Thursday, 08 January 2008 Our Ref:69310 Warrnambool.doc MD0143 Wes Viti Facilities Management Services Division Geelong Campus Pigdons Road GEELONG, VIC, 3217 Dear Wes, Re: Hazardous Materials Audit - Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC Please find enclosed our Hazardous Materials Audit report, reference 69310, conducted at Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC. This work was conducted for Deakin University on Monday, 17 November 2008 through to Friday, 28 November 2008 by Vaughan Buckingham. This report complies with Part 4.3, Division 5 of the current Victorian Occupational Health and Safety Regulations - 2007. If any further information is required or if you have any queries regarding this information please do not hesitate to contact this office on (03) 9890 8811. Yours sincerely, NOEL ARNOLD & ASSOCIATES PTY LTD VAUGHAN BUCKINGHAM Property Risk Consultant

Upload: others

Post on 11-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Thursday, 08 January 2008 Our Ref:69310

    Warrnambool.doc MD0143

    Wes Viti Facilities Management Services Division Geelong Campus Pigdons Road GEELONG, VIC, 3217

    Dear Wes,

    Re: Hazardous Materials Audit - Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC

    Please find enclosed our Hazardous Materials Audit report, reference 69310, conducted at Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC. This work was conducted for Deakin University on Monday, 17 November 2008 through to Friday, 28 November 2008 by Vaughan Buckingham. This report complies with Part 4.3, Division 5 of the current Victorian Occupational Health and Safety Regulations - 2007. If any further information is required or if you have any queries regarding this information please do not hesitate to contact this office on (03) 9890 8811. Yours sincerely, NOEL ARNOLD & ASSOCIATES PTY LTD

    VAUGHAN BUCKINGHAM Property Risk Consultant

  • Noel Arnold & Associates Pty Ltd Level 3 / 818 Whitehorse Road Box Hill Victoria 3128 Australia

    Ph: (03) 9890 8811 Fax: (03) 9890 8911 www.noel-arnold.com.au

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc;Vaughan Buckingham

    Asbestos & Hazardous Materials Risk Assessment Deakin University

    Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC

    Our Ref [MD0143:69310]

    January 2009

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: I

    Asbestos & Hazardous Materials Risk Assessment

    Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC Executive Summary This report documents the findings of the Asbestos & Hazardous Materials risk assessment conducted at Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC. The risk assessment was performed by Vaughan Buckingham on Monday, 17 November 2008, through to Friday, 28th November 2008. This report was prepared in accordance with the National Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC:2018 (2005)] and the Victorian Occupational Health and Safety Regulations (2007). The objective of an Asbestos & Hazardous Materials Risk Assessment is to: • Identify, so far as is practical, whether asbestos and hazardous materials are present in

    the workplace. • Assess the risks posed by the asbestos and hazardous materials identified. • Recommend control actions necessary to manage asbestos and hazardous material

    related risks. The identification of asbestos materials was restricted to accessible and representative areas., of each campus building This executive summary is not to be used without reference to the body of the report. The limitations of this risk assessment are detailed in the body of the report. The major findings and key recommendations of this risk assessment are:

    Hazard Specific Location

    Feature Material Priority Recommendations / Comments

    Building: R; LEVEL 1; Room: R1.01, R1.02, External Asbestos Throughout Ceiling/Roof

    Covering Corrugated

    cement sheet P1 The corrugated cement

    sheet panels should be encapsulated with any visible holes repaired by a licensed asbestos removal contractor as a matter of priority in the short term. In the long term, the corrugated cement sheet panels should be removed by a licensed asbestos removal contractor. Until the short term remedial measures have been completed, this room should have restricted access and all impact activities should be avoided.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: II

    Other hazardous materials were identified throughout the premises. These materials are in a stable condition and should be managed in accordance with the recommendations stipulated in Appendix A: Hazardous Materials Register. Details of findings and other recommendations relating to the management of the identified asbestos materials are contained in the body of this report. Our professional judgement and experience was used in the identification and location of hazardous materials in accessible and representative areas. Should any personnel come across any suspected hazardous material or materials unknown to them, further investigation and assessments will need to be conducted and appropriate access to these areas controlled.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: III

    Asbestos & Hazardous Materials Risk Assessment Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC

    Table of Contents 1. Introduction........................................................................................................... 4 2. Scope of Work ...................................................................................................... 4 3. Limits of Risk Assessment ..................................................................................... 6 4. Methodology ........................................................................................................ 7

    4.1 Site Inspection................................................................................................. 8 4.2 Other Hazardous Materials ............................................................................ 8

    4.2.1 Synthetic Mineral Fibre ............................................................................ 8 4.2.2 Polychlorinated Biphenyls (PCBs)........................................................... 8 4.2.3 Lead Containing Paintwork..................................................................... 8 4.2.4 Ozone Depleting Substances.................................................................. 8

    4.3 Risk Assessment Factors................................................................................. 8 4.3.1 Asbestos.................................................................................................... 8 4.3.2 Hazardous Building Materials.................................................................. 9

    5. Findings ................................................................................................................. 9 5.1 Discussions with Relevant Personnel............................................................. 9 5.2 Review of Available Documentation............................................................ 9 5.3 Visual Inspection and Sampling Program.................................................... 9 5.4 Summary of Findings .................................................................................... 10

    6. Recommendations............................................................................................. 10 6.1 Short to Medium term Recommendations ................................................. 10 6.2 Management Recommendations............................................................... 10

    Appendix A: Asbestos & Hazardous Materials Register ........................................i Appendix B: Photographs.................................................................................. ccvi Appendix C: Asbestos Identification Analysis (Bulk Sample) Results .......... ccxiii Appendix D: Risk Assessment Factors & Risk Priority Assessment ................ ccxiv Appendix E: Hazardous Building Materials Information .............................. ccxviii Appendix F: National Code of Practice & OHS Legislative Requirements ccxxiii Appendix G: Limitations ............................................................................... ccxxviii Appendix H: Glossary of Terms & Reference Documents ............................ccxxx Appendix I: Site Drawings............................................................................. ccxxxiii

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 4

    1. Introduction This report documents the findings of the Asbestos & Hazardous Materials Risk Assessment conducted at Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC. The risk assessment was performed by Vaughan Buckingham on Monday, 17 November 2008. This report was prepared in accordance with the National Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC:2018 (2005)], other relevant Codes pertaining to hazardous materials and the Victorian Occupational Health and Safety Regulations (2007) as detailed within Appendix F. At the time of preparation of this assessment, there was no reported planned redevelopment; refurbishment or demolition of the site and no drawings or schedule of works was received indicating any work. Prior to future works, this risk assessment must be reviewed, incorporating a more detailed and intrusive audit of areas affected by the planned works, including any currently inaccessible areas where materials are likely to be disturbed by the works.

    2. Scope of Work The scope of this Asbestos & Hazardous Materials Risk Assessment was to: • Inspect representative and accessible areas of the site to identify asbestos and hazardous

    materials. • Review previous asbestos documentation provided to identify evidence and records of

    any asbestos removal and audit undertaken at the site. • Compile an up-dated asbestos and hazardous materials register for the site. • Make comments for ongoing management of the asbestos and hazardous materials. The physical scope of the audit, based on supplied information includes the following buildings:

    Building Age (circa)

    Levels Approximate Area

    Construction Type

    Roof Type

    A 0 2 1410m 2 Concrete Metal B 0 3 3916m 2 Concrete Metal C 0 2 2826m 2 Brick Metal Countryside Residence 1980 1 280m 2 Brick Tiles D 0 2 1454m 2 Brick Metal E 0 1 1647m 2 Brick Metal E2 0 1 143m 2 Metal Metal E3 0 1 208m 2 Concrete

    Block Metal

    E4 0 1 141m 2 Concrete Block

    Metal

    F 0 3 1339m 2 Brick Metal G 0 2 526m 2 Brick Metal H 0 1 794m 2 Concrete

    Block Metal

    H2 0 1 233m 2 Metal Metal H4 0 1 334m 2 Metal Metal I 0 1 243m 2 Concrete

    Block Metal

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 5

    if 0 1 34m 2 Concrete Block

    Metal

    J 0 3 3319m 2 Concrete Block

    Metal

    K 0 1 1058m 2 Concrete Block

    Metal

    Q 0 1 1172m 2 Metal Metal R 0 3 850m 2 Concrete

    Block Fibre Cement

    Riverview Residence 1970 1 280m 2 Brick Tiles S 0 1 162m 2 Concrete

    Block Metal

    T 0 1 359m 2 Concrete Block

    Metal

    U1 0 1 162m 2 Brick Tiles U2 0 1 194m 2 Brick Tiles U3 0 1 194m 2 Brick Tiles U4 0 1 156m 2 Brick Tiles U5 0 1 192m 2 Brick Tiles U6 0 1 156m 2 Brick Tiles U7 0 1 195m 2 Brick Tiles V1 0 1 111m 2 Concrete

    Block Metal

    V2 0 1 152m 2 Concrete Block

    Metal

    V3 0 1 111m 2 Concrete Block

    Metal

    V4 0 1 159m 2 Concrete Block

    Metal

    V5 0 1 159m 2 Concrete Block

    Metal

    V6 0 1 159m 2 Concrete Block

    Metal

    W2 0 2 500m 2 Concrete Block

    Metal

    W3 0 2 526m 2 Concrete Block

    Metal

    W4 0 2 526m 2 Concrete Block

    Fibre Cement

    X1 0 1 432m 2 Concrete Block

    Metal

    X2 0 1 329m 2 Concrete Block

    Metal

    X3 0 1 421m 2 Concrete Block

    Metal

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 6

    YA 0 1 211m 2 Concrete Block

    Metal

    YB 0 1 248m 2 Concrete Block

    Metal

    YC 0 1 243m 2 Concrete Block

    Metal

    YD 0 1 211m 2 Concrete Block

    Metal

    Z1 0 2 333m 2 Concrete & Brick

    Metal

    Z2 0 2 333m 2 Concrete & Brick

    Metal

    3. Limits of Risk Assessment This report must not be used for the purposes of asbestos abatement works unless accompanied by a site specific asbestos abatement scope of works and supporting safe work procedures. This report cites areas of the site where more intrusive checks must be conducted prior to commencement of any such works. It is noted that given the constraints of practicable access encountered during the risk assessment survey, the following specific site areas were not accessed or inspected: Building Level Room Reason for No Access /

    Comments A LEVEL 2 A2.52.01 No keys available A LEVEL 3 A3.50.01 No keys available A LEVEL 3 A3.55.01 No keys available A LEVEL 3 Plant Room 3 No safe footing B LEVEL 1 B1.12 No keys available B LEVEL 1 B1.12.02 No keys available B LEVEL 1 B1.21.02 No keys available B LEVEL 2 B2.37 No keys available B LEVEL 2 B2.43.06 No keys available C LEVEL 2 C2.13 No keys available D LEVEL 2 D2.32.01 No keys available D LEVEL 2 D2.32.02 No keys available E3 LEVEL 1 E3.02 No keys available E4 LEVEL 1 E4.1.01 Occupied F LEVEL 1 F1.01 Occupied F LEVEL 1 F1.01.01 Occupied F LEVEL 1 F1.02 Occupied F LEVEL 3 F3.06 No keys available F LEVEL 3 F3.06.01 No keys available H LEVEL 1 - CAFE H1.10 No keys available R LEVEL 1 R1.04 No keys available

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 7

    R LEVEL 1 R1.05 No keys available R LEVEL 1 R1.08 No keys available R LEVEL 2 R2.19.01 No safe footing R LEVEL 2 R2.19.02 No safe footing Riverview Residence

    Level 1 Bungalow - internal No keys available

    Countryside Residence

    Level 1 Garage Occupied

    Other areas not accessed or inspected are described in Appendix A and Appendix G. These areas should be assumed to contain asbestos until such a time that they can be assessed for the presence of asbestos containing or other hazardous materials.

    4. Methodology The scope of the asbestos identification survey involved a visual inspection of accessible and representative construction materials and the collection and analysis of materials suspected of containing asbestos. This survey was undertaken in accordance with the requirements outlined in the Compensation Council (ASCC) Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC: 2018 (2005)] and the Victorian Occupational Health and Safety Regulations (2007). The survey involved: • Discussions with relevant personnel to ascertain the building age and history. • Review of relevant documentation including previous audit reports and abatement

    records. • A visual inspection of the condition of accessible and representative asbestos materials.

    The buildings were occupied at the time of assessment and the survey was conducted during normal business hours.

    • The collection and analysis of materials suspected of containing asbestos. Small representative samples were collected in plastic bags with clip-lock seals. These samples were analysed in Noel Arnold & Associates' NATA-accredited laboratory for the presence of asbestos by Polarised Light Microscopy.

    A strategy of using representative samples of suspected hazardous containing materials has been used to minimise the number of samples and degree of disturbance. Because of this strategy, findings of the audit should be interpreted such that all visually similar materials in the same vicinity must be assumed to be composed of the same material until proven otherwise. Inaccessible areas that are likely to contain asbestos have been assumed to contain asbestos until further inspection and analysis of samples has been undertaken by an approved analyst. Where it was determined that asbestos was present, the risk assessment was based on the following factors: • Type of asbestos-containing material (ACM); • Degree of friability of ACM; • Surface treatment of ACM; • Physical condition of ACM; • Location and accessibility of ACM; & • Building use and occupancy, activity, and disturbance potential of ACM. The ranking of the exposure risk posed by the asbestos-containing materials evaluates (i) the potential for fibre generation, and, (ii) the potential for exposure to person(s). Where these factors have indicated that there is a possibility of exposure to airborne fibres, appropriate risk

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 8

    control measures are recommended. A priority assessment system (as defined in Appendix D) is adopted to assist with identifying priorities for control of asbestos and hazardous material risk items based upon exposure risk and for the purposes of programming and budgeting control actions and any abatement works.

    4.1 Site Inspection An inspection of the campus buildings was conducted to locate, identify and record the typical locations and applications in which asbestos materials have been used. The scope of the survey was limited to a visual examination of the accessible structural elements of the campus buildings, the construction and finishing materials and the fixed equipment (associated with the building services), and the collection and analysis of building materials suspected to contain asbestos. Materials not associated with the building fabric and operational services (e.g. non-fixed manufacturing equipment, stored materials, etc.) were not included in the survey.

    The survey also included an overview of other hazardous materials such as lead paint, synthetic mineral fibre, polychlorinated biphenyls and ozone depleting substances as detailed in Section 4.2.

    4.2 Other Hazardous Materials 4.2.1 Synthetic Mineral Fibre Accessible areas where Synthetic Mineral Fibre (SMF) insulation was visually confirmed as being present were noted to give a general indication to the presence of SMF materials throughout the buildings.

    4.2.2 Polychlorinated Biphenyls (PCBs) Representative light fittings containing capacitors were inspected and details noted for cross-referencing with the ANZECC Identification of PCB containing capacitors - 1997. Where metal capacitors were not listed on the database, these capacitors are noted as suspected to contain polychlorinated biphenyls.

    4.2.3 Lead Containing Paintwork Lead containing paintwork was assessed using an on-site lead swab test. Lead swabs give an instantaneous qualitative result and can detect lead down to 1-2 micrograms. Lead paint was tested on nominated surfaces to give a general indication of the presence of lead containing paintwork.

    4.2.4 Ozone Depleting Substances Representative items of air conditioning and chiller plant suspected of containing ozone depleting gases were noted and cross referenced with known ozone depleting gases published by the United Nations Environment Program.

    4.3 Risk Assessment Factors 4.3.1 Asbestos The qualitative risk assessment and recommended hazard control strategies for the asbestos materials were prepared within the guidelines documented in the Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC: 2018 (2005)].

    The presence of asbestos-containing materials does not necessarily constitute a health risk. However, if the asbestos-containing material is sufficiently disturbed to cause the release of airborne respirable fibres, then a health risk may be posed to exposed individuals.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 9

    To assess the health risk posed by the presence of asbestos-containing material, all relevant factors must be considered. These factors include:

    • Evidence of physical/water damage; • Proximity of air plenums and direct air stream; • Friability of asbestos material; • Likelihood of disturbance of the asbestos material; • Accessibility; • Exposed surface areas; & • Environmental conditions These aspects are in turn judged upon; (i) potential for fibre generation, and, (ii) the potential for exposure. Where these factors have indicated that there is a possibility of exposure to airborne fibres, appropriate recommendations for repair, maintenance or abatement of the asbestos-containing materials are made.

    4.3.2 Hazardous Building Materials The risk assessment factors utilised in this report relate to the potential of exposure of the construction workers during refurbishment or demolition works (excluding programmed hazardous material removal works). This assessment is based on the following factors:

    • Innate health risk potential of the material; • Condition of the material; • Volatility; • Location of the material; • Potential of disturbance. Where these factors have indicated that there is a possibility of exposure to a hazard, appropriate recommendations for the removal or management of the material in question are made.

    5. Findings The findings of this identification and risk assessment are presented in Appendix A: Asbestos & Hazardous Materials Register. The following sections describe the previous records and documents provided on request and verbal information provided by nominated site contacts:

    5.1 Discussions with Relevant Personnel Discussions were held with the following people who provided relevant information on the likelihood of there being asbestos containing materials on site: Date Name - Title Company Information Provided 17th – 28th November, 2008

    Leigh Henry – Facilities Manager

    Deakin University

    Age of building Date and extent of refurbishment Knowledge of presence of hazardous materials Knowledge of abatement activity

    5.2 Review of Available Documentation On request, a hazardous materials database was provided by Wesley Viti of Deakin University that detailed asbestos containing materials throughout all campuses. 5.3 Visual Inspection and Sampling Program Sixty-Five (65) samples of suspected asbestos containing materials were collected during the assessment; of which detailed findings of the risk assessment are contained in Appendix A - Asbestos Materials Register.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 10

    5.4 Summary of Findings The major findings of this risk assessment are:

    Hazard Specific Location Feature Material Priority Building: R; LEVEL 1; Room: R1.01, R1.02, External

    Asbestos Throughout Ceiling/Roof Covering

    Corrugated cement sheet

    P1

    Other Priority 3 and 4 hazardous materials were identified throughout the premises. These materials are in a stable condition and should be managed in accordance with the recommendations stipulated in Appendix A: Hazardous Materials Register. 6. Recommendations Based on the findings of this risk assessment the following recommendations are made:

    6.1 Short to Medium term Recommendations The corrugated cement sheet panels should be encapsulated with any visible holes repaired by a licensed asbestos removal contractor as a matter of priority in the short term. In the long term, the corrugated cement sheet panels should be removed by a licensed asbestos removal contractor. Until the short term remedial measures have been completed, this room should have restricted access and all impact activities should be avoided. 6.2 Management Recommendations • A number of priority 3 and 4 asbestos containing materials are present within the buildings

    of the campus these materials include: Asbestos Cement Sheet infill panels, walls and ceiling Asbestos containing vinyl floor tiles Millboard backed sheet vinyl Mastic expansion joints to structural walls Assumed positive asbestos millboard lining to switchboards.

    In their current condition these materials present no immediate exposure risk. They should be maintained in a good condition, labelled where suitable and reinspected as stipulated.

    • A Hazardous Materials Management Plan (HMP) should be established to manage the risks associated with remaining in-situ hazardous materials located at the site. The purpose of a HMP is to have control over identified asbestos and hazardous materials on site in order to minimise the risk of disturbance and to protect maintenance personnel and staff from exposure to asbestos fibres and dusts. The AMP should stipulate the following key actions: -

    1. Ensure all asbestos-containing materials are labelled appropriately (where suitable) to warn of the dangers of disturbing the surfaces of these materials. 2. Schedule periodic re-assessment of the asbestos materials remaining on-site to monitor their aging/deterioration. 3. Inform all staff, Health & Safety representatives, maintenance personnel about the exact locations of asbestos and other hazardous materials prior to any works being carried out. 4. Adopt suitable controls for any key maintenance activities needed to be carried out on or in the location of asbestos and other hazardous materials. • Areas highlighted in Appendix A, as areas of 'no access' should be presumed to contain

    asbestos. Appropriate management planning should be implemented in order to control access and maintenance activities to these areas, until such a time as they can be accessed and the presence or absence of asbestos containing materials can be confirmed.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: 11

    • Future works will require a new Division 6 Asbestos and Hazardous Materials audit specific

    to any other scope or work or area prior to demolition, refurbishment, alteration or modification works.

    • Should any personnel come across any suspected asbestos or other hazardous material or materials unknown to them, work should cease immediately in the affected areas until further sampling and investigation is performed.

  • January 2009

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: i

    Asbestos & Hazardous Materials Risk Assessment Deakin University Warrnambool Campus, Sherwood Park, Princess Highway, Warrnambool, VIC Appendix A: Asbestos & Hazardous Materials Register

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: ii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: A; LEVEL 2; Room: A2.20 No hazardous materials observed Building: A; LEVEL 2; Room: A2.21 No hazardous materials observed Building: A; LEVEL 2; Room: A2.22 No hazardous materials observed Building: A; LEVEL 2; Room: A2.24 No hazardous materials observed Building: A; LEVEL 2; Room: A2.25 No hazardous materials observed Building: A; LEVEL 2; Room: A2.26 No hazardous materials observed Building: A; LEVEL 2; Room: A2.27 No hazardous materials observed Building: A; LEVEL 2; Room: A2.28 No hazardous materials observed Building: A; LEVEL 2; Room: A2.29 No hazardous materials observed Building: A; LEVEL 2; Room: A2.30 No hazardous materials observed Building: A; LEVEL 2; Room: A2.41 No hazardous materials observed Building: A; LEVEL 2; Room: A2.45 Asbestos 'John Sherwoods

    Things'cupboard Shingles Paint coatings -

    Serpentine rock sample

    69310-25 Negative

    Building: A; LEVEL 2; Room: A2.46

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: iii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Ozone Depleting

    South throughout Fridge Refrigerant gas - 3 units

    Assumed Positive

    P4 This item presents no immediate risk. Ozone depleting refrigerants must be decanted and disposed of in accordance with EPA regulations prior to the disposal of refrigeration units.

    Building: A; LEVEL 2; Room: A2.47 No hazardous materials observed Building: A; LEVEL 2; Room: A2.48 Asbestos North bench Oven Insulation -

    Insulation to hot plate

    69310-26 Negative

    Ozone Depleting

    Throughout Fridge Refrigerant gas - 4 units

    Assumed Positive

    P4 This item presents no immediate risk. Ozone depleting refrigerants must be decanted and disposed of in accordance with EPA regulations prior to the disposal of refrigeration units.

    Asbestos West wall Oven Insulation - Watson Victor Ltd incubator

    3085

    No Sample Taken

    Assumed Positive

    Photo 33 1 unit Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Unable to access / locked. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos North bench Insulation Insulation - Gloves

    69310-27 Negative

    Building: A; LEVEL 2; Room: A2.49

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: iv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Asbestos Throughout Wall Construction joint mastic - Throughout

    building

    69310-28 Positive Photo 35 1 m Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 2; Room: A2.49.01 No hazardous materials observed Building: A; LEVEL 2; Room: A2.49.02 No hazardous materials observed Building: A; LEVEL 2; Room: A2.49.03 No hazardous materials observed Building: A; LEVEL 2; Room: A2.50 No hazardous materials observed Building: A; LEVEL 2; Room: A2.50.01 No hazardous materials observed Building: A; LEVEL 2; Room: A2.50.02 No hazardous materials observed Building: A; LEVEL 2; Room: A2.51 No hazardous materials observed Building: A; LEVEL 2; Room: A2.51.01 No hazardous materials observed Building: A; LEVEL 2; Room: A2.52 Asbestos Adjacent Room

    A2.56 entrance Infill panels Flat cement

    sheet - Painted Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: v

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: A; LEVEL 2; Room: A2.52.01 No access Reason: No keys available Building: A; LEVEL 2; Room: A2.52.02 No hazardous materials observed Building: A; LEVEL 2; Room: A2.52.03

    SMF Throughout Pipework insulation

    Glass fibre - Unwrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: A; LEVEL 2; Room: A2.52.04 No hazardous materials observed Building: A; LEVEL 2; Room: A2.53 Asbestos Under sink Sink splashback Bituminous

    membrane - Lining under sink

    Similar To 69310-24

    Assumed Negative

    Building: A; LEVEL 2; Room: A2.53.01 No hazardous materials observed Building: A; LEVEL 2; Room: A2.54 No hazardous materials observed Building: A; LEVEL 2; Room: A2.55 No hazardous materials observed Building: A; LEVEL 2; Room: A2.56 No hazardous materials observed Building: A; LEVEL 2; Room: A2.57

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: vi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Ozone Depleting

    Throughout Fridge Refrigerant gas - 'Kitchenmaid'

    Assumed Positive

    Photo 38 P4 This item presents no immediate risk. Ozone depleting refrigerants must be decanted and disposed of in accordance with EPA regulations prior to the disposal of refrigeration units.

    Building: A; LEVEL 2; Room: External Asbestos Throughout Wall Construction

    joint mastic - Throughout

    building

    Similar To 69310-28

    Assumed Positive

    20 m Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 3; Room: A3.21 No hazardous materials observed Building: A; LEVEL 3; Room: A3.22 No hazardous materials observed Building: A; LEVEL 3; Room: A3.23 No hazardous materials observed Building: A; LEVEL 3; Room: A3.24 No hazardous materials observed Building: A; LEVEL 3; Room: A3.25 No hazardous materials observed Building: A; LEVEL 3; Room: A3.26 No hazardous materials observed Building: A; LEVEL 3; Room: A3.27 No hazardous materials observed Building: A; LEVEL 3; Room: A3.29 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: vii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: A; LEVEL 3; Room: A3.40 No hazardous materials observed Building: A; LEVEL 3; Room: A3.41 No hazardous materials observed Building: A; LEVEL 3; Room: A3.45 No hazardous materials observed Building: A; LEVEL 3; Room: A3.48 No hazardous materials observed Building: A; LEVEL 3; Room: A3.49 Asbestos Throughout Infill panels Flat cement

    sheet - Lower wall

    69310-23 Positive Photo 27 1 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 3; Room: A3.49.01 No hazardous materials observed Building: A; LEVEL 3; Room: A3.49.02 No hazardous materials observed Building: A; LEVEL 3; Room: A3.49.03 No hazardous materials observed Building: A; LEVEL 3; Room: A3.50 No hazardous materials observed Building: A; LEVEL 3; Room: A3.50.01 No access Reason: No keys available Building: A; LEVEL 3; Room: A3.50.02 No hazardous materials observed Building: A; LEVEL 3; Room: A3.51 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: viii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: A; LEVEL 3; Room: A3.52 SMF West wall Hot water

    service insulation Glass fibre -

    Rheem Positive P4 This material presents no immediate risk.

    Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: A; LEVEL 3; Room: A3.53 Asbestos Under sink Sink splashback Bituminous

    membrane - Lining undersink

    69310-24 Negative

    Building: A; LEVEL 3; Room: A3.53.01 Asbestos Throughout Infill panels Flat cement

    sheet - Panel behind cistern

    Similar To 69310-23

    Assumed Positive

    1 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 3; Room: A3.54 No hazardous materials observed Building: A; LEVEL 3; Room: A3.55 No hazardous materials observed Building: A; LEVEL 3; Room: A3.55.01 No access Reason: No keys available Building: A; LEVEL 3; Room: A3.55.02 No hazardous materials observed Building: A; LEVEL 3; Room: A3.55.03

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: ix

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Throughout Pipework insulation

    Glass fibre - Unwrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: A; LEVEL 3; Room: A3.55.04 No hazardous materials observed Building: A; LEVEL 3; Room: A3.56 No hazardous materials observed Building: A; LEVEL 3; Room: A3.57 Asbestos Throughout Infill panels Flat cement

    sheet - Access to service void -

    unpainted

    69310-22 Positive Photo 29 2 m2 Fair Low Non-Friable

    Low November 2013

    P3 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 3; Room: A3.58 No hazardous materials observed Building: A; LEVEL 3; Plant Room A

    PCB Throughout Fluorescent light fitting

    Capacitor - Approx. 10

    fittings Assumed Positive

    Photo 25 P4 This item presents no immediate risk. Capacitors containing PCB material must be removed from light fittings and disposed of in accordance with EPA requirements prior to disposal or re-use of light fittings.

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: x

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Underside of metal roof

    Insulation batts Glass fibre - Foil lined

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    SMF Throughout Pipework insulation

    Glass fibre - Calico wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    SMF West wall Hot water service insulation

    Glass fibre - Rheem

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Asbestos East wall Switchboard backing

    Flat cement sheet -

    Unpainted 3074 No Sample

    Taken Assumed Positive

    Photo 26 1 m2 Fair Low Non-Friable

    Low November 2013

    P3 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos East wall Switchboard Compressed tar switchboard - Above main

    isolator board

    No Sample Taken

    Assumed Positive

    1 unit Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos East wall Switchboard Millboard - Internal lining

    No Sample Taken

    Assumed Positive

    1 m2 Fair Low Friable Low November 2013

    P3 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos Throughout Duct Gasket material - Flange joints

    3075 No Sample

    Taken Assumed Positive

    Photo 28 10 units

    Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Unable to access / locked. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: A; LEVEL 3; Plant Room 3

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No access Reason: No safe footing Building: B; LEVEL 1; Room: B1.05 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.02 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.03 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.04 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.05 No hazardous materials observed Building: B; LEVEL 1; Room: B1.05.06 No hazardous materials observed Building: B; LEVEL 1; Room: B1.06 No hazardous materials observed Building: B; LEVEL 1; Room: B1.06.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.06.02 No hazardous materials observed Building: B; LEVEL 1; Room: B1.08 No hazardous materials observed Building: B; LEVEL 1; Room: B1.09 No hazardous materials observed Building: B; LEVEL 1; Room: B1.09.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.10

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xiii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No hazardous materials observed Building: B; LEVEL 1; Room: B1.11 No hazardous materials observed Building: B; LEVEL 1; Room: B1.12 No access Reason: No keys available Building: B; LEVEL 1; Room: B1.12.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.12.02 No access Reason: No keys available Building: B; LEVEL 1; Room: B1.14 No hazardous materials observed Building: B; LEVEL 1; Room: B1.15 No hazardous materials observed Building: B; LEVEL 1; Room: B1.16 No hazardous materials observed Building: B; LEVEL 1; Room: B1.17 No hazardous materials observed Building: B; LEVEL 1; Room: B1.20

    Lead Throughout Wall Undercoat - Pipework - white

    3088 Positive Photo 36 P4 This item presents no immediate risk.

    Lead containing paintwork in good condition which is not a friction or impact surface, is not likely to present a health hazard unless disturbed by sanding or chemical or water damage. Areas with minor damage should be over-painted with lead free paint as part of ongoing maintenance works.

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xiv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Asbestos Throughout Pipe Gasket material - 3089 - no

    access to flange joints

    No Sample Taken

    Assumed Positive

    Photo 37 1 unit Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Unable to access / locked. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    SMF Throughout Pipework insulation

    Glass fibre - Calico wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    SMF Throughout Boiler insulation Glass fibre - Hoval boiler units

    X 2 Positive P4 This material presents no immediate risk.

    Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.21 No hazardous materials observed Building: B; LEVEL 1; Room: B1.21.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.21.02

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No access Reason: No keys available Building: B; LEVEL 1; Room: B1.21.03

    SMF Throughout Pipework insulation

    Glass fibre - Unwrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.21.04 Asbestos Throughout Wall Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 1; Room: B1.21.05 No hazardous materials observed Building: B; LEVEL 1; Room: B1.22 No hazardous materials observed Building: B; LEVEL 1; Room: B1.23 Asbestos Throughout Infill panels Flat cement

    sheet - Access to service void -

    painted

    Similar To 69310-22

    Assumed Positive

    2 m2 Fair Low Non-Friable

    Low November 2013

    P3 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 1; Room: B1.23.01

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xvi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No hazardous materials observed Building: B; LEVEL 1; Room: B1.25 No hazardous materials observed Building: B; LEVEL 1; Room: B1.25.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.26 No hazardous materials observed Building: B; LEVEL 1; Room: B1.26.01 No hazardous materials observed Building: B; LEVEL 1; Room: B1.26.02 Asbestos Throughout Infill panels Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P3 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 1; Room: B1.27 Asbestos Throughout Infill panels Flat cement

    sheet - Access to service void -

    unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Fair Low Non-Friable

    Low November 2013

    P3 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 1; Room: B1.28 No hazardous materials observed Building: B; LEVEL 1; Room: B1.28.01

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xvii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.28.02 No hazardous materials observed Building: B; LEVEL 1; Room: B1.29 No hazardous materials observed Building: B; LEVEL 1; Room: B1.30 No hazardous materials observed Building: B; LEVEL 1; Room: B1.31 No hazardous materials observed Building: B; LEVEL 1; Room: B1.32 No hazardous materials observed Building: B; LEVEL 1; Room: B1.34

    SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xviii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: B1.35 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.36 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.37 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xix

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: B1.38 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.39 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.41 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xx

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: B1.42 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.43 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.44 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: B1.44.01 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.45 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.46 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: B1.46.01 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.46.03 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 1; Room: B1.46.04 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxiii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 1; Room: General SMF Throughout Ductwork

    insulation Glass fibre - Throughout building, foil

    wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 2; Room: B2.33 No hazardous materials observed Building: B; LEVEL 2; Room: B2.34 No hazardous materials observed Building: B; LEVEL 2; Room: B2.34.01 No hazardous materials observed Building: B; LEVEL 2; Room: B2.34.02 No hazardous materials observed Building: B; LEVEL 2; Room: B2.35 No hazardous materials observed Building: B; LEVEL 2; Room: B2.37 No access Reason: No keys available Building: B; LEVEL 2; Room: B2.38 No hazardous materials observed Building: B; LEVEL 2; Room: B2.38.01 No hazardous materials observed Building: B; LEVEL 2; Room: B2.38.02 No hazardous materials observed Building: B; LEVEL 2; Room: B2.39

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxiv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No hazardous materials observed Building: B; LEVEL 2; Room: B2.40 No hazardous materials observed Building: B; LEVEL 2; Room: B2.41 No hazardous materials observed Building: B; LEVEL 2; Room: B2.42 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43.01 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43.02 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43.03 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43.04 No hazardous materials observed Building: B; LEVEL 2; Room: B2.43.05 Asbestos Throughout Infill panels Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 2; Room: B2.43.06 No access Reason: No keys available Building: B; LEVEL 2; Room: B2.43.07 No hazardous materials observed Building: B; LEVEL 2; Room: B2.44

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    No hazardous materials observed Building: B; LEVEL 2; Room: B2.45 No hazardous materials observed Building: B; LEVEL 2; Room: B2.46 No hazardous materials observed Building: B; LEVEL 2; Room: B2.50 No hazardous materials observed Building: B; LEVEL 2; Room: B2.51 No hazardous materials observed Building: B; LEVEL 2; Room: B2.51.01 No hazardous materials observed Building: B; LEVEL 2; Room: B2.52 No hazardous materials observed Building: B; LEVEL 2; Room: B2.53 Asbestos Throughout Infill panels Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 2; Room: General

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxvi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Throughout Ductwork insulation

    Glass fibre - Throughout building, foil

    wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: B; LEVEL 3; Room: B3.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.03 No hazardous materials observed Building: B; LEVEL 3; Room: B3.04 No hazardous materials observed Building: B; LEVEL 3; Room: B3.05 No hazardous materials observed Building: B; LEVEL 3; Room: B3.06 No hazardous materials observed Building: B; LEVEL 3; Room: B3.06.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.06.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.06.03 No hazardous materials observed Building: B; LEVEL 3; Room: B3.06.04 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxvii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 3; Room: B3.06.05 No hazardous materials observed Building: B; LEVEL 3; Room: B3.07 No hazardous materials observed Building: B; LEVEL 3; Room: B3.07.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.07.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.11 No hazardous materials observed Building: B; LEVEL 3; Room: B3.12 No hazardous materials observed Building: B; LEVEL 3; Room: B3.13 No hazardous materials observed Building: B; LEVEL 3; Room: B3.14 No hazardous materials observed Building: B; LEVEL 3; Room: B3.15 No hazardous materials observed Building: B; LEVEL 3; Room: B3.16 No hazardous materials observed Building: B; LEVEL 3; Room: B3.17 No hazardous materials observed Building: B; LEVEL 3; Room: B3.18 No hazardous materials observed Building: B; LEVEL 3; Room: B3.20 No hazardous materials observed Building: B; LEVEL 3; Room: B3.21 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxviii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 3; Room: B3.22 No hazardous materials observed Building: B; LEVEL 3; Room: B3.23 No hazardous materials observed Building: B; LEVEL 3; Room: B3.25 No hazardous materials observed Building: B; LEVEL 3; Room: B3.26 No hazardous materials observed Building: B; LEVEL 3; Room: B3.27 No hazardous materials observed Building: B; LEVEL 3; Room: B3.28 No hazardous materials observed Building: B; LEVEL 3; Room: B3.29 No hazardous materials observed Building: B; LEVEL 3; Room: B3.29.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.29.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.31 No hazardous materials observed Building: B; LEVEL 3; Room: B3.32 No hazardous materials observed Building: B; LEVEL 3; Room: B3.33 No hazardous materials observed Building: B; LEVEL 3; Room: B3.34 No hazardous materials observed Building: B; LEVEL 3; Room: B3.35 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxix

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 3; Room: B3.36 No hazardous materials observed Building: B; LEVEL 3; Room: B3.37 No hazardous materials observed Building: B; LEVEL 3; Room: B3.40 No hazardous materials observed Building: B; LEVEL 3; Room: B3.41 No hazardous materials observed Building: B; LEVEL 3; Room: B3.44 No hazardous materials observed Building: B; LEVEL 3; Room: B3.45 No hazardous materials observed Building: B; LEVEL 3; Room: B3.46 No hazardous materials observed Building: B; LEVEL 3; Room: B3.47 No hazardous materials observed Building: B; LEVEL 3; Room: B3.48 No hazardous materials observed Building: B; LEVEL 3; Room: B3.49 No hazardous materials observed Building: B; LEVEL 3; Room: B3.49.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.49.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.50 No hazardous materials observed Building: B; LEVEL 3; Room: B3.50.01 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxx

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: B; LEVEL 3; Room: B3.50.02 No hazardous materials observed Building: B; LEVEL 3; Room: B3.51 No hazardous materials observed Building: B; LEVEL 3; Room: B3.51.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.51.02 Asbestos Throughout Infill panels Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 3; Room: B3.52 No hazardous materials observed Building: B; LEVEL 3; Room: B3.52.01 No hazardous materials observed Building: B; LEVEL 3; Room: B3.53 No hazardous materials observed Building: B; LEVEL 3; Room: B3.53.01 Asbestos Throughout Infill panels Flat cement

    sheet - Unpainted

    Similar To 69310-22

    Assumed Positive

    2 m2 Good Low Non-Friable

    Low November 2013

    P4 Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 3; Room: B3.54

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    PCB Throughout Fluorescent light fitting

    Capacitor - Approx. 10

    fittings Assumed Positive

    P4 This item presents no immediate risk. Capacitors containing PCB material must be removed from light fittings and disposed of in accordance with EPA requirements prior to disposal or re-use of light fittings.

    SMF Underside of metal roof

    Insulation batts Glass fibre - Foil lined

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    SMF Throughout Pipework insulation

    Glass fibre - Calico wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF West wall Hot water service insulation

    Glass fibre - Rheem

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Asbestos East wall Switchboard backing

    Flat cement sheet -

    Unpainted 3074 No Sample

    Taken Assumed Positive

    1 m2 Fair Low Non-Friable

    Low November 2013

    P3 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos East wall Switchboard Compressed tar switchboard - Above main

    isolator board

    No Sample Taken

    Assumed Positive

    1 unit Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Asbestos East wall Switchboard Millboard - Internal lining

    No Sample Taken

    Assumed Positive

    1 m2 Fair Low Friable Low November 2013

    P3 Reason not Sampled: Electrical Hazard. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxiii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Asbestos Throughout Duct Gasket material - Flange joints

    3075 No Sample

    Taken Assumed Positive

    10 units

    Good Low Non-Friable

    Low November 2013

    P4 Reason not Sampled: Unable to access / locked. Maintain in current condition, label where suitable and reinspect as stipulated. Material must be removed by licensed asbestos removal contractor prior to demolition or refurbishment works likely to disturb the material.

    Building: B; LEVEL 3; Room: B3.55 No hazardous materials observed Building: B; LEVEL 3; Room: External Asbestos Throughout Wall Construction

    joint mastic - Throughout

    building

    69310-29 Negative

    Building: C; LEVEL 1; Room: C1.01 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.01.01 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.02 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.03 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.04 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxiv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Throughout Pipework insulation

    Glass fibre - Foil wrapped

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    SMF Throughout Hot water service insulation

    Glass fibre - Vulcan unit

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.05 No hazardous materials observed Building: C; LEVEL 1; Room: C1.06

    SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxv

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: C; LEVEL 1; Room: C1.06.01 No hazardous materials observed Building: C; LEVEL 1; Room: C1.06.02 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.07 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.08 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.08.01

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxvi

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.08.02 SMF Throughout Ceiling tiles Glass fibre -

    Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.08.03 Asbestos External &

    internal Ceiling Flat cement

    sheet - White Similar To 69310-37

    Assumed Negative

    Asbestos External & internal

    Wall Flat cement sheet - White

    69310-37 Negative

    Building: C; LEVEL 1; Room: C1.08.04 No hazardous materials observed Building: C; LEVEL 1; Room: C1.09 No hazardous materials observed Building: C; LEVEL 1; Room: C1.10 No hazardous materials observed

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxvii

    Hazard Specific Location Feature Material Sample No. Item Status

    Photo No. Size of ACM

    Condition Disturbance Potential

    Friability Risk Level Re-inspect Date

    Priority Recommendation

    Building: C; LEVEL 1; Room: C1.11 No hazardous materials observed Building: C; LEVEL 1; Room: C1.12 No hazardous materials observed Building: C; LEVEL 1; Room: C1.13 No hazardous materials observed Building: C; LEVEL 1; Room: C1.13.01 No hazardous materials observed Building: C; LEVEL 1; Room: C1.13.02 No hazardous materials observed Building: C; LEVEL 1; Room: C1.14 No hazardous materials observed Building: C; LEVEL 1; Room: C1.15 No hazardous materials observed Building: C; LEVEL 1; Room: C1.16

    SMF Throughout Ceiling tiles Glass fibre - Mineral fibre ceiling tiles

    Positive P4 This material presents no immediate risk. Synthetic mineral fibre materials should be handled with care using appropriate personal protective equipment and in accordance with the ASCC National Code of Practice for the Safe Use of Synthetic Mineral Fibres [NOHSC:2006(1990)].

    Building: C; LEVEL 1; Room: C1.16.01 Asbestos Throughout Floor covering Rigid vinyl tiles -

    Light brown Similar To 69310-38

    Assumed Negative

    Building: C; LEVEL 1; Room: C1.17

  • Asbestos Containing Materials (ACM) Register Site Name: Warrnambool Campus Site Address: Sherwood Park, Princess Highway, Warrnambool, VIC Survey Date: 17/11/2008

    69310 Div 5 + HAZ Deakin Warrnambool Campus.doc MD0143:Vaughan Buckingham Page: xxxviii

    Hazard Specific Location