receiver status update
DESCRIPTION
Receiver Status Update. MWA Project Meeting December 7 th 2011. Node 10’s first visit to MRO. Node 10 at the MRO on X15 Environmental protection Refrigeration system RF Shielding Ease of access and repair. A visit from the local residents. Major components include: - PowerPoint PPT PresentationTRANSCRIPT
Receiver Status Update
MWA Project MeetingDecember 7th 2011
Node 10’s first visit to MRO
Master Title3
Node 10 at the MRO on X15
Environmental protection
Refrigeration system
RF Shielding
Ease of access and repair
A visit from the local residents
Major components include:
Refrigeration Unit, DOCx Cards, ATIM-T Cards, Refrigeration Control unit, Receiver Crate
Same SBC as Node 10Mechanical Temperature FailsafeLexan covered for easy identificationSome trade-offs in design
Clock Board design is not as robust as I would like.Possible 6 nSec Jitter on SCTN arming.
Obsessive Compulsive Disorder (OCD
Should be 20dB below MIL-STD 461
Must be “Good Neighbor” to ASKAP
Problem with Orbcomm transmissions?
Orbcomm Hunter & Seeker (OH&S) Test Flight 1
Refrigeration failures on X15 & X16New unit but needs testing
Documentation is coming along.
Never detailed enough
First Receiver arrives27th Feb 2012 for testing.2nd April delivery for use.