recommended peel watershed regional land use plan: summary

28
Together for the Peel/Chuu Tl’ti Geenjit Khetok February 2010 SUMMARY: Recommended Peel Watershed Regional Land Use Plan Peel Watershed Planning Commission Whitehorse, Yukon

Upload: yukon-government-dept-energy-mines-resources

Post on 11-Mar-2016

226 views

Category:

Documents


3 download

DESCRIPTION

This plan summary should answer most of the questions of the average reader, but is much smaller than the plan itself. It contains more information than the original brochure. If you are not yet familiar with the Recommended Land Use Plan, this is a good place to start.

TRANSCRIPT

Page 1: Recommended Peel Watershed Regional Land Use Plan: Summary

Together for the Peel/Chuu Tl’ti Geenjit Khetok

February 2010

Summary: recommended Peel Watershed regional Land use Plan

Peel Watershed Planning Commission Whitehorse, yukon

Page 2: Recommended Peel Watershed Regional Land Use Plan: Summary

Cover photo: alpenglow over Goz Lake in the headwaters of the Bonnet Plume river.Jimmy Johnny

!9!9

!9

!9

!9

#*

#*#*#*#*

#*#*#*

#*#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*#*#*#*#*#*#*#*

#*

#*#*

#*

#*#*#*#*

#*#*

#*#*#*#*#*

#*

#*

#*#*

#*

#*

#*#*

#*#*

#*

#*

#*#*

#*#*

#*#*

#* #*

#*

#*#*#*#*#*

#*

#*#*#*

#*

#*

#*

#*

#*

#*

#*

#*

#*

#*#*#*

#*#*#*

#*

#*#*

#*#*#*#*

#*#*

#*#*

#*

#*

#*

#*

#*#*

#*#*

#*

#* #*#*#*

#*#*

#*

#*

#*

#*

#*

#*#*

#*

#*

#*

#*#*

#*

#*

#*

#*#*

#*#*

#*

#*

#*

#*

#*#*#*

#*

#*#*

#*

#*#*

#*

#*

#*

Rock River

Yu kon Ri ver

Engi neer Cre ek

Klon dikeRive r

To mbston e

We s

t

Rapi tan

RI

VE

R

MountMacD onald

QuartetLakes

PopcornfishLake

DogLake

ChappieLake

TurnerLake

Ra cklaPa ss

Aberdeen C anyon

RI

CH

AR

DS

ON

M

OU

NT

AI

NS

Do

l l

C k

En ter prise Ck

Dalg lish Ck

Eng

inee

r

C

k

Eng

inee

r

C

k

No rth

Cache C k

Sa pperHill

Gill L

RI

VE

R

Ha r t

Chance

Geo

rge

Riv e r

N a d a l e e n

R i v e r

Rackla

R i v e r

Or

t ho

go

na

l

Cre ek

Creek

K

R

McQ

ueste n

Ea gle

Fif

teen

mi le

R iver

C h a n d i n d u

Riv

er

Sw ede

K lon dike

No

rth

Kl o

ndi

ke

Riv

erYU

KO

N

Si x

t yM

R

Roc

kC

reek

Cre ek

Brew

ery

R

Waugh

Creek

R a e

C r e e k

H a r t

R i v e r

Ri v

e r

Ck

Corn

TatondukR

oyal

Ck

Bear

River

I l l t yd

Ck

Ck

K

n o r r

C r e e k

Hungry L

McQuestenL

B eaver

River

R i v e r

S t e w a r t

Whi te s t on e

Riv

er

Cre ek

Cre ek

Ri ver

Bl a

c k s t o ne

Riv

er

Ha

r t

Wi

nd

Ri v e r

R

Win d

Li t t le

Bo

nn

et

Pl u m

e

Ri v

er

Sn

ak

e

Ri v

e r

Cr

an

swi c

kR

ive

rN o i s y

Cr e

e k

Fi s

hi n

g

Br a

n c h

Mo u n

t ai n

Ck

R i ver

Trail

River

Cre

ek

AR

CT

IC

RE

D

RI

VE

R

Fishing

Lakes

Nerejo L

Ston eyCreek

Sch

ae ff er

Husky Lake

R i v e r

HungryCk

Runt

Ck

Min

er

R iver

Riv

er

Ea

gl e

Ro

c k

Pi n e

JohnsonC

k

CodyC

reek

Vyah

Kit

Creek

La

ChuteR

Lord

C

Bl u

e f i sh

Sal mon

Trout

R

Ra

MA C K E N Z

I E

RI

VE

R

O g i l v i e

R i v e r

Creek

O n t a r a t u e

R i v e r

Ra

mp

ar

t s

Ham

i lton

F o r k

F o r k

Ri v

er

RI V

ER

Ck

R i v er

Lak e

Ck

P E E L

Ca

ny

on

Cre

ek

Car i b ou

Road

Ri ver

Brown Bear

Ck

RI

VE

R

Sa

inv

i lle

R

PE

EL

Satah

RVit

trek

wa

Riv

er

Nu

kon

Ck

B e l lRi v

e r

TR

EV

OR

RA

NG

EKN

OR

R R A N G E

M A C K E N Z I E M O U N T A I N S

W E R N E C K E

M O U N T A I N S

N A D A L E E N R A N G E

N A H O N I

R A N G E

F

O G I L V I E M O U N T A I N S

MountBa ird

MountSc hellinger

MountPhelps

AitchHill

MountJo yal

IthothHill

Ed igii H ill

BO

NN

E

T P

LU

ME

R

AN

GE

BO

NN

E

T P

LU

ME

R

AN

GE

Go z

Goz Lake

Duo Lakes

Pinguicula L.

Elliot L.

Gillespie L.

McClusky L.

FairchildLake

MargaretLake

Hart L.

Lusk Lake(Caribou lake)

DeceptionLake

Chapman Lake

Bonnet Plume L.

Lomond L.

DEMPST

ER

NORT H KLONDIK E

HWY

HIGHW

AY

Arctic Cir cle

N O R T H W E S T T E R R I T O R I E S

N O R T H W E S T T E R R I T O R I E SY U K O N

Mason Hill

C A

S E L W Y N M O U N T A I NS

Mount F errellMount H art

Re dMountain

Ru styMountain

NadaleenMtn

Bo nnetPlumePa ss

MtPa tterson

MtCa meron

St eamboatMountain

Ca stleMountain

MountJe ckell

NorthForkPa ss

S eela Pass

To mbst oneTe rritorial P ark

MtHa rper

Ca ss iarDomeBa ldyMtn

MountBu rgess

Be arCa veMountain

MtRo ver

Sh arp Mtn

Ba ldHill

TI

NT

IN

A

TR

EN

CH

MountDempster

MountTurner

MountMc Cu llum

Mount H uley

Sa lter H ill

VGR- 07A

TGR- 07FS

VGR- 06A

NNDR- 04A

THR- 49A

NNDR- 07A

THR- 64B

VGR- 08A

NNDR- 11A

THR- 01A

VGR- 02A

THR- 02A

NNDR- 05A

THR- 03A

TGR- 03FS

VGR- 05A

TGR- 10FS

TGR- 08FS

NNDR- 17A

TGR- 12FS

VGR- 04A

NNDR- 08B

TGR- 04FS

THR- 79B

NNDR- 10B

NNDR- 09B

THR- 58B

THR- 20A TH

R- 22B

THR- 80 B

TGR- 05FS

TGR- 13FS

TGR- 14 FS

TGR- 11 FS

TGR- 01 FS

THR- 07 A

VGR- 12 A

THR- 11 A

VGR- 09 A

THR- 83 A

NNDR- 26 B

THR- 19 B

THR- 14A

THR- 23 A

THR- 27 A

THR- 21 B

THR- 31A

THR- 25 A

THR- 40B

THR- 34 B

THR- 29 A

THR- 33 A

THR- 28 A

THR- 66 A

THR- 63A

THR- 69B

THR- 41 B

THR- 35 B

THR- 59 B

THR- 32 A

THR- 70 B

THR- 38 A

NNDR- 15 B

VGS- 3A

VGS- 6A

VGS- 1A

VGS- 7A

THS- 2B

VGS- 19A

VGS- 37A

S- 30A

VGS- 17A

VGS- 32A

VGS- 44A

VGS- 10A

VGS- 45A

VGS- 16A

VGS- 16A

VGS- 39A

VGS- 48A

TGS- 4F S

TGS- 4F S

TGS- 3F S

TGS- 9F S

TGS- 6F S

TGS- 8F S

THS- 31B

THS- 64B

NNDS- 1B

THS- 74B

THS- 13B

THS- 12B

THS- 90B

THS- 14B

THS- 75B

THS- 33B

THS- 30BTH

S- 29B

THS- 88B

THS- 25B

THS- 24B

THS- 27B

THS- 66B

THS- 99B

THS- 50B

THS- 47B

THS- 80B

VGS- 2A /D

VGS- 4A /D

VGS- 8A /D

VGS- 9A /D

TGS- 11F S

TGS- 12F S

TGS- 10F S

THS- 107B

THS- 169B

TGS- 11F S

TGS- 12F S

NNDS- 185

NNDS- 106

THS- 200B

THS- 171B

THS- 155B

THS- 186B

THS- 181B

THS- 145B

THS- 134B

THS- 135B

THS- 123B

THS- 144BTH

S- 206B

THS- 176B

THS- 142B

THS- 159B

VGS- 59A /D

VGS- 57A /D

VGS- 14A /D

VGS- 13A /D

VGS- 11A /D

VGS- 12A /D

VGS- 56A /D

VGS- 41A /D

VGS- 40A /D

NNDS- 187B

NN DS- 138B

NNDS- 134B

NNDS- 122B

NNDS_ 115B

NN DS- 137B

NNDS- 143B

NNDS- 102B

NNDS- 101B

NNDS- 104B

NNDS- 139B

NNDS- 188B

NNDS- 149B

NNDS- 152B

NNDS- 151B

NNDS- 135B

NNDS- 150B

NN DS- 198B

NND

NN DS- 168B

NNDS- 171B

NN DS- 121B

NN DS- 103B

NNDS- 140B

NN DS- 125B

NNDS- 124B

NNDS- 148B

NNDS- 130B

NN DS -172B

TGS- 2F S

TGS- 7F S

THS- 28B

THS- 41B

THS- 72B

THS- 71B

THS- 128B

TGS- 13F S

THS- 112B

THS- 184B

THS- 109B

THS- 180B

THS- 124BTH

S- 202B

THS- 136B

THS- 137B

THS- 138B

THS- 143B

THS- 168B

THS- 106B

THS- 113B

THS- 203B

THS- 205B

VGS- 58A /D

VGS- 20A /D

NN DS- 105B

NN DS- 133B

NNDS- 183B

NN DS- 184B NN D

S- 170BNND

S- 169B

NNDS- 127B

THS- 26B /D

THS- 208B /D

Dawson

Eagle Plains

LMU 9

LMU 12A

LMU 7

LMU 6

LMU 2B

LMU 5 LMU 4B

LMU 10B

LMU11

LMU8B

LMU10A

LMU8A

LMU8C

!I

!5

!G

!4

!F

!N

!M

!K

!5

!H

!E

!D

!B

!C!3

!B

!1

!1

!A

!L

!P

!O

!J

!2

130°

131°

131°

132°

132°

133°

133°

134°

134°

135°

135°

136°

136°

137°

137°

138°

138°

139°

139°

140°

140°141°142°

67°

67°

66°

66°

65°

65°

64°

64°

F0 20 40 60 km

Map 1: Landscape Management Unit Index

Special Management Areas

Integrated Management Areas1 - Lower Ogilvie River2 - Dempster Highway3 - Blackstone River4 - Dalglish Creek5 - Peel Plateau

Watershed Management EmphasisD - Wind/Bonnet Plume River

A - Ogilvie River HeadwatersC - Hart RiverG - Richardson Mountains - SouthP - Mid-Peel River and Big Eddy

Fish and Wildlife Emphasis

Heritage EmphasisF - Hungry LakesN -Tshuu tr'adaojìich'uu / Aberdeen and Peel CanyonsO - Teetl'it njik / Lower Peel River

First Nation Settlement and Tetlit Gwich'in Yukon Lands

Site selection#

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

R-blocks

Protection EmphasisB - Blackstone River UplandsE - Snake RiverH - Richardson Mountains - NorthI - Vittrekwa RiverJ - Tabor LakesK - Jackfish Creek LakesL - Chappie Lake ComplexM - Turner Lake Wetlands

Landscape management unitDempster Hwy Development Area

Peel Watershed planning region

Landscape Management UnitsDesignation & Emphasis

Integrated Management Area

SMA - Heritage

SMA - Fish & Wildlife

SMA - Watershed Management

SMA - Protection

Page 3: Recommended Peel Watershed Regional Land Use Plan: Summary

Contents

acknowledgements 2

message from the Commission 4

Highlights of the recommended Plan 5

about the Plan 6

Introduction 7

Principles and goals 9

Planning process 11

Planning region overview 13

Key issues and findings 15

Tools and concepts 17

recommendations 19

Implementation 23

Next steps 24

acronyms

GmD General management Direction

Ima Integrated management area

Lmu Landscape management unit

OrV Off-road vehicle

PWPC Peel Watershed Planning Commission

Sma Special management area

uFa umbrella Final agreement

yLuPC yukon Land use Planning Council

About our logo:

The logo of the Peel Watershed Planning Commission depicts several groups of people (represented by four blue droplets of water) working together for the Peel Watershed (the red circle in the middle). The green background suggests a healthy environment, while the red outer circle enclosed by a blue circle suggests the interconnection between people and the Peel Watershed.

An earlier version of this plan, published on the web in December 2009, erroneously stated that existing industrial land use was prohibited in

Special Management Areas with an emphasis on general environmental protection (see Table 3, page 20).

Page 4: Recommended Peel Watershed Regional Land Use Plan: Summary

u a narrow mountain tributary of the Snake river. John meikle, Government of yukon

2 Summary: recommended Peel Watershed regional Land use Plan

acknowledgementsThis Plan was developed with the help of many partners. A large number of agencies and groups supported the work of the Peel Watershed Planning Commission (PWPC) with information collection and analysis, the development of planning concepts, responses to early drafts, and the writing and editing of various planning documents.

The Commission appreciates the assistance of its key partners. We thank the Yukon Government, represented by the Internal Working Group and other staff, the First Nation governments of Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin, and the Gwich’in Tribal Council for their sustained involvement and contributions. Special thanks to the chiefs and councils, elders, and community members who took time to provide guidance and share their knowledge.

Representatives from each of these five key partners sat on PWPC’s Senior Liaison Committee and the Technical Working Group. These two groups provided extensive guidance, information, and comments on Commission documents. The Wildlife Conservation Society, Ducks Unlimited Canada, Environment Canada (Canadian Wildlife Service), and Fisheries and Oceans Canada also provided assistance. Thanks also to the Gwich’in Land Use Planning Board and the North Yukon Planning Commission for their experience, insights, examples, and advice.

The Commission appreciates the contribution of colleagues from the Yukon Land Use Planning Council (Ron Cruikshank, Jeff Hamm, Gerald Isaac, and Megan Schneider), who provided finan-cial administration, mapping, technical reviews, First Nations community liaison, and general advice. Former Commission member Ken Roberts and former staff members Brian Johnston, Kathleen Zimmer, Richard Vladars, and Graham Baird laid the foundations for this plan. Thanks also to YLUPC Chair Doug Phillips and Council members Ian Robertson and Steven Buyck for their advisory roles in guiding the PWPC from inception to delivery of the Recommended Plan.

We also thank the many individuals from interested organizations who reviewed preliminary drafts, provided written comments, and participated in meetings. Finally, we gratefully acknowl-edge members of the public for their attendance at public meetings, their direct enquiries, and their considerable written response to earlier documents and drafts.

Page 5: Recommended Peel Watershed Regional Land Use Plan: Summary

The Plan recognizes and supports the heritage and culture of the Na-Cho Nyak Dun, the Tr’ondëk Hwëch’in, the Vuntut Gwitchin, the Tetłit Gwich’in, other affected First Nations, and the yukon.

Page 6: Recommended Peel Watershed Regional Land Use Plan: Summary

4 Summary: recommended Peel Watershed regional Land use Plan

message from the CommissionIn writing this Plan, the Commission considered research and reports, stakeholder submissions, and public consultations, as well as advice and statements from the key partners. The Recom-mended Plan differs substantially from the Draft Plan issued in April 2009. The responses to the Draft Plan made clear that the conflicting visions for the Peel Watershed Planning Region were intractable and that its compromise approach satisfied no one.

As this planning process is founded in the UFA, the Commission focused on “sustainable development.” The UFA definition is clear that ecosystems and social systems must be sustained, and development should be fostered as long as it does not undermine them. The UFA also requires the Commission to recommend measures to limit actual and potential land-use conflicts, to “recognize and promote the cultural values of Yukon Indian People,” and to “promote the well-being of Yukon Indian People, residents of the region, the Yukon as a whole, and consider the interests of other Canadians.” This Plan accomplishes these objectives.

In view of the starkly drawn conflicts over how to manage lands and resources in the planning region, the Commission offers a conservative, cautious plan that preserves the maximum number of future options for society. The Plan recommends a substantial amount of protection for the planning region, but it also provides a process by which society can amend the Plan in light of new information or changed priorities. As the Peel Watershed is unique in several key ways, the Commission does not consider this Plan to be a template for other planning regions in the Yukon.

The Plan recommends that 80.6% of the planning region be given a high degree of protection as designated Special Management Areas (SMAs). These SMAs emphasize a range of priorities: heritage management (2.1%), fish and wildlife management (19.6%), watershed management (27.7%), and general environmental protection (31.2%). The Plan also recommends that proposed Special Management Areas should be immediately withdrawn from staking. However, continued aerial access to, and development of, existing mineral claims will be allowed, subject to specific management conditions. New surface access development is prohibited within SMAs. A Plan Amendment will be required to modify this recommendation.

In Integrated Management Areas (19.4% of the planning region), mineral and oil and gas resources can be developed. Such development is subject to key land-use and environmental management considerations, including enhanced community consultation where specified.

u l: Cloudberries from the Blackstone uplands. Heritage Department Collection, Tr’ondëk Hwëch’in archive

c: a fuel cache at an airstrip near the Bonnet Plume river. Steven Buyck, FNNND

r: Draft Plan consultation with the North yukon rrC in Old Crow. PWPC

Page 7: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 5

Highlights of the recommended Plan The Plan provides a sustainable development framework for land management in the Peel Watershed Planning Region.

The Plan addresses several issues, including: • the potential development of roads in an area where wilderness and ecosystem integrity are

important to outfitters, tourism operators, affected First Nations, and wildlife.• the potential effects of development on wetlands, lakes, and rivers.

The Plan divides the region into 21 Landscape Management Units (LMUs) (see Map 1).

LMUs are designated as either: • Special Management Areas (SMAs) with one of four emphases (heritage, fish and wildlife,

watershed management, or general protection). • Integrated Management Areas (IMAs) where more development may be possible.

For each SMA, the Plan also recommends a type of protected area that best fits the Commission’s vision for the area. These types of protected area are clearly described in existing laws (e.g., natural area park, habitat protection area).

Under the Plan, 19.4% of the region is in IMAs, while 80.6% is in SMAs. SMAs are recommended for withdrawal from staking. However, existing oil and gas and mineral tenures may remain, subject to certain conditions of operation.

The Plan imposes the following conditions on new and existing roads and trails:• It does not allow new roads or winter trails in the region, except near the Dempster Highway.

They may later be permitted in IMAs if (a) enhanced consultation with affected First Nations is carried out, along with protection of key wildlife values, and (b) the Plan is amended.

• It recommends strict control of any new roads or trails, if and when allowed. It also states that the developer must restore the area to its original state when development ends.

• The Plan recommends developing a sub-regional plan for the Dempster Highway corridor.• It recommends that the Wind River Trail no longer be considered an existing right-of-way.

The Plan recommends an immediate interim land withdrawal from mineral staking and new gas tenures.

The Plan recommends the development of a comprehensive regional water management plan.

Page 8: Recommended Peel Watershed Regional Land Use Plan: Summary

6 Summary: recommended Peel Watershed regional Land use Plan

about the PlanThis document summarizes the full Recommended Peel Watershed Regional Land Use Plan. The full Plan was produced by the Peel Watershed Planning Commission (PWPC) as part of the imple-mentation of Chapter 11 of the Final Agreements of the Na-Cho Nyak Dun, Tr’ondëk Hwëch’in,

and Vuntut Gwitchin First Nations.

A cornerstone of the Plan is the definition of sustainable development found in the Umbrella Final Agreement (UFA). The definition suggests that renewable and non-renewable land uses should be allowed only if ecosystems and social systems can be sustained at the same time. The Recommended Plan will help ensure that wilderness characteristics, wildlife and their habitat, cultural resources, and waters are maintained over time while managing resource use.

Who is the Peel Watershed Planning Commission?

As described in Chapter 11 of the UFA, the Peel Watershed Planning Commission is an independent public commis-sion. Its members are nominated by the key partners. The Commission was formed in fall 2004 and is composed of

six members. They are nominated by the First Nation of Na-Cho Nyak Dun (one nominee), the Gwich’in Tribal Council (one nominee), the Yukon Government/Vuntut Gwitchin First Nation (joint nominee), the Yukon Government/Tr’ondëk Hwëch’in (joint nominee), and the Yukon Government (two nominees).

Who are the Parties to the Plan?

The Parties are governments and agencies with jurisdictions in the planning region. The Yukon Government, the Gwich’in Tribal Council of the Northwest Territories (NWT), and the Yukon First Nations of Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin are all Parties to the Plan. These Parties all agreed to establish the Peel Watershed Planning Commission. In this docu-ment we refer to them as key partners.

Hunting practice and hauling firewood on the lower Peel river. PWPC

Page 9: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 7

IntroductionThe Recommended Peel Watershed Land Use Plan is the second regional land use plan in Yukon produced under the mandate of Yukon First Nation land claims agreements. This Plan and future ones will make up the territory’s regional planning regime.

Regional land use plans help us to visualize and achieve the kind of future we want. They are collective statements about how to manage land and resources within a given area, and they provide guidance for making decisions about that area.

This Plan aims to reflect the vision, values, and interests of the Tetłit Gwich’in of the NWT, the Yukon First Nations of Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin, and Yukoners as a whole. It also aims to ensure that wilderness characteristics, wildlife and their habitats, and waters are sustained over time while managing human activities in the Watershed.

The Plan provides a “sustainable development” framework for land management in the Peel Watershed Planning Region. All land uses must be consistent with sustaining ecosystems and social systems.

Background

In 1993, the Council for Yukon Indians, along with the governments of Yukon and Canada, signed the Umbrella Final Agreement. This document provided the framework for subsequent land claim and self-government agreements. Self-government agreements for the First Nation of Na-Cho Nyak Dun and Vuntut Gwitchin First Nation were signed in 1993, while the Tr’ondëk Hwëch’in signed their agreement in 1998. Independently, the Gwich’in of the NWT and the governments of the Northwest Territories and Canada signed the Gwich’in Comprehensive Land Claim Agreement in 1992. This document includes agreements about Yukon lands of the Tetłit Gwich’in.

above: The confluence of Hungry Creek (l) with the Wind river (r); mount Deception is in the background; evidence of a winter trail is in the foreground. John meikle, Government of yukon

Page 10: Recommended Peel Watershed Regional Land Use Plan: Summary

8 Summary: recommended Peel Watershed regional Land use Plan

All these agreements require the development of regional land use plans. The Yukon portion of the Peel River watershed falls within the tradi-tional territories of the Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, Vuntut Gwitchin, and the Tetłit Gwich’in. The Peel Watershed Planning Region (Map 2), which is roughly the same as the Yukon portion of the Peel River water-shed, is the focus of this Plan.

Since late 2004, the Peel Watershed Planning Commission has been involved in producing this Plan. The governments of Yukon, Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin, and the Gwich’in Tribal Council, are responsible for its approval and implementation.

Why plan now?

Economic development activity in Canada’s North will continue to increase. Interest in oil and gas and mineral resources will probably continue to be high. The demand for wilderness and culture-based tourism

activities is growing. New roads will be proposed. Increasing levels of economic development will bring many benefits to the North, but will not come without negative effects. With proper planning, many of these effects can be avoided.

Imagine a road map of Canada in 1900, 1925, 1950, 1975, and now. Over that time, roads became more and more densely built, and they also gradually moved northward. The pattern could continue, bringing more and more roads to the Yukon, and with them the amount of human activity on the land. Some activities may negatively affect others or may affect the environ-ment and traditional culture. The people of the Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, Vuntut Gwitchin, Tetłit Gwich’in, and other First Nations, who have lived in this region for millennia, depend on the health of the land and its waters, wildlife, fish, and plants. This Plan makes an important contribution to putting regional conservation measures in place before levels of land-use activity increase.

Y U K O N

N O R T H W E S TT E R R I T O R I E S

AL

AS

KA

BR IT ISH COLUMBIA

Fort McPherson

Peel Watershed Planning Region

Whitehorse

Mayo

Dawson

EaglePlains

Inuvik

Old Crow

A R C T I C C I R C L E

B E A U F O R T S E A

map 2. Peel Watershed Planning region

Page 11: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 9

Principles and goals There are six guiding principles that underlie the Peel Watershed Regional Land Use Plan:• independence and impartiality;• sustainable development;• First Nations traditional and community resource use;• conservation;• adaptive management; and• the precautionary principle.

Independence and impartiality

The Peel Watershed Planning Commission is an independent public agency appointed to represent the best interests of Yukon people.

The Commission must consider, in a balanced and neutral manner, any and all information, advice, or recommendations provided to it by any government, agency, or the public.

Sustainable development

The core principle that guides the Plan is sustainable development, as defined in the Umbrella Final Agreement: “Beneficial socio-economic change that does not undermine the ecological and social systems upon which communities and societies are dependent.”

Specific goals flow from the principle of sustainable devel-opment (Figure 1).

First Nations traditional and community resource use

The Plan will promote the interests, rights, and responsi-bilities of the Tetłit Gwich’in, Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin for the conservation and use of their traditional territories.

It will support their country food harvest, their renewable resource economy, and other purposes they choose for settlement lands.

Conservation

The Plan proposes to use the conservation principle in managing fish and wildlife, their habitats, and waters.

Conservation is defined in the Umbrella Final Agreement as “the management of Fish and Wild-life populations and habitats and the regulation of users to ensure the quality, diversity and Long Term Optimum Productivity of Fish and Wildlife populations, with the primary goal of ensuring a sustainable harvest and its proper utilization.”

Whitefish in a smoking shack on the Peel river.Peter mather

Page 12: Recommended Peel Watershed Regional Land Use Plan: Summary

10 Summary: recommended Peel Watershed regional Land use Plan

adaptive management

The Plan is a living document. It will be reviewed, monitored, and updated to respond to changes in land use and/or the environment, or as better information becomes available.

Adaptive management means that we must “look, learn, and adjust as required.”

Precautionary principle

The Plan recognizes that the Peel Watershed is an intact ecosystem. It also recognizes the need to consider potential effects before making resource decisions.

Our limited understanding of the effects of different land uses on other resources in the North makes this especially important.

The International Institute for Sustainable Development gives this description of the precaution-ary principle: “A lack of conclusive scientific evidence does not justify inaction on managing the environment, particularly when the consequences of inaction may be undesirable or when the costs of action are negligible.”

Figure 1. Plan goals and their relationship to sustainable development

Sustain ecosystem integrity first Conserving the land, its living things, and its processes is the fundamentalpriority

Sustaincommunities

and cultures nextPreserving

communities andcultures relieson achievingsuccess with

the first priority

Sustainabledevelopment

Foster sustainable economic activitiesthird There are two kinds of sustainability: activities that do not degrade the land orundermine communities and can be sustained indefinitely; and activities that deplete resources, but from which the land can recover

Not all economic activities fit everywherein this region

The Plan provides a sustainable development framework for land management in the Peel Watershed Planning Region. All land uses must be consistent with maintaining intact regional ecosystems and social systems.

Page 13: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 11

Planning processThe PWPC started working towards the Plan in late fall 2004. Since then, the Commission has worked with many agencies and groups, and has hosted consultations and workshops in Mayo, Dawson City, Old Crow, Inuvik, Fort McPherson, and Whitehorse. The Commission has writ-ten reports, descriptions of three scenarios, and a Draft Plan. The Recommended Plan is a result of consultation and feedback on those earlier documents, and further analysis. At this stage, the Commission has completed most of its work in Plan development (Table 1).

Table 1. Phases of Plan development

Time frame Planning phase

2004–2005 Phase 1 Commission start-up

2005–2006 Phase 2 Issues gathering

2006–2008 Phase 3 Information gathering

2008–2009 Phase 4Phase 5

Planning tools and componentsDevelopment of land use scenarios

2009 Phase 6 Development of Draft Land Use Plan

2009 Phase 7 Development of Recommended Land Use Plan

2009–? Phase 8 The key partners review the recommended Land use Plan, consult with one another and with regional communities, and accept it as the approved Land use Plan Or reject it Or recommend modifications to the Commission

? Phase 9 The Commission modifies the recommended Land use Plan to create the Final Recommended Land Use Plan

? Phase 10 The key partners review the Final recommended Land use Plan and approve it Or modify it Or reject it.

We are here

Page 14: Recommended Peel Watershed Regional Land Use Plan: Summary

This Plan aims to ensure that wilderness characteristics, wildlife and their habitats, and waters are sustained over time while managing human activities in the watershed.

Page 15: Recommended Peel Watershed Regional Land Use Plan: Summary

t The late fall landscape of the Source Peaks area. Jimmy Johnny

Summary: recommended Peel Watershed regional Land use Plan 13

Planning region overview

Setting

The Peel Watershed Planning Region makes up about 14% of the Yukon. At about 68,000 square kilometres, it is almost as large as New Brunswick. Despite its name, the region does not cover exactly the same area as the Peel Watershed. Portions of the watershed are in Tombstone Territorial Park and in a block of settlement land on the Ogilvie River, both of which are outside the planning region.

The region is the only one in the Yukon without permanent settlements, though there is a seasonal population base. Commercial or residential facilities are connected to Demp-ster Highway maintenance operations, big-game outfitting base camps, trapping concessions, and temporary mineral exploration camps. There is one all-season road, the Dempster Highway.

Land ownership, regulation, and management

The Government of Yukon manages non-settlement, or public, lands (both surface and subsurface rights), which total 97.3% of the region. There are no protected areas in the region, though the Bonnet Plume River has been recognized as a Canadian Heritage River. Traditional territories of settled First Nations overlap with one another and with all of the non-settlement lands in the region. First Nation citizens have various trapping and hunting rights in their traditional territories.

The Tetłit Gwich’in of the NWT own eleven blocks of fee-simple settlement land — with surface rights only — and fourteen smaller site-specific settlement lands, representing 2.32% of the plan-ning region. These are the only privately owned lands in the planning region. As with Yukon First Nations, the Tetłit Gwich’in have areas where they have trapping and hunting rights. These areas are in the Richardson Mountains and the northern plateau and plains of the planning region.

The Na-Cho Nyak Dun hold 25 site-specific settlement lands and one Category A block (which means they own both surface and subsurface rights), accounting for 0.38% of the region. The tradi-tional territory of the Na-Cho Nyak Dun includes the entire region east of the Dempster Highway.

The Tr’ondëk Hwëch’in have eight site-specific blocks and two Category B blocks (which means they own surface rights only), totalling less than 0.01% of the region. Their traditional territory includes all of the Ogilvie and Blackstone drainages and part of the Hart watershed.

The Vuntut Gwitchin have two site-specific blocks along the Dempster Highway. Their traditional territory includes the lower reaches of the Ogilvie and Blackstone rivers, the Peel River above the Hart, and upper Canyon Creek.

Vittrekwa Wetlands, with the richardson mountains in the background.John meikle

Page 16: Recommended Peel Watershed Regional Land Use Plan: Summary

14 Summary: recommended Peel Watershed regional Land use Plan

Environment

The Peel Watershed has a cold and dry climate. Short spruce forests, shrub and tundra vegetation underlain with permafrost, and scattered wetlands are found in low-lying areas. The wetlands are ideal habitats for culturally important waterfowl, furbearers, and moose, and they act as reservoirs of water. Some of the wetlands are thought to be sensitive to disturbance and climate change.

High-elevation mountain ranges contain rock and sparse vegetation. Large tributaries of the Peel River are often flanked by gravel bars, shrubs, and older stands of big white spruce. Rivers exhibit

very low winter flows and dramatic variations in the summer.

The region has a number of unusual plants, and also has animal species that are listed as national or international conservation concerns. These include the wolverine, northern mountain caribou populations (e.g., Hart River, Bonnet Plume, and Redstone herds), grizzly bear, Peregrine Falcon, Short-eared Owl, and ten other types of birds. The Porcupine and Boreal caribou also use much of the region. Caribou, moose, and fur-bearers like marten and beaver have been highly important to First Nations for generations. The watershed also supports a unique collection of fish species; some of these are also culturally important.

Heritage resources

There are currently no settlements in the planning region. However, the Tr’ondëk Hwëch’in, Na-Cho Nyak Dun, and Vuntut Gwitchin of the Yukon, and the Tetł’it Gwich’in of the Northwest Territories have traditionally lived in, travelled, or harvested vir-tually every corner. This presence is reflected in the many trails and named places, which provide a window into the culture and history of the region. Archaeological evidence shows that the area has been occupied for millennia. Fossils and other plant remains, dinosaurs, ancient fish, insects, and ice age mammals have all been found at a number of sites around the region.

Economy

The regional economy today is a mixed one, in which traditional subsistence harvesting and wage-based activities co-exist. Subsistence hunting, gathering, and trapping are still very important economic and cultural activities to residents of Mayo, Keno City, Dawson City, Fort McPherson, and Old Crow. These communities also want to participate in the wage economy.

Big-game outfitting has occurred in the Peel Watershed for decades. Sport hunting species are Dall’s sheep, grizzly bear, caribou, and moose. Outfitting generally occurs in the more moun-tainous south of the region. More recently, tourism along the Dempster Highway and in the backcountry has become economically important. Operators in both of these industries require large intact wilderness and healthy wildlife populations.

Oil, gas, and mineral exploration in the Peel Watershed has also been part of the local economy for many decades. Oil and gas exploration has focused on the flatter plains and plateaus in the northern part of the region, while most mineral exploration has taken place in the mountainous

Charmaine Christiansen performs archeology work at a test pit at Black City on the Blackstone river.Heritage Department Coll., Tr’ondëk Hwëch’in archive

Page 17: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 15

portions. Discoveries include deposits of natural gas, coal, iron, and zinc, as well as potential for other commodities including copper and uranium.

The main methods of travel in this region are rivers, trails, winter roads, the Dempster Highway, and airplanes. The Wind River Trail and the Hart River Winter Road are two well-known winter trails used occasionally to support exploration projects. There are also a number of small air-strips. Oil and gas development and mining generally need gravel roads, which in turn need large amounts of gravel.

Key issues and findingsThe Plan’s principles and conclusions flow from the issues and findings that emerged from the Com-mission’s consultations and research. Some especially important issues and findings are listed here:• Local First Nations have stated clearly that they depend upon intact regional ecosystems and

landscapes in the Peel Watershed. A conservative and precautionary approach will sustain current uses while keeping future resource options open for First Nation citizens.

• Large parts of the Yukon public have identified values and interests that match those of the affected First Na-tions. They believe that ecosystem wholeness and intact landscapes are the most important land-use consider-ations in the planning region.

• Air access to mineral claims may have been generally manageable, but most of the Yukon public believes that surface access such as roads will undermine the region’s wilderness character outside the Dempster Highway corridor. This wilderness character is very important to most renewable resource sectors (e.g., tourism operators, big-game outfitters) in the planning region.

• Many people, especially those living along the lower reaches of the Peel River, are concerned about sustain-ing clean water and natural flows. Low winter flows are a major limit on certain forms of industrial development in the planning region.

• The Commission believes that current consultation processes and site management for oil and gas development are adequate. However, affected First Nations do not yet have enough information to understand the cumulative effects of such development.

• The Plan is not a template for other Yukon regional land-use plans. It is specific to the region’s unique biophysical and socio-economic features and values.

• Cumulative environmental and socio-economic effects are not well understood or evaluated in project assessments in the Yukon.

• Roads, trails, and off-road vehicles like ATVs and snowmobiles are affecting caribou popula-tions. Voluntary conservation measures may not be enough to sustain these herds at accept-able levels.

• Some resource conflicts are not reconcilable and cannot be solved by on-site management techniques.

Decades-old signs of mineral exploration near the Snake river and Iron Creek.PWPC

Page 18: Recommended Peel Watershed Regional Land Use Plan: Summary

The Plan addresses the potential development of roads in wilderness, which is important to outfitters, tourism operators, First Nations, and wildlife.

Dog teams are still used in the Wernecke mountains.Blaine Walden, Walden’s Guiding & Outfitting

Page 19: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 17

Tools and conceptsThe Plan proposes five tools to communicate and guide land management decisions in the region. Four of these tools function like the supportive legs of a table. These are Landscape Management Units (LMUs), the land-use designation system, LMU-specific con-ditions, and general management directions/monitoring. The fifth tool, Plan conformity evaluation, is like the table top that holds the rest of the Plan’s “legs” or tools together. These tools comple-ment each other and form part of an integrated land-use plan.

Plan conformity evaluation

The Plan guides how existing and new land-use proposals may be evaluated to see if they are consistent (or in conformance) with the Plan. Key partners may decide to use existing regulatory agencies, like YESAB, to evaluate plan conformance.

However, the Plan needs to be flexible in order to adapt to unforeseen circumstances. Decisions about changing the Plan may be influenced by: new land-management approaches; significant new land and resource informa-tion; better knowledge about land-use effects; changes in society’s values; changed demand for land and resources in the region; and new technology affecting land-use management.

The Plan provides three procedures for allowing new land uses that are not permitted under the current version of the Plan: • Plan variances (for land uses that do not conform with some conditions set in the current

Plan) — involves affected key partners.• Plan amendments (for alterations to the Plan’s framework, policy, or management directions)

— involves the Commission and key partners.• Plan review (a systematic process for updating the Plan, either after a five- to seven-year period

or when the key partners agree that a review is needed) — involves the Commission and key partners.

Landscape management units (Lmus)

Different parts of the region have different characteristics, and therefore need to be managed differ-ently. To do this, the region is divided into 21 Landscape Management Units (LMUs). These are dis-tinct areas of land that have well-defined ecological or topographical boundaries (e.g., a watershed boundary, a change from mountains to plain, or a change in vegetation). Some LMUs also have unique ecological characteristics that need special management (e.g., lakes and wetlands on perma-frost). Still other LMUs have concentrations of values for existing or potential land uses (e.g., Eagle Plains oil and gas basin, or overlapping of traditional use areas around Hungry Lakes). The tools of the plan apply differently to each LMU, and the Plan provides a vision statement for each LMU.

Land-use designation or zoning

If LMUs are different parts of the region, land-use designation fits each LMU into a category or zone. Together with a vision statement for each LMU, the zoning provides the broadest level of guidance for land and resource decision making.

What is Plan conformity?

When the Plan is formally approved, it becomes a guide for regulatory agencies like the yukon Environmental and Socio-economic assessment Board in reviewing new proj-ects. The regulator must check whether a land-use activity fits with (conforms with) the Plan.

Page 20: Recommended Peel Watershed Regional Land Use Plan: Summary

18 Summary: recommended Peel Watershed regional Land use Plan

The Plan creates two major management zones to guide future land-use decisions in the region:

1. Special Management Areas (SMAs) These areas do not allow new industrial tenures like mineral claims, oil and gas exploration per-mits, or new winter or all-season roads. SMAs can be one of several types of protected area (e.g., territorial park, national park, habitat protection area) that provide additional legal strength. One or more types of protected area are recommended for each SMA, as well as one of four emphases.

2. Integrated Management Areas (IMAs) These areas may still have very high ecological, heritage, and cultural values; however, the Commission believes these zones can include industrial resource development in a working

landscape. Unlike within the Plan’s SMAs, new oil and gas exploration permits and mineral claims may be staked, although new winter roads or all-season roads are still not allowed. However, the Plan provides an amendment process if industrial development can meet the environmental and socio-economic goals of the Plan (see Plan conformity evaluation).

management conditions

Management conditions (Table 4) are specific rules that apply to a particular LMU. Where an LMU is particularly sensitive to some activities, or where many activities are allowed, more management conditions may apply.

There are Class A and Class B conditions. Class A conditions are man-datory and can only be avoided by going through a formal amendment process, while the more flexible Class B conditions may be avoided with a Plan variance.

General management directions and monitoring

General management directions provide additional guidance for human activities in most of the region. These directions are organized in two main groups:

1. Management of land use by sectorThese directions pertain to different human activities and are divided into sectors (Table 5). For each sector, the Plan lists key issues and may also make a number of recommendations. There are two kinds of recommendations: a) Policy: These recommendations are mainly for regulators and developers. Policy recommendations may require some kinds of activities to be done a certain way or not at all; and b) Research: The Plan recommends more research in certain areas. The key partners will generally be responsible for carrying out the research in order to support better land-use decisions.

2. Management of land use by potential impactDespite the management directions above, various effects or concerns may still occur and are divided into categories (Table 6). For each one, the Plan lists key issues, as well as any policy or research recommendations. These recommendations are generally directed to the key partners.

Putting it all together

In the Plan, each Lmu is discussed in its own section. These sections contain a map of the Lmu; the land-use designation (or zone) with checkboxes showing which general land uses may be allowed; man-agement conditions; a description of land own-ership and status; and a description of ecological, heritage, cultural, and economic values.

Page 21: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 19

recommendations

Landscape management units (Lmus)

The 21 LMUs proposed in the planning region are shown on Map 1. They range in size from 157 km2 (0.2% of the region) to 18,678 km2 (27.7% of the region). Table 2 pro-vides an overview of these planning units. Five LMUs have been assigned to Integrated Management Areas (IMAs), and are numbered 1 to 5. The other sixteen LMUs have been assigned to Special Management Areas (SMAs). These are labelled A to P.

The Recommended Plan gives more complete descriptions for each LMU, including maps and photos. LMUs cannot be significantly changed without a Plan amendment.

Table 2. Summary, Landscape management units

Landscape Management Unit Designation and emphasis Area (km2)

Area (%)

ECC*

Integrated Management Areas (IMAs)1. Lower Ogilvie river2. Dempster Highway3. Blackstone river4. Dalglish Creek5. Peel Plateau

ImaIma - Sub-regional Planning areaImaImaIma

2,7721,8992,7731,5994,004

4.12.84.12.45.9

yesyesyesyesyes

Ima total 13,047 19.4

Special Management Areas (SMAs)a. Ogilvie river HeadwatersB. Blackstone river uplandsC. Hart riverD. Wind/Bonnet Plume riverE. Snake riverF. Hungry LakesG. richardson mountains - SouthH. richardson mountains - NorthI. Vittrekwa riverJ. Tabor LakesK. Jackfish Creek LakesL. Chappie Lake Complexm. Turner Lake WetlandsN. Tshuu tr’adaojìich’uu/aberdeen and Peel CanyonsO. Teetl’it njik/Lower Peel riverP. mid-Peel river and Big Eddy

Sma - Fish and WildlifeSma - ProtectionSma - Fish and WildlifeSma - Watershed managementSma - ProtectionSma - HeritageSma - Fish and WildlifeSma - ProtectionSma - ProtectionSma - ProtectionSma - ProtectionSma - ProtectionSma - ProtectionSma - HeritageSma - HeritageSma - Fish and Wildlife

1,5105,4308,305

18,67811,193

2272,4341,442

180157772267

1,611493698987

2.28.1

12.327.716.6

0.33.62.10.30.21.10.42.40.71.01.5

yes yes yesyes

Sma total 54,384 80.6

Regional total 67,431 100.0

*ECC: Enhanced community consultation

a retrogressive thaw due to melting permafrost above a tributary of the Caribou river.Doug Davidge, Environment Canada

Page 22: Recommended Peel Watershed Regional Land Use Plan: Summary

20 Summary: recommended Peel Watershed regional Land use Plan

Land-use designation (zoning)

Table 3 summarizes the Plan’s designations and emphases. The Recommended Plan gives detailed reasons for each zoning decision. Land-use designations cannot be changed without a Plan amendment.

Special management areas

Sixteen LMUs, covering almost 81% of the region, are designated as Special Management Areas. SMAs are divided into one of four emphases: heritage, fish and wildlife, water-shed, or general environmental protection. Like IMAs, SMAs allow existing non-industrial activities (e.g., big-game outfit-ting) and do not allow new roads. However, unlike IMAs, SMAs do not allow new mineral claims or new oil and gas exploration permits.

Integrated management areas

Five LMUs, covering 19.4% of the region, are designated as IMAs, where fewer land-use conflicts are likely. New and existing non-renewable industries are allowed, but new roads generally are not. The IMAs are all relatively near the Dempster Highway, where most of the region’s development has taken place (or is likely to). The Plan recommends sub-regional planning for one of these IMAs, the corridor immediately on either side of the Dempster Highway, because of the many existing and potential human activities that overlap with valuable heritage and wildlife areas. This IMA also allows new roads. For all IMAs, the key partners must consult before any major developments.

Table 3. Summary: Land-use designation

Designation and emphasis

Area (km2)

Area (%)

Winter or all-season road

Existing non-indus-trial land use1

New non-industrial land use

Existing industrial land use

New industrial land use

ECC*

Ima 11,148 16.5 X √ √ √ √ yes

Ima - Sub-regional Planning area

1,899 2.8 √ √ √ √ √ yes

Sma - Fish and Wildlife 13,236 19.6 X √ √ √ X

Sma - Watershed management 18,678 27.7 X √ √ √ X

Sma - General Environmental Protection

21,052 31.2 X √ X √2 X

Sma - Heritage 1,418 1.7 X √ √ √ X yes

*ECC: Enhanced community consultation Notes: 1. Here, non-industrial land use refers to non-industrial developments, e.g., outfitting camps, etc. 2. The plan published December 2, 2009 erroneously indicated that existing industrial land use was prohibited.

What is enhanced community consultation?

The Plan’s definition of en-hanced consultation comes from the consultation process in the yukon Oil and Gas Act and the definition of consul-tation in the umbrella Final agreement.

In this Plan, enhanced con-sultation asks governments to consult confidentially with each other before making decisions about any new and significant land uses or land tenures.

Page 23: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 21

management conditions

No conditions on land use were applied to some LMUs (those that will probably be little used or visited). For other LMUs that will probably be more used and visited, the Plan applies up to four-teen conditions. These are intended to reduce the effects of human activities on caribou move-ment, caribou habitat, sheep, peregrine falcons, fish, heritage resources, permafrost, water, and other land users. These conditions will also ensure adequate consultation.

There are two types of management conditions: Class A and Class B. Class A conditions are required and only a formal amendment process can alter them. The more flexible Class B conditions may be altered with a Plan variance. Table 4 gives some examples of management conditions (the Plan lists many more). Where needed, these conditions are supported by recom-mended new policies, research and monitoring programs, and best management practices.

Table 4. Example of management conditions

Value considered Example of management condition

Fish avoid or reduce activities in fish habitat during important biological periods or seasons.

Enhancedconsultation

Consult with affected residents and First Nations to identify concerns before granting new land uses that would disturb land, cultural sites, or wildlife.

Permafrost reduce ground temperature changes due to land-use disturbances.

General management directions and monitoring

General management directions (GMDs) give additional guidance to key partners and project developers, but are not required.

management of land use by sector

The Commission recommended GMDs for a number of sectors (types or areas of activity), includ-ing industrial activities (in general), mineral resources, oil and gas resources, subsistence harvesting, trapping, big-game outfitting, tourism and recreation, the Dempster Highway, the Wind River Trail, new surface access, off-road vehicle (ORV) access, air and water access, and new or experimental ORV technologies. Table 5 lists examples of GMDs for specific sectors (the Plan lists many more).

Table 5. Examples of general management directions for specific sectors

Sector Recommendation type

Example of a sector-specific recommendation Intended for

mineral resources

research Develop and distribute mining-specific best management practices. Key partners

Tourism research analyze data for all outdoor recreation and tourism activity to de-velop a carrying capacity threshold for each Lmu.

Key partners

New surface access

Policy restore new all-season access using state-of-the-art techniques once activity has halted. a road restoration bond, levied on the devel-oper, is strongly recommended.

regulators and developers

Off-road vehicle access

Policy apply localized restrictions to OrV use, where necessary, to all resource users. These restrictions should be reflected in legislation of all key partners.

Key partners and regulators

Page 24: Recommended Peel Watershed Regional Land Use Plan: Summary

What happened to the cumulative effects indicators listed in the Draft Plan?

The Draft Peel Watershed regional Land use Plan discussed a number of cumulative effects indicators. These are things that can be measured to help find the total cumulative effects on the land. These indicators are not included in the recommended Plan because:• Some indicators were developed for flatter landscapes and for the migratory Porcupine Caribou

Herd. Woodland caribou were not considered.• There is not enough data to develop meaningful indicator levels.• The zoning framework has changed. monitoring of cumulative effects is no longer a primary tool

of the Plan.

Nonetheless, the Plan recommends researching and developing effective indicators for habitat of all regional caribou herds, wilderness, stream health, wetland health, and stream crossings.

22 Summary: recommended Peel Watershed regional Land use Plan

management of land use by resource issue

The Commission recommended GMDs for a number of resource issues, including management of cumulative effects, surface disturbances, disturbances to hydrology and aquatic habitats, disturbances to wildlife and terrestrial habitats, contaminated sites, climate change effects, and socio-economic assessment.

Table 6 lists examples of GMDs for specific resource issues (the Plan lists many more).

Table 6. Examples of general management directions for resource issues

Resource Issue Recommendation type

Example of issue-specific recommendation Typicalaudience

management of cumulative effects

Policy Consider alternative options and strategies to reduce cumu-lative effects when assessing new development proposals.

regulators and key partners

Surface disturbances

research Determine the effects of roads and other linear features on wildlife populations (e.g., Porcupine Caribou Herd).

Key partners

Disturbances to hydrology and aquatic habitats

research Determine biologically relevant limits to water withdrawal upstream of key overwintering habitats before major devel-opments.

Key partners

Climate change effects

Policy Carry out detailed ground temperature and engineering studies to measure ice content, ice distribution, ground temperature, etc., before the development of any new roads (where permitted) and other structures.

Key partners

Socio-economic assessment

Policy use enhanced consultation recommendations to make sure that First Nations’ traditional use, country food harvest, and other socio-economic objectives are fully analyzed and included in any socio-economic assessment for major projects.

Key partners

Page 25: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land use Plan 23

Implementation The key partners (the governments of Yukon, Na-Cho Nyak Dun, Tr’ondëk Hwëch’in, and Vuntut Gwitchin, and the Gwich’in Tribal Council) are mainly responsible for implementation. These responsibilities may also involve other groups, including:• Peel Watershed Planning Commission;• Yukon Land Use Planning Council;• Yukon Environmental and Socio-economic Assessment Board; • Government of Canada; and,• other Umbrella Final Agreement boards and committees.

Assuming the Plan is accepted, the key partners will need to create a detailed implementation plan. The Commission recommends an immediate interim land withdrawal from mineral staking and new oil and gas tenures. This withdrawal should last until the Recommended Plan review is completed.

above: Consultation with government officials in Dawson City after the release of the Draft Plan.PWPC

Page 26: Recommended Peel Watershed Regional Land Use Plan: Summary

24 Summary: recommended Peel Watershed regional Land use Plan

Next Steps

What happens next?

The key partners will review the Recommended Regional Land Use Plan and consult with each other. The Yukon Government has the added responsibility of consulting with affected communi-ties. When this review and consultation period is complete, the key partners will: • approve the Recommended Plan as the Final Plan; or • recommend modifications to the Commission; or • reject the Plan.

How do I provide comments?

Please send your questions and comments to the key partners (listed below). You can find the full version of this Plan, supporting documents, resource maps, and PWPC news at the website: www.peel.planyukon.ca.

Vuntut Gwitchin First Nation

Box 94, Old Crow, YT Y0B 1N0

phone 867-966-3121

e-mail [email protected]

Tr’ondëk Hwëch’in

Box 599, Dawson City, YT Y0B 1G0

phone 867-993-7145

e-mail [email protected]

First Nation of Na-Cho Nyak Dun

Box 220, Mayo, YT Y0B 1M0

phone 867-996-2265 ext. 138

e-mail [email protected]

Gwich’in Tribal Council

Box 1509, Inuvik, NT X0E 0T0

phone 867-777-7913

e-mail [email protected]

Government of Yukon

Energy, Mines and Resources, Corporate Policy and Planning

Box 2703, Whitehorse, YT Y1A 2C6

phone 867-667-5461 e-mail [email protected]

Please note that, during the review period for the Recom-mended Plan, the Peel Watershed Planning Commission will not have an office. Comments specifically for the Commission may be directed to the Yukon Land Use Planning Council at:Yukon Land Use Planning Council201-307 Jarvis St., Whitehorse, YT Y1A 2H3phone 867-667-7397fax 867-667-4624e-mail [email protected]

Where do I find out about updates?

The Government of Yukon has a public website for regional land-use planning. For updates on the Plan review process, go to www.emr.gov.yk.ca/lands/peel_watershed.html.

a calm stretch of river.Blaine Walden, Walden’s Guiding & Outfitting

Page 27: Recommended Peel Watershed Regional Land Use Plan: Summary

Summary: recommended Peel Watershed regional Land-use Plan

Commission members (l-r): marvin Frost, Steve Taylor, Dave Loeks, Peter Kaye, albert Genier (Chair) and ray Hayes. m. Wright, PWPC

Planning staffReg Whiten Nadele FlynnSenior Land Use Planner Land Use Planner

Sam Skinner Heidi FauldsLand Use Planner Office Administrator

www.peel.planyukon.ca

Page 28: Recommended Peel Watershed Regional Land Use Plan: Summary

Peel Watershed Planning Commission201-307 Jarvis St., Whitehorse, yT, Canada y1a 2H3phone 867-667-7397fax 867-667-4624e-mail [email protected] web www.peel.planyukon.ca