reduction through advanced engineering & long term … · 2016. 12. 8. · power cables...

7
Submarine Ship Renewables Aerospace Transport Oil & Gas RISK REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM RELIABILITY

Upload: others

Post on 11-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

Submarine Ship Renewables Aerospace Transport Oil & Gas

RISK

REDUCTION

THROUGH

ADVANCED

ENGINEERING

& LONG TERM

RELIABILITY

Page 2: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

• Mission critical MOD supplier

• Strategic technology development partner

• 25 years of Fit and Forget

• 10,000 installations, zero leaks

• 19 years unbroken MOD Capability Approval

Pedigree

Page 3: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

Renewable

Energy

Export Cables

Balance of Plant

Power Cables

Instrumentation

Monitoring

Page 4: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

• Tidal turbine systems cable systems require o robust operational performance

o reliable over 25+ years

o resistance to hostile environments

• Short term CapEx saving against higher OpEx

• Reduced through life costs - advanced engineering

Lifetime Value:

the challenge

Page 5: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

SlipstreaM OptiC

• Thermoplastic moulding for range of fibre optic connectors

• High performance sealing for subsea

• 90°routing respects minimum bend radius

• Low profile for higher density layouts

• Low insertion loss

• MM & SM fibre optics

• Hybrid fibre & power

Page 6: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

PlastEthUrm

• Conflicting demands for electrical insulation and abrasion

resistance used to mean choosing between polyethylene &

thermoplastic polyurethane jackets

• Cable systems with single cable jackets are vulnerable to

failures, remediation is difficult and costly

• PlastEthUrm separate sealing & water blocking of both PE and

PU jackets extends guaranteed harness life to 40+ years

Page 7: REDUCTION THROUGH ADVANCED ENGINEERING & LONG TERM … · 2016. 12. 8. · Power Cables Instrumentation Monitoring . 10,000 installations Zero leaks Fit and Forget ... connectors

10,000 installations

Zero leaks

Fit and Forget

Submarine Ship Wave Tidal Wind Aerospace Transport Oil & Gas

10,000 installations, Zero leaks

Fit and Forget

SlipstreaM and PlastEthUrm

Advanced

engineering

& long term

reliability

www.sma.limited