references traffic tunnelling
TRANSCRIPT
Referenzen: Traffic TunnellingReferences: Traffic Tunnelling
HERRENKNECHT AG | U T I L I TY TUNNELL ING | TRAFF IC TUNNELL ING
Inhalt | Contents
Editor ia l | Ed i tor ia l 4Pro jektübers ichtOverv iew of Pro jects 6-15
Pro jekte | Pro jects 12
S-50 Grauholz 46S-52 Mülheim 47S-54.1 Paris Sèvres-Achères Lot n° 3 48S-54.2 Paris Clichy la Briche Lot n° 2 48S-56 Bözberg 73S-68 Essen 49S-78 Les Vignes 71S-82.1 Metro Cairo Line 2 50S-82.2 Metro Cairo Line 2 50S-85 Duisburg 51S-89 Adlertunnel 74S-90 Pomy 75S-96 Zürich 84S-97 Heinenoord 52S-99 Zürich-Glatt 76S-103 Airport Link Sydney 53S-108 Hamburg 54S-110 Berlin 55S-114 Izmir 16S-118 Berlin 55S-120.1 Metro Madrid 17S-120.2 Metro Madrid 17S-121 Murgenthal 77S-122.1 Metro Madrid 17S-122.2 Metro Madrid 17S-127 A86 à l’Ouest de Paris 56S-130 Düsseldorf 57S-134 Singapore Lot 706 18S-135 Singapore Lot 706 18S-137 Westerschelde 58
S-138 Westerschelde 58S-139 Zürich-Thalwil Lot 3.01 82S-140 Zürich-Thalwil Lot 2.01 82S-142.1 Metro Bangkok 19S-142.2 Metro Bangkok 19S-144 Botlekspoortunnel 20S-148 Olympic Metro Athens 72S-150 Sophiaspoortunnel 59S-152 Wesertunnel 60S-153 Ile de la Réunion 89S-155 Tscharner 85S-160 Metro Oporto 21S-162 Ile de la Réunion 89S-163 Sörenberg 78S-164 Moscow, Lefortovo 61S-165 Metro Sur Madrid 22S-167 Lötschberg Steg 86S-168 Pannerdensch Kanaal 62S-169 Metro Beijing Line 5 23S-170 Singapore DTSS T-05 24S-171 Singapore DTSS T-05 24S-173 Singapore DTSS T-01 24S-174 Lötschberg Raron 86S-177 Singapore DTSS T-06 25S-178 Singapore DTSS T-06 25S-179 Metro Guangzhou Line 2 26S-180 Metro Guangzhou Line 2 26S-181 Metro Guangzhou Line 2 26S-182 Metro Guangzhou Line 2 26S-184 Rome 30
S-185 London Heathrow 31S-186 Metro Caracas Line 4 32S-187 Metro Caracas Line 4 32S-188 Metro Athens 34S-189 Minneapolis 35S-190 Metro Nanjing Phase 1 36S-192 London CTRL 63S-193 Dublin Port Tunnel 83S-194 Dublin Port Tunnel 83S-195 Metro Nanjing Phase 1 36S-196 Metro New Delhi 45S-197 Metro New Delhi 45S-198 Metro New Delhi 45S-199 Hongkong Kai Tak Transfer Scheme 64S-200 Herrentunnel 65S-201 Guadarrama North Portal 90S-202 Guadarrama South Portal 91S-203 Metro Oporto 21S-204 London CTRL 63S-205 Metro Athens 34S-206 Metro Shenzhen 37S-207 Metro Shenzhen 37S-208 Metro Toulouse Lot 2 38S-209 Antwerp 66S-210 Gotthard Bodio / Faido 87S-211 Gotthard Bodio / Faido 87S-212 Singapore Marina Line C825 39S-214 Singapore Marina Line C825 39S-217 Metro Nanjing Phase 1 36S-218 Ashgabat 40S-219 Ashgabat 40
S-220 Pontebba 79S-221 Metro Barcelona Line 9 41S-222 Metro Vienna U1/1 67S-225 Metro Tianjin 42S-226 Metro Tianjin 42S-227 Metro Esfahan 43S-228 Metro Esfahan 43S-229 Gotthard Amsteg 88S-230 Gotthard Amsteg 88S-231 Portland 68S-232 Portland 68S-233 Arrowhead 80S-234 Arrowhead 80S-235 Metro Guangzhou Line 3 27S-236 Metro Guangzhou Line 3 27S-237 Metro Guangzhou Line 3 27S-238 Metro Naples Line 1 44S-239 Metro Naples Line 2 44S-240 Metro Guangzhou Line 3 28S-241 Metro Guangzhou Line 3 28S-242 Metro Guangzhou Line 3 29S-243 Metro Guangzhou Line 3 29S-244 Metro Guangzhou Line 3 29S-245 Metro Guangzhou Line 3 29S-247 Metro Caracas Line 3 33S-248 Metro Caracas Line 3 33S-250 Moscow, Silberwald 69S-251 Valsugana 81S-252 Kuala Lumpur 70S-253 Kuala Lumpur 70
4
in mehr als 25 Jahren Unternehmensgeschichte konn-ten wir gemeinsam mit unseren Kunden eine beachtli-che Anzahl von internationalen Referenzprojekten imTraffic Tunnelling (Ø >4,20 m) aufbauen. So kann Herrenknecht heute die höchste Referenzdichte immaschinellen Großtunnelbau vorweisen. Für alle Ver-kehrssysteme, für alle geologischen Baugrundbedin-gungen und in einem Durchmesserbereich von 4,20 mbis über 14 m.
Mit Vortriebstechnik von Herrenknecht werdenTunnel exakt da gebaut, wo sie benötigt werden, umbestehende Verkehrswege abzukürzen, zu erweiternoder intelligent zu verknüpfen. Inmitten dicht bebauterMetropolen, durch Bergmassive hindurch, unter Mee-resarmen oder großen Flüssen. Da Platz auf der Erd-oberfläche eine Mangelware geworden ist, führt derWeg neuer, intelligenter Infrastrukturen immer öfterunter die Erde.
Die technische Weiterentwicklung der Maschinen-verfahren und -komponenten wird durch die stetswachsenden Herausforderungen angetrieben. Tunnel-durchmesser werden immer größer, Tunnel werdenimmer länger, die Lage der Tunnel geht weiter in dieTiefe. Projekte wie die 4. Elbtunnel-Röhre, die Wester-schelde-Querung und der Gotthard-Basistunnel weisendie Richtung.
Dies erfordert nicht nur absolut verlässliche underprobte technische Konzepte. Maximale Sicherheits-anforderungen und umfassendes Risikomanagementspielen für Bauherren, Bauwirtschaft sowie TBM-Her-steller eine immer größere Bedeutung. GegenseitigesVertrauen ist dabei essentiell. Vom geplanten Tunnel biszu dessen Durchbruch ist es ein langer Weg. Bei Her-renknecht dreht sich alles um die Projekte unserer Kun-den. Sie geben das Ziel und die leistungsbezogenenAnforderungen vor. Wir erstellen gemeinsam eine opti-male Projektlösung und begleiten den Bau des Tunnel-projekts von Anfang an. Mit Teamwork Tunnelling kom-men wir überall durch.
Erfahrung schafft Vertrauen. Unsere Erfahrung wol-len wir unseren Kunden, den Planern und Bauherrendurch die vorliegende Broschüre nahelegen. Gemein-sam gestalten wir die Zukunft.
Ihr
Dr.-Ing. E.h. Martin Herrenknecht Vorstandsvorsitzender
Liebe Leserin, lieber Leser,
5
in cooperation with our customers we have succeededin completing a considerable number of internationalprojects in Traffic Tunnelling (Ø > 4.20m) in more than25 years of company history. Today Herrenknecht hasthe largest number of reference projects in mechanicaltunnelling – for all sorts of transport systems, for allgeological conditions and for all diameters from 4.20mto over 14m.
Herrenknecht tunnelling technology allows tunnelsto be built right where they are needed, to shorten orextend existing routes as well as creating links bet-ween them – under densely populated cities, throughmountains, under estuaries or large rivers. As availablespace above ground is constantly decreasing, the wayfor new intelligent infrastructure leads more and moreoften underground.
The further technical development of machine pro-cesses and components is pushed forward by ever-big-ger challenges. Traffic tunnel diameters are increasing,tunnel routes are descending further into the depths ofthe earth and tunnels are becoming ever longer. Pro-jects such as the 4th Tunnel under the River Elbe, thecrossing beneath the Westerschelde and the GotthardBase Tunnel have been leading in this direction.
Such a development requires reliable and proventechnical concepts. Enhanced safety requirements andcomprehensive risk management play an increasinglyimportant role for the clients, the construction compa-nies and the TBM manufacturer. Mutual trust is essen-tial. It is a long way from planning the tunnel to thebreakthrough. For Herrenknecht everything revolvesaround our customer’s project. You state your objectiveand your requirements. Working with you we will deve-lop the best possible project solution. You can count onour support during the construction of the tunnel fromstart to finish. With Teamwork Tunnelling we can over-come all obstacles.
Experience creates trust. With this brochure wewould like to share our experience with our customers,planners and clients. Together we will build the future.
Your sincerely,
Dr.- Ing. E.h. Martin HerrenknechtChairman of the Board of Directors
Dear Readers,
6
Maschin
e Nr.
Machine
no.
Auftrag
geber
Contr
actor
Projek
t
Projec
t
Maschin
entyp
Machine
descr
iption
S-50 Marti AG, Frutiger AG, Wayss & Freytag AG, Grauholz Mixschild / Einfachschild-TBM Schafir + Mugglin AG, Kopp AG Schweiz | Switzerland Mixshield / Single Shield TBM
S-52 Dyckerhoff & Widmann AG, HOCHTIEF AG, Philipp Holzmann AG, Mülheim Mixschild | MixshieldAlfred Kunz GmbH & Co., Strabag Bau AG, Deutschland | GermanyThyssen Schachtbau GmbH, Wayss & Freytag AG
S-54.1 Chantiers Modernes, Bouygues S.A., GTM, Ballot Paris Sèvres-Achères Lot n° 3 Mixschild | MixshieldFrankreich | France
S-54.2 Chantiers Modernes, Bouygues S.A., GTM, Ballot Paris Clichy la Briche Lot n° 2 Mixschild | MixshieldFrankreich | France
S-56 Rothpletz, Lienhard & Cie. AG, Erne AG, Granella AG, Kistler AG, Bözberg Einfachschild-TBM | Single Shield TBMLocher & Cie. AG, Marti AG, Murer AG, Prader AG Schweiz | Switzerland
S-68 HOCHTIEF AG, Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Essen Mixschild | MixshieldPhilipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Deutschland | GermanyWayss & Freytag AG, Ed. Züblin AG
S-78 Losinger Fribourg SA, Locher & Cie. AG, Prader AG, Les Vignes Teilschnittmaschine | Open Face ShieldGrisoni-Zaugg SA, A. Repond SA Schweiz | Switzerland
S-82.1 Campenon Bernard SGE, Arabcontractors, Bouygues S.A., DTP, Metro Cairo Line 2 2 x Mixschild | 2 x MixshieldS-82.2 Dumez, Fougerolle, GTM, Spie Batignolles Ägypten | Egypt
S-85 HOCHTIEF AG, Ed. Züblin AG, E. Heitkamp GmbH, Walter Bau AG Duisburg Mixschild | MixshieldDeutschland | Germany
S-89 Pitsch AG, Infra 2000 SA, Stamm AG, Wenk AG Adlertunnel Einfachschild-TBM | Single Shield TBMSchweiz | Switzerland
S-90 Marti AG, Marti Tunnel AG, Routes Modernes SA, Pomy Einfachschild-TBM | Single Shield TBMKopp AG, Barbonesi SA, COBY Schweiz | Switzerland
S-96 Prader AG Zürich Gripper-TBM | Gripper TBMSchweiz | Switzerland
S-97 Ballast Nedam Beton & Waterbouw B.V., Van Hattum & Blankevoort B.V., Heinenoord Mixschild | MixshieldHollandsche Beton-en Waterbouw B.V., Wayss & Freytag AG Niederlande | The Netherlands
S-99 Locher & Cie. AG, Wayss & Freytag AG, Prader AG, Zürich-Glatt Einfachschild-TBM / EPB-SchildFietz + Leuthold AG Schweiz | Switzerland Single Shield TBM / EPB-Shield
S-103 Transfield, Bouygues S.A. Airport Link Sydney Mixschild | MixshieldAustralien | Australia
S-108 Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Heitkamp GmbH, Hamburg Mixschild | MixshieldHOCHTIEF AG, Philipp Holzmann AG, Wayss & Freytag AG, Ed. Züblin AG Deutschland | Germany
S-110 HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Berlin 2 x Mixschild | 2 x MixshieldDyckerhoff & Widmann AG Deutschland | Germany
S-114 Yapi Merkezi Insaat Ve Sanayi A.S., Wayss & Freytag AG Izmir EPB-Schild | EPB-ShieldTürkei | Turkey
S-118 HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Berlin 2 x Mixschild | 2 x MixshieldDyckerhoff & Widmann AG Deutschland | Germany
S-120.1 Necso, Entrecanales, Cubiertas/Ferrovial Metro Madrid EPB-Schild | EPB-ShieldSpanien | Spain
S-120.2 Necso, ACS, Ferrovial Metro Madrid EPB-Schild | EPB-ShieldSpanien | Spain
Übersicht Referenzen | Overview References
7
Schild
- Ø(m
m)
Shiel
d Ø(m
m)
Tunne
lläng
e (m)
Tunne
l leng
th (m
)
Verw
endu
ng
Emplo
ymen
t
Geolog
ie
Geolog
y
Auslief
erung
Deliver
y
Seite
Page
11600 5500 Bahn | Railway Sand, Kies, Molasse | sand, gravel, molasse 1989 46
6900 2400 U-Bahn | Subway Sandstein, Tonstein | sandstone, claystone 1989 47
4050 3600 Wasser | Water Sand, Ton | sand, clay 1989 48
4050 3000 Wasser | Water Sand, Mergel, grober Kies | sand, marl, coarse gravel 1990 48
11800 2 x 3200 Straße | Road Molasse, Kalkstein, Mergel | molasse, limestone, marl 1989/90 73
8300 2 x 2100 U-Bahn | Subway Mergel, Sand | marl, sand 1992 49
11770 2 x 1900 Straße | Road Moräne, Molasse | moraine, molasse 1993 71
9400 1800 U-Bahn | Subway Sand | sand 1994 501800 + 1500
6570 2 x 1000 U-Bahn | Subway Kreide, Schluff, Sand, Kies, Ton | chalk, silt, sand, gravel, clay 1994 512 x 2040
12535 4100 Bahn | Railway Bunte Mergel, Gipskeuper | coloured marl, gypsum keuper 1995 74
11660 2 x 2700 Straße | Road Molasse | molasse 1994 75
3000 1200, 950 Wasser | Water Molasse | molasse 1995 842000
8550 2 x 940 Straße | Road Sand, Ton | sand, clay 1996 52
5290 2900 Wasser | Water Molasse, Lockergestein | molasse, unconsolidated material 1995 762400
10710 5570 U-Bahn | Subway Ton, Sandstein | clay, sandstone 1996 53
14200 2560 Straße | Road Sand, Geschiebemergel, Schluff und Kies, Findlinge 1997 54sand, glacial drift, silt and gravel, boulders
8930 2 x 570 + 2 x 700 Bahn | Railway Sand, Ton | sand, clay 1997 55
6520 2800 U-Bahn | Subway Ton, Sand | clay, sand 1997 16
8930 2 x 570 + 2 x 700 Bahn | Railway Sand, Ton | sand, clay 1997 55
9330 11000 U-Bahn | Subway Lehm, Sand, Ton | loam, sand, clay 1997 17
9330 3300 U-Bahn | Subway Lehm, Sand, Ton | loam, sand, clay 1997 17
8
Maschin
e Nr.
Machine
no.
Auftrag
geber
Contr
actor
Projek
t
Projec
t
Maschin
entyp
Machine
descr
iption
S-121 Locher & Cie. AG, Murer AG, Prader AG, Rothpletz, Lienhard & Cie. AG, Murgenthal Einfachschild-TBM | Single Shield TBMConrad Zschokke S.A., Ad. Schäfer & Cie. AG Schweiz | Switzerland
S-122.1 Necso, Entrecanales, Cubiertas/O C P Metro Madrid EPB-Schild | EPB-ShieldSpanien | Spain
S-122.2 ACS Metro Madrid EPB-Schild | EPB-ShieldSpanien | Spain
S-127 Campenon Bernard SGE, Jean Lefebvre, Dumez GTM, GTM Construction, A86 à l’Ouest de Paris Mixschild | MixshieldFougerolle, Colas Frankreich | France
S-130 Wayss & Freytag AG, Bilfinger + Berger Bau AG, HOCHTIEF AG, Düsseldorf Mixschild | MixshieldPhilipp Holzmann AG, Bouygues S.A. Deutschland | Germany
S-134 Ed. Züblin AG Singapore Lot 706 EPB-Schild | EPB-ShieldSingapur | Singapore
S-135 Ed. Züblin AG Singapore Lot 706 EPB-Schild | EPB-ShieldSingapur | Singapore
S-137 BAM Infrabouw B.V., Franki N.V., Heijmanns N.V., Philipp Holzmann AG, Westerschelde 2 x Mixschild | 2 x MixshieldS-138 Voormolen Bouw B.V., Wayss & Freytag AG Niederlande | The Netherlands
S-139 Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, Zürich-Thalwil Lot 3.01 Einfachschild-TBM | Single Shield TBMCSC, J. Scheifele AG, Specogna & Co. Schweiz | Switzerland
S-140 Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, Zürich-Thalwil Lot 2.01 Mixschild / Einfachschild-TBMCSC, J. Scheifele AG, Specogna & Co. Schweiz | Switzerland Mixshield / Single Shield TBM
S-142.1 Bilfinger + Berger Bau AG, CH Karnchang Public Co. Ltd., Metro Bangkok 2 x EPB-Schild | 2 x EPB-ShieldS-142.2 Kumagai Gumi Co. Ltd., Tokyu Construction Co. Ltd. Thailand | Thailand
S-144 Ballast Nedam Beton en Waterbouw B.V., Hollandsche Beton- en Botlekspoortunnel EPB-Schild | EPB-ShieldWaterbouw B.V., Strukton Betonbouw B.V., Van Hattum en Niederlande | The NetherlandsBlankevoort B.V., Wayss & Freytag AG
S-148 Sogea, Campenon Bernard SGE Olympic Metro Athens Teilschnittmaschine | Open Face ShieldGriechenland | Greece
S-150 Koninklijke Boskalis Westminster N.V., Heijmans N.V., HOCHTIEF AG, Sophiaspoortunnel Mixschild, kontinuierlicher VortriebPhilipp Holzmann AG, NBM-Amstelland N.V. Niederlande | The Netherlands Mixshield, continuous advance
S-152 HOCHTIEF AG, Philipp Holzmann AG, Ludwig Freytag GmbH & Co. KG, Wesertunnel Mixschild | MixshieldHenrich Hecker GmbH & Co. KG, Martin Oetken GmbH & Co. KG Deutschland | Germany
S-153 Spie Batignolles, Razel, Pico Ile de la Réunion Doppelschild-TBM | Double Shield TBMLa Réunion | La Réunion
S-155 Marti AG Tscharner Gripper-TBM | Gripper TBMSchweiz | Switzerland
S-160 Impregilo S.p.A., Soares da Costa, Somague Metro Oporto EPB-Schild | EPB-ShieldPortugal | Portugal
S-162 Spie Batignolles, Bouygues S.A., Razel, Pico Ile de la Réunion Doppelschild-TBM | Double Shield TBMLa Réunion | La Réunion
S-163 STRABAG AG, Cogeis S.p.A., A. Specogna S.A., Scheifele AG Sörenberg Einfachschild-TBM | Single Shield TBMSchweiz | Switzerland
S-164 AO Corporation Transstroy Moscow, Lefortovo Mixschild | MixshieldRussland | Russia
Übersicht Referenzen | Overview References
9
Schild
- Ø(m
m)
Shiel
d Ø(m
m)
Tunne
lläng
e (m)
Tunne
l leng
th (m
)
Verw
endu
ng
Emplo
ymen
t
Geolog
ie
Geolog
y
Auslief
erung
Deliver
y
Seite
Page
11980 4260 Bahn | Railway Molasse: Mergel, Sandstein | marl and sandstone from the molasse 1997 77
9330 6780 U-Bahn | Subway Lehm, Sand, Ton | loam, sand, clay 1997 17
9330 7600 U-Bahn | Subway Lehm, Sand, Ton | loam, sand, clay 1997 17
11565 4500 + 5500 Straße | Road Kalkstein, Sand, Ton, Mergel, Kreide | limestone, sand, clay, marl, chalk 2000 56
9430 904 U-Bahn | Subway Feinsand, sandiger Kies, Mittel- u. Grobsand, Auffüllung, Steine, Blöcke 1998 57fine sands, sandy gravel, sand, fill, stones, boulders
6550 2 x 920 U-Bahn | Subway Alluvium, Ton | alluvium, clay 1998 18
6550 2 x 750 U-Bahn | Subway Sandstein, Tonstein | sandstone, claystone 1998 18
11340 6600 Straße | Road Sand, Ton | sand, clay 1999 586600
12280 5570 Bahn | Railway Molasse | molasse 1998 82
12360 2620 Bahn | Railway Molasse, Sihlschotter | molasse, sihl ballast rubble 1998 82
6460 4110 U-Bahn | Subway Sand, Ton | sand, clay 1998 194140
9755 2 x 1835 Bahn | Railway Ton, grobe und kiesige Sande | clay, coarse and pebbly sands 1998 20
9495 1911 U-Bahn | Subway Alluvium, Schiefer, Kalkstein, Mergel, Sandstein, Lavagestein 1998 72alluvium, slate, limestone, marl, sandstone, extrusive rocks
9785 2 x 4241 Bahn | Railway Ton, Sand, Schluff | clay, sand, silt 1999 59
11670 2 x 1600 Straße | Road Klei, Sand, Torf, Geschiebemergel, Schluff, Ton 1999 60loam, sand, peat, glacial drift, silt, clay
3865 9512 Wasser | Water Vulkanisches Gestein | volcanic rock 1998 89
9530 2322 Materialtransport Kalk, Mergel, Ton | lime, marl, clay 1999 85Material transport
8700 5700 U-Bahn | Subway Lockergestein, Granit | unconsolidated material, granite 1999 21
3865 8050 Wasser | Water Vulkanisches Gestein | volcanic rock 1999 89
4520 5300 Gasleitung Ton- und Mergelschiefer, Flysch | clay and marl slate, flysch 2000 78Gas pipeline
14200 2222 Straße | Road Fein- bis Grobsand, Ton, Kalkstein (mittelfest, teils stark geklüftet) 2001 61fine to coarse sand, clay, limestone (medium strength, partially very fissured)
10
Maschin
e Nr.
Machine
no.
Auftrag
geber
Contr
actor
Projek
t
Projec
t
Maschin
entyp
Machine
descr
iption
S-165 Ferrovial-Agroman S.A. Metro Sur Madrid EPB-Schild | EPB-ShieldSpanien | Spain
S-167 Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Lötschberg Steg Gripper-TBM | Gripper TBMEd. Züblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd. Schweiz | Switzerland
S-168 VINCI, C.F.E., TBI Beton- en Waterbouw, Welling Pannerdensch Kanaal Mixschild | MixshieldNiederlande | The Netherlands
S-169 Beijing Urban Construction Group Co. Ltd. Metro Beijing Line 5 EPB-Schild | EPB-ShieldChina | China
S-170 Philipp Holzmann AG Singapore DTSS T-05 2 x EPB-Schild | 2 x EPB-ShieldS-171 Singapur | Singapore
S-173 Woh Hup Pte. Ltd., Shanghai Tunnel Engineering Co. Singapore DTSS T-01 EPB-Schild | EPB-ShieldSingapur | Singapore
S-174 Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Lötschberg Raron Gripper-TBM | Gripper TBMEd. Züblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd. Schweiz | Switzerland
S-177 Ed. Züblin AG Singapore DTSS T-06 2 x EPB-Schild | 2 x EPB-ShieldS-178 Singapur | Singapore
S-179 Tunnel Engineering Bureau (TEB No. 1) Metro Guangzhou Line 2 2 x EPB-Schild | 2 x EPB-ShieldS-180 China | China
S-181 Guangzhou Municipal Dunjian Underground Metro Guangzhou Line 2 2 x EPB-Schild | 2 x EPB-ShieldS-182 Construction Engineering Co. Ltd. China | China
S-184 ASTALDI S.p.A., Impregilo S.p.A. Rome EPB-Schild | EPB-ShieldItalien | Italy
S-185 Miller, Dumez GTM London Heathrow EPB-Schild | EPB-ShieldEngland | England
S-186 Construtora Norberto Odebrecht S.A. Metro Caracas Line 4 2 x EPB-Schild | 2 x EPB-ShieldS-187 Venezuela | Venezuela
S-188 AEGEK General Construction Company, AKTOR, SELI Metro Athens EPB-Schild | EPB-ShieldGriechenland | Greece
S-189 Obayashi / Johnson Bros. Minneapolis EPB-Schild | EPB-ShieldUSA | USA
S-190 Shanghai Mechanised Construction Company (SMCC) Metro Nanjing Phase 1 EPB-Schild | EPB-ShieldChina | China
S-192 HOCHTIEF AG, J. Murphy & Sons Limited London CTRL Mixschild | MixshieldEngland | England
S-193 Nishimatsu, Mowlem, Irishenco Dublin Port Tunnel Einfachschild-TBM | Single Shield TBMIrland | Ireland
S-194 Nishimatsu, Mowlem, Irishenco Dublin Port Tunnel 2 x Teilschnittmaschine Irland | Ireland 2 x Open Face Shield
S-195 China Railway Tunnel Group Metro Nanjing Phase 1 EPB-Schild | EPB-ShieldChina | China
S-196 International Metro Civil Contractors Metro New Delhi Einfachschild-TBM / EPB-SchildIndien | India Single Shield TBM / EPB-Shield
Übersicht Referenzen | Overview References
11
Schild
- Ø(m
m)
Shiel
d Ø(m
m)
Tunne
lläng
e (m)
Tunne
l leng
th (m
)
Verw
endu
ng
Emplo
ymen
t
Geolog
ie
Geolog
y
Auslief
erung
Deliver
y
Seite
Page
9330 6840 U-Bahn | Subway Kristallisierter Gips mit Ton und Schluffstein 2000 22crystallized gypsum with clay and siltstone
9430 8925 Bahn | Railway Altkristalliner Gneis, Granit, Granodiorit 2000 86old crystalline gneiss, granite, granodiorite
9795 2 x 1600 Bahn | Railway Sand, Ton | sand, clay 2001 62
6190 2500 U-Bahn | Subway Ton, schluff. Sand, Mittelsand, kies. Sand, Steinschicht mit Feinsand, Schluff 2000 23clay, silty sand, medium sand, gravely sand, stone bed with fine sand, silt
4880 8081 Abwasser | Sewage Frischer Granit, verwitterter Granit, Erde | fresh granite, weathered granite, soil 2000 244535
7200 5800 Abwasser | Sewage Alluvium | alluvium 2000 24
9430 10300 Bahn | Railway Altkristalliner Gneis, Granit, Granodiorit 2001 86old crystalline gneiss, granite, granodiorite
4450 4018 Abwasser | Sewage Frischer und verwitterter Granit, Alluvium | fresh and weathered granite, 2001 255580 alluvium
6250 1760 U-Bahn | Subway Konglomerat und kiesiger Sandstein, Schluffstein, Ton, Schluff 2000 261820 conglomerate and gravely sandstone, siltstone, clay, silt
6250 2060 U-Bahn | Subway Konglomerat und kiesiger Sandstein, Schluffstein, Ton, Schluff 2001 262000 conglomerate and gravely sandstone, siltstone, clay, silt
7970 2400 Bahn | Railway Tuff, Schluff, Ton, Kies | tuff, silt, clay, gravel 2001 30
9160 2 x 1240 Straße | Road London Clay | London clay 2001 31
5850 3650 U-Bahn | Subway Ton, Sand, Fels | clay, sand, rock 2001 323650
9460 3500 U-Bahn | Subway Schluff, Ton, Athener Schiefer | silt, clay, Athens schist 2001 34
6460 2 x 2255 U-Bahn | Subway Groballuvium, Kalkstein, Sandstein, Alluvium, Feines Alluvium 2001 35coarse alluvium, limestone, sandstone, alluvium, fine alluvium
6390 2 x 600 U-Bahn | Subway Sand, Ton, Schluff | sand, clay, silt 2001 362 x 700
8160 2500 Bahn | Railway Alluvium, Kreide, Flintstein | alluvium, chalk, flintstone 2002 63
11825 2 x 2246 Straße | Road Kalkstein, Schiefer | limstone, slate 2001 83
11770 318 + 310 Straße | Road Geschiebemergel | glacial drift 2002 83
6390 2 x 2280 U-Bahn | Subway Schluff, Ton | silt, clay 2001 36
6450 900 U-Bahn | Subway Quarzite | quartzite 2002 45
12
Maschin
e Nr.
Machine
no.
Auftrag
geber
Contr
actor
Projek
t
Projec
t
Maschin
entyp
Machine
descr
iption
S-197 International Metro Civil Contractors Metro New Delhi 2 x EPB-Schild | 2 x EPB-ShieldS-198 Indien | India
S-199 China Harbour Transfield JV Hongkong Kai Tak Mixschild | MixshieldHongkong | Hongkong
S-200 HOCHTIEF AG, Bilfinger Berger AG Herrentunnel Mixschild | MixshieldDeutschland | Germany
S-201 ACS, FCC, Ferrovial Guadarrama North Portal Doppelschild-TBM | Double Shield TBMSpanien | Spain
S-202 Comsa, Dragados, Necso, Ohl, Sacyr Guadarrama South Portal Doppelschild-TBM | Double Shield TBMSpanien | Spain
S-203 Impregilo S.p.A., Soares da Costa, Somague Metro Oporto EPB-Schild | EPB-ShieldPortugal | Portugal
S-204 HOCHTIEF AG, J. Murphy & Sons Limited London CTRL Mixschild | MixshieldEngland | England
S-205 Wayss & Freytag AG, Alpine Bau GmbH, Atticut Metro Athens Teilschnittmaschine | Open Face ShieldGriechenland | Greece
S-206 16th Bureau under the Ministry of Railway Metro Shenzhen 2 x EPB-Schild | 2 x EPB-ShieldS-207 China | China
S-208 Campenon Bernard Eiffage TP Metro Toulouse Lot 2 EPB-Schild | EPB-ShieldFrankreich | France
S-209 T.H.V. ASDAM C/o MBG-CFE N.V. Antwerp Mixschild | MixshieldBelgien | Belgium
S-210 Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Gotthard Bodio / Faido Gripper-TBM | Gripper TBMImpresa Costruzioni SA, Impregilo S.p.A. Schweiz | Switzerland
S-211 Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Gotthard Bodio / Faido Gripper-TBM | Gripper TBMImpresa Costruzioni SA, Impregilo S.p.A. Schweiz | Switzerland
S-212 Woh Hup, STEC, NCC Singapore Marina Line C825 2 x EPB-Schild | 2 x EPB-ShieldS-214 China | China
S-217 China Railway Engineering Corp. / China Railway Tunnel Group Metro Nanjing Phase 1 EPB-Schild | EPB-ShieldChina | China
S-218 Construction Association "Interbudmontazh" (CAI) Ashgabat 2 x EPB-Schild | 2 x EPB-ShieldS-219 Turkmenistan | Turkmenistan
S-220 Consorzio S.B.T. Pontebba Einfachschild-TBM | Single Shield TBMItalien | Italy
S-221 Dragados, NECSO, ACS, Comsa, Sorigue Metro Barcelona Line 9 EPB-Schild | EPB-ShieldSpanien | Spain
S-222 Bilfinger Berger AG Metro Vienna U1/1 Mixschild | MixshieldÖsterreich | Austria
S-225 Shanghai Tunnel Engineering Co. Metro Tianjin 2 x EPB-Schild | 2 x EPB-ShieldS-226 China | China
S-227 Esfahan Urban Railway Organisation Metro Esfahan 2 x EPB-Schild | 2 x EPB-ShieldS-228 Iran | Iran
Übersicht Referenzen | Overview References
13
Schild
- Ø(m
m)
Shiel
d Ø(m
m)
Tunne
lläng
e (m)
Tunne
l leng
th (m
)
Verw
endu
ng
Emplo
ymen
t
Geolog
ie
Geolog
y
Auslief
erung
Deliver
y
Seite
Page
6450 3020 U-Bahn | Subway Schluff, Sand, Ton | silt, sand, clay 2002 452120 + 900
5150 1150 Abwasser | Sewage Frischer und verwitterter Granit, Alluvium 2002 64fresh and weathered granite, alluvium
11670 2 x 760 Straße | Road Sand, Schluff, Moräne | sand, silt, till 2002 65
9510 14500 Bahn | Railway Granit | granite 2002 90
9510 14500 Bahn | Railway Granit | granite 2002 91
8900 4000 U-Bahn | Subway Frischer und verwitterter Granit | fresh and weathered granite 2002 21
8160 2500 Bahn | Railway Alluvium, Kreide, Flintstein | alluvium, chalk, flintstone 2002 63
9495 9480 U-Bahn | Subway Brauner und schwarzer Schiefer, Sand, Ton | brown and black slate, sand, clay 2002 34
6250 1740 U-Bahn | Subway Sand, Ton, Schluff, verwitterter Granit | sand, clay, silt, weathered granite 2002 371740
7745 5050 U-Bahn | Subway Molasse, sandige Molasse, Sandstein | molasse, sandy molasse, sandstone 2002 38
8270 2 x 1230 Bahn | Railway Feiner Sand | fine sand 2002 66
8830 13955 + 11581 Bahn | Railway Gneis, Granit, Schiefer | gneiss, granite, slate 2002 879330
8830 14795 + 12220 Bahn | Railway Gneis, Granit, Schiefer | gneiss, granite, slate 2002 879330
6580 1258 U-Bahn | Subway S 3 Findlinge, Ton, Alluvium | S 3 boulder, clay, alluvium 2002 39
6390 2 x 1457 U-Bahn | Subway Schluff, Ton | silt, clay 2002 36
6250 8000 Wasser | Water Sand, Schluff, Ton | sand, silt, clay 2002 405000
4520 1800 Gasleitung Kalkstein, Dolomit | limestone, dolomite 2002 79Gas pipeline
12060 8500 U-Bahn | Subway Granodiorit, Sand, Ton, Kies, Findlinge 2002 41granodiorite, sand, clay, gravel, boulders
6800 2 x 420 U-Bahn | Subway Sandiger Schluff, Kies, Sand | sandy silt, gravel, sand 2003 67
6390 1000 U-Bahn | Subway Sand, Schluff, Ton | sand, silt, clay 2002 421000
6890 2 x 4324 U-Bahn | Subway Sand, Schluff, Ton | sand, silt, clay 2003 43
14
Maschin
e Nr.
Machine
no.
Auftrag
geber
Contr
actor
Projek
t
Projec
t
Maschin
entyp
Machine
descr
iption
S-229 Murer AG, Strabag AG Gotthard Amsteg 2 x Gripper-TBM | 2 x Gripper TBMS-230 Schweiz | Switzerland
S-231 Impregilo S.p.A., S.A. Healy Portland 2 x Mixschild | 2 x MixshieldS-232 USA | USA
S-233 Joint Venture JF Shea and Kenny Arrowhead 2 x Einfachschild-TBM | 2 x Single Shield TBMS-234 USA | USA
S-235 China Railway First Group Co., Ltd. Metro Guangzhou Line 3 EPB-Schild | EPB-ShieldChina | China
S-236 China Railway First Group Co., Ltd. Metro Guangzhou Line 3 2 x EPB-Schild | 2 x EPB-ShieldS-237 China | China
S-238 Della Morte Costruzioni, Impregilo S.p.A. Metro Naples Line 1 and 2 2 x EPB-Schild | 2 x EPB-ShieldS-239 Italien | Italy
S-240 China Railway Erju Co., Ltd Metro Guangzhou Line 3 2 x EPB-Schild | 2 x EPB-ShieldS-241 China | China
S-242 Guangzhou Municipal Dunjian Underground Construction Engineering Metro Guangzhou Line 3 2 x EPB-Schild | 2 x EPB-ShieldS-243 Co. Ltd. China | China
S-244 Guangzhou Municipal Dunjian Underground Construction Engineering Metro Guangzhou Line 3 2 x EPB-Schild | 2 x EPB-ShieldS-245 Co. Ltd. China | China
S-247 Construtora Norberto Odebrecht S.A. Metro Caracas Line 3 2 x EPB-Schild | 2 x EPB-ShieldS-248 Venezuela | Venezuela
S-250 AO Corporation Transstroy Moscow, Silberwald Mixschild | MixshieldRussland | Russia
S-251 TOTO Costruzioni Generali Valsugana Einfachschild-TBM | Single Shield TBMItalien | Italy
S-252 Wayss & Freytag AG Kuala Lumpur Mixschild | MixshieldMalaysia | Malaysia
S-253 Gamuda Kuala Lumpur Mixschild | MixshieldMalaysia | Malaysia
Übersicht Referenzen | Overview References
15
Schild
- Ø(m
m)
Shiel
d Ø(m
m)
Tunne
lläng
e (m)
Tunne
l leng
th (m
)
Verw
endu
ng
Emplo
ymen
t
Geolog
ie
Geolog
y
Auslief
erung
Deliver
y
Seite
Page
9580 11350 Bahn | Railway Granit | granite 2003 8811350
5050 4350 Abwasser | Sewage Sand, Kies, Alluvium | sand, gravel, alluvium 2003 685140 1350
M 5760 6100 Wasser | Water Gneis | gneiss 2003 806800
6250 3000 U-Bahn | Subway Verwitterter Fels, Verwitterungston, Alluvium | weathered rock, residual clay, 2003 27alluvium
6250 2677 U-Bahn | Subway Verwitterter Fels, Verwitterungston | weathered rock, residual clay 2003 27
6740 4340 U-Bahn | Subway Ton, Tuff | clay, tuff 2003 444340
6250 2520 U-Bahn | Subway Ton, verwitterter Sandstein | clay, weathered sandstone 2003 282522
6250 4785 U-Bahn | Subway Verwitterter Fels, Verwitterungston | weathered rock, residual clay 2003 294731
6250 3110 U-Bahn | Subway Verwitterter Fels, Verwitterungston | weathered rock, residual clay 2002 293110
5850 4300 U-Bahn | Subway Ton, Sand, Fels | clay, sand, rock 2004 334300
14200 2 x 2220 Straße | Road Kreideablagerungen, Steinkohleablagerungen, Lehm | chalk, hard coal, loam 2003 69
12055 2 x 2780 Straße | Road Kalkgestein mit Lehm und sandigen Zonen | limestone with loamy and 2003 81sandy zones
13210 5400 Straße + Wasser Kalkstein, Sand, Marmor | limestone, sand, marble 2003 70Road + Water
13210 4050 Straße + Wasser Kalkstein, Sand, Marmor | limestone, sand, marble 2004 70Road + Water
110,4
68,470,8
51,6
103,2
42,055,2
74,4
10,8
16
Izmir
EPB-Schild | EPB-Shield
Tonclay
Sandsand
Schluffsilt
Bodentop soil
Sand-Kiessand-gravel
S-114
Schilddurchmesser | shield diameter 6520 mm
Tunnellänge | tunnel length 2800 m
Bohrkopfleistung | cutterhead power 800 kW
Geologie | geology Ton, Sand | clay, sand
Auftraggeber | contractor Yapi Merkezi Insaat Ve Sanayi A.S., Wayss & Freytag AG 08 09 10 11 12 13 14 15 16 17
Um
bau
/ Wer
kzeu
gwec
hsel
1998 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
Metro Madrid
17
EPB-Schild | EPB-Shield
S-120.1 / S-120.2 / S-122.1 / S-122.2
Schilddurchmesser | shield diameter 9330 mm
Tunnellänge S-120.1 | tunnel length S-120.1 11000 m
Tunnellänge S-120.2 | tunnel length S-120.2 3300 m
Tunnellänge S-122.1 | tunnel length S-122.1 6780 m
Tunnellänge S-122.2 | tunnel length S-122.2 7600 m
Bohrkopfleistung | cutterhead power 2000 kW
Geologie | geology Lehm, Sand, Ton | loam, sand, clay
Auftraggeber S-120.1 | contractor S-120.1 Necso, Entrecanales, Cubiertas/Ferrovial
Auftraggeber S-120.2 | contractor S-120.2 Necso, ACS, Ferrovial
Auftraggeber S-122.1 | contractor S-122.1 Necso, Entrecanales, Cubiertas/O C P
Auftraggeber S-122.2 | contractor S-122.2 ACS
48
103,5120
70,582,5
67,5
97,5
126136,5144
15 16 17 18 19 20 21 22 23 241998 |
140
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-120.1weekly production [m]
105
133,5126
141
117135 129
117100,5
110
14 15 16 17 18 19 20 21 22 231998 |
140
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-122.1weekly production [m]
18
Singapore Lot 706
EPB-Schild | EPB-Shield
S-134 / S-135
Schilddurchmesser | shield diameter 6550 mm
Tunnellänge S-134 | tunnel length S-134 2 x 920 m
Tunnellänge S-135 | tunnel length S-135 2 x 750 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie S-134 | geology S-134 Alluvium, Ton | alluvium, clay
Geologie S-135| geology S-135 Sandstein, Tonstein | sandstone, claystone
Auftraggeber | contractor Ed. Züblin AG
19,5
123
73,561,5
85,5
106,5
51
108
82,5101
36 37 38 39 40 41 42 43 44 451999 |
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-134weekly production [m]
26
53 5361,5
79,5
103,5 99
34,5
75 72
43 44 45 46 47 48 49 50 51 521999 |
wöchentl. Vortriebsleistung [m] S-135weekly production [m]
100
80
60
40
20
Metro Bangkok
19
EPB-Schild | EPB-Shield
S-142.1 / S-142.2
Schilddurchmesser | shield diameter 6460 mm
Tunnellänge S-142.1 | tunnel length S-142.1 4110 m
Tunnellänge S-142.2 | tunnel length S-142.2 4140 m
Bohrkopfleistung | cutterhead power 640 kW
Geologie | geology Sand, Ton | sand, clay
Auftraggeber | contractor Bilfinger + Berger Bau AG, CH Karnchang Public Co. Ltd., Kumagai Gumi Co. Ltd., Tokyu Construction Co. Ltd.
12
52,8
119 118
180 179 187
82,898,4
126
42 43 44 45 46 47 48 49 50 512000 |
120140160180
10080604020
wöchentl. Vortriebsleistung [m] S-142.1weekly production [m]
20
Botlekspoortunnel
EPB-Schild | EPB-Shield
Sand, fein mit dünnen Tonschichtensand fine with thin layers of clay
Torfpeat
Hauptsächlich Sandmainly sand
Sand, mittel-grob, oft kiesigsand, middle to coarse, mainly gravel
Ton, örtlich Schluff, sandig bis Sand, tonigclay, locally silt, sandy to sand, clayey
Ton, mit Humus und/oder Torfstückenclay, with humus and/or peat
Ton mit dünnen Sandschichtenclay with thin layers of sand
Ton, sandig und schluffigclay, sandy and silty
Sand schluffig mit dünnen Tonschichtensand silty with thin layers of clay
Torf / Ton, schluffig und/oder sandigpeat / clay, silty and/or sandy
Sand feinfine sand
Ton schluffig mit Sandschichtenclay silty with layers of sand
Oude Maas
S-144
Schilddurchmesser | shield diameter 9755 mm
Tunnellänge | tunnel length 2 x 1835 m
Bohrkopfleistung | cutterhead power 2400 kW
Geologie | geology Ton, grobe und kiesige Sande | clay, coarseand pebbly sands
Auftraggeber | contractor Ballast Nedam Beton en Waterbouw B.V., Hollandsche Beton- en Waterbouw B.V., Strukton Betonbouw B.V., Van Hattum en Blankevoort B.V., Wayss & Freytag AG
30
58,5
94,5108
70,5 65 5970,5
81
19,5
40 41 42 43 44 45 46 47 48 492000 |
80
100
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
117127,5
108
63
18
46,5
79,5
24
7869
35 36 37 38 39 40 41 42 43 442000 |
80
100
120
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
Metro Oporto
21
EPB-Schild | EPB-Shield
S-160 / S-203
Schilddurchmesser S-160 | shield diameter S-160 8700 mm
Schilddurchmesser S-203 | shield diameter S-203 8900 mm
Tunnellänge S-160 | tunnel length S-160 5700 m
Tunnellänge S-203 | tunnel length S-203 4000 m
Bohrkopfleistung | cutterhead power 2400 kW
Geologie S-160 | geology S-160 Lockergestein, Granit | unconsolidatedmaterial, granite
Geologie S-203 | geology S-203 Frischer und verwitterter Granitfresh and weathered granite
Auftraggeber | contractor Impregilo S.p.A., Soares da Costa, Somague
39 37,8 42
26,622,4
53,244,8
51,8
19,6
78,4
32 33 34 35 36 37 38 39 40 412002 |
70605040302010
wöchentl. Vortriebsleistung [m] S-160weekly production [m]
51,842
47,656 53,2
74,2
57,4 59 56 56
29 30 31 32 33 34 35 36 37 382003 |
70605040302010
wöchentl. Vortriebsleistung [m] S-203weekly production [m]
Boden, Alluviumsoil, alluviumD1 Granit (W6)D1 granite (W6)
C1 + C2 Granit (W5)C1 + C2 granite (W5)
B GranitB graniteA2 Granit (W1-3)A2 granite (W1-3)
22
Metro Sur Madrid
EPB-Schild | EPB-Shield
S-165
Schilddurchmesser | shield diameter 9330 mm
Tunnellänge | tunnel length 6840 m
Bohrkopfleistung | cutterhead power 2800 kW
techn. Besonderheiten | techn. features 12 Hochdruckdüsen am Schneidrad injizieren Wasser mit 300bar in die Tunnelbrust. | 12 high pressure nozzles on the cutterhead inject water with 300 bar into the tunnel face.
Geologie | Kristallisierter Gips mit Ton und Schluffsteingeology crystallized gypsum with clay and siltstone
Auftraggeber | contractor Ferrovial-Agroman S.A.
96109,5
129 120
85,5
157,5
87
112,5
163,5178,5
19 20 21 22 23 24 25 26 27 282001 |
16014012010080604020
wöchentl. Vortriebsleistung [m]
weekly production [m]
Metro Beijing Line 5
23
EPB-Schild | EPB-Shield
S-169
Schilddurchmesser | shield diameter 6190 mm
Tunnellänge | tunnel length 2500 m
Bohrkopfleistung | cutterhead power 630 kW
Geologie | geology Schluffiger Sand, Mittelsand, kiesiger Sand, Steinschicht mit Feinsand, Schluff, Tonsilty sand, medium sand, gravely sand, stone bed with fine sand, silt, clay
Auftraggeber | contractor Beijing Urban Construction Group Co. Ltd.
Auffüllungenfill
Tonige Schluffschichtclayey silt layer
Schluffige Schichtsilty sand layer
Schluffiger Sand mit Steinensilty sand with cobbles
Toniger und sandiger Schluffclayey silt and sandy silt
Mittelsand Schichtmedium sand layer
Steinschichtcobble layer
Schluffiger Ton und tonige Schluffschichtsilty clay and clayey silt layer
34,8
54 52,8
39,6
73,2
10,819,222,8 24
2,4
48 49 50 51 52 01 02 03 04 052001 | | 2002
70605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
24
Singapore DTSS T-05 and T-01
EPB-Schild | EPB-Shield
S-170 / S-171 / S-173
Schilddurchmesser S-170 / S-171 | shield diameter S-170 / S-171 4880 mm
Schilddurchmesser S-173 | shield diameter S-173 7200 mm
Tunnellänge S-170 | tunnel length S-170 8081 m
Tunnellänge S-171 | tunnel length S-171 4535 m
Tunnellänge S-173 | tunnel length S-173 5800 m
Bohrkopfleistung S-170 / S-171 | cutterhead power S-170 / S-171 1500 kW
Bohrkopfleistung S-173 | cutterhead power S-173 1200 kW
Geologie S-170 / S-171 | Frischer Granit, verwitterter Granit, Erdegeology S-170 / S-171 fresh granite, weathered granite, soil
Geologie S-173 | geology S-173 Alluvium | alluvium
Auftraggeber S-170 / S-171 Philipp Holzmann AGcontractor S-170 / S-171
Auftraggeber S-173 | contractor S-173 Woh Hup Pte. Ltd., Shanghai Tunnel Engineering Co.
Mariner Tonmarine clayVollständig verwitterter Alluvialboden(angeschwemmter Boden)completely weathered old alluvium
Stark verwitterter Alluvialbodenhighly weathered old alluviumTeilweise verwitterter Alluvialbodenpartially weathered old alluvium
Bindige (fluviale) Böden (Kallang Formation)cohesive (fluvial) soils (kallang formation)
Tonestuarine clay
AuffüllungfillFluviale kohäsionslose Böden (Kallang Formation)cohesionless (fluvial) soils (kallang formation)
94,5
126109,5
133,5
102 98
118,5100,5
8499
23 24 25 26 27 28 29 30 31 322002 |
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-173weekly production [m]
78,482,6 80 78,4
49 46 47,6
25,2
51,8
133
46 47 48 49 50 51 52 01 02 032003 | | 2004
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-171weekly production [m]
98
54,6
81,2
39,2
77 77 78,478,4
99,4103,6
04 05 06 07 08 09 10 11 12 132003 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-170weekly production [m]
Fluvialer Sandfluvial sandFluvialer Tonfluvial clay
Mariner Tonmarine clayVerwitterter Alluvialbodenold alluvium
Vollständig bis leicht verwitterter Alluvialbodencompletely to slightly weathered old alluvium
Verwitterungsboden aus Alluvialbodenresidual soil of old alluvium
AuffüllungfillFlussmündungssedimentestuarine deposit
Verwitterungsboden aus Granitresidual soil of graniteVollständig verwitterter Granitcompletely weathered granite
Stark verwitterter Granithighly fractured graniteFrischer bis leicht verwitterter Granitfresh to slightly weathered granite
Singapore DTSS T-06
25
EPB-Schild | EPB-Shield
S-177 / S-178
Schilddurchmesser S-177 / S-178 | shield diameter S-177 / S-178 4450 mm
Tunnellänge S-177 | tunnel length S-177 4018 m
Tunnellänge S-178 | tunnel length S-178 5580 m
Bohrkopfleistung S-177 / S-178 | cutterhead power S-177 / S-178 1250 kW
Geologie S-177 / S-178 | geology S-177 / S-178 Frischer und verwitterter Granit, Alluviumfresh and weathered granite, alluvium
Auftraggeber S-177 / S-178 Ed. Züblin AGcontractor S-177 / S-178
68,9
117
18,2
159,9
114,4
61,153,3
91
183,3
92,3
47 48 49 50 51 52 01 02 03 042002 | | 2003
18016014012010080604020
wöchentl. Vortriebsleistung [m] S-177weekly production [m]
4536 31,5
8779,5
72
39
9681
115,5
47 48 49 50 51 52 01 02 03 042003 | | 2004
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-178weekly production [m]
26
Metro Guangzhou Line 2
EPB-Schild | EPB-Shield
Verwitterte Felszonewell-weathered rock zoneStark verwitterte Felszonestrongly-weathered rock zone
Leicht verwitterte FelszoneSlight-weathered rock zone
Mittelverwitterte Felszonemedium-weathered rock zone
Künstlicher Auffüllungartifrical fillSchlickbodenmud and mud soil
Schlick und schlammiger Sandmud and muddy sandAlluvium-Waschsandalluvium-proluvial wash sand
Alluvium Wasch-Schlickbodenalluvium-proluvial wash mud soilTonrückständeresidual clay
S-179 / S-180 / S-181 / S-182
Schilddurchmesser S-179 / S-180 / S-181 / S-182 6250 mmshield diameter S-179 / S-180 / S-181 / S-182
Tunnellänge S-179 | tunnel length S-179 1760 m
Tunnellänge S-180 | tunnel length S-180 1820 m
Tunnellänge S-181 | tunnel length S-181 2060 m
Tunnellänge S-182 | tunnel length S-182 2000 m
Bohrkopfleistung S-179 / S-180 / S-181 / S-182 945 kWcutterhead power S-179 / S-180 / S-181 / S-182
Geologie S-179 / S-180 / S-181 / S-182 Konglomerat und kiesiger Sandstein, geology S-179 / S-180 / S-181 / S-182 Schluffstein, Ton, Schluff | conglomerate and
gravely sandstone, siltstone, clay, silt
Auftraggeber S-179 / S-180 Tunnel Engineering Bureau (TEB No. 1)contractor S-179 / S-180
Auftraggeber S-181 / S-182 Guangzhou Municipal Dunjian Underground contractor S-181 / S-182 Construction Engineering Co. Ltd.
6681
88,5
51
73,5
91,5
39
105
27
48
11 12 13 14 15 16 17 18 19 202002 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-182weekly production [m]
40,5
79,591,5
28,519,5
10893 88,5
115,5
85,5
49 50 51 52 01 02 03 04 05 062002 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-180weekly production [m]
4536 31,5
8779,5
72
39
9681
115,5
47 48 49 50 51 52 01 02 03 042001 | | 2002
| 2003
| 2002
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-179weekly production [m]
70,579,5
7,5
43,5
88,599
75
31,5
94,5100,5
44 45 46 47 48 49 50 51 52 012001 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-181weekly production [m]
Metro Guangzhou Line 3
27
EPB-Schild | EPB-Shield
S-235 / S-236 / S-237
Schilddurchmesser S-235 / S-236 / S-237 6250 mmshield diameter S-235 / S-236 / S-237
Tunnellänge S-235 | tunnel length S-235 3000 m
Tunnellänge S-236 / S-237 | tunnel length S-236 / S-237 2677 m
Bohrkopfleistung S-235 / S-236 / S-237 945 kWcutterhead power S-235 / S-236 / S-237
Geologie S-235 Verwitterter Fels, Verwitterungston, Alluviumgeology S-235 weathered rock, residual clay, alluvium
Geologie S-236 / S-237 Verwitterter Fels, Verwitterungstongeology S-236 / S-237 weathered rock, residual clay
Auftraggeber S-235 / S-236 / S-237 China Railway First Group Co., Ltd. contractor S-235 / S-236 / S-237
42
133,5
106,5108
8770,5
100,590
45
105
40 41 42 43 44 45 46 47 48 492003 |
100
120
80
60
40
20
wöchentl. Vortriebsleistung [m] S-236weekly production [m]
66,058,558,5
76,5
49,5
97,5
22,5
100,5
78
99
38 39 40 41 42 43 44 45 46 472002 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-235weekly production [m]
99
123
61,5
34,537,5
140 146
99 94,5110
46 47 48 49 50 51 52 53 54 552003 |
100120140
80604020
wöchentl. Vortriebsleistung [m] S-237weekly production [m]
28
Metro Guangzhou Line 3
EPB-Schild | EPB-Shield
S-240 / S-241
Schilddurchmesser S-240 / S-241 | shield diameter S-240 / S-241 6250 mm
Tunnellänge S-240 | tunnel length S-240 2520 m
Tunnellänge S-241 | tunnel length S-241 2522 m
Bohrkopfleistung S-240 / S-241 | cutterhead power S-240 / S-241 945 kW
Geologie S-240 / S-241 Ton, verwitterter Sandsteingeology S-240 / S-241 clay, weathered sandstone
Auftraggeber S-240 / S-241 China Railway Erju Co., Ltdcontractor S-240 / S-241
75
94,5
39 39
55,564,5
34,5 3339 40,5
46 47 48 49 50 51 52 01 02 032003 | | 2004
8070
90
605040302010
wöchentl. Vortriebsleistung [m] S-240weekly production [m]
49,557
1228,531,531,5
46,5
84
10893
34 35 36 37 38 39 40 41 42 432003 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-241weekly production [m]
Metro Guangzhou Line 3
29
EPB-Schild | EPB-Shield
S-242 / S-243 / S-244 / S-245
Schilddurchmesser S-242 / S-243 / S-244 / S-245 6250 mmshield diameter S-242 / S-243 / S-244 / S-245
Tunnellänge S-242 | tunnel length S-242 4785 m
Tunnellänge S-243 | tunnel length S-243 4731 m
Tunnellänge S-244 / S-245 | tunnel length S-244 / S-245 2 x 3110 m
Bohrkopfleistung S-242 / S-243 / S-244 / S-245 945 kWcutterhead power S-242 / S-243 / S-244 / S-245
Geologie S-242 / S-243 / S-244 / S-245 Verwitterter Fels, Verwitterungston geology S-242 / S-243 / S-244 / S-245 weathered rock, residual clay
Auftraggeber S-242 / S-243 / S-244 / S-245 Guangzhou Municipal Dunjian Underground contractor S-242 / S-243 / S-244 / S-245 Construction Engineering Co. Ltd.
30
Rome
EPB-Schild | EPB-Shield
S-184
Schilddurchmesser | shield diameter 7970 mm
Tunnellänge | tunnel length 2400 m
Bohrkopfleistung | cutterhead power 2000 kW
Geologie | geology Tuff, Schluff, Ton, Kies | tuff, silt, clay, gravel
Auftraggeber | contractor ASTALDI S.p.A., Impregilo S.p.A.
109,5
15
42 45
79,567,5
36
5766
90
08 09 10 11 12 13 14 15 16 172002 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
London Heathrow
31
EPB-Schild | EPB-Shield
S-185
Schilddurchmesser | shield diameter 9160 mm
Tunnellänge | tunnel length 2 x 1240 m
Bohrkopfleistung | cutterhead power 2800 kW
Geologie | geology London Clay | London clay
techn. Besonderheiten | techn. features Hinter der Förderschnecke wurde ein zusätzliches Ausschleusesystem installiert. Eine Dickstoffpumpe verdichtet das Abbaumetarial und schließt das System luftdicht ab. | Behind the screw conveyor a discharge system is attached to the screw. The system consists of a distribution pipe and a piston pump, which compresses the excavated material and prevents withdrawal of the compressed air supporting the tunnel face.
Auftraggeber | contractor Miller, Dumez GTM
68
92 97 100 97
76,566,3
76,5
136117,3
39 40 41 42 43 44 45 46 47 482002 |
100
120
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
32
Metro Caracas Line 4
EPB-Schild | EPB-Shield
S-186 / S-187
Schilddurchmesser | shield diameter 5850 mm
Tunnellänge | tunnel length 2 x 3650 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie | geology Ton, Sand, Fels | clay, sand, rock
Auftraggeber | contractor Construtora Norberto Odebrecht S.A.
49 49 49
14
88,2
16,8
65,8 62 62 65,8
08 09 10 11 12 13 14 15 16 172002 |
80
6070
4050
2030
10
wöchentl. Vortriebsleistung [m] S-186weekly production [m]
35
56 56
72,8
35
47,6
67 69 69 67
26 27 28 29 30 31 32 33 34 352002 |
wöchentl. Vortriebsleistung [m] S-187weekly production [m]
6070
4050
2030
10
Metro Caracas Line 3
33
EPB-Schild | EPB-Shield
S-247 / S-248
Schilddurchmesser | shield diameter 5850 mm
Tunnellänge | tunnel length 2 x 4300 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie | geology Ton, Sand, Fels | clay, sand, rock
Auftraggeber | contractor Construtora Norberto Odebrecht S.A.
34
Metro Athens
EPB-Schild / Teilschnittmaschine | EPB-Shield / Open Face Shield
S-188 / S-205
Schilddurchmesser S-188 | shield diameter S-188 9460 mm
Schilddurchmesser S-205 | shield diameter S-205 9495 mm
Tunnellänge S-188 | tunnel length S-188 3500 m
Tunnellänge S-205 | tunnel length S-205 9480 m
Bohrkopfleistung S-188 | cutterhead power S-188 2400 kW
Bohrkopfleistung S-205 | cutterhead power S-205 300 kW
Geologie S-188 Schluff, Ton, Athener Schiefergeology S-188 silt, clay, Athens schist
Geologie S-205 Brauner und schwarzer Schiefer, Sand, Tongeology S-205 brown and black slate, sand, clay
Auftraggeber S-188 | contractor S-188 AEGEK General Construction Company, AKTOR, SELI
Auftraggeber S-205 | contractor S-205 Wayss & Freytag AG, Alpine Bau GmbH, Atticut
63
37,548
82,5
107 102 10192 97,5
105
50 51 52 01 02 03 04 05 06 072002 | | 2003
80
100
60
40
20
wöchentl. Vortriebsleistung [m] S-188weekly production [m]
45 4549,5
18
3330
45
37,5
49,5
42
38 39 40 41 42 43 44 45 46 472002 |
wöchentl. Vortriebsleistung [m] S-205weekly production [m]
304045
2025
1015
5
Minneapolis
35
EPB-Schild | EPB-Shield
S-189
Schilddurchmesser | shield diameter 6460 mm
Tunnellänge | tunnel length 2 x 2255 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie | geology Groballuvium, Kalkstein, Sandstein, Alluvium, Feines Alluvium | coarse alluvium, limestone,sandstone, alluvium, fine alluvium
Auftraggeber | contractor Obayashi / Johnson Bros.
136 143 145 139 148
186
107125
177 172
29 30 31 32 33 34 35 36 37 382002 |
80100120140160180
604020
wöchentl. Vortriebsleistung [m]
weekly production [m]
36
Metro Nanjing Phase 1
EPB-Schild | EPB-Shield
S-190 / S-195 / S-217
Schilddurchmesser S-190 / S-195 / S-217 | shield diameter S-190 / S-195 / S-217 6390 mm
Tunnellänge S-190 | tunnel length S-190 2 x 600, 2 x 700 m
Tunnellänge S-195 | tunnel length S-195 2 x 2280 m
Tunnellänge S-217 | tunnel length S-217 2 x 1457 m
Bohrkopfleistung S-190 / S-195 / S-217 | cutterhead power S-190 / S-195 / S-217 630 kW
Geologie S-190 | geology S-190 Sand, Ton, Schluff | sand, clay, silt
Geologie S-195 / S-217 | geology S-195 / S-217 Schluff, Ton | silt, clay
Auftraggeber S-190 | contractor S-190 Shanghai Mechanised Construction Company (SMCC)
Auftraggeber S-195 | contractor S-195 China Railway Tunnel Group
Auftraggeber S-217 | contractor S-217 China Railway Engineering Corp. / China Railway Tunnel Group
Ton (hart-plastisch)clay (hard-plastic)
Schluffiger Sand mit Feinsandsilty sand with fine sand
Schluff & schluffiger Boden (flüssig-plastisch)silt & silty filled soil (fluid-plastic)
Flach bebaute Erde (leicht plastisch)plain filled soil (soft plastic)
Stark verwitterter Gabbro & Diorit Porphyrithighly weathered gabbro & Diorite-porphyrite
Schluffiger Sandsilty sand
Schluffiger Tonsilty clay
Schluffige Erdesilty soil
Diverse Erdauffüllungenmicsellanous filles soil
Leicht verwitterter Gabbro & Diorit Porphyritmedium weathered gabbro & Diorite-porphyrite
61,2
86,498,4
114 114106
93,6
39,6
7,20
44 45 46 47 48 49 50 51 52 012002 | | 2003
80
100
60
40
20
wöchentl. Vortriebsleistung [m] S-190weekly production [m]
98,4
75,6
98,4107
62,4 6250,4
59 54
126
17 18 19 20 21 22 23 24 25 262003 |
wöchentl. Vortriebsleistung [m] S-195weekly production [m]
60
80
100
120
40
20
Metro Shenzhen
37
EPB-Schild | EPB-Shield
S-206 / S-207
Schilddurchmesser | shield diameter 6250 mm
Tunnellänge | tunnel length 2 x 1740 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie | geology Sand, Ton, Schluff, verwitterter Granit | sand, clay, silt, weathered granite
Auftraggeber | contractor 16th Bureau under the Ministry of Railway
9
79,5 75
119129
114
151,4
119 120
49,5
32 33 34 35 36 37 38 39 40 412002 |
80100120140
604020
wöchentl. Vortriebsleistung [m] S-206weekly production [m]
8160
163,5150 143 138
117102
178,5
72
35 36 37 38 39 40 41 42 43 442003 |
wöchentl. Vortriebsleistung [m] S-207weekly production [m]
6080
100120140160
4020
38
Metro Toulouse Lot 2
EPB-Schild | EPB-Shield
S-208
Schilddurchmesser | shield diameter 7745 mm
Tunnellänge | tunnel length 5050 m
Bohrkopfleistung | cutterhead power 2000 kW
Geologie | geology Molasse, sandige Molasse, Sandstein | molasse,sandy molasse, sandstone
Auftraggeber | contractor Campenon Bernard Eiffage TP
79,898
60,2
131,6
78,4
103,6
67 67
119
0
11 12 13 14 15 16 17 18 19 202003 |
80
100
120
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
39
Singapore Marina Line C825
EPB-Schild | EPB-Shield
S-212 / S-214
Schilddurchmesser | shield diameter 6580 mm
Tunnellänge | tunnel length 1258 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie S 3 Findlinge, Ton, Alluvium geology S 3 boulder, clay, alluvium
Auftraggeber | contractor Woh Hup, STEC, NCC
9,8 9,8 9,8
36,4
67,272,8
63
37,839,2
1,4
11 12 13 14 15 16 17 18 19 202003 |
80
100
120
60
40
20
wöchentl. Vortriebsleistung [m] S-212weekly production [m]
28
64,4
44,8
57,4
19,614 16,8
26,6
44,8
56
43 44 45 46 47 48 49 50 51 522003 |
40
50
60
30
20
10
wöchentl. Vortriebsleistung [m] S-214weekly production [m]
40
Ashgabat
EPB-Schild | EPB-Shield
S-218 / S-219
Schilddurchmesser | shield diameter 6250 mm
Tunnellänge S-218 | tunnel length S-218 8000 m
Tunnellänge S-219 | tunnel length S-219 5000 m
Bohrkopfleistung | cutterhead power 630 kW
Geologie | geology Sand, Schluff, Ton | sand, silt, clay
Auftraggeber | contractor Construction Association „Interbudmontazh“(CAI)
42 42 43,2
62,470,8
66
50,460
54 54
29 30 31 32 33 34 35 36 37 382003 |
40506070
302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
41
Metro Barcelona Line 9
EPB-Schild | EPB-Shield
S-221
Schilddurchmesser | shield diameter 12060 mm
Tunnellänge | tunnel length 8500 m
Bohrkopfleistung | cutterhead power 4000 kW
Geologie | geology Granodiorit, Sand, Ton, Kies, Findlingegranodiorite, sand, clay, gravel, boulders
Auftraggeber | contractor Dragados, NECSO, ACS, Comsa, Sorigue
14,4
106,2
12,6
79,295,4
52,2
77 75,665
75,0
02 03 04 05 06 07 08 09 10 112004 |
40
60
80
100
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
42
Metro Tianjin
EPB-Schild | EPB-Shield
S-225 / S-226
Schilddurchmesser | shield diameter 6390 mm
Tunnellänge | tunnel length 2 x 1000 m
Bohrkopfleistung | cutterhead power 630 kW
Geologie | geology Sand, Schluff, Ton | sand, silt, clay
Auftraggeber | contractor Shanghai Tunnel Engineering Co.
1117
55
1318
46 4540
47
36
46 47 48 49 50 51 52 01 02 032003 | | 2004
| 2004
40
50
30
20
10
wöchentl. Vortriebsleistung [m] S-225weekly production [m]
5262 66 63
53 56 54
8169
57
46 47 48 49 50 51 52 01 02 032003 |
4050607080
302010
wöchentl. Vortriebsleistung [m] S-226weekly production [m]
Metro Esfahan
EPB-Schild | EPB-Shield
S-227 / S-228
Schilddurchmesser | shield diameter 6890 mm
Tunnellänge | tunnel length 2 x 4324 m
Bohrkopfleistung | cutterhead power 945 kW
Geologie | geology Sand, Schluff, Ton | sand, silt, clay
Auftraggeber | contractor Esfahan Urban Railway Organisation
43
44
Metro Naples Line 1 and 2
EPB-Schild | EPB-Shield
S-238 / S-239
Schilddurchmesser | shield diameter 6740 mm
Tunnellänge | tunnel length 2 x 4340 m
Bohrkopfleistung | cutterhead power 1200 kW
Geologie | geology Ton, Tuff | clay, tuff
Auftraggeber | contractor Della Morte Costruzioni, Impregilo S.p.A.
45
Metro New Delhi
EPB-Schild | EPB-Shield / Einfachschild-TBM | Single Shield TBM
S-196 / S-197 / S-198
Schilddurchmesser S-196 / S-197 / S-198 6450 mmshield diameter S-196 / S-197 / S-198
Tunnellänge S-196 | tunnel length S-196 900 m
Tunnellänge S-197 | tunnel length S-197 3020 m
Tunnellänge S-198 | tunnel length S-198 2120 + 900 m
Bohrkopfleistung S-196 | cutterhead power S-196 945 kW
Bohrkopfleistung S-197 / S-198 | cutterhead power S-197 / S-198 640 kW
Geologie S-196 Quarzite | quartzitegeology S-196
Geologie S-197 / S-198 Schluff, Sand, Ton | silt, sand, claygeology S-197 / S-198
Auftraggeber | contractor International Metro Civil Contractors
46
Grauholz
Mixschild / Einfachschild-TBM | Mixshield / Single Shield TBM
S-50
Schilddurchmesser | shield diameter 11600 mm
Tunnellänge | tunnel length 5500 m
Bohrkopfleistung | cutterhead power 1250 kW
techn. Besonderheiten Zwei Betriebsarten: Tunnelbohrmaschine (TBM) techn. features im Schild (Bandaustrag) oder Mixschild.
Separation auf dem Nachläufer.Two operating modes: Shielded TBM with belt conveyor or Mixshield. Separation plant on the back-up.
Geologie | geology Sand, Kies, Molasse | sand, gravel, molasse
Auftraggeber | contractor Marti AG, Frutiger AG, Wayss & Freytag AG, Schafir + Mugglin AG, Kopp AG
113 10169
38
337277
353
115
326
466
05 06 07 08 09 10 11 12 01 021991 | | 1992
45040035030025020015010050
monatliche Vortriebsleistung [m]
monthly production [m]
47
Mülheim
Mixschild | Mixshield
S-52
Schilddurchmesser | shield diameter 6900 mm
Tunnellänge | tunnel length 2400 m
Bohrkopfleistung | cutterhead power 1250 kW
techn. Besonderheiten | techn. features TBM vom Typ Mixschild, mit Hartgesteinbohr-kopf und flüssigkeitsgestützter Ortsbrust.TBM of the type Mixshield with the combination of hard rock cutterhead and slurry supported tunnel face.
Geologie | geology Sandstein, Tonstein | sandstone, claystone
Auftraggeber | contractor Dyckerhoff & Widmann AG, HOCHTIEF AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co., Strabag Bau AG, Thyssen Schachtbau GmbH, Wayss & Freytag AG
60 58,863,6
4237,2
45,640,8
32,4 3644,4
23 24 25 26 27 28 29 30 31 321990 |
60
50
40
30
20
10
wöchentl. Vortriebsleistung [m]
weekly production [m]
48
Paris
Mixschild | Mixshield
S-54.1 / S-54.2
Schilddurchmesser | shield diameter 4050 mm
Tunnellänge S-54.1 | tunnel length S-54.1 3600 m
Tunnellänge S-54.2 | tunnel length S-54.2 3000 m
Bohrkopfleistung | cutterhead power 270 kW
Geologie S-54.1 | geology S-54.1 Sand, Ton | sand, clay
Geologie S-54.2 Sand, Mergel, grober Kies geology S-54.2 sand, marl, coarse gravel
Auftraggeber | contractor Chantiers Modernes, Bouygues S.A., GTM, Ballot
56
82,597
8471,5
83,5 78
99113,5
83,5
10 11 12 13 14 15 16 17 18 191994 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-54.2weekly production [m]
49
Essen
Mixschild | Mixshield
S-68
Schilddurchmesser | shield diameter 8300 mm
Tunnellänge | tunnel length 2 x 2100 m
Bohrkopfleistung | cutterhead power 800 kW
techn. Besonderheiten | techn. features Aktiver Zentrumsschneider, Brustverbauplatten und Steinbrecher. | Active center cutter,face support plates and stone crusher.
Geologie | geology Mergel, Sand | marl, sand
Auftraggeber | contractor HOCHTIEF AG, Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Philipp Holzmann AG, Alfred Kunz GmbH & Co.,Strabag Bau AG, Wayss & Freytag AG, Ed. Züblin AG
4534,5
79,5
33
57 60
4839
64,557
06 07 08 09 10 11 12 13 14 151994 |
6070
4050
2030
10
wöchentl. Vortriebsleistung [m]
weekly production [m]
50
Metro Cairo Line 2
Mixschild | Mixshield
S-82.1 / S-82.2
Schilddurchmesser | shield diameter 9400 mm
Tunnellänge S-82.1 | tunnel length S-82.1 1800 m
Tunnellänge S-82.2 | tunnel length S-82.2 1800 + 1500 m
Bohrkopfleistung | cutterhead power 945 kW
techn. Besonderheiten | techn. features Agitatoren, Möglichkeit Injektionen durch den Schildschwanz zu realisieren, Vakuumerektor, automatisiertes Programm des Förderkreislaufs.Agitators. Possibility to realize injections through the tailskin. Vacuum erector. Automatic program for slurry circuit.
Geologie | geology Sand | sand
Auftraggeber | contractor Campenon Bernard SGE, Arabcontractors, Bouygues S.A., DTP, Dumez, Fougerolle, GTM, Spie Batignolles
12
40,548 54
66 67,5
91,5100,5 99
78
32 33 34 35 36 37 38 39 40 411994 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-82.1weekly production [m]
36
6657
30
97,5
144
117129
138148,5
14 15 16 17 18 19 20 21 22 231995 |
14012010080604020
wöchentl. Vortriebsleistung [m] S-82.2weekly production [m]
51
Duisburg
Mixschild | Mixshield
S-85
Schilddurchmesser | shield diameter 6570 mm
Tunnellänge | tunnel length 2 x 1000, 2 x 2040 m
Bohrkopfleistung | cutterhead power 945 kW
techn. Besonderheiten | techn. features Konvertierbarer Schild von Mixschild- auf EPB-Modus. | Convertible TBM from Mixshield to EPB mode.
Geologie | geology Kreide, Schluff, Sand, Kies, Ton | chalk, silt, sand,gravel, clay
Auftraggeber | contractor HOCHTIEF AG, Ed. Züblin AG, E. Heitkamp GmbH, Walter Bau AG
4857
7567,5
73,5
48
81 8475 72
03 04 05 06 07 08 09 10 11 121997 |
8070
5060
40302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
Hamborner (Ratinger) Tonhamborner (Ratinger) clay
Hamborner Feinsandhamborner fine sand
Walsumer Feinsandwalsumer fine sand
Quartäre Kiese u. Sandequarternary gravels and sands
Aulehmloam
Anschüttungmade ground
Kreide, zumeist Schluff mit Sandschichtenchalk, mainly silt with layers of sand
Kreide, zumeist schluffige Feinsandechalk, mainly silty finesands
Kreide, Schluff, tonig, sandigchalk, silt, clayey, sandy
52
Heinenoord
Mixschild | Mixshield
S-97
Schilddurchmesser | shield diameter 8550 mm
Tunnellänge | tunnel length 2 x 940 m
Bohrkopfleistung | cutterhead power 750 kW
Geologie | geology Sand, Ton | sand, clay
Auftraggeber | contractor Ballast Nedam Beton & Waterbouw B.V., Van Hattum & Blankevoort B.V., Hollandsche Beton- en Waterbouw B.V., Wayss & Freytag AG
31,5
1218
51 54
72
5761,5
16,5
45
11 12 13 14 15 16 17 18 19 201991 |
70605040302010
wöchentl. Vortriebsleistung [m] 1. Streckeweekly production [m] 1st Drive
42
1528,5
5748
70,5
97,5
76,566 64,5
19 20 21 22 23 24 25 26 27 281998 |
708090
605040302010
wöchentl. Vortriebsleistung [m] 2. Streckeweekly production [m] 2nd Drive
Moormoor
Hauptsächlich Tonmainly clayTon, schluffigclay, siltySand mit Tonschichtensand with layers of clay
Sand, örtlich manche Tonschichtensand, locally with layers of clay
Ton, schluffig, örtlich mit dünnen Sandschichtenclay, silty, locally with thin layers of sand
Sandsand
Ton, örtlich sandig und/oder mit Sandschichtenclay, locally sandy and/or with sand layers
Sand, örtlich mit dünnen Tonschichtensand, locally with thin layers of clay
Sand mit Tonlagensand with layers of clayTon mit dünnen Sandschichtenclay with thin layers of sand
Mittlerer bis grober Sandmiddle to coarse sand
Ton, sandig bis Sand, schluffigclay, sandy to sand, silty
Tonclay
Oude Maas
53
Airport Link Sydney
Mixschild | Mixshield
S-103
Schilddurchmesser | shield diameter 10710 mm
Tunnellänge | tunnel length 5570 m
Bohrkopfleistung | cutterhead power 2400 kW
techn. Besonderheiten Agitatoren und Walzenbrecher.techn. features Agitators and rotary crusher.
Geologie | geology Ton, Sandstein | clay, sandstone
Auftraggeber | contractor Transfield, Bouygues S.A.
61,2
39,6
7282,8
52,2
66,6
79,2
64,872
84,6
30 31 32 33 34 35 36 37 38 391997 |
7080
605040302010
wöchentl. Vortriebsleistung [m] 1. Streckeweekly production [m] 1st Drive
57,6 5472
83
47
86,5
130 122108
95,4
03 04 05 06 07 08 09 10 11 121999 |
80
100
120
60
40
20
wöchentl. Vortriebsleistung [m] 2. Streckeweekly production [m] 2nd Drive
54
Hamburg
Mixschild | Mixshield
S-108
Schilddurchmesser | shield diameter 14200 mm
Tunnellänge | tunnel length 2560 m
Bohrkopfleistung | cutterhead power 3200 + 200 kW
techn. Besonderheiten | techn. features Unter atmosphärischen Bedingungen begehbareHauptspeichen des Schneidrades. Zentrums-schneidrad mit eigenem Förderkreislauf. SSP System (Vorauserkundungssystem).Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former.
Geologie | geology Sand, Geschiebemergel, Schluff und Kies, Findlinge | sand, glacial drift, silt and gravel, boulders
Auftraggeber | contractor Bilfinger + Berger Bau AG, Dyckerhoff & Widmann AG, Heitkamp GmbH,HOCHTIEF AG, Philipp Holzmann AG, Wayss & Freytag AG, Ed. Züblin AG
Auffüllung, Sandbackfilling, sand
Sandsand
Geschiebemergelglacial drift
River ElbeElbe
Kiese, Steine, Blöckegravel, stones, blocks
Glimmerschluff und -tonmica silt and mica clay
Beckenschluffbasin silt
50
34
24
5244
52 5046
4032
51 52 01 02 03 04 05 06 07 082000 |
50
40
30
20
10
wöchentl. Vortriebsleistung [m]
weekly production [m]
Berlin
Mixschild | Mixshield
S-110 / S-118
Schilddurchmesser | shield diameter 8930 mm
Tunnellänge S-110 | tunnel length S-110 2 x 570, 2 x 700 m
Tunnellänge S-118 | tunnel length S-118 2 x 570, 2 x 700 m
Bohrkopfleistung | cutterhead power 1000 + 75 kW
techn. Besonderheiten Aktiver Zentrumsschneider, Steinbrechertechn. features active center cutter, stone crusher
Geologie | geology Sand, Ton | sand, clay
Auftraggeber | contractor HOCHTIEF AG, Bilfinger + Berger Bau AG, Philipp Holzmann AG, Dyckerhoff & Widmann AG
24
4552,5
58,5
40,5
64,5
8188,5
73,5
57
03 04 05 06 07 08 09 10 11 121998 |
7080
605040302010
wöchentl. Vortriebsleistung [m] S-110weekly production [m]
216
6355,5
9076,5
55,5
108 114
78
16 17 18 19 20 21 22 23 24 251999 |
80
100
60
40
20
wöchentl. Vortriebsleistung [m] S-118weekly production [m]
55
56
A86 à l’Ouest de Paris
Mixschild | Mixshield
S-127
Schilddurchmesser | shield diameter 11565 mm
Tunnellänge | tunnel length 4500 + 5500 m
Bohrkopfleistung | cutterhead power 4000 kW
techn. Besonderheiten | techn. features Untertage umbaubar von Mixschildbetrieb auf EPB-Betrieb und offener Betrieb. | Convertible TBM in the tunnel from Mixshield to EPB and open mode.
Geologie | geology Kalkstein, Sand, Ton, Mergel, Kreide | limestone, sand, clay, marl, chalk
Auftraggeber | contractor Campenon Bernard SGE, Jean Lefebvre, Dumez GTM, GTM Construction, Fougerolle, Colas
84
50
68
26
68
86
64
92
54
78
30 31 32 33 34 35 36 37 38 392002 |
708090
605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
Sandböden in Fontaineblausandy ground in fontainebleauSandböden in Beauchampsandy ground in beauchampAusternmergeloystermarl
Plastische Tonbödenplastic clayFalsche Lettenfalse poller's clayKalkstein und grüne Tonbödenlimestone and green clay
Kalkstein in Champignylimestone in champignyMassenkalksteinmass limestoneSupragipsmergelsupra gypsum marl
Mergel und Schottermarl and crushed stoneSandböden in Auteuilsandy ground in auteuil
Mergel in Meudonmarl in meudon
Kreidechalk
Düsseldorf
Mixschild | Mixshield
S-130
Schilddurchmesser | shield diameter 9430 mm
Tunnellänge | tunnel length 904 m
Bohrkopfleistung | cutterhead power 1000 kW
Geologie | geology Feinsand, sandiger Kies, Mittel- u. Grobsand, Auffüllung, Steine, Blöcke | fine sands, sandy gravel, sand, fill, stones, boulders
Auftraggeber | contractor Wayss & Freytag AG, Bilfinger + Berger Bau AG, HOCHTIEF AG, Philipp Holzmann AG, Bouygues S.A.
90
60
109
70
96
5670
94 88
109
01 02 03 04 05 06 07 08 09 101999 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
57
58
Westerschelde
Mixschild | Mixshield
S-137 / S-138
Schilddurchmesser | shield diameter 11340 mm
Tunnellänge | tunnel length 2 x 6600 m
Bohrkopfleistung | cutterhead power 2400 + 160 kW
techn. Besonderheiten | techn. features Aufgrund der zu erwartenden hohen Arbeits-drücke von bis zu 8,5 bar werden spezielle Anforderungen bezüglich der Dichtung an das Hauptlager und die Schildschwanzdichtung gestellt. Zentrumsschneider, Walzenbrecher, Agitatoren. | Special requirements regarding the sealing at the main drive and the tailskin sealing due to high working pressures of up to 8.5 bar. Center cutter, rotary crusher, agitators.
Geologie | geology Sand, Ton | sand, clay
Auftraggeber | contractor BAM Infrabouw B.V., Franki N.V., Heijmanns N.V., Philipp Holzmann AG, Voormolen Bouw B.V., Wayss & Freytag AG
Glauconithaltige Sandesands containing glauconite
Tonclay
Toniger Sandclayey sand
Junger Meersandrecent sea sand
Sandsand
94106
120136
148
7088
112 11498
42 43 44 45 46 47 48 49 50 512001 |
140
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-138weekly production [m]
6
92
132
188
128106
148 146 152134
49 50 51 52 01 02 03 04 05 062001 | | 2002
180
140
100
60
20
wöchentl. Vortriebsleistung [m] S-137weekly production [m]
59
Sophiaspoortunnel
Mixschild, kontinuierlicher Vortrieb | Mixshield, continuous advance
S-150
Schilddurchmesser | shield diameter 9785 mm
Tunnellänge | tunnel length 2 x 4241 m
Bohrkopfleistung | cutterhead power 1100 kW
Geologie | geology Ton, Sand, Schluff | clay, sand, silt
Auftraggeber | contractor Koninklijke Boskalis Westminster N.V., Heijmans N.V., HOCHTIEF AG, Philipp Holzmann AG, NBM-Amstelland N.V.
54
120144 147
117
156
28,5
139,5
166,5142,5
02 03 04 05 06 07 08 09 10 112001 |
16014012010080604020
wöchentl. Vortriebsleistung [m]
weekly production [m]
60
Wesertunnel
Mixschild | Mixshield
27 28,5
49,539
22,5
36
57
8778
43,5
34 35 36 37 38 39 40 41 42 432000 |
8070605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
Weserniederterassensandterrace sand layers
Wattsand mit dünnen Klei- und Tonlagensand with loam layers and clay layers
Klei mit Sandlagenloam with sand layersTorf, Klei, Humuspeat, loam, humus
„Kaolinsand” mit dünnen Schluff- und Tonlagen„kaolinsand” with silt layers and clay layers
schluffige, tonige Fazies / Lauenburger Schichtensilty, clayey facies / lauenburger layersGeschiebemergelglacial drift
sandige Fazies / Lauenburger Schichtensandy facies / lauenburger layers
S-152
Schilddurchmesser | shield diameter 11670 mm
Tunnellänge | tunnel length 2 x 1600 m
Bohrkopfleistung | cutterhead power 1320 + 220 kW
techn. Besonderheiten Aktiver Zentrumsschneider, Steinbrecher, abge-techn. features schottetes Sohlsegment. | active center cutter,
stone crusher, isolated invert.
Geologie Klei, Sand, Torf, Geschiebemergel, Schluff, Tongeology loam, sand, peat, glacial drift, silt, clay
Auftraggeber | contractor HOCHTIEF AG, Philipp Holzmann AG, Ludwig Freytag GmbH & Co. KG, Henrich Hecker GmbH & Co. KG, Martin Oetken GmbH & Co. KG
Moscow, Lefortovo
61
Mixschild | Mixshield
S-164
Schilddurchmesser | shield diameter 14200 mm
Tunnellänge | tunnel length 2222 m
Bohrkopfleistung | cutterhead power 3200 + 315 kW
techn. Besonderheiten | techn. features Unter atmosphärischen Bedingungen begehbareHauptspeichen des Schneidrades. Zentrums-schneidrad mit eigenem Förderkreislauf. SSP System (Vorauserkundungssystem).Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former.
Geologie | geology Fein- bis Grobsand, Ton, Kalkstein (mittelfest, teils stark geklüftet) | fine to coarse sand, clay, limestone (medium strength, partially very fissured)
Auftraggeber | contractor AO Corporation Transstroy
4450
62
42
54
36
6064
5854
48 49 50 51 52 01 02 03 04 052002 | | 2003
70605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
Aufschüttungfilling
Schluff, schluffiger Tonsilt, silty clay
Sandsand
Tonclay
Kalksteinlimestone
62
Pannerdensch Kanaal
Mixschild | Mixshield
S-168
Schilddurchmesser | shield diameter 9795 mm
Tunnellänge | tunnel length 2 x 1600 m
Bohrkopfleistung | cutterhead power 1000 kW
Geologie | geology Sand, Ton | sand, clay
Auftraggeber | contractor VINCI, C.F.E., TBI Beton- en Waterbouw, Welling
186
135
174,6
59,4
131,4111,6
203,4
72
186171
40 41 42 43 44 45 46 47 48 492002 |
200
150
100
50
wöchentl. Vortriebsleistung [m]
weekly production [m]
London CTRL
63
Mixschild | Mixshield
S-192 / S-204
Schilddurchmesser | shield diameter 8160 mm
Tunnellänge | tunnel length 2 x 2500 m
Bohrkopfleistung | cutterhead power 1100 kW
Geologie Alluvium, Kreide, Flintsteingeology alluvium, chalk, flintstone
Auftraggeber | contractor HOCHTIEF AG, J. Murphy & Sons Limited
90 91,5
7254
85,5
107 113104 105
138
41 42 43 44 45 46 47 48 49 502002 |
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-192weekly production [m]
136 136 129
171
129141
120105
117
150
21 22 23 24 25 26 27 28 29 302003 |
120140160
10080604020
wöchentl. Vortriebsleistung [m] S-204weekly production [m]
Kiesgravel
Torfpeat
Anschüttungenmade groundAlluviumalluvium
Kreidechalk
64
Honkong Kai Tak
Mixschild | Mixshield
S-199
Schilddurchmesser | shield diameter 5150 mm
Tunnellänge | tunnel length 1150 m
Bohrkopfleistung | cutterhead power 640 kW
Geologie | geology Frischer und verwitterter Granit, Alluvium fresh and weathered granite, alluvium
Auftraggeber | contractor China Harbour Transfield JV
Auffüllungenfill
Alluviumalluvium
Völlig verfaulter Granitcompletely decomposed granite
Leicht verfaulter Granitslightly / moderately decomposed granite
22,831,231,2
38,4
50,4
31,233,6
46,850,4
63,6
17 18 19 20 21 22 23 24 25 262003 |
10
20
30
40
50
60
wöchentl. Vortriebsleistung [m]
weekly production [m]
65
Herrentunnel
Mixschild | Mixshield
S-200
Schilddurchmesser | shield diameter 11670 mm
Tunnellänge | tunnel length 2 x 760 m
Bohrkopfleistung | cutterhead power 1540 kW
techn. Besonderheiten Aktiver Zentrumsschneider, Steinbrecher, abge-techn. features schottetes Sohlsegment. | active center cutter,
stone crusher, isolated invert.
Geologie | geology Sand, Schluff, Moräne | sand, silt, till
Auftraggeber | contractor HOCHTIEF AG, Bilfinger Berger AG
66
Antwerp
Mixschild | Mixshield
S-209
Schilddurchmesser | shield diameter 8270 mm
Tunnellänge | tunnel length 2 x 1230 m
Bohrkopfleistung | cutterhead power 750 kW
Geologie | geology Feiner Sand | fine sand
Auftraggeber | contractor T.H.V. ASDAM C/o MBG-CFE N.V.
28
75
123
64
86
111 106 106 108
0
19 20 21 22 23 24 25 26 27 282003 |
20
40
60
80
100
120
wöchentl. Vortriebsleistung [m]
weekly production [m]
67
Metro Vienna U1/1
Mixschild | Mixshield
S-222
Schilddurchmesser | shield diameter 6800 mm
Tunnellänge | tunnel length 2 x 420 m
Bohrkopfleistung | cutterhead power 480 kW
Geologie Sandiger Schluff, Kies, Sand geology sandy silt, gravel, sand
Auftraggeber | contractor Bilfinger Berger AG
9,1
24,713 14,3
29,9
49,4
76,788,4
81,9
18,2
25 26 27 28 29 30 31 32 33 342003 |
1020304050
7080
60
wöchentl. Vortriebsleistung [m]
weekly production [m]
68
Portland
Mixschild | Mixshield
S-231 / S-232
Schilddurchmesser S-231 | shield diameter S-231 5050 mm
Schilddurchmesser S-232 | shield diameter S-232 5140 mm
Tunnellänge S-231 | tunnel length S-231 4350 m
Tunnellänge S-232 | tunnel length S-232 1350 m
Bohrkopfleistung S-231| cutterhead power S-231 500 kW
Bohrkopfleistung S-232| cutterhead power S-232 330 kW
Geologie | geology Sand, Kies, Alluvium | sand, gravel, alluvium
Auftraggeber | contractor Impregilo S.p.A., S.A. Healy
Sand/Schluffsand/siltBasaltbasalt
Sand/Schluffsand/silt
Affüllungfill
Kiesgravel
Kies in sandigem Schluff/Tonmatrixgravel in sandy silt/clay matrix
Sandiger Tonsteinsandy river mudstone
69
Moscow, Silberwald
Mixschild | Mixshield
S-250
Schilddurchmesser | shield diameter 14200 mm
Tunnellänge | tunnel length 2 x 2220 m
Bohrkopfleistung | cutterhead power 3200 + 315 kW
techn. Besonderheiten | techn. features Unter atmosphärischen Bedingungen begehbareHauptspeichen des Schneidrades. Zentrums-schneidrad mit eigenem Förderkreislauf. SSP System (Vorauserkundungssystem).Ringformer | Accessible main spokes under atmospheric pressure. Center cutter with own slurry circuit. SSP System. Ring former.
Geologie | geology Kreideablagerungen, Steinkohleablagerungen, Lehm | chalk, hard coal, loam
Auftraggeber | contractor AO Corporation Transstroy
70
Kuala Lumpur
Mixschild | Mixshield
S-252 / S-253
Schilddurchmesser | shield diameter 13210 mm
Tunnellänge S-252 | tunnel length S-252 5400 m
Tunnellänge S-253 | tunnel length S-253 4050 m
Bohrkopfleistung | cutterhead power 4000 kW
techn. Besonderheiten | techn. features Steinbrecher, Agitatoren | stone crusher, agitators
Geologie Kalkstein, Sand, Marmor geology limestone, sand, marble
Auftraggeber S-252 | contractor S-252 Wayss & Freytag AG
Auftraggeber S-253 | contractor S-253 Gamuda
71
Les Vignes
Teilschnittmachine | Open Face Shield
S-78
Schilddurchmesser | shield diameter 11770 mm
Tunnellänge | tunnel length 2 x 1900 m
Bohrkopfleistung | cutterhead power 400 kW
Geologie | geology Moräne, Molasse | moraine, molasse
Auftraggeber | contractor Losinger Fribourg SA, Locher & Cie. AG, Prader AG, Grisoni-Zaugg SA, A. Repond SA
41 42 43 44 45 46 47 48 49 50
5157 57 54
6460 62 60
69
57
1993 |
60
50
40
30
20
10
wöchentl. Vortriebsleistung [m] 1. Streckeweekly production [m] 1st drive
46,5
27
61,5 57 58,5
79,566
79,5
16,5
127,5
20 21 22 23 24 25 26 27 28 291995 |
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m] 2. Streckeweekly production [m] 2nd drive
72
Olympic Metro Athens
Teilschnittmaschine | Open Face Shield
S-148
Schilddurchmesser | shield diameter 9495 mm
Tunnellänge | tunnel length 1911 m
Bohrkopfleistung | cutterhead power 300 kW
Geologie | geology Alluviale Ablagerungen, Schiefer, Kalkstein, Mergel, Sandstein, Lavagestein | alluvium, slate, limestone, marl, sandstone, extrusive rocks
Auftraggeber | contractor Sogea, Campenon Bernard SGE
43 41
87
45
79
42 39 43
65 64
01 02 03 04 05 06 07 08 09 101999 |
8070605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
73
Bözberg
Einfachschild-TBM | Single Shield TBM
S-56
Schilddurchmesser | shield diameter 11800 mm
Tunnellänge | tunnel length 2 x 3200 m
Bohrkopfleistung | cutterhead power 3200 kW
Geologie | geology Molasse, Kalkstein, Mergel | molasse, limestone, marl
Auftraggeber | contractor Rothpletz, Lienhard & Cie. AG, Erne AG,Granella AG, Kistler AG, Locher & Cie. AG, Marti AG, Murer AG, Prader AG
290
173
263 283316
282322 303
385 376
11 12 01 02 03 04 05 06 07 081990 | | 1991
35030025020015010050
wöchentl. Vortriebsleistung [m]
weekly production [m]
74
Adlertunnel
Einfachschild-TBM | Single Shield TBM
S-89
Schilddurchmesser | shield diameter 12535 mm
Tunnellänge | tunnel length 4100 m
Bohrkopfleistung | cutterhead power 3600 kW
Geologie | geology Bunte Mergel, Gipskeuper | coloured marl, gypsum keuper
Auftraggeber | contractor Pitsch AG, Infra 2000 SA, Stamm AG, Wenk AG
230
307 280328
440496
410
184
274
184
05 06 07 08 09 10 11 12 01 021997 | | 1998
400450
35030025020015010050
monatliche Vortriebsleistung [m]
monthly production [m]
Hochterrassenschotterhigh terrace brash
Muschelkalkshelly limestone
Karsterscheinungcarstic formation
Gipskeupergypsum keuper
Bunte Mergelcoloured marl
Anhydritgruppeanhydrite group
Liaslias
Opalinustonopaline clay
Künstliche Auffüllungartificial backfilling
Niederterrassenschotterlow terrace brash
Sackungsettlement
Schwemmlehmfloating loam
75
Pomy
Einfachschild-TBM | Single Shield TBM
S-90
Schilddurchmesser | shield diameter 11660 mm
Tunnellänge | tunnel length 2 x 2700 m
Bohrkopfleistung | cutterhead power 1500 kW
Geologie | geology Molasse | molasse
Auftraggeber | contractor Marti AG, Marti Tunnel AG, Routes Modernes SA, Kopp AG, Barbonesi SA,COBY
85
70
85 8176
6876 77 76 77
03 04 05 06 07 08 09 10 11 121997 |
8070605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
76
Zürich-Glatt
Einfachschild-TBM / EPB-Schild | Single Shield TBM / EPB-Shield
106
42
7264
106
58
112
83
115 118
26 27 28 29 30 31 32 33 34 351996 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
Künstliche Auffüllungartificial backfilling
Schottercrushed stone
Seeablagerungen siltig-sandig (locker)lake deposits silty sandy (loose)Seeablagerungen siltig-sandig (dicht)lake deposits silty sandy (dense)Seeablagerungen siltig-tonig (locker)lake deposits silty clayey (loose)Seeablagerungen siltig-tonic (dicht)lake deposits silty clayey (dense)
Schotter/verschwemmte Moräne (locker)crushed stone/aquiferous moraine (loose)Schotter/verschwemmte Moräne (dicht)crushed stone/aquiferous moraine (dense)
Moräne (dicht)moraine (dense)Molassefelsmolasse
S-99
Schilddurchmesser | shield diameter 5290 mm
Tunnellänge | tunnel length 2900 + 2400 m
Bohrkopfleistung | cutterhead power 945 kW
techn. Besonderheiten | techn. features Umbaubar von Einfachschild-TBM auf EPB-Schild. | Convertible from Single Shield TBM to EPB-Shield.
Geologie Molasse, Lockergestein geology molasse, unconsolidated material
Auftraggeber | contractor Locher & Cie. AG, Wayss & Freytag AG, Prader AG, Fietz + Leuthold AG
77
Murgenthal
Einfachschild-TBM | Single Shield TBM
05 06 07 08 09 10 11 12 13 14
99
123
74
126
90102 104
117 120105
1998 |
120
100
80
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
Boden, Lockergesteinsoil and soil-like materials
Mergel und Sandstein in der unteren Süßwassermolassemarl and sandstone from the molasse
Verwitterter Felsweathered rock
S-121
Schilddurchmesser | shield diameter 11980 mm
Tunnellänge | tunnel length 4260 m
Bohrkopfleistung | cutterhead power 3200 kW
techn. Besonderheiten | techn. features Radiale Räumer (mechanisch verstellbar, um den Materialfluss zu steuern). | Radial buckets which can be opened and closed mechanically.
Geologie | geology Molasse: Mergel, Sandstein | marl and sand-stone from the molasse
Auftraggeber | contractor Locher & Cie. AG, Murer AG, Prader AG, Rothpletz, Lienhard & Cie. AG, Conrad Zschokke S.A., Ad. Schäfer & Cie. AG
78
Sörenberg
Einfachschild-TBM | Single Shield TBM
S-163
Schilddurchmesser | shield diameter 4520 mm
Tunnellänge | tunnel length 5300 m
Bohrkopfleistung | cutterhead power 900 kW
Geologie Ton- und Mergelschiefer, Flysch geology clay and marl slate, flysch
Auftraggeber | contractor STRABAG AG, Cogeis S.p.A., A. Specogna S.A., Scheifele AG
113 114
179 176 179
228
181,5
100,5
167 165
36 37 38 39 40 41 42 43 44 452000 |
200
150
100
50
wöchentl. Vortriebsleistung [m]
weekly production [m]
79
Pontebba
Einfachschild-TBM | Single Shield TBM
S-220
Schilddurchmesser | shield diameter 4520 mm
Tunnellänge | tunnel length 1800 m
Bohrkopfleistung | cutterhead power 900 kW
Geologie | geology Kalkstein, Dolomit | limestone, dolomite
Auftraggeber | contractor Consorzio S.B.T.
80
Arrowhead
Einfachschild-TBM | Single Shield TBM
S-233 / S-234
Schilddurchmesser | shield diameter 5760 mm
Tunnellänge S-233 | tunnel length S-233 6100 m
Tunnellänge S-234 | tunnel length S-234 6800 m
Bohrkopfleistung | cutterhead power 2000 kW
techn. Besonderheiten | techn. features Aufwändige Möglichkeiten zur vorauseilenden Bodenverbesserung. | Extensive pre-excavation grouting.
Geologie | geology Gneis | gneiss
Auftraggeber | contractor Joint Venture JF Shea and Kenny
100155 155
220250
205
360310
200
0
42 43 44 45 46 47 48 49 50 512003 |
35030025020015010050
wöchentl. Vortriebsleistung [Fuß] S-233weekly production [ft]
81
Valsugana
Einfachschild-TBM | Single Shield TBM
S-251
Schilddurchmesser | shield diameter 12055 mm
Tunnellänge | tunnel length 2 x 2780 m
Bohrkopfleistung | cutterhead power 3600 kW
Geologie | geology Kalkgestein mit Lehm und sandigen Zonen limestone with loam and sandy zones
Auftraggeber | contractor TOTO Costruzioni Generali
82
Zürich-Thalwil Lot 3.01 and Lot 2.01
Einfachschild-TBM | Single Shield TBM
S-139 / S-140
Schilddurchmesser S-139 | shield diameter S-139 12280 mm
Schilddurchmesser S-140 | shield diameter S-140 12360 mm
Tunnellänge S-139 | tunnel length S-139 5570 m
Tunnellänge S-140 | tunnel length S-140 2620 m
Bohrkopfleistung S-139 | cutterhead power S-139 1540 kW
Bohrkopfleistung S-140 | cutterhead power S-140 2000 kW
techn. Besonderheiten S-140 Umbaubar im Tunnel von Mixschildbetrieb auf techn. features S-140 Hartgesteinmodus. | Convertible TBM in the
tunnel from Mixshield to hard rock mode.
Geologie S-139 | geology S-139 Molasse | molasse
Geologie S-140 | geology S-140 Molasse, Sihlschotter | molasse, sihl ballast rubble
Auftraggeber | contractor Zschokke Locher AG, Murer AG, Prader AG, Wayss & Freytag AG, CSC, J. Scheifele AG, Specogna & Co.
145 143160
150 147165
136
163 170 162
36 37 38 39 40 41 42 43 44 451999 |
16014012010080604020
wöchentl. Vortriebsleistung [m] S-139weekly production [m]
39,1
85 85 85 85 85 90,1 94 95,2 97
06 07 08 09 10 11 12 13 14 152000 |
8090
70605040302010
wöchentl. Vortriebsleistung [m] S-140weekly production [m]
83
Dublin Port Tunnel
Einfachschild-TBM / Teilschnittmaschine | Single Shield TBM / Open Face Shield
S-193 / S-194
Schilddurchmesser S-193 | shield diameter S-193 11825 mm
Schilddurchmesser S-194 | shield diameter S-194 11770 mm
Tunnellänge S-193 | tunnel length S-193 2 x 2246 m
Tunnellänge S-194 | tunnel length S-194 318 + 310 m
Bohrkopfleistung | cutterhead power 3200 kW
Geologie S-193 | geology S-193 Kalkstein, Schiefer | limstone, slate
Geologie S-194 | geology S-194 Geschiebemergel | glacial drift
Auftraggeber | contractor Nishimatsu, Mowlem, Irishenco
59,551
40,849,3
76,585
76,564,6
72 69,7
02 03 04 05 06 07 08 09 10 112003 |
8070605040302010
wöchentl. Vortriebsleistung [m] S-193weekly production [m]
15,3
34
20,4
30,6
26
30,6 2932,3
26 26
37 38 39 40 41 42 43 44 45 462003 |
30
25
20
15
10
5
wöchentl. Vortriebsleistung [m] S-194weekly production [m]
84
Zürich
Gripper-TBM | Gripper TBM
S-96
Schilddurchmesser | shield diameter 3000 mm
Tunnellänge | tunnel length 1200 + 950 + 2000 m
Bohrkopfleistung | cutterhead power 640 kW
Geologie | geology Molasse | molasse
Auftraggeber | contractor Prader AG
50
68
86 8979 80 78
59
3124
02 03 04 05 06 07 08 09 10 111996 |
8070605040302010
wöchentl. Vortriebsleistung [m]
weekly production [m]
85
Tscharner
Gripper-TBM | Gripper TBM
S-155
Schilddurchmesser | shield diameter 9530 mm
Tunnellänge | tunnel length 2322 m
Bohrkopfleistung | cutterhead power 2100 kW
Geologie | geology Kalk, Mergel, Ton | lime, marl, clay
Auftraggeber | contractor Marti AG
85
43
7868 70,5
63 63 63 66,577,5
40 41 42 43 44 45 46 47 48 492000 |
8070605040302010
wöchentl. Vortriebsleistung im Einschichtbetrieb [m]
weekly production in single shift operation [m]
86
Lötschberg Steg/Raron
Gripper-TBM | Gripper TBM
S-167 / S-174
Schilddurchmesser | shield diameter 9430 mm
Tunnellänge S-167 | tunnel length S-167 8925 m
Tunnellänge S-174 | tunnel length S-174 10300 m
Bohrkopfleistung | cutterhead power 3500 kW
Geologie Altkristalliner Gneis, Granit, Granodiorit geology old crystalline gneiss, granite, granodiorite
Auftraggeber | contractor Marti AG, Walter Gruppe (Walter Bau AG merged with Dywidag, Ed. Züblin AG), Porr Asdag Tunnelbau GmbH, Balfour Beatty Ltd.
135 144
95111
172189
139156 154 146
17 18 19 20 21 22 23 24 25 262002 |
18016014012010080604020
wöchentl. Vortriebsleistung [m] S-174weekly production [m]
128150
124
204
166186
166
207173 167
20 21 22 23 24 25 26 27 28 292002 |
200
150
100
50
wöchentl. Vortriebsleistung [m] S-167weekly production [m]
87
Gotthard Bodio/Faido
Gripper-TBM | Gripper TBM
S-210 / S-211
Schilddurchmesser | shield diameter 8830 mm / 9330 mm
Tunnellänge S-210 | tunnel length S-210 13955 + 11581 m
Tunnellänge S-211 | tunnel length S-211 14795 + 12220 m
Bohrkopfleistung | cutterhead power 3500 kW
Geologie | geology Gneis, Granit, Schiefer | gneiss, granite, slate
Auftraggeber | contractor Zschokke Locher AG, HOCHTIEF AG, Alpine Mayreder Bau GmbH, CSC Impresa Costruzioni SA, Impregilo S.p.A.
78,5 82 81
108,5
81,692
99,489
75,288,2
41 42 43 44 45 46 47 48 49 502003 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-210weekly production [m]
9284,4
110 113
80,592,2
64,0
88,1 93 92,4
39 40 41 42 43 44 45 46 47 482003 |
100
80
60
40
20
wöchentl. Vortriebsleistung [m] S-211weekly production [m]
Penninsche Gneiss-Zonepennine Gneiss zone
Ursenen Gravera Zonegotthard Massif
Pioramuldepiora zone
Ursenen Gravera Zoneurseren-Garvera zone
Tavetscher Zwischenmassivtavetsch Intermediate Massif
Aar Massivaar Massif
88
Gotthard Amsteg
Gripper-TBM | Gripper TBM
S-229 / S-230
Schilddurchmesser | shield diameter 9580 mm
Tunnellänge | tunnel length 2 x 11350 m
Bohrkopfleistung | cutterhead power 3500 kW
Geologie | geology Granit | granite
Auftraggeber | contractor Murer AG, Strabag AG
59,667,8
38,6
81,8 8472,9
51,3
110 105121
41 42 43 44 45 46 47 48 49 502003 |
80
100
120
60
40
20
wöchentl. Vortriebsleistung [m]
weekly production [m]
89
Ile de la Réunion
Doppelschild-TBM | Double Shield TBM
S-153 / S-162
Schilddurchmesser | shield diameter 3865 mm
Tunnellänge S-153 | tunnel length S-153 9512 m
Tunnellänge S-162 | tunnel length S-162 8050 m
Bohrkopfleistung | cutterhead power 1000 kW
Geologie | geology Vulkanisches Gestein | volcanic rock
Auftraggeber S-153 | contractor S-153 Spie Batignolles, Razel, Pico
Auftraggeber S-162 | contractor S-162 Spie Batignolles, Bouygues S.A., Razel, Pico
67,5
10587,5
97,5
150
50
130110
92,5 100
19 20 21 22 23 24 25 26 27 282000 |
100120140
80604020
wöchentl. Vortriebsleistung [m] S-153weekly production [m]
90
Guadarrama North Portal
Doppelschild-TBM | Double Shield TBM
S-201
Schilddurchmesser | shield diameter 9510 mm
Tunnellänge | tunnel length 14500 m
Bohrkopfleistung | cutterhead power 4200 kW
Geologie | geology Granit, verwitterter Granit | granite, weathered granite
Auftraggeber | contractor ACS, FCC, Ferrovial
182160 166 158
22,4
106126,4
219,2
83,2
0
48 49 50 51 52 01 02 03 04 052003 | | 2004
200
150
100
50
wöchentl. Vortriebsleistung [m]
weekly production [m]
91
Guadarrama South Portal
Doppelschild-TBM | Double Shield TBM
S-202
Schilddurchmesser | shield diameter 9510 mm
Tunnellänge | tunnel length 14500 m
Bohrkopfleistung | cutterhead power 4200 kW
Geologie | geology Granit, verwitterter Granit | granite, weathered granite
Auftraggeber | contractor Comsa, Dragados, Necso, Ohl, Sacyr
85
166,4
97,6
176158
139155
131147
163
14 15 16 17 18 19 20 21 22 232003 |
100120140160
80604020
wöchentl. Vortriebsleistung [m]
weekly production [m]
Herrenknecht ist überall auf der Welt.Auch direkt bei Ihnen: www.herrenknecht.de