referencess - uom ir

6
REFERENCESS [1] Robin Koffler, Jason Yates, "The Power Protection Guide", Technical Guide of Riello UPS, vol. 1, pp 15-33, 2007. [2] Web Site: http://www.ashleyedison.com, Ashley-Edison International Limited. [3] J.W.D.Somasundara, N.N.K.P.Withanage, "Problems and Prospects of Telecommunications Services in the Ratnapura District", Research Paper published in TRCSL website, pp 235-238, 2006. [4] H.S.C Perera, "Services Quality and Telecommunications Services in the Southern Province in Sri Lanka", Research Paper published in TRCSL website, pp 106-139, 2004. [5] Flanagan, William, "Handbook of Transformer Design and Applications", McGraw-Hill, pp 22-65, 1993. [6] V.N. Mittle, A. Mittal, "Design of Electrical Machines", Standard Publishers Distributors, Delhi, 4th edition, pp 1-81, 2006. [7] Callister, Jr., William D, "Materials Science and Engineering - an Introduction", 5th edition, John Wiley and Sons, pp 14-98, 2000. [8] A. Draper, "Electrical Machines", Longaman Inc, 7 th edition, pp 35-189, 1967. [9] Website: www.emersonnetworkpower.com, Emerson Network Power Co., Ltd Homepage. [10] Dale R. Patrick, Stephen W. Fardo, "Electrical Motor Control Systems", The Goodheart- Willcox Company, Inc Publisher, pp 100-100, 1999. [11] John N. Chiasson, "Modeling and High Performance Control of Electric Machines", Wiley-IEEE Press, New York, 2005. [12] Donald R. Wulfinghoff, "Energy Efficiency Manual", Energy Institute Press, 2004. [13] Donald R. Wulfinghoff, "The Four Steps of Effective Energy Management", Wulfinghoff Energy Services, Inc, pp 12-346, 2004. 97

Upload: others

Post on 11-Feb-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REFERENCESS - UoM IR

REFERENCESS

[1] Robin Koffler, Jason Yates, "The Power Protection Guide", Technical Guide of Riello UPS, vol. 1, pp 15-33, 2007.

[2] Web Site: http://www.ashleyedison.com, Ashley-Edison International Limited.

[3] J.W.D.Somasundara, N.N.K.P.Withanage, "Problems and Prospects of Telecommunications Services in the Ratnapura District", Research Paper published in TRCSL website, pp 235-238, 2006.

[4] H.S.C Perera, "Services Quality and Telecommunications Services in the Southern Province in Sri Lanka", Research Paper published in TRCSL website, pp 106-139, 2004.

[5] Flanagan, William, "Handbook of Transformer Design and Applications", McGraw-Hill, pp 22-65, 1993.

[6] V.N. Mittle, A. Mittal, "Design of Electrical Machines", Standard Publishers Distributors, Delhi, 4th edition, pp 1-81, 2006.

[7] Callister, Jr., William D, "Materials Science and Engineering - an Introduction", 5th edition, John Wiley and Sons, pp 14-98, 2000.

[8] A. Draper, "Electrical Machines", Longaman Inc, 7th edition, pp 35-189, 1967.

[9] Website: www.emersonnetworkpower.com, Emerson Network Power Co., Ltd Homepage.

[10] Dale R. Patrick, Stephen W. Fardo, "Electrical Motor Control Systems", The Goodheart- Willcox Company, Inc Publisher, pp 100-100, 1999.

[11] John N. Chiasson, "Modeling and High Performance Control of Electric Machines", Wiley-IEEE Press, New York, 2005.

[12] Donald R. Wulfinghoff, "Energy Efficiency Manual", Energy Institute Press, 2004.

[13] Donald R. Wulfinghoff, "The Four Steps of Effective Energy Management", Wulfinghoff Energy Services, Inc, pp 12-346, 2004.

97

Page 2: REFERENCESS - UoM IR

[14] John C. Andreas, "Energy Efficient Electric Motors - Selection & Applications", 2nd edition, Marcel Dekker Inc, pp 65-258, 1992.

[15] Nandike Pathirage, "Solving the Under Voltage problem in Sri Lanka National grid", Thesis for MSc at University of Moratuwa, 2001.

[16] P.C. Devasurendra, "Investigation of Voltage Profile in Low voltage Distribution Network", Thesis for MSc at University of Moratuwa, 2006.

[17] Web Site: http://www.success.com.my, Success Electronic & Transformer manufacturer Limited Homepage.

[18] Donald G. Fink and H. Wayne Beaty, "Standard Handbook for Electrical Engineers", Eleventh Edition, McGraw-Hill, New York, 1978.

[19] Bandula S. Tilakasena, K.A. Noel Priyantha, "End-user characteristics of the electricity demand in Sri Lanka", Research paper published in CEB website, 2001.

[20] M.T.K. De Silva, "Design of Power Electronic Inverter for Active power reduction in an unbalance 3 phase system", Thesis for MSc at University of Moratuwa, pp 33-33, 2004.

[21] G.Weerasekara, "Voltage Sag mitigation using Dynamic voltage restore with multi-feedback control", Thesis for MSc at University of Moratuwa, pp 33-33, 2005.

[22] H.C.S. Hettigoda, "Hardware Implementation of a Power system stabilizer", Thesis for MSc at University of Moratuwa, 2002.

[23] Website: http://www.wapa.gov, Western Area Power Administration, an agency of U.S. Department of energy website.

[24] Professor V.J. Gosbell, "Voltage fluctuations in the electric supply system", Technical Note for Integral Energy Power Quality Centre, University of Wollongong, 2003.

98

Page 3: REFERENCESS - UoM IR

R 10

12

HI

H2 H

3 6A/VSE

I 0/

£ C

LEGEN

D

- MO

ULDED CASE

CIRCUIT BRCAKL

V

-RE

SID

UA

L CU

RR

EN

T ^

CIR

CU

IT BR

EA

KE

R

J - M

INIA

TUR

E

* C

IRC

UIT B

RE

AK

ER

4 1- - PR

OTE

CTIO

N FU

SE

g)

- INDICATOR LAM

P

* NO

TE

:- AL

L CO

NTR

OL C

AB

LE

AR

E 1.5sqm

m

FLEX

IBLE

CA

BLE

DciaurncM

DESIGNED

ST CMECXZD

BY AA

MlO

VtD

»T

LA

NK

A

BE

LL

(PV

T)L

TD

, LEVEL 6, EAST LO

WER BLO

CK 1, W

OR

LD TRAD

E CENTR

E,ECHELO

N SQ

AAE, C

OLO

MBO

1 ,SR1 LArtKA.

LA

NK

A

BE

LL

(PV

T)L

TD

, N

O: 11,

MAH

AWELA R

OAD

, DfM

ATA

GO

OA

. C

OLO

MBO

9,SRI LAN

KA.

PA

NE

L ID:

RB

S P

OW

ER

P

AN

EL

S

DR

AW

ING

TIT

LE

:

SIN

GL

E LIN

E L

AY

OU

T

LA

NK

A

BE

LL

LT

D

TE

CH

NI

CA

L O

PE

RA

TI

ON

S D

EP

AR

TM

EN

T D

WG

. STATUS

R.I.J. M

M*

PAMKL

J/3

A3 BUILT DRAWING

6AT/COM/07/UL/LAHKA

MLL

Page 4: REFERENCESS - UoM IR
Page 5: REFERENCESS - UoM IR

PFR

CT

CTR

CC

GC

GCT

PHAS

E FA

ILUR

E RE

LAY

SS

-CO

MM

ERCI

AL

POW

ER

SENS

ING

TIM

ER

(10S

) M

CL

-CO

MM

ERCI

AL

POW

ER

SENS

ING

RELA

Y M

GL

-CO

MM

ERCI

AL

POW

ER

CONT

ACTO

R MA

-

GENE

RATO

R PO

WER

CO

NTAC

TOR

MOL

-

GENE

RATO

R PO

WER

SE

NSI

NG

TIM

ER

(10S

) GA

-

GOL

-

SELE

CTO

R SW

ITCH

FO

R AU

TO/O

FF

MAN

UAL

COM

MER

CIAL

PO

WER

LO

AD

KEY

SWIT

CH

MAN

UAL

GENE

RATO

R PO

WER

LO

AD

KEY

SWIT

CH

MAI

NS A

VAIL

ABLE

BU

L3

MAI

NS O

N LO

AD

BULB

GE

NERA

TOR

POW

ER

AVAI

LABL

E BU

L3

GENE

RATO

R O

N LO

AD

BULB

GT

GDT

+• 1

2V

DC

CTR

A

7 Km

GT

OV

0-

EEE A

3 \

GT

\ 6

-§ a

7? HS

) 2

4

GENE

RATO

R ST

ARTI

NG

TIM

ER(6

S)

GENE

RATO

R CO

OLDO

WN

TIM

ER(3

M)

r 5 (O

F IP

LANK

A BE

LL

LAN

KA

BELL

PVT

LTD

. ce

pinc

i ;(

,Mm

iiiu

» w>:

s.»s

TEV.

u

" ys

.vr.s

o*

r.'t

i.

v.

DT

C. t

irti.

AU

TO

M

AI

NS

FA

IL

UR

E

DdCN

TD

BY:

A\U

K>

KA

*A

CH

TO

CZ

D

BY:

xmov

a BY

:

DR

A¥M

£)O

YO

NA

NC

JA

DJT

TX:

28

/C

5/

32

3C

JHZ

: N

.r.S

.

Page 6: REFERENCESS - UoM IR

ANNEXURE 04 - (CABIN DRAWING)

8 ' - 0 "

Battery B 2

Battery B 1

Rectifier

BTS

A/C 2

^ ^ a 2 ' - 0 "

Radio Rack

Power distribution box & ATS.

' Huawei Alarm Box & DDF

Cable in.

LANKA BELL PVT LTD. P K O J L C I ' » P L A N N I N G D I V I S I O N

LANKA BELL C.AUX RtM.0. COLOMBO • 03 — tl—- Ttt94-115-339933,322213 TAlf !W-IIMI4J«

DTO. TTTTX. PROPOSED SHELTER PLAN AT PF.RIYA KTNNTYA.

DESIGNED FT:

I.HB1K1) BY:

APPROVED BT:

st^uui* oe/i2/ax»

AS SHOT* CAD PTL&

Ko= CDMA-SHELTER-PERIYA KlNNIYA-0001