WELCOME TO: ARCH 2430
BUILDING TECHNOLOGY IV
Saitama-Storm Sewer
Theory:Clearance SizesWall to floor connectionsBeam to floor connections
Lab [Computer Topics]:a. Wall to floor connectionsb. Beam to floor connections
ARCH 2430
Placing Rebar
Prepared
by; Tyheem
Joiner ED. A
lexander Aptekar © 2013
![Page 2: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/2.jpg)
10/1/2013
2
ARCH 2430 Prepared
by; Alexander Aptekar ED
. Barbara Mishara ©
2012
Rules of Thumb
• 1” min clear between unattached bar
• 1.5” min. cover to edge
• Rebar extends down and into beam column or wall for structural continuity
Top bars are for tension, but are not always necessary.
• First we will place 2 sections through our model:
• One at a beam to floor connection, the other to a wall to floor connection.
• Then we turn on fine detail and set the scale to 1 1/2”=1’‐0”
![Page 3: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/3.jpg)
10/1/2013
3
Placing Rebar
• Go to the structural tab, then to Rebar
Placing Rebar
• There are three ways to place rebar:
• Parallel to work plane (place in same plane as the section)
• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)
• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)
![Page 4: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/4.jpg)
10/1/2013
4
Placing Rebar
• There are three ways to place rebar:
• Parallel to work plane (place in same plane as the section)
• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)
• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)
Placing Rebar
• There are three ways to place rebar:
• Parallel to work plane (place in same plane as the section)
• Parallel to cover (place perpendicular to plane as the section and parallel to nearest edge)
• Perpendicular to cover (place perpendicular to plane as the section and parallel to nearest edge)
![Page 5: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/5.jpg)
10/1/2013
5
Placing Rebar
• You can place a single element or multiple by selecting different option next to layout.
• Using a set number or a maximum amount of space in between, following suggested guidelines.
Placing Rebar
Beam to Floor Connection
1. lets load in all of the rebar shapes, from the structural rebar folder.
2. click on ... to close or open shape browser
2
1
![Page 6: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/6.jpg)
10/1/2013
6
Placing Rebar
Beam to Floor Connection
We can place shape T1 from the shape browser; using parallel to work plane button
lets place the bars with a minimum clear spacing of 6" on the layout panel
we can adjust the bars using the triangular buttons, if necessary.
Placing Rebar
Beam to Floor Connection
Finally we can place a fixed number of 3 shape 00 bars perpendicular to section and along the edge of beam.
using the perpendicular to cover button. adjust as necessary.
Add more bars and repeat as necessary on the wall to floor detail.
![Page 7: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/7.jpg)
10/1/2013
7
Basulto , David. "Impressive Storm Sewer System / Saitama, Japan" 07 Jul 2008. ArchDaily. Accessed 24 Feb 2013. <http://www.archdaily.com/3591>
Saitama-Storm Sewer
Placing Rebar
• Load
![Page 8: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/8.jpg)
10/1/2013
8
![Page 9: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/9.jpg)
10/1/2013
9
![Page 10: REBAR - City Tech OpenLab](https://reader034.vdocuments.net/reader034/viewer/2022051315/627a142bff8ddf223c059cf1/html5/thumbnails/10.jpg)
10/1/2013
10
http://incli-nation.com/2009/01/14/unbelievable-tokyo-underground-sewer-labyrinth-dreamscape/
Saitama-Storm Sewer