 21-B Pacific Plaza Tower South, Fort Bonifacio, Makati City

    Design By : New Success Design

    Contact Person : Ms. Sylvia Heras LopezArea : 250 Sqm

    LIST OF COMPLETED PROJECT 2000

    THOMSON ASIA PTE. LTD.

    PROPOSED FIT-OUT WORKS

    (September - December 2000)

    Project Cost : P 8,722,530.00

    Location : 18th Floor Ayala Life FGU Bldg., Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Mr.Freddie Galves (Thomson), Ms. Mina de Leon (SLA)Area : 1,100 Sqm.

    PBCOM CORPORATE BUSINESS CENTER 

    PROPOSED FIT-OUT WORKS

    (November 2000 – January 2001)

    Project Cost : P 9,729,700.00

    Location : Ground Floor PBCOM Tower, Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. & Associates

    Contact Person : Arch. Lamberto G. MercadoArea : 750 Sqm.

    ATLAS RESOURCES

    PROPOSED FIT-OUT WORKS

    (Nov. 2000 – January 2001)Project Cost : P 6,780,000.00

    Location : 19th Floor PCI Equitable Tower, ADB Avenue, Pasig City

    Contact Person : Mrs. Janice SuaArea : 660 Sqm.

    GLOBAL LINK HOLDINGS CORP.

    PROPOSED FIT-OUT WORKS

    (November 2000 – January 2001)

    Project Cost : P5,500,000.00

    Location : 14th Floor Ayala Life FGU Center, Alabang Zapote Road, Muntinlupa City

    Contact Person : Mr. Alfredo MattaArea : 1,128 Sqm.

    UCPB GENERAL INSURANCE

    PROPOSED FIT-OUT WORKS

    (Oct. – December 2000)

    Project Cost : P 3,884,000.00

    Location : 24th & 25th Floor LKG Tower, Ayala Avenue, Makati City

    Design By : Group 3 Design Studio

    Contact Person : Arch. Edwin M. Gumila (Group 3)Area : 1,600 Sqm.

  • 8/17/2019 Rc w Profile

    51/62

    J. WALTER THOMPSON (JWT)

    PROPOSED FIT-OUT WORKS

    (Oct. – December 2000)

    Project Cost : P 21,790,528.00

    Location : Level 29 & 30 Tower 1, The Enterprise Center, 6766 Ayala Ave., Makati City

    Design By : BDG Mccoll (Hongkong)

    Contact Person : Mr. Randi Lorica (JWT), Mr. John Scade (BDG Mccoll)

    Area : 1,679 Sqm.

    KUMON PHILIPPINES, INC.

    PROPOSED FIT-OUT WORKS

    (July – October 2000)

    Project Cost : P 2,000,000.00

    Location : 19th Floor Philamlife Tower, Paseo de Roxas, Makati City

    Design By : Goudie Associates

    Contact Person : Mr. Joseph InfanteArea : 290 Sqm.

    PRA SOLUTION

    PROPOSED PRA SOLUTION FIT-OUT WORKS

    (August – October 2000)

    Project Cost : P 7,395,000.00

    Location : 16th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport Campbell

    Contact Person : Ms. Joy Alejandro (DC)

    QUEZON CITY HALL 14TH

     & 15TH

     FLOOR 

    PROPOSED INTERIOR FIT-OUT WORKS

    (April - October 2000)Project Cost : P 2,712,386.91

    Location : Quezon City Hall, Quezon City

    Design By : New Success Design

    Contact Person : Ms. Sylvia Lopez (NSD)Area : 2,040 Sqm.

    FPD-SAVILLS

    PROPOSED FITTING-OUT WORKS

    (July – October 2000)

    Project Cost : P 2,700,000.00

    Location : 37/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport Campbell

    Contact Person : Arch. Joy Alejandro (DC), Mr. David Leechiu (FPD)Area : 310 Sqm.

  • 8/17/2019 Rc w Profile

    52/62

    PBCOM T. ALONZO BRANCH

    PROPOSED OFFICE RENOVATION WORKS

    (July – September 2000)

    Project Cost : P 1,550,000.00

    Location : T. Alonzo St., cor. Soler St., Sta. Cruz, Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Lamberto G. MercadoArea : 300 Sqm.

    DISCOVERY CENTER 22ND FLOOR PROPOSED OFFICE RENOVATION

    (March – June 2000)

    Project Cost : P 13,500,000.00

    Location : ADB Avenue, Ortigas Center, Pasig City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Eng. Edwin Bolanos (Jose Aliling, Inc.), Arch. Ricci Uy (SLA)Area : 1,100 Sqm.

    PRIMARK PHILIPPINES, INC.

    PROPOSED OFFICE RELOCATION

    (June – July 2000)

    Project Cost : P 15,116,000.00Location : 20/F Ayala FGU Center, Ayala Avenue, Makati City

    Design By : Goudie Associates

    Contact Person : Ms. Dinah Snowden, Ms. Dezzie Isla (GA)Area : 1,154 Sqm.

    TEXACO PHILIPPINES, INC.

    PROPOSED FIT-OUT WORKS

    (June – July 2000)

    Project Cost : P 7,915,000.00

    Location : 8th Floor Asian Star Building, Asean Drive, Filinvest Corporate City, Alabang

    Design By : Goudie Associates

    Contact Person : Mr. James Le JeuneArea : 503 Sqm.

    SSA – US VETERANS (US EMBASSY)

    PROPOSED FIT-OUT WORKS

    (June – November 2000)

    Project Cost : P 2,350,000.00

    Location : G/F US Embassy Roxas Boulevard, Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Agripino Agor Area : 326 Sqm..

  • 8/17/2019 Rc w Profile

    53/62

    ABN-AMRO SAVINGS BANK BRANCHES

    PROPOSED FIT-OUT WORKS

    1.  ABN-AMRO SAVINGS BANK – TEKTITE BRANCH

      Strata 100 Emerald Ave., Ortigas Center, Pasig City

    (March – May 2000)

    2.  ABN-AMRO SAVINGS BANK – LIBIS BRANCH

      IBM Plaza Eastwood Center, Libis, Quezon City

    (March – May 2000)

    3. ABN-AMRO SAVINGS BANK – SHELL HOUSE BRANCH

      Shellhouse Bldg. Valero cor. Villar St., Makati City

      (March – May 2000)

    Project Cost : P 3,949,000.00 – Tektite Branch

      4,075,000.00 – Libis Branch

      5,310,000.00 – Shell House Branch

    Design By : Davenport Campbell

    Contact Person : Arch. Letlet Reyes (DC), Mr.

    Area : 175 Sqm. – Tektite Branch

      191Sqm. – Libis Branch

      235 Sqm. – Shell House Branch

    UNITED OVERSEAS BANK PHILIPPINESINTERIOR DESIGN FITTING-OUT WORKS

    (August – September 2000)

    Project Cost : P 5,599,193.80

    Location : Ground Floor IBP Bldg., Dona Juliana Vargas Ave., Ortigas Center, Pasig City

    Design By : Tema International Philippines

    Contact Person : Mr. Vince Au Yoong

    OGILVY & MATHER PHILIPPINES, INC.

    PROPOSED FITTING-OUT WORKS

    (April – June 2000)

    Project Cost : P 12,935,452.00

    Location : 15/F Philamlife Tower, Paseo de Roxas, Makati CityDesign By : Davenport Campbell

    Contact Person : Ms. Mariel Catacutan (DC), Ms. Nympha Salazar (Ogilvy)Area : 710 Sqm.

    ABN AMRO SAVINGS BANK 

    PROPOSED BANKING HALL, GROUND FLOOR AND BASEMENT

    (February – April 2000)

    Project Cost : P 15,250,000.00

    Location : LKG Tower 68013 Ayala Avenue, Makati City

    Design By : Davenport CampbellProject Management by : Jones Lang LaSalle (HK)

    Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL – HK)Area : 754 Sqm.

    MINDSHARE MANILA

    PROPOSED FITTING-OUT WORKS

    (February – March 2000)

    Project Cost : P 7,500,000.00

    Location : 17th Floor Philamlife Tower, Paseo de Roxas, Makati CityDesign By : BDG McColl

    Project Management By : Jones Lang LaSalle (HK)

    Contact Person : Mr. Kenneth Chan (JLL – HK), Mr. Gene Torcal (Mindshare),

      Mr. John Scade (BDG McColl) Area : 440 Sqm.

  • 8/17/2019 Rc w Profile

    54/62

    ABN AMRO SAVINGS BANK 16TH

    , 17TH,

    18TH

    & 19TH FLOOR 

    PROPOSED ABN AMRO SAVINGS BANK FIT OUT WORKS

     (January 2000 – March 2000 )

    Project Cost : P 62,186,000.00

    Location : LKG Tower 68013 Ayala Avenue, Makati City

    Design By : Davenport Campbell

    Project Management by : Jones Lang LaSalle (HK)

    Contact Person : Ms. Caroline Cruz (Davenport) Mr. Kenneth Chan (JLL – HK)

    Area : 5,200 Sqm.

    AVENTIS PHARMACEUTICALS

    PROPOSED OFFICE INTERIOR FITTING OUT WORKS

    (February 2000 - March 2000)

    Project Cost : P 3,795,000.00

    Location : 12/F Orient Square, Emerald Avenue, Ortigas Center, Pasig City

    Design By : Group 3 Design

    Contact Person : Mr. Manolito Co (Aventis), Arch Jesselyn Gumila (Group 3)Area : 700 Sqm.

    BAXTER HEALTH CARE PHILIPPINES, INC.

    PROPOSED OFFICE INTERIOR FITTING OUT WORKS(February 2000 - March 2000)

    Project Cost : P 2,800,000.00

    Location : 19/F Wynsum Corporate Plaza, Emerald Avenue, Ortigas Center, Pasig city

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Ms. Amie V. Enriquez (Baxter) Arch. Boy Sioco (SLA)Area : 600 Sqm.

    JOSE MARI CHAN’S RESIDENCE

    PROPOSED INTERIOR RENOVATION (MASTER’S BEDROOM, DRESSER & T & B)

    (April - May 2000)

    Project Cost : P 885,000.00

    Location : #09 Dapdap, North Forbes Park, Makati CityDesign By : New Success Design

    Contact Person : Ms. Sylvia LopezArea : 55 Sqm.

  • 8/17/2019 Rc w Profile

    55/62

    LIST OF COMPLETED PROJECT 1999

    CHASE MANHATTAN BANK PROPOSED CHASE MANHATTAN BANK INTERIOR FITTING OUT WORKS(December 1999 – March 2000)

    Project Cost : P 20,300,000.00

    Location : 31/F Philamlife Tower, Paseo de Roxas, Makati City

    Design By : Group 3 DesignContact Person : Mr. Gerry Shirley, Mr. Mert Natividad (Chase), Arch. Edwin Gumila (Group 3)Area : 1,500 Sqm.

    PBCOM BINONDO 2ND FLOOR PROPOSED OFFICE RENOVATION WORKS(November 1999 – March 2000)

    Project Cost : P 2,575,000.00

    Location : #214 PBCOM Building, Juan Luna St., Binondo, Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Lamberto G. MercadoArea : 459 Sqm.

    PHILIP MORRIS PHILIPPINES, INC.PROPOSED OFFICE RENOVATION(October 1999 – December 1999)

    Project Cost : P 12,572,000.00

    Location : 27/F Tower 1 Enterprises Center, Ayala Ave., cor. Paseo de Roxas, Makati City

    Design By : Goudie Associates Manila

    Contact Person : Mr. Logan Vijayaratnam, (Philip Morris) Ms. Dinah L. Snowden, (Goudie)Area : 1,175 Sqm.

    DISCOVERY CENTRE 4TH FLOOR PROPOSED SUPPLY AND INSTALLATION OF HEALTH CLUB FINISHES AT 4TH FLOOR (June 1999 – March 2000)

    Project Cost : P 4,500,000.00Location : ADB Avenue, Ortigas Center, Pasig City

    Design By : Steven J. Leach Jr. + Associates

    Contact Person : Engr. Edwin Bolaños (Jose Aliling, Inc.) Arch. Ricci Uy (SLA)Area : 1,340 Sqm.

    DISCOVERY CENTRE GROUND FLOOR PROPOSED SUPPLY AND INSTALLATION OF G/F LOBBIES/HALLWAYS AND ELEVATOR LOBBIES(May 1999 – March 2000)

    Project Cost : P 3,900,000.00Location : ADB Avenue, Ortigas Center, Pasig City

    Design By : Steven J. Leach Jr. + AssociatesContact Person : Engr. Edwin Bolaños (Jose Aliling, Inc.) Arch. Ricci Uy (SLA)Area : 1,128 Sqm.

    LA TONDEÑA DISTILLERS, INC.PROPOSED OFFICE RENOVATION(June - October 1999)

    Project Cost : P 3,360,000.00Location : 3rd and 6th Floor San Miguel Building, Pasig City

    Design By : New Success Design

    Contact Person : Ms. Sylvia Herras - LopezArea : 1,100 Sqm.

  • 8/17/2019 Rc w Profile

    56/62

    PROCTER & GAMBLE PHILS.PROPOSED RECEPTION LOBBY(June – September 1999)

    Project Cost : P 1,033,878.00

    Location : 14/F 6750 Ayala Avenue, Makati City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Leonardo Sioco (SLA)Area : 95 Sqm

    INTERNATIONAL FINANCE CORPORATIONPROPOSED MAIN FITTING OUT WORKS(June – August 1999)

    Project Cost : P 2,978,447.00

    Location : 11/F Tower 1, Ayala Triangle, Ayala Ave., Makati City

    Design By : Goudie Associates Manila Ltd. Co.

    Contact Person : Arch. Carlos de Castro, (GA) Erwein John M. Catoto, (IFC)Area : 275 Sqm.

    MICROSOFT PHILIPPINESPROPOSED OFFICE RENOVATION

    (July – October 1999)Project Cost : P 3,900,000.00

    Location : 22/F Tower 2, The Enterprise Centre, Ayala Ave., Makati City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Arch. Ricci Uy, (SLA) Miss Borge Gaerlan, (Microsoft)Area : 1,070 Sqm.

    DBS BANK PHILIPPINES, INC. – LEVELS 1, 2, B-1, 6TH & 7THPROPOSED DBS BANK PHILS., INC. OFFICE RENOVATION(February – June 1999)

    Project Cost : P 5,146,773.00 ( Levels 1, 2, & B-1)

      P 5,649,264.00 (Level 6th & 7th)

    Location : Levels B-1, 1, 2, 6 & 7, The Enterprise Center, Ayala Ave., Makati CityDesign By : Design Programmers, Inc.

    Contact Person : Mr. Leslie SeowArea : 5,126 Sqm

    DBS BANK PHILIPPINES, INC. - WILSON BRANCHPROPOSED FAÇADE & PARKING RENOVATION(May – June 1999)

    Project Cost : P 282,000.00

    Location : #214 Wilson Street, Greenills, San Juan, M.M.

    Design By : Design Programmers, Inc.

    Contact Person : Mr. Leslie Seow

    CALATAGAN GOLF CLUBHOUSEPROPOSED CALATAGAN GOLF CLUBHOUSE INTERIOR FINISHING WORKS(Oct. 1998 – July 1999)

    Project Cost : P 11,300,000.00

    Location : Barrio Balintoc, Calatagan, Batangas

    Contact Person : Arch. Bob Sanches, (SLA) / Mr. Alfred C. Moraleja, (GHT)

    Design By : Steven Leach, Jr. + Associates

    Area : 2,608 Sqm.

  • 8/17/2019 Rc w Profile

    57/62

    PHILIPPINE BANK OF COMMUNICATIONS - GILMORE BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(January – July 1999)

    Project Cost : P 1,575,000.00

    Location : Gilmore Street cor. Aurora Blvd., Quezon City

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Mr. Rommel O. Echon, (PBCOM)Area : 203 Sqm

    PHILIPPINE BANK OF COMMUNICATIONS - PACO BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(January – July 1999)

    Project Cost : P 1,595,000.00

    Location : Pedro Gil Street, Paco, Manila

    Design By : Steven J. Leach, Jr. + Associates

    Contact Person : Mr. Rommel O. Echon, (PBCOM)Area : 110 Sqm

    AETNA LIFE INSURANCE – SAN FERNANDOPROPOSED OFFICE INTERIOR RENOVATION(May - June 1999)

    Project Cost : P 515,000.000

    Location : LK Building San Fernando, Pampanga

    Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)

    Design By : Steven J. Leach Jr. + Associates

    PARIBAS ASIA EQUITY (PHILS.)PROPOSED OFFICE INTERIOR RENOVATION WORKS(January – March 1999)

    Project Cost : P 860,000.00Location : 25th Flr., Pacific Star Bldg., Buendia cor. Makati Ave., Makati City

    Contact Person : Ms. Anne Bautista, Ms. Mariel Catacutan (Davenport)

      Design By : Davenport CampbellArea : 317.35 Sqm.

    THE WORLD BANK PROPOSED OFFICE INTERIOR FIT-OUT WORKS(January - March 1999)

    Project Cost : P 5,700,000.00

    Location : 20th Floor Taipan Place, Garnet St., Ortigas Center, Pasig City

    Contact Person : Ms. Zeny Uson, (World Bank)Design By : Steven J. Leach, Jr. + Associates

      Area : 650 Sqm.

  • 8/17/2019 Rc w Profile

    58/62

    SAN PASCUAL COGENERATION COMPANY (PHILS.) LIMITEDPROPOSED SAN PASCUAL COGENERATION COMPANY NEW OFFICE(Jan. – Feb. 1999)

    Project Cost : P 1,312,000.00

    Location : 1610/11 Tower One, Ayala Triangle, Ayala Avenue, Makati City

    Contact Person : Ms. Cristy C. Villanueva, Mr. Jong Guangco (Goudie)

      Design By : Goudie Associates

    Area : 525 Sqm.

    JONES LANG WOOTTONPROPOSED OFFICE INTERIOR RENOVATION WORKS(Jan. – Feb. 1999)

    Project Cost : P 1,387,000.00

    Location : 8th Floor The Enterprise Center, Ayala Avenue, Makati City

    Contact Person : Mr. Peter M. Small, Managing Director 

      Design By : Goudie AssociatesArea : 220 Sqm.

  • 8/17/2019 Rc w Profile

    59/62

    LIST OF PROJECTS 1998

    PHILIPPINE BANK OF COMMUNICATIONS - NOVALICHES BRANCHPROPOSED CIVIL WORKS CONSTRUCTION(June 1998 – January 1999)

    Project Cost : P 1,800,000.00

    Location : Quirino Highway, Novaliches, Quezon City

    Design By : Steven J. Leach, Jr. + AssociatesContact Person : Engr. Antonio Victor R. Antonio, (PBCOM)Area : 311 Sqm

    UNITED STATES INFORMATION SERVICESPROPOSED OFFICE INTERIOR FINISHING WORKS(June – Dec. 1998)

    Project Cost : P 1,069,561.00

    Location : US Embassy 1020 Roxas Blvd., Annex Office Bldg. (1st Floor West)

    Contact Person : Ron Walton - Senior Project Manager - NATI Const. Division

      Design By : Karn Charuhas Chapman & Twohey

    Area : 1,132 Sqm.

    XAVIER SPORTS & COUNTRY CLUBPROPOSED XAVIER SPORTS & COUNTRY CLUBINTERIOR FINISHING WORKS PACKAGE #006(July – Dec. 1998)

    Project Cost : P 1,903,733.02

    Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro City

    Design By : Alfredo B. Alfonso, Architects & Associates

    Contact Person : Arch. Wilfredo Avilla

    MANDARIN ORIENTAL HOTELPROPOSED SHOPFITTING AND BUILDING WORKS AT 3RD  FLOOR BALLROOM,FUNCTION ROOMS & CORRIDOR (June – Sept. 1998)

    Project Cost : P 9,200,000.00

    Location : 3rd Floor Mandarin Oriental Hotel, Makati Avenue, Makati City

    Design By : Hirsch Bedner Associates

    Contact Person : Mr. Lloyd Adrukow - Project Manager , (Mandarin Oriental)

      Ms. Gillian Lane / Mr. Andrew Healey, (Quantity Surveyor : WT Partnership)

    Area : 1,200 Sqm.

    AYALA AON RISK SERVICES, INC.PROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – Sept. 1998)

    Project Cost : P 7,074,054.00

    Location : 4/F Ayala Triangle, Ayala Tower 1, Ayala Ave., Makati City

    Contact Person : Mr. Peter Gebbie / Ms. Teresita “TQ” Quianson, (Ayala Aon)

      Mr. Andrew Gay / Arch. Reynan Cumpas (Davenport)

    Design By : Davenport Campbell

    Area : 1,093 Sqm.

  • 8/17/2019 Rc w Profile

    60/62

    ABN – AMRO (HG ASIA SECURITIES) – FINANCE MANAGER PROPOSED FINANCE MANAGER ROOM OFFICE INTERIOR RENOVATION(September 1998 – On going)

    Project Cost : P 636,000.00

    Location : 3/F Pacific Star Building, Gil Puyat Ave. cor. Makati Ave., Makati City

    Contact Person : Ms. Mina de Leon, (SLA)

    Design By : Steven J. Leach Jr. + Associates

    Area : 70 Sqm.

    RAYTHEON INTERNATIONALPROPOSED OFFICE INTERIOR FIT-OUT WORKS(September - October 1998)

    Project Cost : P 895,500.00

    Location : 1404 TOEP Ayala Triangle, Ayala Avenue, Makati City

    Contact Person : Ms. Mina de Leon, (SLA)

    Design By : Steven J. Leach Jr. + Associates

    Area : 74 Sqm.

    AETNA LIFE - HERRERAPROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – Sept. 1998)

    Project Cost : P 2,300,000.00Location : 8th Floor Herrera St., Legaspi Village, Makati City

    Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)

    Design By : Steven J. Leach Jr. + Associates

    Area : 420 Sqm.

    AETNA LIFE - ALABANGPROPOSED OFFICE INTERIOR FIT-OUT WORKS(July – August 1998)

    Project Cost : P 920,000.00

    Location : 459 DMR Building, Almanza, Zapote -Alabang Road, Las Pinas City

    Contact Person : Arch. Ramon Torres, (SLA) / Mr. Nolan Yambao, (Aetna)

    Design By : Steven J. Leach Jr. + AssociatesArea : 220 Sqm.

    APMC HEAD OFFICEPROPOSED FINISHING OF INTERIOR WORKS PROJECT(April - June 1998)

    Project Cost : P 1,550,000.00

    Location : 5th Floor Glorietta 4, Ayala Center, Ayala Avenue, Makati City

    Contact Person : Engr. Bong Robles, (APMC)

    Area : 500 Sqm.

    PHILIPPINE BANK OF COMMUNICATIONS - ARANETA BRANCH

    PROPOSED ONE STOREY WITH MEZZANINE PBCOM BUILDING1. STRUCTURAL WORKS(February - June 1998 )

    2. INTERIOR FINISHING WORKS(June 1998 - On-going)

    Project Cost : P 4,475,000.00 - Structural Works

      1,839,800.00 - Interior Finishing Works

    Location : Araneta Avenue cor. Bayani Street, Quezon City  

    Contact Person : Engr. Antonio Victor R. Antonio – AVP, (PBCom)

    Design By : Arch. Francisco Y. Lim - Erwin S. Lim

    Interior Design By : Steven J. Leach, Jr. + Associates Area : 350 Sqm.

  • 8/17/2019 Rc w Profile

    61/62

    PHILIPPINE BANK OF COMMUNICATIONSPROPOSED HEAD OFFICE BLDG. RENOVATION PROJECT(GROUND & MEZZANINE FLOOR)Project Schedule :

    Phase 1 March 1997 - September 1997

    Phase 2 October 1997 - December 1997

    Phase 3 February 1998 - April 1998

    Phase 4 May - July 1998

    Project Cost : P 14,350,000.00Location : #214 PBCOM Bldg., Juan Luna St., Binondo, Manila

    Design By : Steven J. Leach Jr. + Associates

    Contact Person : Mr. Boyet Echon / Engr. Antonio Victor R. Antonio, (PBCom)

    Area : 2,150 Sq.m.

    XAVIER SPORTS & COUNTRY CLUBPROPOSED XAVIER SPORTS & COUNTRY CLUB(October 1996 - On-Going)

    Project Cost : P 3,390,000.00 - Ceiling Main Hall - Main & Lower Level - Oct. 1996 / Completed

      2,750,000.00 - Exterior CHB Walls for Masonry Works -Dec. 1996 / Completed

      425,960.00 - Built-Up Trellis Columns at Sports Hall - Oct. 1996 / Completed

      2,896,137.00 - Interior Finishing Work Package # 001 - Feb. 10, 1997 / Completed  450,000.00 - Plenum Barrier for FCU - March 1997 / Completed

      8,000,000.00 - Interior Finishing Works Package # 002 - March 1997 / Completed

      5,000,000.00 - Interior Finishing Works Package # 003 - May 16, 1997 / Jan. 1998

      2,250,000.00 - Interior Finishing Works Package # 004 - July 25, 1997 / Feb. 1998

      9,350,000.00 - Interior Finishing Works Package #005 - Nov. 1997 / July 1998

    Location : Km. 5 Upper Balulang, Carmen, Cagayan De Oro City

    Design By : Arch. Alfredo B. Alfonso

    Contact Person : Arch. Alfredo B. Alfonso

    AETNA LIFE - CAGAYAN DE ORO CITYPROPOSED OFFICE INTERIOR FIT-OUT WORKS

    (February - April 1998)Project Cost : P 1,400,000.00

    Location : 3rd Floor Jofelmar Building, Montola St., Cagayan de Oro City

    Contact Person : Arch. Leonardo Sioco - (SLA) / Mr. Nolan Yambao, (Aetna)

    Design By : Steven J. Leach Jr. + Associates

    NOL TRAINING CENTER PROPOSED INTERIOR FIT-OUT WORKS(January - February 1998)

    Project Cost : P 1,319,510.00

    Location : 2nd Floor NOL Tower, Madrigal Business Park, Alabang

    Contact Person : Mr. Sydney Salvo, Mr. Philip Low, (NOL)

    Area : 273 Sqm.

    GLAXO WELLCOME PHILIPPINES INC.PROPOSED OFFICE EXPANSION - GLAXO WELLCOME BUILDING(September 1997 - May 1998)

    Project Cost : P 9,500,000.00

    Location : Don Chino Roces Avenue, Makati City

    Contact Person : Ms. Pamela Gomez , (Glaxo) / Mary Ann Chee (Goudie)

    Design By : Goudie Associates

    Area : 4,109 Sqm.

  • 8/17/2019 Rc w Profile

    62/62

    BOULEVARD MANSIONPROPOSED HOTEL LOBBY  (February - May 1998)

    Project Cost : P 3,000,000.00

    Location : 1440 Roxas Boulevard, Manila

    Design By : Chai Hilgendorf Sy, Inc.

    Contact Person : Mr. Marcelo Co, (Mansion Group)

    Area : 250 Sqm.

    MABINI MANSIONPROPOSED HOTEL LOBBY & COFFEE SHOP RENOVATION PROJECT(October 1997 - May 1998)

    Project Cost : P 5,500,000.00

    Location : No. 1611 A. Mabini Street, Malate, Manila

    Design By : Wilma R. Dee

    Contact Person : Mr. Marcelo Co

    Area : 200 Sq.m. (SLA)

    RESIDENTIAL PROJECTS

    PETER LIMPROPOSED FINISHING OF INTERIOR WORKS PROJECT(August 1996 - July 1998)

    Project Cost : P 4,700,000.00

    Location : Blk 2 Lot 2 Bautista St., cor. Gajo St., Corinthian Gardens,

      Quezon City

    Design By : Steven J. Leach Jr. + Associates

    Contact Person : Arch. Leopoldo Cruz / Arch. Leonardo Sioco