rec’d digitally 5( 7xun *urxqgzdwhu 5hsruw...monitoring well mw-11 was installed on march 24,...

246
5LHJHU &DUROLQH 7R 6DGOHU %LOO 6XEMHFW 5( 7XUN *URXQGZDWHU 5HSRUW )URP 6HQW 7R 6 &F - 6XEM ŝůů WůĞĂƐ dŚĂŶ P /HVOLH ( )X W :HGQHVGD\ 6DGOHU %LOO -DVRQ 5 -RKQV MHFW 7XUN *U ƐĞ ƐĞĞ ĂƚƚĂĐŚĞ ŶŬƐ XHUVFKEDFK >P \ 'HFHPEHU VRQ 7HUHQFH RXQGZDWHU 5H ĞĚ ƌĞƉŽƌƚ /(6/,( ( /()8(56& 1 $//( PDLOWROHIXHUVF ( :HKOLQJ HSRUW ( )8(56&+% &+%$&+#$(3& (1 $9( 6+5(9 FKEDFK#DHS 30 %$&+ _ (19,5 &20 _ ' (3257 /$ FRP@ 5210(17$/ / (1*,1((5 5 Rec’d Digitally AFIN:_________________________ PMT#:_________________________ S W DOC ID#:______________________ M D TO:___________________________ By Caroline Rieger at 4:13 pm, Dec 18, 2019 29-00506 0311-S3N-R1 BS>File <CR 77407

Upload: others

Post on 12-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Rec’d Digitally

AFIN:_________________________

PMT#:_________________________S

W DOC ID#:______________________ M

DTO:___________________________

By Caroline Rieger at 4:13 pm, Dec 18, 2019

29-00506

0311-S3N-R1

BS>File <CR

77407

Page 2: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 3: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Second Half 2019 Groundwater Analysis Report

Southwestern Electric Power Company John W. Turk, Jr. Power Plant

Landfill Fulton, Arkansas

Permit No 0311-S3N-R1 AFIN 29-00506

In support of the Detection Monitoring Program

for the John W. Turk, Jr. Landfill

Sampling Event of September 19, 2019

Prepared by

American Electric Power Environmental Services Division

December 2019

Page 4: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

- 2 -

Table of Contents I. Summary ................................................................................................................. 3 II. Report Scope ........................................................................................................... 3 III. Site Description ....................................................................................................... 3 IV. The Constituent List ................................................................................................ 4 V. Monitoring Results.................................................................................................. 5 VI. Data Evaluation and Statistical Testing Method ..................................................... 8 VII. References ............................................................................................................... 9

Appendices Appendix 1 Monitoring Well Analytical Data Tables Appendix 2 Monitoring Well Time Series Graphs Appendix 3 Monitoring Well Field Reports Appendix 4 Monitoring Well Laboratory Reports Appendix 5 Monitoring Well Potentiometric Maps and Data Appendix 6 Statistical Analysis Report

Page 5: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 3 -

I. Summary This report documents the sampling event for the monitoring wells at the John W. Turk Jr. Power Plant Landfill. The landfill began receiving wastes on November 20, 2012. There are 11 monitoring wells in the landfill groundwater monitoring program.

II. Report Scope This report covers the sampling event on September 19, 2019, and presents the results of analyzing the groundwater for detection parameters.

III. Site Description The John W. Turk, Jr. Power Plant is located between the towns of Fulton and McNab in Hempstead County. The power plant is a 600 megawatt coal-fired power plant. The landfill is approximately 73 acres in size and is located on property contiguous to the power plant. The landfill permit was issued on July 15, 2011, and revised on April 11, 2016. The landfill permit number is 0311-S3N-R1. Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling event. The monitoring well is located south of the leachate pond and north of Cell 2.

Page 6: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 4 -

IV. The Constituent List The following is a list of parameters to be monitored as given in the landfill permit.

Table 1

Detection Parameters Arsenic Barium Boron Cadmium Chromium Fluoride Iron Lead Manganese Mercury Molybdenum Selenium Silver Strontium Chloride Sulfate Total Dissolved Solids (TDS) pH Specific Conductance Turbidity

Page 7: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 5 -

V. Monitoring Results On September 19, 2019, the 11 monitoring wells and the leachate pond were sampled. Groundwater concentrations for each parameter analyzed for the sampling event are summarized in Table 2 and Table 3 for the September 19, 2019, samples. Table 4 summarizes the 2 of 2 sample for manganese.

Table 2 short_name MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 measure_unit

Acidity <10 <10 <10 <10 <10 <10 mg/L Alkalinity, lab 463 247 293 732 671 404 mg/L Arsenic, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L Barium, total 0.0237 0.0965 0.171 0.0566 0.0386 0.0307 mg/L Boron, total <0.2 <0.2 <0.2 0.37 <0.2 0.286 mg/L

Cadmium,total <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 mg/L Calcium, total 221 91.9 136 525 299 384 mg/L Chloride, total 209 9.37 25.1 1010 113 234 mg/L

Chromium, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L Fluoride, total 1.1 0.324 0.248 0.309 0.298 0.328 mg/L

Iron, total 0.252 0.385 0.72 0.114 0.108 0.146 mg/L Lead, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L

Manganese, total 0.0379 0.0111 0.419 0.675 1.71 0.0189 mg/L Mercury, total <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 mg/L

Molybdenum, total <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 mg/L ORP (field) 153 141 51 119 158 160 mV

pH (field) 7.43 8 7.91 6.97 6.83 7.24 pH Potassium, total 3.14 2.29 1.83 3.84 2.13 3.63 mg/L Selenium, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L

Silver, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L Sodium, total 244 42.7 58.6 359 139 200 mg/L

Solids, total dissolved 1330 379 546 2880 1210 2070 mg/L Solids, total suspended <2.5 9.2 4.2 <2.5 <2.5 <2.5 mg/L

Specific Conductance @ 25 2660 659 969 4370 2060 3350 micromhos/cm Strontium, total 3.43 1.77 1.32 9 3.25 6.58 mg/L

Sulfate, total 419 84.3 161 387 310 840 mg/L Temp (Celsius) 23.36 23.83 26.43 26.23 25.97 23.66 degrees C Turbidity, field 14.3 18.4 53.4 17.1 0 0 NTU

Page 8: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 6 -

Table 3

short_name MW-7 MW-8 MW-9D MW-10 MW-11 LEACHATE measure_unit Acidity <10 <10 <10 <10 <10 <10 mg/L

Alkalinity, lab 306 497 245 562 382 45.8 mg/L Arsenic, total 0.00267 <0.002 <0.002 <0.002 <0.002 0.00519 mg/L Barium, total 0.0725 0.031 0.0135 0.0455 0.036 0.0855 mg/L Boron, total <0.2 <0.2 <0.2 <0.2 <0.2 2.12 mg/L

Cadmium,total <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 mg/L Calcium, total 253 267 88.8 320 563 341 mg/L Chloride, total 207 186 18.7 363 824 160 mg/L

Chromium, total <0.002 <0.002 <0.002 <0.002 0.00215 0.00261 mg/L Fluoride, total 0.243 0.447 0.134 0.249 0.377 0.964 mg/L

Iron, total 2.93 0.364 <0.1 0.146 1.86 0.328 mg/L Lead, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L

Manganese, total 0.84 0.0246 0.0294 0.0176 0.164 0.123 mg/L Mercury, total <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 mg/L

Molybdenum, total <0.005 <0.005 <0.005 <0.005 <0.005 0.214 mg/L ORP (field) -125 161 217 9 1 -14 mV

pH (field) 6.88 6.72 7.9 6.6 6.62 9.05 pH Potassium, total 2.79 2.31 3.11 1.87 3.98 52.1 mg/L Selenium, total <0.002 0.00387 <0.002 <0.002 <0.002 0.00316 mg/L

Silver, total <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 mg/L Sodium, total 124 256 56.1 262 331 941 mg/L

Solids, total dissolved 1090 1470 453 1810 2680 4070 mg/L Solids, total suspended 8 12 5.8 <2.5 33.6 20 mg/L

Specific Conductance @ 25 1950 2700 765 3800 4950 5330 micromhos/cm Strontium, total 3.01 3.78 1.77 4.08 7.93 5.41 mg/L

Sulfate, total 340 567 122 569 918 2910 mg/L Temp (Celsius) 24.6 26.68 20.48 24.38 25.03 32.12 degrees C Turbidity, field 10.2 47.1 40.2 3.3 418 58.3 NTU

Table 4 MW-5 Measure unit Manganese 0.342 mg/L

The statistical test being used to determine if there has been an SSI is the 1-of-2 prediction limit. Up to two samples may be taken to fulfill the requirements of the statistical test. If both sample results are above the prediction limit then an SSI is determined. If either of the two sample results is below the prediction limit then the statistical test result is that no change has occurred. There was one parameter that exceeded the upper prediction limit for manganese at MW-5. A 2-of-2 sample was collected on 11/25/2019. For the 2-of-2 sample for manganese at MW-5, the result was below the upper prediction limit so an SSI was not found. Historical data for the eleven landfill monitoring wells and leachate are included in tabular form in Appendix 1. Time series graphs for each of the sampled parameters of the monitoring wells and leachate are included in Appendix 2. Non-detect results are displayed at one-half of the laboratory’s method detection limit (MDL). Field and laboratory reports are included in Appendices 3 and 4, respectively.

Page 9: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 7 -

A potentiometric map and supporting data on potentiometric groundwater elevations are included in Appendix 5. Monitoring well MW-9D is in the Nacatoch Aquifer, a separate aquifer from the other ten monitoring wells. The potentiometric elevation for MW-9D is displayed in a different color to indicate it is in a different aquifer and is not used in development of the potentiometric surface.

The groundwater seepage velocity for this sampling event is calculated using Darcy’s Law as follows:

dhdlV kn

=

Where: v = groundwater seepage velocity k = average hydraulic conductivity (dh/dl) = hydraulic gradient n = effective porosity The average hydraulic conductivity is obtained from the Hydrogeologic and Geotechnical Report that was prepared for the landfill permit application. The average hydraulic conductivity is 6.47 x 10-5 cm/sec. The effective porosity was obtained from the same report and is 20%. The maximum hydraulic gradient between any two monitoring wells was between MW-7 and MW-8. The hydraulic gradient is 0.0171 ft/ft. Using these values gives a groundwater seepage velocity of 5.72 feet per year. A table of the various calculated hydraulic gradients is included in Appendix 5.

Page 10: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 8 -

VI. Data Evaluation and Statistical Testing Method During the development of the landfill permit application, several piezometers were installed in the footprint of the landfill. Six of these piezometers were completed to depths similar to the compliance monitoring wells. These piezometers are numbered PZ-1I through PZ-6I. After the compliance monitoring wells (MW series) were installed, the PZ wells were no longer sampled. All of the water samples analyzed from the PZ wells were collected before any waste had been placed in the landfill. Therefore no landfill waste could have impacted these samples. All of the PZ wells have been plugged and abandoned. Monitoring well MW-1 is up gradient to the landfill. MW-9D is in a separate aquifer, the Nacatoch Aquifer. The other nine wells are down gradient to either the leachate pond or cell 1 or future cells. Groundwater flow at the landfill site is generally to the east. Generally, there is a northern component at some locations and a southern component at other locations. Statistics have been computed for the 11 monitoring wells. The statistical test being used is the 1-of-2 prediction limit on future observations. Intra-well testing is being performed. The prediction limit is being used to determine if there has been a statistically significant increase. A prediction interval will have an upper limit and a lower limit. For most parameters, except for pH, only the upper limit is of concern. If the sample concentration is larger than the upper prediction limit then the assumption is that the new value is different than the background and indicates an increase over background. Using the 1-of-2 prediction limit methodology, if the first sample exceeds the prediction limit then a resampling is performed. If the second sample concentration is below the prediction limit then there is no indication of an increase. However, if both tests are above the prediction limit then the results indicate an increase over background concentrations. This approach is described in the Unified Guidance, section 19.1. The Unified Guidance, in section 6.2, recommends using a site wide false positive rate (SWFPR) in order to keep the number of false positives to a manageable level. The Unified Guidance recommends setting the SWFPR to 10% per year. Since semiannual sampling is occurring the SWFPR is set to 5% per sampling event.

Page 11: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

John W. Turk, Jr. Power Plant Landfill Second Half 2019 Groundwater Analysis Report

- 9 -

VII. References MANAGES, Version 3.4.49. 2014. Electric Power Research Institute, 3412 Hillview

Avenue, Palo Alto, CA 94304. www.epri.com. USEPA. 1989. Statistical Analysis of Ground-water Monitoring Data at RCRA Facilities

– Interim Final Guidance. Environmental Protection Agency report EPA 530-SW-89-026, NTIS PM89-151047, Office of Solid Waste, Washington, D.C.

USEPA. 1992. Statistical Analysis of Ground-water Monitoring Data at RCRA Facilities

– Addendum To Interim Final Guidance. Environmental Protection Agency report, Office of Solid Waste, Washington, D.C.

USEPA. 2002. Ground-Water Sampling Guidelines for Superfund and RCRA Project

Managers. Environmental Protection Agency report EPA 542-S-02-001. Office of Resource Conservation and Recovery, Washington, D.C.

USEPA. 2009. Statistical Analysis of Groundwater Monitoring Data at RCRA Facilities -

Unified Guidance. Environmental Protection Agency report EPA 530-R-09-007. Office of Resource Conservation and Recovery, Washington, D.C.

Page 12: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 1

Monitoring Well Analytical Data Tables

Page 13: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Arsenic, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 <0.005       <0.005

6/19/2009                               0.005 <0.005  6/22/2009                         <0.005 <0.005 <0.005     <0.00510/6/2009                         <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

12/22/2009                         <0.005 <0.005 <0.005 <0.005 0.049 <0.0054/14/2010                         <0.005 <0.005 <0.005 <0.005 <0.005 <0.0057/20/2010                                 <0.005 <0.0057/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         <0.005 <0.005 <0.005 <0.005 0.013 <0.0051/31/2011                         <0.005 <0.005 <0.005 <0.005    4/28/2011                         <0.005 <0.005 <0.005 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    11/7/2012   0.0046 0.0098   0.00086 0.0048 0.0061 0.0031 0.0023 0.0044 0.0039 0.00089            2/28/2013   0.0019 0.0065   0.001 0.0028 0.0046 0.0021 0.0019 0.0028 <0.00025 <0.00025            3/21/2013 0.0032                                  5/20/2013 0.0057 0.0038 0.0055   0.0031 0.003 0.0053 0.0018 0.0013 0.0023 0.0018 <0.00025            8/6/2013 0.0042 0.0018 0.0043   0.0045 0.0013 0.0035 <0.001 0.0014 0.0017 0.001 <0.001            

11/4/2013 0.0055 0.0023 0.0058   0.0043 0.0056 0.0046 0.0016 0.0027 0.0021 0.0014 <0.001            2/10/2014 0.017 0.005 0.0051   0.0054 0.0055 0.0074 0.0033 0.0031 0.0028 0.0028 0.0011            5/5/2014 0.024 0.0036 0.0087   0.0051 0.005 0.0055 0.0031 0.0022 0.0032 0.0021 <0.00025            8/5/2014 0.01 0.0026 0.0034   0.0046 0.0039 0.0039 0.0016 0.001 0.0013 0.0017 <0.001            

11/5/2014 0.0054 <0.002 0.0027   0.0051 0.0024 0.0043 <0.002 <0.002 0.0043 <0.002 <0.002            2/3/2015 0.0082 0.0026 0.0061   0.0024 0.0027 0.0035 0.0025 <0.002 <0.002 0.002 <0.002            5/5/2015 <0.002 <0.002 <0.002   0.0029 0.0025 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 0.00466 <0.002 <0.002   0.00466 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            11/18/2015 <0.002 <0.002 <0.002   <0.002 0.00264 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

Page 14: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Arsenic, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 <0.005       <0.005

6/19/2009                               0.008 0.032  6/22/2009                         <0.005 <0.005 <0.005     <0.00510/6/2009                         <0.005 <0.005 <0.005 0.005 <0.005 <0.005

12/22/2009                         0.09 <0.005 <0.005 <0.005 0.223 <0.0054/14/2010                         <0.005 <0.005 <0.005 <0.005 0.005 <0.0057/20/2010                                 0.02 <0.0057/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         <0.005 <0.005 <0.005 <0.005 0.039 <0.0051/31/2011                         <0.005 <0.005 <0.005 <0.005    4/28/2011                         <0.005 <0.005 <0.005 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    9/19/2011   <0.01     <0.01 <0.01   <0.01                    9/20/2011             <0.01   <0.01 <0.01   <0.01            

12/29/2011   0.002 0.0045   0.0022 0.0029   0.0019 0.0018     0.00092            12/30/2011             0.0026     0.0024 0.0024              2/27/2012     0.011         0.0054                    2/28/2012   0.0044     0.0014 0.0034 0.0065   0.0031 0.0039 0.0038 0.00071            5/16/2012   0.0075 0.0095   0.0014 0.012     0.0029     <0.00025            5/17/2012             0.0086 0.0028   0.0038 0.0054              8/7/2012         0.003             <0.00025            8/8/2012   0.0046 0.005     0.0031 0.0035 0.0014 0.0012 0.0022 0.001              

11/7/2012   0.0063 0.012   0.0011 0.0049 0.01 0.0063 0.0053 0.0071 0.012 0.00066            2/28/2013   0.0046 0.013   0.0014 0.0078 0.011 0.005 0.0044 0.0094 0.0055 <0.0013            3/21/2013 0.0038                                  5/20/2013 0.0039 0.004 0.0029   0.0058 0.003 0.014 0.0018 0.0015 0.0046 0.0021 <0.00025            8/6/2013 0.0043 0.0019 0.0058   0.0035 0.0016 0.0041 <0.001 <0.001 0.0018 <0.001 <0.001            

11/4/2013 0.0085 0.0033 0.0091   0.0045 0.019 0.0066 0.0023 0.0031 0.0033 0.0022 <0.001            2/10/2014 0.017 0.0034 0.0029   0.0039 0.0029 0.0072 0.0021 0.0031 0.003 0.0015 <0.00025            5/5/2014 0.012 0.0023 0.0051   0.0039 0.0028 0.0047 0.0025 0.0016 0.0029 0.0025 <0.00025            8/5/2014 0.0066 0.0017 0.0014   0.0027 0.0035 0.0075 0.001 0.0012 0.0039 0.002 <0.001            

11/5/2014 0.006 0.0038 0.0022   0.0064 0.0022 0.0058 <0.002 <0.002 0.0022 <0.002 <0.002            2/3/2015 <0.002 <0.002 <0.002   <0.002 0.0025 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            5/5/2015 <0.002 <0.002 <0.002   0.0029 0.0024 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 0.00472 <0.002 <0.002   0.00464 0.00251 <0.002 <0.002 <0.002 0.00269 <0.002 <0.002            11/18/2015 0.00204 <0.002 <0.002   <0.002 0.00259 0.00266 <0.002 <0.002 0.00213 <0.002 <0.002            3/23/2016 <0.002 <0.002 <0.002   <0.002 <0.002 0.00224 <0.002 <0.002 <0.002 <0.002 <0.002            6/1/2016   <0.002 <0.002 0.00552 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

7/25/2016 0.00338                                  9/1/2016 <0.002 <0.002 <0.002 0.00275 <0.002 <0.002 0.00202 <0.002 <0.002 0.00375 <0.002 <0.002            

12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/1/2017 <0.002                                  

6/29/2017 0.00241 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/6/2017 <0.002 <0.002 <0.002 0.00335 0.00295 <0.002 <0.002 0.00483 <0.002 0.00393 <0.002 <0.002            4/26/2018 0.00209 <0.002 <0.002 <0.002 <0.002 <0.002 0.00336 <0.002 <0.002 0.00296 <0.002 <0.002            

12/12/2018 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00254 <0.002 0.00245 <0.002 <0.002            4/17/2019 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00418 <0.002 <0.002 0.00361 <0.002 <0.002            9/19/2019 0.00519 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00267 <0.002 <0.002            

Page 15: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Barium, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.028 0.047 0.05  3/5/2009                         0.018 0.014       0.018

6/19/2009                               0.05 0.067  6/22/2009                         0.019 0.016 0.029     0.01810/6/2009                         0.02 0.017 0.029 0.052 0.044 0.02

12/22/2009                         0.043 0.025 0.03 0.046 0.828 0.024/14/2010                         0.024 0.016 0.028 0.068 0.038 0.0227/20/2010                                 0.074 0.0187/21/2010                         0.021 0.015 0.027 0.034    

10/27/2010                         0.02 0.015 0.024 0.051 0.265 0.0191/31/2011                         0.021 0.018 0.032 0.047    4/28/2011                         0.046 0.018 0.023 0.034    7/26/2011                         0.02 0.015 0.024 0.031    11/7/2012   0.037 0.04   0.032 0.04 0.027 0.057 0.046 0.04 0.036 0.027            2/28/2013   0.039 0.036   0.041 0.035 0.034 0.051 0.031 0.027 0.03 0.031            3/21/2013 0.05                                  5/20/2013 0.046 0.04 0.047   0.039 0.034 0.086 0.049 0.039 0.028 0.023 0.03            8/6/2013 0.04 0.037 0.031   0.039 0.037 0.037 0.046 0.035 0.037 0.045 0.029            

11/4/2013 0.02 0.038 0.035   0.033 0.035 0.032 0.045 0.035 0.017 0.025 0.029            2/10/2014 0.018 0.04 0.056   0.065 0.029 0.03 0.042 0.036 0.028 0.041 0.027            5/5/2014 0.017 0.034 0.037   0.04 0.026 0.029 0.03 0.032 0.038 0.025 0.022            8/5/2014 0.059 0.039 0.05   0.04 0.035 0.031 0.038 0.03 0.016 0.03 0.021            

11/5/2014 0.058 0.026 0.049   0.017 0.052 0.023 0.036 0.026 0.021 0.038 0.019            2/3/2015 0.051 0.032 0.036   0.039 0.068 0.027 0.025 0.031 0.017 0.039 0.017            5/5/2015 0.029 0.038 0.029   0.09 0.11 0.048 0.042 0.024 0.038 0.04 0.02            

8/19/2015 0.0943 0.0352 0.0344   0.0968 0.132 0.0301 0.0255 0.0279 0.0231 0.0308 0.0215            11/18/2015 0.0363 0.0385 0.0364   0.0781 0.0463 0.0395 0.0412 0.0401 0.0223 0.0246 0.0179            12/15/2016   0.039 0.046 0.034 0.157 0.052 0.058 0.036 0.041 0.056 0.032 0.018            

Page 16: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Barium, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.028 0.047 0.051  3/5/2009                         0.02 0.015       0.026/19/2009                               0.1 0.601  6/22/2009                         0.091 0.018 0.03     0.03510/6/2009                         0.034 0.017 0.031 0.063 0.062 0.02212/22/2009                         1.12 0.041 0.096 0.132 3.96 0.0284/14/2010                         0.032 0.019 0.032 0.076 0.096 0.0557/20/2010                                 0.35 0.0347/21/2010                         0.028 0.017 0.029 0.034    10/27/2010                         0.118 0.021 0.072 0.073 0.655 0.0231/31/2011                         0.059 0.022 0.038 0.066    4/28/2011                         0.075 0.019 0.037 0.051    7/26/2011                         0.097 0.019 0.046 0.054    9/19/2011   0.0568     0.0636 0.0611   0.0937                    9/20/2011             0.0429   0.0577 0.0284   0.0211            12/29/2011   0.05 0.055   0.054 0.048   0.076 0.05     0.035            12/30/2011             0.039     0.037 0.052              2/27/2012     0.056         0.063                    2/28/2012   0.046     0.048 0.046 0.04   0.041 0.03 0.053 0.033            5/16/2012   0.046 0.052   0.043 0.043     0.042     0.033            5/17/2012             0.034 0.058   0.038 0.094              8/7/2012         0.046             0.028            8/8/2012   0.058 0.053     0.034 0.035 0.056 0.042 0.037 0.04              11/7/2012   0.058 0.047   0.038 0.036 0.032 0.053 0.044 0.036 0.036 0.026            2/28/2013   0.041 0.039   0.047 0.037 0.13 0.046 0.026 0.058 0.04 0.027            3/21/2013 0.048                                  5/20/2013 0.046 0.084 0.052   0.061 0.043 0.38 0.053 0.04 0.069 0.052 0.054            8/6/2013 0.042 0.045 0.042   0.042 0.037 0.15 0.047 0.038 0.066 0.038 0.043            11/4/2013 0.022 0.039 0.043   0.033 0.039 0.045 0.054 0.04 0.041 0.042 0.029            2/10/2014 0.016 0.045 0.054   0.075 0.03 0.11 0.044 0.036 0.036 0.046 0.027            5/5/2014 0.019 0.059 0.039   0.07 0.027 0.056 0.036 0.038 0.045 0.051 0.022            8/5/2014 0.063 0.043 0.065   0.046 0.042 0.17 0.045 0.04 0.058 0.076 0.023            11/5/2014 0.07 0.038 0.064   0.026 0.066 0.24 0.044 0.041 0.027 0.048 0.025            2/3/2015 0.053 0.0414 0.038   0.05 0.068 0.035 0.03 0.035 0.032 0.061 0.018            5/5/2015 0.03 0.042 0.034   0.073 0.11 0.15 0.045 0.038 0.053 0.04 0.02            7/7/2015           0.087                        8/19/2015 0.111 0.0376 0.0395   0.116 0.127 0.0499 0.0302 0.0457 0.0409 0.0774 0.034            10/9/2015         0.16 0.242     0.0417   0.0449 0.0183            11/18/2015 0.0361 0.038 0.0491   0.0773 0.0491 0.097 0.0417 0.0397 0.0492 0.0421 0.0175            3/23/2016 0.0356 0.0467 0.0374   0.0871 0.0761 0.148 0.0319 0.04 0.0273 0.0294 0.0184            6/1/2016   0.0339 0.0629 0.0778 0.112 0.0741 0.0549 0.0388 0.0348 0.0272 0.0199 0.0216            7/25/2016 0.15                                  9/1/2016 0.05 0.0409 0.0543 0.04 0.147 0.0991 0.076 0.039 0.0365 0.0639 0.0302 0.0258            11/2/2016         0.18         0.0879                12/15/2016   0.039 0.051 0.036 0.158 0.055 0.063 0.035 0.042 0.056 0.033 0.024            2/1/2017 0.0387                                  2/21/2017         0.0796                          6/29/2017 0.0531 0.027 0.054 0.0336 0.103 0.0768 0.0668 0.034 0.0318 0.0666 0.0267 0.0181            12/6/2017 0.0402 0.0271 0.0573 0.0309 0.0353 0.215 0.0243 0.0591 0.0381 0.0838 0.0357 0.0187            2/13/2018           0.0728       0.0512                4/26/2018 0.0286 0.0241 0.0458 0.0375 0.085 0.0785 0.064 0.0432 0.026 0.0429 0.0321 0.0146            12/12/2018 0.0345 0.0251 0.064 0.0305 0.0921 0.104 0.0398 0.0475 0.0319 0.0496 0.0306 0.0141            4/17/2019 0.0194 0.0204 0.0403 0.0308 0.104 0.164 0.0756 0.0457 0.03 0.032 0.0275 0.0147            9/19/2019 0.0855 0.0237 0.0455 0.036 0.0965 0.171 0.0566 0.0386 0.0307 0.0725 0.031 0.0135            

Page 17: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Boron, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.259 0.323 0.202  3/5/2009                         0.14 1.03       0.967

6/19/2009                               0.25 0.161  6/22/2009                         0.121 0.889 0.215     0.86410/6/2009                         0.143 0.903 0.238 0.266 0.175 0.879

12/22/2009                         0.703 0.971 0.298 0.365 0.227 1.224/14/2010                         0.161 0.949 0.235 0.276 0.189 0.9417/20/2010                                 0.176 0.9517/21/2010                         0.165 0.899 0.255 0.239    

10/27/2010                         0.412 0.986 0.42 0.328 0.21 0.9651/31/2011                         0.173 0.976 0.66 0.385    4/28/2011                         0.482 0.927 0.738 0.449    7/26/2011                         0.201 0.921 0.488 0.388    11/7/2012   1.9 0.55   0.9 1.2 0.46 0.12 0.24 0.14 0.54 0.08            2/28/2013   1.7 0.35   0.93 1.1 0.45 0.38 0.37 0.28 0.35 <0.013            3/21/2013 <0.013                                  5/20/2013 <0.013 0.94 <0.013   0.98 1.3 0.5 <0.013 <0.013 <0.013 0.23 <0.013            8/6/2013 0.28 0.71 0.37   0.99 0.72 0.47 <0.2 0.32 <0.2 <0.2 <0.2            

11/4/2013 0.25 0.39 0.33   1.1 1.2 0.47 <0.2 0.65 <0.2 <0.2 <0.2            2/10/2014 0.28 0.33 <0.013   0.55 0.46 0.45 <0.013 0.29 <0.013 <0.013 <0.013            5/5/2014 0.49 0.49 0.42   1.2 0.89 0.53 0.33 0.37 <0.013 0.26 <0.013            8/5/2014 0.67 0.48 <0.2   1.2 <0.2 0.55 <0.2 0.28 <0.2 0.27 <0.2            

11/5/2014 0.36 <0.2 <0.2   <0.2 <0.2 0.2 <0.2 <0.2 <0.2 <0.2 <0.2            2/3/2015 0.3 0.58 0.36   0.86 <0.2 0.48 0.37 0.22 <0.2 <0.2 <0.2            5/5/2015 0.4 0.35 0.32   0.25 <0.2 0.53 <0.2 0.44 <0.2 <0.2 <0.2            

8/19/2015 0.946 0.264 0.282   <0.2 <0.2 0.5 0.401 0.319 <0.2 0.334 <0.2            11/18/2015 0.701 0.384 <0.2   <0.2 <0.2 0.514 0.256 0.243 <0.2 0.236 <0.2            12/15/2016   0.328 0.05 0.15 0.108 0.05 0.294 0.03 0.14 0.07 0.114 0.121            

Page 18: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Boron, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.231 0.326 0.173  3/5/2009                         0.159 1.02       0.96

6/19/2009                               0.259 0.162  6/22/2009                         0.129 0.9 0.222     0.8910/6/2009                         0.145 0.91 0.25 0.269 0.172 0.891

12/22/2009                         1.05 0.958 0.309 0.324 0.32 1.194/14/2010                         0.166 0.933 0.236 0.26 0.183 0.9167/20/2010                                 0.178 0.9317/21/2010                         0.172 0.896 0.248 0.229    

10/27/2010                         0.195 0.933 0.769 0.753 0.249 0.9551/31/2011                         0.357 0.979 0.934 0.343    4/28/2011                         0.177 0.947 1.04 0.35    7/26/2011                         0.284 0.921 0.675 0.356    9/19/2011   2.18     1.09 1.29   0.108                    9/20/2011             0.486   0.773 <0.1   <0.1            

12/29/2011   2 0.24   1 1.2   0.25 0.46     0.078            12/30/2011             0.49     0.18 0.22              2/27/2012     0.18         0.37                    2/28/2012   1.7     0.98 1.3 0.46   0.27 0.12 0.23 0.061            5/16/2012   1.4 0.22   0.88 1.2     0.34     0.082            5/17/2012             0.44 0.12   0.15 0.29              8/7/2012         1.1             0.066            8/8/2012   1.4 0.4     1.2 0.48 0.34 0.32 0.14 0.25              

11/7/2012   1.8 0.34   0.91 1.2 0.46 0.09 0.24 0.13 0.35 0.082            2/28/2013   1.7 0.42   0.85 1.2 0.51 0.48 0.69 0.35 0.32 <0.013            3/21/2013 <0.013                                  5/20/2013 <0.013 0.77 <0.013   1.1 1.2 0.46 <0.013 <0.013 <0.013 0.21 0.21            8/6/2013 0.29 0.65 0.43   0.92 0.72 0.51 <0.2 0.25 <0.2 <0.2 <0.2            

11/4/2013 0.3 0.42 0.34   1.1 0.84 0.48 <0.2 0.7 <0.2 0.24 <0.2            2/10/2014 0.26 0.57 <0.013   0.64 0.31 0.49 <0.013 0.32 <0.013 <0.013 <0.013            5/5/2014 0.5 0.49 0.34   0.93 0.74 0.54 0.37 0.35 <0.013 0.28 <0.013            8/5/2014 0.74 0.46 <0.2   1.4 <0.2 0.58 <0.2 0.29 <0.2 0.41 <0.2            

11/5/2014 0.51 0.41 <0.2   0.23 <0.2 0.61 <0.2 0.34 <0.2 <0.2 <0.2            2/3/2015 0.29 0.495 0.24   0.72 <0.2 0.45 0.34 0.21 <0.2 <0.2 <0.2            5/5/2015 0.39 0.32 0.38   <0.2 <0.2 0.5 <0.2 0.36 <0.2 <0.2 <0.2            

8/19/2015 1.18 0.3 0.21   <0.2 <0.2 0.534 0.413 0.495 0.216 0.472 <0.2            10/9/2015         0.401 0.257     0.251   0.312 <0.2            

11/18/2015 0.708 0.377 <0.2   <0.2 <0.2 0.458 0.204 0.239 <0.2 <0.2 <0.2            3/23/2016 0.635 0.287 0.223   <0.2 <0.2 0.483 0.504 0.211 <0.2 0.268 <0.2            4/26/2016               <0.2                    6/1/2016   0.259 <0.2 0.319 <0.2 <0.2 0.337 <0.2 <0.2 <0.2 <0.2 0.214            

7/25/2016 1.25                     <0.2            9/1/2016 1.03 0.271 <0.2 0.221 <0.2 <0.2 0.416 <0.2 0.423 <0.2 <0.2 <0.2            

12/15/2016   0.333 0.05 0.152 0.109 0.06 0.305 0.03 0.145 0.07 0.115 0.12            2/1/2017 0.728                                  

6/29/2017 0.924 <0.2 <0.2 0.2 <0.2 <0.2 0.333 <0.2 <0.2 0.245 <0.2 <0.2            12/6/2017 1.55 0.546 <0.2 <0.2 1.05 0.428 0.506 <0.2 0.268 0.291 <0.2 <0.2            4/26/2018 0.555 <0.2 <0.2 <0.2 <0.2 <0.2 0.318 <0.2 <0.2 <0.2 <0.2 <0.2            

12/12/2018 0.266 <0.2 <0.2 <0.2 <0.2 <0.2 0.528 <0.2 <0.2 <0.2 <0.2 <0.2            4/17/2019 0.415 <0.2 <0.2 <0.2 <0.2 <0.2 0.314 <0.2 <0.2 <0.2 <0.2 <0.2            9/19/2019 2.12 <0.2 <0.2 <0.2 <0.2 <0.2 0.37 <0.2 0.286 <0.2 <0.2 <0.2            

Page 19: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Cadmium, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.001 <0.001 <0.001  3/5/2009                         <0.001 <0.001       <0.001

6/19/2009                               <0.001 <0.001  6/22/2009                         <0.001 <0.001 <0.001     <0.00110/6/2009                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

12/22/2009                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0014/14/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0017/20/2010                                 <0.001 <0.0017/21/2010                         <0.001 <0.001 <0.001 <0.001    

10/27/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0011/31/2011                         <0.001 <0.001 <0.001 <0.001    4/28/2011                         <0.001 <0.001 <0.001 <0.001    7/26/2011                         <0.001 <0.001 <0.001 <0.001    11/7/2012   <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            2/28/2013   <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            3/21/2013 <0.00016                                  5/20/2013 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            8/6/2013 0 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            

11/4/2013 <0.0005 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            2/10/2014 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            5/5/2014 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            8/5/2014 <0.0005 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            

11/5/2014 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/3/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            5/5/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

8/19/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            11/18/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            12/15/2016   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

Page 20: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Cadmium,total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.001 <0.001 <0.001  3/5/2009                         <0.001 <0.001       <0.001

6/19/2009                               <0.001 <0.001  6/22/2009                         <0.001 <0.001 <0.001     <0.00110/6/2009                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

12/22/2009                         0.007 <0.001 <0.001 <0.001 0.007 <0.0014/14/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0017/20/2010                                 <0.001 <0.0017/21/2010                         <0.001 <0.001 <0.001 <0.001    

10/27/2010                         <0.001 <0.001 <0.001 <0.001 0.002 <0.0011/31/2011                         <0.001 <0.001 <0.001 <0.001    4/28/2011                         <0.001 <0.001 <0.001 <0.001    7/26/2011                         <0.001 <0.001 <0.001 <0.001    9/19/2011   <0.0005     <0.0005 <0.0005   <0.0005                    9/20/2011             <0.0005   <0.0005 <0.0005   <0.0005            

12/29/2011   <0.0005 <0.0005   <0.0005 <0.0005   <0.0005 <0.0005     <0.0005            12/30/2011             <0.0005     <0.0005 <0.0005              2/27/2012     <0.00016         <0.00016                    2/28/2012   <0.00016     <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016            5/16/2012   <0.00016 <0.00016   <0.00016 <0.00016     <0.00016     <0.00016            5/17/2012             <0.00016 <0.00016   <0.00016 <0.00016              8/7/2012         <0.00016             <0.00016            8/8/2012   <0.00016 <0.00016     <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016              

11/7/2012   0.00019 <0.00016   0.00027 0.00024 0.00027 0.00019 0.00024 0.00022 0.00026 <0.00016            2/28/2013   <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            3/21/2013 <0.00016                                  5/20/2013 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 0.00077 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            8/6/2013 0 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            

11/4/2013 <0.0005 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            2/10/2014 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            5/5/2014 <0.00016 <0.00016 <0.00016   <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016 <0.00016            8/5/2014 <0.0005 <0.0005 <0.0005   <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005 <0.0005            

11/5/2014 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/3/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            5/5/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

8/19/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            11/18/2015 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            3/23/2016 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            6/1/2016   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

7/25/2016 <0.001                                  9/1/2016 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

12/15/2016   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/1/2017 <0.001                                  

6/29/2017 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            12/6/2017 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            4/26/2018 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

12/12/2018 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            4/17/2019 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            9/19/2019 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

Page 21: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Chloride, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             1131.6 810.1 106  3/5/2009                         259.7 583.3       587.4

6/19/2009                               890.3 106.5  6/22/2009                         326.7 322.2 1347.2     662.310/6/2009                         251.4 535.5 1086.1 728.5 94.2 461.8

12/22/2009                         475 658 1138 814 104 5534/14/2010                         302 624 1081 723 99 5727/20/2010                                 127 5857/21/2010                         299 671 1184 817    

10/27/2010                         266 666 1143 823 121 6131/31/2011                         260 576 1108 761    4/28/2011                         261 579 1083 774    7/26/2011                         310 551 1156 748    9/19/2011   418     72.2 476   396                    9/20/2011             1190   484 459   5.96            

12/29/2011   460 750   77 590   540 510     6.1            12/30/2011             1200     340 240              2/27/2012     730         600                    2/28/2012   680     79 560 1200   450 270 560 6.2            5/16/2012   640 730   74 560     340     6.2            5/17/2012             1200 330   360 480              8/7/2012         72             5.7            8/8/2012   600 1000     470 1200 530 310 440 490              

11/7/2012   520 1200   80 530 1200 300 320 460 220 6.1            2/28/2013   550 1000   85 610 1200 690 470 410 240 6.4            3/21/2013 32                                  5/20/2013 27 670 590   72 660 630 340 250 350 320 6.7            8/6/2013 24 620 910   79 330 1200 280 310 160 95 8.3            

11/4/2013 16 450 920   81 370 1200 280 430 250 290 7.4            2/10/2014 19 340 330   140 500 930 270 360 140 170 21            5/5/2014 45 450 1200   76 280 1200 620 360 350 320 21            8/5/2014 31 400 550   72 12 1200 190 180 300 180 13            

11/5/2014 21 370 260   27 9.6 550 250 63 56 50 14            2/3/2015 31 421 620   35 5.7 1200 560 110 400 160 7.2            5/5/2015 24 330 1100   6.2 5.8 1200 170 280 45 200 19            

8/19/2015 76.9 338 722   11.3 14.3 1200 505 215 362 343 23.8            10/9/2015                       15.5            

11/18/2015 26 364 690   17 17.2 1010 152 136 391 356 10.4            3/23/2016 29.8 313 753   4.03 2.15 1140 425 104 24.9 235 10            6/1/2016   297 317 960 9.58 5.06 701 99.8 59.3 23 72.4 27.6            

7/25/2016 38.1                     20.4            9/1/2016 31.8 313 548 760 23.1 18.3 1200 69.7 304 70.2 84.8 17.8            

12/15/2016   350 514 675 47 15 930 55 102 50 83 13            2/1/2017 32.2                                  

6/29/2017 35.3 255 346 724 3.95 6.25 727 79.9 148 102 56.9 12.5            12/6/2017 187 324 525 755 53 143 1240 118 204 314 274 13.1            2/13/2018             905                      4/26/2018 52.3 187 361 808 6.18 3.9 860 136 75.1 77.1 124 9.08            

12/12/2018 26.8 195 292 818 4.59 4.66 1210 217 46.2 52.5 83.8 10.3            2/26/2019             999                      4/17/2019 34.1 188 370 832 5.54 3.55 991 125 54.7 10.4 91.3 17            9/19/2019 160 209 363 824 9.37 25.1 1010 113 234 207 186 18.7            

Page 22: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Chromium, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.001 <0.001 <0.001  3/5/2009                         <0.001 <0.001       <0.001

6/19/2009                               <0.001 0.007  6/22/2009                         <0.001 <0.001 <0.001     <0.00110/6/2009                         <0.001 <0.001 <0.001 <0.001 0.001 <0.001

12/22/2009                         0.006 0.008 <0.001 <0.001 0.3 <0.0014/14/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0017/20/2010                                 0.012 <0.0017/21/2010                         <0.001 <0.001 <0.001 <0.001    

10/27/2010                         <0.001 <0.001 <0.001 0.006 0.092 <0.0011/31/2011                         <0.001 <0.001 0.005 0.004    4/28/2011                         0.01 <0.001 <0.001 <0.001    7/26/2011                         0.002 0.002 0.002 0.001    11/7/2012   0.0012 0.00091   0.00096 0.00098 0.00085 0.0016 0.0018 0.00079 0.00088 0.0011            2/28/2013   <0.00054 <0.00054   <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054            3/21/2013 0.0047                                  5/20/2013 <0.00054 <0.00054 <0.00054   <0.00054 <0.00054 0.0046 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054            8/6/2013 0.003 <0.002 0.0032   <0.002 <0.002 <0.002 <0.002 0.0036 0.0025 <0.002 <0.002            

11/4/2013 0.0051 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 0.0022 <0.002 <0.002            2/10/2014 0.006 <0.00054 <0.00054   <0.00054 0.003 0.0056 0.0035 <0.00054 <0.00054 0.0026 <0.00054            5/5/2014 <0.00054 <0.00054 <0.00054   <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054 <0.00054            8/5/2014 <0.002 0.0031 0.006   0.004 0.0036 0.0043 0.0051 0.0054 0.0029 0.0054 0.0021            

11/5/2014 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            2/3/2015 0.012 0.0096 0.0058   0.0089 0.0046 0.0069 0.0083 0.0069 0.0063 0.0068 0.0032            5/5/2015 0.01 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            11/18/2015 0.0158 <0.002 <0.002   <0.002 <0.002 0.00206 <0.002 <0.002 <0.002 <0.002 <0.002            12/15/2016   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

Page 23: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Chromium, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.001 <0.001 <0.001  3/5/2009                         0.002 <0.001       0.001

6/19/2009                               0.024 0.176  6/22/2009                         0.035 <0.001 <0.001     0.0110/6/2009                         0.009 0.001 <0.001 0.006 0.007 0.002

12/22/2009                         1.09 0.023 0.044 0.039 1.37 0.0114/14/2010                         0.006 0.002 0.004 0.002 0.021 0.0137/20/2010                                 0.109 0.0137/21/2010                         0.004 0.001 0.001 <0.001    

10/27/2010                         0.046 0.005 0.028 0.017 0.247 0.0031/31/2011                         0.017 0.004 0.009 0.007    4/28/2011                         0.027 0.003 0.008 0.004    7/26/2011                         0.032 0.005 0.013 0.004    9/19/2011   <0.01     <0.01 <0.01   <0.01                    9/20/2011             <0.01   <0.01 <0.01   <0.01            

12/29/2011   0.001 0.0036   0.0014 0.0016   0.003 0.0024     0.00085            12/30/2011             <0.002     0.0017 0.0015              2/27/2012     0.0049         0.009                    2/28/2012   0.0052     0.0049 0.0074 0.0057   0.0034 0.0044 0.0058 0.0027            5/16/2012   0.0057 0.0039   0.0026 0.0051     0.0016     0.005            5/17/2012             0.0019 0.0028   0.0028 0.014              8/7/2012         0.0026             <0.00054            8/8/2012   0.015 0.0022     0.00057 <0.00054 0.0007 0.0006 <0.00054 <0.00054              

11/7/2012   0.035 0.012   0.0032 0.0014 0.0039 0.0057 0.0024 0.0011 0.0028 0.0012            2/28/2013   0.0031 <0.0027   0.0058 0.0069 0.014 0.0026 <0.00054 0.021 <0.0027 <0.00054            3/21/2013 0.0047                                  5/20/2013 <0.00054 0.0051 <0.00054   0.002 <0.00054 0.037 <0.00054 <0.00054 0.016 0.0029 <0.00054            8/6/2013 0.0033 <0.002 0.0037   <0.002 <0.002 0.0064 <0.002 <0.002 0.0027 <0.002 <0.002            

11/4/2013 0.0054 <0.002 <0.002   <0.002 <0.002 0.0078 <0.002 <0.002 0.0065 <0.002 <0.002            2/10/2014 0.0068 <0.00054 <0.00054   0.0025 <0.00054 0.013 <0.00054 <0.00054 0.005 <0.00054 <0.00054            5/5/2014 <0.00054 <0.00054 <0.00054   <0.00054 <0.00054 0.0026 <0.00054 <0.00054 0.0037 0.002 <0.00054            8/5/2014 <0.002 <0.002 <0.002   <0.002 <0.002 0.017 <0.002 <0.002 0.012 <0.002 <0.002            

11/5/2014 <0.002 0.0066 0.0065   0.0042 0.0029 0.0093 0.0047 0.005 0.0028 0.0055 0.0034            2/3/2015 0.012 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 0.0026 <0.002 <0.002            5/5/2015 0.011 <0.002 <0.002   0.0029 <0.002 0.0039 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 0.00355 <0.002 <0.002   <0.002 0.00201 0.00276 <0.002 0.00205 0.00811 0.00374 0.00342            11/18/2015 0.0155 <0.002 <0.002   <0.002 <0.002 0.00337 <0.002 <0.002 0.00414 <0.002 <0.002            3/23/2016 0.00894 <0.002 <0.002   <0.002 <0.002 0.00301 <0.002 <0.002 <0.002 <0.002 <0.002            6/1/2016   <0.002 <0.002 0.00599 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

7/25/2016 0.0116                                  9/1/2016 0.00246 <0.002 <0.002 <0.002 0.00239 <0.002 0.00324 <0.002 <0.002 <0.002 <0.002 <0.002            

12/15/2016   <0.001 0.001 0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001            2/1/2017 0.0171                                  

6/29/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/6/2017 0.0031 <0.002 0.0025 0.00491 <0.002 <0.002 <0.002 <0.002 <0.002 0.00679 0.00402 <0.002            4/26/2018 0.0127 <0.002 0.00326 0.00334 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00244 <0.002            

12/12/2018 0.0182 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            4/17/2019 0.0283 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            9/19/2019 0.00261 <0.002 <0.002 0.00215 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

Page 24: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Fluoride, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <5 <5 <5  3/5/2009                         <5 <5       <5

6/19/2009                               <2 <2  6/22/2009                         <5 <5 <5     <510/6/2009                         <5 <5 <5 <5 <5 <5

12/22/2009                         <5 <5 <5 <5 <5 <54/14/2010                         <5 <5 <5 <5 <5 <57/20/2010                                 <5 <57/21/2010                         <5 <5 <5 <5    

10/27/2010                         <5 <5 <5 <5 <5 <51/31/2011                         <5 <5 <5 <5    4/28/2011                         <5 <5 <5 <5    7/26/2011                         <1 <1 <1 <1    9/19/2011   <0.5     <0.5 <0.5   <0.5                    9/20/2011             <0.5   <0.5 <0.5   <0.5            

12/29/2011   0.2 0.16   0.18 0.21   0.2 0.15     0.15            12/30/2011             0.22     0.94 0.69              2/27/2012     0.18         0.21                    2/28/2012   0.25     0.19 0.27 0.23   0.17 0.85 0.38 0.11            5/16/2012   0.26 0.27   0.18 0.29     0.3     0.12            5/17/2012             0.22 0.3   0.7 0.38              8/7/2012         0.15             0.13            8/8/2012   0.31 0.3     0.24 0.17 0.22 0.56 0.72 0.36              

11/7/2012   0.23 0.24   0.19 0.24 0.22 0.28 0.41 0.54 0.5 0.082            2/28/2013   0.21 0.31   0.2 0.31 0.32 0.19 0.16 0.25 0.38 <0.0099            3/21/2013 0.24                                  5/20/2013 0.29 0.49 0.26   0.22 0.43 0.46 0.29 0.23 0.42 0.38 0.11            8/6/2013 0.3 0.57 0.32   0.26 1.1 0.25 0.24 0.4 0.46 0.93 <0.1            

11/4/2013 0.27 0.92 0.32   0.18 1.2 0.25 0.24 0.24 0.35 0.38 <0.1            2/10/2014 0.24 1.4 0.24   0.95 1.3 0.29 0.27 0.37 0.33 0.56 0.13            5/5/2014 0.38 0.92 0.28   0.33 0.83 0.22 0.27 0.31 0.32 0.37 0.12            8/5/2014 0.48 0.92 0.24   0.34 0.68 0.22 0.27 0.43 0.3 0.5 0.12            

11/5/2014 0.25 0.9 0.22   1.4 0.2 0.21 0.17 0.58 0.43 0.5 0.12            2/3/2015 0.26 0.721 0.24   0.52 0.21 0.2 0.25 0.47 0.24 0.49 0.12            5/5/2015 0.28 1 0.3   0.52 0.15 0.24 0.23 0.26 0.29 0.47 0.12            

8/19/2015 0.599 0.76 0.329   0.382 0.17 0.197 0.256 0.327 0.263 0.335 0.118            11/18/2015 0.35 0.954 0.275   0.475 0.37 0.382 0.314 0.616 0.324 0.37 0.104            1/27/2016             0.508 0.263 0.261                  3/23/2016 0.397 1.03 0.331   0.369 0.153 0.266 0.295 0.549 0.178 0.448 <0.1            6/1/2016   1.06 0.236 0.314 0.274 0.13 0.441 0.252 0.65 0.146 0.602 0.104            

7/25/2016 0.727               0.38                  9/1/2016 0.562 0.991 0.201 0.368 0.319 0.185 0.227 0.18 0.239 0.168 0.629 0.106            

12/15/2016   2 <1 <1 <1 1 <1 <1 1 <1 1 <1            2/1/2017 0.328                                  

2/21/2017   0.979             0.655   0.571              6/29/2017 0.636 1.02 0.231 0.401 0.339 0.241 0.449 0.228 0.427 0.188 0.637 0.106            12/6/2017 0.528 0.41 0.267 0.387 0.303 0.232 0.24 0.307 0.431 0.319 0.442 0.159            4/26/2018 0.433 1.32 0.249 0.382 0.4 0.179 0.399 0.306 0.592 0.256 0.508 <0.1            

12/12/2018 0.455 1.21 0.197 0.323 0.369 0.278 0.178 0.244 0.674 0.163 0.533 0.131            4/17/2019 0.44 1.26 0.204 0.281 0.292 0.205 0.298 0.266 0.455 0.186 0.383 0.15            9/19/2019 0.964 1.1 0.249 0.377 0.324 0.248 0.309 0.298 0.328 0.243 0.447 0.134            

Page 25: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Hg, diss Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.000025 <0.000025 <0.000025  3/5/2009                         <0.000025 <0.000025       <0.000025

6/19/2009                               <0.000025 <0.000025  6/22/2009                         <0.000025 <0.000025 <0.000025     <0.00002510/6/2009                         <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025

12/22/2009                         <0.000025 <0.000025 <0.000025 <0.000025 0.000075 <0.0000254/14/2010                         <0.000025 <0.000025 0.000037 <0.000025 <0.000025 <0.0000257/20/2010                                 <0.000025 <0.0000257/21/2010                         <0.000025 <0.000025 <0.000025 <0.000025    

10/27/2010                         <0.000025 <0.000025 <0.000025 <0.000025 0.000025 <0.0000251/31/2011                         0.000144 <0.000025 <0.000025 <0.000025    4/28/2011                         <0.000025 <0.000025 <0.000025 <0.000025    7/26/2011                         <0.000025 <0.000025 <0.000025 <0.000025    11/7/2012   <0.000049 0.000015   <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015            2/28/2013   <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            3/21/2013 <0.000049                                  5/20/2013 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            8/6/2013 0 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

11/4/2013 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            2/10/2014 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            5/5/2014 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            8/5/2014 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

11/5/2014 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            2/3/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            5/5/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

8/19/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            11/18/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            12/15/2016   <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025            

Page 26: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Iron, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                           0.02 0.05 <0.01  3/5/2009                       0.02 0.02       0.166

6/19/2009                             2.54 3.87  6/22/2009                       0.174 0.01 <0.01     1.3110/6/2009                       0.08 0.1 <0.01 2.83 0.404 7.55

12/22/2009                       2.66 2.43 0.44 3.47 166 3.824/14/2010                       0.205 <0.01 <0.01 0.02 <0.01 3.097/20/2010                               6.12 2.377/21/2010                       0.08 0.14 0.01 <0.01    

10/27/2010                       0.01 <0.01 0.09 2.5 49.6 1.821/31/2011                       0.216 <0.01 1.68 1.31    4/28/2011                       4.01 0.02 0.127 <0.01    7/26/2011                       0.05 0.104 0.133 <0.01    11/7/2012   0.062 0.39 0.42 0.94 0.04 0.099 0.065 <0.014 <0.014 0.24            2/28/2013   <0.014 0.36 0.49 <0.014 <0.014 <0.014 <0.014 <0.014 0.16 <0.014            3/21/2013 <0.014                                5/20/2013 <0.014 <0.014 <0.014 3.2 <0.014 6.4 0.14 <0.014 <0.014 <0.014 <0.014            8/6/2013 0 <0.1 0.67 9.6 0.47 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1            

11/4/2013 <0.1 <0.1 0.67 9.4 19 0.17 0.12 0.13 0.58 <0.1 0.74            2/10/2014 <0.014 <0.014 <0.014 0.99 0.15 <0.014 <0.014 <0.014 <0.014 <0.014 0.3            5/5/2014 <0.014 <0.014 0.93 4.3 5 <0.014 0.47 <0.014 <0.014 <0.014 0.26            8/5/2014 <0.1 <0.1 <0.1 7.7 0.85 0.12 <0.1 <0.1 0.15 <0.1 0.2            

11/5/2014 <0.1 <0.1 <0.1 0.52 0.99 0.16 <0.1 <0.1 1 <0.1 0.23            2/3/2015 <0.1 <0.1 1.5 0.88 0.72 <0.1 0.21 <0.1 0.16 <0.1 0.34            5/5/2015 <0.1 <0.1 <0.1 0.83 1 1 <0.1 <0.1 <0.1 <0.1 0.12            

8/19/2015 <0.1 <0.1 <0.1 2.32 0.813 <0.1 0.202 <0.1 0.161 <0.1 <0.1            11/18/2015 0.115 <0.1 <0.1 0.236 0.306 0.346 <0.1 <0.1 <0.1 <0.1 <0.1            

Page 27: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Iron, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.187 0.343 0.346  3/5/2009                         0.415 0.1       0.4746/19/2009                               11.6 102  6/22/2009                         14.8 0.226 0.09     4.3810/6/2009                         2.94 0.233 0.139 4.31 3.57 7.6512/22/2009                         406 7.48 17.6 16.3 767 5.064/14/2010                         2.02 0.41 0.662 0.751 9.07 5.957/20/2010                                 58.1 5.687/21/2010                         1.34 0.402 0.457 0.08    10/27/2010                         18.2 1.41 10.5 6.05 135 2.241/31/2011                         6.71 1.15 3.78 2.54    4/28/2011                         10.6 0.785 3.32 1.29    7/26/2011                         12.6 1.33 4.68 0.732    9/19/2011   0.114     0.307 0.116   0.196                    9/20/2011             0.104   0.385 0.0777   0.501            12/29/2011   0.26 0.58   0.44 0.036   0.13 0.098     0.38            12/30/2011             0.05     0.14 <0.1              2/27/2012     0.42         0.17                    2/28/2012   0.088     0.36 0.12 <0.026   0.08 0.2 1 0.4            5/16/2012   0.17 0.58   0.47 0.27     0.16     0.41            5/17/2012             0.16 0.14   0.38 5.5              8/7/2012         1.1             0.35            8/8/2012   2.7 1.4     0.4 <0.026 <0.026 0.043 <0.026 0.059              11/7/2012   2 0.32   0.64 0.12 <0.014 0.16 0.091 0.1 0.085 0.27            2/28/2013   0.29 0.88   0.51 0.54 12 0.32 0.46 12 0.88 <0.014            3/21/2013 <0.014                                  5/20/2013 <0.014 2.2 0.36   7.7 0.85 38 0.48 0.16 7.9 1.9 1.8            8/6/2013 0 0.18 4   5.2 0.55 12 <0.1 0.25 3.9 0.23 1.3            11/4/2013 <0.1 <0.1 1.3   9.3 1.8 0.93 0.33 0.68 1.4 0.58 0.83            2/10/2014 <0.014 <0.014 0.11   1.6 0.31 6.5 <0.014 0.23 0.8 0.13 1.1            5/5/2014 0.15 1.2 0.8   4.8 3.4 3.1 0.89 0.51 3.2 2 0.29            8/5/2014 <0.1 0.14 0.18   14 0.93 4.8 0.13 0.26 5.4 2.5 0.23            11/5/2014 <0.1 <0.1 0.3   1.3 1 19 0.18 0.24 1.9 0.3 1.2            2/3/2015 <0.1 0.269 0.27   0.88 0.69 0.61 0.23 0.2 2.7 0.81 0.37            5/5/2015 0.11 0.26 0.6   1.1 1 12 0.14 0.81 4 0.38 0.2            7/7/2015                 0.4                  8/19/2015 0.238 0.164 0.368   3.18 1.22 1.86 0.296 1.12 4.83 2.48 5.16            10/9/2015         8.01 3.13     0.165   2.1 0.153            11/18/2015 0.36 0.157 0.14   0.662 0.971 7.57 0.223 <0.1 6.64 1.77 0.124            3/23/2016 <0.1 0.564 0.372   0.694 0.6 11.1 0.426 0.418 0.784 0.903 0.438            6/1/2016   0.254 0.14 10.3 0.448 0.557 0.191 <0.1 0.157 0.189 <0.1 0.872            7/25/2016 1.82                                  9/1/2016 0.196 0.415 <0.1 2.13 0.93 0.662 2.66 <0.1 0.64 3.31 <0.1 1.2            

12/15/2016   <0.01 0.04 1.62 0.01 0.596 0.365 <0.01 <0.01 0.164 0.228 2.63            2/1/2017 0.131                                  6/29/2017 0.131 <0.1 <0.1 1.35 <0.1 0.634 0.505 <0.1 <0.1 1.98 0.201 0.175            12/6/2017 0.137 0.143 0.138 2.13 6.31 1.17 0.342 3.78 <0.1 3.66 0.275 2.02            2/13/2018               0.176                    4/26/2018 <0.1 <0.1 0.161 1.36 <0.1 0.118 0.167 0.197 <0.1 2.45 0.215 0.247            12/12/2018 0.335 <0.1 0.322 0.181 <0.1 0.336 0.275 1.42 <0.1 0.674 <0.1 <0.1            2/26/2019               0.193                    4/17/2019 <0.1 <0.1 0.114 <0.1 <0.1 0.498 <0.1 0.131 <0.1 2.49 <0.1 <0.1            9/19/2019 0.328 0.252 0.146 1.86 0.385 0.72 0.114 0.108 0.146 2.93 0.364 <0.1            

Page 28: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Lead, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 <0.005       <0.005

6/19/2009                               <0.005 <0.005  6/22/2009                         <0.005 <0.005 <0.005     <0.00510/6/2009                         <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

12/22/2009                         <0.005 <0.005 <0.005 <0.005 0.094 <0.0054/14/2010                         <0.005 <0.005 <0.005 <0.005 <0.005 <0.0057/20/2010                                 <0.005 <0.0057/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         <0.005 <0.005 <0.005 <0.005 0.025 <0.0051/31/2011                         <0.005 <0.005 <0.005 <0.005    4/28/2011                         <0.005 <0.005 <0.005 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    11/7/2012   <0.00024 0.00059   0.00073 0.00041 0.0004 0.00045 0.00047 0.00046 0.00043 0.00035            2/28/2013   <0.00024 <0.00024   <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024            3/21/2013 <0.00024                                  5/20/2013 <0.00024 <0.00024 0.002   <0.0012 <0.00024 0.0048 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024            8/6/2013 0 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/4/2013 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/10/2014 <0.00024 <0.00024 <0.00024   <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024            5/5/2014 <0.00024 <0.00024 <0.00024   <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024 <0.00024            8/5/2014 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/5/2014 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            2/3/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            5/5/2015 <0.002 <0.002 <0.002   <0.002 <0.002 0.0024 <0.002 0.002 <0.002 <0.002 <0.002            

8/19/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            11/18/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

Page 29: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Lead, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 <0.005       <0.005

6/19/2009                               0.007 0.062  6/22/2009                         0.006 <0.005 <0.005     <0.00510/6/2009                         <0.005 <0.005 <0.005 <0.005 <0.005 <0.005

12/22/2009                         0.158 <0.005 0.009 0.009 0.434 <0.0054/14/2010                         <0.005 <0.005 <0.005 <0.005 0.006 <0.0057/20/2010                                 0.033 <0.0057/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         0.006 <0.005 <0.005 <0.005 0.078 <0.0051/31/2011                         <0.005 <0.005 <0.005 <0.005    4/28/2011                         <0.005 <0.005 <0.005 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    9/19/2011   <0.015     <0.015 <0.015   <0.015                    9/20/2011             <0.015   <0.015 <0.015   <0.015            

12/29/2011   <0.001 0.00033   <0.001 <0.001   0.00028 <0.001     <0.001            12/30/2011             <0.001     0.0012 <0.001              2/27/2012     0.00047         0.00038                    2/28/2012   0.0006     <0.00024 0.00066 0.00099   0.00063 0.00043 0.0025 0.00058            5/16/2012   <0.00024 <0.00024   <0.00024 <0.00024     <0.00024     <0.00024            5/17/2012             <0.00024 <0.00024   <0.00024 0.017              8/7/2012         <0.00024             <0.0012            8/8/2012   0.005 <0.0012     0.00025 0.00031 <0.00024 <0.0012 <0.00024 <0.00024              

11/7/2012   0.0035 0.00061   0.00025 0.00028 <0.00024 0.00033 <0.00024 <0.00024 0.00028 0.0003            2/28/2013   <0.00024 <0.00024   <0.00024 0.001 0.0085 <0.00024 <0.00024 0.016 0.0036 <0.00024            3/21/2013 <0.00024                                  5/20/2013 <0.00024 0.0032 <0.00024   0.0016 0.0014 0.027 0.001 <0.00024 0.0061 0.0035 <0.00024            8/6/2013 0 <0.001 <0.001   <0.001 <0.001 0.0076 <0.001 <0.001 0.0023 0.003 0.0014            

11/4/2013 <0.001 <0.001 <0.001   <0.001 0.0011 0.0045 <0.001 <0.001 0.0038 0.0022 <0.001            2/10/2014 <0.00024 <0.00024 <0.00024   0.0013 <0.00024 0.0065 <0.00024 <0.00024 0.0024 <0.00024 <0.00024            5/5/2014 <0.00024 0.0017 <0.00024   0.0024 <0.00024 0.0028 0.0017 <0.00024 0.0084 0.0028 <0.00024            8/5/2014 <0.001 0.0023 <0.001   <0.001 0.0033 0.012 <0.001 <0.001 0.0058 0.0028 <0.001            

11/5/2014 <0.002 <0.002 <0.002   0.0021 0.003 0.0071 <0.002 <0.002 <0.002 <0.002 <0.002            2/3/2015 <0.002 <0.002 <0.002   <0.02 <0.002 0.0021 <0.002 <0.002 0.0027 0.0038 <0.002            5/5/2015 <0.002 <0.002 <0.002   0.0021 <0.002 0.0066 <0.002 <0.002 0.0024 <0.002 <0.002            

8/19/2015 <0.002 <0.002 <0.002   <0.002 <0.002 0.00225 <0.002 <0.002 0.00308 0.00393 0.002            11/18/2015 <0.002 <0.002 <0.002   <0.002 <0.002 0.00389 <0.002 <0.002 0.00282 <0.002 <0.002            3/23/2016 <0.002 <0.002 <0.002   0.00203 <0.002 0.00358 <0.002 <0.002 <0.002 <0.002 <0.002            6/1/2016   <0.002 0.00204 0.0047 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

7/25/2016 <0.002   <0.005                              9/1/2016 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00273 <0.002 <0.002 <0.002 <0.002 <0.002            

12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/1/2017 <0.002                                  

6/29/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/6/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00227 <0.002 <0.002            4/26/2018 <0.002 <0.002 <0.002 <0.01 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

12/12/2018 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            4/17/2019 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00279 <0.002 <0.002            9/19/2019 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

Page 30: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Manganese, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                           0.168 0.861 1.04  3/5/2009                       0.106 0.115       0.066

6/19/2009                             1.78 0.516  6/22/2009                       0.038 0.106 0.093     0.12810/6/2009                       0.1 0.109 0.102 1.98 0.229 0.179

12/22/2009                       0.977 0.236 0.113 2.35 5.16 0.1344/14/2010                       0.04 0.079 0.074 1.23 0.012 0.1997/20/2010                               0.327 0.1597/21/2010                       0.007 0.144 0.069 0.885    

10/27/2010                       0.012 0.067 0.081 0.593 1.27 0.1761/31/2011                       0.033 0.019 0.131 1.04    4/28/2011                       0.212 0.061 0.122 0.39    7/26/2011                       0.031 0.025 0.076 0.275    11/7/2012   0.23 0.12 0.15 0.41 0.46 0.013 0.012 0.007 0.012 0.11            2/28/2013   0.029 0.069 0.34 0.025 0.063 0.011 0.011 0.15 0.016 <0.0012            3/21/2013 0.064                                5/20/2013 0.23 0.018 <0.0012 0.61 0.15 0.53 <0.0012 <0.0012 0.011 <0.0012 0.03            8/6/2013 0.026 <0.01 0.076 0.87 0.15 1 <0.01 <0.01 0.048 <0.01 0.14            

11/4/2013 0.012 0.014 0.069 1.3 1.6 0.58 <0.01 0.023 0.074 <0.01 0.42            2/10/2014 0.069 <0.0012 <0.0012 0.25 <0.0012 0.023 <0.0012 <0.0012 <0.0012 <0.0012 0.25            5/5/2014 1.8 <0.0012 0.046 0.65 0.41 0.18 0.071 <0.0012 0.053 <0.0012 0.19            8/5/2014 0.1 0.023 <0.01 1 0.11 0.28 0.035 <0.01 0.015 <0.01 0.16            

11/5/2014 0.015 0.03 <0.01 0.09 0.19 0.071 0.75 <0.01 0.1 <0.01 0.17            2/3/2015 <0.01 <0.01 0.086 0.31 0.14 0.11 0.02 <0.01 0.045 <0.01 0.17            5/5/2015 0.055 0.015 0.014 0.1 0.31 0.17 <0.01 <0.01 0.024 <0.01 0.16            

8/19/2015 0.779 0.0476 0.0172 0.126 0.33 0.125 0.0169 <0.01 0.0598 <0.01 0.24            11/18/2015 0.505 0.0368 <0.01 0.0686 0.227 0.0724 <0.01 <0.01 <0.01 <0.01 0.137            

Page 31: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Manganese, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             0.16 0.849 1.02  3/5/2009                         0.106 0.111       0.074

6/19/2009                               1.82 3.3  6/22/2009                         0.501 0.117 0.102     0.15710/6/2009                         0.187 0.109 0.104 1.9 0.448 0.182

12/22/2009                         10.9 0.369 0.348 2.9 20.9 0.1734/14/2010                         0.127 0.144 0.095 1.29 0.756 0.2267/20/2010                                 1.84 0.2577/21/2010                         0.056 0.128 0.084 0.853    

10/27/2010                         0.528 0.062 0.278 0.482 3.85 0.1681/31/2011                         0.323 0.048 0.167 1.51    4/28/2011                         0.358 0.069 0.151 0.544    7/26/2011                         0.543 0.056 0.125 0.743    9/19/2011   0.582     0.388 0.299   0.376                    9/20/2011             1.33   0.208 0.0411   0.119            

12/29/2011   0.32 0.56   0.8 0.56   0.099 0.046     0.11            12/30/2011             0.66     0.0093 0.0019              2/27/2012     0.38         0.04                    2/28/2012   0.17     0.28 0.72 0.66   0.021 0.006 0.043 0.11            5/16/2012   0.095 0.1   0.22 0.2     0.0094     0.11            5/17/2012             0.48 0.012   0.0077 0.15              8/7/2012         0.75             0.12            8/8/2012   0.23 0.15     0.32 0.58 0.016 0.0094 0.0068 0.018              

11/7/2012   0.26 0.082   0.17 0.13 0.44 0.023 0.014 0.012 0.057 0.11            2/28/2013   0.029 0.12   0.18 0.063 1.2 0.055 0.055 0.54 0.041 <0.0012            3/21/2013 0.062                                  5/20/2013 0.24 0.043 0.054   0.96 0.13 2.4 0.055 0.032 0.14 0.024 0.029            8/6/2013 0.055 0.017 0.16   0.75 0.15 1.8 0.029 <0.01 0.17 0.01 0.83            

11/4/2013 0.035 0.018 0.081   1.2 0.26 0.82 0.049 0.07 0.14 0.018 0.43            2/10/2014 0.058 <0.0012 <0.0012   0.39 0.022 0.59 0.042 0.059 0.066 0.015 0.27            5/5/2014 1.9 0.022 0.029   0.41 0.27 0.34 0.1 <0.0012 0.11 0.022 0.18            8/5/2014 0.16 0.025 0.017   2 0.12 0.8 0.071 0.01 0.1 0.028 0.17            

11/5/2014 0.13 0.042 0.025   0.075 0.16 1.1 0.89 0.015 0.049 <0.01 0.25            2/3/2015 0.055 0.012 0.012   0.28 0.15 0.2 0.011 0.012 0.081 0.036 0.16            5/5/2015 0.27 0.017 0.052   0.08 0.3 0.67 0.16 <0.01 0.1 0.018 0.15            

8/19/2015 1 0.0546 <0.01   0.144 0.284 0.331 0.0136 0.0172 0.107 0.0432 0.677            11/18/2015 0.501 0.0418 <0.01   0.0801 0.215 0.509 <0.01 0.0144 0.0681 0.0178 0.138            3/23/2016 0.0408 0.0134 <0.01   0.0964 0.421 0.698 0.0253 <0.01 0.028 0.0111 0.0267            6/1/2016   0.0222 <0.01 1.46 0.0799 0.249 0.222 0.0336 <0.01 0.0102 <0.01 0.484            

7/25/2016 6.13                                  9/1/2016 0.274 0.0136 <0.01 0.501 0.0327 0.465 0.188 0.113 <0.01 0.0716 <0.01 0.472            

12/15/2016   <0.001 0.002 0.268 <0.001 0.313 0.051 0.005 <0.001 0.095 0.007 0.501            2/1/2017 0.0913                                  

6/29/2017 0.817 <0.01 <0.01 0.294 <0.01 0.471 0.171 0.817 <0.01 0.213 <0.01 0.0733            12/6/2017 0.151 0.0451 <0.01 0.216 0.591 0.872 0.223 2.49 <0.01 0.759 0.0169 0.194            2/13/2018           0.0816   0.081                    4/26/2018 0.317 0.0236 <0.01 0.156 <0.01 0.0638 0.146 0.0901 <0.01 0.145 <0.01 0.0625            

12/12/2018 0.0187 <0.01 0.0139 0.158 <0.01 0.352 0.981 1.17 <0.01 0.116 <0.01 <0.01            2/26/2019               0.309                    4/17/2019 0.269 0.0158 <0.01 0.0354 <0.01 0.525 0.435 0.119 0.0127 0.036 <0.01 0.037            9/19/2019 0.123 0.0379 0.0176 0.164 0.0111 0.419 0.675 1.71 0.0189 0.84 0.0246 0.0294            

11/25/2019               0.342                    

Page 32: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Mercury, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.000025 <0.000025 <0.000025  3/5/2009                         <0.000025 <0.000025       <0.000025

6/19/2009                               0.000029 0.000052  6/22/2009                         <0.000025 <0.000025 <0.000025     <0.00002410/6/2009                         <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025

12/22/2009                         0.000396 <0.000025 0.000045 <0.000039 0.000344 0.0000264/14/2010                         <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.0000257/20/2010                                 0.000038 <0.0000257/21/2010                         <0.000025 <0.000025 <0.000025 <0.000025    

10/27/2010                         <0.000025 <0.000025 0.000027 <0.000025 0.000052 <0.0000251/31/2011                         <0.000025 <0.000025 <0.000025 <0.000025    4/28/2011                         <0.000025 <0.000025 <0.000025 <0.000025    7/26/2011                         <0.000025 <0.000025 <0.000025 <0.000025    9/19/2011   <0.0002     <0.0002 <0.0002   <0.0002                    9/20/2011             <0.0002   <0.0002 <0.0002   <0.0002            

12/29/2011   <0.0002 <0.0002   <0.0002 <0.0002   <0.0002 <0.0002     <0.0002            12/30/2011             <0.0002     <0.0002 <0.0002              2/27/2012     <0.000015         <0.000015                    2/28/2012   <0.000015     <0.000015 <0.000015 <0.000015   <0.000015 <0.000015 <0.000015 <0.000015            5/16/2012   <0.000015 <0.000015   <0.000015 <0.000015     <0.000015     <0.000015            5/17/2012             <0.000015 <0.000015   <0.000015 <0.000015              8/7/2012         <0.000015             <0.000015            8/8/2012   <0.000015 <0.000015     <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015              

11/7/2012   <0.000015 <0.000015   <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015 <0.000015            2/28/2013   <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            3/21/2013 <0.000049                                  5/20/2013 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            8/6/2013 0 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

11/4/2013 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            2/10/2014 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            5/5/2014 <0.000049 <0.000049 <0.000049   <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049 <0.000049            8/5/2014 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

11/5/2014 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            2/3/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            5/5/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

8/19/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            11/18/2015 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            3/23/2016 <0.0002 <0.0002 <0.0002   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            6/1/2016   <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

7/25/2016 <0.0002                                  9/1/2016 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

12/15/2016   <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025 <0.000025            2/1/2017 <0.0002                                  

6/29/2017 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            12/6/2017 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            4/26/2018 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

12/12/2018 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            4/17/2019 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            9/19/2019 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002 <0.0002            

Page 33: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Molybdenum, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 0.013 <0.005  3/5/2009                         <0.005 <0.005       0.005

6/19/2009                               0.012 <0.005  6/22/2009                         <0.005 <0.005 <0.005     0.00610/6/2009                         <0.005 <0.005 <0.005 0.007 <0.005 0.007

12/22/2009                         <0.005 <0.005 <0.005 0.005 0.013 0.014/14/2010                         <0.005 <0.005 <0.005 0.006 <0.005 0.0067/20/2010                                 <0.005 0.0067/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         <0.005 <0.005 <0.005 <0.005 <0.005 0.0081/31/2011                         <0.005 0.005 <0.005 <0.005    4/28/2011                         <0.005 <0.005 <0.005 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    11/7/2012   0.0027 0.0027   0.0057 0.0057 0.0043 0.0074 0.0072 0.01 0.0097 0.004            2/28/2013   <0.0016 <0.0016   0.0093 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016            3/21/2013 0.018                                  5/20/2013 0.012 <0.0016 <0.0016   0.0063 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016            8/6/2013 0.018 <0.005 0   0.0065 0.022 <0.005 <0.005 <0.005 <0.005 0.0074 <0.005            

11/4/2013 0.0094 <0.005 <0.005   0.0062 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/10/2014 0.031 0.0076 0.0052   0.014 0.011 <0.0016 <0.0016 0.0065 <0.0016 0.0091 <0.0016            5/5/2014 0.017 <0.0016 <0.0016   0.011 0.0057 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016            8/5/2014 0.044 <0.005 <0.005   0.0055 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

11/5/2014 0.015 <0.005 <0.005   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/3/2015 0.045 <0.005 <0.005   0.01 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            5/5/2015 0.061 <0.005 <0.005   0.0055 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

8/19/2015 0.118 <0.005 <0.005   0.00536 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            11/18/2015 0.121 <0.005 <0.005   0.0056 <0.005 <0.005 <0.005 0.00501 <0.005 <0.005 <0.005            12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

Page 34: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Molybdenum, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 0.013 <0.005  3/5/2009                         <0.005 <0.005       0.005

6/19/2009                               0.014 0.008  6/22/2009                         <0.005 <0.005 <0.005     0.00710/6/2009                         <0.005 <0.005 <0.005 0.008 0.005 0.006

12/22/2009                         0.038 0.005 0.005 <0.005 0.047 0.0114/14/2010                         <0.005 <0.005 <0.005 0.006 <0.005 0.0077/20/2010                                 0.006 0.0087/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         0.006 <0.005 0.012 0.006 0.011 0.0051/31/2011                         <0.005 0.013 0.006 <0.005    4/28/2011                         <0.005 0.013 0.008 <0.005    7/26/2011                         <0.005 <0.005 <0.005 <0.005    9/19/2011   <0.03     <0.03 <0.03   <0.03                    9/20/2011             <0.03   <0.03 <0.03   <0.03            

12/29/2011   <0.005 <0.005   0.0044 <0.005   0.0026 <0.005     0.0027            12/30/2011             <0.005     0.015 0.013              2/27/2012     0.011         0.0093                    2/28/2012   0.013     0.018 0.016 0.012   0.0085 0.014 0.011 0.0025            5/16/2012   <0.008 <0.0032   <0.008 <0.008     <0.008     <0.0032            5/17/2012             <0.008 <0.008   <0.0016 <0.0032              8/7/2012         0.02             <0.0016            8/8/2012   0.011 <0.0016     0.015 0.012 0.0092 0.01 0.0096 0.0074              

11/7/2012   0.022 0.024   0.025 0.024 0.022 0.017 0.019 0.018 0.02 0.0039            2/28/2013   <0.0016 0.036   0.036 0.035 0.034 0.036 0.032 0.032 0.031 0.011            3/21/2013 0.024                                  5/20/2013 0.009 <0.0016 <0.0016   0.0098 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016            8/6/2013 0.018 <0.005 0   0.0078 0.019 <0.005 <0.005 <0.005 <0.005 0.0089 <0.005            

11/4/2013 0.016 <0.005 <0.005   0.012 0.0088 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/10/2014 0.026 0.0084 <0.0016   0.013 0.011 0.0054 <0.0016 <0.0016 <0.0016 0.0054 <0.0016            5/5/2014 0.016 <0.0016 <0.0016   0.0066 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016 <0.0016            8/5/2014 0.058 0.0052 0.013   0.014 0.0098 0.0069 0.0084 0.011 0.0086 0.012 0.0091            

11/5/2014 0.027 <0.005 <0.005   0.014 <0.005 <0.005 <0.005 0.0056 0.008 0.0054 <0.005            2/3/2015 0.045 <0.005 <0.005   0.0089 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            5/5/2015 0.06 <0.005 <0.005   0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

8/19/2015 0.134 <0.005 <0.005   0.00707 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            11/18/2015 0.123 <0.005 <0.005   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            3/23/2016 0.109 <0.005 <0.005   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            6/1/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.00597 <0.005 <0.005 <0.005            

7/25/2016 0.0787                                  9/1/2016 0.0838 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/1/2017 0.0708                                  

6/29/2017 0.0931 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            12/6/2017 0.219 <0.005 <0.005 <0.005 0.00974 <0.005 <0.005 0.0051 <0.005 <0.005 <0.005 <0.005            4/26/2018 0.156 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

12/12/2018 0.106 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.00693 <0.005 <0.005 <0.005            4/17/2019 0.189 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            9/19/2019 0.214 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

Page 35: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

pH (field) Results in pH standard unitsDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             6.48 7.07 6.9  6/19/2009                               6.38 6.92  6/22/2009                         6.34 7.58 6.71     6.410/6/2009                         6.48 7.75 6.35 6.82 6.73 6.3812/22/2009                         6.59 6.85 6.82 6.65 7.05 6.674/14/2010                         6.38 6.92 6.86 6.63 7.1 6.637/21/2010                         6.91 6.87 6.72 6.47 6.73 6.5410/27/2010                         7.01 6.95 6.79 6.43 6.75 6.841/31/2011                         7.14 6.89 7.01 6.4    4/28/2011                         7.39 8.21 6.89 6.88    7/26/2011                         7.21 8.44 7.4 7.02    9/19/2011   6.55     6.8 6.4   6.57                    9/20/2011             6.55   6.58 6.59   7.17            12/29/2011   6.86 6.73   6.87 6.83   6.87 6.89     7.47            12/30/2011             7.28     7.53 7.59              2/28/2012   6.26 6.16   6.34 6.24 6.73 6.37 6.91 7.25 7.01 7.02            5/16/2012   6.36 6.3   6.43 6.45     6.75     7            5/17/2012             6.69 6.48   7.07 6.55              8/7/2012         7.2 7.23 7.24     7.43 7.13 7.68            8/8/2012   7.09 7.14         7.11 7.31                  11/7/2012   6.68 6.52   6.6 6.57 6.92 6.5 6.64 6.91 6.72 7.41            2/28/2013   6.83 6.65   6.81 7.12 7.22 7.2 6.82 6.84 6.99 7.52            5/20/2013 7.52 7.05 6.68   6.93 6.76 6.89 6.7 6.93 7.15 7.1 7.6            8/6/2013 8.98 7.34 6.57   6.83 7.13 6.73 6.34 6.53 6.76 7.05 8.17            11/4/2013 9.15 7.26 7.13   7.27 7.41 7.2 7.18 7.31 7.54 7.39 7.93            2/10/2014 8.06 6.82 7.32   7.05 7.14 7.09 7.3 7.31 7.55 7.42 7.38            5/5/2014 7.47 7.22 6.57   6.87 6.62 6.67 6.52 6.7 6.81 6.89 7.4            8/5/2014 8.11 6.64 6.23   6.3 6.52 6.08 6.29 6.32 6.26 6.09 6.97            11/5/2014 7.8 7.45 6.63   7.53 6.97 6.5 6.33 6.84 7.29 7.04 7.55            2/3/2015 7.55 6.44 6.51   7.05 6.87 6.53 6.71 6.81 6.58 6.54 7.16            5/5/2015 7.63 7.08 6.4   7.48 6.81 6.92 6.53 6.76 6.83 6.73 7.32            8/19/2015 7.65 6.86 6.57   7.62 6.69 6.63 7.09 7 7.17 7 7.21            10/9/2015         6.94 7.14     6.87 6.82 7.04 6.73            11/18/2015 7.64 7.13 7.04   7.3 7.17 6.69 6.62 6.87 7.1 6.91 7.31            3/23/2016 7.83 6.53 6.89   7.28 7 6.8 7.43 7.29 7.71 7.49 6.99            4/26/2016   7.4 6.82 6.78 7.7 7.21 6.92 6.61 6.77 6.91   7.57            6/1/2016   6.97 7.77 7.99 7.88 7.61 7.18 7.71 7.45 8.22 8.13 7.99            7/25/2016 8.58 6.48 6.72 7.28 6.86 7.43 7.37 7.73 7.06 6.88 7.34 7.68            9/1/2016 7.68 6.46 6.57 6.63 6.94 7.26 7.07 7.52 6.85 6.58 6.59 7.56            

12/15/2016   6.72 6.31 6.21 7.02 7.44 7.25 7.67 7.17 6.44 5.74 7.45            2/1/2017 8.17                                  2/21/2017               6.9                    6/29/2017 8.09 7.41 5.81 6.38 7.87 7.57 6.99 6.95 7.89 5.86 6.24 7.68            7/19/2017                 7.32                  12/6/2017 8.43 7.23 6.16 6.41 7.79 7.32 6.86 7.19 7.36 6.9 6.46 7.51            4/26/2018 8.45 7.25 7.32 7.5 7.63 7.41 6.99 6.97 6.92 7.56 7.26 7.33            12/12/2018 8.46 7.31 7.39 7.32 7.5 6.91 6.68 6.54 6.87 7.56 7.56 7.2            4/17/2019 8.21 7.53 7.43 7.42 7.92 7.49 6.96 7.16 7.31 7.53 7.37 7.45            9/19/2019 9.05 7.43 6.6 6.62 8 7.91 6.97 6.83 7.24 6.88 6.72 7.9            11/25/2019         8.65 8.22   7.3                    

Page 36: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

pH (lab) Results in pH standard unitsDate PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009     7 7 7.4  3/5/2009 7.3 7       6.9

6/19/2009       7.1 7.3  6/22/2009 7.7 7.7 7.5     7.610/6/2009 7.2 6.9 6.7 6.8 7.3 6.7

12/22/2009 7.5 7.6 7.1 7 7.8 74/14/2010 7.3 7 6.9 7.2 7.3 6.87/20/2010         6.9 7.37/21/2010 7.3 6.9 6.9 6.8    

10/27/2010 8 7.6 7.3 7.4 7.8 7.71/31/2011 7.4 7.4 6.8 7    4/28/2011 7.2 7.2 6.7 7.2    7/26/2011 7.5 7.5 7.4 7.4    

Page 37: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Selenium, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 0.064       <0.005

6/19/2009                               <0.005 <0.005  6/22/2009                         <0.005 0.025 <0.005     <0.00510/6/2009                         <0.005 0.022 <0.005 <0.005 <0.005 <0.005

12/22/2009                         <0.005 0.013 <0.005 <0.005 <0.005 <0.0054/14/2010                         <0.005 0.022 <0.005 <0.005 <0.005 <0.0057/20/2010                                 <0.005 <0.0057/21/2010                         <0.005 <0.005 <0.005 <0.005    

10/27/2010                         <0.005 0.045 <0.005 <0.005 0.005 <0.0051/31/2011                         <0.005 0.033 <0.005 <0.005    4/28/2011                         0.008 0.019 <0.005 <0.005    7/26/2011                         <0.005 0.017 <0.005 <0.005    11/7/2012   0.0088 0.027   0.00073 0.014 0.037 0.0099 0.012 0.0097 0.0088 0.00097            2/28/2013   0.013 0.017   0.0017 0.037 0.034 0.016 0.013 0.013 0.0082 <0.00038            3/21/2013 0.0031                                  5/20/2013 0.0032 0.019 0.025   <0.00038 0.023 0.026 0.0086 0.0066 0.011 0.01 <0.00038            8/6/2013 0.0044 0.011 0.021   0.002 0.013 0.018 0.0048 0.012 0.0056 0.0034 <0.001            

11/4/2013 0.0042 0.01 0.024   <0.001 0.0096 0.029 0.016 0.011 0.0038 0.0068 <0.001            2/10/2014 0.0059 0.0073 0.0074   0.0033 0.023 0.031 0.0098 0.016 0.0033 0.0059 0.0011            5/5/2014 0.0028 0.01 0.027   0.0015 0.012 0.037 0.018 0.013 0.0074 0.011 <0.00038            8/5/2014 0.005 0.013 0.017   0.0033 0.0015 0.031 0.007 0.0076 0.0031 0.013 <0.001            

11/5/2014 0.0035 0.0089 0.0086   0.0024 <0.002 0.047 0.006 0.005 0.0034 0.005 0.0026            2/3/2015 0.0086 0.0034 <0.002   <0.002 <0.002 0.015 0.0064 0.0025 <0.002 0.0044 <0.002            5/5/2015 0.0057 <0.002 <0.002   <0.002 <0.002 0.017 0.0025 0.003 <0.002 0.0035 <0.002            

8/19/2015 0.00267 <0.002 <0.002   <0.002 <0.002 0.00493 0.00592 0.00368 <0.002 0.00366 <0.002            11/18/2015 0.00704 <0.002 <0.002   <0.002 <0.002 0.0107 0.00779 0.00474 <0.002 0.0109 <0.002            12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            

Page 38: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Selenium, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.005 <0.005 <0.005  3/5/2009                         <0.005 0.065       <0.005

6/19/2009                               <0.005 <0.005  6/22/2009                         <0.005 0.033 <0.005     <0.00510/6/2009                         <0.005 0.026 <0.005 <0.005 0.006 <0.005

12/22/2009                         0.007 0.012 <0.005 <0.005 <0.005 <0.0054/14/2010                         <0.005 0.02 <0.005 <0.005 <0.005 <0.0057/20/2010                                 <0.005 <0.0057/21/2010                         <0.005 0.008 <0.005 <0.005    

10/27/2010                         <0.005 0.025 <0.005 <0.005 <0.005 <0.0051/31/2011                         0.008 0.033 0.005 <0.005    4/28/2011                         <0.005 0.021 <0.005 <0.005    7/26/2011                         <0.005 0.017 <0.005 <0.005    9/19/2011   <0.002     0.00581 0.00716   <0.002                    9/20/2011             0.00348   <0.002 <0.002   <0.002            

12/29/2011   0.0072 0.014   0.0011 0.03   0.0072 0.0073     <0.001            12/30/2011             0.02     0.0079 0.011              2/27/2012     0.036         0.025                    2/28/2012   0.022     0.0017 0.02 0.038   0.014 0.013 0.02 0.0016            5/16/2012   0.016 0.018   0.0021 0.027     0.013     0.001            5/17/2012             0.041 0.0091   0.0062 0.0099              8/7/2012         0.0028             <0.00038            8/8/2012   0.015 0.029     0.014 0.029 0.011 0.011 0.0091 0.0087              

11/7/2012   0.013 0.023   0.0043 0.02 0.041 0.0081 0.0099 0.0082 0.018 <0.00038            2/28/2013   0.013 0.017   0.0025 0.047 0.032 0.0095 0.012 0.011 0.007 <0.0019            3/21/2013 0.0046                                  5/20/2013 0.0023 0.016 0.0074   0.001 0.019 0.021 0.0084 0.0068 0.007 0.0083 <0.00038            8/6/2013 0.017 0.011 0.02   0.0018 0.016 0.019 0.0046 0.008 0.0054 0.003 <0.001            

11/4/2013 0.005 0.016 0.036   0.0024 0.017 0.032 0.012 0.012 0.0044 0.011 <0.001            2/10/2014 0.0068 0.0054 0.0043   0.0018 0.0054 0.016 0.0057 0.01 0.0022 0.0055 <0.00038            5/5/2014 0.0027 0.0078 0.019   0.002 0.011 0.027 0.014 0.0095 0.0062 0.0085 <0.00038            8/5/2014 0.029 0.0082 0.0072   0.0015 <0.001 0.024 0.0064 0.006 0.0043 0.0098 <0.001            

11/5/2014 0.024 0.018 0.01   0.0043 0.0038 0.038 0.005 0.0033 <0.002 0.0037 0.0028            2/3/2015 0.0081 0.0028 0.0024   <0.002 <0.002 0.016 0.008 <0.002 <0.002 0.0043 <0.002            5/5/2015 0.0055 <0.002 <0.002   <0.002 <0.002 0.024 0.0027 0.0027 <0.002 0.0029 <0.002            

8/19/2015 0.00252 <0.002 <0.002   <0.002 <0.002 0.0089 0.00565 0.00258 <0.002 0.00224 <0.002            11/18/2015 0.00721 <0.002 <0.002   <0.002 <0.002 0.0047 0.00635 0.00457 <0.002 0.0152 <0.002            3/23/2016 0.0072 <0.002 0.00226   <0.002 <0.002 0.00839 0.00411 0.00369 <0.002 0.00845 <0.002            6/1/2016   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00202 <0.002 <0.002 0.00283 <0.002            

7/25/2016 0.00246                                  9/1/2016 0.00286 <0.002 <0.002 <0.002 0.00206 <0.002 0.00707 <0.002 0.00333 <0.002 <0.002 <0.002            

12/15/2016   <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005            2/1/2017 0.00418                                  

6/29/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00513 <0.002 0.00286 <0.002            12/6/2017 0.00501 <0.002 <0.002 <0.002 <0.002 <0.002 0.00495 <0.002 0.00888 <0.002 0.0056 <0.002            4/26/2018 0.00811 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00299 <0.002 0.00594 <0.002            

12/12/2018 0.0053 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00456 <0.002            4/17/2019 0.00833 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00319 <0.002            9/19/2019 0.00316 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.00387 <0.002            

Page 39: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Silver, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                           <0.001 <0.001 <0.001  3/5/2009                       <0.001 <0.001       <0.001

6/19/2009                             <0.001 <0.001  6/22/2009                       <0.001 <0.001 <0.001     <0.00110/6/2009                       <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

12/22/2009                       <0.001 <0.001 <0.001 <0.001 <0.001 <0.0014/14/2010                       <0.001 <0.001 <0.001 <0.001 <0.001 <0.0017/20/2010                               <0.001 <0.0017/21/2010                       <0.001 <0.001 <0.001 <0.001    

10/27/2010                       <0.001 <0.001 <0.001 <0.001 <0.001 <0.0011/31/2011                       <0.001 <0.001 <0.001 <0.001    4/28/2011                       <0.001 <0.001 <0.001 <0.001    7/26/2011                       <0.001 <0.001 <0.001 <0.001    11/7/2012   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            2/28/2013   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            3/21/2013 <0.00031                                5/20/2013 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            8/6/2013 0 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/4/2013 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/10/2014 0.0013 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            5/5/2014 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            8/5/2014 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/5/2014 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            2/3/2015 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            5/5/2015 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            11/18/2015 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

Page 40: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Silver, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             <0.001 <0.001 0.006  3/5/2009                         <0.001 <0.001       <0.001

6/19/2009                               <0.001 <0.001  6/22/2009                         <0.001 <0.001 <0.001     <0.00110/6/2009                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

12/22/2009                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0014/14/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0017/20/2010                                 <0.001 <0.0017/21/2010                         <0.001 <0.001 <0.001 <0.001    

10/27/2010                         <0.001 <0.001 <0.001 <0.001 <0.001 <0.0011/31/2011                         <0.001 <0.001 <0.001 <0.001    4/28/2011                         <0.001 <0.001 <0.001 <0.001    7/26/2011                         <0.001 <0.001 <0.001 <0.001    9/19/2011   <0.02     <0.02 <0.02   <0.02                    9/20/2011             <0.02   <0.02 <0.02   <0.02            

12/29/2011   <0.001 <0.001   <0.001 <0.001   <0.001 <0.001     <0.001            12/30/2011             <0.001     0.00063 <0.001              2/27/2012     <0.00031         <0.00031                    2/28/2012   <0.00031     <0.00031 <0.00031 <0.00031   <0.00031 <0.00031 <0.00031 <0.00031            5/16/2012   <0.00031 <0.00031   <0.00031 <0.00031     <0.00031     <0.00031            5/17/2012             <0.00031 <0.00031   <0.00031 <0.00031              8/7/2012         <0.00031             <0.00031            8/8/2012   0.00036 0.00039     <0.00031 <0.00031 0.00079 <0.00031 <0.00031 <0.00031              

11/7/2012   <0.00031 <0.00031   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            2/28/2013   <0.00031 <0.00031   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            3/21/2013 <0.00031                                  5/20/2013 <0.00031 <0.00031 0.0016   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            8/6/2013 0 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/4/2013 <0.001 <0.001 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/10/2014 <0.00031 0.0013 <0.00031   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            5/5/2014 <0.00031 <0.00031 <0.00031   <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031 <0.00031            8/5/2014 <0.001 0.0023 <0.001   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            

11/5/2014 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            2/3/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            5/5/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

8/19/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            11/18/2015 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            3/23/2016 <0.002 <0.002 <0.002   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            6/1/2016   <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

7/25/2016 <0.002                                  9/1/2016 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

12/15/2016   <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001            2/1/2017 <0.002                                  

6/29/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            12/6/2017 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            4/26/2018 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

12/12/2018 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            4/17/2019 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            9/19/2019 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002            

Page 41: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Solids, total dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             3968 3336 920  3/5/2009                         1672 4060       37446/19/2009                               3302 834  6/22/2009                         4484 4070 4120     379610/6/2009                         1724 4240 4236 3284 888 367612/22/2009                         2292 4088 3436 2956 1066 34724/14/2010                         1728 4196 3968 2956 864 36807/20/2010                                 964 36967/21/2010                         1758 4220 4058 3126    10/27/2010                         1720 4178 5036 3412 952 37321/31/2011                         1764 4118 3888 2928    4/28/2011                         1776 4274 4964 3208    7/26/2011                         2448 4172 4580 3002    9/19/2011   4000     3200 4000   2000                    9/20/2011             3800   3600 2700   300            12/29/2011   4000 4300   3200 4400   2500 3400     310            12/30/2011             3500     2800 2700              2/27/2012     3900         2800                    2/28/2012   4300     3000 4200 3400   3100 2200 3000 300            5/16/2012   4400 3900   3200 4400     3100     320            5/17/2012             4400 1700   2100 3100              8/7/2012         3200             320            8/8/2012   8200 4400     3600 4100 2900 3200 2200 3300              11/7/2012   4700 3500   3000 4100 3600 1600 2700 2200 2400 300            2/28/2013   3700 3900   2900 4300 3300 3400 2900 2900 1800 340            3/21/2013 450                                  5/20/2013 520 3100 2100   3000 4800 1900 1900 1600 2100 2200 320            8/6/2013 650 3300 3900   3500 4200 4400 1700 2600 1700 1100 360            11/4/2013 670 2500 3800   3000 3200 3600 1700 3500 1500 2600 310            2/10/2014 980 2000 1600   1800 2600 2600 1600 2800 1200 1600 500            5/5/2014 1200 2600 4600   2700 2900 4700 3100 2800 1600 2100 500            8/5/2014 1200 2800 2300   3800 520 3700 1500 2000 1600 1800 460            11/5/2014 860 2400 1500   690 390 4000 1200 1600 590 870 450            2/3/2015 1120 2100 2700   1700 370 3600 2700 1700 3000 1500 320            5/5/2015 1000 2000 5800   490 460 3900 1400 1900 520 1600 480            8/19/2015 2000 1720 3340   543 669 3440 3080 2300 2440 2200 546            10/9/2015                       435            11/18/2015 682 2020 2010   527 481 2950 1410 1680 2790 1880 463            3/23/2016 1340 1740 3990   334 367 3710 2590 1360 379 1900 375            6/1/2016   1600 1620 3750 378 426 2250 1210 1230 339 1350 630            7/25/2016 1620                     578            9/1/2016 1350 1820 2160 3410 592 811 2930 1050 2820 804 1180 534            

12/15/2016   2328 2298 2376 562 408 2980 1036 1484 761 1296 468            2/1/2017 1080                                  6/29/2017 1320 1330 1630 2390 301 366 2060 1020 1390 817 1010 433            12/6/2017 3390 2890 1770 2580 2530 2590 2650 1260 1870 1950 1740 446            4/26/2018 1450 1160 1520 2910 257 235 2280 1350 1080 732 1300 380            12/12/2018 763 1110 1420 2740 270 302 3550 1280 888 681 1140 379            4/17/2019 1270 1190 1780 3290 297 335 2730 1350 982 311 1310 493            9/19/2019 4070 1330 1810 2680 379 546 2880 1210 2070 1090 1470 453            

Page 42: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Specific Cond Results in micromhos/cmDate PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009     5350 4460 1416  3/5/2009 2560 4930       4530

6/19/2009       4260 1269  6/22/2009 2310 4910 5200     441010/6/2009 2530 5070 5410 4390 1363 4400

12/22/2009 3330 5260 5450 4490 1421 44304/14/2010 2570 5150 5320 4070 1376 13107/20/2010         1396 44207/21/2010 2470 5040 5210 4220    

10/27/2010 2600 5210 6150 4480 4310 45201/31/2011 2620 5190 5980 4460    4/28/2011 2600 5220 6120 4370    7/26/2011 3330 5170 6065 4280    

Page 43: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Specific Conductance @ 25 Results in micromhos/cmDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             2880 2.14 1058  3/5/2009                         1346 3450       3890

6/19/2009                               3742 1327  6/22/2009                         3109 3632 3482     413010/6/2009                         2774 3598 2762 3716 1004 3501

12/22/2009                         2770 5200 5497 4720 1163 46004/14/2010                         2906 5359 5338 4702 1297 43277/21/2010                         2827 3622 3802 4428 1168 3064

10/27/2010                         2806 4128 4023 4406 1143 29151/31/2011                         2894 4147 4086 4703    4/28/2011                         1925 5340 6470 5270    7/26/2011                         2247 4827 6187 4739    9/19/2011   4220     3230 4250   2450                    9/20/2011             4870   4420 4750   525            

12/29/2011   4750 5670   3280 5230   3400 3540     441            12/30/2011             4940     3860 3130              2/28/2012   4850 3660   3160 4940 4630 3650 3470 3110 3430 446            5/16/2012   5700 4890   3520 5270     3900     469            5/17/2012             5280 2430   3430 4730              8/7/2012         3180 4450 4660     3480 4880 452            8/8/2012   4950 5680         3240 4090                  

11/7/2012   4890 5660   3300 4930 5000 2280 3420 3810 5050 457            2/28/2013   4820 6260   3400 5540 5030 2690 4040 4510 3550 508            5/20/2013 734 4300 5440   3102 5460 4620 3640 3306 1990 2999 737            8/6/2013 911 4430 5540   3200 4290 4500 2280 3950 3013 2000 547            

11/4/2013 992 3860 4420   3280 4420 5080 3590 4210 1960 3670 553            2/10/2014 1280 2730 2190   2320 4410 4300 2050 3250 1360 2250 691            5/5/2014 1550 3240 4510   2650 4200 4440 3230 3280 2420 2620 721            8/5/2014 1420 2920 3090   2730 782 4310 3130 2450 1010 2470 613            

11/5/2014 970 2810 2280   869 474 4380 1370 1980 649 1370 607            2/3/2015 1390 3890 5220   1820 954 4390 2440 2610 3430 3590 531            5/5/2015 1008 3247 3338   1149 632 4295 1988 2431 1389 2183 584            

8/19/2015 2290 2470 5230   741 708 4260 2360 2480 2490 2890 734            10/9/2015         1980 1780     2230 3400 2850 593            

11/18/2015 1620 2810 4620   717 609 4620 1890 2240 1810 2330 565            3/23/2016 1620 2330 5600   462 536 4480 2400 1890 1440 2400 510            4/26/2016   2160 3340 3940 417 1030 4000 1130 1540 455   819            6/1/2016   2400 3770 3241 532 508 3340 2050 1660 1290 2140 809            

7/25/2016 1870                     702            9/1/2016 1580 2550 4620 3910 883 757 4580 1380 1860 1770 2590 617            

12/15/2016   3140 4300 4070 888 828 3980 1760 1970 2060 2040 646            2/1/2017 1140                                  

6/29/2017 1640 1860 3240 4210 524 701 3580 1380 1090 930 1870 589            7/19/2017                 1390                  12/6/2017 3830 2140 3930 4390 444 751 3680 1500 1610 1610 3040 547            4/26/2018 2050 1820 2960 4100 447 379 3710 1920 1550 1120 1980 496            

12/12/2018 1160 1680 2440 3080 412 440 4020 1980 1310 1120 1740 496            4/17/2019 1650 1640 2800 3600 451 455 3960 1630 1270 628 1650 609            9/19/2019 5330 2660 3800 4950 659 969 4370 2060 3350 1950 2700 765            

Page 44: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Strontium, dissolved Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                           10.7 8.3 2.11  3/5/2009                       3.62 12.4       14

6/19/2009                             7.07 1.79  6/22/2009                       3.44 10 9.89     12.310/6/2009                       3.68 11.9 10.1 7.29 1.91 12.7

12/22/2009                       8.77 12.3 11 8.03 2.95 14.14/14/2010                       3.89 12.4 10.5 7.55 1.97 13.77/20/2010                               1.87 12.87/21/2010                       3.83 11.4 9.88 6.78    

10/27/2010                       6.94 12.2 12 7.66 2.62 13.71/31/2011                       3.84 11.9 12.9 7.54    4/28/2011                       7.38 12.1 13.4 8.38    7/26/2011                       4.24 11.9 11.4 7.84    11/7/2012   13 13 12 13 10 4.2 6.6 4.7 4.9 1.2            2/28/2013   13 13 13 12 9.8 8.9 9.8 10 9.5 1.2            3/21/2013 0.81                                5/20/2013 0.92 9.1 9.6 12 12 9.8 4.3 3.3 7 5.5 1.2            8/6/2013 1 7.7 13 12 5.2 9.7 3.8 7.1 4.6 2.4 1.2            

11/4/2013 0.94 4.4 12 12 12 9.6 5.8 13 3.7 3.9 1.2            2/10/2014 1.3 2.8 2.7 6 5 7.1 3.6 7.4 2.7 2.8 1.4            5/5/2014 1.8 5.3 14 12 9.6 10 7.6 9.6 4.4 5.6 1.6            8/5/2014 2 4.9 4.4 11 0.48 10 3.5 5.2 1.9 6.3 1.4            

11/5/2014 1.5 3.7 3.5 0.94 1 9.6 2.6 3.1 1.6 1.6 1.4            2/3/2015 1.8 7.4 10 9.1 1.2 9.4 7.6 4.2 5.6 3 1.2            5/5/2015 2 4 11 2.4 1.5 10 4 10 3.4 3.6 1.6            

8/19/2015 3.6 3.62 11.8 1.3 1.91 10 7.88 7.86 6.38 7.09 1.65            11/18/2015 2.67 4.77 9.12 1.26 0.904 9.59 5.72 4.04 4.33 4.41 1.4            

Page 45: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Strontium, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             10.9 8.1 2.11  3/5/2009                         3.58 12.1       14.36/19/2009                               6.82 2.18  6/22/2009                         3.77 11.7 10.2     12.910/6/2009                         3.76 11.7 10.3 7.42 1.87 12.712/22/2009                         21.5 12.4 11.3 7.91 5.89 14.34/14/2010                         3.92 12.2 10.5 7.41 2.01 13.67/20/2010                                 2.28 12.67/21/2010                         3.81 11.3 9.91 6.73    10/27/2010                         4.19 12.3 14.9 10.3 2.68 13.41/31/2011                         6.08 11.7 14.2 7.4    4/28/2011                         4.15 12.1 15.1 7.52    7/26/2011                         5.21 11.9 12.9 7.51    9/19/2011   12.1     11.9 12.4   4.62                    9/20/2011             10   12.5 5.99   1.2            12/29/2011   14 10   13 12   6.6 11     1.4            12/30/2011             11     3.1 3.4              2/27/2012     9.5         8.3                    2/28/2012   14     13 12 9.9   6.3 2.6 5.3 1.2            5/16/2012   11 9.3   9.7 11     5.5     1.2            5/17/2012             8.8 3.6   3.4 6.7              8/7/2012         12             1.2            8/8/2012   14 13     10 9.8 7.6 5.7 4.3 6              11/7/2012   12 12   12 12 9.1 3.8 5.8 4.2 8.2 1.1            2/28/2013   12 14   12 11 9.8 9.4 13 10 7.8 1.2            3/21/2013 0.74                                  5/20/2013 0.87 7.9 4.2   12 12 7.3 4.7 3.6 5.3 5.5 5.8            8/6/2013 1 6.9 14   12 6 9.8 3.4 6.5 4 1.6 1.2            11/4/2013 0.95 4.2 12   10 8.5 9.5 4.5 12 2.7 4.7 1.2            2/10/2014 1.3 2.8 2.8   4.4 2.1 5.2 3.7 7.6 2.9 3 1.4            5/5/2014 1.8 4.9 12   10 7.3 9.9 7.6 8.8 4.4 5.6 1.5            8/5/2014 1.8 4.4 2.8   9.8 0.47 8.7 3.2 4.7 3.1 6.3 1.2            11/5/2014 1.6 4.5 3.2   0.82 0.83 11 3 3.5 1.1 1.8 1.7            2/3/2015 1.8 6.61 12   8.2 1.1 9.6 7.5 4 7.2 2.9 1.2            5/5/2015 1.9 3.9 12   1.2 1.4 10 3.9 8.1 1.9 3.5 1.5            8/19/2015 4.28 4.02 9.73   1.64 1.75 9.77 7.94 10.4 6.65 9.02 1.8            10/9/2015                     6.27              11/18/2015 2.52 4.51 6.59   1.17 0.893 6.97 4.76 3.85 3.95 3.35 1.34            3/23/2016 2.22 3.41 9.71   1.13 0.958 8.31 8.39 3.46 0.959 5.44 1.31            6/1/2016   3.21 3.01 9.64 1.29 0.873 5.21 3.12 2.31 0.812 1.5 1.86            7/25/2016 2.83                                  9/1/2016 2.23 3.39 4.69 6.43 1.72 1.66 6.8 2.32 7.66 1.88 1.75 1.52            

12/15/2016   5.37 4.69 7.33 1.78 0.626 0.626 2.28 3.64 1.83 2.46 1.5            2/1/2017 1.98                                  6/29/2017 2.64 2.8 3.74 7.18 1.14 1.18 6.58 2.54 3.87 2.03 1.85 1.47            12/6/2017 6.26 7.36 4.55 6.63 9.75 6.63 9.79 2.91 5.33 4.39 3.58 1.46            4/26/2018 2.57 2.36 3.71 7.5 0.986 0.414 7.93 3.31 2.75 1.79 2.67 1.28            12/12/2018 1.39 2.37 3.29 7.02 1.06 0.548 9.86 3.96 2.07 1.64 2.29 1.38            4/17/2019 2.15 2.21 3.27 7.55 1.28 0.668 8.92 3.17 2.36 0.655 2.31 1.59            9/19/2019 5.41 3.43 4.08 7.93 1.77 1.32 9 3.25 6.58 3.01 3.78 1.77            

Page 46: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Sulfate, total Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             838.6 901.2 224.7  3/5/2009                         550.7 1824.7       1603.56/19/2009                               1124.9 210.4  6/22/2009                         680.3 676.2 935.7     1790.910/6/2009                         619.2 1932.1 811.8 839.7 211.4 1623.512/22/2009                         1094 1907 904 924 224 17364/14/2010                         675 1819 786 764 204 16587/20/2010                                 233 16517/21/2010                         682 1893 869 826    10/27/2010                         640 1853 1555 916 230 16741/31/2011                         623 1771 1166 866    4/28/2011                         620 1762 1486 919    7/26/2011                         944 1630 1358 877    9/19/2011   1600     1480 1540   558                    9/20/2011             804   1570 924   13.6            12/29/2011   2100 1700   1900 2300   910 1800     17            12/30/2011             840     1500 1200              2/27/2012     1700         1100                    2/28/2012   2400     1900 2200 830   1600 1100 1400 16            5/16/2012   2100 1700   1700 2300     1500     16            5/17/2012             840 410   890 1400              8/7/2012         1700             16            8/8/2012   1900 1800     1800 790 880 1700 990 1400              11/7/2012   2100 1800   1800 2200 920 520 1400 1000 1000 18            2/28/2013   2100 1800   1900 2300 880 1400 1600 1200 870 19            3/21/2013 280                                  5/20/2013 280 1300 660   1700 2300 640 540 400 1000 980 19            8/6/2013 360 1200 1500   1800 2200 800 480 1300 640 300 24            11/4/2013 450 910 1600   1800 1600 830 540 1500 780 820 17            2/10/2014 300 700 450   850 1700 650 570 1400 670 620 130            5/5/2014 780 1000 1800   1700 1500 830 1000 1500 550 820 120            8/5/2014 750 800 690   1600 78 780 500 970 840 530 81            11/5/2014 590 780 420   210 63 2300 180 750 180 150 92            2/3/2015 690 782 710   610 34 760 980 730 1500 500 27            5/5/2015 710 700 1800   86 50 820 470 1600 160 600 120            8/19/2015 1290 307 1460   118 192 894 1020 968 1850 1250 132            10/9/2015                   438   99.1            11/18/2015 1200 743 838   128 120 557 410 883 862 905 59.5            3/23/2016 928 506 1400   64.3 31.8 741 823 583 122 711 45.6            6/1/2016   513 400 1600 53.8 36.6 211 379 546 73.4 315 230            7/25/2016 927                     143            9/1/2016 884 499 694 879 994 159 810 340 1420 275 342 120            

12/15/2016   830 559 718 79 43 434 220 652 283 378 103            2/1/2017 719                                  6/29/2017 841 408 460 765 20.6 48.9 192 281 588 327 310 85.2            12/6/2017 2270 1520 706 844 1470 1520 813 339 753 890 673 98.7            4/26/2018 917 358 501 894 24 19.9 194 355 448 262 467 49.2            12/12/2018 483 308 420 829 24.3 13.6 804 460 354 270 407 65.8            4/17/2019 785 313 454 868 18.4 13.6 162 319 339 70.9 413 125            9/19/2019 2910 419 569 918 84.3 161 387 310 840 340 567 122            

Page 47: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Turbidity, field Results in mg/LDate LEACHATE MW‐1 MW‐10 MW‐11 MW‐2 MW‐3 MW‐4 MW‐5 MW‐6 MW‐7 MW‐8 MW‐9D PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009                             5.86 30.9 4.69  3/5/2009                         11.4 3.15       3.9

6/19/2009                               78.6 4021  6/22/2009                         2461 67.2 321     90.510/6/2009                         2018 127 382 84.7 2109 137

12/22/2009                         1366 251 73.2 786 2789 105.34/14/2010                         2107 201 111 284 2663 164.37/21/2010                         40.1 14.8 24.4 20.1 1304 26.5

10/27/2010                         1843 97.1 87.2 138 957 39.61/31/2011                         1664 97.1 70 104    4/28/2011                         737 39.7 46.8 186    7/26/2011                         824 64.3 82.7 147    9/19/2011   2.63     5.01 3.84   1.44                    9/20/2011             3.81   16.6 3.43   6.01            

12/29/2011   4.51 5.5   3.31 1.9   2.89 2.75     3.26            12/30/2011             1.67     3.25 1.72              2/28/2012   4.24 2.33   2.73 3.07 2.51 4.13 4.38 4.62 36.8 3.11            5/16/2012   6.38 5.85   3.52 13     5.97     3.36            5/17/2012             19.9 3.92   6250 319              8/7/2012         3.37 6.64 4.48     2.88 10.7 2.96            8/8/2012   7.27 34.7         2.99 3.16                  

11/7/2012   4.18 3.73   6.25 3.87 21.6 3.27 4.89 16.7 9.42 3.26            2/28/2013   30.7 181   117 399 1000 39.8 67.8 1000 370 13.6            5/20/2013 66.1 395 62   157 391 1000 41.4 59.8 409 3334 86.6            8/6/2013 85.4 226 85.3   136 103 859 46.5 70.6 368 158 306            

11/4/2013 59.5 196 171   171 115 1000 79 155 1000 442 108            2/10/2014 14.5 59.5 55   72.9 50.6 646 38.6 83.9 199 36.9 48.3            5/5/2014 25.4 35.8 39   191 19.6 452 21.9 78.6 315 171 5.7            8/5/2014 25 29.3 62.1   86.6 62.2 822 55.5 86.1 357 187 19.2            

11/5/2014 27.1 56.7 39.9   164 54.1 1000 61.2 38.2 81 67.7 53.2            2/3/2015 16.6 283 84.9   113 62.3 734 63.5 73.3 672 266 51.9            5/5/2015 29.7 107 52.7   158 41.9 821 54.7 43.7 184 153 43.1            

8/19/2015 137 72.3 88.3   69.8 137 243 135 132 1000 209 178            10/9/2015         208 115     104 606 406 74.9            

11/18/2015 87 125 144   133 124 770 121 124 337 469 92            3/23/2016 130 292 247   200 167 1000 220 188 485 271 184            4/26/2016   86.5 57.2 247 55.1 58.4 75.4 60.2 46.4 53.8   69            6/1/2016   118 323 327 129 78.2 146 282 79.6 369 320 173            

7/25/2016 130   13.6                              9/1/2016 127 108 41.6 76.6 178 83.2 630 112 110 60.3 145 128            

12/15/2016   123 102 616 140 106 246 96.3 99.2 123 140 82.1            2/1/2017 75.2                                  

6/29/2017 39.9 76.4 115 581 126 152 153 101 49.8 112 181 46.5            7/19/2017                 51.2                  12/6/2017 20.5 54.8 54.5 310 64.1 116 132 50.8 36.1 33.3 63.9 63.8            4/26/2018 33.3 64.3 32.2 197 36.2 108 136 102 60.4 32 17 50.6            

12/12/2018 30.1 37.6 34.6 137 44.8 102 94.3 61.4 36.4 45 31.7 60.9            4/17/2019 37.4 13.8 47 61.3 49.3 99.2 108 37.9 20.6 127 37.5 35.1            9/19/2019 58.3 14.3 3.3 418 18.4 53.4 17.1 0 0 10.2 47.1 40.2            

Page 48: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Turbidity Results in NTUDate PZ‐1I PZ‐2I PZ‐3I PZ‐4I PZ‐5I PZ‐6I

3/4/2009     4 4 21  3/5/2009 14 4       32

6/19/2009       1627 4254  6/22/2009 308 5 <1     11210/6/2009 82 4 4 29 22 54

12/22/2009 17 27 20 17 15 184/14/2010 90.3 2.45 16.3 16.7 74.4 1017/20/2010         1 17/21/2010 <1 1 1 <1    

10/27/2010 5 4 27 7 29 61/31/2011 240 15 69 74    4/28/2011 1 1 <1 <1    7/26/2011 346 120 309 26    

Page 49: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 2

Monitoring Well Time Series Graphs

Page 50: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−1

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Turk − Arsenic MCL 0.01

● ●●●● ● ●●●● ●● ● ●

● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−2

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

● ●●●

● ● ●●●

●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−3

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL● ●●●

●● ●●

●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−4

Sample Date

Ars

enic

mg/

L●

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

● ●●●●● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−5

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL● ●●●●

● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−6

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Page 51: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●●● ●

●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−7

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Turk − Arsenic MCL 0.01

●●●●

●●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−8

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

●●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−9D

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL●

●●●

● ●●●●

●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−10

Sample Date

Ars

enic

mg/

L●

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

MW−11

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL●●●

●●

●● ●

● ● ● ● ● ●● ● ● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

LEACHATE

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Page 52: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−1I

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Turk − Arsenic MCL 0.01

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−2I

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−3I

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL●

● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−4I

Sample Date

Ars

enic

mg/

L●

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−5I

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

050

0.10

00.

150

0.20

00.

250

PZ−6I

Sample Date

Ars

enic

mg/

L

Arsenic, total non−detectArsenic, total detectArsenic, dissolved non−detectArsenic, dissolved detect

MCL

Page 53: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−1

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Turk − Barium MCL 2

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ●●●

● ●● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−2

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ●●●●

● ●● ● ● ●●

●● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−3

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ●●●● ●●

●●

●●●

●●

● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−4

Sample Date

Bar

ium

mg/

L●

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−5

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−6

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Page 54: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ●●● ● ●●● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−7

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Turk − Barium MCL 2

●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−8

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−9D

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−10

Sample Date

Bar

ium

mg/

L●

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

MW−11

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

●●●● ●● ● ●● ●●

● ●●● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

LEACHATE

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Page 55: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●● ●

● ●● ●●●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−1I

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Turk − Barium MCL 2

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−2I

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−3I

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−4I

Sample Date

Bar

ium

mg/

L●

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−5I

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

0.8

1.6

2.4

3.2

4.0

PZ−6I

Sample Date

Bar

ium

mg/

L

Barium, total non−detectBarium, total detectBarium, dissolved non−detectBarium, dissolved detect

MCL

Page 56: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●● ●

●●

● ●●

●● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−1

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Turk − Boron

●●

●●

● ●

● ●● ● ● ●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−2

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●● ● ●●

● ●● ● ●

● ●● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−3

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

● ●●●● ●

●●

●● ●●

● ●

●● ●

● ●

●●

● ●

●●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−4

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●●

● ●

●● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−5

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●●●

●●●

●● ●

●●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−6

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Page 57: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●●● ●

●●

●●

● ●● ●

● ●● ● ●

●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−7

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Turk − Boron

●●●

● ●

●● ●

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−8

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

● ●●●● ●●

●●

●●

● ●● ● ●●● ●

●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−9D

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●●

●●

● ●

● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−10

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●●

● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

MW−11

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●●

●●●

●●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

LEACHATE

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Page 58: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−1I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Turk − Boron

● ●● ●

●●

●●●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−2I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

● ● ●●

● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−3I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●● ●

●● ●

●●●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−4I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

● ● ●

● ●●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−5I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

●● ●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.44

0.88

1.32

1.76

2.20

PZ−6I

Sample Date

Bor

onm

g/L

Boron, total non−detectBoron, total detectBoron, dissolved non−detectBoron, dissolved detect

Page 59: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−1

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Turk − Cadmium MCL 0.005

● ●●●●

●●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−2

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ●●●●

●●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−3

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ●●●●

●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−4

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ●●●● ● ●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−5

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ●●●●

●●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−6

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Page 60: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●●

●●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−7

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Turk − Cadmium MCL 0.005

●●●●

●●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−8

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ●●●● ● ●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−9D

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

●●●● ● ●●

●●●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−10

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

MW−11

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

●●●●

●●●

●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

LEACHATE

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Page 61: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−1I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Turk − Cadmium MCL 0.005

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−2I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−3I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−4I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ● ●

● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−5I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0024

0.00

480.

0072

PZ−6I

Sample Date

Cad

miu

mm

g/L

Cadmium,total non−detectCadmium,total detectCadmium, dissolved non−detectCadmium, dissolved detect

MCL

Page 62: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●

●●

●●

●●

●●

● ●●

●● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00MW−1

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Turk − Chloride

● ●●●● ● ●●●●

● ●●●

● ● ● ●● ●●

●●

● ● ● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−2

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●●

●●

●●

● ●● ● ● ● ●● ● ● ●

● ● ● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−3

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

● ●●●● ● ●

●●

● ●

● ● ●

●●

●● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−4

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●● ●

●● ●

●● ●

● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−5

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●

●● ●

●●

●●

●●

●●

●● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−6

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Page 63: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●

●●

●●

●●● ●

●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00MW−7

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Turk − Chloride

●●

● ●

●●

● ●

● ● ●●

●● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−8

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−9D

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●●

●●

●●

●●

● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−10

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●

●● ● ● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

MW−11

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●●● ●● ● ●● ●

●● ● ●● ● ●

●● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

LEACHATE

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Page 64: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●● ●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00PZ−1I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Turk − Chloride

●●

● ●

●●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

PZ−2I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

●●

●●

●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

PZ−3I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

● ●

●●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

PZ−4I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

● ● ●● ●● ●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

PZ−5I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

● ● ●●

2010 2012 2014 2016 2018 2020

028

056

084

011

2014

00

PZ−6I

Sample Date

Chl

orid

em

g/L

Chloride, total non−detectChloride, total detect

Page 65: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ●●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−1

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Turk − Chromium MCL 0.1

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−2

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−3

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ●●●● ● ●●

●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−4

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−5

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−6

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Page 66: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−7

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Turk − Chromium MCL 0.1

●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−8

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−9D

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−10

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

MW−11

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

●●●● ●● ● ●● ● ● ● ● ●● ● ● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

LEACHATE

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Page 67: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ●●

●●●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−1I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Turk − Chromium MCL 0.1

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−2I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ● ●●

● ●● ●●●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−3I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

●● ●

●● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−4I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−5I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.28

0.56

0.84

1.12

1.40

PZ−6I

Sample Date

Chr

omiu

mm

g/L

Chromium, total non−detectChromium, total detectChromium, dissolved non−detectChromium, dissolved detect

MCL

Page 68: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●●● ●

●●

● ● ●●

●●● ●

● ●

●● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−1

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Turk − Fluoride MCL 4

● ●●●● ● ●●●●

● ●

● ●●

●●

● ●●

● ●● ●

● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−2

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ●●●● ● ●●

●●

●●

●● ● ●

●● ●

● ● ●● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−3

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ●●●● ●●

●● ●● ● ●● ● ●

●●

●●

● ●

●●

●● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−4

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ●●●

● ●●

●●● ●● ●●

● ● ● ●●●● ●

●● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−5

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●●●

●●

●●●

●●●

●●

● ●

●●

●●

● ●●

●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−6

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Page 69: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●●

●●●

● ●● ●●

● ● ● ●●● ●

●● ●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−7

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Turk − Fluoride MCL 4

●●●●

●●

●●

●● ●● ●

● ●●

● ●

● ●

● ● ●● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−8

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●●●●● ●

●●●●

●● ● ●● ● ● ● ●● ●

● ●●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−9D

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●●●● ● ●●●●

●● ● ●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−10

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ●●

● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

MW−11

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●●●● ●●

●● ●

● ●

●●

●●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

LEACHATE

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Page 70: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−1I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Turk − Fluoride MCL 4

● ● ●● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−2I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ● ●● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−3I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●● ● ● ● ●●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−4I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−5I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

0.90

1.80

2.70

3.60

4.50

PZ−6I

Sample Date

Flu

orid

em

g/L

Fluoride, total non−detectFluoride, total detectMCL

Page 71: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−1

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Turk − Iron

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−2

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−3

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ●●●● ● ●●

●● ●● ●●

● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−4

Sample Date

Iron

mg/

L●

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ●●● ●●● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−5

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ●●●● ● ●●●● ●● ● ●● ●●●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−6

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Page 72: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−7

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Turk − Iron

●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−8

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−9D

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−10

Sample Date

Iron

mg/

L●

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

MW−11

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

●●●● ●● ● ●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

LEACHATE

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Page 73: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●● ●

● ●● ●●●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−1I

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Turk − Iron

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−2I

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ● ●●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−3I

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ● ●●● ● ● ●●●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−4I

Sample Date

Iron

mg/

L●

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−5I

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

080

240

400

560

720

PZ−6I

Sample Date

Iron

mg/

L

Iron, total non−detectIron, total detectIron, dissolved non−detectIron, dissolved detect

Page 74: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−1

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Turk − Lead MCL 0.015

● ●●●● ● ●●●● ●● ● ●●

● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−2

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−3

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL● ●●●● ●

●● ●●● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−4

Sample Date

Lead

mg/

L●

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−5

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−6

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Page 75: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ●●

●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−7

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Turk − Lead MCL 0.015

●●●

● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−8

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−9D

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL●●●● ● ●●●● ●● ● ●● ● ● ● ●●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−10

Sample Date

Lead

mg/

L●

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

MW−11

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL●●●● ●● ● ●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

LEACHATE

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Page 76: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−1I

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Turk − Lead MCL 0.015

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−2I

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−3I

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−4I

Sample Date

Lead

mg/

L●

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−5I

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

090

0.18

00.

270

0.36

00.

450

PZ−6I

Sample Date

Lead

mg/

L

Lead, total non−detectLead, total detectLead, dissolved non−detectLead, dissolved detect

MCL

Page 77: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●●● ●●●● ●●●●●● ●● ●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−1

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Turk − Manganese

●●

●●●

● ●●●

●●●

●●● ●● ●●● ● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−2

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ●●●●● ●●●● ●●●●●● ●● ●●● ● ●

●●● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−3

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

●●●●●●

●●

● ●●●●

●● ●● ●

●● ● ● ● ●●

● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−4

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ●●●●● ●●●● ●●●●

●● ●● ●●● ●●

●●

●●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−5

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ●●●●● ●●●● ●●●●●● ●● ●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−6

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Page 78: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●●●●

●●● ●●●●●● ●● ●●● ● ●●

● ● ●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−7

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Turk − Manganese

●●●●● ●●●● ●●●●●● ●● ●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−8

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ●●●●● ●●●

● ●●●●●●●

● ●●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−9D

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

●●●●● ●●●● ●●●●●● ●● ●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−10

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−11

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

●●●● ●

●●●●●

●●

● ●●

● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

LEACHATE

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Page 79: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●● ●

● ●● ●●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−1I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Turk − Manganese

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−2I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−3I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ●

●●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−4I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−5I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−6I

Sample Date

Man

gane

sem

g/L

Manganese, total non−detectManganese, total detectManganese, dissolved non−detectManganese, dissolved detect

Page 80: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−1

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Turk − Mercury MCL 0.002

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−2

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−3

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−4

Sample Date

Mer

cury

mg/

L●

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−5

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−6

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Page 81: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−7

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Turk − Mercury MCL 0.002

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−8

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−9D

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

●●● ● ●●●●

●●● ●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−10

Sample Date

Mer

cury

mg/

L●

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

MW−11

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

●●●

●●●

● ●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

LEACHATE

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Page 82: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−1I

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Turk − Mercury MCL 0.002

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−2I

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−3I

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−4I

Sample Date

Mer

cury

mg/

L●

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

●●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−5I

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000

0.00

066

0.00

132

0.00

198

PZ−6I

Sample Date

Mer

cury

mg/

L

Mercury, total non−detectMercury, total detectHg, diss non−detectHg, diss detect

MCL

Page 83: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●●●●

●● ●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−1

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Turk − Molybdenum

●●

●●● ●

●● ●

●● ●

● ●● ● ● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−2

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

● ●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−3

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●

●●● ●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−4

Sample Date

Mol

ybde

num

mg/

L●

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●

●●

●●● ●●●

●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−5

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●

●●

●●● ●●

●●● ● ● ● ●● ● ● ● ● ●

●● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−6

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Page 84: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●

●●

●●● ●●● ●

● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−7

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Turk − Molybdenum

●●

●●

●●

● ●●

●●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−8

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●●● ●●

●●● ●●●

●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−9D

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●

●●

●●● ●●

●● ● ● ● ●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−10

Sample Date

Mol

ybde

num

mg/

L●

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

MW−11

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●●

●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

LEACHATE

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Page 85: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−1I

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Turk − Molybdenum

● ● ●● ● ● ●

●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−2I

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

● ● ●● ● ●

●●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−3I

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

● ●●

● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−4I

Sample Date

Mol

ybde

num

mg/

L●

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

●● ●

● ●●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−5I

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

● ● ●●

● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

044

0.08

80.

132

0.17

60.

220

PZ−6I

Sample Date

Mol

ybde

num

mg/

L

Molybdenum, total non−detectMolybdenum, total detectMolybdenum, dissolved non−detectMolybdenum, dissolved detect

Page 86: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●

●●

●●

● ● ●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−1

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Turk − pH

●●

●●

●●

●●

● ●

●●

●●

●●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−2

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●

●●●

●●

●●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−3

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●

●●

●●

●●

●●●●

●●

● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−4

Sample Date

pH pH●

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●

●●

●●

●●

●●

● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−5

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●●

●●

● ●

●●●

●●●

● ●

● ●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−6

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Page 87: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ●

●●

● ● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−7

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Turk − pH

●●●

● ●

●●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−8

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●

●●

●●

●●

●●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−9D

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●●

●●●

●●

●●●

●●

●● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−10

Sample Date

pH pH●

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

● ●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

MW−11

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

●● ●●

●●

● ● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

LEACHATE

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Page 88: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−1I

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Turk − pH

●● ●

● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−2I

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

● ●●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−3I

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

● ●● ● ●

●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−4I

Sample Date

pH pH●

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

● ●

● ●

● ●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−5I

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

● ●

● ●●

2010 2012 2014 2016 2018 2020

5.5

6.3

7.1

7.9

8.7

9.5

PZ−6I

Sample Date

pH pH

pH (field) non−detectpH (field) detectpH (lab) non−detectpH (lab) detect

Page 89: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●● ●

●● ●

●● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−1

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Turk − Selenium MCL 0.05

●●●●●

●●●● ●● ●

● ● ● ● ●● ● ●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−2

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●

●● ● ● ● ●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−3

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●

●●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−4

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●

●●●

●●

● ●●

● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−5

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●● ●

●●

●●●

●●

●● ●

● ●●

● ●●

●● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−6

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Page 90: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●

●●●

●●

●● ● ● ● ●● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−7

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Turk − Selenium MCL 0.05

●●

●●

●●

●●● ●

●●

● ●● ●

●● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−8

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ●●●● ● ●●●● ●● ●●

● ● ● ● ●● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−9D

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●

●● ● ●

●● ●

●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−10

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ●●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

MW−11

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

●●

●●

●●

● ●

●●●

●●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

LEACHATE

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Page 91: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ● ●

●●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−1I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Turk − Selenium MCL 0.05

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−2I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ● ●● ● ● ●●

●●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−3I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−4I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ●

● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−5I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

00.

014

0.02

80.

042

0.05

60.

070

PZ−6I

Sample Date

Sel

eniu

mm

g/L

Selenium, total non−detectSelenium, total detectSelenium, dissolved non−detectSelenium, dissolved detect

MCL

Page 92: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●●

●● ●●

●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−1

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Turk − Silver

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−2

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−3

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−4

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●

● ●●●●

●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−5

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−6

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Page 93: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●● ● ●●●●

●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−7

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Turk − Silver

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−8

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●● ● ●●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−9D

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●

●● ●

●●●●

●● ● ● ● ●● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−10

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

● ●

● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

MW−11

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

●●●

●●●

●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

LEACHATE

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Page 94: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−1I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Turk − Silver

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−2I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−3I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

● ● ●● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−4I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−5I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

0.00

000.

0033

0.00

660.

0099

PZ−6I

Sample Date

Silv

erm

g/L

Silver, total non−detectSilver, total detectSilver, dissolved non−detectSilver, dissolved detect

Page 95: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ● ●

●●

● ●

●●●

●●

●● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00MW−1

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Turk − Specific Conductance

● ●●

●● ●

●●●

● ●

●●●

● ●

● ● ● ● ●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−2

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●● ●

● ●

● ●

●● ●

● ●

● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−3

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

● ●

● ●

●●

●●

● ●● ● ●

●●

● ● ●

● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−4

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm●

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

● ●

●●

● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−5

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●●

●●

●●

●● ●

●●

●●

● ●

●● ●

● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−6

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Page 96: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00MW−7

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Turk − Specific Conductance

●●

●●

●●

● ●●

●●

●● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−8

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

● ●●●● ● ●●

●●●● ● ●● ●

●●● ●

●●●● ● ● ● ● ● ●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−9D

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

● ●

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−10

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm●

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−11

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●●

●●

● ●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

LEACHATE

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Page 97: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00PZ−1I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Turk − Specific Conductance

●● ●

●●

● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−2I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●● ●

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−3I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

● ●

● ●● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−4I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm●

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●●

●● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−5I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

●●

●●

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−6I

Sample Date

Spe

cific

Con

duct

ance

mic

rom

hos/

cm

Specific Conductance @ 25 non−detectSpecific Conductance @ 25 detectSpecific Cond. (lab) non−detectSpecific Cond. (lab) detect

Page 98: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ●

●● ●

● ●●

●● ●

● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−1

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Turk − Strontium

●●

● ● ●●●

● ●

●●

● ●●● ●

● ● ●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−2

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●●

●●● ● ●

● ●●●

●●

● ● ●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−3

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●

●●

●● ●

● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−4

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●

● ●

●● ● ●

●●

●● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−5

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●● ●

●●

●●

● ●

●● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−6

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Page 99: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ●

● ●

●●

● ● ●

● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−7

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Turk − Strontium

●●

●●

●●

●●

● ●●

●● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−8

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

● ●●●● ● ●

●● ●● ●●

● ● ●● ●

● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−9D

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●●

●●

● ●

● ●

●●

●● ●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−10

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

● ●●

●●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

MW−11

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●●● ●● ● ●● ●

● ●●● ●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

LEACHATE

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Page 100: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ●

● ●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−1I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Turk − Strontium

●● ●

● ●

●●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−2I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●● ●

●●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−3I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

●●

●●

●●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−4I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

● ● ●

● ●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−5I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

● ●

●●

●●

2010 2012 2014 2016 2018 2020

0.0

4.4

8.8

13.2

17.6

22.0

PZ−6I

Sample Date

Str

ontiu

mm

g/L

Strontium, total non−detectStrontium, total detectStrontium, dissolved non−detectStrontium, dissolved detect

Page 101: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●

●●

● ●●●

●● ●

●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00MW−1

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Turk − Sulfate

●●

●●●

●●●

●●

● ● ●●●

●●

● ● ●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−2

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●

●●●

●●

● ●● ●

●●

●●

●● ●

● ● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−3

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

● ●●●●

● ●

●●

●●

●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−4

Sample Date

Sul

fate

mg/

L●

Sulfate, total non−detectSulfate, total detect

●●

● ●

● ●●

●● ●

● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−5

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●

●●

●●

●●

●●

●●

●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−6

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Page 102: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●● ●

●●

●●

● ● ●

● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00MW−7

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Turk − Sulfate

●●●

●●

●●

● ● ●●

●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−8

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

● ●●●● ● ●●●●●● ● ●

●● ●●● ●

●●● ● ● ●

● ●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−9D

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●●● ● ●

●●

●●

●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−10

Sample Date

Sul

fate

mg/

L●

Sulfate, total non−detectSulfate, total detect

● ●●

●● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

MW−11

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●●

● ●

●● ●

●●

● ●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

LEACHATE

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Page 103: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

● ● ● ●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00PZ−1I

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Turk − Sulfate

●●●

● ●●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

PZ−2I

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●

●●

●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

PZ−3I

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●

●●

●●

●●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

PZ−4I

Sample Date

Sul

fate

mg/

L●

Sulfate, total non−detectSulfate, total detect

● ● ●● ● ● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

PZ−5I

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

●●

● ● ●

2010 2012 2014 2016 2018 2020

060

012

0018

0024

0030

00

PZ−6I

Sample Date

Sul

fate

mg/

L

Sulfate, total non−detectSulfate, total detect

Page 104: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●

●●

●●

●● ●

●●

●●●

● ● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00MW−1

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Turk − TDS

● ●●

●●● ●●

● ● ●●●

● ●●

● ● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−2

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●

●●

●●

● ●● ●●

● ●●

● ●

● ● ●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−3

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●●

●●

●●

●●

●●

● ●

●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−4

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●

●●● ●

●●

●● ● ●

● ● ● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−5

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●

●●●

●●

●●

●●●

●●●

● ●

●● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−6

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Page 105: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●

●●● ●

●●

● ●

●●

●●

● ● ●

● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00MW−7

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Turk − TDS

●●●

●●

● ●

●● ●

●● ●

●●

●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−8

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

● ●●●● ● ●●●●●● ● ●●

● ●●● ●●●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−9D

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●

●●

● ●

● ●● ●

● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−10

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●

● ●●

●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

MW−11

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●●●●●

● ●●

● ●

●●●

●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

LEACHATE

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Page 106: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ● ● ●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00PZ−1I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Turk − TDS

● ●●

● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

PZ−2I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

●● ●

● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

PZ−3I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

● ● ●● ●

●●

●●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

PZ−4I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

● ● ●●

● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

PZ−5I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

● ● ●●

● ● ●

2010 2012 2014 2016 2018 2020

018

0036

0054

0072

0090

00

PZ−6I

Sample Date

TD

Sm

g/L

Solids, total dissolved non−detectSolids, total dissolved detect

Page 107: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●●● ● ●

●●●

●● ● ●●

● ● ●●●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00MW−1

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Turk − Turbidity

● ●●●● ● ●●●● ●● ● ●● ● ●

●● ●●●

● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−2

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●●●● ●

●●

●● ●● ● ●● ● ●●● ●●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−3

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●●●● ●

●●●

●●

●●

● ●

●●

●●

● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−4

Sample Date

Turb

idity

NT

U●

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●●●● ● ●●●● ●● ● ●● ● ● ● ●●●

● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−5

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●●●● ● ●●●● ●● ● ●● ● ●●● ●●● ● ● ●● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−6

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Page 108: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

● ●●

● ●

●●

●● ●

●●

● ● ● ● ● ● ●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00MW−7

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Turk − Turbidity

●●●

● ●

●● ●

●● ● ●

●●●●

● ● ●● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−8

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●●●● ● ●●●

● ●● ● ●● ●●●● ●

●● ● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−9D

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

●●●● ●●

●●●●● ● ●● ● ● ● ●

●●

●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−10

Sample Date

Turb

idity

NT

U●

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

●●●

● ●● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

MW−11

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

●●● ●● ● ●● ● ● ● ● ●● ● ● ● ● ● ● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

LEACHATE

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Page 109: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

●●

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00PZ−1I

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Turk − Turbidity

● ● ●● ●

● ● ●●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−2I

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ●

● ● ● ● ●●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−3I

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ● ●

●●

● ●●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−4I

Sample Date

Turb

idity

NT

U●

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

●●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−5I

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

● ● ●● ●● ●

2010 2012 2014 2016 2018 2020

014

0028

0042

0056

0070

00

PZ−6I

Sample Date

Turb

idity

NT

U

Turbidity, field non−detectTurbidity, field detectTurbidity non−detectTurbidity detect

Page 110: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 3

Monitoring Well Field Reports

Page 111: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 112: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 113: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 114: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 115: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 116: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 117: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 118: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 119: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 120: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 121: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 122: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 123: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 124: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 125: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 126: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 4

Monitoring Well Laboratory Reports

Page 127: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ANALYTICAL REPORTOctober 01 , 2019

American Electric Power - AR

Sample Delivery Group: L1141991

Samples Received: 09/21/2019

Project Number:

Description: Turk

Report To: Mr. Terry Wehling

502 N. Allen Ave.

Shreveport, LA 71101

Entire Report Reviewed By:

October 01 , 2019

[Preliminary Report]

Craig CothronPro ject Manager

Results relate only to the items tested or calibrated and are reported as rounded values. This test report shall not be reproduced, except in full, without written approval of the laboratory. Where applicable, sampling conducted by Pace Analytical National is performed per guidance provided in laboratory standard operating procedures ENV-SOP-MTJL-0067 and ENV-SOP-MTJL-0068. Where sampling conducted by the customer, results relate to the accuracy of the information provided, and as the samples are received.

12065 Lebanon Rd Mount Jul iet , TN 37122 615-758-5858 800-767-5859 www.pacenational .com

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 1 of 55

October 02, 2019

Craig CothronPro ject Manager

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 1 of 55

Page 128: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.TABLE OF CONTENTS

Cp: Cover Page 1

Tc: Table of Contents 2

Ss: Sample Summary 3

Cn: Case Narrative 7

Sr: Sample Results 8

MW-1 L1141991-01 8

MW-2 L1141991-02 10

MW-3 L1141991-03 12

MW-4 L1141991-04 14

MW-5 L1141991-05 16

MW-6 L1141991-06 18

MW-7 L1141991-07 20

MW-8 L1141991-08 22

MW-9 L1141991-09 24

MW-10 L1141991-10 26

MW-11 L1141991-11 28

LEACHATE POND L1141991-12 30

DUPLICATE L1141991-13 32

EQUIPMENT BLANK L1141991-14 34

Qc: Quality Control Summary 36

Gravimetric Analysis by Method 2540 C-2011 36

Gravimetric Analysis by Method 2540 D-2011 38

Wet Chemistry by Method 2310 B-2011 39

Wet Chemistry by Method 2320 B-2011 40

Wet Chemistry by Method 9056A 41

Mercury by Method 7470A 47

Metals (ICP) by Method 6010B 49

Metals (ICPMS) by Method 6020 50

Gl: Glossary of Terms 52

Al: Accreditations & Locations 53

Sc: Sample Chain of Custody 54

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 2 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 2 of 55

Page 129: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE SUMMARY

Collected by Collected date/time Received date/time

MW-1 L1141991-01 GW KM / MH 09/19/19 09:55 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 10/01/19 00:24 10/01/19 00:24 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350430 1 09/23/19 21:05 09/23/19 21:05 LDC Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350430 10 09/23/19 21:22 09/23/19 21:22 LDC Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 21:50 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 20:39 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:32 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-2 L1141991-02 GW KM / MH 09/19/19 13:20 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 21:23 09/30/19 21:23 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350430 1 09/23/19 21:38 09/23/19 21:38 LDC Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 21:52 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 20:49 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:35 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-3 L1141991-03 GW KM / MH 09/19/19 13:45 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 21:33 09/30/19 21:33 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350430 1 09/23/19 22:44 09/23/19 22:44 LDC Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350430 5 09/23/19 23:00 09/23/19 23:00 LDC Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 21:54 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 20:51 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:39 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-4 L1141991-04 GW KM / MH 09/19/19 12:45 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 10/01/19 00:39 10/01/19 00:39 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 1 09/23/19 19:43 09/23/19 19:43 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 20 09/23/19 20:00 09/23/19 20:00 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 21:56 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 20:54 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:49 JPD Mt. Juliet, TN

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 3 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 3 of 55

Page 130: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE SUMMARY

Collected by Collected date/time Received date/time

MW-5 L1141991-05 GW KM / MH 09/19/19 11:45 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 10/01/19 00:46 10/01/19 00:46 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 1 09/23/19 20:16 09/23/19 20:16 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 5 09/23/19 20:32 09/23/19 20:32 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 21:58 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:02 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:52 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-6 L1141991-06 GW KM / MH 09/19/19 10:50 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 21:59 09/30/19 21:59 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 1 09/23/19 20:49 09/23/19 20:49 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 10 09/24/19 01:50 09/24/19 01:50 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350431 5 09/23/19 21:05 09/23/19 21:05 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 22:00 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:05 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:55 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-7 L1141991-07 GW KM / MH 09/19/19 11:28 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:06 09/30/19 22:06 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 15:28 09/23/19 15:28 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 5 09/23/19 15:42 09/23/19 15:42 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 22:02 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:07 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 13:58 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-8 L1141991-08 GW KM / MH 09/19/19 10:39 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:14 09/30/19 22:14 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 15:57 09/23/19 15:57 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 10 09/23/19 16:12 09/23/19 16:12 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 22:04 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:10 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 14:02 JPD Mt. Juliet, TN

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 4 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 4 of 55

Page 131: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE SUMMARY

Collected by Collected date/time Received date/time

MW-9 L1141991-09 GW KM / MH 09/19/19 08:57 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350119 1 09/24/19 10:30 09/24/19 11:12 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:30 09/30/19 22:30 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 16:27 09/23/19 16:27 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 5 09/24/19 00:14 09/24/19 00:14 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350286 1 09/24/19 15:13 09/24/19 22:10 TCT Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:13 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 14:05 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-10 L1141991-10 GW KM / MH 09/19/19 12:23 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350120 1 09/24/19 11:29 09/24/19 12:26 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:38 09/30/19 22:38 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 17:57 09/23/19 17:57 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 10 09/23/19 18:12 09/23/19 18:12 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350287 1 09/23/19 21:00 09/25/19 10:11 ABL Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:15 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351139 1 09/25/19 10:25 09/26/19 14:08 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

MW-11 L1141991-11 GW KM / MH 09/19/19 13:08 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350120 1 09/24/19 11:29 09/24/19 12:26 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:45 09/30/19 22:45 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 18:26 09/23/19 18:26 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 20 09/23/19 18:41 09/23/19 18:41 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350287 1 09/23/19 21:00 09/25/19 10:16 ABL Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:18 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351137 1 09/24/19 16:35 09/25/19 13:41 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

LEACHATE POND L1141991-12 GW KM / MH 09/19/19 13:20 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350120 1 09/24/19 11:29 09/24/19 12:26 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 22:52 09/30/19 22:52 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 18:56 09/23/19 18:56 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 100 09/23/19 19:11 09/23/19 19:11 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350287 1 09/23/19 21:00 09/25/19 10:18 ABL Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:21 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351137 1 09/24/19 16:35 09/25/19 13:44 JPD Mt. Juliet, TN

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 5 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 5 of 55

Page 132: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE SUMMARY

Collected by Collected date/time Received date/time

DUPLICATE L1141991-13 GW KM / MH 09/19/19 11:28 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350120 1 09/24/19 11:29 09/24/19 12:26 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 23:02 09/30/19 23:02 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 19:26 09/23/19 19:26 ST Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 10 09/23/19 19:41 09/23/19 19:41 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350287 1 09/23/19 21:00 09/25/19 10:20 ABL Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:24 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351137 1 09/24/19 16:35 09/25/19 13:48 JPD Mt. Juliet, TN

Collected by Collected date/time Received date/time

EQUIPMENT BLANK L1141991-14 GW KM / MH 09/19/19 13:40 09/21/19 08:45

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Gravimetric Analysis by Method 2540 C-2011 WG1350120 1 09/24/19 11:29 09/24/19 12:26 TH Mt. Juliet, TN

Gravimetric Analysis by Method 2540 D-2011 WG1351144 1 09/24/19 13:01 09/24/19 13:59 TH Mt. Juliet, TN

Wet Chemistry by Method 2310 B-2011 WG1354542 1 10/01/19 10:18 10/01/19 10:18 MCG Mt. Juliet, TN

Wet Chemistry by Method 2320 B-2011 WG1353734 1 09/30/19 23:09 09/30/19 23:09 GB Mt. Juliet, TN

Wet Chemistry by Method 9056A WG1350604 1 09/23/19 19:56 09/23/19 19:56 ST Mt. Juliet, TN

Mercury by Method 7470A WG1350287 1 09/23/19 21:00 09/25/19 10:22 ABL Mt. Juliet, TN

Metals (ICP) by Method 6010B WG1351135 1 09/24/19 17:14 09/24/19 21:26 EL Mt. Juliet, TN

Metals (ICPMS) by Method 6020 WG1351137 1 09/24/19 16:35 09/25/19 13:51 JPD Mt. Juliet, TN

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 6 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 6 of 55

Page 133: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.CASE NARRATIVE

All sample aliquots were received at the correct temperature, in the proper containers, with the appropriate preservatives, and within method specified holding times, unless qualified or notated withinthe report. Where applicable, all MDL (LOD) and RDL (LOQ) values reported for environmental sampleshave been corrected for the dilution factor used in the analysis. All Method and Batch Quality Control are within established criteria except where addressed in this case narrative, a non-conformance form or properly qualified within the sample results. By my digital signature below, I affirm to the best of my knowledge, all problems/anomalies observed by the laboratory as having the potential to affect the quality of the data have been identified by the laboratory, and no information or data have been knowingly withheld that would affect the quality of the data.

[Preliminary Report]

Craig CothronPro jec t Manager

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 7 of 55

Craig CothronPro jec t Manager

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 7 of 55

Page 134: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 01L 1 1 4 1 9 9 1

MW-1C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 0 9 : 5 5

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 1330 25.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-01 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 463 20.0 1 10/01/2019 00:24 WG1353734

Sample Narrative:

L1141991-01 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 209 10.0 10 09/23/2019 21:22 WG1350430

Fluoride 1.10 0.100 1 09/23/2019 21:05 WG1350430

Sulfate 419 50.0 10 09/23/2019 21:22 WG1350430

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 21:50 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0237 0.00500 1 09/24/2019 20:39 WG1351135

Boron ND 0.200 1 09/24/2019 20:39 WG1351135

Calcium 221 V 1.00 1 09/24/2019 20:39 WG1351135

Iron 0.252 0.100 1 09/24/2019 20:39 WG1351135

Manganese 0.0379 0.0100 1 09/24/2019 20:39 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 20:39 WG1351135

Potassium 3.14 B 1.00 1 09/24/2019 20:39 WG1351135

Sodium 244 V 1.00 1 09/24/2019 20:39 WG1351135

Strontium 3.43 0.0100 1 09/24/2019 20:39 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 8 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 8 of 55

Page 135: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 01L 1 1 4 1 9 9 1

MW-1C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 0 9 : 5 5

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:32 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:32 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:32 WG1351139

Lead ND 0.00200 1 09/26/2019 13:32 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:32 WG1351139

Silver ND 0.00200 1 09/26/2019 13:32 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 9 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 9 of 55

Page 136: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 02L 1 1 4 1 9 9 1

MW-2C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 2 0

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 379 10.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 9.20 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-02 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 247 20.0 1 09/30/2019 21:23 WG1353734

Sample Narrative:

L1141991-02 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 9.37 1.00 1 09/23/2019 21:38 WG1350430

Fluoride 0.324 0.100 1 09/23/2019 21:38 WG1350430

Sulfate 84.3 5.00 1 09/23/2019 21:38 WG1350430

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 21:52 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0965 0.00500 1 09/24/2019 20:49 WG1351135

Boron ND 0.200 1 09/24/2019 20:49 WG1351135

Calcium 91.9 1.00 1 09/24/2019 20:49 WG1351135

Iron 0.385 0.100 1 09/24/2019 20:49 WG1351135

Manganese 0.0111 0.0100 1 09/24/2019 20:49 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 20:49 WG1351135

Potassium 2.29 B 1.00 1 09/24/2019 20:49 WG1351135

Sodium 42.7 1.00 1 09/24/2019 20:49 WG1351135

Strontium 1.77 0.0100 1 09/24/2019 20:49 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 10 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 10 of 55

Page 137: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 02L 1 1 4 1 9 9 1

MW-2C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 2 0

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:35 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:35 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:35 WG1351139

Lead ND 0.00200 1 09/26/2019 13:35 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:35 WG1351139

Silver ND 0.00200 1 09/26/2019 13:35 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 11 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 11 of 55

Page 138: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 03L 1 1 4 1 9 9 1

MW-3C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 4 5

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 546 10.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 4.20 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-03 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 293 20.0 1 09/30/2019 21:33 WG1353734

Sample Narrative:

L1141991-03 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 25.1 1.00 1 09/23/2019 22:44 WG1350430

Fluoride 0.248 0.100 1 09/23/2019 22:44 WG1350430

Sulfate 161 25.0 5 09/23/2019 23:00 WG1350430

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 21:54 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.171 0.00500 1 09/24/2019 20:51 WG1351135

Boron ND 0.200 1 09/24/2019 20:51 WG1351135

Calcium 136 1.00 1 09/24/2019 20:51 WG1351135

Iron 0.720 0.100 1 09/24/2019 20:51 WG1351135

Manganese 0.419 0.0100 1 09/24/2019 20:51 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 20:51 WG1351135

Potassium 1.83 B 1.00 1 09/24/2019 20:51 WG1351135

Sodium 58.6 1.00 1 09/24/2019 20:51 WG1351135

Strontium 1.32 0.0100 1 09/24/2019 20:51 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 12 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 12 of 55

Page 139: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 03L 1 1 4 1 9 9 1

MW-3C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 4 5

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:39 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:39 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:39 WG1351139

Lead ND 0.00200 1 09/26/2019 13:39 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:39 WG1351139

Silver ND 0.00200 1 09/26/2019 13:39 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 13 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 13 of 55

Page 140: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 04L 1 1 4 1 9 9 1

MW-4C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 2 : 4 5

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 2880 50.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-04 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 732 20.0 1 10/01/2019 00:39 WG1353734

Sample Narrative:

L1141991-04 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 1010 20.0 20 09/23/2019 20:00 WG1350431

Fluoride 0.309 0.100 1 09/23/2019 19:43 WG1350431

Sulfate 387 100 20 09/23/2019 20:00 WG1350431

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 21:56 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0566 0.00500 1 09/24/2019 20:54 WG1351135

Boron 0.370 0.200 1 09/24/2019 20:54 WG1351135

Calcium 525 1.00 1 09/24/2019 20:54 WG1351135

Iron 0.114 0.100 1 09/24/2019 20:54 WG1351135

Manganese 0.675 0.0100 1 09/24/2019 20:54 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 20:54 WG1351135

Potassium 3.84 1.00 1 09/24/2019 20:54 WG1351135

Sodium 359 1.00 1 09/24/2019 20:54 WG1351135

Strontium 9.00 0.0100 1 09/24/2019 20:54 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 14 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 14 of 55

Page 141: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 04L 1 1 4 1 9 9 1

MW-4C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 2 : 4 5

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:49 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:49 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:49 WG1351139

Lead ND 0.00200 1 09/26/2019 13:49 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:49 WG1351139

Silver ND 0.00200 1 09/26/2019 13:49 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 15 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 15 of 55

Page 142: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 05L 1 1 4 1 9 9 1

MW-5C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 4 5

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 1210 20.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-05 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 671 20.0 1 10/01/2019 00:46 WG1353734

Sample Narrative:

L1141991-05 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 113 5.00 5 09/23/2019 20:32 WG1350431

Fluoride 0.298 0.100 1 09/23/2019 20:16 WG1350431

Sulfate 310 25.0 5 09/23/2019 20:32 WG1350431

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 21:58 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0386 0.00500 1 09/24/2019 21:02 WG1351135

Boron ND 0.200 1 09/24/2019 21:02 WG1351135

Calcium 299 1.00 1 09/24/2019 21:02 WG1351135

Iron 0.108 0.100 1 09/24/2019 21:02 WG1351135

Manganese 1.71 0.0100 1 09/24/2019 21:02 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:02 WG1351135

Potassium 2.13 B 1.00 1 09/24/2019 21:02 WG1351135

Sodium 139 1.00 1 09/24/2019 21:02 WG1351135

Strontium 3.25 0.0100 1 09/24/2019 21:02 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 16 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 16 of 55

Page 143: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 05L 1 1 4 1 9 9 1

MW-5C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 4 5

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:52 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:52 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:52 WG1351139

Lead ND 0.00200 1 09/26/2019 13:52 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:52 WG1351139

Silver ND 0.00200 1 09/26/2019 13:52 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 17 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 17 of 55

Page 144: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 06L 1 1 4 1 9 9 1

MW-6C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 0 : 5 0

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 2070 50.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-06 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 404 20.0 1 09/30/2019 21:59 WG1353734

Sample Narrative:

L1141991-06 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 234 5.00 5 09/23/2019 21:05 WG1350431

Fluoride 0.328 0.100 1 09/23/2019 20:49 WG1350431

Sulfate 840 50.0 10 09/24/2019 01:50 WG1350431

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 22:00 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0307 0.00500 1 09/24/2019 21:05 WG1351135

Boron 0.286 0.200 1 09/24/2019 21:05 WG1351135

Calcium 384 1.00 1 09/24/2019 21:05 WG1351135

Iron 0.146 0.100 1 09/24/2019 21:05 WG1351135

Manganese 0.0189 0.0100 1 09/24/2019 21:05 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:05 WG1351135

Potassium 3.63 1.00 1 09/24/2019 21:05 WG1351135

Sodium 200 1.00 1 09/24/2019 21:05 WG1351135

Strontium 6.58 0.0100 1 09/24/2019 21:05 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 18 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 18 of 55

Page 145: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 06L 1 1 4 1 9 9 1

MW-6C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 0 : 5 0

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 13:55 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:55 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:55 WG1351139

Lead ND 0.00200 1 09/26/2019 13:55 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:55 WG1351139

Silver ND 0.00200 1 09/26/2019 13:55 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 19 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 19 of 55

Page 146: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 07L 1 1 4 1 9 9 1

MW-7C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 2 8

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 1090 20.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 8.00 P1 5.00 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-07 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 306 20.0 1 09/30/2019 22:06 WG1353734

Sample Narrative:

L1141991-07 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 207 5.00 5 09/23/2019 15:42 WG1350604

Fluoride 0.243 0.100 1 09/23/2019 15:28 WG1350604

Sulfate 340 25.0 5 09/23/2019 15:42 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 22:02 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0725 0.00500 1 09/24/2019 21:07 WG1351135

Boron ND 0.200 1 09/24/2019 21:07 WG1351135

Calcium 253 1.00 1 09/24/2019 21:07 WG1351135

Iron 2.93 0.100 1 09/24/2019 21:07 WG1351135

Manganese 0.840 0.0100 1 09/24/2019 21:07 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:07 WG1351135

Potassium 2.79 B 1.00 1 09/24/2019 21:07 WG1351135

Sodium 124 1.00 1 09/24/2019 21:07 WG1351135

Strontium 3.01 0.0100 1 09/24/2019 21:07 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 20 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 20 of 55

Page 147: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 07L 1 1 4 1 9 9 1

MW-7C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 2 8

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic 0.00267 0.00200 1 09/26/2019 13:58 WG1351139

Cadmium ND 0.00100 1 09/26/2019 13:58 WG1351139

Chromium ND 0.00200 1 09/26/2019 13:58 WG1351139

Lead ND 0.00200 1 09/26/2019 13:58 WG1351139

Selenium ND 0.00200 1 09/26/2019 13:58 WG1351139

Silver ND 0.00200 1 09/26/2019 13:58 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 21 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 21 of 55

Page 148: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 08L 1 1 4 1 9 9 1

MW-8C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 0 : 3 9

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 1470 25.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 12.0 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-08 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 497 20.0 1 09/30/2019 22:14 WG1353734

Sample Narrative:

L1141991-08 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 186 10.0 10 09/23/2019 16:12 WG1350604

Fluoride 0.447 0.100 1 09/23/2019 15:57 WG1350604

Sulfate 567 50.0 10 09/23/2019 16:12 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 22:04 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0310 0.00500 1 09/24/2019 21:10 WG1351135

Boron ND 0.200 1 09/24/2019 21:10 WG1351135

Calcium 267 1.00 1 09/24/2019 21:10 WG1351135

Iron 0.364 0.100 1 09/24/2019 21:10 WG1351135

Manganese 0.0246 0.0100 1 09/24/2019 21:10 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:10 WG1351135

Potassium 2.31 B 1.00 1 09/24/2019 21:10 WG1351135

Sodium 256 1.00 1 09/24/2019 21:10 WG1351135

Strontium 3.78 0.0100 1 09/24/2019 21:10 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 22 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 22 of 55

Page 149: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 08L 1 1 4 1 9 9 1

MW-8C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 0 : 3 9

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 14:02 WG1351139

Cadmium ND 0.00100 1 09/26/2019 14:02 WG1351139

Chromium ND 0.00200 1 09/26/2019 14:02 WG1351139

Lead ND 0.00200 1 09/26/2019 14:02 WG1351139

Selenium 0.00387 0.00200 1 09/26/2019 14:02 WG1351139

Silver ND 0.00200 1 09/26/2019 14:02 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 23 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 23 of 55

Page 150: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 09L 1 1 4 1 9 9 1

MW-9C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 0 8 : 5 7

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 453 10.0 1 09/24/2019 11:12 WG1350119

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 5.80 5.00 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-09 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 245 20.0 1 09/30/2019 22:30 WG1353734

Sample Narrative:

L1141991-09 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 18.7 1.00 1 09/23/2019 16:27 WG1350604

Fluoride 0.134 0.100 1 09/23/2019 16:27 WG1350604

Sulfate 122 25.0 5 09/24/2019 00:14 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/24/2019 22:10 WG1350286

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0135 0.00500 1 09/24/2019 21:13 WG1351135

Boron ND 0.200 1 09/24/2019 21:13 WG1351135

Calcium 88.8 1.00 1 09/24/2019 21:13 WG1351135

Iron ND 0.100 1 09/24/2019 21:13 WG1351135

Manganese 0.0294 0.0100 1 09/24/2019 21:13 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:13 WG1351135

Potassium 3.11 B 1.00 1 09/24/2019 21:13 WG1351135

Sodium 56.1 1.00 1 09/24/2019 21:13 WG1351135

Strontium 1.77 0.0100 1 09/24/2019 21:13 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 24 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 24 of 55

Page 151: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 09L 1 1 4 1 9 9 1

MW-9C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 0 8 : 5 7

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 14:05 WG1351139

Cadmium ND 0.00100 1 09/26/2019 14:05 WG1351139

Chromium ND 0.00200 1 09/26/2019 14:05 WG1351139

Lead ND 0.00200 1 09/26/2019 14:05 WG1351139

Selenium ND 0.00200 1 09/26/2019 14:05 WG1351139

Silver ND 0.00200 1 09/26/2019 14:05 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 25 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 25 of 55

Page 152: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 10L 1 1 4 1 9 9 1

MW-10C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 2 : 2 3

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 1810 20.0 1 09/24/2019 12:26 WG1350120

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-10 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 562 20.0 1 09/30/2019 22:38 WG1353734

Sample Narrative:

L1141991-10 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 363 10.0 10 09/23/2019 18:12 WG1350604

Fluoride 0.249 0.100 1 09/23/2019 17:57 WG1350604

Sulfate 569 50.0 10 09/23/2019 18:12 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/25/2019 10:11 WG1350287

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0455 0.00500 1 09/24/2019 21:15 WG1351135

Boron ND 0.200 1 09/24/2019 21:15 WG1351135

Calcium 320 1.00 1 09/24/2019 21:15 WG1351135

Iron 0.146 0.100 1 09/24/2019 21:15 WG1351135

Manganese 0.0176 0.0100 1 09/24/2019 21:15 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:15 WG1351135

Potassium 1.87 B 1.00 1 09/24/2019 21:15 WG1351135

Sodium 262 1.00 1 09/24/2019 21:15 WG1351135

Strontium 4.08 0.0100 1 09/24/2019 21:15 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 26 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 26 of 55

Page 153: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 10L 1 1 4 1 9 9 1

MW-10C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 2 : 2 3

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/26/2019 14:08 WG1351139

Cadmium ND 0.00100 1 09/26/2019 14:08 WG1351139

Chromium ND 0.00200 1 09/26/2019 14:08 WG1351139

Lead ND 0.00200 1 09/26/2019 14:08 WG1351139

Selenium ND 0.00200 1 09/26/2019 14:08 WG1351139

Silver ND 0.00200 1 09/26/2019 14:08 WG1351139

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 27 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 27 of 55

Page 154: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 11L 1 1 4 1 9 9 1

MW-11C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 0 8

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 2680 50.0 1 09/24/2019 12:26 WG1350120

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 33.6 5.00 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-11 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 382 20.0 1 09/30/2019 22:45 WG1353734

Sample Narrative:

L1141991-11 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 824 20.0 20 09/23/2019 18:41 WG1350604

Fluoride 0.377 0.100 1 09/23/2019 18:26 WG1350604

Sulfate 918 100 20 09/23/2019 18:41 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/25/2019 10:16 WG1350287

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0360 0.00500 1 09/24/2019 21:18 WG1351135

Boron ND 0.200 1 09/24/2019 21:18 WG1351135

Calcium 563 1.00 1 09/24/2019 21:18 WG1351135

Iron 1.86 0.100 1 09/24/2019 21:18 WG1351135

Manganese 0.164 0.0100 1 09/24/2019 21:18 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:18 WG1351135

Potassium 3.98 1.00 1 09/24/2019 21:18 WG1351135

Sodium 331 1.00 1 09/24/2019 21:18 WG1351135

Strontium 7.93 0.0100 1 09/24/2019 21:18 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 28 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 28 of 55

Page 155: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 11L 1 1 4 1 9 9 1

MW-11C o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 0 8

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/25/2019 13:41 WG1351137

Cadmium ND 0.00100 1 09/25/2019 13:41 WG1351137

Chromium 0.00215 0.00200 1 09/25/2019 13:41 WG1351137

Lead ND 0.00200 1 09/25/2019 13:41 WG1351137

Selenium ND 0.00200 1 09/25/2019 13:41 WG1351137

Silver ND 0.00200 1 09/25/2019 13:41 WG1351137

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 29 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 29 of 55

Page 156: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 12L 1 1 4 1 9 9 1

LEACHATE PONDC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 2 0

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 4070 100 1 09/24/2019 12:26 WG1350120

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 20.0 5.00 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-12 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 45.8 20.0 1 09/30/2019 22:52 WG1353734

Sample Narrative:

L1141991-12 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 160 100 100 09/23/2019 19:11 WG1350604

Fluoride 0.964 0.100 1 09/23/2019 18:56 WG1350604

Sulfate 2910 500 100 09/23/2019 19:11 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/25/2019 10:18 WG1350287

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0855 0.00500 1 09/24/2019 21:21 WG1351135

Boron 2.12 0.200 1 09/24/2019 21:21 WG1351135

Calcium 341 1.00 1 09/24/2019 21:21 WG1351135

Iron 0.328 0.100 1 09/24/2019 21:21 WG1351135

Manganese 0.123 0.0100 1 09/24/2019 21:21 WG1351135

Molybdenum 0.214 0.00500 1 09/24/2019 21:21 WG1351135

Potassium 52.1 1.00 1 09/24/2019 21:21 WG1351135

Sodium 941 1.00 1 09/24/2019 21:21 WG1351135

Strontium 5.41 0.0100 1 09/24/2019 21:21 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 30 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 30 of 55

Page 157: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 12L 1 1 4 1 9 9 1

LEACHATE PONDC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 2 0

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic 0.00519 0.00200 1 09/25/2019 13:44 WG1351137

Cadmium ND 0.00100 1 09/25/2019 13:44 WG1351137

Chromium 0.00261 0.00200 1 09/25/2019 13:44 WG1351137

Lead ND 0.00200 1 09/25/2019 13:44 WG1351137

Selenium 0.00316 0.00200 1 09/25/2019 13:44 WG1351137

Silver ND 0.00200 1 09/25/2019 13:44 WG1351137

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 31 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 31 of 55

Page 158: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 13L 1 1 4 1 9 9 1

DUPLICATEC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 2 8

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids 2200 50.0 1 09/24/2019 12:26 WG1350120

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids 9.40 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-13 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity 475 20.0 1 09/30/2019 23:02 WG1353734

Sample Narrative:

L1141991-13 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride 371 10.0 10 09/23/2019 19:41 WG1350604

Fluoride 0.378 0.100 1 09/23/2019 19:26 WG1350604

Sulfate 837 50.0 10 09/23/2019 19:41 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/25/2019 10:20 WG1350287

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium 0.0307 0.00500 1 09/24/2019 21:24 WG1351135

Boron ND 0.200 1 09/24/2019 21:24 WG1351135

Calcium 326 1.00 1 09/24/2019 21:24 WG1351135

Iron 0.349 0.100 1 09/24/2019 21:24 WG1351135

Manganese 0.0249 0.0100 1 09/24/2019 21:24 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:24 WG1351135

Potassium 2.83 B 1.00 1 09/24/2019 21:24 WG1351135

Sodium 276 1.00 1 09/24/2019 21:24 WG1351135

Strontium 4.78 0.0100 1 09/24/2019 21:24 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 32 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 32 of 55

Page 159: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 13L 1 1 4 1 9 9 1

DUPLICATEC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 1 : 2 8

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/25/2019 13:48 WG1351137

Cadmium ND 0.00100 1 09/25/2019 13:48 WG1351137

Chromium ND 0.00200 1 09/25/2019 13:48 WG1351137

Lead ND 0.00200 1 09/25/2019 13:48 WG1351137

Selenium 0.00325 0.00200 1 09/25/2019 13:48 WG1351137

Silver ND 0.00200 1 09/25/2019 13:48 WG1351137

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 33 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 33 of 55

Page 160: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 14L 1 1 4 1 9 9 1

EQUIPMENT BLANKC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 4 0

Gravimetric Analysis by Method 2540 C-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Dissolved Solids ND 10.0 1 09/24/2019 12:26 WG1350120

Gravimetric Analysis by Method 2540 D-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Suspended Solids ND 2.50 1 09/24/2019 13:59 WG1351144

Wet Chemistry by Method 2310 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Acidity ND 10.0 1 10/01/2019 10:18 WG1354542

Sample Narrative:

L1141991-14 WG1354542: Endpoint pH 8.3

Wet Chemistry by Method 2320 B-2011

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Alkalinity ND 20.0 1 09/30/2019 23:09 WG1353734

Sample Narrative:

L1141991-14 WG1353734: Endpoint pH 4.5 headspace

Wet Chemistry by Method 9056A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Chloride ND 1.00 1 09/23/2019 19:56 WG1350604

Fluoride ND 0.100 1 09/23/2019 19:56 WG1350604

Sulfate ND 5.00 1 09/23/2019 19:56 WG1350604

Mercury by Method 7470A

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Mercury ND 0.000200 1 09/25/2019 10:22 WG1350287

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Barium ND 0.00500 1 09/24/2019 21:26 WG1351135

Boron ND 0.200 1 09/24/2019 21:26 WG1351135

Calcium ND 1.00 1 09/24/2019 21:26 WG1351135

Iron ND 0.100 1 09/24/2019 21:26 WG1351135

Manganese ND 0.0100 1 09/24/2019 21:26 WG1351135

Molybdenum ND 0.00500 1 09/24/2019 21:26 WG1351135

Potassium ND 1.00 1 09/24/2019 21:26 WG1351135

Sodium ND 1.00 1 09/24/2019 21:26 WG1351135

Strontium ND 0.0100 1 09/24/2019 21:26 WG1351135

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 34 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 34 of 55

Page 161: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 14L 1 1 4 1 9 9 1

EQUIPMENT BLANKC o l l e c t e d d a t e / t i m e : 0 9 / 1 9 / 1 9 1 3 : 4 0

Metals (ICPMS) by Method 6020

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Arsenic ND 0.00200 1 09/25/2019 13:51 WG1351137

Cadmium ND 0.00100 1 09/25/2019 13:51 WG1351137

Chromium ND 0.00200 1 09/25/2019 13:51 WG1351137

Lead ND 0.00200 1 09/25/2019 13:51 WG1351137

Selenium ND 0.00200 1 09/25/2019 13:51 WG1351137

Silver ND 0.00200 1 09/25/2019 13:51 WG1351137

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 35 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 35 of 55

Page 162: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350119G r a v i m e t r i c A n a l y s i s b y M e t h o d 2 5 4 0 C - 2 0 1 1 L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9

Method Blank (MB)

(MB) R3455773-1 09/24/19 11:12

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Dissolved Solids U 2.82 10.0

L1141848-04 Original Sample (OS) • Duplicate (DUP)

(OS) L1141848-04 09/24/19 11:12 • (DUP) R3455773-3 09/24/19 11:12

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Dissolved Solids 367 381 1 3.74 5

Laboratory Control Sample (LCS)

(LCS) R3455773-2 09/24/19 11:12

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Dissolved Solids 8800 8500 96.6 85.0-115

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 36 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 36 of 55

Page 163: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350120G r a v i m e t r i c A n a l y s i s b y M e t h o d 2 5 4 0 C - 2 0 1 1 L 1 1 4 1 9 9 1 - 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3454455-1 09/24/19 12:26

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Dissolved Solids U 2.82 10.0

L1141806-01 Original Sample (OS) • Duplicate (DUP)

(OS) L1141806-01 09/24/19 12:26 • (DUP) R3454455-3 09/24/19 12:26

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Dissolved Solids 542 521 1 3.95 5

Laboratory Control Sample (LCS)

(LCS) R3454455-2 09/24/19 12:26

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Dissolved Solids 8800 8510 96.7 85.0-115

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 37 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 37 of 55

Page 164: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1351144G r a v i m e t r i c A n a l y s i s b y M e t h o d 2 5 4 0 D - 2 0 1 1 L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3454256-1 09/24/19 13:59

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Suspended Solids U 0.350 2.50

L1141215-01 Original Sample (OS) • Duplicate (DUP)

(OS) L1141215-01 09/24/19 13:59 • (DUP) R3454256-3 09/24/19 13:59

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Suspended Solids 216 190 1 12.8 P1 5

L1141991-07 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-07 09/24/19 13:59 • (DUP) R3454256-4 09/24/19 13:59

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Suspended Solids 8.00 6.60 1 19.2 P1 5

Laboratory Control Sample (LCS)

(LCS) R3454256-2 09/24/19 13:59

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Suspended Solids 773 860 111 85.0-115

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 38 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 38 of 55

Page 165: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1354542W e t C h e m i s t r y b y M e t h o d 2 3 1 0 B - 2 0 1 1 L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3456438-1 10/01/19 10:18

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Acidity U 3.63 10.0

Sample Narrative:

BLANK: Endpoint pH 8.3

L1141991-01 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-01 10/01/19 10:18 • (DUP) R3456438-3 10/01/19 10:18

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Acidity ND ND 1 0.000 20

Sample Narrative:

OS: Endpoint pH 8.3

DUP: Endpoint pH 8.3

Laboratory Control Sample (LCS)

(LCS) R3456438-2 10/01/19 10:18

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Acidity 50.0 44.5 88.9 85.0-115

Sample Narrative:

LCS: Endpoint pH 8.3

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 39 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 39 of 55

Page 166: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1353734W e t C h e m i s t r y b y M e t h o d 2 3 2 0 B - 2 0 1 1 L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3456218-1 09/30/19 20:49

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Alkalinity 3.82 J 2.71 20.0

Sample Narrative:

BLANK: Endpoint pH 4.5

L1142600-04 Original Sample (OS) • Duplicate (DUP)

(OS) L1142600-04 10/01/19 00:08 • (DUP) R3456218-3 10/01/19 00:16

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Alkalinity 673 673 1 0.0357 20

Sample Narrative:

OS: Endpoint pH 4.5 headspace

DUP: Endpoint pH 4.5

L1141991-01 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-01 10/01/19 00:24 • (DUP) R3456218-4 10/01/19 00:31

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Alkalinity 463 463 1 0.0319 20

Sample Narrative:

OS: Endpoint pH 4.5 headspace

DUP: Endpoint pH 4.5

Laboratory Control Sample (LCS)

(LCS) R3456218-2 09/30/19 22:21

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Alkalinity 100 111 111 85.0-115

Sample Narrative:

LCS: Endpoint pH 4.5

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 40 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 40 of 55

Page 167: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350430W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3

Method Blank (MB)

(MB) R3453795-1 09/23/19 18:54

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Chloride U 0.0519 1.00

Fluoride U 0.00990 0.100

Sulfate U 0.0774 5.00

L1141848-03 Original Sample (OS) • Duplicate (DUP)

(OS) L1141848-03 09/23/19 19:43 • (DUP) R3453795-3 09/23/19 20:00

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride 1.77 1.76 1 0.594 15

Fluoride ND 0.0698 1 0.000 15

Sulfate 73.2 73.1 1 0.0458 15

L1142092-10 Original Sample (OS) • Duplicate (DUP)

(OS) L1142092-10 09/24/19 05:01 • (DUP) R3453795-6 09/24/19 05:18

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride 4.45 4.39 1 1.36 15

Fluoride 0.163 0.164 1 1.10 15

Sulfate 32.1 32.1 1 0.105 15

Laboratory Control Sample (LCS)

(LCS) R3453795-2 09/23/19 19:10

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Chloride 40.0 39.8 99.5 80.0-120

Fluoride 8.00 8.25 103 80.0-120

Sulfate 40.0 40.2 100 80.0-120

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 41 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 41 of 55

Page 168: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350430W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3

L1141848-03 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141848-03 09/23/19 19:43 • (MS) R3453795-4 09/23/19 20:16 • (MSD) R3453795-5 09/23/19 20:32

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Chloride 50.0 1.77 51.2 51.0 98.8 98.4 1 80.0-120 0.317 15

Fluoride 5.00 ND 4.93 4.96 97.3 97.7 1 80.0-120 0.447 15

Sulfate 50.0 73.2 121 121 96.1 96.5 1 80.0-120 E E 0.161 15

L1142092-10 Original Sample (OS) • Matrix Spike (MS)

(OS) L1142092-10 09/24/19 05:01 • (MS) R3453795-7 09/24/19 05:34

Spike Amount Original Result MS Result MS Rec. Dilution Rec. Limits MS Qualifier

Analyte mg/l mg/l mg/l % %

Chloride 50.0 4.45 55.5 102 1 80.0-120

Fluoride 5.00 0.163 5.35 104 1 80.0-120

Sulfate 50.0 32.1 83.8 104 1 80.0-120

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 42 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 42 of 55

Page 169: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350431W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 4 , 0 5 , 0 6

Method Blank (MB)

(MB) R3453761-1 09/23/19 12:45

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Chloride U 0.0519 1.00

Fluoride U 0.00990 0.100

Sulfate U 0.0774 5.00

L1141967-01 Original Sample (OS) • Duplicate (DUP)

(OS) L1141967-01 09/23/19 13:43 • (DUP) R3453761-3 09/23/19 13:58

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride 3.40 3.37 1 1.02 15

Fluoride 0.211 0.208 1 1.24 15

Sulfate 323 323 1 0.0463 E 15

L1141967-11 Original Sample (OS) • Duplicate (DUP)

(OS) L1141967-11 09/23/19 17:48 • (DUP) R3453761-6 09/23/19 18:05

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride 34.3 34.2 1 0.309 15

Fluoride 0.267 0.270 1 1.15 15

Sulfate 172 172 1 0.186 E 15

Laboratory Control Sample (LCS)

(LCS) R3453761-2 09/23/19 13:01

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Chloride 40.0 39.0 97.6 80.0-120

Fluoride 8.00 7.97 99.7 80.0-120

Sulfate 40.0 39.9 99.8 80.0-120

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 43 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 43 of 55

Page 170: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350431W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 4 , 0 5 , 0 6

L1141967-03 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141967-03 09/23/19 14:31 • (MS) R3453761-4 09/23/19 14:48 • (MSD) R3453761-5 09/23/19 15:04

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Chloride 50.0 77.5 124 124 93.0 93.0 1 80.0-120 E E 0.0149 15

Fluoride 5.00 0.149 5.27 5.27 102 102 1 80.0-120 0.0721 15

Sulfate 50.0 416 445 444 58.7 56.7 1 80.0-120 E V E V 0.231 15

L1141974-01 Original Sample (OS) • Matrix Spike (MS)

(OS) L1141974-01 09/23/19 18:21 • (MS) R3453761-7 09/23/19 18:37

Spike Amount Original Result MS Result MS Rec. Dilution Rec. Limits MS Qualifier

Analyte mg/l mg/l mg/l % %

Chloride 50.0 25.1 73.9 97.6 1 80.0-120

Fluoride 5.00 0.575 5.62 101 1 80.0-120

Sulfate 50.0 129 173 86.5 1 80.0-120 E

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 44 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 44 of 55

Page 171: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350604W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3453756-1 09/23/19 14:43

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Chloride U 0.0519 1.00

Fluoride U 0.00990 0.100

Sulfate U 0.0774 5.00

L1141991-09 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-09 09/23/19 16:27 • (DUP) R3453756-3 09/23/19 16:42

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride 18.7 18.5 1 0.677 15

Fluoride 0.134 0.134 1 0.672 15

Sulfate 129 129 1 0.0436 E 15

L1141991-14 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-14 09/23/19 19:56 • (DUP) R3453756-6 09/23/19 20:11

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Chloride ND 0.108 1 0.000 15

Fluoride ND 0.000 1 0.000 15

Sulfate ND 0.000 1 0.000 15

L1141991-09 Original Sample (OS) • Duplicate (DUP)

(OS) L1141991-09 09/24/19 00:14 • (DUP) R3453756-8 09/24/19 00:29

Original Result DUP Result Dilution DUP RPD DUP Qualifier DUP RPD Limits

Analyte mg/l mg/l % %

Sulfate 122 128 5 5.31 15

Laboratory Control Sample (LCS)

(LCS) R3453756-2 09/23/19 14:58

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Chloride 40.0 38.0 95.1 80.0-120

Fluoride 8.00 7.76 97.0 80.0-120

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 45 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 45 of 55

Page 172: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350604W e t C h e m i s t r y b y M e t h o d 9 0 5 6 A L 1 1 4 1 9 9 1 - 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Laboratory Control Sample (LCS)

(LCS) R3453756-2 09/23/19 14:58

Spike Amount LCS Result LCS Rec. Rec. Limits LCS Qualifier

Analyte mg/l mg/l % %

Sulfate 40.0 39.0 97.6 80.0-120

L1141991-09 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141991-09 09/23/19 16:27 • (MS) R3453756-4 09/23/19 16:57 • (MSD) R3453756-5 09/23/19 17:12

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Chloride 50.0 18.7 66.6 66.5 95.8 95.8 1 80.0-120 0.0416 15

Fluoride 5.00 0.134 4.92 5.07 95.7 98.8 1 80.0-120 3.04 15

Sulfate 50.0 129 170 170 81.8 82.0 1 80.0-120 E E 0.0690 15

L1141991-14 Original Sample (OS) • Matrix Spike (MS)

(OS) L1141991-14 09/23/19 19:56 • (MS) R3453756-7 09/23/19 20:56

Spike Amount Original Result MS Result MS Rec. Dilution Rec. Limits MS Qualifier

Analyte mg/l mg/l mg/l % %

Chloride 50.0 ND 49.5 98.7 1 80.0-120

Fluoride 5.00 ND 4.89 97.7 1 80.0-120

Sulfate 50.0 ND 50.1 99.9 1 80.0-120

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 46 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 46 of 55

Page 173: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350286M e r c u r y b y M e t h o d 7 4 7 0 A L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9

Method Blank (MB)

(MB) R3454172-1 09/24/19 21:09

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Mercury U 0.0000490 0.000200

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3454172-2 09/24/19 21:11 • (LCSD) R3454172-3 09/24/19 21:13

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Mercury 0.00300 0.00320 0.00302 107 101 80.0-120 5.69 20

L1141809-05 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141809-05 09/24/19 21:15 • (MS) R3454172-4 09/24/19 21:16 • (MSD) R3454172-5 09/24/19 21:22

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Mercury 0.00300 U 0.00315 0.00316 105 105 1 75.0-125 0.149 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 47 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 47 of 55

Page 174: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1350287M e r c u r y b y M e t h o d 7 4 7 0 A L 1 1 4 1 9 9 1 - 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3454333-1 09/25/19 10:01

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Mercury U 0.0000490 0.000200

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3454333-2 09/25/19 10:03 • (LCSD) R3454333-3 09/25/19 10:09

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Mercury 0.00300 0.00281 0.00285 93.5 95.0 80.0-120 1.59 20

L1141991-10 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141991-10 09/25/19 10:11 • (MS) R3454333-4 09/25/19 10:12 • (MSD) R3454333-5 09/25/19 10:14

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Mercury 0.00300 ND 0.00336 0.00304 112 101 1 75.0-125 9.85 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 48 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 48 of 55

Page 175: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1351135M e t a l s ( I C P ) b y M e t h o d 6 0 1 0 B L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9 , 1 0 , 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3454196-1 09/24/19 20:31

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Barium U 0.00170 0.00500

Boron U 0.0126 0.200

Calcium U 0.0463 1.00

Iron U 0.0141 0.100

Manganese U 0.00120 0.0100

Molybdenum U 0.00160 0.00500

Potassium 0.314 J 0.102 1.00

Sodium 0.561 J 0.0985 1.00

Strontium U 0.00170 0.0100

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3454196-2 09/24/19 20:33 • (LCSD) R3454196-3 09/24/19 20:36

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Barium 1.00 1.03 1.02 103 102 80.0-120 1.62 20

Boron 1.00 1.01 1.02 101 102 80.0-120 1.39 20

Calcium 10.0 10.3 10.3 103 103 80.0-120 0.126 20

Iron 10.0 10.2 10.2 102 102 80.0-120 0.402 20

Manganese 1.00 0.988 0.974 98.8 97.4 80.0-120 1.41 20

Molybdenum 1.00 1.03 1.01 103 101 80.0-120 1.73 20

Potassium 10.0 10.3 10.3 103 103 80.0-120 0.495 20

Sodium 10.0 10.8 10.8 108 108 80.0-120 0.0730 20

Strontium 1.00 1.02 1.01 102 101 80.0-120 0.998 20

L1141991-01 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1141991-01 09/24/19 20:39 • (MS) R3454196-5 09/24/19 20:44 • (MSD) R3454196-6 09/24/19 20:46

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Barium 1.00 0.0237 1.04 1.03 102 101 1 75.0-125 1.02 20

Boron 1.00 ND 1.24 1.20 106 103 1 75.0-125 2.80 20

Calcium 10.0 221 229 226 72.5 42.6 1 75.0-125 V V 1.31 20

Iron 10.0 0.252 10.6 10.3 103 101 1 75.0-125 2.56 20

Manganese 1.00 0.0379 1.00 1.00 96.3 96.5 1 75.0-125 0.177 20

Molybdenum 1.00 ND 1.05 1.04 104 104 1 75.0-125 0.695 20

Potassium 10.0 3.14 12.9 12.9 97.8 97.2 1 75.0-125 0.486 20

Sodium 10.0 244 250 247 57.9 31.2 1 75.0-125 V V 1.08 20

Strontium 1.00 3.43 4.44 4.37 101 94.1 1 75.0-125 1.57 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 49 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 49 of 55

Page 176: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1351137M e t a l s ( I C P M S ) b y M e t h o d 6 0 2 0 L 1 1 4 1 9 9 1 - 1 1 , 1 2 , 1 3 , 1 4

Method Blank (MB)

(MB) R3454438-1 09/25/19 12:48

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Arsenic U 0.000250 0.00200

Cadmium U 0.000160 0.00100

Chromium U 0.000540 0.00200

Lead U 0.000240 0.00200

Selenium U 0.000380 0.00200

Silver U 0.000310 0.00200

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3454438-2 09/25/19 12:51 • (LCSD) R3454438-3 09/25/19 12:55

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Arsenic 0.0500 0.0505 0.0496 101 99.1 80.0-120 1.96 20

Cadmium 0.0500 0.0501 0.0499 100 99.9 80.0-120 0.438 20

Chromium 0.0500 0.0520 0.0519 104 104 80.0-120 0.147 20

Lead 0.0500 0.0503 0.0476 101 95.3 80.0-120 5.49 20

Selenium 0.0500 0.0511 0.0512 102 102 80.0-120 0.139 20

Silver 0.0500 0.0514 0.0513 103 103 80.0-120 0.0596 20

L1140305-08 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1140305-08 09/25/19 12:58 • (MS) R3454438-5 09/25/19 13:05 • (MSD) R3454438-6 09/25/19 13:08

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Arsenic 0.0500 0.00298 0.0522 0.0522 98.5 98.5 1 75.0-125 0.00440 20

Cadmium 0.0500 U 0.0505 0.0506 101 101 1 75.0-125 0.314 20

Chromium 0.0500 0.000924 0.0503 0.0509 98.8 99.9 1 75.0-125 1.05 20

Lead 0.0500 0.000662 0.0494 0.0480 97.5 94.8 1 75.0-125 2.86 20

Selenium 0.0500 U 0.0507 0.0502 101 100 1 75.0-125 1.01 20

Silver 0.0500 U 0.0507 0.0508 101 102 1 75.0-125 0.128 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 50 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 50 of 55

Page 177: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1351139M e t a l s ( I C P M S ) b y M e t h o d 6 0 2 0 L 1 1 4 1 9 9 1 - 0 1 , 0 2 , 0 3 , 0 4 , 0 5 , 0 6 , 0 7 , 0 8 , 0 9 , 1 0

Method Blank (MB)

(MB) R3454925-1 09/26/19 13:09

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Arsenic U 0.000250 0.00200

Cadmium U 0.000160 0.00100

Chromium 0.000547 J 0.000540 0.00200

Lead U 0.000240 0.00200

Selenium U 0.000380 0.00200

Silver U 0.000310 0.00200

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3454925-2 09/26/19 13:12 • (LCSD) R3454925-3 09/26/19 13:16

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Arsenic 0.0500 0.0499 0.0491 99.9 98.1 80.0-120 1.74 20

Cadmium 0.0500 0.0511 0.0514 102 103 80.0-120 0.507 20

Chromium 0.0500 0.0509 0.0501 102 100 80.0-120 1.49 20

Lead 0.0500 0.0511 0.0498 102 99.7 80.0-120 2.58 20

Selenium 0.0500 0.0501 0.0505 100 101 80.0-120 0.832 20

Silver 0.0500 0.0544 0.0539 109 108 80.0-120 0.943 20

L1142089-10 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1142089-10 09/26/19 13:19 • (MS) R3454925-5 09/26/19 13:26 • (MSD) R3454925-6 09/26/19 13:29

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Arsenic 0.0500 U 0.0495 0.0476 99.1 95.2 1 75.0-125 4.02 20

Cadmium 0.0500 U 0.0507 0.0504 101 101 1 75.0-125 0.551 20

Chromium 0.0500 0.000621 0.0506 0.0501 100 99.0 1 75.0-125 0.961 20

Lead 0.0500 U 0.0501 0.0506 100 101 1 75.0-125 1.04 20

Selenium 0.0500 U 0.0509 0.0493 102 98.6 1 75.0-125 3.13 20

Silver 0.0500 U 0.0531 0.0543 106 109 1 75.0-125 2.21 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 51 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 51 of 55

Page 178: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.GLOSSARY OF TERMS

Guide to Reading and Understanding Your Laboratory Report

The information below is designed to better explain the various terms used in your report of analytical results from the Laboratory. This is not intended as a comprehensive explanation, and if you have additional questions please contact your project representative.

Results Disclaimer - Information that may be provided by the customer, and contained within this report, include Permit Limits, Project Name, Sample ID, Sample Matrix, Sample Preservation, Field Blanks, Field Spikes, Field Duplicates, On-Site Data, Sampling Collection Dates/Times, and Sampling Location. Results relate to the accuracy of this information provided, and as the samples are received.

Abbreviations and Definitions

MDL Method Detection Limit.

ND Not detected at the Reporting Limit (or MDL where applicable).

RDL Reported Detection Limit.

Rec. Recovery.

RPD Relative Percent Difference.

SDG Sample Delivery Group.

U Not detected at the Reporting Limit (or MDL where applicable).

Analyte The name of the particular compound or analysis performed. Some Analyses and Methods will have multiple analytes reported.

Dilution

If the sample matrix contains an interfering material, the sample preparation volume or weight values differ from the standard, or if concentrations of analytes in the sample are higher than the highest limit of concentration that the laboratory can accurately report, the sample may be diluted for analysis. If a value different than 1 is used in this field, the result reported has already been corrected for this factor.

LimitsThese are the target % recovery ranges or % difference value that the laboratory has historically determined as normal for the method and analyte being reported. Successful QC Sample analysis will target all analytes recovered or duplicated within these ranges.

Original Sample The non-spiked sample in the prep batch used to determine the Relative Percent Difference (RPD) from a quality control sample. The Original Sample may not be included within the reported SDG.

QualifierThis column provides a letter and/or number designation that corresponds to additional information concerning the resultreported. If a Qualifier is present, a definition per Qualifier is provided within the Glossary and Definitions page and potentially a discussion of possible implications of the Qualifier in the Case Narrative if applicable.

Result

The actual analytical final result (corrected for any sample specific characteristics) reported for your sample. If there was no measurable result returned for a specific analyte, the result in this column may state “ND” (Not Detected) or “BDL” (Below Detectable Levels). The information in the results column should always be accompanied by either an MDL (Method Detection Limit) or RDL (Reporting Detection Limit) that defines the lowest value that the laboratory could detect or report for this analyte.

Uncertainty (Radiochemistry) Confidence level of 2 sigma.

Case Narrative (Cn)A brief discussion about the included sample results, including a discussion of any non-conformances to protocol observed either at sample receipt by the laboratory from the field or during the analytical process. If present, there will be a section in the Case Narrative to discuss the meaning of any data qualifiers used in the report.

Quality Control Summary (Qc)

This section of the report includes the results of the laboratory quality control analyses required by procedure or analytical methods to assist in evaluating the validity of the results reported for your samples. These analyses are not being performed on your samples typically, but on laboratory generated material.

Sample Chain of Custody (Sc)

This is the document created in the field when your samples were initially collected. This is used to verify the time and date of collection, the person collecting the samples, and the analyses that the laboratory is requested to perform. This chain of custody also documents all persons (excluding commercial shippers) that have had control or possession of the samples from the time of collection until delivery to the laboratory for analysis.

Sample Results (Sr)This section of your report will provide the results of all testing performed on your samples. These results are provided by sample ID and are separated by the analyses performed on each sample. The header line of each analysis section foreach sample will provide the name and method number for the analysis reported.

Sample Summary (Ss) This section of the Analytical Report defines the specific analyses performed for each sample ID, including the dates andtimes of preparation and/or analysis.

Qualifier Description

B The same analyte is found in the associated blank.

E The analyte concentration exceeds the upper limit of the calibration range of the instrument established by the initial calibration (ICAL).

J The identification of the analyte is acceptable; the reported value is an estimate.

P1 RPD value not applicable for sample concentrations less than 5 times the reporting limit.

V The sample concentration is too high to evaluate accurate spike recoveries.

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 52 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 52 of 55

Page 179: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.

Pace National is the only environmental laboratory accredited/certified to support your work nationwide from one location. One phone call, one point of contact, one laboratory. No other lab is as accessible or prepared to handle your needs throughout the country. Our capacity and capability from our single location laboratory is comparable to the collective totals of the network laboratories in our industry. The most significant benefit to our one location design is the design of our laboratory campus. The model is conducive to accelerated productivity, decreasing turn-around time, and preventing cross contamination, thus protecting sample integrity. Our focus on premium quality and prompt service allows us to be YOUR LAB OF CHOICE. * Not all certifications held by the laboratory are applicable to the results reported in the attached report. * Accreditation is only applicable to the test methods specified on each scope of accreditation held by Pace National.

State AccreditationsAlabama 40660 Nebraska NE-OS-15-05

Alaska 17-026 Nevada TN-03-2002-34

Arizona AZ0612 New Hampshire 2975

Arkansas 88-0469 New Jersey–NELAP TN002

California 2932 New Mexico ¹ n/a

Colorado TN00003 New York 11742

Connecticut PH-0197 North Carolina Env375

Florida E87487 North Carolina ¹ DW21704

Georgia NELAP North Carolina ³ 41

Georgia ¹ 923 North Dakota R-140

Idaho TN00003 Ohio–VAP CL0069

Illinois 200008 Oklahoma 9915

Indiana C-TN-01 Oregon TN200002

Iowa 364 Pennsylvania 68-02979

Kansas E-10277 Rhode Island LAO00356

Kentucky ¹ ⁶ 90010 South Carolina 84004

Kentucky ² 16 South Dakota n/a

Louisiana AI30792 Tennessee ¹ ⁴ 2006

Louisiana ¹ LA180010 Texas T104704245-18-15

Maine TN0002 Texas ⁵ LAB0152

Maryland 324 Utah TN00003

Massachusetts M-TN003 Vermont VT2006

Michigan 9958 Virginia 460132

Minnesota 047-999-395 Washington C847

Mississippi TN00003 West Virginia 233

Missouri 340 Wisconsin 9980939910

Montana CERT0086 Wyoming A2LA

Third Party Federal AccreditationsA2LA – ISO 17025 1461.01 AIHA-LAP,LLC EMLAP 100789

A2LA – ISO 17025 ⁵ 1461.02 DOD 1461.01

Canada 1461.01 USDA P330-15-00234

EPA–Crypto TN00003

ACCREDITATIONS & LOCATIONS

¹ Drinking Water ² Underground Storage Tanks ³ Aquatic Toxicity ⁴ Chemical/Microbiological ⁵ Mold ⁶ Wastewater n/a Accreditation not applicable

Our LocationsPace National has sixty-four client support centers that provide sample pickup and/or the delivery of sampling supplies. If you would like assistance from one of our support offices, please contactour main office. Pace National performs all testing at our central laboratory.

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/01/19 17:08 53 of 55

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1141991 10/02/19 08:19 53 of 55

Page 180: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 181: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 182: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ANALYTICAL REPORTNovember 29, 2019

American Electric Power - AR

Sample Delivery Group: L1164699

Samples Received: 11/26/2019

Project Number:

Description: Turk

Report To: Mr. Terry Wehling

502 N. Allen Ave.

Shreveport, LA 71101

Entire Report Reviewed By:

November 29, 2019

[Preliminary Report]

Craig CothronPro ject Manager

Results relate only to the items tested or calibrated and are reported as rounded values. This test report shall not be reproduced, except in full, without written approval of the laboratory. Where applicable, sampling conducted by Pace Analytical National is performed per guidance provided in laboratory standard operating procedures ENV-SOP-MTJL-0067 and ENV-SOP-MTJL-0068. Where sampling conducted by the customer, results relate to the accuracy of the information provided, and as the samples are received.

12065 Lebanon Rd Mount Jul iet , TN 37122 615-758-5858 800-767-5859 www.pacenational .com

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 1 of 10

November 29, 2019

Jason RomerPro ject Manager

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 1 of 10

Page 183: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.TABLE OF CONTENTS

Cp: Cover Page 1

Tc: Table of Contents 2

Ss: Sample Summary 3

Cn: Case Narrative 4

Sr: Sample Results 5

MW-5 L1164699-01 5

Qc: Quality Control Summary 6

Metals (ICP) by Method 6010B 6

Gl: Glossary of Terms 7

Al: Accreditations & Locations 8

Sc: Sample Chain of Custody 9

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 2 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 2 of 10

Page 184: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE SUMMARY

Collected by Collected date/time Received date/time

MW-5 L1164699-01 GW Kenny McDonald 11/25/19 09:42 11/26/19 08:30

Method Batch Dilution Preparation Analysis Analyst Location

date/time date/time

Metals (ICP) by Method 6010B WG1387155 1 11/27/19 01:22 11/27/19 17:15 CCE Mt. Juliet, TN

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 3 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 3 of 10

Page 185: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.CASE NARRATIVE

All sample aliquots were received at the correct temperature, in the proper containers, with the appropriate preservatives, and within method specified holding times, unless qualified or notated withinthe report. Where applicable, all MDL (LOD) and RDL (LOQ) values reported for environmental sampleshave been corrected for the dilution factor used in the analysis. All Method and Batch Quality Control are within established criteria except where addressed in this case narrative, a non-conformance form or properly qualified within the sample results. By my digital signature below, I affirm to the best of my knowledge, all problems/anomalies observed by the laboratory as having the potential to affect the quality of the data have been identified by the laboratory, and no information or data have been knowingly withheld that would affect the quality of the data.

[Preliminary Report]

Craig CothronPro jec t Manager

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 4 of 10

Jason RomerPro jec t Manager

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 4 of 10

Page 186: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.SAMPLE RESULTS - 01L 1 1 6 4 6 9 9

MW-5C o l l e c t e d d a t e / t i m e : 1 1 / 2 5 / 1 9 0 9 : 4 2

Metals (ICP) by Method 6010B

Result Qualifier RDL Dilution Analysis Batch

Analyte mg/l mg/l date / time

Manganese 0.342 0.0100 1 11/27/2019 17:15 WG1387155

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 5 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 5 of 10

Page 187: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.QUALITY CONTROL SUMMARYWG1387155M e t a l s ( I C P ) b y M e t h o d 6 0 1 0 B L 1 1 6 4 6 9 9 - 0 1

Method Blank (MB)

(MB) R3477246-1 11/27/19 17:07

MB Result MB Qualifier MB MDL MB RDL

Analyte mg/l mg/l mg/l

Manganese U 0.00120 0.0100

Laboratory Control Sample (LCS) • Laboratory Control Sample Duplicate (LCSD)

(LCS) R3477246-2 11/27/19 17:09 • (LCSD) R3477246-3 11/27/19 17:12

Spike Amount LCS Result LCSD Result LCS Rec. LCSD Rec. Rec. Limits LCS Qualifier LCSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l % % % % %

Manganese 1.00 0.965 0.965 96.5 96.5 80.0-120 0.0467 20

L1164699-01 Original Sample (OS) • Matrix Spike (MS) • Matrix Spike Duplicate (MSD)

(OS) L1164699-01 11/27/19 17:15 • (MS) R3477246-5 11/27/19 17:20 • (MSD) R3477246-6 11/27/19 17:23

Spike Amount Original Result MS Result MSD Result MS Rec. MSD Rec. Dilution Rec. Limits MS Qualifier MSD Qualifier RPD RPD Limits

Analyte mg/l mg/l mg/l mg/l % % % % %

Manganese 1.00 0.342 1.30 1.28 95.4 94.2 1 75.0-125 0.918 20

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 6 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 6 of 10

Page 188: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.GLOSSARY OF TERMS

Guide to Reading and Understanding Your Laboratory Report

The information below is designed to better explain the various terms used in your report of analytical results from the Laboratory. This is not intended as a comprehensive explanation, and if you have additional questions please contact your project representative.

Results Disclaimer - Information that may be provided by the customer, and contained within this report, include Permit Limits, Project Name, Sample ID, Sample Matrix, Sample Preservation, Field Blanks, Field Spikes, Field Duplicates, On-Site Data, Sampling Collection Dates/Times, and Sampling Location. Results relate to the accuracy of this information provided, and as the samples are received.

Abbreviations and Definitions

MDL Method Detection Limit.

RDL Reported Detection Limit.

Rec. Recovery.

RPD Relative Percent Difference.

SDG Sample Delivery Group.

U Not detected at the Reporting Limit (or MDL where applicable).

Analyte The name of the particular compound or analysis performed. Some Analyses and Methods will have multiple analytes reported.

Dilution

If the sample matrix contains an interfering material, the sample preparation volume or weight values differ from the standard, or if concentrations of analytes in the sample are higher than the highest limit of concentration that the laboratory can accurately report, the sample may be diluted for analysis. If a value different than 1 is used in this field, the result reported has already been corrected for this factor.

LimitsThese are the target % recovery ranges or % difference value that the laboratory has historically determined as normal for the method and analyte being reported. Successful QC Sample analysis will target all analytes recovered or duplicated within these ranges.

Original Sample The non-spiked sample in the prep batch used to determine the Relative Percent Difference (RPD) from a quality control sample. The Original Sample may not be included within the reported SDG.

QualifierThis column provides a letter and/or number designation that corresponds to additional information concerning the resultreported. If a Qualifier is present, a definition per Qualifier is provided within the Glossary and Definitions page and potentially a discussion of possible implications of the Qualifier in the Case Narrative if applicable.

Result

The actual analytical final result (corrected for any sample specific characteristics) reported for your sample. If there was no measurable result returned for a specific analyte, the result in this column may state “ND” (Not Detected) or “BDL” (Below Detectable Levels). The information in the results column should always be accompanied by either an MDL (Method Detection Limit) or RDL (Reporting Detection Limit) that defines the lowest value that the laboratory could detect or report for this analyte.

Uncertainty (Radiochemistry) Confidence level of 2 sigma.

Case Narrative (Cn)A brief discussion about the included sample results, including a discussion of any non-conformances to protocol observed either at sample receipt by the laboratory from the field or during the analytical process. If present, there will be a section in the Case Narrative to discuss the meaning of any data qualifiers used in the report.

Quality Control Summary (Qc)

This section of the report includes the results of the laboratory quality control analyses required by procedure or analytical methods to assist in evaluating the validity of the results reported for your samples. These analyses are not being performed on your samples typically, but on laboratory generated material.

Sample Chain of Custody (Sc)

This is the document created in the field when your samples were initially collected. This is used to verify the time and date of collection, the person collecting the samples, and the analyses that the laboratory is requested to perform. This chain of custody also documents all persons (excluding commercial shippers) that have had control or possession of the samples from the time of collection until delivery to the laboratory for analysis.

Sample Results (Sr)This section of your report will provide the results of all testing performed on your samples. These results are provided by sample ID and are separated by the analyses performed on each sample. The header line of each analysis section foreach sample will provide the name and method number for the analysis reported.

Sample Summary (Ss) This section of the Analytical Report defines the specific analyses performed for each sample ID, including the dates andtimes of preparation and/or analysis.

Qualifier Description

The remainder of this page intentionally left blank, there are no qualifiers applied to this SDG.

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 7 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 7 of 10

Page 189: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

ONE LAB. NATIONWIDE.

Pace National is the only environmental laboratory accredited/certified to support your work nationwide from one location. One phone call, one point of contact, one laboratory. No other lab is as accessible or prepared to handle your needs throughout the country. Our capacity and capability from our single location laboratory is comparable to the collective totals of the network laboratories in our industry. The most significant benefit to our one location design is the design of our laboratory campus. The model is conducive to accelerated productivity, decreasing turn-around time, and preventing cross contamination, thus protecting sample integrity. Our focus on premium quality and prompt service allows us to be YOUR LAB OF CHOICE. * Not all certifications held by the laboratory are applicable to the results reported in the attached report. * Accreditation is only applicable to the test methods specified on each scope of accreditation held by Pace National.

State AccreditationsAlabama 40660 Nebraska NE-OS-15-05

Alaska 17-026 Nevada TN-03-2002-34

Arizona AZ0612 New Hampshire 2975

Arkansas 88-0469 New Jersey–NELAP TN002

California 2932 New Mexico ¹ n/a

Colorado TN00003 New York 11742

Connecticut PH-0197 North Carolina Env375

Florida E87487 North Carolina ¹ DW21704

Georgia NELAP North Carolina ³ 41

Georgia ¹ 923 North Dakota R-140

Idaho TN00003 Ohio–VAP CL0069

Illinois 200008 Oklahoma 9915

Indiana C-TN-01 Oregon TN200002

Iowa 364 Pennsylvania 68-02979

Kansas E-10277 Rhode Island LAO00356

Kentucky ¹ ⁶ 90010 South Carolina 84004

Kentucky ² 16 South Dakota n/a

Louisiana AI30792 Tennessee ¹ ⁴ 2006

Louisiana ¹ LA180010 Texas T104704245-18-15

Maine TN0002 Texas ⁵ LAB0152

Maryland 324 Utah TN00003

Massachusetts M-TN003 Vermont VT2006

Michigan 9958 Virginia 460132

Minnesota 047-999-395 Washington C847

Mississippi TN00003 West Virginia 233

Missouri 340 Wisconsin 9980939910

Montana CERT0086 Wyoming A2LA

Third Party Federal AccreditationsA2LA – ISO 17025 1461.01 AIHA-LAP,LLC EMLAP 100789

A2LA – ISO 17025 ⁵ 1461.02 DOD 1461.01

Canada 1461.01 USDA P330-15-00234

EPA–Crypto TN00003

ACCREDITATIONS & LOCATIONS

¹ Drinking Water ² Underground Storage Tanks ³ Aquatic Toxicity ⁴ Chemical/Microbiological ⁵ Mold ⁶ Wastewater n/a Accreditation not applicable

Our LocationsPace National has sixty-four client support centers that provide sample pickup and/or the delivery of sampling supplies. If you would like assistance from one of our support offices, please contactour main office. Pace National performs all testing at our central laboratory.

1

Cp

2

Tc

3

Ss

4

Cn

5

Sr

6

Qc

7

Gl

8

Al

9

Sc

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 09:12 8 of 10

ACCOUNT: PROJECT: SDG: DATE/TIME: PAGE:

American Electric Power - AR L1164699 11/29/19 10:13 8 of 10

Page 190: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 191: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 192: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 5

Potentiometric Maps and Data

Page 193: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Distance between wells. MW-9D is in a different aquifer and will not be used for groundwater seepage rates.

MW1 MW2 MW3 MW4 MW5 MW6 MW7 MW8 MW-9D MW10 MW11MW1 - 2543.2 3011.6 3258.2 2467.8 2699.7 2536.9 2245.8 - 3307.2 2023.3MW2 - 551.3 1121.1 1399.3 1683.8 1914.6 1903.9 - 1551.4 1447.3MW3 - 527.1 1306.0 1569.4 1872.8 1949.1 - 1182.5 1572.5MW4 - 1088.6 1297.2 1642.1 1794.5 - 709.3 1374.0MW5 - 284.6 569.3 709.8 - 753.1 588.8MW6 - 257.2 596.6 - 813.7 691.6MW7 - 303.5 - 1164.1 644.4MW8 - - 1404.0 490.7MW-9D - - - - - - - - - - -MW10 - 1335.8MW11 -

Turk landfill MW monitoring wells

MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 MW-8 MW-9D MW-10 MW-11Total depth of well, TOC 33.05 43.05 42.90 42.05 27.70 22.95 23.10 23.00 151.00 27.85 33.25

Depth to water in feet, TOCDate

9/20/2011 20.65 34.99 32.61 27.21 12.90 19.77 12.00 Dry 50.10 Dry12/30/2011 10.04 32.00 33.58 27.28 8.00 10.86 10.18 3.89 47.63 18.43

2/28/2012 9.10 31.84 29.35 27.75 7.83 9.88 9.87 4.27 47.23 16.625/17/2012 9.66 31.65 29.12 27.82 8.24 9.07 9.34 5.75 47.30 14.20

8/8/2012 11.58 31.60 29.13 27.93 11.00 9.25 10.82 8.43 49.34 13.9511/7/2012 12.73 31.52 29.18 28.00 13.26 10.18 10.75 4.54 48.75 15.352/28/2013 10.64 31.30 28.74 28.12 7.45 8.50 9.51 3.36 47.84 12.785/20/2013 10.56 31.13 28.49 27.17 7.80 8.27 8.91 3.79 46.67 14.25

8/6/2013 11.24 31.25 28.09 27.13 7.81 8.00 9.39 4.62 48.06 13.1811/4/2013 6.34 27.39 28.27 26.81 6.22 7.44 9.21 4.00 48.23 12.442/10/2014 8.06 30.89 28.12 25.26 6.35 6.13 8.49 3.15 47.62 11.9

5/5/2014 8.17 30.68 27.70 24.38 7.20 6.40 8.58 5.21 45.81 10.968/5/2014 7.90 26.43 22.76 24.41 6.39 3.18 8.26 4.14 47.56 12.25

11/5/2014 8.94 30.42 26.99 24.56 7.17 5.12 8.98 5.16 47.33 10.982/3/2015 6.18 26.34 11.90 24.14 6.27 2.62 8.28 3.59 48.46 10.425/5/2015 8.46 23.81 22.80 23.51 5.99 3.29 7.96 4.43 49.73 13.22

8/19/2015 9.91 28.58 24.73 22.99 8.20 7.34 9.29 6.26 49.12 10.7911/18/2015 7.73 3.71 16.72 23.60 5.45 3.37 8.46 3.50 47.41 11.71

3/23/2016 7.58 17.97 16.08 22.52 5.91 3.16 8.19 5.15 44.79 10.244/26/2016 8.21 17.80 16.37 22.36 5.91 3.42 8.54 44.40 19.47 5.39

6/1/2016 7.88 3.39 21.04 22.62 5.51 2.49 6.73 3.70 45.11 15.84 15.847/25/2016 9.57 27.89 23.91 22.50 7.36 8.43 9.30 6.13 47.98 12.56 5.24

9/1/2016 8.28 24.83 23.55 22.50 6.32 4.51 8.78 5.29 47.90 12.61 5.2211/2/2016 9.68 28.78 23.88 23.08 8.11 8.39 11.36 8.78 50.11 12.28 6.33

12/15/2016 9.27 25.22 23.26 23.51 6.27 3.18 9.45 6.37 50.48 13.43 6.132/1/2017 7.23 18.72 19.39 22.86 5.36 2.98 8.91 5.25 50.97 14.23 5.70

2/21/2017 7.56 8.55 19.83 22.99 6.33 2.66 7.18 3.80 50.56 18.65 4.855/2/2017 6.71 3.65 21.16 22.71 4.95 2.73 8.03 4.67 49.25 13.03 4.96

6/29/2017 8.38 27.33 23.10 22.56 6.63 6.81 8.85 7.01 48.59 11.86 5.517/19/2017 8.18 26.33 23.15 22.66 5.98 6.47 8.74 6.01 49.43 16.41 5.338/10/2017 8.25 4.65 22.35 22.61 4.53 5.87 8.35 4.87 49.23 16.89 5.0312/6/2017 8.13 27.37 22.84 23.20 8.69 8.09 9.29 9.33 51.96 11.52 7.114/26/2018 7.44 19.45 21.10 22.18 6.25 2.66 8.46 5.48 48.83 10.45 7.33

12/12/2018 6.85 18.08 20.22 22.24 4.43 2.72 7.56 3.64 47.21 9.38 6.474/17/2019 7.67 12.04 19.12 21.49 5.71 2.70 8.12 4.90 46.56 9.40 7.229/19/2019 9.50 24.16 18.97 21.92 9.11 8.60 10.91 7.67 48.66 9.95 6.85

Page 194: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Hydraulic gradient. Use row 67 9/19/2019 Gradient seepage rate (ft/ft) (ft/yr)

MW1 MW2 MW3 MW4 MW5 MW6 MW7 MW8 MW10 MW11 Max gradientMW1 - 0.008002 0.00519 0.005190 0.007448 0.008519 0.009484 0.008402 - 0.004396 0.006455 0.017100 5.724MW2 - 0.008562 0.003068 0.001408 0.001574 0.001938 0.000777 - 0.003745 0.005037MW3 - 0.002428 0.002106 0.004696 0.004501 0.001662 - 0.000922 0.001634 mean gradientMW4 - 0.001350 0.004695 0.004354 0.001092 - 0.003341 0.002802 0.005777984 1.934MW5 - 0.016233 0.009977 0.000690 - 0.005099 0.009035MW6 - 0.004121 0.006923 - 0.010397 0.014372 median gradientMW7 - 0.017100 - 0.008178 0.017070 0.004694727 1.571MW8 - - 0.003084 0.011840MW-9D - - - - - - - - - - - Min gradientMW10 - 0.001108 0.000690335 0.231MW11 -

Turk landfill MW monitoring wells

MW-1 MW-2 MW-3 MW-4 MW-5 MW-6 MW-7 MW-8 MW-9D MW-10 MW-11Top of casing elevation, ft 304.93 299.24 298.77 300.44 286.16 281.03 282.28 284.23 301.77 290.84 289.22

(ft/yr)Potentiometric surface, feet NAVD88 (dh/dl) seepage rate

Date gradient max9/20/2011 284.28 264.25 266.16 273.23 273.26 261.26 270.28 <261.23 251.67 <262.99 0.042164441 14.11

12/30/2011 294.89 267.24 265.19 273.16 278.16 270.17 272.10 280.34 254.14 272.41 0.028074491 9.402/28/2012 295.83 267.40 269.42 272.69 278.33 271.15 272.41 279.96 254.54 274.22 0.025228391 8.445/17/2012 295.27 267.59 269.65 272.62 277.92 271.96 272.94 278.48 254.47 276.64 0.020942 7.01

8/8/2012 293.35 267.64 269.64 272.51 275.16 271.78 271.46 275.80 252.43 276.89 0.0143 4.7911/7/2012 292.20 267.72 269.59 272.44 272.90 270.85 271.53 279.69 253.02 275.49 0.026886 9.002/28/2013 294.29 267.94 270.03 272.32 278.71 272.53 272.77 280.87 253.93 278.06 0.026689 8.935/20/2013 294.37 268.11 270.28 273.27 278.36 272.76 273.37 280.44 255.10 276.59 0.023294893 7.80

8/6/2013 293.69 267.99 270.68 273.31 278.35 273.03 272.89 279.61 253.71 277.66 0.02214168 7.4111/4/2013 298.59 271.85 270.50 273.63 279.94 273.59 273.07 280.23 253.54 278.40 0.023591 7.902/10/2014 296.87 268.35 270.65 275.18 279.81 274.90 273.79 281.08 254.15 278.94 0.024020 8.04

5/5/2014 296.76 268.56 271.07 276.06 278.96 274.63 273.70 279.02 255.96 279.88 0.01752883 5.878/5/2014 297.03 272.81 276.01 276.03 279.77 277.85 274.02 280.09 254.21 278.59 0.02 6.69

11/5/2014 295.99 268.82 271.78 275.88 278.99 275.91 273.30 279.07 254.44 279.86 0.019012 6.362/3/2015 298.75 272.90 286.87 276.30 279.89 278.41 274.00 280.64 253.31 280.42 0.025340 8.485/5/2015 296.47 275.43 275.97 276.93 280.17 277.74 274.32 279.80 252.04 277.62 0.018056013 6.04

8/19/2015 295.02 270.66 274.04 277.45 277.96 273.69 272.99 277.97 252.65 280.05 0.016408567 5.4911/18/2015 297.20 295.53 282.05 276.84 280.71 277.66 273.82 280.73 254.36 279.13 0.024451297 8.18

3/23/2016 297.35 281.27 282.69 277.92 280.25 277.87 274.09 279.08 256.98 280.60 0.016442 5.504/26/2016 296.72 281.44 282.40 278.08 280.25 277.61 273.74 257.37 271.37 283.83 0.015046656 5.04

6/1/2016 297.05 295.85 277.73 277.82 280.65 278.54 275.55 280.53 256.66 275.00 273.38 0.032867767 11.007/25/2016 295.36 271.35 274.86 277.94 278.80 272.60 272.98 278.10 253.79 278.28 283.98 0.021784961 7.29

9/1/2016 296.65 274.41 275.22 277.94 279.84 276.52 273.50 278.94 253.87 278.23 284.00 0.017924 6.0011/2/2016 295.25 270.46 274.89 277.36 278.05 272.64 270.92 275.45 251.66 278.56 282.89 0.019009136 6.36

12/15/2016 295.66 274.02 275.51 276.93 279.89 277.85 272.83 277.86 251.29 277.41 283.09 0.019518 6.532/1/2017 297.70 280.52 279.38 277.58 280.80 278.05 273.37 278.98 250.80 276.61 283.52 0.018484349 6.19

2/21/2017 297.37 290.69 278.94 277.45 279.83 278.37 275.10 280.43 251.21 272.19 284.37 0.02131326 7.135/2/2017 298.22 295.59 277.61 277.73 281.21 278.30 274.25 279.56 252.52 277.81 284.26 0.03261 10.91

6/29/2017 296.55 271.91 275.67 277.88 279.53 274.22 273.43 277.22 253.18 278.98 283.71 0.018658 6.247/19/2017 296.75 272.91 275.62 277.78 280.18 274.56 273.54 278.22 252.34 274.43 283.89 0.019747 6.618/10/2017 296.68 294.59 276.42 277.83 281.63 275.16 273.93 279.36 252.54 273.95 284.19 0.032958 11.0312/6/2017 296.80 271.87 275.93 277.24 277.47 272.94 272.99 274.90 249.81 279.32 282.11 0.015917077 5.334/26/2018 297.49 279.79 277.67 278.26 279.91 278.37 273.82 278.75 252.94 280.39 281.89 0.017690513 5.92

12/12/2018 298.08 281.16 278.55 278.20 281.73 278.31 274.72 280.59 254.56 281.46 282.75 0.019341021 6.474/17/2019 297.26 287.20 279.65 278.95 280.45 278.33 274.16 279.33 255.21 281.44 282.00 0.017034596 5.709/19/2019 295.43 275.08 279.80 278.52 277.05 272.43 271.37 276.56 253.11 280.89 282.37 0.0171 5.72

(dh / dl)v k

n= 5ft cm (dh / dl) 1in 1ft 60 sec* 60 min* 8760hr

v 6.47e * * * *yr sec 0.20 2.54cm 12in min* hr * yr

−=

Page 195: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling
Page 196: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Appendix 6

Statistical Analysis Report

Page 197: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

December 16, 2019

Turk

Statistical Analysis Procedure

Compliance Date Range: 06/01/2019 to 10/30/2019

0.01

1

Intrawell

MW-1,MW-10,MW-11,MW-2,MW-3,MW-4,MW-5,MW-6,MW-7,MW-8,MW-9D

Compliance Date Range

Background Locations:

Background Date Range: 03/03/2009 to 03/01/2017

6:27:15 PM

Comparison Method if all Background Results are Non-Detect: STmdl = Last MDL

Statistical Test for Parametric Background Data Distributions: STpar = Parametric Prediction Interval on Background

Statistical Test for Cases with High Percentage of Non-Detect Background Data:

Statistical Test for Cases with High Percentage of Non-Detect Background Data:

STnon = Non-Parametric Prediction Interval on Background

STlow1 = Non-Parametric Prediction Interval on Background (ND Frequency > 15%)

Trend Analysis Date Range:

Trend Analysis for Exceedances:

Background Comparison:

Number of Verification Samples:

Default Type 1 Individual Comparison Error Level

(False Positive Rate) for tests other than Prediction Interval

Non-Detect Processing (Parametric Tests):

Compliance Locations: MW-1,MW-10,MW-11,MW-2,MW-3,MW-4,MW-5,MW-6,MW-7,MW-8,MW-9D

Mann-Kendall Trend Analysis

Non-Detect Processing (All Other):

<=15% using MDL * 0.5

>15% using Aitchison's/Cohen's Decision

<=15% using MDL * 0.5

>15% using MDL * 0.5

Statistical Test for Non-Parametric Background Data Distributions:

STlow2 = Non-Parametric Prediction Interval on Background (ND Frequency > 50%)

Page 198: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

2MANAGES

Page 199: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 40.91 Yes/Yes <0.0020MW-1 Arsenic, total,

mg/L

0.007596.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.0237MW-1 Barium, total,

mg/L

0.074698.47

09/19/2019 NoSTnon 22 0.00 No/No <0.2000MW-1 Boron, total, mg/L 2.180096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-1 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 209.000MW-1 Chloride, total,

mg/L

747.88698.47

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-1 Chromium, total,

mg/L

0.035096.34

09/19/2019 NoSTpar 23 4.35 Yes/No 1.1000MW-1 Fluoride, total,

mg/L

1.807298.47

09/19/2019 NoSTlow1 22 18.18 No/Yes 0.2520MW-1 Iron, total, mg/L 2.700096.34

09/19/2019 NoSTlow2 22 72.73 No/Yes <0.0020MW-1 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTpar 22 9.09 No/Yes 0.0379MW-1 Manganese, total,

mg/L

1.945498.47

3MANAGES

Page 200: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-1 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 77.27 No/No <0.0050MW-1 Molybdenum,

total, mg/L

0.022096.34

09/19/2019 NoSTpar 24 0.00 Yes/Yes 7.430MW-1 pH (field), pH 7.78398.47 5.923

09/19/2019 NoSTlow1 22 36.36 No/No <0.0020MW-1 Selenium, total,

mg/L

0.022096.34

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-1 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 1,330.000MW-1 Solids, total

dissolved, mg/L

7,498.34498.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 2,660.000MW-1 Specific

Conductance @

25, micromhos/cm

6,116.24198.47

09/19/2019 NoSTpar 22 0.00 No/Yes 3.430MW-1 Strontium, total,

mg/L

23.20398.47

09/19/2019 NoSTpar 22 0.00 No/Yes 419.000MW-1 Sulfate, total, mg/L 3,980.46098.47

09/19/2019 NoSTpar 23 0.00 No/Yes 14.300MW-1 Turbidity, field,

NTU

1,854.44498.47

4MANAGES

Page 201: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 21 38.10 No/No <0.0020MW-10 Arsenic, total,

mg/L

0.013096.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 0.0455MW-10 Barium, total,

mg/L

0.070998.47

09/19/2019 NoSTlow1 21 33.33 Yes/No <0.2000MW-10 Boron, total, mg/L 0.430096.04

09/19/2019 NoSTmdl 21 100.00 No/No <0.00100MW-10 Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 21 0.00 Yes/Yes 363.000MW-10 Chloride, total,

mg/L

1,385.34398.47

09/19/2019 NoSTlow2 21 61.90 No/Yes <0.0020MW-10 Chromium, total,

mg/L

0.012096.04

09/19/2019 NoSTpar 21 4.76 Yes/Yes 0.2490MW-10 Fluoride, total,

mg/L

0.442998.47

09/19/2019 NoSTpar 21 4.76 No/Yes 0.1460MW-10 Iron, total, mg/L 4.867798.47

09/19/2019 NoSTlow2 22 81.82 No/Yes <0.0020MW-10 Lead, total, mg/L 0.002596.34

09/19/2019 NoSTlow1 21 28.57 No/Yes 0.0176MW-10 Manganese, total,

mg/L

0.560096.04

5MANAGES

Page 202: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 21 100.00 No/No <0.000200MW-10 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 21 80.95 No/No <0.0050MW-10 Molybdenum,

total, mg/L

0.036096.04

09/19/2019 NoSTpar 23 0.00 Yes/Yes 6.600MW-10 pH (field), pH 7.72098.47 5.692

09/19/2019 NoSTlow1 21 28.57 No/Yes <0.0020MW-10 Selenium, total,

mg/L

0.036096.04

09/19/2019 NoSTlow2 21 90.48 No/No <0.0020MW-10 Silver, total, mg/L 0.001696.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 1,810.000MW-10 Solids, total

dissolved, mg/L

6,036.05898.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3,800.000MW-10 Specific

Conductance @

25, micromhos/cm

7,245.45098.47

09/19/2019 NoSTpar 21 0.00 Yes/No 4.080MW-10 Strontium, total,

mg/L

18.20398.47

09/19/2019 NoSTnon 21 0.00 No/No 569.000MW-10 Sulfate, total, mg/L 1,800.00096.04

09/19/2019 NoSTpar 23 0.00 No/Yes 3.300MW-10 Turbidity, field,

NTU

1,061.14698.47

6MANAGES

Page 203: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 3 33.33 Yes/Yes <0.0020MW-11 Arsenic, total,

mg/L

0.005555.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 0.0360MW-11 Barium, total,

mg/L

0.200298.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes <0.2000MW-11 Boron, total, mg/L 0.772498.47

09/19/2019 NoSTmdl 3 100.00 No/No <0.00100MW-11 Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 3 0.00 Yes/Yes 824.000MW-11 Chloride, total,

mg/L

1,742.87598.47

09/19/2019 NoSTlow1 3 33.33 No/No 0.0022MW-11 Chromium, total,

mg/L

0.006055.66

09/19/2019 NoSTlow1 3 33.33 Yes/Yes 0.3770MW-11 Fluoride, total,

mg/L

0.500055.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 1.8600MW-11 Iron, total, mg/L 36.127198.47

09/19/2019 NoSTlow2 3 66.67 Yes/Yes <0.0020MW-11 Lead, total, mg/L 0.004755.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 0.1640MW-11 Manganese, total,

mg/L

4.821498.47

7MANAGES

Page 204: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 3 100.00 No/No <0.000200MW-11 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTmdl 3 100.00 No/No <0.0050MW-11 Molybdenum,

total, mg/L

0.0050N/A

09/19/2019 NoSTpar 5 0.00 Yes/Yes 6.620MW-11 pH (field), pH 10.02098.47 3.936

09/19/2019 NoSTmdl 3 100.00 No/No <0.0020MW-11 Selenium, total,

mg/L

0.0050N/A

09/19/2019 NoSTmdl 3 100.00 No/No <0.0020MW-11 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 3 0.00 Yes/Yes 2,680.000MW-11 Solids, total

dissolved, mg/L

7,798.32298.47

09/19/2019 NoSTpar 4 0.00 Yes/Yes 4,950.000MW-11 Specific

Conductance @

25, micromhos/cm

5,402.62298.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes 7.930MW-11 Strontium, total,

mg/L

18.48998.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes 918.000MW-11 Sulfate, total, mg/L 4,097.78998.47

09/19/2019 NoSTpar 4 0.00 Yes/Yes 418.000MW-11 Turbidity, field,

NTU

1,291.07998.47

8MANAGES

Page 205: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 31.82 Yes/Yes <0.0020MW-2 Arsenic, total,

mg/L

0.006496.34

09/19/2019 NoSTpar 25 0.00 No/Yes 0.0965MW-2 Barium, total,

mg/L

0.230398.47

09/19/2019 NoSTlow1 23 26.09 No/No <0.2000MW-2 Boron, total, mg/L 1.400096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-2 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/No 9.370MW-2 Chloride, total,

mg/L

139.21698.47

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-2 Chromium, total,

mg/L

0.005896.34

09/19/2019 NoSTpar 22 9.09 No/Yes 0.3240MW-2 Fluoride, total,

mg/L

1.228198.47

09/19/2019 NoSTpar 23 0.00 No/Yes 0.3850MW-2 Iron, total, mg/L 45.106698.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-2 Lead, total, mg/L 0.010096.34

09/19/2019 NoSTnon 22 4.55 No/No 0.0111MW-2 Manganese, total,

mg/L

2.000096.34

9MANAGES

Page 206: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-2 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0050MW-2 Molybdenum,

total, mg/L

0.036096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 8.000MW-2 pH (field), pH 8.12398.47 5.949

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0020MW-2 Selenium, total,

mg/L

0.005896.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-2 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTnon 22 0.00 No/No 379.000MW-2 Solids, total

dissolved, mg/L

3,800.00096.34

09/19/2019 NoSTnon 24 0.00 No/No 659.000MW-2 Specific

Conductance @

25, micromhos/cm

3,520.00096.86

09/19/2019 NoSTnon 22 0.00 No/No 1.770MW-2 Strontium, total,

mg/L

13.00096.34

09/19/2019 NoSTnon 22 0.00 No/No 84.300MW-2 Sulfate, total, mg/L 1,900.00096.34

09/19/2019 NoSTpar 24 0.00 Yes/No 18.400MW-2 Turbidity, field,

NTU

271.18598.47

10MANAGES

Page 207: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 22.73 No/Yes <0.0020MW-3 Arsenic, total,

mg/L

0.019096.34

09/19/2019 NoSTpar 24 0.00 No/Yes 0.1710MW-3 Barium, total,

mg/L

0.191098.47

09/19/2019 NoSTlow1 23 39.13 No/No <0.2000MW-3 Boron, total, mg/L 1.300096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-3 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTnon 22 0.00 No/No 25.100MW-3 Chloride, total,

mg/L

660.00096.34

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-3 Chromium, total,

mg/L

0.007496.34

09/19/2019 NoSTpar 22 4.55 No/Yes 0.2480MW-3 Fluoride, total,

mg/L

1.960798.47

09/19/2019 NoSTpar 23 0.00 No/Yes 0.7200MW-3 Iron, total, mg/L 6.933498.47

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-3 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.4190MW-3 Manganese, total,

mg/L

0.653898.47

11MANAGES

Page 208: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-3 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0050MW-3 Molybdenum,

total, mg/L

0.035096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.910MW-3 pH (field), pH 7.93198.47 5.991

09/19/2019 NoSTlow1 22 40.91 No/Yes <0.0020MW-3 Selenium, total,

mg/L

0.047096.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-3 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTnon 22 0.00 No/No 546.000MW-3 Solids, total

dissolved, mg/L

4,800.00096.34

09/19/2019 NoSTnon 24 0.00 No/No 969.000MW-3 Specific

Conductance @

25, micromhos/cm

5,540.00096.86

09/19/2019 NoSTnon 22 0.00 No/No 1.320MW-3 Strontium, total,

mg/L

12.40096.34

09/19/2019 NoSTnon 22 0.00 No/No 161.000MW-3 Sulfate, total, mg/L 2,300.00096.34

09/19/2019 NoSTpar 24 0.00 No/Yes 53.400MW-3 Turbidity, field,

NTU

1,516.14298.47

12MANAGES

Page 209: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 27.27 Yes/Yes <0.0020MW-4 Arsenic, total,

mg/L

0.014096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.0566MW-4 Barium, total,

mg/L

0.416698.47

09/19/2019 NoSTpar 22 0.00 Yes/No 0.3700MW-4 Boron, total, mg/L 0.635898.47

09/19/2019 NoSTlow2 22 90.91 No/No <0.00100MW-4 Cadmium,total,

mg/L

0.0007796.34

09/19/2019 NoSTnon 22 0.00 No/No 1,010.000MW-4 Chloride, total,

mg/L

1,200.00096.34

09/19/2019 NoSTlow1 22 27.27 No/Yes <0.0020MW-4 Chromium, total,

mg/L

0.037096.34

09/19/2019 NoSTnon 23 8.70 No/No 0.3090MW-4 Fluoride, total,

mg/L

0.508096.62

09/19/2019 NoSTpar 22 13.64 No/Yes 0.1140MW-4 Iron, total, mg/L 498.692798.47

09/19/2019 NoSTlow1 22 27.27 No/Yes <0.0020MW-4 Lead, total, mg/L 0.027096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.6750MW-4 Manganese, total,

mg/L

4.102098.47

13MANAGES

Page 210: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-4 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 72.73 No/No <0.0050MW-4 Molybdenum,

total, mg/L

0.034096.34

09/19/2019 NoSTpar 24 0.00 Yes/Yes 6.970MW-4 pH (field), pH 7.72898.47 6.034

09/19/2019 NoSTpar 22 9.09 Yes/No <0.0020MW-4 Selenium, total,

mg/L

0.051798.47

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-4 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,880.000MW-4 Solids, total

dissolved, mg/L

5,118.63298.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 4,370.000MW-4 Specific

Conductance @

25, micromhos/cm

5,521.20898.47

09/19/2019 NoSTnon 22 0.00 No/No 9.000MW-4 Strontium, total,

mg/L

11.00096.34

09/19/2019 NoSTnon 22 0.00 No/No 387.000MW-4 Sulfate, total, mg/L 2,300.00096.34

09/19/2019 NoSTnon 23 0.00 No/No 17.100MW-4 Turbidity, field,

NTU

1,000.00096.62

14MANAGES

Page 211: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-5 Arsenic, total,

mg/L

0.006396.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.0386MW-5 Barium, total,

mg/L

0.084198.47

09/19/2019 NoSTlow1 23 43.48 No/No <0.2000MW-5 Boron, total, mg/L 0.504096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-5 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 113.000MW-5 Chloride, total,

mg/L

795.96898.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-5 Chromium, total,

mg/L

0.009096.34

09/19/2019 NoSTpar 23 8.70 No/Yes 0.2980MW-5 Fluoride, total,

mg/L

0.425698.47

09/19/2019 NoSTlow1 22 27.27 No/Yes 0.1080MW-5 Iron, total, mg/L 0.890096.34

09/19/2019 NoSTlow2 22 77.27 No/Yes <0.0020MW-5 Lead, total, mg/L 0.007596.34

09/19/2019 YesSTpar 22 4.55 No/Yes 1.7100MW-5 Manganese, total,

mg/L

0.8616 Insufficient Data:

Cannot Trend.

98.47

15MANAGES

Page 212: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-5 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 72.73 No/No <0.0050MW-5 Molybdenum,

total, mg/L

0.036096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 6.830MW-5 pH (field), pH 8.13998.47 5.643

09/19/2019 NoSTpar 22 13.64 No/Yes <0.0020MW-5 Selenium, total,

mg/L

0.037298.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-5 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 1,210.000MW-5 Solids, total

dissolved, mg/L

3,760.53698.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 2,060.000MW-5 Specific

Conductance @

25, micromhos/cm

4,232.70198.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.250MW-5 Strontium, total,

mg/L

10.53798.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 310.000MW-5 Sulfate, total, mg/L 1,399.20998.47

09/19/2019 NoSTnon 23 0.00 No/No 0.000MW-5 Turbidity, field,

NTU

282.00096.62

16MANAGES

Page 213: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-6 Arsenic, total,

mg/L

0.005396.34

09/19/2019 NoSTpar 23 0.00 Yes/Yes 0.0307MW-6 Barium, total,

mg/L

0.054398.47

09/19/2019 NoSTpar 23 8.70 Yes/No 0.2860MW-6 Boron, total, mg/L 0.780398.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-6 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 234.000MW-6 Chloride, total,

mg/L

617.03198.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-6 Chromium, total,

mg/L

0.005096.34

09/19/2019 NoSTpar 25 4.00 Yes/Yes 0.3280MW-6 Fluoride, total,

mg/L

0.867598.47

09/19/2019 NoSTpar 24 8.33 No/Yes 0.1460MW-6 Iron, total, mg/L 3.106598.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-6 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTlow1 22 31.82 No/Yes 0.0189MW-6 Manganese, total,

mg/L

0.208096.34

17MANAGES

Page 214: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-6 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0050MW-6 Molybdenum,

total, mg/L

0.032096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.240MW-6 pH (field), pH 7.64598.47 6.174

09/19/2019 NoSTlow1 22 18.18 Yes/Yes <0.0020MW-6 Selenium, total,

mg/L

0.014096.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-6 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,070.000MW-6 Solids, total

dissolved, mg/L

4,228.40298.47

09/19/2019 NoSTpar 24 0.00 Yes/Yes 3,350.000MW-6 Specific

Conductance @

25, micromhos/cm

5,065.70698.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 6.580MW-6 Strontium, total,

mg/L

14.54798.47

09/19/2019 NoSTpar 22 0.00 Yes/No 840.000MW-6 Sulfate, total, mg/L 2,235.61398.47

09/19/2019 NoSTpar 24 0.00 Yes/No 0.000MW-6 Turbidity, field,

NTU

189.06598.47

18MANAGES

Page 215: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 27.27 No/Yes 0.0027MW-7 Arsenic, total,

mg/L

0.009496.34

09/19/2019 NoSTpar 23 0.00 Yes/Yes 0.0725MW-7 Barium, total,

mg/L

0.083698.47

09/19/2019 NoSTlow2 22 63.64 No/No <0.2000MW-7 Boron, total, mg/L 0.350096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-7 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTnon 22 0.00 No/No 207.000MW-7 Chloride, total,

mg/L

460.00096.34

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0020MW-7 Chromium, total,

mg/L

0.021096.34

09/19/2019 NoSTpar 22 9.09 Yes/Yes 0.2430MW-7 Fluoride, total,

mg/L

0.929998.47

09/19/2019 NoSTpar 22 4.55 No/Yes 2.9300MW-7 Iron, total, mg/L 76.615598.47

09/19/2019 NoSTlow1 22 40.91 No/Yes <0.0020MW-7 Lead, total, mg/L 0.016096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.8400MW-7 Manganese, total,

mg/L

0.904398.47

19MANAGES

Page 216: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-7 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0050MW-7 Molybdenum,

total, mg/L

0.032096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 6.880MW-7 pH (field), pH 8.24098.47 5.857

09/19/2019 NoSTlow1 22 45.45 No/No <0.0020MW-7 Selenium, total,

mg/L

0.013096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-7 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 Yes/No 1,090.000MW-7 Solids, total

dissolved, mg/L

3,836.74898.47

09/19/2019 NoSTpar 24 0.00 Yes/Yes 1,950.000MW-7 Specific

Conductance @

25, micromhos/cm

5,291.10698.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.010MW-7 Strontium, total,

mg/L

9.06798.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 340.000MW-7 Sulfate, total, mg/L 1,903.64098.47

09/19/2019 NoSTpar 24 0.00 No/Yes 10.200MW-7 Turbidity, field,

NTU

19,008.13698.47

20MANAGES

Page 217: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 21 47.62 No/Yes <0.0020MW-8 Arsenic, total,

mg/L

0.012096.04

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.0310MW-8 Barium, total,

mg/L

0.088398.47

09/19/2019 NoSTlow1 22 36.36 Yes/No <0.2000MW-8 Boron, total, mg/L 0.472096.34

09/19/2019 NoSTlow2 21 95.24 No/No <0.00100MW-8 Cadmium,total,

mg/L

0.0005096.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 186.000MW-8 Chloride, total,

mg/L

588.92698.47

09/19/2019 NoSTlow2 21 61.90 No/Yes <0.0020MW-8 Chromium, total,

mg/L

0.014096.04

09/19/2019 NoSTpar 22 0.00 No/Yes 0.4470MW-8 Fluoride, total,

mg/L

0.995598.47

09/19/2019 NoSTpar 22 13.64 No/Yes 0.3640MW-8 Iron, total, mg/L 16.351598.47

09/19/2019 NoSTlow1 21 47.62 No/Yes <0.0020MW-8 Lead, total, mg/L 0.017096.04

09/19/2019 NoSTpar 21 14.29 No/Yes 0.0246MW-8 Manganese, total,

mg/L

0.190598.47

21MANAGES

Page 218: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 21 100.00 No/No <0.000200MW-8 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 21 57.14 No/Yes <0.0050MW-8 Molybdenum,

total, mg/L

0.031096.04

09/19/2019 NoSTpar 23 0.00 Yes/Yes 6.720MW-8 pH (field), pH 8.32198.47 5.634

09/19/2019 NoSTpar 21 9.52 Yes/Yes 0.0039MW-8 Selenium, total,

mg/L

0.020398.47

09/19/2019 NoSTmdl 21 100.00 No/No <0.0020MW-8 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 21 0.00 Yes/Yes 1,470.000MW-8 Solids, total

dissolved, mg/L

3,603.08198.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,700.000MW-8 Specific

Conductance @

25, micromhos/cm

5,275.32498.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.780MW-8 Strontium, total,

mg/L

9.98398.47

09/19/2019 NoSTpar 21 0.00 Yes/Yes 567.000MW-8 Sulfate, total, mg/L 1,718.10298.47

09/19/2019 NoSTpar 22 0.00 No/Yes 47.100MW-8 Turbidity, field,

NTU

6,027.84998.47

22MANAGES

Page 219: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-9D Arsenic, total,

mg/L

0.005096.34

09/19/2019 NoSTpar 23 0.00 No/Yes 0.0135MW-9D Barium, total,

mg/L

0.051298.47

09/19/2019 NoSTlow2 24 66.67 No/No <0.2000MW-9D Boron, total, mg/L 0.214096.86

09/19/2019 NoSTmdl 22 100.00 No/No <0.00100MW-9D Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 24 0.00 No/Yes 18.700MW-9D Chloride, total,

mg/L

38.04298.47

09/19/2019 NoSTlow2 22 68.18 No/No <0.0020MW-9D Chromium, total,

mg/L

0.005096.34

09/19/2019 NoSTlow1 22 27.27 No/No 0.1340MW-9D Fluoride, total,

mg/L

0.500096.34

09/19/2019 NoSTpar 23 4.35 No/Yes <0.1000MW-9D Iron, total, mg/L 10.284698.47

09/19/2019 NoSTlow2 22 81.82 No/Yes <0.0020MW-9D Lead, total, mg/L 0.007596.34

09/19/2019 NoSTnon 22 4.55 No/No 0.0294MW-9D Manganese, total,

mg/L

0.830096.34

23MANAGES

Page 220: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-9D Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 77.27 No/No <0.0050MW-9D Molybdenum,

total, mg/L

0.015096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.900MW-9D pH (field), pH 8.31798.47 6.502

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-9D Selenium, total,

mg/L

0.002896.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-9D Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 24 0.00 Yes/Yes 453.000MW-9D Solids, total

dissolved, mg/L

653.37698.47

09/19/2019 NoSTpar 25 0.00 Yes/Yes 765.000MW-9D Specific

Conductance @

25, micromhos/cm

859.65598.47

09/19/2019 NoSTnon 22 0.00 No/No 1.770MW-9D Strontium, total,

mg/L

5.80096.34

09/19/2019 NoSTnon 24 0.00 No/No 122.000MW-9D Sulfate, total, mg/L 230.00096.86

09/19/2019 NoSTnon 24 0.00 No/No 40.200MW-9D Turbidity, field,

NTU

306.00096.86

24MANAGES

Page 221: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

December 16, 2019

Turk

Statistical Analysis Procedure

Compliance Date Range: 06/01/2019 to 12/30/2019

0.01

Number of Future Observations: 220.00

1

Intrawell

MW-1,MW-10,MW-11,MW-2,MW-3,MW-4,MW-5,MW-6,MW-7,MW-8,MW-9D

Compliance Date Range

Background Locations:

Background Date Range: 03/03/2009 to 03/01/2017

6:29:34 PM

Comparison Method if all Background Results are Non-Detect: STmdl = Last MDL

Statistical Test for Parametric Background Data Distributions: STpar = Parametric Prediction Interval on Background

Statistical Test for Cases with High Percentage of Non-Detect Background Data:

Statistical Test for Cases with High Percentage of Non-Detect Background Data:

STnon = Non-Parametric Prediction Interval on Background

STlow1 = Non-Parametric Prediction Interval on Background (ND Frequency > 15%)

Trend Analysis Date Range:

Trend Analysis for Exceedances:

Background Comparison:

Number of Verification Samples:

Default Type 1 Individual Comparison Error Level

(False Positive Rate) for tests other than Prediction Interval

Type 1 Individual Comparison Error Level

(False Positive Rate) for Prediction Interval

Calculate based on number of locations, parameters, and number of verification

resamples, assumes site-wide Error Level of 0.05, using the approach of ASTM (1998).

Non-Detect Processing (Parametric Tests):

Compliance Locations: MW-1,MW-10,MW-11,MW-2,MW-3,MW-4,MW-5,MW-6,MW-7,MW-8,MW-9D

Mann-Kendall Trend Analysis

Non-Detect Processing (All Other):

<=15% using MDL * 0.5

>15% using Aitchison's/Cohen's Decision

<=15% using MDL * 0.5

>15% using MDL * 0.5

Statistical Test for Non-Parametric Background Data Distributions:

STlow2 = Non-Parametric Prediction Interval on Background (ND Frequency > 50%)

Page 222: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

2MANAGES

Page 223: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 40.91 Yes/Yes <0.0020MW-1 Arsenic, total,

mg/L

0.007596.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.0237MW-1 Barium, total,

mg/L

0.074698.47

09/19/2019 NoSTnon 22 0.00 No/No <0.2000MW-1 Boron, total, mg/L 2.180096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-1 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 209.000MW-1 Chloride, total,

mg/L

747.88698.47

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-1 Chromium, total,

mg/L

0.035096.34

09/19/2019 NoSTpar 23 4.35 Yes/No 1.1000MW-1 Fluoride, total,

mg/L

1.807298.47

09/19/2019 NoSTlow1 22 18.18 No/Yes 0.2520MW-1 Iron, total, mg/L 2.700096.34

09/19/2019 NoSTlow2 22 72.73 No/Yes <0.0020MW-1 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTpar 22 9.09 No/Yes 0.0379MW-1 Manganese, total,

mg/L

1.945498.47

3MANAGES

Page 224: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-1 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 77.27 No/No <0.0050MW-1 Molybdenum,

total, mg/L

0.022096.34

09/19/2019 NoSTpar 24 0.00 Yes/Yes 7.430MW-1 pH (field), pH 7.78398.47 5.923

09/19/2019 NoSTlow1 22 36.36 No/No <0.0020MW-1 Selenium, total,

mg/L

0.022096.34

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-1 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 1,330.000MW-1 Solids, total

dissolved, mg/L

7,498.34498.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 2,660.000MW-1 Specific

Conductance @

25, micromhos/cm

6,116.24198.47

09/19/2019 NoSTpar 22 0.00 No/Yes 3.430MW-1 Strontium, total,

mg/L

23.20398.47

09/19/2019 NoSTpar 22 0.00 No/Yes 419.000MW-1 Sulfate, total, mg/L 3,980.46098.47

09/19/2019 NoSTpar 23 0.00 No/Yes 14.300MW-1 Turbidity, field,

NTU

1,854.44498.47

4MANAGES

Page 225: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 21 38.10 No/No <0.0020MW-10 Arsenic, total,

mg/L

0.013096.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 0.0455MW-10 Barium, total,

mg/L

0.070998.47

09/19/2019 NoSTlow1 21 33.33 Yes/No <0.2000MW-10 Boron, total, mg/L 0.430096.04

09/19/2019 NoSTmdl 21 100.00 No/No <0.00100MW-10 Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 21 0.00 Yes/Yes 363.000MW-10 Chloride, total,

mg/L

1,385.34398.47

09/19/2019 NoSTlow2 21 61.90 No/Yes <0.0020MW-10 Chromium, total,

mg/L

0.012096.04

09/19/2019 NoSTpar 21 4.76 Yes/Yes 0.2490MW-10 Fluoride, total,

mg/L

0.442998.47

09/19/2019 NoSTpar 21 4.76 No/Yes 0.1460MW-10 Iron, total, mg/L 4.867798.47

09/19/2019 NoSTlow2 22 81.82 No/Yes <0.0020MW-10 Lead, total, mg/L 0.002596.34

09/19/2019 NoSTlow1 21 28.57 No/Yes 0.0176MW-10 Manganese, total,

mg/L

0.560096.04

5MANAGES

Page 226: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 21 100.00 No/No <0.000200MW-10 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 21 80.95 No/No <0.0050MW-10 Molybdenum,

total, mg/L

0.036096.04

09/19/2019 NoSTpar 23 0.00 Yes/Yes 6.600MW-10 pH (field), pH 7.72098.47 5.692

09/19/2019 NoSTlow1 21 28.57 No/Yes <0.0020MW-10 Selenium, total,

mg/L

0.036096.04

09/19/2019 NoSTlow2 21 90.48 No/No <0.0020MW-10 Silver, total, mg/L 0.001696.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 1,810.000MW-10 Solids, total

dissolved, mg/L

6,036.05898.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3,800.000MW-10 Specific

Conductance @

25, micromhos/cm

7,245.45098.47

09/19/2019 NoSTpar 21 0.00 Yes/No 4.080MW-10 Strontium, total,

mg/L

18.20398.47

09/19/2019 NoSTnon 21 0.00 No/No 569.000MW-10 Sulfate, total, mg/L 1,800.00096.04

09/19/2019 NoSTpar 23 0.00 No/Yes 3.300MW-10 Turbidity, field,

NTU

1,061.14698.47

6MANAGES

Page 227: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 3 33.33 Yes/Yes <0.0020MW-11 Arsenic, total,

mg/L

0.005555.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 0.0360MW-11 Barium, total,

mg/L

0.200298.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes <0.2000MW-11 Boron, total, mg/L 0.772498.47

09/19/2019 NoSTmdl 3 100.00 No/No <0.00100MW-11 Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 3 0.00 Yes/Yes 824.000MW-11 Chloride, total,

mg/L

1,742.87598.47

09/19/2019 NoSTlow1 3 33.33 No/No 0.0022MW-11 Chromium, total,

mg/L

0.006055.66

09/19/2019 NoSTlow1 3 33.33 Yes/Yes 0.3770MW-11 Fluoride, total,

mg/L

0.500055.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 1.8600MW-11 Iron, total, mg/L 36.127198.47

09/19/2019 NoSTlow2 3 66.67 Yes/Yes <0.0020MW-11 Lead, total, mg/L 0.004755.66

09/19/2019 NoSTpar 3 0.00 Yes/Yes 0.1640MW-11 Manganese, total,

mg/L

4.821498.47

7MANAGES

Page 228: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 3 100.00 No/No <0.000200MW-11 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTmdl 3 100.00 No/No <0.0050MW-11 Molybdenum,

total, mg/L

0.0050N/A

09/19/2019 NoSTpar 5 0.00 Yes/Yes 6.620MW-11 pH (field), pH 10.02098.47 3.936

09/19/2019 NoSTmdl 3 100.00 No/No <0.0020MW-11 Selenium, total,

mg/L

0.0050N/A

09/19/2019 NoSTmdl 3 100.00 No/No <0.0020MW-11 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 3 0.00 Yes/Yes 2,680.000MW-11 Solids, total

dissolved, mg/L

7,798.32298.47

09/19/2019 NoSTpar 4 0.00 Yes/Yes 4,950.000MW-11 Specific

Conductance @

25, micromhos/cm

5,402.62298.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes 7.930MW-11 Strontium, total,

mg/L

18.48998.47

09/19/2019 NoSTpar 3 0.00 Yes/Yes 918.000MW-11 Sulfate, total, mg/L 4,097.78998.47

09/19/2019 NoSTpar 4 0.00 Yes/Yes 418.000MW-11 Turbidity, field,

NTU

1,291.07998.47

8MANAGES

Page 229: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 31.82 Yes/Yes <0.0020MW-2 Arsenic, total,

mg/L

0.006496.34

09/19/2019 NoSTpar 25 0.00 No/Yes 0.0965MW-2 Barium, total,

mg/L

0.230398.47

09/19/2019 NoSTlow1 23 26.09 No/No <0.2000MW-2 Boron, total, mg/L 1.400096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-2 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/No 9.370MW-2 Chloride, total,

mg/L

139.21698.47

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-2 Chromium, total,

mg/L

0.005896.34

09/19/2019 NoSTpar 22 9.09 No/Yes 0.3240MW-2 Fluoride, total,

mg/L

1.228198.47

09/19/2019 NoSTpar 23 0.00 No/Yes 0.3850MW-2 Iron, total, mg/L 45.106698.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-2 Lead, total, mg/L 0.010096.34

09/19/2019 NoSTnon 22 4.55 No/No 0.0111MW-2 Manganese, total,

mg/L

2.000096.34

9MANAGES

Page 230: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-2 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0050MW-2 Molybdenum,

total, mg/L

0.036096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 8.000MW-2 pH (field), pH 8.12398.47 5.949

11/25/2019 Yes 25 0.00 Yes/Yes 8.6508.123 Insufficient Data:

Cannot Trend.

98.47 5.949

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0020MW-2 Selenium, total,

mg/L

0.005896.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-2 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTnon 22 0.00 No/No 379.000MW-2 Solids, total

dissolved, mg/L

3,800.00096.34

09/19/2019 NoSTnon 24 0.00 No/No 659.000MW-2 Specific

Conductance @

25, micromhos/cm

3,520.00096.86

09/19/2019 NoSTnon 22 0.00 No/No 1.770MW-2 Strontium, total,

mg/L

13.00096.34

09/19/2019 NoSTnon 22 0.00 No/No 84.300MW-2 Sulfate, total, mg/L 1,900.00096.34

09/19/2019 NoSTpar 24 0.00 Yes/No 18.400MW-2 Turbidity, field,

NTU

271.18598.47

10MANAGES

Page 231: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

11MANAGES

Page 232: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 22.73 No/Yes <0.0020MW-3 Arsenic, total,

mg/L

0.019096.34

09/19/2019 NoSTpar 24 0.00 No/Yes 0.1710MW-3 Barium, total,

mg/L

0.191098.47

09/19/2019 NoSTlow1 23 39.13 No/No <0.2000MW-3 Boron, total, mg/L 1.300096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-3 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTnon 22 0.00 No/No 25.100MW-3 Chloride, total,

mg/L

660.00096.34

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-3 Chromium, total,

mg/L

0.007496.34

09/19/2019 NoSTpar 22 4.55 No/Yes 0.2480MW-3 Fluoride, total,

mg/L

1.960798.47

09/19/2019 NoSTpar 23 0.00 No/Yes 0.7200MW-3 Iron, total, mg/L 6.933498.47

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0020MW-3 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.4190MW-3 Manganese, total,

mg/L

0.653898.47

12MANAGES

Page 233: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-3 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 63.64 No/Yes <0.0050MW-3 Molybdenum,

total, mg/L

0.035096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.910MW-3 pH (field), pH 7.93198.47 5.991

11/25/2019 Yes 25 0.00 Yes/Yes 8.2207.931 Insufficient Data:

Cannot Trend.

98.47 5.991

09/19/2019 NoSTlow1 22 40.91 No/Yes <0.0020MW-3 Selenium, total,

mg/L

0.047096.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-3 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTnon 22 0.00 No/No 546.000MW-3 Solids, total

dissolved, mg/L

4,800.00096.34

09/19/2019 NoSTnon 24 0.00 No/No 969.000MW-3 Specific

Conductance @

25, micromhos/cm

5,540.00096.86

09/19/2019 NoSTnon 22 0.00 No/No 1.320MW-3 Strontium, total,

mg/L

12.40096.34

09/19/2019 NoSTnon 22 0.00 No/No 161.000MW-3 Sulfate, total, mg/L 2,300.00096.34

09/19/2019 NoSTpar 24 0.00 No/Yes 53.400MW-3 Turbidity, field,

NTU

1,516.14298.47

13MANAGES

Page 234: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

14MANAGES

Page 235: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 27.27 Yes/Yes <0.0020MW-4 Arsenic, total,

mg/L

0.014096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.0566MW-4 Barium, total,

mg/L

0.416698.47

09/19/2019 NoSTpar 22 0.00 Yes/No 0.3700MW-4 Boron, total, mg/L 0.635898.47

09/19/2019 NoSTlow2 22 90.91 No/No <0.00100MW-4 Cadmium,total,

mg/L

0.0007796.34

09/19/2019 NoSTnon 22 0.00 No/No 1,010.000MW-4 Chloride, total,

mg/L

1,200.00096.34

09/19/2019 NoSTlow1 22 27.27 No/Yes <0.0020MW-4 Chromium, total,

mg/L

0.037096.34

09/19/2019 NoSTnon 23 8.70 No/No 0.3090MW-4 Fluoride, total,

mg/L

0.508096.62

09/19/2019 NoSTpar 22 13.64 No/Yes 0.1140MW-4 Iron, total, mg/L 498.692798.47

09/19/2019 NoSTlow1 22 27.27 No/Yes <0.0020MW-4 Lead, total, mg/L 0.027096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.6750MW-4 Manganese, total,

mg/L

4.102098.47

15MANAGES

Page 236: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-4 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 72.73 No/No <0.0050MW-4 Molybdenum,

total, mg/L

0.034096.34

09/19/2019 NoSTpar 24 0.00 Yes/Yes 6.970MW-4 pH (field), pH 7.72898.47 6.034

09/19/2019 NoSTpar 22 9.09 Yes/No <0.0020MW-4 Selenium, total,

mg/L

0.051798.47

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-4 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,880.000MW-4 Solids, total

dissolved, mg/L

5,118.63298.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 4,370.000MW-4 Specific

Conductance @

25, micromhos/cm

5,521.20898.47

09/19/2019 NoSTnon 22 0.00 No/No 9.000MW-4 Strontium, total,

mg/L

11.00096.34

09/19/2019 NoSTnon 22 0.00 No/No 387.000MW-4 Sulfate, total, mg/L 2,300.00096.34

09/19/2019 NoSTnon 23 0.00 No/No 17.100MW-4 Turbidity, field,

NTU

1,000.00096.62

16MANAGES

Page 237: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-5 Arsenic, total,

mg/L

0.006396.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.0386MW-5 Barium, total,

mg/L

0.084198.47

09/19/2019 NoSTlow1 23 43.48 No/No <0.2000MW-5 Boron, total, mg/L 0.504096.62

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-5 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 113.000MW-5 Chloride, total,

mg/L

795.96898.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-5 Chromium, total,

mg/L

0.009096.34

09/19/2019 NoSTpar 23 8.70 No/Yes 0.2980MW-5 Fluoride, total,

mg/L

0.425698.47

09/19/2019 NoSTlow1 22 27.27 No/Yes 0.1080MW-5 Iron, total, mg/L 0.890096.34

09/19/2019 NoSTlow2 22 77.27 No/Yes <0.0020MW-5 Lead, total, mg/L 0.007596.34

09/19/2019 YesSTpar 22 4.55 No/Yes 1.7100MW-5 Manganese, total,

mg/L

0.8616 Insufficient Data:

Cannot Trend.

98.47

11/25/2019 No 22 4.55 No/Yes 0.34200.861698.47

17MANAGES

Page 238: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-5 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 72.73 No/No <0.0050MW-5 Molybdenum,

total, mg/L

0.036096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 6.830MW-5 pH (field), pH 8.13998.47 5.643

11/25/2019 No 25 0.00 Yes/Yes 7.3008.13998.47 5.643

09/19/2019 NoSTpar 22 13.64 No/Yes <0.0020MW-5 Selenium, total,

mg/L

0.037298.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-5 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 1,210.000MW-5 Solids, total

dissolved, mg/L

3,760.53698.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 2,060.000MW-5 Specific

Conductance @

25, micromhos/cm

4,232.70198.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.250MW-5 Strontium, total,

mg/L

10.53798.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 310.000MW-5 Sulfate, total, mg/L 1,399.20998.47

09/19/2019 NoSTnon 23 0.00 No/No 0.000MW-5 Turbidity, field,

NTU

282.00096.62

18MANAGES

Page 239: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 50.00 No/Yes <0.0020MW-6 Arsenic, total,

mg/L

0.005396.34

09/19/2019 NoSTpar 23 0.00 Yes/Yes 0.0307MW-6 Barium, total,

mg/L

0.054398.47

09/19/2019 NoSTpar 23 8.70 Yes/No 0.2860MW-6 Boron, total, mg/L 0.780398.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-6 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTpar 22 0.00 Yes/Yes 234.000MW-6 Chloride, total,

mg/L

617.03198.47

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0020MW-6 Chromium, total,

mg/L

0.005096.34

09/19/2019 NoSTpar 25 4.00 Yes/Yes 0.3280MW-6 Fluoride, total,

mg/L

0.867598.47

09/19/2019 NoSTpar 24 8.33 No/Yes 0.1460MW-6 Iron, total, mg/L 3.106598.47

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-6 Lead, total, mg/L 0.007596.34

09/19/2019 NoSTlow1 22 31.82 No/Yes 0.0189MW-6 Manganese, total,

mg/L

0.208096.34

19MANAGES

Page 240: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-6 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0050MW-6 Molybdenum,

total, mg/L

0.032096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.240MW-6 pH (field), pH 7.64598.47 6.174

09/19/2019 NoSTlow1 22 18.18 Yes/Yes <0.0020MW-6 Selenium, total,

mg/L

0.014096.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-6 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,070.000MW-6 Solids, total

dissolved, mg/L

4,228.40298.47

09/19/2019 NoSTpar 24 0.00 Yes/Yes 3,350.000MW-6 Specific

Conductance @

25, micromhos/cm

5,065.70698.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 6.580MW-6 Strontium, total,

mg/L

14.54798.47

09/19/2019 NoSTpar 22 0.00 Yes/No 840.000MW-6 Sulfate, total, mg/L 2,235.61398.47

09/19/2019 NoSTpar 24 0.00 Yes/No 0.000MW-6 Turbidity, field,

NTU

189.06598.47

20MANAGES

Page 241: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 22 27.27 No/Yes 0.0027MW-7 Arsenic, total,

mg/L

0.009496.34

09/19/2019 NoSTpar 23 0.00 Yes/Yes 0.0725MW-7 Barium, total,

mg/L

0.083698.47

09/19/2019 NoSTlow2 22 63.64 No/No <0.2000MW-7 Boron, total, mg/L 0.350096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.00100MW-7 Cadmium,total,

mg/L

0.0005096.34

09/19/2019 NoSTnon 22 0.00 No/No 207.000MW-7 Chloride, total,

mg/L

460.00096.34

09/19/2019 NoSTlow1 22 31.82 No/Yes <0.0020MW-7 Chromium, total,

mg/L

0.021096.34

09/19/2019 NoSTpar 22 9.09 Yes/Yes 0.2430MW-7 Fluoride, total,

mg/L

0.929998.47

09/19/2019 NoSTpar 22 4.55 No/Yes 2.9300MW-7 Iron, total, mg/L 76.615598.47

09/19/2019 NoSTlow1 22 40.91 No/Yes <0.0020MW-7 Lead, total, mg/L 0.016096.34

09/19/2019 NoSTpar 22 0.00 No/Yes 0.8400MW-7 Manganese, total,

mg/L

0.904398.47

21MANAGES

Page 242: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-7 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 68.18 No/Yes <0.0050MW-7 Molybdenum,

total, mg/L

0.032096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 6.880MW-7 pH (field), pH 8.24098.47 5.857

09/19/2019 NoSTlow1 22 45.45 No/No <0.0020MW-7 Selenium, total,

mg/L

0.013096.34

09/19/2019 NoSTlow2 22 95.45 No/No <0.0020MW-7 Silver, total, mg/L 0.010096.34

09/19/2019 NoSTpar 22 0.00 Yes/No 1,090.000MW-7 Solids, total

dissolved, mg/L

3,836.74898.47

09/19/2019 NoSTpar 24 0.00 Yes/Yes 1,950.000MW-7 Specific

Conductance @

25, micromhos/cm

5,291.10698.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.010MW-7 Strontium, total,

mg/L

9.06798.47

09/19/2019 NoSTpar 23 0.00 Yes/Yes 340.000MW-7 Sulfate, total, mg/L 1,903.64098.47

09/19/2019 NoSTpar 24 0.00 No/Yes 10.200MW-7 Turbidity, field,

NTU

19,008.13698.47

22MANAGES

Page 243: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow1 21 47.62 No/Yes <0.0020MW-8 Arsenic, total,

mg/L

0.012096.04

09/19/2019 NoSTpar 22 0.00 Yes/Yes 0.0310MW-8 Barium, total,

mg/L

0.088398.47

09/19/2019 NoSTlow1 22 36.36 Yes/No <0.2000MW-8 Boron, total, mg/L 0.472096.34

09/19/2019 NoSTlow2 21 95.24 No/No <0.00100MW-8 Cadmium,total,

mg/L

0.0005096.04

09/19/2019 NoSTpar 21 0.00 Yes/Yes 186.000MW-8 Chloride, total,

mg/L

588.92698.47

09/19/2019 NoSTlow2 21 61.90 No/Yes <0.0020MW-8 Chromium, total,

mg/L

0.014096.04

09/19/2019 NoSTpar 22 0.00 No/Yes 0.4470MW-8 Fluoride, total,

mg/L

0.995598.47

09/19/2019 NoSTpar 22 13.64 No/Yes 0.3640MW-8 Iron, total, mg/L 16.351598.47

09/19/2019 NoSTlow1 21 47.62 No/Yes <0.0020MW-8 Lead, total, mg/L 0.017096.04

09/19/2019 NoSTpar 21 14.29 No/Yes 0.0246MW-8 Manganese, total,

mg/L

0.190598.47

23MANAGES

Page 244: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 21 100.00 No/No <0.000200MW-8 Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 21 57.14 No/Yes <0.0050MW-8 Molybdenum,

total, mg/L

0.031096.04

09/19/2019 NoSTpar 23 0.00 Yes/Yes 6.720MW-8 pH (field), pH 8.32198.47 5.634

09/19/2019 NoSTpar 21 9.52 Yes/Yes 0.0039MW-8 Selenium, total,

mg/L

0.020398.47

09/19/2019 NoSTmdl 21 100.00 No/No <0.0020MW-8 Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 21 0.00 Yes/Yes 1,470.000MW-8 Solids, total

dissolved, mg/L

3,603.08198.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 2,700.000MW-8 Specific

Conductance @

25, micromhos/cm

5,275.32498.47

09/19/2019 NoSTpar 22 0.00 Yes/Yes 3.780MW-8 Strontium, total,

mg/L

9.98398.47

09/19/2019 NoSTpar 21 0.00 Yes/Yes 567.000MW-8 Sulfate, total, mg/L 1,718.10298.47

09/19/2019 NoSTpar 22 0.00 No/Yes 47.100MW-8 Turbidity, field,

NTU

6,027.84998.47

24MANAGES

Page 245: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-9D Arsenic, total,

mg/L

0.005096.34

09/19/2019 NoSTpar 23 0.00 No/Yes 0.0135MW-9D Barium, total,

mg/L

0.051298.47

09/19/2019 NoSTlow2 24 66.67 No/No <0.2000MW-9D Boron, total, mg/L 0.214096.86

09/19/2019 NoSTmdl 22 100.00 No/No <0.00100MW-9D Cadmium,total,

mg/L

0.00100N/A

09/19/2019 NoSTpar 24 0.00 No/Yes 18.700MW-9D Chloride, total,

mg/L

38.04298.47

09/19/2019 NoSTlow2 22 68.18 No/No <0.0020MW-9D Chromium, total,

mg/L

0.005096.34

09/19/2019 NoSTlow1 22 27.27 No/No 0.1340MW-9D Fluoride, total,

mg/L

0.500096.34

09/19/2019 NoSTpar 23 4.35 No/Yes <0.1000MW-9D Iron, total, mg/L 10.284698.47

09/19/2019 NoSTlow2 22 81.82 No/Yes <0.0020MW-9D Lead, total, mg/L 0.007596.34

09/19/2019 NoSTnon 22 4.55 No/No 0.0294MW-9D Manganese, total,

mg/L

0.830096.34

25MANAGES

Page 246: Rec’d Digitally 5( 7XUN *URXQGZDWHU 5HSRUW...Monitoring well MW-11 was installed on March 24, 2016. This well was sampled for the first time for the second quarter 2016 sampling

Normal /Compliance

Percent

of Non

detects

Count

Of Bkg

ResultsConfidence

Location Parameter Sample Date Lognormal Test Level Upper Limit Analysis Result Exceedance TrendLower Limit

09/19/2019 NoSTmdl 22 100.00 No/No <0.000200MW-9D Mercury, total,

mg/L

0.000025N/A

09/19/2019 NoSTlow2 22 77.27 No/No <0.0050MW-9D Molybdenum,

total, mg/L

0.015096.34

09/19/2019 NoSTpar 25 0.00 Yes/Yes 7.900MW-9D pH (field), pH 8.31798.47 6.502

09/19/2019 NoSTlow2 22 86.36 No/No <0.0020MW-9D Selenium, total,

mg/L

0.002896.34

09/19/2019 NoSTmdl 22 100.00 No/No <0.0020MW-9D Silver, total, mg/L 0.0010N/A

09/19/2019 NoSTpar 24 0.00 Yes/Yes 453.000MW-9D Solids, total

dissolved, mg/L

653.37698.47

09/19/2019 NoSTpar 25 0.00 Yes/Yes 765.000MW-9D Specific

Conductance @

25, micromhos/cm

859.65598.47

09/19/2019 NoSTnon 22 0.00 No/No 1.770MW-9D Strontium, total,

mg/L

5.80096.34

09/19/2019 NoSTnon 24 0.00 No/No 122.000MW-9D Sulfate, total, mg/L 230.00096.86

09/19/2019 NoSTnon 24 0.00 No/No 40.200MW-9D Turbidity, field,

NTU

306.00096.86

26MANAGES