references
TRANSCRIPT
![Page 1: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/1.jpg)
REFERENCES AND BIBLIOGRAHPY
REFERENCES
Akintoye A and Skitmore M (1991) ‘Profitability of UK construction contractors’,
Journal of Construction Management and Economics, Volume 9, No.3, pp. 311-
325.
Ankrah N A (2007) ‘An investigation into the impact of culture on construction project
performance’, PhD thesis, School of Engineering and the Built Environment,
University of Wolverhampton, Wolverhampton.
Assaf, S.A. and Al-Hejji, S. (2006) ‘Causes of delay in large construction projects’,
International Journal of Project Management, Volume 24, No 43. pp.349-357
Babbie, E. R. (1990) Survey research methods, Belmont, California, Wadsworth
Publishing Company.
Blaxter L, Hughes C and Tight M (2006) How to Research (3rd edn), Berkshire: Open
University Press.
Cagan P (1956) ‘The Monetary Dynamics of Hyperinflation’ in Friedman M (ed)
Studies in the Quantity Theory of Money: University of Chicago Press
Chan,D.W.M and Kumaraswamy,M.M, (1997) ‘A Comparative study of causes of time
overruns in Hong Kong construction project’, International Journal of Project
Management, Vol 15, No 1, pp 55-63.
Chan.D.W.M and Kumaraswamy.M.M, (1996) ‘An Evaluation of Construction Time
Performance in the Building Industry’, Building and Environment, Vol. 31, No. 6.
pp. 569- 578, Elsevier Science Ltd
Coggan, D.R. (2001) ‘Construction Contract incentivisation Schemes: lessons from
past experience’, London, CIRIA C554, CIRIA publication:
Coltart, D. (2008) ‘A Decade of Suffering in Zimbabwe’, Centre for Global Liberty and
Prosperity, March, No.5.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 63
![Page 2: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/2.jpg)
REFERENCES AND BIBLIOGRAHPY
Denscombe M (2007) ‘The Good Research Guide for small-scale social research
projects’ (3rd edn), Berkshire: Open University Press.
Dubois.A, and Gadde.L, (2002) ‘The construction industry as a loosely coupled
system-implications for productivity and innovation’, Construction Management
and Economics, Volume 20, pp 621-631.
Egan J (1998) ‘ Rethinking Construction’ ,The report of the Construction Task Force to
the Deputy Prime Minister , John Prescott, on the scope for improving the
quality and efficiency of UK Construction, London
Gombera P.P. and Okoroh, M.I. (1999), ‘Zimbabwe Public Sector Procurement
Strategies: Trial and Error combinations in Ogunlana S (ed) ,Profitable
Partnering in Construction Procurement: London, E and FN Spon.
Hughes, W. (1999) What makes a good research paper, Department of Construction
Management and Engineering, UK ,University of Reading.
Hughes. W. (1994) ‘The PhD in construction management’, Department of
Construction Management and Engineering, UK, University of Reading.
JCT (2008) ‘Practice Note’, Deciding on the appropriate JCT contract, London,
www.jctcontracts.com
Kamig.P.F, Olomolaiye.P.O, Holt.G.D and Harris C.F, (1997)’Factors influencing
construction time and cost overruns on high rise projects in Indonesia’,
Construction Management and Economics, Vol15, pp. 83-94.
Kometa, S., Olomolaiye, P.O. and Harris, F.C. (1995), ‘An evaluation of clients’ needs
and responsibilities in the construction process’, Engineering, Construction and
Architectural Management, Vol. 2 ,No. 1, pp. 45-56.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 64
![Page 3: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/3.jpg)
REFERENCES AND BIBLIOGRAHPY
Latham, M. (1994) Constructing the team, Final report of the government/industry
review of procurement and contractual arrangements in the United Kingdom
construction industry, London, HMSO, Department of Environment.
Makochekanwa A (2007) ‘A Dynamic Enquiry into the Causes of hyperinflation in
Zimbabwe’, Working Paper: 2007-10, University of Pretoria.
Mbiba B and Ndubiwa M (2006) ‘Decent work in Construction and The Role of Local
Authorities The Case of Bulawayo City , Zimbabwe, University of Geneva.
Naoum S G (2007) ‘Dissertation Research and Writing for Construction Students’ (2nd
edn) Oxford: Elsevier Ltd.
Nkado, R.N. (1995) ‘Construction time-influencing factors: the contractor’s perspective’,
Construction Management and Economics, Vol 13, No. pp.81-89.
Pearce, D. (2003) ‘The social and economic value of construction: The construction
industry's contribution to sustainable development’, London, NCRISP.
Robertson R (2007), ‘August 2007 Forecast paper’, Robertson Economic Information
for Zimbabwean statistics, http://www.economic.co.zw
Santos, A (1999) ‘Application of flow principles in the production management of
construction sites’, PhD Thesis, School of Construction and Property
Management , Salford, UK, University of Salford.
Takim .R, Akintoye, (2002) ‘Performance indicators of successful construction project
performance’, Association of Researchers in Construction Management, Vol
2, pp.545-555.
Walker D. H. T (1997) ‘Choosing an appropriate research methodology’, Journal of
Construction Management and Economics, Vol 15 ,pp 149-159.
Wikipedia,‘Hyperinflation’,http://en.wikipedia.org/w/index.php?title=Hyperinflation
accessed on 14 May 2008.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 65
![Page 4: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/4.jpg)
REFERENCES AND BIBLIOGRAHPY
Wit de B and Dyk van B (1996) ‘Lessons from a Brazilian Miracle: Surviving and
Thriving in Highly Inflationary Environment’, The Columbian Journal of World
Business, fall.
Xiao, H. & Proverbs, D. (2002a) ‘The performance of contractors in Japan, the UK and
the USA: a comparative evaluation of construction cost’, Construction
Management and Economics, Vol 20, No 5, pp 425-435.
Xiao, H. & Proverbs, D. (2002b) ‘The performance of contractors in Japan, the UK and
the USA: an evaluation of construction quality’, International Journal of Quality
and Reliability Management, Vol 19, No (6/7), pp672- 687.
Xiao, H. & Proverbs, D. (2003) ‘Factors influencing contractor performance: an
international investigation’,Engineering Construction and Architectural
Management, 10 (5), 322-332.
Yin, R. K (1994) ‘Case Study Research: Design and methods (2nd edn) in Santos, A
(1999) ‘Application of flow principles in the production management of
construction sites, PhD Thesis, School of Construction and Property
Management , Salford, UK ,University of Salford.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 66
![Page 5: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/5.jpg)
REFERENCES AND BIBLIOGRAHPY
BIBLIOGRAHPY
Atkinson.R,(1999) ‘Project management-cost, time and quality-two best guesses and
phenomenon, its time to accept other success criteria’ International
Journal of Project Management ,Vol 17,No 6,pp 337-342.Akintoye.A,
Skitmore.M, (1991),’ Profitability of UK Construction Contractors’ Construction
Management and Economics ,Vol 9, pp 311-325.
Best.R,Langston C,(2006) ‘Evaluation of construction contractor performance-A critical
analysis of some recent research’ Construction Management and
Economics ,Vol 24,pp 439-445.
Beathan.S, Anumba.C and Thorpe, (2004) ‘KPI`s- a critical analysis appraisal of their
use in construction’ Benchmarking an International Journal, Vol 11, No 1, pp
93-117.
Birgouul.M.T and Han.S, (2007),’Using fuzzy risk assessment to rate cost overrun risk
in international construction projects’,International Journal of Project Management, Vol
25, pp 494-505.
Curtis.B, Ward.C.S and Chapman.C.B, (1991) Objectives and performance in
construction projects: Construction Management and Economics,Vol 9, pp 343-
353.
Colin.E,Terry.W and Ackerman.F ,(2005) ‘Analysing project cost overruns-comparing
the ‘measured mile’ analysis and system dynamics modeling’ International
Journal of Project Management ,Vol 23,pp 135-139.
Chan.A.P.C, Chan.A.P.L (2004) Key performance indicators for measuring
construction success: Benchmarking an International Journal, Vol 11, No.2, pp
203-221.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 67
![Page 6: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/6.jpg)
REFERENCES AND BIBLIOGRAHPY
Chan.D.W.M and Kumaraswamy.M.M,(1997) A comparative study of causes of time
overruns in Hong Kong construction projects: International Journal of Project
Management,Vol 15,No1,pp 55-63.
Daniel.W.M, Kumaraswamy.M.M, (1996) Contributors to construction delays,
Department of Civil and Structural Engineering, Hong Kong ,The University of
Hong Kong. .
David.J, Robinson.L, (2005), ‘Client versus contractor perspectives on project success
criteria’ International Journal of Project Management, Vol 23, pp 622-629.
Dissanayaka.S.M and Kumaraswamy.M.M, (1999)’ Evaluation of factors affecting time
and cost performance in Hong Kong building projects’,Construction and
Architectural Management,Vol 6,3,pp287-298.
Firuzan.Y, Arditi.D and Mohammadi.S.J, (2002) Assessing Contractor quality
performance: Construction Management and Economics, Vol 20, pp 211-223.
Faradi.S.A, El-Sayegh.M.S, (2006) Significant factors causing delay in the UAE
Construction industry: Construction Management and Economics, 24, pp 1167-
1176.
Iyer.K.C, Jha.K.N, (2005),’Factors affecting cost performance evidence from Indian
construction project’, International Journal of Project Management ,23, pp 283-
295.
Ireland.V,(1985)‘The role of managerial actions in the cost, time and quality
performance of high rise commercial building projects’,Construction
Management and Economics ,Vol 3,pp 59-87.
Jha.K.N, Iyner.K.C, (2007)’Commitment, coordination, competence and the iron
triangle’, International Journal of Project Management, Vol 25, pp 527-540.
Karna.S, Junnon.M, (2002) Customer satisfaction in construction, Helsinka, Finland.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 68
![Page 7: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/7.jpg)
REFERENCES AND BIBLIOGRAHPY
Kashiwoyi.D, Byfiel.R.E, (2002) ‘,Selecting the best contractor to get performance-on
time, on budget, meeting quality expectations’,Journal of facilities management,
Vol 1, No 2, pp 103-116.
Kekale.T, (1996) Construction and triangulation-weaponry for attempts to create and
test theory, Finland ,Technobothnia,
Khang.B.D and Mynint.M.Y, (1999) Time, cost and quality trade off in project
management- a case study: International Journal of Project Management, Vol 17, No
4, pp 249-256.
Koota.J, (2003) Market review and study of success characteristics in construction
companies-case USA, Finland Otamedia Oy.
Lim.C.S and Mohammed.Z.M,(1999),’Criteria of project success-an explanatory
reexamination’,International Journal of Project Management ,Vol 17,No
4,pp243-248.
Love.E.D and Edwards.D.J, (2004),’Determinants of rework in building construction
projects’, Construction and Architectural Management, Vol 11, No4
Mbachu.J and Nkado.R,(2007)’Factors constraining successful building project
implementation in South Africa’,Construction Management and Economics
,Vol 25,pp 39-54.
Morledge.R, Bassett.D and Sharif.A, (1996)‘Client time expectations and construction
industry performance’,RICS research papers.
Mohsini.R.A and Davidson.H.C,(1992)’Determinants of performance in the traditional
building process’, Construction Management and Economics ,Vol10,pp 343-
359.
Ogunsemi and R.D,Jagboro.O.G,(2006)‘Time-cost model for building projects in
Nigeria’,Construction Management and Economics,Vol 24,pp 253-258.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 69
![Page 8: References](https://reader036.vdocuments.net/reader036/viewer/2022082405/547149f4b4af9f3f608b4589/html5/thumbnails/8.jpg)
REFERENCES AND BIBLIOGRAHPY
Oyegoke.S.D, (2005) ‘Construction Industry overview in the UK,US,Japan and Finland-
A comparative analysis’,Journal on construction research, Finland,World
Scientific.
Peter.M, (1998) Body of Knowledge 4th Edition, apm, USA.
Proverbs.D.G and Faniran.O.O, (2005)’International construction performance
comparisons-a study of ‘European ‘and Australian contractors’,Engineering,
construction and Architectural Management, Vol 8, No 4,284-291.
Raymond.Y.C and Love.P.E, (2003) ‘An economic analysis of the effect of delays on
project costs’,Journal of construction research, Vol 4, No2, pp155-160, World
Scientific.
Reeve.K, (2002) Construction business systems in Japan-general contractors and
subcontractors, Japan, Ichibancho.
Sadi.A.A and Sadiq.H,(2006)’Causes of delay in large construction projects’,
International Journal of Project Management ,Vol 24,pp 349-357.
Sambasivan.M and Soon.W.Y, (2006)’Causes and effects of delays in Malaysian
construction industry’, International Journal of Project Management, Vol 25,pp
517-526.
Seymour and Rooke.J, (1995) ‘The culture of the industry and the culture of research’,
Construction Management and Economics, 13, pp 511-523.
Siklos.P.L,(2000)Inflation and Hyperinflation,Department of Economics,Wilfrid Lauriel ,
Canada University.
Walker.D.H, (1995) ‘An Investigation into construction time performance’, Construction
Management and Economics, Vol 13, pp 263-277.
Nilson BitonStudent Number 9756570 BSc Construction Management Page 70