Re-use , recycling and future of demolished buildings in Ru ss ia. Dasha Sinishin Irina Dombrovskaya Aleksandra Pravikovskaya Ksenia Latushko Evgenia Solodchenko Maria T olkombaeva. Most of the buildings will be demolished sooner or later . - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/1.jpg)
Re-use, recycling and future of demolished buildings in Russia
Dasha SinishinIrina DombrovskayaAleksandra PravikovskayaKsenia LatushkoEvgenia SolodchenkoMaria Tolkombaeva
![Page 2: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/2.jpg)
Most of the buildings will be demolished sooner or later.
In the process of work a lot of waste is formed.
![Page 3: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/3.jpg)
What shall we do with these
wastes?
land filling recycling
![Page 4: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/4.jpg)
Construction waste
Consist of :63% – crushed brick
26% – ferroconcrete items breakage
![Page 5: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/5.jpg)
Construction wastes
11% – wood wastes and scrap metal
![Page 6: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/6.jpg)
Procedure
We need some Demolition permit
Regulations for preparation and execution of earth-
moving work
![Page 7: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/7.jpg)
Procedure
In order to demolish any building you need to implement the following procedure:
prepare the draft for demolition of the building,
get Demolition permit,
![Page 8: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/8.jpg)
Procedure
move the people who are staying in the building and offices
make ready the territory for the demolition,
demolish the building
![Page 9: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/9.jpg)
Procedure
clean up the territory,
remove and recycle construction wastes
![Page 10: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/10.jpg)
Actual problems
Customer must be sure that contractor has all the needed documents such as a Permission for operation with wastes
![Page 11: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/11.jpg)
Re-using and recycling
The rate of recycling of all dismantled construction material is only 1%
There is no sorting of construction rubble at all
![Page 12: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/12.jpg)
There are some open reasons:
Lack of information about sources of materials, composition of materials, including information of specification, standards, legislation and performance
![Page 13: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/13.jpg)
High costs of transportation and material storage;
Complications with legislation: it is necessary to convert construction rubble from the class of waste to the class of recyclable materials.
![Page 14: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/14.jpg)
There are some variants such as facade preservation, but with the replacement of all inside, especially when we are talking about some historical buildings.
![Page 15: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/15.jpg)
National laws and regulations
The Federal Law ‘On waste production and
consumption’
the ownership of the waste belongs to the owner of the
material
![Page 16: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/16.jpg)
An art. 751 of the Civil Code
the ownership of the waste belongs to contractors and
subcontractors
![Page 17: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/17.jpg)
The Federal Law ‘On technical regulation’
the owner of the waste is the legal entity who is responsible for the
areas where the wastes are located legally.
![Page 18: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/18.jpg)
In each case, you need to control the contract
because these civil rules are applied only if
they satisfy contract terms or requirement
![Page 19: Re-use , recycling and future of demolished buildings in Ru ss ia](https://reader035.vdocuments.net/reader035/viewer/2022062305/56816336550346895dd3c361/html5/thumbnails/19.jpg)
We should right one extra section in the contract:
ownership and responsibility for the waste
Conclusion