Building Design & Construction ROSSI POOL RENOVATION PROJECT RECREATION & PARKS Civic Design Review - Phase 3 Presentation February 11, 2019

Upload: others

Post on 23-Jun-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Building Design & Construction

ROSSI POOL RENOVATION PROJECTRECREATION & PARKS Civic Design Review - Phase 3 PresentationFebruary 11, 2019

Page 2: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

2

Building Design & Construction

CDR PHASE 2 COMMENTS AND RESPONSES

CDR PHASE 2 COMMENTS AND RESPONSES

1) extending the new paving at the entrance for wider path.

RESPONSE: Entrance path was widen by 4’ from the existing width.

2) reducing the number of columns of the entrance passage and substantiating the support beam.

RESPONSE: The number of columns of the existing entrance passage trellis could not be reduced because the trellis is to remain in

place due to value engineering.

3) respecting the pattern of the eaves.

RESPONSE: Phase 2 presentation base scope had the existing trellis being removed.

Existing trellis is to remain in place in BID scope of work due to value engineering.

4) using horizontal cable railing instead of picket vertical rail.

RESPONSE: Cable railing has been specifi ed. See updated rendering.

5) using preferred color scheme of cream base and bronze metal.

RESPONSE: A color scheme using cream base and bronze metal has been specifi ed. See updated renderings.

6) adding some more hedge material on the north side of the building.

RESPONSE: Plant material could not be added due to existing vaults adjacent to the building and maintenance concerns of the RPD

staff, e.g. illegal dumping, homeless storage.

7) using Option 1 of the single panel perforated metal

RESPONSE: Option 1 has been specifi ed for perforated metal. See updated renderings.

Page 3: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

3

Building Design & Construction

PREVIOUS - VIEW FROM ENTRY STAIR (PHASE 2, MARCH 2018)

4) using horizontal cable railing instead of picket vertical rail.

5) using preferred color scheme of cream base and bronze metal.

CDR PHASE 2 COMMENTS

Page 4: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

4

Building Design & Construction

UPDATED VIEW FROM ENTRY STAIR

CDR PHASE 2 RESPONSES 4) cable railing has been specifi ed.

5) a color scheme using cream base and bronze metal has been specifi ed.

Page 5: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

5

Building Design & Construction

PREVIOUS - SOUTH PERSPECTIVE (PHASE 2, MARCH 2018)

UPDATED COLOR PALETTE

EXISTING STONE

ALUMINUM FRAMES

PAINTED WOOD

PAINTED CONCRETE

PERFORATED METAL

GLAZING

UPDATED SOUTH PERSPECTIVE

5) using preferred color scheme of cream base and bronze metal.

RESPONSE: a color scheme using cream base and bronze metal has been specifi ed.

CDR PHASE 2 COMMENTS AND RESPONSES

Page 6: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

6

Building Design & Construction

UPDATED EAST PERSPECTIVE

UPDATED COLOR PALETTE

EXISTING STONE

ALUMINUM FRAMES

PAINTED WOOD

PAINTED CONCRETE

PERFORATED METAL

GLAZING

PREVIOUS - EAST PERSPECTIVE (PHASE 2, MARCH 2018)

5) using preferred color scheme of cream base and bronze metal.

RESPONSE: a color scheme using cream base and bronze metal has been specifi ed.

CDR PHASE 2 COMMENTS AND RESPONSES

Page 7: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

7

Building Design & Construction

MAIN ENTRY PATIO AND SEATING AREA

UPDATED PERSPECTIVE

PREVIOUS - PROPOSED ADD ALTERNATE (PHASE 2, MARCH 2018)PREVIOUS - PROPOSED BASE SCOPE (PHASE 2, MARCH 2018)

1) extending the new paving at the entrance for wider path.

RESPONSE: Entrance path was widen by 4’ from the existing width.

2) reducing the number of columns of the entrance passage and substantiating the

support beam.

RESPONSE: The number of columns of the existing entrance passage trellis could not

be reduced because the trellis is to remain in place due to value engineering.

3) respecting the pattern of the eaves.

RESPONSE: Phase 2 presentation base scope had the existing trellis being removed.

Existing trellis is to remain in place in BID scope of work due to value engineering.

4) using horizontal cable railing instead of picket vertical rail.

RESPONSE: Cable railing has been specifi ed.

5) using preferred color scheme of cream base and bronze metal.

RESPONSE: A color scheme using cream base and bronze metal has been specifi ed.

CDR PHASE 2 COMMENTS AND RESPONSES

Page 8: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

MECHANICAL ENCLOSURERecreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

8

Building Design & Construction

UPDATED

PREVIOUS - (PHASE 2, MARCH 2018)

PANEL

7) using Option 1 of the single panel perforated metal (Bronze Color of

Phase 2 presentation, March 2018)

RESPONSE: Option 1 has been specifi ed for perforated metal. See updated

renderings.

CDR PHASE 2 COMMENTS AND RESPONSES

Page 9: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

9

Building Design & Construction

PREVIOUS - PROPOSED NORTH ELEVATION (PHASE 2, MARCH 2018)

EXTERIOR ELEVATIONS

UPDATED PROPOSED NORTH ELEVATION

6) adding some more hedge material on the north side of the building.

RESPONSE: Plant material could not be added due to existing vaults

adjacent to the building and maintenance concerns of the RPD staff, e.g.

illegal dumping, homeless storage.

CDR PHASE 2 COMMENTS AND RESPONSES

Page 10: RECREATION & PARKS ROSSI POOL RENOVATION … Pool...Recreation & Parks | Rossi Pool Renovation Project Civic Design Review - Phase 3 | 02.11.20193 Building Design & Construction PREVIOUS

Recreation & Parks | Rossi Pool Renovation Project

Civic Design Review - Phase 3 | 02.11.2019

10

Building Design & Construction

T H A N K YO U