Ref.-IE/S-G/O&M/PD/2016/223 Through Email also Date: 05-05-2016 To, The Project Director, Project Implementation Unit Gandhidham, National Highway Authority of India, Z-6, Ground Floor Divine Life Society Hospital (Sterling), Adipur, (Gujarat)-370205. Sub: - "Independent Engineer (IE) Services during Operation and Maintenance period of six laning of Samakhiali - Gandhidham section of NH-41 (Old NH-8A) from km 306.000 to km 362.160 on the state of Gujarat to be executed as BOT (TOLL) on Design, Build, Finance, Operate and Transfer (DBFOT) Under NHDP Phase - V". Reg. Proposal for grant of Permission for laying optical fiber cable (4G Project) across the Project Highway. Crossing details mentioned below (Total Length - 43 Mtrs.):- Ref: - 1. NHAI-PIU Gandhidham letter no. NHAI/PIU/GDM/S-G/crossing/2016/D-4672, Dtd:- 23.04.2016. 2. Reliance Jio infocom Ltd. Letter no. RJIL/OFC/ROW/Road crossing/NHAI Gandhidham/Ol, Dtd: -18.04.2016. Dear Sir, With above reference subject, following comments are offered. 1. In the Checklist annexure-l, the Column of information/status are kept blank at many a places, which need to be filled in with appropriate details. 2. This is the Proposal for crossing the project highway but before and after crossing the highway there is no mention of any proposal for laying the cable along the project highway to make it complete, which need to be clarified. The original proposal is returned herewith for compliance of above comments and further resubmission. Thanking you, ...:..-:-:---- (K. B. Patel) Team Leader cum Sr. Highway Engineer K&J Project Pvt. Ltd. Samakhiali-Gandhidham Section. End: Original proposal as above. C/C: Mr. Vilas Dange, Executive Director, K&J Projects Pvt. Ltd. Pune. K It 1 Projects Pvt. Ltd. Plot No. 57, Ward 3A, Adipur, Kutch - 370205, Gujarat Ph . No . : 0283-6650962 .E-mail : tUg@knjprojects .com, www.knjprojects.com

Upload: truongdieu

Post on 13-May-2018

286 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Ref.-IE/S-G/O&M/PD/2016/223 Through Email also …nhai.org.in/spw/CorrespondenceIssues/Letter No.223 (Reg. Proposal... · Ref.-IE/S-G/O&M/PD/2016/223 Through Email also ... The Project

Ref-IES-GOampMPD2016223 Through Email also Date 05-05-2016

To The Project Director Project Implementation Unit Gandhidham National Highway Authority of India Z-6 Ground Floor Divine Life Society Hospital (Sterling) Adipur (Gujarat)-370205

Sub - Independent Engineer (IE) Services during Operation and Maintenance period of six laning of Samakhiali - Gandhidham section of NH-41 (Old NH-8A) from km 306000 to km 362160 on the state of Gujarat to be executed as BOT (TOLL) on Design Build Finance Operate and Transfer (DBFOT) Under NHDP Phase - V Reg Proposal for grant of Permission for laying optical fiber cable (4G Project) across the Project Highway Crossing details mentioned below (Total Length - 43 Mtrs)shy

Ref - 1 NHAI-PIU Gandhidham letter no NHAIPIUGDMS-Gcrossing2016D-4672 Dtdshy23042016

2 Reliance Jio infocom Ltd Letter no RJILOFCROWRoad crossingNHAI GandhidhamOl Dtd -18042016

Dear Sir With above reference subject following comments are offered

1 In the Checklist annexure-l the Column of informationstatus are kept blank at many a places which need to be filled in with appropriate details

2 This is the Proposal for crossing the project highway but before and after crossing the highway there is no mention of any proposal for laying the cable along the project highway to make it complete which need to be clarified

The original proposal is returned herewith for compliance of above comments and further resubmission

Thanking you

YOU~thfUIlY

-----shy(K B Patel) Team Leader cum Sr Highway Engineer KampJ Project Pvt Ltd Samakhiali-Gandhidham Section

End Original proposal as above

CC Mr Vilas Dange Executive Director KampJ Projects Pvt Ltd Pune

K It 1 Projects Pvt Ltd Plot No 57 Ward 3A Adipur Kutch - 370205 Gujarat Ph No 0283-6650962 E-mail tUgknjprojectscom wwwknjprojectscom

TellFax 02836 - 260104 141dlq ~ uJtqlti SU~etlOI e-mail palnhaiorg (~~-m~~)

I

National Highways Authority of In~ia (Ministry of Road Transport amp Highways) I Project Implementation Unit Gandhidham (NS-EW~ Z-6 Ground Floor Near Divine Life Society Hospital (Stirling) Adipur Dist Kachchh PIN 370205 Site Office Gayatri Complex Opp Gayatri Temple NHmiddot 27 P~LANPURmiddot 385001 Tel 02742middot 26825355

Dated 23042016NO NHAIPIUGDMS-GCrossing2016D-4672

To To I The Team Leader The Project Manager Ms KampJ Projects Pvt Ltd Ms LampT Samakhiyali Gandhidham Tollway IE for Samakhiyali-Gandhidham project Ltd J Plot no 57 Ward-3A Adipur Dist K tch Adipur - Kutch Gujarat I Gujarat-370205

I

Sub Six Laning of Samakhiyali-Gandhidham Section Of NH-8A from Km 306000 to Km 362160 in the State of Gujarat to be execu~ed as BOT (Toll) on Design Build Finance operate and Transfer (DBFOT) lfInder NHDP Phase V Reg Proposal for grant of permission for laying optical fiber cable (4G Project) across the Project Highway Crossing details mentioned below (Total Length - 43 Mtrs)- I

I bull Road crossing at km 343450 on Samakhiyali IGandhidham NH-41 (Total

Length - 43 Mtrs)

Ref Reliance Jio Infocom Ltd letter No RIJLOFCRoWRoad CrossingNHAIGandhidham01 dated 18042016

Sir

This is in reference to above letter dated 18042016 frtom MIs Reliance Jio Infocom Pvt ltd regarding Proposal for grant of permission for laying optical fiber cable (4G Project) across the Project Highway Crossing details mel tioned below (Total Length shy43 Mtrs)-

bull Road crossing at km 343450 on Samakhiyali Gandhidham NH-41 (Total Length - 43 Mtrs)

_ The copy of proposal is enclosed herewith You are re uested to verify the proposal as per the Ministry Guideline and submit your comment~ as this laying I crossing of pipeline will not affect the progress the four six laning Of work Comments them IE amp Concessionaire are both mandatory

Thanking you

Yours sincerely

~~0gt_ (P K Singh)

Project Director PIU Gandhidham

End Proposal in original (1 set each)

Corp Office Plot No G5 ampG6 Sector-10 Dwarka NeW Delhi-11 0075 Ph 91-11-2507410025074200 I

Reliance Jio Infocomm Limited

Ref No RJILOFCROWRoad CrossingNHAI Gandhidham01 Date 18-04-2016

To The Project Director NHAI Gandhidham

Sub - Proposal for grant of permission for laying Optical Fibre Cable (4G Project) Across the National

Highway CrOSSing details Mentioned below (Total Length - 43 Mtrs)

1 Road crossing at Km 34yen450 on Samakhyali - Gandhidham NH - 41 (Total length - 43 Mtrs)

Dear Sir

Ms Reliance Jio Infocomm Limited having its registered office at 9th floor Maker Chambers Nariman point Mumbai - 400021 is Registered with Department of Telecommunications (DOT) as Infrastructure Provider Category I (IP-I) vide registration certificate no 3702011 dated 23rd June 2011 to establish and maintain the assets such as Dark Fibers Right of way Duct space and Tower

As part of our Network we are planning to lay optical fiber cable through duct adopting various methodologies like HDD Open trench Clamping and other suitable method as required on the ground in the NHAI to construct a Fiber optic backbone link

The work will be carried out as per laid down standard Condition amp Guidelines of NHAI for laying the OFC Cable We are enclosing herewith the requisite documents for the permissions to lay the Optical Fiber Cable (OFC)

You are requested to kindly grant us the permission at the earliest we intend to take up the job immediately

For Relia-nZe Jio Infocomm Limited

Any Correspondence in this regards may please be addressed to

~~tfQMlFlt Shri Samir Agnihotri (7043071373) - -- 10_1 i n T I

Page 2: Ref.-IE/S-G/O&M/PD/2016/223 Through Email also …nhai.org.in/spw/CorrespondenceIssues/Letter No.223 (Reg. Proposal... · Ref.-IE/S-G/O&M/PD/2016/223 Through Email also ... The Project

TellFax 02836 - 260104 141dlq ~ uJtqlti SU~etlOI e-mail palnhaiorg (~~-m~~)

I

National Highways Authority of In~ia (Ministry of Road Transport amp Highways) I Project Implementation Unit Gandhidham (NS-EW~ Z-6 Ground Floor Near Divine Life Society Hospital (Stirling) Adipur Dist Kachchh PIN 370205 Site Office Gayatri Complex Opp Gayatri Temple NHmiddot 27 P~LANPURmiddot 385001 Tel 02742middot 26825355

Dated 23042016NO NHAIPIUGDMS-GCrossing2016D-4672

To To I The Team Leader The Project Manager Ms KampJ Projects Pvt Ltd Ms LampT Samakhiyali Gandhidham Tollway IE for Samakhiyali-Gandhidham project Ltd J Plot no 57 Ward-3A Adipur Dist K tch Adipur - Kutch Gujarat I Gujarat-370205

I

Sub Six Laning of Samakhiyali-Gandhidham Section Of NH-8A from Km 306000 to Km 362160 in the State of Gujarat to be execu~ed as BOT (Toll) on Design Build Finance operate and Transfer (DBFOT) lfInder NHDP Phase V Reg Proposal for grant of permission for laying optical fiber cable (4G Project) across the Project Highway Crossing details mentioned below (Total Length - 43 Mtrs)- I

I bull Road crossing at km 343450 on Samakhiyali IGandhidham NH-41 (Total

Length - 43 Mtrs)

Ref Reliance Jio Infocom Ltd letter No RIJLOFCRoWRoad CrossingNHAIGandhidham01 dated 18042016

Sir

This is in reference to above letter dated 18042016 frtom MIs Reliance Jio Infocom Pvt ltd regarding Proposal for grant of permission for laying optical fiber cable (4G Project) across the Project Highway Crossing details mel tioned below (Total Length shy43 Mtrs)-

bull Road crossing at km 343450 on Samakhiyali Gandhidham NH-41 (Total Length - 43 Mtrs)

_ The copy of proposal is enclosed herewith You are re uested to verify the proposal as per the Ministry Guideline and submit your comment~ as this laying I crossing of pipeline will not affect the progress the four six laning Of work Comments them IE amp Concessionaire are both mandatory

Thanking you

Yours sincerely

~~0gt_ (P K Singh)

Project Director PIU Gandhidham

End Proposal in original (1 set each)

Corp Office Plot No G5 ampG6 Sector-10 Dwarka NeW Delhi-11 0075 Ph 91-11-2507410025074200 I

Reliance Jio Infocomm Limited

Ref No RJILOFCROWRoad CrossingNHAI Gandhidham01 Date 18-04-2016

To The Project Director NHAI Gandhidham

Sub - Proposal for grant of permission for laying Optical Fibre Cable (4G Project) Across the National

Highway CrOSSing details Mentioned below (Total Length - 43 Mtrs)

1 Road crossing at Km 34yen450 on Samakhyali - Gandhidham NH - 41 (Total length - 43 Mtrs)

Dear Sir

Ms Reliance Jio Infocomm Limited having its registered office at 9th floor Maker Chambers Nariman point Mumbai - 400021 is Registered with Department of Telecommunications (DOT) as Infrastructure Provider Category I (IP-I) vide registration certificate no 3702011 dated 23rd June 2011 to establish and maintain the assets such as Dark Fibers Right of way Duct space and Tower

As part of our Network we are planning to lay optical fiber cable through duct adopting various methodologies like HDD Open trench Clamping and other suitable method as required on the ground in the NHAI to construct a Fiber optic backbone link

The work will be carried out as per laid down standard Condition amp Guidelines of NHAI for laying the OFC Cable We are enclosing herewith the requisite documents for the permissions to lay the Optical Fiber Cable (OFC)

You are requested to kindly grant us the permission at the earliest we intend to take up the job immediately

For Relia-nZe Jio Infocomm Limited

Any Correspondence in this regards may please be addressed to

~~tfQMlFlt Shri Samir Agnihotri (7043071373) - -- 10_1 i n T I

Page 3: Ref.-IE/S-G/O&M/PD/2016/223 Through Email also …nhai.org.in/spw/CorrespondenceIssues/Letter No.223 (Reg. Proposal... · Ref.-IE/S-G/O&M/PD/2016/223 Through Email also ... The Project

Reliance Jio Infocomm Limited

Ref No RJILOFCROWRoad CrossingNHAI Gandhidham01 Date 18-04-2016

To The Project Director NHAI Gandhidham

Sub - Proposal for grant of permission for laying Optical Fibre Cable (4G Project) Across the National

Highway CrOSSing details Mentioned below (Total Length - 43 Mtrs)

1 Road crossing at Km 34yen450 on Samakhyali - Gandhidham NH - 41 (Total length - 43 Mtrs)

Dear Sir

Ms Reliance Jio Infocomm Limited having its registered office at 9th floor Maker Chambers Nariman point Mumbai - 400021 is Registered with Department of Telecommunications (DOT) as Infrastructure Provider Category I (IP-I) vide registration certificate no 3702011 dated 23rd June 2011 to establish and maintain the assets such as Dark Fibers Right of way Duct space and Tower

As part of our Network we are planning to lay optical fiber cable through duct adopting various methodologies like HDD Open trench Clamping and other suitable method as required on the ground in the NHAI to construct a Fiber optic backbone link

The work will be carried out as per laid down standard Condition amp Guidelines of NHAI for laying the OFC Cable We are enclosing herewith the requisite documents for the permissions to lay the Optical Fiber Cable (OFC)

You are requested to kindly grant us the permission at the earliest we intend to take up the job immediately