reference list - ingeteam · gas y electricidad generacion, s.a. 2013 support to expediting...

29
REFERENCE LIST LOW VOLTAGE

Upload: others

Post on 17-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

REFERENCE LIST

LOW VOLTAGE

Page 2: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2016

1 ppal. Switchboard of 400Vac +

1 emergency switchboard of

400/230Vac + 1 Ppal.

Switchboard of 230Vac/24V

Fixed 500V 36kA 3 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2016 2 MCC Rolls Royce Belgium Fixed 500V 36kA 2 BELGIUMINGETEAM POWER TECHNOLOGY

(Industry)

2016 2GCC Rolls-Royce Belgium Fixed 500V 10kA 2 BELGIUMINGETEAM POWER TECHNOLOGY

(Industry)

2016Secundary switchboards for 1

st

Granalero Balenciaga C407 ship Fixed 500V 10kA 31 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2016 6 GCC Rolls Royce Baltimore Fixed 500V 10kA 6 BALTIMOREINGETEAM POWER TECHNOLOGY

(Industry)

2016Variable Frequency Drives

Switchboards for UnileverFixed 500V 10kA 1 LEIOA (SPAIN) PINE INSTALACIONES Y MONTAJES

2016690Vca switchboard Draga Van

OordFixed 800V 42,4kA 1 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

2016

440V Switchboard & 440V

Emergency swichboard Draga

Van Oord

Fixed 500V 33,1kA 3 SESTAO (SPAIN)INGETEAM POWER TECHNOLOGY

(Marine)

2016Shore connection boxes Draga

Van OordFixed 800/ 500V

42,4kA/

33,1kA3 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

2016Gland pumps switchboards for

Draga Van OordFixed 800V 42,2kA 2 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

www.pine.esREF. LV

Page 3: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2015400Vac panel +230Vac panel

+emergency panel + bulk carrierFixed 400/230V 35kA 3 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2015 Lighting secondary panels Fixed 230 V 10 kA 19 Ferrol (SPAIN) NAVANTIA

2015 Secondary panels Fixed 24 V 10kA 8 Ferrol (SPAIN) NAVANTIA

2015Power secondary switchboards

60Hz (5th and 6th BAM) Fixed 400/230/ 115 V Several 62 Ferrol (SPAIN) NAVANTIA

2015 Control Panels (5th and 6

th BAM) Fixed 400/230/ 24 V Several 65

PUERTO REAL

(CADIZ-SPAIN)NAVANTIA

2015Panel shore power socket (5

th

and 6th BAM)

Fixed 440 V 65 kA 2PUERTO REAL

(CADIZ-SPAIN)NAVANTIA

2015 Testing panel (5th and 6th BAM) Fixed440/230/

115/24 VSeveral 3

PUERTO REAL

(CADIZ-SPAIN)NAVANTIA

2015Secondary Panels of 400Hz (5th

and 6th BAM) Fixed 115 V 10kA 1 Ferrol (SPAIN) NAVANTIA

2015 MP Starter Group Beneetti PINE INSTALACIONES Y MONTAJES

2015LV switchboards Cable Lay La

NavalFixed 440/230 V Several 17 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

2015 Wikinger LV switchgears supply Fixed 400/230/ 24 V Several 18PUERTO REAL

(CADIZ-SPAIN)PINE INSTALACIONES Y MONTAJES

www.pine.esREF. LV

Page 4: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2015General LV switchboard Etap de

SalterasSEVILLA (SPAIN) UTE ETAP SALTERAS

2015 CCM COQUE evacuation systemINGETEAM POWER TECHNOLOGY -

U.P. Industry

2015

LV panels for Oceanographic

Vessel C-460 Gondan Fixed 230-690V 2,8-39kA 4 SESTAO (SPAIN)INGETEAM POWER TECHNOLOGY

(Marine)

2015

Main panels standby and ship

propulsion (Balenciaga C452 and

C453)

Fixed 440/230V 35kA 4 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2015

Secondary panels standby and

ship propulsion (Balenciaga C452

and C453)

Fixed 440/230V <15kA 100 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2015CDBT'S for new work-place CT 5

in VicinayFixed 420V 50-150kA 4 SESTAO (SPAIN) ELDU, S.A.

2014Reformation saw cutting tubes of

24"Fixed 400V

1MCC

1PLC

2 panels

2 local

boxes

Valle de Trápaga

(SPAIN)INDUSTRIAS LAGUN ARTEA, S.L.

2014Technical assistance and supply

of boards for the WARAO SHIPWithdrawable 440Vac 42kA 6 BRASIL

ECOVIX-ENGEVIX CONSTRUCOES

OCEANICAS S.A.

2014Cabin supply F.C. to MSB's -

H386Fixed 400-230V 42-66kA 4

INGETEAM POWER TECHNOLOGY

(Marine)

2014Switchboards Ferry Ro-Ro (La

Naval)Fixed 400V 2,9-52,8 14 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

www.pine.esREF. LV

Page 5: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2014Switchboards HVAC Ferry La

Naval (P15-P20)Fixed 400V 36kA 5 SESTAO (SPAIN)

INGETEAM POWER TECHNOLOGY

(Marine)

2014CMI and MCC alternating voltage

cabinet RussiaFixed 400V 36kA 10 RUSSIA

INGETEAM POWER TECHNOLOGY

(Industry)

2014

Electric changings in the handling

between Behringuer saws - Steel

room

Fixed 400V 36kA

1

MCC+PL

C

1 panel

VALLE DE

TRAPAGA

(SPAIN)

PRODUCTOS TUBULARES

2014 13 GCC cabinets for Rolls Royce MOZAMBIQUEINGETEAM POWER TECHNOLOGY

(Industry)

2014Switchboards installation in 20-

foot containeren (4units)Fixed 380V 15 15

BARDZOUR

(REUNION

ISLAND)

INGETEAM POWER TECHNOLOGY

(Technology)

2014Manufacture of 6 control modules

for ABB driveFixed 400V 6 COLOMBIA ASEA BROWN BOVERI, S.A.

2014

Distribution panel low voltage-

IBIZA CENTRAL DIESEL

(BALEARES)

Withdrawable 400V 75kA 1 CGBT IBIZA (SPAIN)GAS Y ELECTRICIDAD GENERACION,

S.A.

2013 Support to Expediting DRAGADOS OFFSHORE

2013Electrical engineers for PTAR

BELLOCOLOMBIA ACCIONA AGUA

2013

Main, secundary and emergency

switchgears and 220Vac Stand-

by (for 4 ships)

Fixed 440V 36kA 11/ SHIP ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJES

2013 AT0353 Converters assembly Fixed 230Vac 6kA 5

BARDZOUR

(REUNION

ISLAND)

INGETEAM POWER TECHNOLOGY -

TECHNOLOGY

www.pine.esREF. LV

Page 6: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2013 Installation of drives Fixed 400Vac 50kA 2

JEREZ DE LA

FRONTERA

(SPAIN)

PINE INSTALACIONES Y MONTAJES

2013

Electrical adjustments and

reforms in lime furnace and

grouting workshop

Fixed 400Vac 50kA 2

JEREZ DE LA

FRONTERA

(SPAIN)

PINE INSTALACIONES Y MONTAJES

2013 Cabinet for crane ref. 53952 Fixed 400V 10kA 1 PRODUCTOS TUBULARES

2013Switchgears and assembly for

Bardzour containersFixed 400V 10kA 4

BARDZOUR

(REUNION

ISLAND)

INGETEAM POWER TECHNOLOGY -

TECHNOLOGY

2013 Cabinets recovery Silvon Fixed 400Vca 35kAASTURIAS

(SPAIN)EON GENERACION

2013 FEL Europeo (88 units) Fixed 230Vcc 88HAMBURG

(GERMANY)CIEMAT

2013 Switchgears to HC Villagonzalo Fixed 220/127Vca 50kA 4SALAMANCA

(SPAIN)

INGETEAM POWER TECHNOLOGY -

ENERGY

2012

MCC's nº1 y nº2 + starter boxes +

auxiliaries services and specials

(Vessel Ulstein PX-105)

PINE INSTALACIONES Y MONTAJES,

S.A.

2012Cabinets, power swithgear and

MCC's Biomass Plant (Mérida)Withdrawable 400V 75kA 15(69) MÉRIDA (SPAIN) SENER INGENIERIA Y SISTEMAS, S.A.

2012Adaptation of an electrical

instalation of sugar dryer (Cádiz)CÁDIZ (SPAIN)

PINE INSTALACIONES Y MONTAJES,

S.A.

www.pine.esREF. LV

Page 7: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2012Supply of cabinets LV (B1/3) -

New instalations of VicinayFixed 1000V 65/50kA 5 SESTAO (SPAIN) ELDU, S.A.

2012Assembly of 3 LV4901-E

equipments400/500Vac 3 ZAMUDIO (SPAIN)

INGETEAM POWER TECHNOLOGY -

TECHNOLOGY

2012Termical Central of Quileva

480/277V 60HzWithdrawable 480/227V 65kA 1 ANGOLA

INGETEAM POWER TECHNOLOGY -

INDUSTRY

2012Assembly of 3 LV4901-D

equipments3 ZAMUDIO (SPAIN)

INGETEAM POWER TECHNOLOGY -

TECHNOLOGY

2012Assembly and wiring of 39

TM0141 equipments88 POLAND

INGETEAM POWER TECHNOLOGY, -

TRACTION

2012Auxiliaries services cabinets 440v

for Astilleros Balenciaga C-447

PINE INSTALACIONES Y MONTAJES,

S.A.

2012Auxiliaries cabinets for

Balenciaga Vessel C-446/447 Fixed

PINE INSTALACIONES Y MONTAJES,

S.A.

2012 Assembly of 6 L3 equipments Fixed 6 ZAMUDIO (SPAIN)INGETEAM POWER TECHNOLOGY, -

TECHNOLOGY

2012 LV4901-C equipments (3units) Fixed 3 ZAMUDIO (SPAIN)INGETEAM POWER TECHNOLOGY, -

TECHNOLOGY

2012Protection panels for

Torrearenillas Subtation (Cádiz)Fixed HUELVA (SPAIN) SISTEMAS ELÉCTRICOS THALES, S.A.

2012Assembly of 2 AQ1880-C

equipmentsFixed 440/230 2 ZAMUDIO (SPAIN)

INGETEAM POWER TECHNOLOGY, -

TECHNOLOGY

www.pine.esREF. LV

Page 8: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2012 Supply of AQ0401-A equipment Fixed 240Vac 1 ZAMUDIO (SPAIN)INGETEAM POWER TECHNOLOGY, -

TECHNOLOGY

2012 H.C. La Muela II MCC's WithdrawableVALENCIA

(SPAIN)IBERDROLA GENERACIÓN

2012Electrical cabinets, boats Project

454-AFixed 400V 10kA 32 CADIZ (SPAIN)

NAVANTIA, S.A. AST. SAN FERNANDO.

PUERTO REAL

2012Assembly and supply of 2

LV4703 equipments A and BFixed 2 ZAMUDIO (SPAIN)

INGETEAM POWER TECHNOLOGY,

S.A.-U.P.TECHNOLOGY

2012External assembly of AQ1880

equipments (2 Units)Fixed 440/230Vac 2 ZAMUDIO (SPAIN)

INGETEAM POWER TECHNOLOGY,

S.A.-U.P.TECHNOLOGY

2012 Thyristors cabinets Fixed 690Vac 1 ZAMUDIO (SPAIN)INGETEAM POWER TECHNOLOGY,

S.A.-U.P.TECHNOLOGY

2012

Distribution panels and MCC's

C.T. Dos Caminhos de Ferro,

Luanda (Angola)

Withdrawable /

Fixed400Vac 65kA 3 (20)

LUANDA

(ANGOLA)

INGETEAM POWER TECHNOLOGY,

S.A.-U.P.INDUSTRY

2012Main panel of a.c. and c.c.

(+10BA) Torres de SegreFixed 400Vac/125Vdc 25kA 1(4) LÉRIDA (SPAIN)

INGETEAM POWER TECHNOLOGY,

S.A.-U.P.TECHNOLOGY

2012Power and lighting boxes C.T

CasablancaFixed 400/220V 15kA/ 6kA 22

CACERES

(SPAIN)

UTE C.T. CASABLANCA (COBRA-

SENER)

2012Control and protection cabinets

STR OquillasFixed 400Vac/125Vdc BURGOS (SPAIN)

PINE INSTALACIONES Y MONTAJE,

S.A.

www.pine.esREF. LV

Page 9: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2012

Control and protection cabinets,

auxiliaries services and voltage

boxes STR Estella

Fixed 400Vac/125Vdc 8NAVARRA

(SPAIN)

PINE INSTALACIONES Y MONTAJE,

S.A.

2012

Control and protection cabinets,

auxiliaries services and voltage

boxes STR Carcastillo

Fixed 400Vac/125Vdc 14NAVARRA

(SPAIN)

PINE INSTALACIONES Y MONTAJE,

S.A.

2012

Electrical equipments PILGER II -

28", Anex 2ª Saw and

oleohydraulic roller group

Fixed 400V 50kA 13 (D-F)TRAPAGA

(SPAIN)PRODUCTOS TUBULARES, S.A.

2012Manufacture frames and cabinets

of Hijar & Esquedas SubstationsFixed 400/220V 44

HIJAR AND

ESQUEDAS

(SPAIN)

ENDESA INGENIERIA, SLU

2012Main and auxiliaries cabinets

Balenciaga Vessel B-447Fixed 400/220V 50 kA 9 ZUMAIA (SPAIN)

PINE INSTALACIONES Y MONTAJE,

S.A.

2012Main and auxiliaries cabinets

Balenciaga Vessel B-446Fixed 400/220V 50 kA 9 ZUMAIA (SPAIN)

PINE INSTALACIONES Y MONTAJE,

S.A.

2012

Control and protection cabinets -

and Auxiliary services ST IB

Fuente Hito

Fixed430/ 230Vac +

125 Vdc12

FUENTE HITO

(MADRID-SPAIN)

IBERDROLA DISTRIBUC.ELECTRICA,

S.A

2012

Control,protection panelboards,

auxiliary services and load

resistors boxes S.T. IB Balsicas

Fixed430/ 230Vac +

125 Vdc17

TORRE

PACHECO

(SPAIN)

IBERDROLA DISTRIBUC.ELECTRICA,

S.A

www.pine.esREF. LV

Page 10: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2012Supply of 16 equipments mod.

TR600Fixed 16

TRAPAGA

(SPAIN)

INGETEAM POWER TECHNOLOGY,

S.A.-U.P.TRACTION

2011 TS500 Supply (3 Equipments) Fixed 3 VIZCAYA (SPAIN) INGETEAM TRACTION, S.A.

2011 Switchboard-RFQ Testing Fixed 690 V 50 kA 1MILWAUKEE -

USAINGETEAM INC

2011Repair of KRUG crane, 5th line

Lamination AreaFixed 400 V 50 kA 8

TRAPAGA

(SPAIN)PRODUCTOS TUBULARES, S.A.

2011

Power and low voltage

panelboards for Thermosolar

Plant Termosol 2

Fixed 400 V 25 kA 12NAVALVILLAR DE

PELA (SPAIN)

PLANTA TERMOSOLAR DE

EXTREMADURA 2, S.L.

2011

Power and low voltage

panelboards for Thermosolar

Plant Termosol 1

Fixed 400 V 25 kA 12NAVALVILLAR DE

PELA (SPAIN)

PLANTA TERMOSOLAR DE

EXTREMADURA, S.L.

2011 4 Panelboards MV1352 Supply Fixed 4 INGETEAM TECHNOLOGY

2011 12 Converters TR600 for WP Fixed 12WIELKOPOLSKA

(POLAND)INGETEAM TRACTION

2011

Electrical boxes. Fall Pipe &

Minning Vessel (La Naval

"NB340")

CONSTRUCCIONES NAVALES DEL

NORTE

2011Testing and repairs in automatic

valves

JEREZ DE LA

FRONTERA

(SPAIN)

AZUCARERA EBRO, S.L.U

www.pine.esREF. LV

Page 11: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2011Power and Lighting Panelboards

Extresol-3Fixed 400 V 15 kA 22

TORRE DE

MIGUEL

SESMERO

(SPAIN)

UTE CT EXTRESOL 3 (COBRA -

SENER)

2011

Remote I/O System. Fall Pipe &

Minning Vessel (La Naval

"NB340")

INGETEAM MARINE, S.A.

2011

Distribution switchboards and

Motor Control Center. Biomass

Plant Reocín

Fixed 400 V 66,2 kA 34 REOCIN (SPAIN) INGETEAM ENERGY, S.A.

2011Control and protection

panelboards H.C. Bossot

CONTROL Y MONTAJES

INDUSTRIALES CYMI, S.A.

2011Fall pipe & Mining Vessel (La

Naval "NB340")Fixed 24 a 690V 78 kA 112 SESTAO (SPAIN)

CONSTRUCCIONES NAVALES DEL

NORTE

2011

Main Switchboards, emergency

and 220Vac Stand-by for

Balenciaga Tug Boats

Fixed 440 V / 220 V 36 kA 12 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJE

2011

5 Motor Control Centers for

Winders - Outokumpu Tornio

Works

Fixed 400 V 50 kA 5 FINLAND INGETEAM INDUSTRY

20113 Switchboards for Winders -

Outokumpu Tornio WorksFixed 400 V 50 kA 3 FINLAND INGETEAM INDUSTRY

2011Motor control centers and VVVF

CGL Costa RicaCOSTA RICA INGETEAM INDUSTRY

www.pine.esREF. LV

Page 12: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2011Power and control Switchboards

for Furnace of BentFixed 380 Vac 58 kA 40 LLODIO (SPAIN) GUARDIAN LLODIO UNO, S.L.

2011 16 TR600 Converters Fixed 380 Vac 16 POLAND INGETEAM TRACTION

2011Transformer protection panel for

Thermosolar Plant Termosol 2Fixed 110 Vcc 1

EXTREMADURA

(SPAIN)

PLANTA TERMOSOLAR DE

EXTREMADURA 2, S.L.

2011Transformer protection panel for

Thermosolar Plant Termosol 1Fixed 110 Vcc 1

EXTREMADURA

(SPAIN)

PLANTA TERMOSOLAR DE

EXTREMADURA, S.L.

2011

Assembly of 200 Switchboards

POWER MAN - Photovoltaic

Inversors

ITALY INGETEAM PANELES

2011Switchboards for Auxiliary

Services H.C. La Muela II

Fixed /

Withdrawable400 V

65 kA / 50

kA21

VALENCIA

(SPAIN)IBERDROLA GENERACION

2010Main Switchboard +70BA and

Auxiliary Switchboard +70CAINGETEAM MARINE

2010Main Switchboard +70BA and

Auxiliary Switchboard +70CAINGETEAM MARINE

2010Main Switchboards for Balenciaga

C-401-402-403-404 Tug BoatsFixed 440 V / 220 V 36 kA 12 ZUMAIA (SPAIN) PINE INSTALACIONES Y MONTAJE

2010 Switchboards for Bench Testing Fixed ZAMUDIO (SPAIN) INGETEAM TECHNOLOGY

www.pine.esREF. LV

Page 13: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2010

6 Switchboards for Voltage

distribution - Ingeteam

Technology new Laboratory

Fixed 6 ZAMUDIO (SPAIN) INGETEAM TECHNOLOGY

2010 26 TR500 Converters Fixed 380 Vca 26 INGETEAM TRACTION

2010 AN6100 Converters Fixed 380 Vca 4 INGETEAM TRACTION

2010 Panels for Trains Fixed BOSNIA TALGO

2010Transformer protection panels

Thermosolar Plant Valle 1Fixed 400 Vca 50 KA 2

SAN JOSE DEL

VALLE (SPAIN)SENER - COBRA

2010Assembly and wiring of 85 TOP

Panelboards for wind turbinesITALY INGETEAM PANELES

2010Transformer protection panels

Thermosolar Plant Valle 2Fixed 400 Vca 50 KA 2

SAN JOSE DEL

VALLE (SPAIN)SENER - COBRA

2010Power and Lighting Panelboards

Thermosolar Plant Valle 1Fixed 400 Vca 50 KA 12

SAN JOSE DEL

VALLE (SPAIN)SENER - COBRA

2010Assembly of 81 equipments

500kV photovoltaic invertersITALY INGETEAM PANELES

2010Power and Lighting Panelboards

Thermosolar Plant Valle 2Fixed 400 Vca 50 KA 12

SAN JOSE DEL

VALLE (SPAIN)SENER - COBRA

www.pine.esREF. LV

Page 14: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2010

690V distribution panel, MCC and

400V switchboard for Palma del

Rio thermosolar plant

Fijo / Extraíble690 Vca / 400

Vac

690V 80kA

/ 400V

65kA

5CORDOBA

(SPAIN)INGETEAM ENERGY, S.A.

2010

String equipment supply and

condenser equipments for wind

turbines

ITALY INGETEAM PANELES

2010Main Switchboards 7500 m3

Dredge Jande Nul 1Fixed 400 Vca 70 KA 10 KOREA INGETEAM MARINE

2010Main Switchboards 7500 m3

Dredge Jande Nul 2Fixed 400 Vca 70 KA 10 KOREA INGETEAM MARINE

2010Transformer protection panels

Thermal Plant Río TurbioFixed 400 Vca 35 KA 5 ARGENTINA ISOLUX

20103 Motor Control Centers steel mill

ArkansasFixed

120 / 480 Vca

24 Vcc3 ARKANSAS INGETEAM INDUSTRY, S.A.

2010Generator panelboards H.C.. San

Vicente / San MiguelWithdrawable 440 Vca 36 kA 8 LA RIOJA (SPAIN) INGETEAM ENERGY, S.A.

2010DTR panels for Combined Cycle

Plant Koudiet Fixed 400 Vca 10 kA 3

KOUDIET

(ALGERIA)

IBERDROLA INGENIERIA Y

CONSTRUCCION

2010 Equipments AQ1807-A Fixed 400 Vca 36 kA ZAMUDIO (SPAIN) INGETEAM TECHNLOGY S.A.

2010

4 M.C.Cs, 4 GENSET, 1PCCP 4

local panels and 25 local

keypads. Rolls-Roice

Fixed 400 Vca 36 kA 38 YEMEN INGETEAM INDUSTRY, S.A.

2009 Switchboards AQ5503 Fixed440 / 220 Vca

24 Vcc6 INGETEAM TECHNOLOGY, S.A.

www.pine.esREF. LV

Page 15: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

20095 Motor Control Centers

ERDEMIR-TURQUIAFixed

800 / 640 / 380

220 / 460 Vca20 TURKEY INGETEAM INDUSTRY, S.A.

2009Distribution Power Switchboards

U7Fixed 400 / 230 Vca 35 / 25 kA 8 PETROLEOS DEL NORTE, S.A.

2009 Transformer protection panel Fixed 110 Vcc 31,5 kA 1 PETROLEOS DEL NORTE, S.A.

2009Power switchboards, services

and consolesFixed Several (9+9)X4

RIVABELLOSA

(SPAIN)PATENTES TALGO, S.L.

2009LV Switchboards Testing

laboratory INDARFixed

690/400/ 230

Vca41 BEASAIN (SPAIN) INGETEAM INDUSTRY, S.A.

2009

Distribution Panel 690V/400V and

MCCs Thermosolar Plant of

Palma del Río (Córdoba)

Fixed /

Withdrawable

690/400/230

Vca50

CORDOBA

(SPAIN)INGETEAM ENERGY, S.A.

2009

Distribution Switchboards

400/400-230V Thermal Plant

Mejillones

Fixed 400 / 230 Vca 36 kA 4 CHILEUTE C.T. MEJILLONES COBRA-

FOSTER WHEELER

2009Low voltage switchboards, Bloque

1/2Withdrawable 1000 Vca ≥56 kA

61 / 18

BoxesSESTAO (SPAIN)

CONSTRUCCIONES NAVALES DEL

NORTE

2009

Control signal panels A-B-C-D-E-

F-G-H-O-P-Q

(2ªDRAGA NAVAL SESTAO)

Fixed 230 / 440 Vca 11 SESTAO (SPAIN) INGETAM MARINE, S.A.

20092 Panels VVVF MCC (DELIVERY

+10EA) ArkansasFixed 480 Vca 5 ARKANSAS INGETEAM INDUSTRY, S.A.

www.pine.esREF. LV

Page 16: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2009DC MCC Aux. Drives +11FA

ArkansasFixed 480 Vca 4 duplex ARKANSAS INGETEAM INDUSTRY, S.A.

2009 Control panels 2º,3º,4º POV Fixed 115 Vca / 60Hz 116PUERTO REAL

(SPAIN)

NAVANTIA, S.A. AST.SAN FERNANDO

P.REAL

2009 Control panels MTL 2º, 3º, 4ª BVL Fixed 115 Vca / 60Hz 21SAN FERNANDO

(SPAIN)

NAVANTIA, S.A. AST.SAN FERNANDO

P.REAL

2009Mineral sands cabinet (Valencia) -

Ref.: 40510Fixed 400 Vca 15 kA 5 SONDIKA (SPAIN) ANIVI INGENIERIA, S.A.

2009

Lighting and power LV

panelboards Thermosolar Plant

Extresol-2

Fixed 400 / 230 Vca4,15 /

20,30 kA28

EXTREMADURA

(SPAIN)

UTE C.T. EXTRESOL 2 COBRA -

SENER

2009

Lighting and power LV

panelboards Thermosolar Plant

Extresol-1

Fixed 400 / 230 Vca4,15 /

20,30 kA28

EXTREMADURA

(SPAIN)UTE C.T. EXTRESOL 1 COBRA-SENER

2008 2 Cuadros principales Fijo 690 Vca 18 HUELVA (SPAIN) INGETEAM MARINE, S.A.

2008 Lighting boxes 1º Pov Fixed 115 Vca 10 kA 1PUERTO REAL

(SPAIN)

NAVANTIA, S.A.-AST. SAN FERNANDO-

P. REAL

2008 2 Main Switchboards Fixed 690 Vca 18 HUELVA (SPAIN) INGETEAM MARINE, S.A.

2008

Switchboards 440V "P6, P8, P9 y

P10" C333 (Fall Pipe & Mining

Vessel)

Fixed 440 / 230 Vca78 kA 50

kA45 SESTAO (SPAIN)

CONSTRUCCIONES NAVALES DEL

NORTE, S

2008 Panels (CNN La Naval C334) Fixed 440 / 230 Vca 13 SESTAO (SPAIN)CONSTRUCCIONES NAVALES DEL

NORTE, S

2008 Secundary panels for POV Vessel Fixed440 / 115 Vca

24 Vdc

10kA

36kA 1

PUERTO REAL

(SPAIN)

NAVANTIA, S.A.-AST. SAN FERNANDO-

P. REAL

www.pine.esREF. LV

Page 17: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2008

Switchboards for Suction Dredge

46.000 m3 (B-332 Astillero de

Sestao)

Fixed 440 / 230 Vca 9 SESTAO (SPAIN)CONSTRUCCIONES NAVALES DEL

NORTE, S

2008Lighting and secundary panel 4º

BVLFixed

440 / 115 Vca

24 Vdc

10kA

36kA 1

SAN FERNANDO

(SPAIN)

NAVANTIA, S.A.-AST. SAN FERNANDO-

P. REAL

2008

5 MCC'S CC and 1 DC BUS

Rectifier steel mill Vega Do Sul

(Brasil)

Fixed460 Vca 650

Vcc12kA 28

VEGA DO SUL

(BRASIL)INGETEAM INDUSTRY, S.A.

2008 8 Panels Ucs Simple with Tcp Fixed125 Vcc / 220

Vca8

INGETEAM TRANSMISSION &

DISTRIBUTION

2008

DC MCC DELIVERY MAIN

MOTOR +40FC (ARCELOR

MITTAL-INDIANA)

Fixed 480 Vca 12 kA 9ARCELOR MITTAL

INDIANAINGETEAM INDUSTRY, S.A.

2008

VVVF MCC ENGINEERING

+30FA (ARCELOR MITTAL-

INDIANA)

Fixed 480 Vca 12 kA 7ARCELOR MITTAL

INDIANAINGETEAM INDUSTRY, S.A.

2008 4 Equipments AQ0724 Fixed380 Vca / 24

Vcc20 INGETEAM TECHNOLOGY, S.A.

20082 MCC mill boxes 11B y 12B -

NervaceroFixed 380 / 230 Vca 8

NERVACERO

(SPAIN)INGETEAM INDUSTRY, S.A.

2008 Panel UTE-3500 Fixed INGETEAM TRACTION, S.A.

2008Converters TALGO 250

(TR0100)Fixed INGETEAM TRACTION, S.A.

www.pine.esREF. LV

Page 18: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2008 8 Panels UCS Fixed 125 Vcc 8INGETEAM TRANSMISSION &

DISTRIBUTION

20086 Main switchboard ZY5022AB

+01RA0Fixed

24 / 48 Vcc 220

Vca6

INGETEAM TRANSMISSION &

DISTRIBUTION

20089 Units YAR UCS SIMPLE CON

TCPFixed 125 Vcc

INGETEAM TRANSMISSION &

DISTRIBUTION

2008

Transformer protection panels.

Combined Cycle Power Plant

Lares

Fixed125 Vcc /220

Vca2 PORTUGAL C.C. DE LARES - ACE

2008 8 Simple panelboards Tcp Fixed 125 Vcc 8INGETEAM TRANSMISSION &

DISTRIBUTION

2008

Lighting and Auxiliary services

panels. Thermosolar Plant

Puertollano

Fixed 440 Vca 15 kA 5PUERTOLLANO

(SPAIN)

IBERDROLA ENERGIA SOLAR DE

PUERTOLLANO

2008

Control -protection and Auxiliary

services panels 30 KV. (ST

Hernani)

Fixed220 Vca

125 Vcc10

ST HERNANI

(SPAIN)

IBERDROLA DISTRIBUC.ELECTRICA,

S.A

2008

Control -protection and auxiliary

services panels AC/DC (STR

Lamiaco)

Fixed400 / 230 Vca

125 Vcc4 STR. LAMIACO

PINE INSTALACIONES Y MONTAJES,

S.A.

2008

Control -protection and Auxiliary

services panels AC / DC (ST

Brosquil)

Fixed

400 / 220 Vca

125 / 48 / 12

Vdc

10EL BROSQUIL

(SPAIN)

IBERDROLA DISTRIBUC.ELECTRICA,

S.A

2008Auxiliary services panels AC / DC

(STR San Miguel de Basauri)Fixed

400 / 220Vca

125 Vdc25 kA 2

SAN MIGUEL DE

BASAURI (SPAIN)

PINE INSTALACIONES Y MONTAJES,

S.A.

www.pine.esREF. LV

Page 19: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2008 AEM CANAVESE ( RR - ITALY) Fixed 400 Vca ITALY INGETEAM INDUSTRY, S.A.

2007

Auxiliary Switchboard 400V ASB-

P2 +70 CA Jan De Nul THSD

7500 m3

Fixed 400 V 35 10 CORESAINGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007

Main Switchboard 690V MSB-P1

+70 BA Jan De Nul THSD 7500

m3

Fixed 690 V 35 12 KOREAINGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007Traction converter panels

AN7191Fixed 440 V 35 14 VENEZUELA

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

20071 CCM CA y 1 CCM VVVF

Inspection line number 3 Fixed 400 V 50 14 AVILES (SPAIN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007 Distribution Switchboard 400 HzNAVANTIA, S.A. SAN FERNANDO -

PUERTO REAL

2007 Control console +Z36 in train PATENTES TALGO, S.A.

2007Juliana - Vulcano 533 Seismic

VesselFixed 690 V 50 18 GIJON (SPAIN) PINE INSTALACIONES Y MONTAJES

20072 MCC CC tandem boxes UR +

ERFixed 380 V 10 MADRID (SPAIN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007 Voltage Distribution Switchboard PINE INSTALACIONES Y MONTAJES

2007Juliana - Vulcano 532 Seismic

VesselFixed 690V 50 18 GIJON (SPAIN) PINE INSTALACIONES Y MONTAJES

2007 Distribution Switchboard CT4 Fixed 400 V 50 2 AMURRIO (SPAIN) TUBOS REUNIDOS, S.A.

2007 500 Switchboards Top E70V2 Fixed 400 V 50 1 SESMA (SPAIN) PANELES ELECTRICOS, S.A.

www.pine.esREF. LV

Page 20: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2007 MCC CC steel mill Fixed 690 V 50 4 MOROCCOINGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007 MCC CC mill Fixed 600 V 50 25 MOROCCOINGELECTRIC INGENIERIA DE

SISTEMAS, S.A.

2007Main and emergency

switchboards 1º BVLWithdrawable 440 V 36 16 VENEZUELA

NAVANTIA, S.A. SAN FERNANDO -

PUERTO REAL

2007Main and emergency

switchboards 2º BVLWithdrawable 440 V 36 16 VENEZUELA

NAVANTIA, S.A. SAN FERNANDO -

PUERTO REAL

2007Main and emergency

switchboards 3º BVLWithdrawable 440 V 36 16 VENEZUELA

NAVANTIA, S.A. SAN FERNANDO -

PUERTO REAL

2007Main and emergency

switchboards 4º BVLWithdrawable 440 V 36 16 VENEZUELA

NAVANTIA, S.A. SAN FERNANDO -

PUERTO REAL

2007Low Voltage switchboards. (

Airport )Fixed 400 V 70 26

GRAN CANARIA

(SPAIN) SENER INGENIERIA Y SISTEMAS

20073- Pump control ring degassing

stationFixed 400 V 50 3 BASAURI (SPAIN)

SIDERNAVAL EQUIPOS

SIDERURGICOS, S.A.

2006 Switchboard LDB REE PRODUCTOS TUBULARES, S.A.

2006 Pilger Motor PRODUCTOS TUBULARES, S.A.

2006

MCC CC Shears CV-90,

horizontal CCM CC and vertical

case

NERVACERO

(SPAIN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006

MCC drive supply for cabinets 13,

22 and 23 for the modernization

of Arcelor’s number 2 train

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

www.pine.esREF. LV

Page 21: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2006Vertical prescaler project

exchanger platesAZUCARERA EBRO

2006CGBT / MCC / Water treatment

plantARCELOR (ETXEBARRI)

2006Arcelor debugger switchboards -

2 MCC, PLC and commisioning

TSK ELECTRICA Y ELECTRICIDAD,

S.A

2006Commisioning Boukara water

treatment plantDEGREMONT, S.A.

2006Treatment Ovens Nº 1 and Nº 2 +

RobotPRODUCTOS TUBULARES, S.A.

2006 Pilger I Reform Phase II TALLERES GOMETEGUI, S.L.

2006Water pumping decanted by

biological treatmentBILBAO (SPAIN) CONSORCIO DE AGUAS

2006LV switchboards for Kaplan

turbine C.H. Cabriana16 kA

IBERDROLA DISTRIBUCION

ELECTRICA, S.A.

2006Mechanical completion C/207

ampliationNAVANTIA, S.S ASTILLEROS FERROL

2006 Maintenance in frigate C/207 NAVANTIA, S.S ASTILLEROS FERROL

2006Mecanical completion and

commissioning C/208NAVANTIA, S.S ASTILLEROS FERROL

2006Secundary switchboards 440 60

Hz c/107NAVANTIA, S.A. AST. PUERTO REAL

2006Shore power connection

SwitchboardNAVANTIA, S.A. AST. PUERTO REAL

www.pine.esREF. LV

Page 22: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2006

CAMF electric panels in edges

carriages (18 trains of the 7th

series)

PATENTES TALGO, S.A.

2006 Cabin junction box and lighting ASTILLEROS PUERTO REAL, S.R.L.

2006 Prototype panels CCS / R.E.E. 12 TEAM - ARTECHE, S.A.

2006 Simple ucs with tcp 11 PRODUCTOS TUBULARES, S.A.

2006 PML Chugai Ro 24OUTOKUMPU

(SWEDEN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006 Panels UCS dual 10 TEAM - ARTECHE, S.A.

2006MCC furnace heating 1 y 2 -

celdas simple frente 2

OUTOKUMPU

(SWEDEN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006MCC Freq. Converter 13 double

panels

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006Panels for double bar line (LDB).

PIA7 TEAM - ARTECHE, S.A.

2006Inversors EME. Panels for 18

units (series)22 POLAND TEAM, S.A.

2006 MCC CC inspection line Sidmed 2INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006 MCC CC inspection line Sidmed 6INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006 MCC CA inspection line+11DAINGELECTRIC INGENIERIA DE

SISTEMAS, S.A

www.pine.esREF. LV

Page 23: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2006Distribution switchboards, MCC

freq. Converters and MCC CA

OUTOKUMPU

(SWEDEN)

INGELECTRIC INGENIERIA DE

SISTEMAS, S.A

2006Paneles for ref.-1500AEH0203NH

FLUITECNIK (v.2)75 PANELES ELECTRICOS, S.A.

2006Relay panels for line and

transformer position

S.T. EL SEQUERO

(SPAIN)

IBERDROLA DISTRIBUCION

ELECTRICA, S.A.

2006Distribution and Lighting

switchboards10 kA IBERDROLA GENERACION, S.A.

2006

CAMF Cobtrol, protection and

auxiliary switchboards for

substation. 400 kV

C.C.C.

CASTELLON 4

(SPAIN)

IBERDROLA GENERACION, S.A.

2006Distribution and Lighting

switchboardsCOBRA, S.A.

2006

Low Voltage distribution

switchboards and MCC for cycle

power plant BF-BJ (Riga TPP-2)

LATVIAIBERDROLA INGENIERIA Y

CONSULTORIA

2006

CAMF Protection panel - control

and auxiliary servicesAC/DC (ST

Ezcaray)

IBERDROLA DISTRIBUCION

ELECTRICA, S.A.

2006Switchboards for container

groups60 CUBA ELEKTRA, S.A.

2006 Flow measurement in frigateNAVANTIA, S.A. ASTILLEROS DE

FERROL

www.pine.esREF. LV

Page 24: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2005Main switchboards, auxiliaries,

consoles and starters1 PINE INSTALACIONES Y MONTAJES

2005c/399 system supervision and

coordinationNAVANTIA

2005 MCC supply GENERAL QUIMICA

2005 C/293 air condition commsionig 2NERVACERO

(SPAIN)INGELECTRIC

2005 MCC PILGER I and II supply PRODUCTOS TUBULARES

2005 MCC CC boxes 4ZUMARRAGA

(SPAIN)INGELECTRIC

20054+10 + 11 MCC CA frequency

converter S/F 25

OLABERRIA G.

ARCELOR

(SPAIN)

INGELECTRIC

2005

Electric equipments and

commisioning (Buque LNG de

138.000 m3 - C331)

IZAR SESTAO

2005 MCC CA 6 ALGERIA INGELECTRIC

2005 Panels KAT G8X 40º 40 ARALAR, S.A.L

2005BPE - distribution switchboards

50Hz 324-3-32-010-0T15 kA

ASTILLERO

FERROL (SPAIN)NAVANTIA FERROL

2005

Installation and connection of

electrical equipment in trawler

vessels

ELECTROHUELVA

2005Power Distribution Switchboards

Steel Mild Argerie TGBT 1/2/4/54 ALGERIA INGELECTRIC

www.pine.esREF. LV

Page 25: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2005Station Equipment VOD ref.-

2.2.380/RU/MT-CE1016ASIDERNAVAL

2005Switchboards for container

groups "Cuba"80 ELEKTRA

2005 c/399 on-call service enlargement NAVANTIA SAN FERNANDO

2005MCC and 1 mounting plate

automation scaling3 AVILES (SPAIN) INGELECTRIC

2005Control and Protection

Switchboards posc. 220 kVST DAGANZO IBERDROLA (BILBAO)

2005Control and Protection

Switchboards posc. 220 kV ST BENADRESA IBERDROLA (BILBAO)

2005MCC CA and MCC VVVF skin-

pass Galvanizing line 1 AVILES (SPAIN) INGELECTRIC

2005 2 and 3 axis Portic Reform PRODUCTOS TUBULARES

2005 High Temperature panels 40º 90 ARALAR (SPAIN) ARALAR, S.A.L

2005MCC drivers and 6 panels cooler

CSC Mexicali6 MEXICALI INGELECTRIC

2005Electric erection alcohol storage

pumpsAZUCARERA EBRO

2005

Control and protection panels. T1

45/13,8 kV, serv. aux. AC/DC

(STR Albahonda)

1 STR ALBAHONDA IBERDROLA (BILBAO)

www.pine.esREF. LV

Page 26: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2005 Electric Switchboards 76 PINE INSTALACIONES Y MONTAJES

2005 Electrical erection for cooling CUBA AZUCARERA EBRO

2005MCC CA, 2 lighting box and 6

P.M.L.

ZIERBENA

(SPAIN)INGELECTRIC

2005MCC CA, 2 lighting box and 6

P.M.L.

ZIERBENA

(SPAIN)INGELECTRIC

2005

MainSwitchboard, emergency,

MCCs and Starters (LNG 138.000

m3 - C331)

IZAR SESTAO

2004 Power switchboard and consoles TALGO

2004 Motor Control Center INGETEAM

2004 105,E support for the workshop IZAR PUERTO REAL

2004 Ampliation sum s/lines 26 and 27 DEGREMONT

2004C/103 Signal commisioning deck

IASIZAR PUERTO REAL

2004 Pilger 1 and 2 PRODUCTOS TUBULARES

2004Switchboard 9ST10/20 Arcos I

and IIIBERDROLA (MADRID)

2004 Telecontrol equipments 8 PETRONOR

2004 Distribution Switchboards 4 ALGERIA INGELECTRIC

2004 Erection of BMA AZUCARERA EBRO

www.pine.esREF. LV

Page 27: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2004C.D.B.T. +01BA01 - Wind test

IndarINGELECTRIC

2004 MCC/PLC General Quimica GENERAL QUIMICA, S.A.

2004Administration jobs sprinkles

habilitationIZAR SEVILLA

2004 Management jobs engineer DRAGADO OFF-SHORE

2004Hospital Vessel electric

switchboards C-370PINE INSTALACIONES Y MONTAJES

2004 MCC CC 5 ALGERIA INGELECTRIC

2004 MCC CA 6 ALGERIA INGELECTRIC

2004 MCC and PLCs supplyE.D.A.R de

ARRIANDICONSORCIO DE AGUAS

2004

Water Treatment Plant , electric

equipment - software and

commisioning

TIANJIN (CHINA) DEGREMONT

2004Keypad P.M.L. Oil pump and

MCC CA Auxiliaries 6 INGELECTRIC

2004Equipment electric erection in

Roro and doors c/399S.P. CONSULTORES Y SERVICIOS

2004Vessel Switchoards C-375 / 377 /

392 / 393

UNION NAVAL DE

VALENCIA

(SPAIN)

PINE INSTALACIONES Y MONTAJES

2004 Vessel Switchoards C-425

UNION NAVAL DE

VALENCIA

(SPAIN)

PINE INSTALACIONES Y MONTAJES

www.pine.esREF. LV

Page 28: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2004

C/105 on-call service

enlargement (from June 15 to

October 15)

IZAR PUERTO REAL

2004 Ultrasonic Inspection, GRP PRODUCTOS TUBULARES

2004Distribution Switchboards - L.V. -

OVEN-4 and OVEN-5PINE INSTALACIONES Y MONTAJES

2004

CAMF Control panels for trains

Talgo Serie 7 (4 trains = 48

carriages )

TALGO

2004 Vessel Switchboards C-392 / 393 ASTILLERO

BALENCIAGAPINE INSTALACIONES Y MONTAJES

2004Erection and installation of fire

and gas systemDRAGADOS OFF-SHORE

2004 Main and Auxiliary switchboards GALVERBEL PINE INSTALACIONES Y MONTAJES

2004Control panels - Galvanizing line

Benxi56 INGELECTRIC

2004CAMF Ligthning and several

services panels (C.C.C. Arcos III)50 IBERDROLA (MADRID)

2004 Vessel Switchboards C-371UNION NAVAL DE

VALENCIAPINE INSTALACIONES Y MONTAJES

2004Effluent treatment plant C.T.C.C

AES 50

CARTAGENA

(SPAIN)HIDROAMBIENTE

2004Electric Equipments, Erection and

CommisioningC.H. PIARREJAS INGEHYDRO

2004 Panels ThyssenKrupp Lifts PINE INSTALACIONES Y MONTAJES

www.pine.esREF. LV

Page 29: REFERENCE LIST - Ingeteam · GAS Y ELECTRICIDAD GENERACION, S.A. 2013 Support to Expediting DRAGADOS OFFSHORE 2013 Electrical engineers for PTAR BELLO COLOMBIA ACCIONA AGUA 2013 Main,

YEAR DESCRIPTION EXEC.IS. VOLTAG.

(Ui)Icc QUANT.

COUNTRY/

REGIONCUSTOMER

2004Dc Bus rectifier - Benxi Iron &

Steel CHINA INGELECTRIC

2004

Control Panelsl

"COGENERACIÓN

FIBERBLADE"

GUASCOR, S.A.

2004 Auxiliary panels Ref.-TALGO S.A. TEAM

2004 CAMF Control Switchboards C.H. SILVON IBERINCO (BILBAO)

2004Engineering, Tests and

Commisioning. C.H. SILVON IBERINCO (BILBAO)

2003Distribution Switchboards

Biomass Plant SangüesaFixed 1000V 65 kA 16

SANGÜESA

(SPAIN)EHN

2002 Distribution Switchboards Fixed 1000V 50 kA 5 SOMOZAS

PLT.DE TRATAMIENTO Y

VALORACIÓN ENERGÉTICA DE

NEUMÁTICOS FUERZA DE USO, LAS

SOMOZAS

2002

Power Switchboards for

cogeneration plant of 10 gas

generators

Fixed 1000V 50 kA 12SAO PAULO

(BRAZIL)EMBRAER (BRASIL)

www.pine.esREF. LV