    Introduction Rehabilitation of

    bridges are essential

    because of: Ageing factor

    Introduction of higherloading standard.

  • 8/3/2019 Re Girder Ing

    3/34

    Critical factors of re-girdering

    To be done under runningtraffic.

    Time constrained.

    Space constrained.

    Huge safety arrangement. High technical abilities.

  • 8/3/2019 Re Girder Ing

    4/34

    Methods of re-girdering

    of Plate Girders Using Railway BD crane.

    Using Road crane. Side slewing method.

    Other Suitable methods.

    Using lifting frames.

    http://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppt
  • 8/3/2019 Re Girder Ing

    5/34

    Benefit of this method

    Standardized, Suitable for anysite condition.

    Able to tackle replacement ofbed block also in same block.

    Removal the released girder

    from bridge in same block. Proven system, over 100 span

    replaced.

  • 8/3/2019 Re Girder Ing

    6/34

    Features of this project

    Sharing of experience.

    To help others to adoptsame method, when

    required.

  • 8/3/2019 Re Girder Ing

    7/34

    Method

    Preliminary activities.

    Replacement of girder.

    Post block activities.

  • 8/3/2019 Re Girder Ing

    8/34

    Preliminary activities Assembling & Riveting of

    Girder

    Painting of girder. Assembling of Lifting crane

    and Special trolley.

    Placement of rails for pulling.

    Fixing of bed blocks withgirder.

  • 8/3/2019 Re Girder Ing

    9/34

    Dismantling ofexisting masonryand bed stone/isolated bed block

    with Out-riggerarrangement.

  • 8/3/2019 Re Girder Ing

    10/34

    Out-Rigger

    XXY ZZ

    WoodenSupport

  • 8/3/2019 Re Girder Ing

    11/34

    Hard WoodSupport

    Hard WoodSupport

    WoodenSupport

  • 8/3/2019 Re Girder Ing

    12/34

    Replacement of girder

    Placing of Lifting frames& Special Trolleys ontrack.

    Pulling of girder over

    Trolleys.

  • 8/3/2019 Re Girder Ing

    13/34

    New AssembledGirder (NG)

    Tirfers

    Lift FrameFar (LF)

    Lift FrameNear (LN)Specially DesignedTrolley (T)

    Fig1: Arrangement at approaches

  • 8/3/2019 Re Girder Ing

    14/34

  • 8/3/2019 Re Girder Ing

    15/34

  • 8/3/2019 Re Girder Ing

    16/34

    Move the entire loadtowards existing girder.

    Support the Lifting frame

    over pier/ abutment.

    Hang the new girder from

    the lifting frame.

  • 8/3/2019 Re Girder Ing

    17/34

  • 8/3/2019 Re Girder Ing

    18/34

  • 8/3/2019 Re Girder Ing

    19/34

    Remove Track structure.

    Remove connectingbracings of ex. girder.

    Slew the ex. girder oneither side over pier.

  • 8/3/2019 Re Girder Ing

    20/34

    Ex. Girders

  • 8/3/2019 Re Girder Ing

    21/34

    Lay epoxy layer overcleaned bed block.

    Lower the bed block in

    position.

    Place the new girder in

    position.

  • 8/3/2019 Re Girder Ing

    22/34

  • 8/3/2019 Re Girder Ing

    23/34

    Link The Track.

    Hold the released girderwith lifting frame.

    Remove all frames andtrolleys from bridge and

    then from Track.Clear Block.

  • 8/3/2019 Re Girder Ing

    24/34

  • 8/3/2019 Re Girder Ing

    25/34

    Time studyPlacing lifting frames and trolleys

    loaded with girder on runningtrack

    45 min

    Placing new girder over ex. girder

    and lifting with lifting frame

    35 min

    Slewing ex girder and placing bedblock and new girder

    110 min

    Removing released girders and allaccessories from track 50 min

    Unforeseen times 30 min

  • 8/3/2019 Re Girder Ing

    26/34

    Total time required:270 minutes.

  • 8/3/2019 Re Girder Ing

    27/34

    Manpower StudySupervisors 2 nos.

    Skilled Staff 32 Nos.

    P. Way gang 13 nos.

    Un-skilled staff 24 nos.

    Other staff 4 nos.

  • 8/3/2019 Re Girder Ing

    28/34

    Total Staff required:

    75 Heads

  • 8/3/2019 Re Girder Ing

    29/34

    Major tools & equipmentsAir Compressor Lifting & Pulling

    Machine

    Lifting Frame Riveting tools

    Special Trolley Hydraulic jacks

    Yard crane for

    assembling

    Traverser Base

    Chain Pulley block Other small tools

  • 8/3/2019 Re Girder Ing

    30/34

    Precautionary Measure

    General Arrangement Drawing.

    Line & level of girder.

    Checking of gadgets & toolsbefore use.

    Movement of gadgets & girders

    to position.

    Placement of Bed blocks.

    Safety to running traffic.

  • 8/3/2019 Re Girder Ing

    31/34

    Conclusion Method developed under the

    guidance of

    Sri Chahatey Ram, DRM/ Lucknow

    Sri R. N. Drivedi, CTE/ TM/ WR(Previously CBE & Dy.CE/Bridge,Eastern Railway).

    Executed by M/s BBJ ConstructionCo. Ltd., Kolkata,

  • 8/3/2019 Re Girder Ing

    32/34

    Not the easiest

    But

    Standardized methodfor re-girdering of

    plate girders at anysite condition.

  • 8/3/2019 Re Girder Ing

    33/34

    Proven System

    Already more than100 girders replaced

    successfully