reaching to the horizons (working title) the nsac 2015 long range plan don geesaman 1 june 2015 2015...

21
Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Upload: simon-morrison

Post on 27-Dec-2015

228 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Reaching to the Horizons(Working Title)

The NSAC 2015 Long Range Plan

Don Geesaman1 June 2015

2015 JLAB Users Group Meeting

Page 2: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

The Horizon at Kitty Hawk, NCThe location of our Long Range Plan Meeting

Photo by Matt Shepherd

The Wright brothers first airplane flight

Page 3: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

3

Charge to NSAC to Develop a New Long Range Plan

Page 4: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

No-Spoiler Alert

• I am not going to present the recommendation(s).

• I am not going to quote news articles about what the recommendations might be.

• I will be happy to answer your questions except about the recommendations

Page 5: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Why This is Important

The Agencies ListenAll major projects in Nuclear Physics since 1979 have been recommendations of a Long Range Plan

It gives you a sense of what your colleagues think is important

Page 6: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Anticipated LRP Schedule Charge delivered at 24 April NSAC Meeting LRP Working Group formed in early June ~ 60 members

- NuPECC and ANPhA observers. Community organization last summer DNP town meetings in the July/September Joint APS-DNP-JPS Meeting Oct 7-11, 2014 – Wednesday afternoon

discussion. Working Group organizational meeting Nov 16, 2014 in Rockville, MD White papers by end of January to have greatest impact Cost review of EIC – Report at April 3 NSAC meeting Most of text of report assembled by April 10. Resolution meeting of Long Range Plan working group April 16-20, 2015. Second draft of full report by May 18 • Draft report reviewed by external wise women and men.• LRP final report due October 2015 – NSAC Meeting and Public

Presentation

Page 7: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

The 2015 NSAC Long Range Plan

7

1979

1983

1989

1996

2002

2007

Page 8: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

History

1983: Increase operating and equipment funds♯ Build RHIC

♯ Following instruction to assume CEBAF led to a mixed message which had to be addressed later.

1989: Complete CEBAF, Build RHIC, Join Kaon

1996: Pursuit of opportunities from recent investments Build RHIC Radioactive Beams – in-flight and ISOL LISS and AGS hadron beams

2002: Exploit opportunities from recent investments, facility ops, universities and theory

Build RIA Underground Lab CEBAF upgrade

Page 9: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

FY07 LRP Recommendations (after a period of little major construction)

• Complete JLAB 12 GeV• Build FRIB• Targeted program in fundamental symmetries• Upgrade RHIC

• Resources for R&D for EIC

• Initiatives in theory, gamma-ray tracking and Accelerator R&D

Page 10: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Web locationsYou can find more information on the NSAC web site:http://science.energy.gov/np/nsac/This will give you the charge, membership of the Long Range Plan working group and a link to a site at ANL with further information such as the schedule for upcoming activities.

Argonne Site:http://www.phy.anl.gov/nsac-lrp/

This describes what we are doing and contains a link to all the input documents we have received from the community.

Page 11: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Recommendations from the Cold QCD Town Meeting

RECOMMENDATION I: With highest priority, we recommend both completion of construction and full operation of the 12 GeV CEBAF at the Thomas Jefferson National Accelerator Facility, along with targeted instrumentation investments, such as the SoLID and MOLLER projects. RECOMMENDATION II: A high luminosity, high-energy polarized Electron Ion Collider (EIC) is the highest priority of the U.S. Nuclear Physics QCD community for new construction after FRIB.

RECOMMENDATION III: We recommend strong support for other existing facilities, such as the polarized proton facility at RHIC, university-based laboratories, and the scientists involved in these efforts, in order to guarantee the effective utilization of such resources for continued scientific leadership and discovery, and for educating the next generation of nuclear scientists in the USA.

Page 12: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

RECOMMENDATION IV: We recommend that support for the hadron theory program be increased, in a balanced manner and in proportion to new and continuing investment in experiment. This will both guarantee that all aims of the existing program can most rapidly be achieved and secure a promising future for the next generation of nuclear scientists and the nation. Given the breadth of the hadron physics enterprise, this program must necessarily be multifaceted and capable of reacting quickly to the new opportunities that innovative experiment and creative theory will reveal.

The QCD and Hadron Physics Town Meeting also voted to endorse the following conclusions from the Town Meeting on Education and Innovation and the Town Meeting on High Performance Computing.

Recommendations from the Cold QCD Town MeetingContinued

Page 13: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

EIC Cost reviewSince the cost of an EIC was a significant issue for the plan, there was a cost review chaired by Ed Temple.

Excerpt from Summary:

Of the uncertainties that remain, the subcommittee considers the dominant ones to be technical. Given these technical uncertainties, based on the plans presented by both teams, the subcommittee concluded that an EIC could be built for about $1.5B in FY15$. We note that critical information on the performance of the eRHIC energy recovery linac (ERL) and the coherent electron cooling (CeC) approaches is planned to become available in 2016. Such information could go a long way toward reducing the greatest technical uncertainties for the eRHIC concept. The total on-project cost for both approaches may potentially be reduced as technical risk is retired, by off-project funds especially for the detectors from international sources, by redirection of operating funds at the host laboratory or by reducing the design requirements.

Page 14: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Recommendations from the Town Meetings

Run JLAB12Run RHIC RHIRun RHIC Spin and other existing facilitiesRun ATLAS and NSCLParticipation in LHC

Build and run FRIB

Build EIC

Lead NLDBD

INCREASE Instrumentation and MIE

Increase theory and theory computing

Increase experimental research in Astro, FS&N

These flow into possible Working Group

recommendations

RequestsJLAB $75MLE $116MRHI $31MASTRO $25M???OTHER FS&N $116M

TOTAL 363M

Not PriorityOrdered!

Page 15: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Budget Constraints are Real!

We were asked what resources and funding levels would be required to maintain a world leadership position in nuclear physics research

and

what the impacts are and priorities should be if funding available provides for a constant level of effort…

Page 16: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Budget History

Page 17: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

General Thoughts

• How do we make it clear that we understand we cannot get everything.

• Many small recommendations only make sense if they are to shut something down. Otherwise how do you evaluate relative priorities?

• We have to trust the agencies have the wisdom to deal with scarce resources across areas of the field.

Page 18: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Summary• The community worked very effectively preparing

for the Long Range PlanThank you!

• The LRP working group respectfully grappled with a number of serious issues.

• I believe we are creating a plan that will allow us to reach new horizons.

• When you see it in October, I hope you will agree.

Page 19: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

Backup

Page 20: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

2007 EIC Recommendation

The nuclear science community has recognized the importance of this future facility and makes the following recommendation.

We recommend the allocation of resources to develop accelerator and detector technologies necessary to lat the foundation for a polarized Electron-Ion Collider. The EIC would explore the new QCD frontier of strong color fields in nuclei and precisely image the gluons in the proton.

Page 21: Reaching to the Horizons (Working Title) The NSAC 2015 Long Range Plan Don Geesaman 1 June 2015 2015 JLAB Users Group Meeting

2007 FS&N Recommendation

We recommend a targeted program of experiments to investigate neutrino properties and fundamental symmentries. These experiments aim to investigate the nature of the neutrino, yet-unseen violations of time-reversal symmetry, and other key ingredients for the New Standard Model of fundamental interactions. Construction of a Deep Underground Science and Engineering Laboaratory is vital to U. S. leadership in core aspects of this initiative.