Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi Completions Engineer DRIMS # 7594942 Sep 2011

Upload: votu

Post on 06-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Recovery from Hydrate Plug During Well Control incident using Coiled Tubing

Abdullah Eshtewi

Completions Engineer

DRIMS # 7594942

Sep 2011

Page 2: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 2/32

Agenda

• Overview.

• Themes.

• Where ? Why ?

• Coiled Tubing rig up.

• Hydrate Milling operation.

• Coiled Tubing abrasive cutting and perforation.

• Choke and Kill line blockage.

• Lessons learned.

Page 3: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 3/32

Larsen-1 Overview

• Production casing ran and cemented with the 9 5/8” casing shoe set at 2829m.

• On February 1st 2010, drilled into gas bearing formation and a gas kick was recorded at 4602m.

• Well was shut in and the formation 100m below the shoe broke down - under ground blow out.

• Attempts to control the well by setting Barite plugs were unsuccessful.

• Well control operations were complicated by hydrate blockage in the C&K lines and drill pipe.

• The well was P&A on March 18th, 2010, after 38 days to control the well.

This presentation will focus on challenges encountered during Coiled Tubing operations

Page 4: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 4/32

Themes

1. Contingency planning.

• Think a head to cater for escalation.

2. Problem solving.

• Require open minded and experienced team to adopt unconventional solutions.

Page 5: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 5/32

Where ?

Larsen 1

• Larsen-1 is located on the Exmouth Plateau.

• 1200m water depth.

• Deepest well for woodside in the area.

• New built Semi-Sub “Maersk Discoverer” drilling rig.

Page 6: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 6/32

Sequence of Events Prior Intervention

• Took a kick “under ground blow out”.

• Pumped 2 x Barite plug (unsuccessful).

• Blocked C&K.

• Ran in hole E-line to sever pipe, tag shallow at 1165m.

Start Planning Coiled Tubing “NOW”

Better to start planning early

Page 7: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 7/32 4606m

9 5/8” 2829m

6 ¾

” B

HA

5”

DP

5.87

5”

DP

1279.2m BOP Shut in on Annular

Choke Line No Circ

Boo

st L

ine

OK

Riser

E line BOP

5”

HW

DP

Loss zone

2 x FOSV

• Under ground blow out.

• Well shut in.

• Stuck BHA.

• C&K lines plugged.

• DP plugged.

• Trapped pressure below BOP.

Status Schematic

Kill Line No Circ

Gas cross flow

• No Tool access • No circulation path • Pressure build up be low BOP

Rig up Coiled Tubing “NOW”

Pressure build up

below BOP

Page 8: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 8/32

Plan of attack

• Rig up Coiled Tubing.

• Mill Hydrate plug.

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and pump cement plug to isolate the shoe.

• Remove trapped gas below BOP.

• Clear C&K lines using CT

4606m

9 5/8” 2829m

6 ¾

”B

HA

5” DP

5.87

5”D

P

Boo

st L

ine

OK

Riser

E line BOP

5” HW

DP

2 x FOSV

Trapped gas

Page 9: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 9/32

0.6m

Rigging up Coiled Tubing

• FOSV => 2 ¼” ID, changed out to 2 ¾” ID

• Only few CT tools fits through this restriction

• Drill Pipe elevators Not suitable to rig up CT

E-Line R/U

Upper Tension frame

45’ bails

DP elevator

FOSV

Lesson learned: Up front planning for well control operations

Page 10: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 10/32 1.8m

Rigging up Coiled Tubing

king size elevator

Used D.P elevators as C plate

10cm O ring is required

Up front planning for well control incidents

Page 11: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 11/32

Rigging up Coiled Tubing

~25m

Page 12: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 12/32

Rigging up Coiled Tubing

• CT hoses did not reach Injector head.

Up front planning

• New built rig.

• CT rig up on computer model.

Page 13: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 13/32

Plan of attack

• Rig up Coiled Tubing.

• Mill Hydrate plug.

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and pump cement plug to isolate the shoe.

• Remove trapped gas below BOP.

• Clear C&K lines using CT

Page 14: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 14/32

Milling Hydrate - Design

Key component:

• Hydrate suppression mud “HSM”

Mobilized all the MEG on the east cost !

• Mill design

• Motor performance

Page 15: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 15/32

Milling Hydrate - Operation

Operations:

• RIH and tagged top of plug at 1156m.

• Displaced to HSM.

• Milled through Multiple layers of Hydrate with pressurized gas pockets in between.

• Continued RIH C.T and drifted the pipe.

• Encountered losses.

• Set a DP plug.

• Multiple hydrate plugs rather than one solid plug • Huge quantities of MEG were required

Page 16: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 16/32

Plan of attack

• Rig up Coiled Tubing

• Mill Hydrate plug

• Set PSP plug to stop losses

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and set cement plug on shoe

• Remove trapped gas below BOP.

• Clear C&K lines using CT

Requirment to understand well behaviour and performance of barite/cement plugs

Temperature Log

Page 17: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 17/32

20

40

60

80

100

120

140

24002500

26002700

28002900

30003100

32003300

34003500

36003700

38003900

40004100

4200

Depth (m)

Tem

pera

ture

(deg

C)

Drims

Shoe Loss zone

Temperature Log Analysis

Run 1 - PSP plug in the string, T log after ~ 6hrs Run 2 - Sever the DP and pump ~400bbls 1.25sg “dynamic kill: followed by 90 bbls barite plug Run 3 - T log after ~ 8hrs Run 4 - After Cement plug

Page 18: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 18/32

20

40

60

80

100

120

140

24002500

26002700

28002900

30003100

32003300

34003500

36003700

38003900

40004100

4200

Depth (m)

Tem

pera

ture

(deg

C)

Drims

Shoe Cut at 4245m

Loss zone

Temperature Log Analysis

Run 1 - PSP plug in the string, T log after ~ 6hrs Run 2 – Sever the DP and pump ~400bbls 1.25sg “dynamic kill: followed by 90 bbls barite plug Run 3 - T log after ~ 8hrs Run 4 - After Cement plug

Page 19: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 19/32

20

40

60

80

100

120

140

24002500

26002700

28002900

30003100

32003300

34003500

36003700

38003900

40004100

4200

Depth (m)

Tem

pera

ture

(deg

C)

Drims

Temperature Log Analysis

Shoe Cut at 4245m

Loss zone

Run 1 - PSP plug in the string, T log after ~ 6hrs Run 2 – Sever the DP and pump ~400bbls 1.25sg “dynamic kill: followed by 90 bbls barite plug Run 3 - T log after ~ 8hrs Run 4 - After Cement plug

Page 20: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 20/32

20

40

60

80

100

120

140

24002500

26002700

28002900

30003100

32003300

34003500

36003700

38003900

40004100

4200

Depth (m)

Tem

pera

ture

(deg

C)

Drims

Run 1 - PSP plug in the string, T log after ~ 6hrs Run 2 - Sever the DP and pump ~400bbls 1.25sg “dynamic kill: followed by 90 bbls barite plug Run 3 - T log after ~ 8hrs Run 4 - After Cement plug

Shoe Cut at 4245m

Loss zone

Temperature Log Analysis

Page 21: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 21/32

Plan of attack

• Rig up Coiled Tubing.

• Mill Hydrate plug.

• Set PSP plug to stop losses.

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and set cement plug to isolate the shoe.

• Sever DP at the shoe to release string.

• Remove trapped gas below BOP.

• Clear C&K lines using CT

Page 22: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 22/32 4606m

9 5/8” 2829m

4565m

4421m

6 ¾

” B

HA

5”

DP

5.87

5”

DP

5”

HW DP

Barite

Cement

E-line tagged obstruction 2631m

Uncertain shoe isolations

4606m

1279.2m BOP Shut in on Annular

Choke Line No Circ

Boo

st L

ine

OK

Riser

E line BOP

2 x FOSV

Kill Line No Circ

Status Schematic

Must regain access Attempted to mill cement Inside the DP using CT

trapped gas

Page 23: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 23/32

Plan of attack

• Rig up Coiled Tubing

• Mill Hydrate plug

• Set PSP plug to stop losses

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and set cement plug to isolate the shoe.

• Sever DP at the shoe to release string.

• Mill cement inside DP and sever DP below shoe depth.

• Remove trapped gas below BOP.

• Clear C&K lines using CT

Coiled Tubing abrasive cutter

Risk of casing damage with E-line severance tools + Surface restriction at FOSV

Page 24: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 24/32

CT abrasive cutter

100 mesh sand

Slurry filter before the C.T realer Sand suspension test up to 90min

Sand concentration ~ 120 kg/m3 max

New Technology within Woodside.

Main Risks: 1. Eroded coil / surface equipment. 2. Plugged coil / surface equipment.

You want to do what ??!

Page 25: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 25/32

Coiled Tubing Abrasive cutter

• BHA

Page 26: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 26/32

Operations:

• Position cutting head at desired depth.

• Flush annulus 2 x annulus volume.

• Pumped pre determined slurry volume and successfully cut the DP.

• Flush annulus 2 x annulus volume and POOH.

Encountered issues.

• 2 X Cement unit failed during the pumping operations.

Coiled Tubing Abrasive cutter

Page 27: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 27/32

Plan of attack

• Rig up Coiled Tubing

• Mill Hydrate plug

• Set PSP plug to stop losses

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and set cement plug to isolate the shoe.

• Sever DP at the shoe to release string.

• Mill cement inside DP and sever DP below shoe depth.

• Cut DP above the shoe using CT abrasive cutter and cement the shoe.

• Remove Trapped gas below BOP

• Clear C&K lines using CT

Page 28: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 28/32

Removing trapped gas below BOP

Operations:

• RIH CT Memory CCL.

• RIH CT abrasive perforate and punch hole.

• Bleed off gas below BOP.

• Strip DP and bleed off remanning gas below annular.

2 x 3/8” holes

Page 29: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 29/32

Choke and Kill line Coiled Tubing rig up

Return line

• Nipple down slip joint.

• Pulled out first riser joint and land on riser spider.

• RIH C.T jetting BHA ONLY and cleared up C&K.

Rotary Table

Riser Joint

Page 30: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 30/32

Plan of attack

• Rig up Coiled Tubing

• Mill Hydrate plug

• Set PSP plug to stop losses

• Sever the DP, pump barite and cement plug to isolate lower zone.

• Sever the DP and set cement plug to isolate the shoe.

• Sever DP at the shoe to release string.

• Mill cement inside DP and sever DP below shoe depth.

• Cut DP above the shoe using CT abrasive cutter and cement the shoe.

• Remove Trapped gas below BOP

• Memory CCL.

• Run CT abrasive perforator and circulate the gas out.

• Clear C&K lines using CT

Page 31: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 31/32

Themes

1. Contingency planning.

• Think a head to cater for escalation.

2. Problem solving.

• Require open minded and experienced team to adopt unconventional solutions.

Page 32: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 32/32

My personal take on this effort…

It’s not rocket science, but...

• Time frame very very short due to well control nature, but.

• My first well control experience.

• Variety of technical hurdles.

• Achieved the unachievable with no HSE incidents.

Page 33: Recovery from Hydrate Plug During Well Control incident .... Novel Coil Tubing.pdf · Recovery from Hydrate Plug During Well Control incident using Coiled Tubing Abdullah Eshtewi

Slide 33/32

Questions