reconfiguring food facilities in response to covid-19

17
Reconfiguring Food Facilities in Response to Covid-19 August 5, 2020 Guest Speaker Brian King, President | A M King

Upload: others

Post on 03-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Reconfiguring Food Facilities in Response to Covid-19

Reconfiguring Food Facilities in Response to Covid-19

August 5, 2020

Guest Speaker Brian King, President | A M King

Page 2: Reconfiguring Food Facilities in Response to Covid-19

2THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Learning ObjectivesFood facilities will find it necessary to develop long-term solutions to combat the spread of the virus throughout their facilities to ensure employee safety and work-force retention.

The reconfiguration of Food Facilities is a viable and necessary solution.

There are four specific solutions to be considered, each providing varying degrees of defense while incurring different levels of facility and cost impacts.

Page 3: Reconfiguring Food Facilities in Response to Covid-19

Since the start of the Coronavirus pandemic in the US, more than 70 food facilities have been forced to shut down for a period of time.

635

BY THE NUMBERS

Source: FERN, as of July 31, 2020The Food and Environment Reporting Network (www.thefern.org)

Meatpacking and food processing plants

Farms and production facilities

FACILITIES

89WORKERS

Confirmed cases | Covid-19

51,453 221

The Food Industry and Covid-19

Tested positive | Covid-19 Died | Covid-19

3THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

38,641 meatpacking workers 7,314 food processing workers5,498 farmworkers

174 meatpacking workers34 food processing workers 13 farmworkers

Source: www.fooddive.com

Page 4: Reconfiguring Food Facilities in Response to Covid-19

What Industry Leaders are Saying

The closure of this facility, combined with a growing list of other protein plants that have temporarily ceased operations across our industry, is pushing our country perilously close to the edge in terms of our meat supply. It is impossible to keep our grocery stores stocked if our plants are not running.

Everyone is most worried about factory workers. We can find different packaging-materials or raw-materials suppliers, but we need those plants to keep operating.

If you’re a business you want to make money, and the only way to do that is by continuing to operate the plants with healthy employees. So what is good for employees is also good for business.

KEN SULLIVANCEO Smithfield FoodsAnnouncing the initial closing of Smithfield’s Sioux Falls facility

PATRICK CRITESERChief Executive Tillamook County Creamery Association

STEWART GLENDINNINGExecutive Vice President & Chief Financial Officer Tyson Foods

4THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Page 5: Reconfiguring Food Facilities in Response to Covid-19

1 2

Food Safety

Keeping the product safe from pathogens or harmful materials

Employee Physical Safety

Protecting the worker from physical harm

5THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

The Two Layers of Food Facility Safety

Page 6: Reconfiguring Food Facilities in Response to Covid-19

Infectious Disease Protection

Keeping employees safe from the spread of virus

36

THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

The NewThird Layerof Safety

Page 7: Reconfiguring Food Facilities in Response to Covid-19

Unique aspects of food processing and food distribution facilities

Essential businesses for our society

Workers cannot work remotely

7THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Facility designs involved close proximity between workers

Page 8: Reconfiguring Food Facilities in Response to Covid-19

8THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Protecting workers from

contracting harmful virus during normal

work activities

Maintaining operational productivity

and efficiency amid facility changes

Retaining workforce

New Challenges Covid-19 Presents to Food Facility Operators

Page 9: Reconfiguring Food Facilities in Response to Covid-19

9THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Reconfiguration of Food Facilities is a long-term solution to address the challenges presented by Virus Pandemics as related to the unique aspects of food processing and distribution.

Page 10: Reconfiguring Food Facilities in Response to Covid-19

UP

UPUP

UP

UP

DNDNDN

DN

DN DN

A2012

A201

A201

A201

1

4

x1 x2 x3 x4 x5 x6

xA

xA.3

xA.7

xB

xB.5

xC

xC.5

xD

xD.5

xE

xE.5

xF

3

SECURITYOFFICE

116

JAN. CLOSET113

MEN'SLOCKER

111

USDA OFFICE106

OFFICE107

OPENOFFICES

105

MAINCORRIDOR

104STAIR 3

112SECURITY

115

FISHGOWNING

149

MEATOFFICES

142

MEATGOWNING

141

STAIR 2102

ELEVATOR103

RECEPTION101

EXPRESS121

MEN'S ROOM123

WOMEN'SROOM

122

35° CHEESEROOM

144

34° DRY AGEROOM

145

-20° BLASTFREEZER

146

STAIR 1124

-10° FREEZER154

32° COOLER155

MAINTENANCE127

DRY DOCK126

DRYSTORAGE

125

32° COOLERDOCK

156

RECEIVING /INVENTORY

133

OTR DRIVERS135

OFFICE134

32° COLDCORRIDOR

148

MAINTENANCEOFFICE

128

RESTROOM136

2A301

4A301

1A301

61' - 11" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 2' - 6"

277' - 11"

258'

- 8"

20' -

0"18

' - 8"

29' -

8"

49' -

4"50

' - 0"

50' -

0"50

' - 0"

59' -

4"

A1031

A1093

35° FISHDOCK

152

A1081 A107

1

A1092

A1061

RF ROOM132

4A304

EMPLOYEEENTRY

117

ELECTRICALROOM

157

A1041

A1051

WOMEN'SROOM

108MEN'S ROOM

110

WOMEN'SLOCKER

109

STORAGE129

SCRUBBERPIT

35° SCRAPCOOLER

153D.7

E.3

E.4

E.9

1.1

1.1

1.5 2.2 2.7 3.4

8" 34' - 11" 26' - 4" 7' - 8" 34' - 0" 12' - 4" 21' - 8" 32' - 4"

1.3

C.7

5A303

1A303

P&P OFFICES137

ICE PIT

6.1

6.3 6.7

A.8

A.4

B.2

1.48" 26' - 0"

1A302

2A302

3A302

4A302

4A303

1A304

2A304

3A304

5A304

6A305

4A305

1A306

1A306

SIM

2A306

1A308

2A308

3A308

4A308

5A306

3A3064

A306

3A305

1A307

SIM

6A307

2A307

4A307

19' - 2" 25' - 7"

99' - 2" 22' - 4" 65' - 4" 8' - 2" 29' - 4" 19' - 0" 35' - 1"

48' -

6"12

3' - 1

0"73

' - 8"

12' -

8"

166' - 10" 20' - 0" 91' - 7"

24' - 0" 146' - 4" 16' - 6" 51' - 8" 39' - 11" 47' - 3"

70' -

3"20

' - 3"

79' -

9"16

' - 2 7

/8"42

' - 4 1

/8"

49' - 8" 29' - 8" 56' - 6"

5A308

5A308

SIM

NORTH

70' -

10 1/

2"10

1' - 5

1/2"

86' -

4"

26' -

7"

24' -

4"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

20' -

0"20

' - 0"

19' -

4"

44' - 9"

29' -

1"

21' -

4"8'

- 2"

BREAKROOM114

UTILITYROOM

131

FIRE PUMPROOM

158

EQUIPMENTSTORAGE

130

GLYCOL PIT

45° FISHPROCESSING

150

35° FISHSTORAGE

151

35° MEATPROCESSING

143

9' - 0

"11

' - 0"

9' - 0

"9'

- 8"

10' -

4"19

' - 4"

7"29

' - 7"

4' - 5

"14

' - 9"

15' -

5"34

' - 7"

16' -

8"33

' - 4"

8' - 4

"25

' - 0"

9' - 7

"25

' - 0"

5' - 1

0"23

' - 9"

22' - 10" 12' - 1"

2A306

SIM

MEAT SCRAP147

SCRAPCOOLER PAD

159

ELECTRICALCLOSET

160

6' - 0

"

FISH OFFICE161

A1083

54' - 10"

1A305

2A303

2A305

4A302

SIM

3A303

25' -

0"25

' - 0"

25' -

0"25

' - 0"

5A305

6A306

1A305

1

0" T.O.S.

5" RIGID INSULATION (30PSI) & 4" MUD SLAB

1

2

2A303

SIM

6' - 8

1/8"

3

© C

o p y

r i g

h t 2

0 1 9

J

o h n

N .

K o

u r y

, A

r c h

i t e c

t a

l l r

i g h

t s r

e s e

r v e

d

REVISIONS:FOR PERMIT AND CONSTRUCTION

10/11/19

OVERALL FIRSTFLOOR PLAN

A101

407 W

ESTC

LIFF R

OAD,

GRE

ENSB

ORO,

NC

2740

9

ISSUED: 3/22/2019

CBI -

SOU

THER

N FO

ODS

UPFI

T

PHASE 2: INTERIOR COMPLETION

3/32" = 1'-0"1 OVERALL FIRST FLOOR PLAN

NO. DATE DESCRIPTION1 5/10/19 Revision 12 7/03/19 Revision 23 10/11/19 Revision 3

Space Planning

Barriers of Separation

Process Modification

THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Automation

Four solution considerations

with varying degrees of facility and

cost impacts

10

Page 11: Reconfiguring Food Facilities in Response to Covid-19

Barriers of Separation

11THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Methods and materials providing barriers

Consider areas of separation (production, welfare, entrances and exits)

Employee efficiency and productivity negatively impacted

Low to Medium

Page 12: Reconfiguring Food Facilities in Response to Covid-19

Equipment relocation additional doors or walls / traffic lanes / finishes

Low to High

ProcessModification

THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

Evaluating existing processes to allow distancing and separation

Employee access / work functions and locations / shift changes

Movement within a facility of equipment and product

12

Page 13: Reconfiguring Food Facilities in Response to Covid-19

UP

UPUP

UP

UP

DNDNDN

DN

DN DN

A2012

A201

A201

A201

1

4

x1 x2 x3 x4 x5 x6

xA

xA.3

xA.7

xB

xB.5

xC

xC.5

xD

xD.5

xE

xE.5

xF

3

SECURITYOFFICE

116

JAN. CLOSET113

MEN'SLOCKER

111

USDA OFFICE106

OFFICE107

OPENOFFICES

105

MAINCORRIDOR

104STAIR 3

112SECURITY

115

FISHGOWNING

149

MEATOFFICES

142

MEATGOWNING

141

STAIR 2102

ELEVATOR103

RECEPTION101

EXPRESS121

MEN'S ROOM123

WOMEN'SROOM

122

35° CHEESEROOM

144

34° DRY AGEROOM

145

-20° BLASTFREEZER

146

STAIR 1124

-10° FREEZER154

32° COOLER155

MAINTENANCE127

DRY DOCK126

DRYSTORAGE

125

32° COOLERDOCK

156

RECEIVING /INVENTORY

133

OTR DRIVERS135

OFFICE134

32° COLDCORRIDOR

148

MAINTENANCEOFFICE

128

RESTROOM136

2A301

4A301

1A301

61' - 11" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 2' - 6"

277' - 11"

258'

- 8"

20' -

0"18

' - 8"

29' -

8"

49' -

4"50

' - 0"

50' -

0"50

' - 0"

59' -

4"

A1031

A1093

35° FISHDOCK

152

A1081 A107

1

A1092

A1061

RF ROOM132

4A304

EMPLOYEEENTRY

117

ELECTRICALROOM

157

A1041

A1051

WOMEN'SROOM

108MEN'S ROOM

110

WOMEN'SLOCKER

109

STORAGE129

SCRUBBERPIT

35° SCRAPCOOLER

153D.7

E.3

E.4

E.9

1.1

1.1

1.5 2.2 2.7 3.4

8" 34' - 11" 26' - 4" 7' - 8" 34' - 0" 12' - 4" 21' - 8" 32' - 4"

1.3

C.7

5A303

1A303

P&P OFFICES137

ICE PIT

6.1

6.3 6.7

A.8

A.4

B.2

1.48" 26' - 0"

1A302

2A302

3A302

4A302

4A303

1A304

2A304

3A304

5A304

6A305

4A305

1A306

1A306

SIM

2A306

1A308

2A308

3A308

4A308

5A306

3A3064

A306

3A305

1A307

SIM

6A307

2A307

4A307

19' - 2" 25' - 7"

99' - 2" 22' - 4" 65' - 4" 8' - 2" 29' - 4" 19' - 0" 35' - 1"

48' -

6"12

3' - 1

0"73

' - 8"

12' -

8"

166' - 10" 20' - 0" 91' - 7"

24' - 0" 146' - 4" 16' - 6" 51' - 8" 39' - 11" 47' - 3"

70' -

3"20

' - 3"

79' -

9"16

' - 2 7

/8"42

' - 4 1

/8"

49' - 8" 29' - 8" 56' - 6"

5A308

5A308

SIM

NORTH

70' -

10 1/

2"10

1' - 5

1/2"

86' -

4"

26' -

7"

24' -

4"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

20' -

0"20

' - 0"

19' -

4"

44' - 9"

29' -

1"

21' -

4"8'

- 2"

BREAKROOM114

UTILITYROOM

131

FIRE PUMPROOM

158

EQUIPMENTSTORAGE

130

GLYCOL PIT

45° FISHPROCESSING

150

35° FISHSTORAGE

151

35° MEATPROCESSING

143

9' - 0

"11

' - 0"

9' - 0

"9'

- 8"

10' -

4"19

' - 4"

7"29

' - 7"

4' - 5

"14

' - 9"

15' -

5"34

' - 7"

16' -

8"33

' - 4"

8' - 4

"25

' - 0"

9' - 7

"25

' - 0"

5' - 1

0"23

' - 9"

22' - 10" 12' - 1"

2A306

SIM

MEAT SCRAP147

SCRAPCOOLER PAD

159

ELECTRICALCLOSET

160

6' - 0

"

FISH OFFICE161

A1083

54' - 10"

1A305

2A303

2A305

4A302

SIM

3A303

25' -

0"25

' - 0"

25' -

0"25

' - 0"

5A305

6A306

1A305

1

0" T.O.S.

5" RIGID INSULATION (30PSI) & 4" MUD SLAB

1

2

2A303

SIM

6' - 8

1/8"

3

© C

o p y

r i g

h t 2

0 1 9

J

o h n

N .

K o

u r y

, A

r c h

i t e c

t a

l l r

i g h

t s r

e s e

r v e

d

REVISIONS:FOR PERMIT AND CONSTRUCTION

10/11/19

OVERALL FIRSTFLOOR PLAN

A101

407 W

ESTC

LIFF R

OAD,

GRE

ENSB

ORO,

NC

2740

9

ISSUED: 3/22/2019

CBI -

SOU

THER

N FO

ODS

UPFI

T

PHASE 2: INTERIOR COMPLETION

3/32" = 1'-0"1 OVERALL FIRST FLOOR PLAN

NO. DATE DESCRIPTION1 5/10/19 Revision 12 7/03/19 Revision 23 10/11/19 Revision 3

THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 202013

Modifications involve design and construction

Medium to High

UP

UPUP

UP

UP

DNDNDN

DN

DN DN

A2012

A201

A201

A201

1

4

x1 x2 x3 x4 x5 x6

xA

xA.3

xA.7

xB

xB.5

xC

xC.5

xD

xD.5

xE

xE.5

xF

3

SECURITYOFFICE

116

JAN. CLOSET113

MEN'SLOCKER

111

USDA OFFICE106

OFFICE107

OPENOFFICES

105

MAINCORRIDOR

104STAIR 3

112SECURITY

115

FISHGOWNING

149

MEATOFFICES

142

MEATGOWNING

141

STAIR 2102

ELEVATOR103

RECEPTION101

EXPRESS121

MEN'S ROOM123

WOMEN'SROOM

122

35° CHEESEROOM

144

34° DRY AGEROOM

145

-20° BLASTFREEZER

146

STAIR 1124

-10° FREEZER154

32° COOLER155

MAINTENANCE127

DRY DOCK126

DRYSTORAGE

125

32° COOLERDOCK

156

RECEIVING /INVENTORY

133

OTR DRIVERS135

OFFICE134

32° COLDCORRIDOR

148

MAINTENANCEOFFICE

128

RESTROOM136

2A301

4A301

1A301

61' - 11" 54' - 0" 54' - 0" 54' - 0" 54' - 0" 2' - 6"

277' - 11"

258'

- 8"

20' -

0"18

' - 8"

29' -

8"

49' -

4"50

' - 0"

50' -

0"50

' - 0"

59' -

4"

A1031

A1093

35° FISHDOCK

152

A1081 A107

1

A1092

A1061

RF ROOM132

4A304

EMPLOYEEENTRY

117

ELECTRICALROOM

157

A1041

A1051

WOMEN'SROOM

108MEN'S ROOM

110

WOMEN'SLOCKER

109

STORAGE129

SCRUBBERPIT

35° SCRAPCOOLER

153D.7

E.3

E.4

E.9

1.1

1.1

1.5 2.2 2.7 3.4

8" 34' - 11" 26' - 4" 7' - 8" 34' - 0" 12' - 4" 21' - 8" 32' - 4"

1.3

C.7

5A303

1A303

P&P OFFICES137

ICE PIT

6.1

6.3 6.7

A.8

A.4

B.2

1.48" 26' - 0"

1A302

2A302

3A302

4A302

4A303

1A304

2A304

3A304

5A304

6A305

4A305

1A306

1A306

SIM

2A306

1A308

2A308

3A308

4A308

5A306

3A3064

A306

3A305

1A307

SIM

6A307

2A307

4A307

19' - 2" 25' - 7"

99' - 2" 22' - 4" 65' - 4" 8' - 2" 29' - 4" 19' - 0" 35' - 1"

48' -

6"12

3' - 1

0"73

' - 8"

12' -

8"

166' - 10" 20' - 0" 91' - 7"

24' - 0" 146' - 4" 16' - 6" 51' - 8" 39' - 11" 47' - 3"

70' -

3"20

' - 3"

79' -

9"16

' - 2 7

/8"42

' - 4 1

/8"

49' - 8" 29' - 8" 56' - 6"

5A308

5A308

SIM

NORTH

70' -

10 1/

2"10

1' - 5

1/2"

86' -

4"

26' -

7"

24' -

4"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

25' -

0"25

' - 0"

20' -

0"20

' - 0"

19' -

4"

44' - 9"

29' -

1"

21' -

4"8'

- 2"

BREAKROOM114

UTILITYROOM

131

FIRE PUMPROOM

158

EQUIPMENTSTORAGE

130

GLYCOL PIT

45° FISHPROCESSING

150

35° FISHSTORAGE

151

35° MEATPROCESSING

143

9' - 0

"11

' - 0"

9' - 0

"9'

- 8"

10' -

4"19

' - 4"

7"29

' - 7"

4' - 5

"14

' - 9"

15' -

5"34

' - 7"

16' -

8"33

' - 4"

8' - 4

"25

' - 0"

9' - 7

"25

' - 0"

5' - 1

0"23

' - 9"

22' - 10" 12' - 1"

2A306

SIM

MEAT SCRAP147

SCRAPCOOLER PAD

159

ELECTRICALCLOSET

160

6' - 0

"

FISH OFFICE161

A1083

54' - 10"

1A305

2A303

2A305

4A302

SIM

3A303

25' -

0"25

' - 0"

25' -

0"25

' - 0"

5A305

6A306

1A305

1

0" T.O.S.

5" RIGID INSULATION (30PSI) & 4" MUD SLAB

1

2

2A303

SIM

6' - 8

1/8"

3

© C

o p y

r i g

h t 2

0 1 9

J

o h n

N .

K o

u r y

, A

r c h

i t e c

t a

l l r

i g h

t s r

e s e

r v e

d

REVISIONS:FOR PERMIT AND CONSTRUCTION

10/11/19

OVERALL FIRSTFLOOR PLAN

A101

407 W

ESTC

LIFF R

OAD,

GRE

ENSB

ORO,

NC

2740

9

ISSUED: 3/22/2019

CBI -

SOU

THER

N FO

ODS

UPFI

T

PHASE 2: INTERIOR COMPLETION

3/32" = 1'-0"1 OVERALL FIRST FLOOR PLAN

NO. DATE DESCRIPTION1 5/10/19 Revision 12 7/03/19 Revision 23 10/11/19 Revision 3

Space Planning

Provide opportunity for employee distancing

Allocation opportunities of existing space

Conversion of under-utilized space

Expanding a facility footprint

Page 14: Reconfiguring Food Facilities in Response to Covid-19

THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 202014

AutomationAvailable automation solutions vs solutions under development

Collaboration with equipment vendors / manufacturers

Consideration of long-term goals

Conduct an ROI exercise

HighFootprint, processes and operations may all be impacted

Page 15: Reconfiguring Food Facilities in Response to Covid-19

Further Considerations

FACILITY IMPACTNo solution will be without some level of impact, both to the facility and from a cost perspective.

EXPANSION & GROWTH When determining re-configuration to protect workers from virus spread, consider future expansion and growth needs and goals.

NECESSARY ADJUSTMENTS Safety requirements addressing Virus Pandemics will alter the design and operations of food facilities. Successful companies of the future will be those who adapt and adjust to operate the most productively in this new environment.

15THE RECONFIGURATION OF FOOD FACILITIES IN RESPONSE TO COVID-19 | AUGUST 5, 2020

COLLABORATION A collaborative team will always develop the best solutions – designers, construction professionals, equipment manufacturers, facility management and facility workers.