ExpoStation&OverrunTunnelContract922DTL3ES007Panelsurfacerectificationprocedure
__________________________________________________________________________________________________________________
1
DiaphragmWallRectificationWorkProposalforexposingofreinforcementbarandunsoundconcretesurfaceatPanelEN007
Location : ESSTunnel,PanelEN007 StructureElement : Diaphragmwall Elevation : BetweenB1andB2Diaphragmwallsurface TypeofDefect:Exposeofthereinforcementduetounsoundconcretesurface
1. ProposedrectificationmethodInaccordancetoourstandardrectificationmethod,abovementioneddefectshallbe
rectifiedbyusingflowgrout/pourgroutmethodwithnonshrinkcementmixorpressure
groutingmethodforthecaseofdeeperunsoundconcretecondition(defectextendbehind
themainreinforcementanddepthmorethan100mm).
Forthe
above
mention
case
,in
future
diaphragm
wall
surface
shall
be
hacked
and
shear
linksshallbeexposedforstraighteningpriortoinner/skinwallconstruction.
Thereforethose exposedreinforcementandunsoundconcreteareneededtobe
covered/repairedtemporarilybeforeskinwallconstructionstagetopreventcorrosionof
thereinforcementandpriortostrut/walerinstallation.
Thereforewewouldliketoproposefollowingrectificationworkforabovementionpanel
defects.
2. Procedureoftherectificationworka. Surfacecleaning
Hackandremoveallunsoundconcreteuntilexposesoundconcretesurface Removeanyintactlooseconcrete,loosescaleandrustfromthesteelbar,
anddegreasingthereinforcement ifnecessaryorifpresenceofoilor
grease.
Cleanthesurfacewithcleanwaterandcompressairblowforanylooseparticles.
b. ApplyingAntiCorrosivePaint Topreventthecorrosionorrusty,anticorrosivepaintsuchasNtitroprime
Zinrichorsimilarpaintshallbeappliedatleasttwocoatonthe
reinforcementsurfacebybrushuntilthesteelreinforcementfullcoverand
allowedforatleast1hourforcuring.
-
7/27/2019 Rectification Proposal
2/4
ExpoStation&OverrunTunnelContract922DTL3ES007Panelsurfacerectificationprocedure
__________________________________________________________________________________________________________________
2
c. ApplyingCementMortar Uponthecompletionofapplyinganticorrosivepaint,handmix
cement/sand/watermortarshallbeplasteredonthedefectsurfaceareaby
usingtrowel.Cementmortarthicknessshallbeatleast20mmcoveronthe
reinforcementsurface.
Cement:Sand:Waterratioshallbe1:3:3d. Removalofcementmortarsurface
PriortoconstructionofSkinwallandstraighteningofthediaphragmwallshearlinkstoconnecttotheskinwall, allthecementplastershallbetotally
removedfromthediaphragmwallsurface.
3. PhotoofthedefectsurfaceatthePanelEN007.
Photo.1
-
7/27/2019 Rectification Proposal
3/4
ExpoStation&OverrunTunnelContract922DTL3ES007Panelsurfacerectificationprocedure
__________________________________________________________________________________________________________________
3
Photo.2
-
7/27/2019 Rectification Proposal
4/4
ExpoStation&OverrunTunnelContract922DTL3ES007Panelsurfacerectificationprocedure
__________________________________________________________________________________________________________________
4
Photo.3