Introduction Rehabilitation of
bridges are essential
because of: Ageing factor
Introduction of higherloading standard.
-
8/3/2019 Re Girder Ing
3/34
Critical factors of re-girdering
To be done under runningtraffic.
Time constrained.
Space constrained.
Huge safety arrangement. High technical abilities.
-
8/3/2019 Re Girder Ing
4/34
Methods of re-girdering
of Plate Girders Using Railway BD crane.
Using Road crane. Side slewing method.
Other Suitable methods.
Using lifting frames.
http://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppthttp://e/Dy%20CE%20Br%20L/kadambam/Sup.ppt -
8/3/2019 Re Girder Ing
5/34
Benefit of this method
Standardized, Suitable for anysite condition.
Able to tackle replacement ofbed block also in same block.
Removal the released girder
from bridge in same block. Proven system, over 100 span
replaced.
-
8/3/2019 Re Girder Ing
6/34
Features of this project
Sharing of experience.
To help others to adoptsame method, when
required.
-
8/3/2019 Re Girder Ing
7/34
Method
Preliminary activities.
Replacement of girder.
Post block activities.
-
8/3/2019 Re Girder Ing
8/34
Preliminary activities Assembling & Riveting of
Girder
Painting of girder. Assembling of Lifting crane
and Special trolley.
Placement of rails for pulling.
Fixing of bed blocks withgirder.
-
8/3/2019 Re Girder Ing
9/34
Dismantling ofexisting masonryand bed stone/isolated bed block
with Out-riggerarrangement.
-
8/3/2019 Re Girder Ing
10/34
Out-Rigger
XXY ZZ
WoodenSupport
-
8/3/2019 Re Girder Ing
11/34
Hard WoodSupport
Hard WoodSupport
WoodenSupport
-
8/3/2019 Re Girder Ing
12/34
Replacement of girder
Placing of Lifting frames& Special Trolleys ontrack.
Pulling of girder over
Trolleys.
-
8/3/2019 Re Girder Ing
13/34
New AssembledGirder (NG)
Tirfers
Lift FrameFar (LF)
Lift FrameNear (LN)Specially DesignedTrolley (T)
Fig1: Arrangement at approaches
-
8/3/2019 Re Girder Ing
14/34
-
8/3/2019 Re Girder Ing
15/34
-
8/3/2019 Re Girder Ing
16/34
Move the entire loadtowards existing girder.
Support the Lifting frame
over pier/ abutment.
Hang the new girder from
the lifting frame.
-
8/3/2019 Re Girder Ing
17/34
-
8/3/2019 Re Girder Ing
18/34
-
8/3/2019 Re Girder Ing
19/34
Remove Track structure.
Remove connectingbracings of ex. girder.
Slew the ex. girder oneither side over pier.
-
8/3/2019 Re Girder Ing
20/34
Ex. Girders
-
8/3/2019 Re Girder Ing
21/34
Lay epoxy layer overcleaned bed block.
Lower the bed block in
position.
Place the new girder in
position.
-
8/3/2019 Re Girder Ing
22/34
-
8/3/2019 Re Girder Ing
23/34
Link The Track.
Hold the released girderwith lifting frame.
Remove all frames andtrolleys from bridge and
then from Track.Clear Block.
-
8/3/2019 Re Girder Ing
24/34
-
8/3/2019 Re Girder Ing
25/34
Time studyPlacing lifting frames and trolleys
loaded with girder on runningtrack
45 min
Placing new girder over ex. girder
and lifting with lifting frame
35 min
Slewing ex girder and placing bedblock and new girder
110 min
Removing released girders and allaccessories from track 50 min
Unforeseen times 30 min
-
8/3/2019 Re Girder Ing
26/34
Total time required:270 minutes.
-
8/3/2019 Re Girder Ing
27/34
Manpower StudySupervisors 2 nos.
Skilled Staff 32 Nos.
P. Way gang 13 nos.
Un-skilled staff 24 nos.
Other staff 4 nos.
-
8/3/2019 Re Girder Ing
28/34
Total Staff required:
75 Heads
-
8/3/2019 Re Girder Ing
29/34
Major tools & equipmentsAir Compressor Lifting & Pulling
Machine
Lifting Frame Riveting tools
Special Trolley Hydraulic jacks
Yard crane for
assembling
Traverser Base
Chain Pulley block Other small tools
-
8/3/2019 Re Girder Ing
30/34
Precautionary Measure
General Arrangement Drawing.
Line & level of girder.
Checking of gadgets & toolsbefore use.
Movement of gadgets & girders
to position.
Placement of Bed blocks.
Safety to running traffic.
-
8/3/2019 Re Girder Ing
31/34
Conclusion Method developed under the
guidance of
Sri Chahatey Ram, DRM/ Lucknow
Sri R. N. Drivedi, CTE/ TM/ WR(Previously CBE & Dy.CE/Bridge,Eastern Railway).
Executed by M/s BBJ ConstructionCo. Ltd., Kolkata,
-
8/3/2019 Re Girder Ing
32/34
Not the easiest
But
Standardized methodfor re-girdering of
plate girders at anysite condition.
-
8/3/2019 Re Girder Ing
33/34
Proven System
Already more than100 girders replaced
successfully
-