rcra air emission training jeopardy game with complete ... · final jeopardy answerfinal jeopardy...

54

Upload: others

Post on 22-Oct-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or
Page 2: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

JeopardyJeopardyJeopardyJeopardyP t i

Control Stick to the Get Outta By the

PotpourriYourself!Program

$100 $100 $100$100 $100

Here!y

Numbers

$200 $200 $200 $200 $200

$300

$

$300 $300 $300 $300

$400

$400

$500

$400 $400 $400 $400

$500 $500 $500 $500

$ $500 $500 $500 $500

Final Jeopardy

Page 3: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$100 Answer$100 Answer

These generator classes are exempt fromexempt from

Subparts AA, BB, and CC

Page 4: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$100 Question$100 Question

Who are Small QuantityWho are Small Quantity Generators (SQGs) and

C di i ll S llConditionally Exempt Small Quantity Generators (CESQGs)?

Page 5: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$200 Answer$200 Answer

These units, used for ,neutralization of corrosive-only hazardous wastes, are exempthazardous wastes, are exempt from RCRA permitting and air

emissions regulationsemissions regulations

Page 6: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$200 Question$200 Question

What are Elementary Neutralization Units or ENUs?Neutralization Units or ENUs?

Page 7: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$300 Answer$300 Answer

These typically exempt units yp y pmust comply with Subpart AA and BB provisions if located atand BB provisions if located at

a facility that already has a RCRA permitRCRA permit

Page 8: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$300 Question $300 Question

What are recycling units?What are recycling units?

Page 9: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$400 Answer$400 Answer

Equipment containing or contacting 10 percent by weightcontacting 10 percent by weight organic hazardous waste for less

than 300 hoursthan 300 hours in a calendar year are

di i ll f hconditionally exempt from these provisions of Subpart BB

Page 10: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$400 Question$400 Question

What are the Subpart BB equipmentWhat are the Subpart BB equipment design standards, inspections, and

it i i t ?monitoring requirements?

(Recordkeeping and reporting requirements still apply)(Recordkeeping and reporting requirements still apply)

Page 11: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$500 Answer$500 Answer

This industry has received an administrative stay of certain

Subpart CC regulations for their p ghazardous waste tanks and containers due to potentialcontainers due to potential

explosion hazards

Page 12: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Get Outta Here!

$$$500 Question$500 Question

What is the organic peroxideWhat is the organic peroxide manufacturing industry?

R dk i d tifi tiRecordkeeping and notification requirements still apply

Page 13: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$100 Answer$100 Answer

Subpart CC classification ofSubpart CC classification of tanks and containers used

f t t bili tifor waste stabilization

(two-part answer)

Page 14: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$100 Question$100 Question

What are Level 2 tanks and Level 3 containers?Level 3 containers?

Page 15: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$200 Answer$200 Answer

Cl Ai A t th d d tClean Air Act method used to document no detectable

volatile organic emissions

Page 16: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$200 Question$200 Question

What is Method 21? ( d i 40 C 60 A di A)(Found in 40 CFR Part 60, Appendix A)

Page 17: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$300 Answer$300 Answer

Allowable facility-wide organic emission rates underorganic emission rates under

Subpart AA

two part answer: ho rl and ann al rateshourly and annual rates

Page 18: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$300 Question $300 Question

What is 3 pounds per hourand 3 1 tons per year?and 3.1 tons per year?

Page 19: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$400 Answer$400 Answer

Allowable cumulative duration of planned, routine maintenance per

year – during which timeyear during which time Subpart CC emissions controls

need not be operatingneed not be operating

Page 20: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$400 Question$400 Question

What is 240 hours?

Page 21: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$500 Answer$500 Answer

Maximum time frames within which repairs to surfacewhich repairs to surface

impoundment emissions controls b i i i d d l dmust be initiated and completed

(two part answer)(two-part answer)

Page 22: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

By the NumbersBy the Numbers

$$$500 Question$500 Question

What are 5 calendar days for theWhat are 5 calendar days for the first attempt, and 45 calendar d f i l ti ?days for repair completion?

(Assuming that no allowable delays apply)

Page 23: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$100 Answer$100 Answer

This phase of the RCRA air emissions regulations will be promulgated if neededbe promulgated if needed to address specific organic constituents or industriesconstituents or industries

Page 24: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$100 Question$100 Question

What is Phase III?What is Phase III?

Page 25: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$200 Answer$200 Answer

The specific federal law citationThe specific federal law citation that provides EPA with the

authority and mandate to regulateauthority and mandate to regulate air emissions from hazardous

f ili iwaste facilities

Page 26: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$200 Question$200 Question

What is Section 3004(n) of the RCRA Statute?RCRA Statute?

Page 27: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$300 Answer$300 Answer

Agency responsible for development of numerous RCRA

air emissions tools, including model , gpermit modules, inspection

checklists draft information requestchecklists, draft information request letters, and other resources

Page 28: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$300 Question$300 Question

Who is EPA Region 4?

Page 29: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$400 Answer$400 Answer

Eff ti d t f th S b t CCEffective date of the Subpart CC regulations

Be careful! This is not the Federal Register date!This is not the Federal Register date!

Page 30: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$400 Question$400 Question

What is December 6 1996?December 6, 1996?

Page 31: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$500 Answer$500 Answer

This innovative EPA program allows for promulgation of alternative RCRA

air emissions standards for Merck’s Stonewall Plant in Elkton,

Virginia and the OSi Specialties PlantVirginia and the OSi Specialties Plant in Sistersville, West Virginia

Page 32: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Stick to the ProgramStick to the Program

$$$500 Question$500 Question

What is Project XL?

Page 33: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$100 Answer$100 Answer

Type of control device where process vent exhaust is routed through a

stack to a flame for organicsstack to a flame for organics combustion prior to release; flame

must be visible at all timesmust be visible at all times

Page 34: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$100 Question$100 Question

What is a flare?

Page 35: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$200 Answer$200 Answer

M b hi h hMeans by which exhaust gases are routed to organic vapor control devices for treatment prior to releasep

Page 36: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$200 Question$200 Question

What are closed vent (h d i d) ?(hard-piped) systems?

Page 37: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$300 Answer$300 Answer

Page 38: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$300 Question$300 Question

What is a continuous synthetic b ?membrane cover?

The cover may be used alone if in direct contactThe cover may be used alone if in direct contact with the hazardous waste.

If the cover is NOT in direct contact i h h l i h iwith the waste, vapors may accumulate in the air space under the cover, and the system must be

vented to a control device.

Page 39: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$400 Answer$400 Answer

Thermal vapor incinerators, catalytic vapor incinerators,

boilers, andboilers, and process heaters

Page 40: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$400 Question$400 Question

What are enclosed combustion devices?enclosed combustion devices?

Page 41: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$500 Answer$500 Answer

Standard efficiency required forStandard efficiency required for organic vapor recovery systems (e.g.,

d b d ticondensers, carbon adsorption systems) under Subpart AA

Page 42: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Control Yourself!Control Yourself!

$$$500 Question$500 Question

What is 95 percent by weight removal of organics in theremoval of organics in the

waste stream?

Page 43: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$100 Answer$100 Answer

i ill i f i iDistillation, fractionation, air stripping, steam stripping,

thin film evaporation, and solvent extractionand solvent extraction

Page 44: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$100 Question$100 Question

Wh t th “Bi Si ”What are the “Big Six” processes potentially subject to

Subpart AA air emissions requirements under RCRA?q

Page 45: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$200 Answer$200 Answer

F f i fFrequency of reporting for instances of noncompliance

Page 46: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$200 Question$200 Question

What is semi-annually?

Page 47: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$300 Answer$300 Answer

E i dEquipment used to manage of a waste stream in the

gaseous state under operating conditions

Page 48: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$300 Question$300 Question

What is the definition of “gas/vapor service” undergas/vapor service under

Subpart BB?

Page 49: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$400 Answer$400 Answer

Two methods that can be used toTwo methods that can be used to determine the mass-weighted

average VOC concentration at theaverage VOC concentration at the point of hazardous waste origination

f S b CCfor Subpart CC purposes

Page 50: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$400 Question$400 Question

What are direct measurement viaWhat are direct measurement via Method 25D and application of

waste knowledge?waste knowledge?

Page 51: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$500 Answer$500 Answer

Provides a reference list ofProvides a reference list of low volatility constituents that

need not be included in theneed not be included in the VOC concentration

d i i f bdetermination for Subpart CC

Page 52: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

PotpourriPotpourri

$$$500 Question$500 Question

What is Appendix VI f 40 CFR P t 265?of 40 CFR Part 265?

Page 53: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Final JeopardyFinal JeopardyFinal JeopardyFinal Jeopardy

The three criteria that a facility ymust meet to qualify for a Clean

Air Act exemption under theAir Act exemption under the RCRA air emissions regulations

Page 54: RCRA Air Emission Training Jeopardy Game with complete ... · Final Jeopardy AnswerFinal Jeopardy Answer What are:What are: • Subject to, and in compliance with, Parts 60, 61, or

Final Jeopardy AnswerFinal Jeopardy AnswerFinal Jeopardy AnswerFinal Jeopardy AnswerWhat are:What are:• Subject to, and in compliance with,

Parts 60, 61, or 63 of the CAA• Equipped with and operating active• Equipped with and operating active

air emissions controls• Adequate records kept to document

CAA compliancep