Nepal Electricity Authority (A Government of Nepal Undertaking) Transmission Directorate Grid Development Department DORDI CORRIDOR 132 kV TRANSMISSION LINE PROJECT Bidding Document for Design, Supply, Construction, Installation, Testing and Commissioning of Kirtipur-Udipur 132 kV Transmission Line (Single Stage, Two Envelope Bidding Procedure) ICB No: DCTL-073/74-01 Volume – III of III May 2017

Upload: others

Post on 26-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

Nepal Electricity Authority(A Government of Nepal Undertaking)

Transmission DirectorateGrid Development Department

DORDI CORRIDOR 132 kV TRANSMISSION LINEPROJECT

Bidding Document

for

Design, Supply, Construction, Installation, Testing and

Commissioning of Kirtipur-Udipur 132 kV Transmission Line

(Single Stage, Two Envelope Bidding Procedure)

ICB No: DCTL-073/74-01

Volume – III of III

May 2017

Page 2: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 2

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Abbreviations

BD ... ............................................................Bidding Document

BDF ......................................................... .. Bidding Forms

BDS ......................................................... .. Bid Data Sheet

BOQ .......................................................... Bill of Quantities

COF .......................................................... Contract Forms

DP ... .......................................................... Development Partners

ELI ... ..................................................... ... Eligibility

EQC ... ..................................................... .. Evaluation and Qualification Criteria

EXP ........................................................ .. Experience

FIN ... ..................................................... ... Financial

GCC ... ..................................................... .. General Conditions of Contract

GoN ......................................................... .. Government of Nepal

ICC ............................................................. International Chamber of Commerce

IFB ……………………………………. Invitation for Bids

ITB ... .......................................................... Instructions to Bidders

JV ... ........................................................ .. Joint Venture

LIT ... ..................................................... ... Litigation

NCB ... ....................................................... National Competitive Bidding

PAN ... .................................................... .. Permanent Account Number

PPA ... ..................................................... .. Public Procurement Act

PPMO ... .................................................... Public Procurement Monitoring Office

PPR ... ..................................................... .. Public Procurement Regulations

PL ... .............................................................Profit & Loss

SBD ......................................................... .. Standard Bidding Document

SCC ........................................................ .. Special Conditions of Contract

TS ... .............................................................Technical Specifications

VAT ... .................................................... .. Value Added Tax

WRQ ... .................................................. ... Works RequirementsNEA ……………………………………. Nepal Electricity Authority

Page 3: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 3

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

D/C ……………………………………… Double Circuit

Bill of Quantities

Letter of Price Bid ………4

Preamble Bill of Quantities ………6

1. Price Schedule 1: (Supply and Delivery of Plant and Equipment Foreign Origin) ………7

2. Price Schedule 2: (Plant (including Mandatory Spare Parts) Supplied fromwithin Employer's country)

………15

3. Price Schedule 3: (Insurance, Clearing, Forwarding and Transport up to Site(including port clearance etc.)

………23

4. Price Schedule 4: Installation Services, Charges and Civil Works ………31

5. Price Schedule for Proto Type Testing of Tower ………38

6. Summary of Prices (Schedule-1 to Schedule-5) ………39

Page 4: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 4

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Letter of Price Bid-- Note –

The bidder must accomplish the Letter of Price Bid on its letterhead clearly showing the bidder’s completename and address

Date: ..................................................

ICB No.: ..................................................

Invitation for Bid No.: ..................................................

To: [. . . insert complete name of the employer . . .]

We, the undersigned, declare that:

(a) We have examined and have no reservations to the Bidding Document, includingAddenda issued in accordance with Instructions to Bidders (ITB) 8.

(b) We offer to design, manufacture, test, deliver, install, pre-commission, and commissionin conformity with the Bidding Document the following Plant and Services: [. . . insertnarrative . . .]

(c) The total price of our Bid, excluding any discounts offered in item (d) below is the sumof

(d) The discounts offered and the methodology for their application are as follows: [. . .insert discounts and methodology for their application if any . . .]

(e) Our Bid shall be valid for a period of [. . . insert bid validity period as specified in ITB 20.1 of theBDS . . .] days from the date fixed for the submission deadline in accordance with theBidding Documents, and it shall remain binding upon us and may be accepted at anytime before the expiration of that period.

[amount of foreign currency in words], [amount in figures], and [amount of local currency in words], [amount

in figures]

The total bid price from the Grand Summary (Schedule No. 5) should be entered by the Bidder inside thisbox. Absence of the total bid price in the Letter of Price Bid may result in the rejection of the bid.

Page 5: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 5

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

(f) If our Bid is accepted, we commit to obtain a performance security in accordance with the Bidding Document.

(g) We have paid, or will pay the following commissions, gratuities, or fees with respect tothe bidding process or execution of the Contract: 1

Name of Recipient Address Reason Amount

......................................... ........................................ ............................... .....................

......................................... ........................................ ............................... .................... .

(h) We understand that this bid, together with your written acceptance thereof included inyour notification of award, shall constitute a binding contract between us, until aformal contract is prepared and executed.

(i) We understand that you are not bound to accept the lowest evaluated bid or any otherbid that you may receive.

(j) We agree to permit EMPLOYER/DP or its representative to inspect ouraccounts and records and other documents relating to the bid submission and tohave them audited by auditors appointed by EMPLOYER/DP.

Name .................................................................................................................................................

In the capacity of ...............................................................................................................................

Signed ............................................................................................................................................................................................................................................................................................................

1 If none has been paid or is to be paid, indicate “None.”

Page 6: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 6

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Duly authorized to sign the Bid for and on behalf of ........................................................................

Date ……………………………………………………………………………………………………………………………………………..

Preamble of Bill of Quantities

A. General1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and

Special Conditions of Contract, Technical Specifications, and Drawings.

2. The quantities given in the Bill of Quantities are estimated and provisional, and are given toprovide a common basis for bidding. The basis of payment will be the actual quantities of workordered and carried out, as measured by the Contractor and verified by the Project Manager andvalued at the rates and prices bid in the priced Bill of Quantities, where applicable, andotherwise at such rates and prices as the Project Manager may fix within the terms of the Contract.

3. For any item for which measurement is based on records made before or during construction therecords shall be prepared and agreed between the Engineer and the Contractor. Should the Contractorcarry out such work without the prior agreement of the Engineer, the Engineer may request theContractor to carry out investigations to confirm the extent of the work and the quantity of workcertified for payment shall be solely at the Engineer's discretion. The cost of any such investigationshall be borne by the Contractor.

4. The rates and prices bid in the priced Bill of Quantities shall, except as otherwise provided underthe Contract, include all construction equipment, labor, supervision, materials, erection,maintenance, insurance, profit, taxes, and duties, together with all general risks, liabilities, andobligations set out or implied in the Contract.

5. A rate or price shall be entered against each item in the priced Bill of Quantities, whetherquantities are stated or not. The cost of items against which the Contractor has failed to enter a rateor price shall be deemed to be covered by other rates and prices entered in the Bill of Quantities.

6. The whole cost of complying with the provisions of the Contract shall be included in the Itemsprovided in the priced Bill of Quantities, and where no Items are provided, the cost shall bedeemed to be distributed among the rates and prices entered for the related Items of Work.

7. General directions and descriptions of work and materials are not necessarily repeated norsummarized in the Bill of Quantities. References to the relevant sections of the Contractdocumentation shall be made before entering prices against each item in the priced Bill ofQuantities. The Specification Clause references where given in the item description of the Bills ofQuantities are for the convenience of bidders and generally refer to the principal relevant-specification clause but do not necessarily represent the whole of the specification requirements forthe work required within the item. The presence of a Specification clause reference shall not in anyway reduce the Bidders obligation to complete work in accordance with all the requirements of theSpecification.

8. Provisional Sums included and so designated in the Bill of Quantities shall be expended in wholeor in part at the direction and discretion of the Project Manager in accordance with the Conditionsof Contract.

Page 7: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 7

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

9. The method of measurement of completed work for payment shall be in accordance with theSpecifications.

Page 8: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 8

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Nepal Electricity AuthorityTransmission Directorate

GRID DEVELOPMENT DEPARTMENTDORDI CORRIDOR 132kV TRANSMISSION LINE PROJECT

Price Schedule 1: Supply and Delivery of Plant and Equipment Foreign Origin

S.N. Description

Estimated Bill ofQuantity

Dordi Corridor 132 kV TransmissionLine Project

Remarks

Unit Quantity Unit Rate (NRs) Amount(USD/INR)

1 2 3 4 5 6=4x51.0 TOWER AND LINE MATERIALS1.1 Fabrication & supply of following types of

towers & tower extension parts complete withstubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding toweraccessories such as danger plates, numberplates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DAa) Stubs Sets 8 1 set of 4 Nos. stubb) Basic Tower Nos. 8c) DA +/-0m Leg Ext Nos. 27

Page 9: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 9

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

d) DA -1.5m Leg Ext Nos. 3e) DA +1.5m Leg Ext Nos. 6f) DA -3m Leg Ext Nos. 2g) DA +3m Leg Ext Nos. 3h) DA -4.5m Leg ext Nos. 1i) DA +4.5m Leg ext Nos. 2j) DA +6 m Leg Ext Nos. 1k) DA +7.5m Leg Ext Nos. 1l) DA +9m Leg Ext Nos. 1

Total of Sub - Total 1.1.11.1.2 Tension Tower DB

a) Stubs Sets 9 1 set of 4 Nos. stubb) Basic Tower Nos. 9c) DB +/-0m Leg Ext Nos. 31d) DB -1.5m Leg Ext Nos. 2e) DB +1.5m Leg Ext Nos. 8f) DB -3m Leg Ext Nos. 2g) DB +3m Leg Ext Nos. 9h) DB -4.5m Leg ext Nos. 1i) DB +4.5m Leg ext Nos. 2j) DB +6 m Leg Ext Nos. 2k) DB +7.5m Leg Ext Nos. 2l) DB +9m Leg Ext Nos. 4

Total of Sub - Total 1.1.21.1.3 Tension Tower DC

Page 10: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 10

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

a) Stubs Sets 8 1 set of 4 Nos .stubb) Basic Tower Nos. 8c) DC +/-0m Leg Ext Nos. 29d) DC -1.5m Leg Ext Nos. 1e) DC +1.5m Leg Ext Nos. 2f) DC -3m Leg Ext Nos. 1g) DC +3m Leg Ext Nos. 1h) DC -4.5m Leg ext Nos. 1i) DC +4.5m Leg ext Nos. 1j) DC +6 m Leg Ext Nos. 4k) DC +7.5m Leg Ext Nos. 2l) DC +9m Leg Ext Nos. 17

Total of Sub - Total 1.1.31.1.4 Tension Tower DD

a) Stubs Sets 16 1 set of 4 Nos. stubb) Basic Tower Nos. 16c) DD +18M body extension. Nos. 7d) DD +25M body extension. Nos. 2e) DD +/-0m Leg Ext Nos. 24f) DD -1.5m Leg Ext Nos. 2g) DD +1.5m Leg Ext Nos. 2h) DD -3m Leg Ext Nos. 1i) DD +3m Leg Ext Nos. 2j) DD -4.5m Leg ext Nos. 1k) DD +4.5m Leg ext Nos. 1

Page 11: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 11

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

l) DD +6 m Leg Ext Nos. 2m) DD +7.5m Leg Ext Nos. 2n) DD +9m Leg Ext Nos. 3

Total of Sub - Total 1.1.4Total of 1

2.0 Additional Galvanized steel works other thanabove for leg extension etc for all tower T 12

Total of 2

3.0 TOWER ACCESSORIES AND EARTHING3.1 Tower Accessoriesi) Danger Plate Nos. 41ii) Number Plate Nos. 41iii) Anti Climbing Device Sets 41iv) Phase Plate (set of 3) Sets 82v) Circuit plate (sets of 3) Sets 82vi) Bird Guards Sets 246vii) Aviation Signal Sets 5

Total of Sub - Total 3.13.2 Tower Earthing Materiali) Pipe Type Sets 14ii) Counterpoise Typea Counterpoise Type - 25 m Sets 11b Counterpoise Type - 50 m Sets 9

Page 12: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 12

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

c Counterpoise type - 100M Set 7Total of Sub - Total 3.2

Total of 3

4.0 LINE MATERIALS4.1 Conductor and Accessories

i) ACSR conductor, code name "CARDINAL" witharmour rod etc to complete the job

Phasekm 73

ii) Stockbridge Vibration damper for CARDINALConductor with preformed armour rods Sets 636

iii) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 55

iv) Repair sleeve for ACSR "CARDINAL" conductor Nos. 55Sub - Total of 4.1

4.2 Optical Fiber ground wire (OPGW) andaccessories

aOptical fiber ground wire including intermediatesplice boxes, terminal splice boxes and additionallength as required

km 13

bStockbridge Vibration damper for OPGWoverhead ground wire with preformed armourrods

Nos. 88

Sub - Total of 4.2

Page 13: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 13

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

4.3

Insulator strings with insulators, attachmentassemblies and arcing horns all complete forACSR "CARDINAL" conductor and attachmentassemblies all complete for OPGW

i)Single suspension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 18

ii)Single tension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 282

iii)Double tension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 138

iv)Double suspension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 24

v)Jumper set with pilot insulators, armour rod &suitable counter weight complete with allaccessories for one tower

Sets 60

vi) OPGW suspension preformed assemblycomplete for one tower Sets 6

vii) OPGW tension preformed assembly completefor one tower (one set/tower) Sets 35

Sub - Total of 4.34.4 Optical Fiber and accessories

Page 14: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 14

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

i) Optical approach cable For Kirtipur and UdipurSubstation Km 1

ii)Optical Distribution Frames and other accessoriesrequired for connection with Multiplexer of Dordiand Udipur Substations

Lot 1

Sub - Total of 4.4Total of 4

5.0 SUPPLY OF SPARES

5.1 Supply of Basic Tower with extension + 9mincluding Stub

i) Tower Type DA+9M Complete Nos. 1ii) Tower Type DB+9M Complete Nos. 1iii) Tower Type DC+9M Complete Nos. 1iv) Tower Type DD+9M Complete Nos. 1

Sub - Total of 5.15.2 Conductor and OPGW accessories

i) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 10

ii) Repair sleeve for ACSR "BEAR" conductor Nos. 10

iii) Insulator 70kN 650kV BIL long rod polymerinsulator Nos. 10

iv) Insulator 120kN capacity 650kV BIL long rodpolymer insulator Nos. 10

Page 15: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 15

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

v) Stockbridge vibration damper for ACSR"CARDINAL" conductor with accessories Nos. 24

vi) Vibration damper for OPGW Nos. 12vii) Optical approach cable Km 0.50

Sub-Total of 5.2Total of 5 ( Spares)

6.0 TOOLS AND TACKELS

6.1 Flat wrench of different sizes for common bolts Sets 2

6.2 Torque wrench of different sizes for commonbolts Sets 2

6.3 Pipe wrench for common bolts Sets 26.4 Steel ropes (Pilot wire) 35 sq. mm m 5006.5 Pilot wire grips (35 sq. mm) come along clamp Nos. 36.6 Rubber covered rollers,pullies(2,3 keys) Sets 3

6.7 Portable earthing set (for Transmission linemaintenance safety purpose) Sets 1

6.8 Safety belt Sets 56.9 Line operator's leather gloves Pairs 5

6.10Hydraulic,Manually operated portable crimpingtools with 2 sets of each dies suitable forconductor "CARDINAL" and OPGW

Sets 1

6.11 Safety helmet with chinstrap and accessories Sets 10

Page 16: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 16

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

6.12 Insulation tester (10000 V) suitable for outdoorline testing purpose Nos. 1

6.13 Earth resistivity tester Nos. 26.14 Earthing resistance tester Nos. 2

6.15 Double sheeve pulley block 5 MT capacity with allaccessories Sets 1

6.16 Sagging Winch 10 MT capacity hand operated Sets 16.17 Grip suitable for ACSR "CARDINAL" Conductor Sets 46.18 Grip suitable for "OPGW" Ground Wire Sets 4

Total of 6GRAND TOTAL

Page 17: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 17

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Nepal Electricity AuthorityTransmission Directorate

GRID DEVELOPMENT DEPARTMENTDORDI CORRIDOR 132kV TRANSMISSION LINE PROJECT

Price Schedule 2: Plant (including Mandatory Spare Parts) Supplied from within Employer's country

S.N. DescriptionEstimated Bill of

QuantityDordi Corridor 132 kV Transmission

Line ProjectRemarks

Unit Quantity Unit Rate (NRs) Amount (NRs)1 2 3 4 5 6=4x5

1.0 TOWER AND LINE MATERIALS1.1 Fabrication & supply of following types of

towers & tower extension parts complete withstubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding toweraccessories such as danger plates, numberplates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DAa) Stubs Sets 8 1 set of 4 Nos. stubb) Basic Tower Nos. 8c) DA +/-0m Leg Ext Nos. 27

Page 18: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 18

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

d) DA -1.5m Leg Ext Nos. 3e) DA +1.5m Leg Ext Nos. 6f) DA -3m Leg Ext Nos. 2g) DA +3m Leg Ext Nos. 3h) DA -4.5m Leg ext Nos. 1i) DA +4.5m Leg ext Nos. 2j) DA +6 m Leg Ext Nos. 1k) DA +7.5m Leg Ext Nos. 1l) DA +9m Leg Ext Nos. 1

Total of Sub - Total 1.1.11.1.2 Tension Tower DB

a) Stubs Sets 9 1 set of 4 Nos. stubb) Basic Tower Nos. 9c) DB +/-0m Leg Ext Nos. 31d) DB -1.5m Leg Ext Nos. 2e) DB +1.5m Leg Ext Nos. 8f) DB -3m Leg Ext Nos. 2g) DB +3m Leg Ext Nos. 9h) DB -4.5m Leg ext Nos. 1i) DB +4.5m Leg ext Nos. 2j) DB +6 m Leg Ext Nos. 2k) DB +7.5m Leg Ext Nos. 2l) DB +9m Leg Ext Nos. 4

Total of Sub - Total 1.1.21.1.3 Tension Tower DC

Page 19: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 19

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

a) Stubs Sets 8 1 set of 4 Nos. stubb) Basic Tower Nos. 8c) DC +/-0m Leg Ext Nos. 29d) DC -1.5m Leg Ext Nos. 1e) DC +1.5m Leg Ext Nos. 2f) DC -3m Leg Ext Nos. 1g) DC +3m Leg Ext Nos. 1h) DC -4.5m Leg ext Nos. 1i) DC +4.5m Leg ext Nos. 1j) DC +6 m Leg Ext Nos. 4k) DC +7.5m Leg Ext Nos. 2l) DC +9m Leg Ext Nos. 17

Total of Sub - Total 1.1.31.1.4 Tension Tower DD

a) Stubs Sets 16 1 set of 4 Nos. stubb) Basic Tower Nos. 16c) DD +18M body extension. Nos. 7d) DD +25M body extension. Nos. 2e) DD +/-0m Leg Ext Nos. 24f) DD -1.5m Leg Ext Nos. 2g) DD +1.5m Leg Ext Nos. 2h) DD -3m Leg Ext Nos. 1i) DD +3m Leg Ext Nos. 2j) DD -4.5m Leg ext Nos. 1k) DD +4.5m Leg ext Nos. 1

Page 20: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 20

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

l) DD +6 m Leg Ext Nos. 2m) DD +7.5m Leg Ext Nos. 2n) DD +9m Leg Ext Nos. 3

Total of Sub - Total 1.1.4Total of 1

2.0 Additional Galvanized steel works other thanabove for leg extension etc for all tower T 12

Total of 2

3.0 TOWER ACCESSORIES AND EARTHING3.1 Tower Accessoriesi) Danger Plate Nos. 41ii) Number Plate Nos. 41iii) Anti Climbing Device Sets 41iv) Phase Plate (set of 3) Sets 82v) Circuit plate (sets of 3) Sets 82vi) Bird Guards Sets 246vii) Aviation Signal Sets 5

Total of Sub - Total 3.13.2 Tower Earthing Materiali) Pipe Type Sets 14ii) Counterpoise Typea Counterpoise Type - 25 m Sets 11b Counterpoise Type - 50 m Sets 9

Page 21: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 21

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

c Counterpoise type - 100M Set 7Total of Sub - Total 3.2

Total of 3

4.0 LINE MATERIALS4.1 Conductor and Accessories

i) ACSR conductor, code name "CARDINAL" witharmour rod etc to complete the job

Phasekm 73

ii) Stockbridge Vibration damper for CARDINALConductor with preformed armour rods Sets 636

iii) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 55

iv) Repair sleeve for ACSR "CARDINAL" conductor Nos. 55Sub - Total of 4.1

4.2 Optical Fiber ground wire (OPGW) andaccessories

aOptical fiber ground wire including intermediatesplice boxes, terminal splice boxes and additionallength as required

km 13

bStockbridge Vibration damper for OPGWoverhead ground wire with preformed armourrods

Nos. 88

Sub - Total of 4.2

Page 22: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 22

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

4.3

Insulator strings with insulators, attachmentassemblies and arcing horns all complete forACSR "CARDINAL" conductor and attachmentassemblies all complete for OPGW

i)Single suspension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 18

ii)Single tension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 282

iii)Double tension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 138

iv)Double suspension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 24

v)Jumper set with pilot insulators, armour rod &suitable counter weight complete with allaccessories for one tower

Sets 60

vi) OPGW suspension preformed assemblycomplete for one tower Sets 6

vii) OPGW tension preformed assembly completefor one tower (one set/tower) Sets 35

Sub - Total of 4.34.4 Optical Fiber and accessories

Page 23: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 23

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

i) Optical approach cable For Kirtipur and UdipurSubstation Km 1

ii)Optical Distribution Frames and other accessoriesrequired for connection with Multiplexer of Dordiand Udipur Substations

Lot 1

Sub - Total of 4.4Total of 4

5.0 SUPPLY OF SPARES

5.1 Supply of Basic Tower with extension + 9mincluding Stub

i) Tower Type DA+9M Complete Nos. 1ii) Tower Type DB+9M Complete Nos. 1iii) Tower Type DC+9M Complete Nos. 1iv) Tower Type DD+9M Complete Nos. 1

Sub - Total of 5.15.2 Conductor and OPGW accessories

i) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 10

ii) Repair sleeve for ACSR "BEAR" conductor Nos. 10

iii) Insulator 70kN 650kV BIL long rod polymerinsulator Nos. 10

iv) Insulator 120kN capacity 650kV BIL long rodpolymer insulator Nos. 10

Page 24: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 24

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

v) Stockbridge vibration damper for ACSR"CARDINAL" conductor with accessories Nos. 24

vi) Vibration damper for OPGW Nos. 12vii) Optical approach cable Km 0.50

Sub-Total of 5.2Total of 5 ( Spares)

6.0 TOOLS AND TACKELS

6.1 Flat wrench of different sizes for common bolts Sets 2

6.2 Torque wrench of different sizes for commonbolts Sets 2

6.3 Pipe wrench for common bolts Sets 26.4 Steel ropes (Pilot wire) 35 sq. mm m 5006.5 Pilot wire grips (35 sq. mm) come along clamp Nos. 36.6 Rubber covered rollers,pullies(2,3 keys) Sets 3

6.7 Portable earthing set (for Transmission linemaintenance safety purpose) Sets 1

6.8 Safety belt Sets 56.9 Line operator's leather gloves Pairs 5

6.10Hydraulic,Manually operated portable crimpingtools with 2 sets of each dies suitable forconductor "CARDINAL" and OPGW

Sets 1

6.11 Safety helmet with chinstrap and accessories Sets 10

Page 25: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 25

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

6.12 Insulation tester (10000 V) suitable for outdoorline testing purpose Nos. 1

6.13 Earth resistivity tester Nos. 26.14 Earthing resistance tester Nos. 2

6.15 Double sheeve pulley block 5 MT capacity with allaccessories Sets 1

6.16 Sagging Winch 10 MT capacity hand operated Sets 16.17 Grip suitable for ACSR "CARDINAL" Conductor Sets 46.18 Grip suitable for "OPGW" Ground Wire Sets 4

Total of 6GRAND TOTAL

Page 26: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 26

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Nepal Electricity AuthorityTransmission Directorate

GRID DEVELOPMENT DEPARTMENTDORDI CORRIDOR 132kV TRANSMISSION LINE PROJECT

Price Schedule 3: Insurance, Clearing, Forwarding and Transport up to Site (including port clearance etc.)

S.N. DescriptionEstimated Bill of

QuantityDordi Corridor 132 kV Transmission

Line ProjectRemarks

Unit Quantity Unit Rate (NRs) Amount (NRs)1 2 3 4 5 6=4x5

1.0 TOWER AND LINE MATERIALS1.1 Fabrication & supply of following types of

towers & tower extension parts complete withstubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding toweraccessories such as danger plates, numberplates, phase plates, anti-climbing devices

1.1.1 Suspension Tower DAa) Stubs Sets 8b) Basic Tower Nos. 8c) DA +/-0m Leg Ext Nos. 27

Page 27: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 27

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

d) DA -1.5m Leg Ext Nos. 3e) DA +1.5m Leg Ext Nos. 6f) DA -3m Leg Ext Nos. 2g) DA +3m Leg Ext Nos. 3h) DA -4.5m Leg ext Nos. 1i) DA +4.5m Leg ext Nos. 2j) DA +6 m Leg Ext Nos. 1k) DA +7.5m Leg Ext Nos. 1l) DA +9m Leg Ext Nos. 1

Total of Sub - Total 1.1.11.1.2 Tension Tower DB

a) Stubs Sets 9b) Basic Tower Nos. 9c) DB +/-0m Leg Ext Nos. 31d) DB -1.5m Leg Ext Nos. 2e) DB +1.5m Leg Ext Nos. 8f) DB -3m Leg Ext Nos. 2g) DB +3m Leg Ext Nos. 9h) DB -4.5m Leg ext Nos. 1i) DB +4.5m Leg ext Nos. 2j) DB +6 m Leg Ext Nos. 2k) DB +7.5m Leg Ext Nos. 2l) DB +9m Leg Ext Nos. 4

Total of Sub - Total 1.1.21.1.3 Tension Tower DC

Page 28: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 28

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

a) Stubs Sets 8b) Basic Tower Nos. 8c) DC +/-0m Leg Ext Nos. 29d) DC -1.5m Leg Ext Nos. 1e) DC +1.5m Leg Ext Nos. 2f) DC -3m Leg Ext Nos. 1g) DC +3m Leg Ext Nos. 1h) DC -4.5m Leg ext Nos. 1i) DC +4.5m Leg ext Nos. 1j) DC +6 m Leg Ext Nos. 4k) DC +7.5m Leg Ext Nos. 2l) DC +9m Leg Ext Nos. 17

Total of Sub - Total 1.1.31.1.4 Tension Tower DD

a) Stubs Sets 16b) Basic Tower Nos. 16c) DD +18M body extension. Nos. 7d) DD +25M body extension. Nos. 2e) DD +/-0m Leg Ext Nos. 24f) DD -1.5m Leg Ext Nos. 2g) DD +1.5m Leg Ext Nos. 2h) DD -3m Leg Ext Nos. 1i) DD +3m Leg Ext Nos. 2j) DD -4.5m Leg ext Nos. 1k) DD +4.5m Leg ext Nos. 1

Page 29: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 29

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

l) DD +6 m Leg Ext Nos. 2m) DD +7.5m Leg Ext Nos. 2n) DD +9m Leg Ext Nos. 3

Total of Sub - Total 1.1.4Total of 1

2.0 Additional Galvanized steel works other thanabove for leg extension etc for all tower T 12

Total of 2

3.0 TOWER ACCESSORIES AND EARTHING3.1 Tower Accessoriesi) Danger Plate Nos. 41ii) Number Plate Nos. 41iii) Anti Climbing Device Sets 41iv) Phase Plate (set of 3) Sets 82v) Circuit plate (sets of 3) Sets 82vi) Bird Guards Sets 246vii) Aviation Signal Sets 5

Total of Sub - Total 3.13.2 Tower Earthing Materiali) Pipe Type Sets 14ii) Counterpoise Typea Counterpoise Type - 25 m Sets 11b Counterpoise Type - 50 m Sets 9

Page 30: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 30

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

c Counterpoise type - 100M Set 7Total of Sub - Total 3.2

Total of 3

4.0 LINE MATERIALS4.1 Conductor and Accessories

i) ACSR conductor, code name "CARDINAL" witharmour rod etc to complete the job

Phasekm 73

ii) Stockbridge Vibration damper for CARDINALConductor with preformed armour rods Sets 636

iii) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 55

iv) Repair sleeve for ACSR "CARDINAL" conductor Nos. 55Sub - Total of 4.1

4.2 Optical Fiber ground wire (OPGW) andaccessories

aOptical fiber ground wire including intermediatesplice boxes, terminal splice boxes and additionallength as required

km 13

bStockbridge Vibration damper for OPGWoverhead ground wire with preformed armourrods

Nos. 88

Sub - Total of 4.2

Page 31: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 31

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

4.3

Insulator strings with insulators, attachmentassemblies and arcing horns all complete forACSR "CARDINAL" conductor and attachmentassemblies all complete for OPGW

i)Single suspension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 18

ii)Single tension with 1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 282

iii)Double tension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 138

iv)Double suspension with 2x1 composite long rodinsulator complete for "Cardinal" conductorsuitable for altitude up to 1,000 m

Sets 24

v)Jumper set with pilot insulators, armour rod &suitable counter weight complete with allaccessories for one tower

Sets 60

vi) OPGW suspension preformed assemblycomplete for one tower Sets 6

vii) OPGW tension preformed assembly completefor one tower (one set/tower) Sets 35

Sub - Total of 4.34.4 Optical Fiber and accessories

Page 32: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 32

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

i) Optical approach cable For Kirtipur and UdipurSubstation Km 1

ii)Optical Distribution Frames and other accessoriesrequired for connection with Multiplexer of Dordiand Udipur Substations

Lot 1

Sub - Total of 4.4Total of 4

5.0 SUPPLY OF SPARES

5.1 Supply of Basic Tower with extension + 9mincluding Stub

i) Tower Type DA+9M Complete Nos. 1ii) Tower Type DB+9M Complete Nos. 1iii) Tower Type DC+9M Complete Nos. 1iv) Tower Type DD+9M Complete Nos. 1

Sub - Total of 5.15.2 Conductor and OPGW accessories

i) Mid span compression joints for ACSR"CARDINAL" conductor Nos. 10

ii) Repair sleeve for ACSR "BEAR" conductor Nos. 10

iii) Insulator 70kN 650kV BIL long rod polymerinsulator Nos. 10

iv) Insulator 120kN capacity 650kV BIL long rodpolymer insulator Nos. 10

Page 33: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 33

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

v) Stockbridge vibration damper for ACSR"CARDINAL" conductor with accessories Nos. 24

vi) Vibration damper for OPGW Nos. 12vii) Optical approach cable Km 0.50

Sub-Total of 5.2Total of 5 ( Spares)

6.0 TOOLS AND TACKELS

6.1 Flat wrench of different sizes for common bolts Sets 2

6.2 Torque wrench of different sizes for commonbolts Sets 2

6.3 Pipe wrench for common bolts Sets 26.4 Steel ropes (Pilot wire) 35 sq. mm m 5006.5 Pilot wire grips (35 sq. mm) come along clamp Nos. 36.6 Rubber covered rollers,pullies(2,3 keys) Sets 3

6.7 Portable earthing set (for Transmission linemaintenance safety purpose) Sets 1

6.8 Safety belt Sets 56.9 Line operator's leather gloves Pairs 5

6.10Hydraulic,Manually operated portable crimpingtools with 2 sets of each dies suitable forconductor "CARDINAL" and OPGW

Sets 1

6.11 Safety helmet with chinstrap and accessories Sets 10

Page 34: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 34

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

6.12 Insulation tester (10000 V) suitable for outdoorline testing purpose Nos. 1

6.13 Earth resistivity tester Nos. 26.14 Earthing resistance tester Nos. 2

6.15 Double sheeve pulley block 5 MT capacity with allaccessories Sets 1

6.16 Sagging Winch 10 MT capacity hand operated Sets 16.17 Grip suitable for ACSR "CARDINAL" Conductor Sets 46.18 Grip suitable for "OPGW" Ground Wire Sets 4

Total of 6GRAND TOTAL

Page 35: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 35

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Nepal Electricity AuthorityTransmission Directorate

GRID DEVELOPMENT DEPARTMENTDORDI CORRIDOR 132kV TRANSMISSION LINE PROJECT

Price Schedule 4. Installation Services, Charges and Civil Works

S. N Description Unit Quantity

Dordi Corridor 132 kV Transmission LineProject

Remarks

Unit Rate (NRs) Amount (NRs)

1 2 3 4 5 6=4x5

1 Survey

a)Check survey, Profile preparation, Tower spotting, stakingof tower locations ans survey on tower location includingassociated works

KM 11.5

b) Preparation of Land Parcel Data from tower spotting forland acquisition lot 1

c) Detail survey and associated works KM 5.5Total of 1

2 Soil investigationa) All kind of soil except fissured rock & hard rock Loc 19

Page 36: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 36

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

b) Fissured Rock Loc 13c) Hard Rock Loc 3d) River Crossing Loc 6e) Furnishing Bore Log Data Loc 41

Total of Sub-Total 2.12.2 Benchinga) Normal Rock Cu m 45b) Fissured Rock Cu m 45c) Hard Rock including breaking of boulder Cu m 2000

Total of Sub-Total 2.2Total of 2

3 Measurements of soil resistivity/ground resistance Loc 41Total of 3

4Erection of towers with its body and leg extensions(complete) including bolt & nuts, tack welding and supplyand application of enamel & zinc rich paint

4.1 Tower type DAa) Stubs Sets 8.00b) Basic Tower Nos. 8.00c) DA +/-0m Leg Ext Nos. 27.00d) DA -1.5m Leg Ext Nos. 3.00e) DA +1.5m Leg Ext Nos. 6.00f) DA -3m Leg Ext Nos. 2.00

Page 37: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 37

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

g) DA +3m Leg Ext Nos. 3.00h) DA -4.5m Leg ext Nos. 1.00i) DA +4.5m Leg ext Nos. 2.00j) DA +6 m Leg Ext Nos. 1.00k) DA +7.5m Leg Ext Nos. 1.00l) DA +9m Leg Ext Nos. 1.00

Total of Sub-Total 4.14.2 Tension Tower DBa) Stubs Sets 9.00b) Basic Tower Nos. 9.00c) DB +/-0m Leg Ext Nos. 31.00d) DB -1.5m Leg Ext Nos. 2.00e) DB +1.5m Leg Ext Nos. 8.00f) DB -3m Leg Ext Nos. 2.00g) DB +3m Leg Ext Nos. 9.00h) DB -4.5m Leg ext Nos. 1.00i) DB +4.5m Leg ext Nos. 2.00j) DB +6 m Leg Ext Nos. 2.00k) DB +7.5m Leg Ext Nos. 2.00l) DB +9m Leg Ext Nos. 4.00

Total of Sub-Total 4.24.3 Tension Tower DCa) Stubs Sets 8.00b) Basic Tower Nos. 8.00c) DC +/-0m Leg Ext Nos. 29.00

Page 38: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 38

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

d) DC -1.5m Leg Ext Nos. 1.00e) DC +1.5m Leg Ext Nos. 2.00f) DC -3m Leg Ext Nos. 1.00g) DC +3m Leg Ext Nos. 1.00h) DC -4.5m Leg ext Nos. 1.00i) DC +4.5m Leg ext Nos. 1.00j) DC +6 m Leg Ext Nos. 4.00k) DC +7.5m Leg Ext Nos. 2.00l) DC +9m Leg Ext Nos. 17.00

Total of Sub-Total 4.34.4 Tension Tower DD/DDEa) Stubs Sets 16.00b) Basic Tower Nos. 16.00c) DD +18M body extension. Nos. 7.00d) DD +25M body extension. Nos. 2.00e) DD +/-0m Leg Ext Nos. 24.00f) DD -1.5m Leg Ext Nos. 2.00g) DD +1.5m Leg Ext Nos. 2.00h) DD -3m Leg Ext Nos. 1.00i) DD +3m Leg Ext Nos. 2.00j) DD -4.5m Leg ext Nos. 1.00k) DD +4.5m Leg ext Nos. 1.00l) DD +6 m Leg Ext Nos. 2.00

m) DD +7.5m Leg Ext Nos. 2.00n) DD +9m Leg Ext Nos. 3.00

Page 39: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 39

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Total of Sub-Total 4.4Total of 4

5 Work associated with construction of tower foundationsincluding stub setting

5.1 Tower type DA (for all type of body and leg extensionsa) Dry Soil Nos. 1b) Wet Soil Nos. 2c) Fully Submerged Soil Nos. 1d) Dry Fissured Rock Nos. 1e) Wet Fissured Rock Nos. 1f) Submerged Fissured Rock Nos. 1g) Hard Rock Nos. 1

Total of Sub-Total 5.15.2 Tower type DB (for all type of body and leg extensionsa) Dry Soil Nos. 2b) Wet Soil Nos. 1c) Fully Submerged Soil Nos. 2d) Dry Fissured Rock Nos. 1e) Wet Fissured Rock Nos. 1f) Submerged Fissured Rock Nos. 1g) Hard Rock Nos. 1

Total of Sub-Total 5.25.3 Tower type DC (for all type of body and leg extensionsa) Dry Soil Nos. 1

Page 40: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 40

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

b) Wet Soil Nos. 2c) Fully Submerged Soil Nos. 1d) Dry Fissured Rock Nos. 1e) Wet Fissured Rock Nos. 1f) Submerged Fissured Rock Nos. 1g) Hard Rock Nos. 1

Total of Sub-Total 5.3

5.4 Tower type DD/DDE (for all type of body and legextensions

a) Dry Soil Nos. 3b) Wet Soil Nos. 4c) Fully Submerged Soil Nos. 2d) Dry Fissured Rock Nos. 3e) Wet Fissured Rock Nos. 1f) Submerged Fissured Rock Nos. 1g) Hard Rock Nos. 2

Total of Sub-Total 5.4Total of 5

6 Installation of tower accessories and earthing6.1 Tower accessoriesa) Danger plate No 41b) Number plate No 41c) Anti climbing device Sets 41d) Phase plate (sets of 3) Sets 82

Page 41: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 41

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

e) Circuit plate (sets of 3) Sets 82f) Bird Guard Sets 246g) Aviation Signal 5

Total of Sub-Total 6.16.2 Installation of tower earthing materialsa) Pipe Type Sets 15b) Counterpoise typei) Counterpoise type - 25M Sets 10ii) Counterpoise type - 50M Sets 10iii) Counterpoise type - 100M Sets 6

Total of Sub-Total 6.2Total of 6

7 Additional Galvanized steel works other than above forleg extension etc for all tower T 12.00

Total of 7

8 Installation of line materials8.1 Stringing of conductor and ground wire

a) ACSR CARDINAL conductor including armour rod, mid spanjoints, repair sleeves, etc (single wire)

Ck-KM 73

b)Steel ground wire with optical fibre (24 fiber) includingintermediate splice boxes and necessary terminal spliceboxes etc.

KM 13

Total of 8

Page 42: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 42

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

9 Protection of tower footing

a) Random rubble stone masnory including excavation, stonesoling and PCC (1:4 cement : concrete) Cum 1500

b) Stone bound in galvanizing wire netting includingexcavation Cum 1000

c) Back filling and leveling of volumes enclosed by revetment Cum 500

d) M15 concrete nominal mix 1:2:4 for top seal cover Cum 100

e) M20 Conc. Nominal Mix 1:1.5:3 for foundation ofmiscellaneous works Cum 50

f) Reinforcement bar T 7Total of 9

Grand Total

Page 43: Nepal Electricity Authoritynea.org.np/admin/assets/uploads/supportive_docs/Volume III.pdf · stubs setting template, step bolts, hangers, D-shackles, bolts & nuts etc but excluding

BIDDING DOCUMENTNepal Electricity AuthorityDordi Corridor 132 kV Transmission Line Project

Procurement of Works| 43

Bidding Document for ICB-DCTL 073/74-01 Single-Stage: Two-Envelope

Nepal Electricity AuthorityTransmission Directorate

GRID DEVELOPMENT DEPARTMENTDORDI CORRIDOR 132kV TRANSMISSION LINE PROJECT

Price Schedule 5: Price Schedule for Proto Type Testing ofTower

S. No. Description

Estimated Bill ofQuantity

Dordi Corridor 132 kVTransmission Line Project

RemarksUnit Quantity Unit Rate

(NRs) Amount (NRs)

1 2 3 4 5 6=4x51 1.0 PROTO TYPE TESTING OF TOWERS

1.1 Tower Type DA with extension +9m No. 11.2 Tower Type DB with extension +9m No. 11.3 Tower Type DC with extension +9m No. 11.4 Tower Type DD with extension +25m No. 1

Total of 1

2 Total of Proto Type Testing ofTowers (Excluding Taxes and VAT)