rebuilding vernonia, or inventing a new future

21
Rebuilding Vernonia, OR Inventing a New Future

Upload: evan-austin

Post on 16-Jan-2016

225 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rebuilding Vernonia, OR Inventing a New Future

Rebuilding Vernonia, OR

Inventing a New Future

Page 2: Rebuilding Vernonia, OR Inventing a New Future
Page 3: Rebuilding Vernonia, OR Inventing a New Future
Page 4: Rebuilding Vernonia, OR Inventing a New Future
Page 5: Rebuilding Vernonia, OR Inventing a New Future
Page 6: Rebuilding Vernonia, OR Inventing a New Future
Page 7: Rebuilding Vernonia, OR Inventing a New Future
Page 8: Rebuilding Vernonia, OR Inventing a New Future

Inventing a New Future

Elements of this ambitious project include:

• Creation of a safer and greener school system located outside the floodplain, designed to LEED specifications. The new school complex integrates solar electric and solar thermal systems, and combines net-zero design principles.

Page 9: Rebuilding Vernonia, OR Inventing a New Future
Page 10: Rebuilding Vernonia, OR Inventing a New Future
Page 11: Rebuilding Vernonia, OR Inventing a New Future
Page 12: Rebuilding Vernonia, OR Inventing a New Future

• Development of a fully self-sustaining electricity system by designing a system to use biomass from nearby forest thinning and fire management efforts to power the town, eliminating the need to import expensive and unreliable power.

Inventing a New Future

Page 13: Rebuilding Vernonia, OR Inventing a New Future
Page 14: Rebuilding Vernonia, OR Inventing a New Future

• Construction of a more efficient, safer wastewater treatment facility outside the floodplain, begin downtown renewal and Main Street Program, complete street improvements, and build a Community Service Center.

Inventing a New Future

Page 15: Rebuilding Vernonia, OR Inventing a New Future
Page 16: Rebuilding Vernonia, OR Inventing a New Future

• Providing flood recovery and prevention assistance; including rehabilitating flood-damaged structures, elevating flood-damaged structures, and creating a stormwater drainage master plan to incorporate floodplain restoration as well as stormwater capture for beneficial uses.

Inventing a New Future

Page 17: Rebuilding Vernonia, OR Inventing a New Future

Same House Pre and Post Flood

Page 18: Rebuilding Vernonia, OR Inventing a New Future

• Positioning community for increased economic development through workforce training in green building practices, provision of broadband internet services, and build out of a Light Industrial Site.

Inventing a New Future

Page 19: Rebuilding Vernonia, OR Inventing a New Future

• Implementing a Healthy Environment/Healthy Community Initiative, linking human health to forest health.

Inventing a New Future

Page 20: Rebuilding Vernonia, OR Inventing a New Future
Page 21: Rebuilding Vernonia, OR Inventing a New Future