re: bcuc - sustainable services ltd. - application for ... … · bcuc - stream a tes application...
TRANSCRIPT
~ SSL.
September 4, 2018
British Columbia Utilities Commission
Sixth Floor, 900 Howe Street, Box 250
Vancouver, BC V6Z 2N3
ATIN: Patrick Wruck, Commission Secretary
SSL-Sustainable Services Ltd.
957 Langford Parkway
Victoria, BC
V9B OAS
T: (250} 391-7260
F: (250} 391-7268
www.SSL-BC.com
via Email
RE: BCUC - Sustainable Services Ltd . - Application for Stream A TES
Dear Mr. Wruck,
Further to the Commission's Order dated June 5, 2018 directing SSL to file an application for regulatory
approvals, please find enclosed our Stream A TES Application and supporting appendices.
Sincerely,
SSL-Sustainable Services Ltd.
Kyle Taylor
Manager
cc: Lisa Parkes, Corporate Counsel - SSL
B-1
BCUC - Stream A TES Application f or SSL-Sustainable Services Ltd. 2018-09-04
Stream A TES Application - Background:
Section 2.3 of the TES Guidelines state that two types of TES are considered by the Commission to be
Stream A Thermal Energy Systems. The second of these are "Any TES that does not meet the
requirements of an Exempt TES, without a CPCN or a CPCN exemption that has an in-service date prior
to August 28, 2014."
SSL was established in 2008 and began providing thermal energy as a municipal service through its
Community Energy System in 2010. Several years of planning, design and construction of infrastructure
preceded the system commencing operation, and as part of that, SSL requested a meeting with BCUC.
That meeting was held on June 3, 2008, between Brian Williston and Philip Nakoneshny of BCUC, and
Reg Stewart, Ryan McKenzie and Georgeann Glover of SSL, as well as two consultants working with SSL
on the creation of the system. A range of topics were discussed at that meeting, with SSL
representatives answering all of the BCUC representatives' questions, and the meeting did not result in
BCUC regulation of SSL.
We submit that the second basis for being considered to be a Stream A TES set out above exists for
situations exactly like SSL's where the thermal energy provider had commenced operation prior to
BCUC's Thermal Energy Guidelines being enacted. Not only is this the situation for SSL, representatives
of the company also went above and beyond simply determining whether BCUC appeared to regulate
thermal energy providers, and sought and attended a meeting with BCUC representatives to
ensure that it was in compliance with BCUC rules. We make this submission in support of SSL's
application to be considered a Stream A TES on the basis that it has an in-service date prior to August
28, 2014.
Name of Applicant:
Company Name:
BC Business Registration No.:
Year Registered:
Full Address:
Phone:
Email Contact:
Public or Privately held Business:
Name of Parent Company:
TES Location (address):
TES Service Area:
Primary Energy Centre:
Kyle Taylor
SSL-Sustainable Services Ltd .
Inc. No. 0822775
2008
204-957 Langford Pky, Victoria, BC V9B OAS
250-391-7260
Private
Westhills Land Corp {957 Langford Pky, Victoria, BC V9B OAS)
Westhills community (see Appendix A)
3011 Langford Lake Rd, Victoria, BC
Page 2 of 8
BCUC - Stream A TES Application for SSL-Sustoinoble Services Ltd. 2018-09-04
Is this TES a:
New Construction Retrofit Purchase Extension to an existing TES In service prior to 2014/08/24
In Service Date of the TES:
April 2010
Description of the Construction phase-in or build-out period (in years):
Construction of the TES began in 2008, with commissioning of the first phase and establishment of
utility operations occurring in early 2010. Subsequent build-out of the TES - including both the primary
energy centre and thermal energy distribution network - was phased with the Westhills development
project and completed in 2017.
Service Provided:
Space heating is provided to all customers. Space cooling and domestic hot water heating is provided to
the majority of customers.
Primary Thermal Energy Sources:
Energy conversion technology used:
Heating:
Cooling:
Geo-exchange
Geo-exchange
The TES utilizes water-to-water heat pumps and plate heat exchangers in its primary energy centre.
Buildings served:
420 single-family homes; 4 town home strata complexes (32 units); 1 condo strata (68 units)
Approx. 110,000 sq-meters of serviced floor area
Municipal building permit number:
N/A
Page 3 of 8
BCUC - Stream A TES Application for SSL-Sustainable Services Ltd. 2018-09-04
Location of TES facilities and description of site size. Include map or schematic diagram if possible.
The TES was established to provide heating and cooling services to end-users in the community of
Westhills in Langford, BC. SSL-Sustainable Services Ltd. ("SSL") delivers these services as part of a
Services Agreement with the City of Langford ("the City") and consistent with the terms and conditions
of Bylaw 1291, both of which define a contiguous Service Area within the municipal boundaries of the
City where the TES currently operates. Further details are provided in Appendices A and B.
Description of TES including energy centre and distribution system {drawing, diagram or description
of equipment, connections etc.)
The primary thermal energy source for the TES is a gee-exchange borefield consisting of 212 vertically
drilled wells combined into a closed-loop system. The gee-exchange borefield is located underneath
Goudy Field, which is part of an artificial playing surface and stadium complex owned by the City. The
TES also utilizes natural gas boilers as an energy source for backup and peak demand energy needs.
Finally, the TES is connected to Westhills Arena, a nearby ice rink facility owned by the City, which
provides supplemental energy to the TES in the form of waste heat generated by its refrigeration system.
Energy from the above-mentioned sources is routed through a primary energy centre which transfers
this thermal energy into a water-based distribution network. Each street within the service area
contains a pair of energy distribution mains, connecting all users to a common loop (similar to a water
system). Water is used to deliver heat to and from end-users because of its strong ability to store
thermal energy. The distribution network consists of two mains in every street: a "warm" pipe and a
"cool" pipe. The warm pipe contains water running at a higher temperature and is the main energy
source for space and domestic hot water heating. The cool pipe runs at a lower temperature and acts as
a cooling sink to remove heat and provide space cooling.
End users connect to the distribution network via on-site water-source heat pumps, which provide
functional heating or cooling to their buildings.
Describe system size and known energy demand.
Please refer to the "Load Forecast & Analysis" section (below) and Appendix B for details on system size and energy figures.
Description of whether system and or site is designed to be scalable and intended to connect to other
systems, buildings or locations.
The TES is broadly designed for scalability, as evidenced by its ability to expand from initially serving only
a handful of customers to its current service base of more than 400 connections. At this time, there are
no confirmed plans to scale the system beyond its current capacity.
Page 4 of 8
BCUC - Stream A TES Application for SSL-Sustainable Services Ltd. 2018-09-04
Description of back up or alternative services available. Including information of provider.
In addition to the primary thermal energy source (geo-exchange), the TES also uses centralized natural
gas (FortisBC) boilers in its energy centre, along with a waste heat recovery system connected to a
nearby ice rink (owned by the City) . Most end user mechanical systems also include an electric (BC
Hydro) or natural gas (FortisBC) backup/heating component.
Any other information on service/energy provided and the scope of services and facilities.
SSL leases water-source heat pump systems to the majority of its end users. These systems are
designed to be compatible with the operating conditions provided by the overall TES. As part of this
arrangement, SSL is also responsible for the ongoing maintenance, repair, and eventual replacement of leased equipment.
While largely separate from the TES, SSL is also responsible for the delivery of potable water within the
Westhills Service Area. Water is provided under a similar structure to that of the TES, with SSL acting as
a service provider on behalf of the City in accordance with a local bylaw and Service Agreement.
Description of the use of municipal or public rights of ways.
SSL has installed infrastructure for the energy distribution system throughout the roads leading to and
within the Westhills Service Area. One such road, Lot D, is actually a titled lot (owned by the City)
making up a part of the Langford Parkway. There is infrastructure running under this road, including
two large distribution pipes, which is used to provide the Energy Service to the Westhills Energy Service
Area with no SRW or other charge in place formalizing SSL's rights to install such infrastructure nor
preserving SSL's ownership of this infrastructure. Similarly, as opposed to what is often the case for
major utility providers such as BC Hydro and Fortis, SSL and the City do not have a formal highway
license agreement in place for SSL's installation of Energy Service infrastructure in dedicated roads.
While the Services Agreement contemplated the granting of such an instrument by the City to SSL, it
was in fact never entered into by the parties. The attached Appendix Coffers a schematic plan showing
the areas where infrastructure is installed pursuant to a formal charge and areas where there is no such
formal charge or license agreement.
Name the customer(s) involved in the selection or signing of contracts.
N/A {Unclear what is being asked?}
Number of customers/end-users:
The TES currently provides service to 425 connections.
Page 5 of 8
BCUC - Str eam A TES Application for SSL-Sustainable Services Ltd. 2018-09-04
Type of customers: (e.g.)
All customers are residential, including a mix of single-family homes, strata town homes, and a 68-unit strata condominium.
Is (are) the Customer(s) obligated or restricted to taking service from the TES? If so, how and why.
Customers are not required to receive service from the TES. Alternative options, such as electric
heating/cooling, are available through other providers (e.g. BC Hydro) and provisions exist for termination/disconnection of service from the TES.
What percent of the estimated TES cost was/will be competitively tendered?
System construction is complete and there are no confirmed plans for further expansion.
How else is cost reasonableness for construction of the facility assured?
System construction is complete.
LOAD FORECAST & ANALYSIS
I/We confirm that the load analysis and energy demand forecast was/will be completed by the
following qualified person(s):
Andrew Byrnes, P.Eng. {Pinchin Ltd.}
Information on peak loads (MW) and annual loads {MWh) by thermal energy end-use.
TOTAL Peak Load (MW) HEATING 1.627 MW
COOLING 1.396 MW Annual Loads (MWh) HEATING 2,346 MWh
COOLING 1,344 MWh
What is the method used to forecast the peak and annual loads? What are the key assumptions and
design references used?
Peak loads are based on actual plant data from 2016 and forecast based on 2018 customer buildings.
Annual loads are based on data from previous 12 months of operation as provided by the operator (SSL).
Page 6 of 8
BCUC - Stream A TES Application for SSL-Sustainable Services Ltd.
What is the peak design output (MW) of the TES (not including peaking/backup systems)?
1.648 MW heating capacity
What is the peak design output (MW) of the peaking/backup system?
1.464 MW heating capacity
2018-09-04
Has the TES been designed to meet the full peak load for the site? If not, please explain other sources of peaking
Customer buildings include backup/peaking heat sources. This includes electric resistance duct heaters
in single-family homes and electric resistance or natural gas boilers in multi-family buildings.
Cost Estimates
Estimated Capital Cost:
Estimated Annual Operating Costs:
Approx. $11M
Approx. $0.SM
Page 7 of 8
BCUC-Stream A TES Application f or SSL-Sustainable Services Ltd.
APPENDICES*:
Appendix A - Westhills Energy Service Area
Appendix B - SSL TES Distribution Schematic
Appendix C - SSL TES Right-Of-Way Schematic
2018-09-04
* attached separately
Page 8 of 8
2
WESTHILLS ENERGY SERVICE AREA
.. i
i I
!
' ·' I
LANGFORD LAKE ROAD
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
FRESHWATER CRES
AR
TE
SIA
N C
OU
RT
W
A
T
E
R
V
I
E
W
C
L
O
S
E
C
L
E
A
R
W
A
T
E
R
P
L
A
C
E
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
ALO
UE
TT
E D
RIV
E
A
L
O
U
E
T
T
E
D
R
I
V
E
A
L
O
U
E
T
T
E
D
R
I
V
E
S
I
K
O
R
S
K
Y
R
O
A
D
G
R
O
B
P
L
A
C
E
AN
TON
OV
LA
NE
D
O
R
N
IE
R
R
O
A
D
D
O
R
N
I
E
R
R
O
A
D
D
O
R
N
IE
R
R
O
A
D
A
R
A
D
O
C
R
E
S
C
E
N
T
P
A
R
K
D
A
L
E
C
R
E
E
K
G
A
R
D
E
N
S
P
A
R
K
D
A
L
E
R
O
A
D
G
L
E
N
L
A
K
E
R
O
A
D
G
L
E
N
L
A
K
E
R
O
A
D
102-1206
104-1206
1
0
6
-
1
2
0
6
1
1
1
-
1
2
0
6
1
0
9
-
1
2
0
6
1
0
7
-
1
2
0
6
1
0
5
-
1
2
0
6
1
0
3
-
1
2
0
6
1210
1214
1218
1222
1226
1234
1238
1230
1242
1239
1235
1231
1211
1215
1219
1223
1227
3006
3010
3014
3018
3022
3026
3030
3034
3038
3009
3013
3017
1220
1224
1228
1236
1216
1212
1208
1204
3005
1232
3042
3046
3050
3054
1215
1221
12271231
1237
1241
1247
1269
1242
1246
1250
1254
1258
1262
1266
1270
1274
1278
1282
1286
3066 3060 30563052 3048
3044
3040
3036
3132
3128
3124
3016
3012
3008
3004
3000
U
R
B
A
N
C
R
E
E
K
W
A
Y
1302
1306
13101314
1318
1322
1326
1330
1334
1338
1342
1346
1307
1311
1315
1319
1323
1327
1331
1335
1339
1343
1347
1351
1355
1359
1363
1364
1360
1356
3076
3080
30843088
3092
3096
3100
3104
3108
3112
3116
2950
2956
2960
2964
2970
2974
2969
2977
2973
2981
2985
2989
2993
2997
3001
3005
3009
2978
2984
2988
2994
2998
3002
3006
3012
3016
3022
3026
3042
3032
3036
3046
3050
3054
3058
3062
3066
3070
3074
1036
1032
1028
1024
1020
1016
1012
1008
1004
1025
1021
1170
1174
1178
1182
1186
1190
1194
1149
1153
1157
1161
1165
1169
1173
1177
1185
1181
1189
1193
1197
3047
3051
3055
3059
3063
3067
3071
3075
3079
3083
3087
3091
2969
2965
2961
2957
2953
2949
2945
2941
2940
2944
2948
2952
2956
2960
2964
2968
2972
2983
2991
2995
2999
2996
2992
2988
2984
2980
2976
3003
3007
3011
3015
3019
3023
3027
3031
3035
3039
3043
3047
3051
3055
3059
3063
3067
3000
3004
3008
3012
3016
3020
3024
3028
3032
3036
3040
3044
3048
3052
3056
3060
3064
3068
3072
3076
3080
3084
3088
3092
3096
3100
3104
3108
3112
3116
3120
3124
1296
1292
1288
1282
1278
3003
3007
3013
3017
3023
3027
3031
3035
3041
3046
3040
3036
3030
3026
3020
3016
3010
1274
1270
1266
1262
1258
1254
1250
1246
1242
1238
1234
1230
1226
1222
1218
1214
1206
1210
3088
1277
1273
1269
1265
1261
1257
1253
1249
1245
1241
1237
1233
1229
1225
1221
1217
1213
1209
1205
1201
3096
1196
1192
1188
1184
1180
1176
1179
1183
1187
1191
1195
3095
2987
G
L
E
N
L
A
K
E
R
O
A
D
1089
3044
3040
3036
3032
3028
LAN
GF
OR
D P
AR
KW
AY
3
0
0
2
3
0
0
3
3
0
0
4
3
0
0
5
3
0
0
6
3
0
0
7
3
0
0
8
3
0
0
9
3
0
1
0
3
0
1
1
3
0
1
2
3
0
1
3
3
0
1
4
3
0
1
5
3
0
1
6
3
0
1
7
3
0
1
8
3
0
1
9
3
0
2
0
3
0
2
1
3
0
2
2
3
0
2
4
3
0
2
5
3
0
2
6
3
0
2
7
3
0
2
8
3
0
2
9
3
0
3
0
3
0
3
1
3
0
3
2
3
0
3
3
3
0
3
4
3
0
3
5
3
0
3
6
3
0
3
7
3
0
3
8
3
0
3
9
3
0
4
0
3
0
4
1
3
0
4
2
3
0
4
3
3
0
4
4
3
0
4
5
3
0
4
6
3
0
4
7
3
0
5
0
3
0
5
1
3
0
5
4
3
0
5
5
3
0
5
6
3
0
5
7
3
0
5
8
3
0
5
9
3
0
6
0
3
0
6
1
3
0
6
2
3
0
6
3
3
0
6
4
3
0
6
5
3
0
6
6
3
0
6
7
3
0
6
8
3
0
6
9
3
0
7
0
3
0
7
1
3
0
7
2
3
0
7
3
3
0
7
4
3
0
7
5
3
0
7
6
3
0
7
7
3
0
7
8
3
0
7
9
3
0
8
0
3
0
8
1
3
0
8
2
3
0
8
3
3
0
8
4
3
0
8
5
3
0
8
6
3
0
8
7
3
0
8
8
3
0
8
9
3
0
9
0
3
0
9
1
3
0
9
2
3
0
9
3
3
0
9
4
3
0
9
5
3
0
9
6
3
0
9
7
3
0
9
8
3
0
9
9
3
1
0
0
3
1
0
2
3
1
0
3
3
1
0
4
3
1
0
5
3
1
0
6
3
1
0
8
3
1
0
9
3
1
1
8
3
1
1
9
3
1
2
0
3
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
1
2
5
3
1
2
6
3
1
2
7
3
1
3
2
3
1
3
3
3
1
3
4
3
1
3
5
3
1
3
6
3
1
3
7
3
1
3
8
3
1
3
9
3
1
4
0
3
1
4
1
3
1
4
2
3
1
4
3
3
1
4
4
3
1
5
1
3
1
5
0
3
1
4
9
3
1
4
8
3
1
4
7
3
1
4
6
3
1
4
5
3
0
2
3
3
0
0
1
3
1
0
7
3
0
5
3
3
0
5
4
3
0
5
3
3
0
5
4
PAGE 02
PAGE 04
MH 1
MH 3
MH 2
MH 4
MH 5
MH 7
ARENA AND
BOLWING ALLY
PAGE 03
PAGE 05
P
I
L
A
T
U
S
R
U
N
B
O
M
B
A
R
D
I
E
R
C
R
E
S
B
O
M
B
A
R
D
I
E
R
C
R
E
S
C
O
M
M
A
N
D
E
R
C
R
T
W
E
S
T
S
H
O
R
E
P
A
R
K
W
A
Y
B
O
E
IN
G
C
L
O
S
E
0
1:5000100 300m
WES
THILL
S Fr
iday,
March
14, 2
014 2
:09 P
M F
:\003
WES
THILL
S W
ATER
UTI
LITY\
MAIN
BOO
K\GE
OTHE
RMAL
\003-
02-M
AP B
ASE.
DWG
WESTHILLS PROJECT No.
GOVERNING AUTHORITY FILE No.
WESTHILLS DRAWING No.
003-GEO
003-GEO-01
SHEET 01 OF 05
REV:
DESIGNED: DRAWN: CHECKED: REVIEWED:
DAV
RJR
DATE:SCALE: 1:5000
MAIN BOOK
SSL
COVER PAGE
SSL
GEOTHERMAL
MAIN BOOK
WESTHILLS
2018/07/27
LANGFORD LAKE ROAD
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
FRESHWATER CRES
AR
TE
SIA
N C
OU
RT
W
A
T
E
R
V
I
E
W
C
L
O
S
E
C
L
E
A
R
W
A
T
E
R
P
L
A
C
E
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
ALO
UE
TT
E D
RIV
E
S
I
K
O
R
S
K
Y
R
O
A
D
G
R
O
B
P
L
A
C
E
AN
TO
NO
V L
AN
E
D
O
R
N
IE
R
R
O
A
D
102-1206
104-1206
1
0
6
-
1
2
0
6
1
1
1
-
1
2
0
6
1
0
9
-
1
2
0
6
1
0
7
-
1
2
0
6
1
0
5
-
1
2
0
6
1
0
3
-
1
2
0
6
1210
1214
1218
1222
1226
1234
1238
1230
1242
1239
1235
1231
1211
1215
1219
1223
1227
3006
3010
3014
3018
3022
3026
3030
3034
3038
3009
3013
3017
1220
1224
1228
1236
1216
1212
1208
1204
3005
1232
3042
3046
3050
3054
1215
122112271231
1237
1241
1247
1269
1242
1246
1250
1254
1258
1262
1266
1270
1274
1278
1282
1286
30663060
30563052 3048
3044
3040
3036
3132
3128
3124
3016
3012
3008
3004
3000
U
R
B
A
N
C
R
E
E
K
W
A
Y
1302
1306
13101314
1318
1322
1326
1330
1334
1338
1342
1346
1307
1311
1315
1319
1323
1327
1331
1335
1339
1343
1347
1351
1355
1359
1363
1364
1360
1356
3076
3080
30843088
3092
3096
3100
3104
3108
3112
3116
2950
2956
2960
2964
2970
2974
2969
2977
2973
2981
2985
2989
2993
2997
3001
3005
3009
2978
2984
2988
2994
2998
3002
3006
1036
1032
1028
1024
1020
1016
1012
1008
1004
1025
1021
1170
1174
1178
1182
1186
1190
1194
1149
1153
1157
1161
1165
1169
1173
1177
1185
1181
1189
2969
2965
2961
2957
2953
2949
2945
2941
2940
2944
2948
2952
2956
2960
2964
2968
2972
2983
2991
2995
2999
2992
2988
2984
2980
2976
2987
100Ø
1
0
0
Ø
1
5
0
Ø
1
5
0
Ø
1
5
0
Ø
150Ø
150Ø
150Ø
250Ø
250Ø
2
5
0
Ø
250Ø
2
5
0
Ø
250Ø
250Ø
250Ø
3
5
0
Ø
350Ø
350Ø
350Ø350Ø
3
5
0
Ø
2
0
0
Ø
100Ø
2
0
0
Ø
2
0
0
Ø
200Ø
2
0
0
Ø
3
5
0
Ø
150Ø
2
5
0
Ø
3
5
0
Ø
4
0
0
Ø
2
5
0
Ø
3
5
0
Ø
250Ø
2
0
0
Ø
2
0
0
Ø
2
0
0
Ø
3
0
0
2
3
0
0
3
3
0
0
4
3
0
0
5
3
0
5
4
3
0
5
5
3
0
5
6
3
0
5
7
3
0
5
8
3
0
5
9
3
0
6
0
3
0
8
6
3
0
8
7
3
0
8
8
3
0
8
9
3
0
9
0
3
0
9
1
3
0
9
2
3
0
9
3
3
0
9
4
3
0
9
5
3
0
9
6
3
0
9
7
3
0
9
8
3
0
9
9
3
1
0
0
3
1
0
2
3
1
0
3
3
1
0
4
3
1
0
5
3
1
0
6
3
1
0
8
3
1
0
9
3
1
1
8
3
1
1
9
3
1
2
0
3
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
1
2
5
3
1
3
5
3
1
3
6
3
1
3
7
3
0
0
1
3
1
0
7
3
0
5
3
3
0
5
4
3
0
5
3
3
0
5
4
100Ø
TWO GATE VALVES
BY-PASS
TEMPERATURE AND PRESSURE SENSORS
2- 2" SADDLES
TEMPERATURE AND PRESSURE SENSORS
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
TWO GATE VALVES AND 2" BY-PASS VALVE
BLOW-OFF ASSEMBLY
2" SADDLES WITH BALL
VALVES PLUGGED
TWO GATE VALVES
8" AND 2" BY-PASS
TEMPERATURE AND
PRESSURE SENSORS
AIR VALVES AND BY-PASS 2"
AIR VALVES
AIR VALVES
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
JB ELECTRICAL
2-14" VALVES
JB ELECTRICAL
2" BY PASS
NO VALVES
BLOW OFF IS UNDER
PAVEMENT IN BARREL
DEC ACCEPTED IT AS IS
SADDLE LOCATION
TEMP & PRESSURE SENSOR
CAUTION VALVES
RIGHT HAND CLOSE
DEW/DEC VALVE AND INSTRUMENT
CHAMBER-2 (3800X1600)(LXW). 2 PAIR
SHUT-OFF VALVES. TEMPERATURE
SENSORS/PRESSURE SENSORS PAIR.
DEW/DEC EDUCTOR CHAMBER
(3000X1600)(LXW).
EDUCTOR ASSEMBLY AND PAIR OF
BLOW-OFFS.
AIR VALVES
DIRECT BURIED
GATE VALVE.
TYPICAL OF 2
2-4" VALVES
REDUCED TO 2"
2-4" SERVICES
LOW PT FLUSHOUT
CHAMBER
2-4" VALVES
REDUCED TO 2"
FLUSHOUTS AND GATE VALVES
FLOW METERS
CHAMBER
LINE VALVES OUTSIDE OF
BUILDING
SLEEVE UNDER
BOLDER WALL
3 PAIRS OF GATE
VALVES IN CHAMBER
400Ø DESS PIPES CAPPED OFF FOR
FUTURE PHASE
W
E
S
T
S
H
O
R
E
P
A
R
K
W
A
Y
B
O
E
IN
G
C
L
O
S
E
WES
THILL
S Fr
iday,
March
14, 2
014 2
:08 P
M F
:\003
WES
THILL
S W
ATER
UTI
LITY\
MAIN
BOO
K\GE
OTHE
RMAL
\003-
02-M
AP B
ASE.
DWG
WESTHILLS PROJECT No.
GOVERNING AUTHORITY FILE No.
WESTHILLS DRAWING No.
003-GEO
003-GEO-02
SHEET 02 OF 05
REV:
DESIGNED: DRAWN: CHECKED: REVIEWED:DATE:SCALE: 1:2000
GEOTHERMAL MAIN SYSTEM
MAIN BOOK
SSL
DAV
RJR
2018/07/27
FOR CONTINUATION SEE PAGE 04
FO
R C
ON
TIN
UA
TIO
N S
EE
P
AG
E 0
5
0
1:200040 120m
LEGEND
- GEOTHERMAL MAIN COLD
- GEOTHERMAL MAIN WARM
- GATE VALVE
- GEOTHERMAL MANHOLE
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
C
L
E
A
R
W
A
T
E
R
P
L
A
C
E
L
A
N
G
F
O
R
D
P
A
R
K
W
A
Y
102-1206
104-1206
1
0
6
-
1
2
0
6
1
1
1
-
1
2
0
6
1
0
9
-
1
2
0
6
1
0
7
-
1
2
0
6
1
0
5
-
1
2
0
6
1
0
3
-
1
2
0
6
1210
1214
1218
1222
1211
1215
3
5
0
Ø
2
0
0
Ø
3
5
0
Ø
350Ø
350Ø
G
L
E
N
L
A
K
E
R
O
A
D
1089
3044
3040
3036
3032
3028
LA
NG
FO
RD
PA
RK
WA
Y
TWO GATE VALVES AND 2" BY-PASS VALVE
2-14" VALVES
APPROXIMATELY
1.8m FROM CURB
FLOW METERS
0
1:200040 120m
WES
THILL
S Fr
iday,
March
14, 2
014 2
:08 P
M F
:\003
WES
THILL
S W
ATER
UTI
LITY\
MAIN
BOO
K\GE
OTHE
RMAL
\003-
02-M
AP B
ASE.
DWG
WESTHILLS PROJECT No.
GOVERNING AUTHORITY FILE No.
WESTHILLS DRAWING No.
003-GEO
003-GEO-03
SHEET 03 OF 05
REV:
DESIGNED: DRAWN: CHECKED: REVIEWED:DATE:SCALE: 1:2000
GEOTHERMAL MAIN SYSTEM
MAIN BOOK
SSL
DAV
RJR
2018/07/27
LEGEND
- GEOTHERMAL MAIN COLD
- GEOTHERMAL MAIN WARM
- GATE VALVE
- GEOTHERMAL MANHOLE
FO
R C
ON
TIN
UA
TIO
N S
EE
P
AG
E 0
2
A
L
O
U
E
T
T
E
D
R
I
V
E
A
L
O
U
E
T
T
E
D
R
I
V
E
S
I
K
O
R
S
K
Y
R
O
A
D
G
R
O
B
P
L
A
C
E
AN
TO
NO
V L
AN
E
D
O
R
N
IE
R
R
O
A
D
D
O
R
N
I
E
R
R
O
A
D
D
O
R
N
IE
R
R
O
A
D
A
R
A
D
O
C
R
E
S
C
E
N
T
P
A
R
K
D
A
L
E
C
R
E
E
K
G
A
R
D
E
N
S
P
A
R
K
D
A
L
E
R
O
A
D
G
L
E
N
L
A
K
E
R
O
A
D
G
L
E
N
L
A
K
E
R
O
A
D
2981
2985
2989
2993
2997
3001
3005
3009
2984
2988
2994
2998
3002
3006
3012
3016
3022
3026
3042
3032
3036
3046
3050
3054
3058
3062
3066
3070
3074
1008
1004
1025
1021
1170
1174
1178
1182
1186
1190
1194
1149
1153
1157
1161
1165
1169
1173
1177
1185
1181
1189
1193
1197
3047
3051
3055
3059
3063
3067
3071
3075
3079
3083
3087
3091
2969
2964
2968
2972
2983
2991
2995
2999
2996
2992
2988
2984
2980
2976
3003
3007
3011
3015
3019
3023
3027
3031
3035
3039
3043
3047
3051
3055
3059
3063
3067
3000
3004
3008
3012
3016
3020
3024
3028
3032
3036
3040
3044
3048
3052
3056
3060
3064
3068
3072
3076
3080
3084
3088
3092
3096
3100
3104
3108
3112
3116
3120
3124
1296
1292
1288
1282
1278
3003
3007
3013
3017
3023
3027
3031
3035
3041
3046
3040
3036
3030
3026
3020
3016
3010
1274
1270
1266
1262
1258
1254
1250
1246
1242
1238
1234
1230
1226
1222
1218
1214
1206
1210
3088
1277
1273
1269
1265
1261
1257
1253
1249
1245
1241
1237
1233
1229
1225
1221
1217
1213
1209
1205
1201
3096
1196
1192
1188
1184
1180
1176
1179
1183
1187
1191
1195
3095
2987
100Ø
1
0
0
Ø
1
5
0
Ø
1
5
0
Ø
2
5
0
Ø
1
5
0
Ø
2
5
0
Ø
2
5
0
Ø
25
0Ø
25
0Ø
2
5
0
Ø
25
0Ø
250Ø
250Ø
4
0
0
Ø
4
0
0
Ø
4
0
0
Ø
3
5
0
Ø
4
0
0
Ø
4
0
0
Ø
250Ø
2
0
0
Ø
2
0
0
Ø
3
0
2
4
3
0
2
5
3
0
2
6
3
0
2
7
3
0
2
8
3
0
2
9
3
0
3
0
3
0
3
1
3
0
3
2
3
0
3
3
3
0
3
4
3
0
3
5
3
0
3
6
3
0
3
7
3
0
3
8
3
0
3
9
3
0
4
0
3
0
4
1
3
0
4
2
3
0
4
3
3
0
4
4
3
0
4
5
3
0
4
6
3
0
4
7
3
0
5
0
3
0
5
1
3
0
5
4
3
0
5
5
3
0
5
6
3
0
5
7
3
0
5
8
3
0
5
9
3
0
6
0
3
0
6
1
3
0
6
2
3
0
6
3
3
0
6
4
3
0
6
5
3
0
6
6
3
0
6
7
3
0
6
8
3
0
6
9
3
0
7
0
3
0
7
1
3
0
7
2
3
0
7
6
3
0
7
7
3
0
7
8
3
0
7
9
3
0
8
0
3
0
8
1
3
0
8
2
3
0
8
3
3
0
8
4
3
0
8
5
3
0
8
6
3
0
8
7
3
0
8
8
3
0
8
9
3
0
9
0
3
0
9
1
3
0
9
2
3
0
9
3
3
0
9
4
3
0
9
5
3
0
9
6
3
0
9
7
3
0
9
8
3
0
9
9
3
1
0
0
3
1
1
8
3
1
1
9
3
1
2
0
3
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
0
5
3
3
0
5
4
3
0
5
3
3
0
5
4
2
5
0
Ø
2
5
0
Ø
1
0
0
Ø
2
5
0
Ø
100Ø
AIR VALVES AND BY-PASS 2"
3 PAIRS OF GATE VALVES
IN CHAMBER
TEMPERATURE
AND PRESSURE
SENSORS
AIR VENT
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
JB ELECTRICAL
JB ELECTRICAL
BLOW OFF IS UNDER
PAVEMENT IN BARREL
DEC ACCEPTED IT AS IS
CAUTION VALVES
RIGHT HAND CLOSE
CHAMBER
CHAMBER
3 PAIRS OF GATE
VALVES IN CHAMBER
DEW/DEC MAIN LINE
BLOW-OFF ASSEMBLY
PAIR
DIRECT BURIED
GATE VALVE.
TYPICAL OF 2
B
O
M
B
A
R
D
I
E
R
C
R
E
S
C
O
M
M
A
N
D
E
R
C
R
T
4
0
0
Ø
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
0
1:200040 120m
WES
THILL
S Fr
iday,
March
14, 2
014 2
:08 P
M F
:\003
WES
THILL
S W
ATER
UTI
LITY\
MAIN
BOO
K\GE
OTHE
RMAL
\003-
02-M
AP B
ASE.
DWG
WESTHILLS PROJECT No.
GOVERNING AUTHORITY FILE No.
WESTHILLS DRAWING No.
003-GEO
003-GEO-04
SHEET 04 OF 05
REV:
DESIGNED: DRAWN: CHECKED: REVIEWED:DATE:SCALE: 1:2000
GEOTHERMAL MAIN SYSTEM
MAIN BOOK
SSL
DAV
RJR
2018/07/27
LEGEND
FOR CONTINUATION SEE PAGE 02
- GEOTHERMAL MAIN COLD
- GEOTHERMAL MAIN WARM
- GATE VALVE
- GEOTHERMAL MANHOLE
FO
R C
ON
TIN
UA
TIO
N S
EE
P
AG
E 0
5
LANGFORD LAKE ROAD
L
A
N
G
F
O
R
D
L
A
K
E
R
O
A
D
FRESHWATER CRES
ALO
UE
TT
E D
RIV
E
AN
TO
NO
V L
AN
E
D
O
R
N
IE
R
R
O
A
D
D
O
R
N
I
E
R
R
O
A
D
1231
12371241
1247
1269
1242
1246
1250
1254
1258
1262
1266
1270
1274
1278
1282
1286
30663060
30563052
3048
3132
3128
3124
3016
3012
3008
3004
3000
U
R
B
A
N
C
R
E
E
K
W
A
Y
1342
1346
1307
1311
1315
1319
1323
1327
1331
1335
1339
1343
1347
1351
1355
1359
1363
1364
1360
1356
3076
3080
30843088
3092
3096
3100
3104
3108
3112
3116
2950
2956
2960
2964
2970
2974
2969
2977
2973
2981
2985
2989
2993
2997
3001
3005
3009
2978
2984
2988
2994
2998
3002
3006
3012
3016
3022
3026
3042
3032
3036
1036
1032
1028
1024
1025
1021
1190
1194
2969
2965
2961
2957
2953
2949
2945
2941
2940
2944
2948
2952
2956
2960
2964
2968
2972
2983
2991
2995
2999
2996
2992
2988
2984
2980
2976
3003
3007
3011
3015
3019
3023
3027
3031
3035
3039
3043
3047
3051
3055
3059
3063
3000
3004
3008
3012
3016
3020
3024
3028
3032
3036
3040
3044
3048
3052
3056
3060
3064
2987
100Ø
2
5
0
Ø
150Ø
150Ø
250Ø
250Ø
2
5
0
Ø
250Ø
2
5
0
Ø
250Ø
250Ø
250Ø
4
0
0
Ø
4
0
0
Ø
4
0
0
Ø
3
5
0
Ø
350Ø
350Ø
100Ø
2
0
0
Ø
2
0
0
Ø
3
5
0
Ø
150Ø
2
5
0
Ø
3
5
0
Ø
4
0
0
Ø
2
5
0
Ø
250Ø
2
0
0
Ø
2
0
0
Ø
2
0
0
Ø
2
0
0
Ø
200Ø
3
0
0
2
3
0
0
3
3
0
0
4
3
0
0
5
3
0
0
6
3
0
0
7
3
0
0
8
3
0
0
9
3
0
1
0
3
0
1
1
3
0
1
2
3
0
1
3
3
0
1
4
3
0
1
5
3
0
1
6
3
0
1
7
3
0
1
8
3
0
1
9
3
0
2
0
3
0
2
1
3
0
2
2
3
0
2
4
3
0
2
5
3
0
2
6
3
0
2
7
3
0
2
8
3
0
2
9
3
0
3
0
3
0
3
1
3
0
3
2
3
0
3
3
3
0
3
4
3
0
3
5
3
0
3
6
3
0
3
7
3
0
3
8
3
0
3
9
3
0
4
0
3
0
4
1
3
0
4
2
3
0
4
3
3
0
4
4
3
0
4
5
3
0
4
6
3
0
4
7
3
0
5
0
3
0
5
1
3
0
5
4
3
0
5
5
3
0
5
6
3
0
5
7
3
0
5
8
3
0
5
9
3
0
6
0
3
0
6
1
3
0
6
2
3
0
6
3
3
0
6
4
3
0
6
5
3
0
6
6
3
0
6
7
3
0
6
8
3
0
6
9
3
0
7
0
3
0
7
1
3
0
7
2
3
0
7
3
3
0
7
4
3
0
7
5
3
0
7
6
3
0
7
7
3
0
7
8
3
0
7
9
3
0
8
0
3
0
8
1
3
0
8
2
3
0
8
3
3
0
8
4
3
0
8
5
3
0
8
6
3
0
8
7
3
0
8
8
3
0
8
9
3
0
9
0
3
0
9
1
3
0
9
2
3
0
9
3
3
0
9
4
3
0
9
5
3
0
9
6
3
0
9
7
3
0
9
8
3
0
9
9
3
1
0
0
3
1
0
2
3
1
0
3
3
1
0
4
3
1
0
5
3
1
0
6
3
1
0
8
3
1
0
9
3
1
1
8
3
1
1
9
3
1
2
0
3
1
2
1
3
1
2
2
3
1
2
3
3
1
2
4
3
1
2
5
3
1
2
6
3
1
2
7
3
1
3
2
3
1
3
3
3
1
3
4
3
1
3
5
3
1
3
6
3
1
3
7
3
1
3
8
3
1
3
9
3
1
4
0
3
1
4
1
3
1
4
2
3
1
4
3
3
1
4
4
3
1
5
1
3
1
5
0
3
1
4
9
3
1
4
8
3
1
4
7
3
1
4
6
3
1
4
5
3
0
2
3
3
0
0
1
3
1
0
7
3
0
5
3
3
0
5
4
3
0
5
3
3
0
5
4
2
5
0
Ø
2
5
0
Ø
1
0
0
Ø
2
5
0
Ø
100Ø
TWO GATE VALVES
BY-PASS
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
TEMPERATURE
AND PRESSURE
SENSORS
AIR VENT
AIR VALVES
AIR VALVES
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
JB ELECTRICAL
2" BY PASS
NO VALVES
BLOW OFF IS UNDER
PAVEMENT IN BARREL
DEC ACCEPTED IT AS IS
SADDLE LOCATION
TEMP & PRESSURE SENSOR
CAUTION VALVES
RIGHT HAND CLOSE
DEW/DEC VALVE AND INSTRUMENT
CHAMBER-2 (3800X1600)(LXW). 2 PAIR
SHUT-OFF VALVES. TEMPERATURE
SENSORS/PRESSURE SENSORS PAIR.
DEW/DEC EDUCTOR CHAMBER
(3000X1600)(LXW).
EDUCTOR ASSEMBLY AND PAIR OF
BLOW-OFFS.
DIRECT BURIED
GATE VALVE.
TYPICAL OF 2
AIR VALVES
AIR VALVES
DEW/DEC VALVE AND
INSTRUMENT CHAMBER
(3800x1600) (LxW). 2
PAIR SHUT-OFF
VALVES.
DIRECT BURIED
GATE VALVE.
TYPICAL OF 2
2-4" VALVES
REDUCED TO 2"
2-4" SERVICES
LOW PT FLUSHOUT
CHAMBER
2-4" VALVES
REDUCED TO 2"
CHAMBER
LINE VALVES OUTSIDE OF
BUILDING
3 PAIRS OF GATE
VALVES IN CHAMBER
DEW/DEC MAIN LINE
BLOW-OFF ASSEMBLY
PAIR
DIRECT BURIED
GATE VALVE.
TYPICAL OF 2
P
I
L
A
T
U
S
R
U
N
B
O
M
B
A
R
D
I
E
R
C
R
E
S
B
O
M
B
A
R
D
I
E
R
C
R
E
S
C
O
M
M
A
N
D
E
R
C
R
T
W
E
S
T
S
H
O
R
E
P
A
R
K
W
A
Y
B
O
E
IN
G
C
L
O
S
E
4
0
0
Ø
TEMPERATURE
AND PRESSURE
SENSORS
AIR VALVES
0
1:200040 120m
WES
THILL
S Fr
iday,
March
14, 2
014 2
:08 P
M F
:\003
WES
THILL
S W
ATER
UTI
LITY\
MAIN
BOO
K\GE
OTHE
RMAL
\003-
02-M
AP B
ASE.
DWG
WESTHILLS PROJECT No.
GOVERNING AUTHORITY FILE No.
WESTHILLS DRAWING No.
003-GEO
003-GEO-05
SHEET 05 OF 05
REV:
DESIGNED: DRAWN: CHECKED: REVIEWED:DATE:SCALE: 1:2000
GEOTHERMAL MAIN SYSTEM
MAIN BOOK
SSL
RJR
2018/07/27
- GEOTHERMAL MAIN COLD
- GEOTHERMAL MAIN WARM
- GATE VALVE
- GEOTHERMAL MANHOLE
LEGEND
FO
R C
ON
TIN
UA
TIO
N S
EE
P
AG
E 0
4
FOR CONTINUATION SEE PAGE 04
FOR CONTINUATION SEE PAGE 02
FO
R C
ON
TIN
UA
TIO
N S
EE
P
AG
E 0
2
DAV
July 31, 2017 I For Information o::J "lot D" (Langford Pky)
• Titled lot/ owned by City of Langford
• No SRW or Hwy Licence Agreement
"lot 2" {Goudy Field) • Titled lot/ owned by City of Langford
• Subsurface infrastructure pursuant to SRW
• City of Langford public roads
• No Hwy Licence Agreement {SRW is N/A)
·~__,, -~::o~