NU REG/ CR-5335 Prepared for Division of High-level Waste Management Office of Nuclear Material Safety and Safeguards Washington, DC 20555 NRC FIN D1016 1 U.S. Nuclear Regulatory Commission I NUREG/CR--5335 TI89 009562 Manuscript Completed: October 1988 Date Published: March 1989 Prepared by T. Brandshaug ltasca Consulting Group, Inc. Suite 210, 1313 5th Street SE Minneapolis, MN 55414 STER BBUTION OF 7%" DOCUMENT IS UNLIMITED

Upload: others

Post on 26-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

NU REG/ CR-5335

Prepared for Division of High-level Waste Management Office of Nuclear Material Safety and Safeguards

Washington, DC 20555 NRC FIN D1016

1 U.S. Nuclear Regulatory Commission

I

NUREG/CR--5335

TI89 009562

Manuscript Completed: October 1988 Date Published: March 1989

Prepared by T. Brandshaug

ltasca Consulting Group, Inc. Suite 210, 1313 5th Street SE Minneapolis, MN 55414

STER

BBUTION OF 7%" DOCUMENT IS UNLIMITED

Page 2: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

DISCLAIMER

This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, make any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

Page 3: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

Portions

DISCLAIMER

of this document may be illegible in eiectronic image products. Images are produced from the best available original document.

Page 4: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

iii

AB S TRAC T

This report presents the results of a numerical analysis to de- termine the stability of waste disposal rooms for vertical and horizontal emplacement during the period of waste retrieval. It is assumed that waste retrieval starts 50 years after the initial emplacement of the waste, and that access to and retrieval of the waste containers take place through the disposal rooms. It is further assumed that the disposal rooms are not backfilled. Con- vective cooling of the disposal rooms in preparation for waste retrieval is included in the analysis. Conditions and parameters used were taken from the Nevada Nuclear Waste Storage Investiga- tion ( " W S I ) Project Site Characterization Plan Conceptual Design Report (MacDougall et al., 1987).

Thermal results are presented which illustrate the heat transfer response of the rock adjacent to the disposal rooms. Mechanical results are presented which illustrate the predicted distribution of stress, joint slip, and room deformations for the period of time investigated.

Under the assumption that the host rock can be classified as "fair to good" using the Geomechanics Classification system (Bieniawski, 1974), only light ground support would appear to be necessary for the disposal rooms to remain stable.

Page 5: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI
Page 6: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

TABLE OF CONTENTS

PAGE

L I S T O F F I G U R E S . . . v i i

1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . 1

1.1 Background . . . . . . . . . . . . . . . . . . . 1.3 Scope . . . . . . . . . . . . . . . . . . . . . 1.2 Objective . . . . . . . . . . . . . . . . . . . 1

3 3

2.0 APPROACH . . . . . . . . . . . . . . . . . . . . . . 4

2.1 Assumptions and Idealizations . . . . . . . . . 2.2 Numerical Models . . . . . . . . . . . . . . . . 2.3 Conceptual Considerations . . . . . . . . . . .

4 7 9

3.0 MODEL INPUT PARAMETERS . . . . . . . . . . . . . . . 15

3.1 Material Properties . . . . . . . . . . . . . . 3.2 Waste Form Characteristics . . . . . . . . . . . 15

17

4.0 DISCUSSION OF RESULTS . . . . . . . . . . . . . . . . 18

4.1 Thermal Results . . . . . . . . . . . . . . . . 18

4.1.1 Vertical Emplacement . . . . . . . . . . 4.1.2 Horizontal Emplacement . . . . . . . . .

4.2 Mechanical R e s u l t s . . . . . . . . . . . . . . .

18 25

32

4.2.1 Vertical Emplacement . . . . . . . . . . 4.2.2 Horizontal Emplacement . . . . . . . . . . 32

38

5.0 SUMMARY AND CONCLUSIONS . . . . . . . . . . . . . . . 43

Page 7: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

~~

Vi

TABLE OF CONTENTS (cont hued)

PAGE

6.0 RECOMMENDATIONS FOR FUTURE STUDIES . . . . . . . . . 45

7.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . 46

APPENDIX A: DETERMINATION OF THE RADIUS OF THERMAL INFLUENCE

APPENDIY 3: DETERMINATION OF THE THERMAL LOADING

APPENDIX C: DETERMINATION OF CONVECTIVE HEAT TRANSFER COEFFICIENTS

APPENDIX D: FLAC INPUT FILES

Page 8: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

v i i

LIST OF FIGURES

PAGE - Fig. 1 Retrieval Time Frame for Design Purposes

[MacDougall et al., 19873 . . . . . . . . . . . . . 2 Fig. 2 Range of Thermal Influence at Waste Panel Center

After 50 Years. . . . . . . . . . . . . . . . . . . 5

Fig. 3 Mohr-Coulomb Failure Criterion for a Rock Matrix. . 7

Fig. 4 Mohr-Coulomb Failure Criterion for a Rock Joint . . 8

Fig. 5 Plan and Cross-Sectional Views of the Vertical Commingled SF and DHLW Emplacement Configuration [MacDougall et al., 1987, Chapter 41. . . . . . . . 10

Fig. 6 Plan and Cross-Sectional Views of the Horizontal Commingled SF and DHLW Emplacement Configuration [MacDougall et al., 1987, Chapter 41. . . . . . . . 11

Fig. 7 Conceptual Models of the Disposal Rooms for Vertical and Horizontal Waste Emplacement . . . . . 13

Fig. 8 Waste Form Normalized Power Decay . . . . . . . . . 17

Fig. 9 Predicted Temperature Contours ("C) Around the Waste Disposal Room for Vertical Emplacement 1 Year After Initial Waste Emplacement. . . . . . . 19

Fig. 10 Predicted Temperature Contours (OC) Around the Waste Disposal Room for Vertical Emplacement 25 Years After Initial Waste Emplacement . . . . . 20

Fig. 11 Predicted Temperature Contours (OC) Around the Waste Disposal Room for Vertical Emplacement 50 Years After Initial Waste Emplacement . . . . . 21

Fig. 12 Predicted Temperature Histories in the Floor, Wall and Roof of the Waste Disposal Room for Vertical Emplacement . . . . . . . . . . . . . . . 22

Fig. 13 Predicted Temperature Profiles into the Pillar of the Waste Disposal Room for Vertical Emplacement. . . . . . . . . . . . . . . . . . . . 24

Page 9: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

v i i i

Fig. 14

Fig. 15

Fig. 16

Fig. 17

Fig. 18

Fig. 19

Fig. 20

Fig. 21

Fig. 22

Fig. 23

Fig. 24

Predicted Temperature Contours (" C) Around the Waste Disposal Room for Horizontal Emplacement

Predicted Temperature Contours (" C) Around the Waste Disposal Room for Horizontal Emplacement

Predicted Temperature Contours (" C) Around the Waste Disposal Room for Horizontal Emplacement

10 Years After Initial Waste Emplacement . . . . .

25 Years After Initial Waste Emplacement . . . . .

50 Years After Initial Waste Emplacement . . . . . Predicted Temperature Histories in the Floor, Wall and Roof of the Waste Disposal Room for Horizontal Emplacement . . . . . . . . . . . . . . Predicted Temperature Profiles in the Pillar of the Waste Disposal Room for Horizontal Emplace- ment Prior to Waste Retrieval. . . . . . . . . . . Predicted Temperature Profiles Into the Pillar of the Waste Disposal Room for Horizontal Emplacement During Waste Retrieval . . . . . . . . Predicted Slip Along Vertical Joints as a Result of Excavation of the Waste Disposal Room for Vertical Emplacement . . . . . . . . . . . . . Predicted Shear and Horizontal Stresses As a Result of Excavation of the Waste Disposal Room for Vertical Emplacement . . . . . . . . . . . . . Predicted Slip Along Vertical Joints Around the Waste Disposal Room for Vertical Emplacement at the Time of Waste Retrieval and After Waste Retrieval. . . . . . . . . . . . . . . . . . . . . Predicted History of the Roof to Floor Closure and Wall to Wall Closure of the Waste Disposal Room for Vertical Emplacement. . . . . . . . . . . Suggested Ground Support As a Function of Induced Stresses and Rock Mass Quality [after Hoek, 19791. . . . . . . . . . . . . . . . . . . .

PAGE -

26

27

28

29

30

31

33

34

35

36

37

Page 10: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

PAGE - Fig. 25 Predicted Slip Along Vertical Joints Around the

Waste Disposal Room for Horizontal Emplacement After Excavation and at the Time of Waste Retrieval. . . . . . . . . . . . . . . . . . . . . 39

Fig. 26 Predicted Slip Along Vertical Joints Around the Waste Disposal Room for Horizontal Emplacement After 120 Days of Ventilation. . . . . . . . . . . 40

Fig. 27 Predicted Shear and Horizontai Stresses As a Result of Excavation of the Waste Disposal Room for Horizontal Emplacement . . . . . . . . . . . . 41

Fig. 28 Predicted History of the Roof to Floor Closure and the Wall to Wall Closure of the Waste Disposal Room for Horizontal Emplacement . . . . . 42

Page 11: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

1.0 INTRODUCTION

This report addresses the subject of structural stability of dis- posal rooms in a geologic radioactive waste repository. This subject is important because of requirements to retrieve &ny of the emplaced waste if this should become necessary. In this re- port, it is assumed, strictly for the purpose of analysis, that waste retrieval will take place 50 years after initial waste em- placement, access to and retrieval of the waste will take place through the disposal rooms, and the disposal rooms are not back- filled prior to waste retrieval.

1.1 Background

The Nuclear Waste Policy Act of 1982 (NWPA) which mandates the development of repositories for disposal of high-level waste and spent nuclear fuel also requires the repository to be designed and constructed to permit the retrieval of any emplaced radioac- tive waste. Regulations concerning waste retrieval are also is- sued by the Nuclear Regulatory Commission (NRC) in 10 CFR 60, and by the Environmental Protection Agency (EPA) in 40 CFR 191.14(f). These regulations dictate specific requirements which affect re- pository design and performance objectives.

If access to and retrieval of the waste take place through the disposal rooms, the two most important elements in complying with the regulations are the unobstructed access to the waste con- tainer boreholes, and the unobstructed access to the waste con- tainers inside the boreholes. This means the disposal rooms and the container boreholes must remain structurally stable for the time period required to complete the retrieval process. This re- port addresses only the issue of room stability.

The candidate repository site is at Yucca Mountain, Nevada, where the repository horizon is proposed to be located in a densely welded tuff. The site is being evaluated by the Nevada Nuclear Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI project’s position paper on waste retrieval is given by Flores (1986) and concludes that the disposal rooms are likely to be stable, but may require a minimal amount of maintenance.

The Site Characterization Plan Conceptual Design Report for Yucca Mountain (MacDougall et al., 1987), subsequently referred to as the SCP-CDR, and the Consultation Draft Site Characterization Plan (U.S. DOE, 1988), subsequently referred to as the CD-SCP,

Page 12: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-2-

PERIOD OF RETRIEVABILITY

50 YR

outline a waste retrieval philosophy and provide a list of design criteria. The retrieval time frame considered in both these documents is shown in Fig. 1. The "retrievability period" is de- fined as "the time during which the ability to initiate retrieval will be maintained". This period is set to 50 years [U.S. DOE (1986), Appendix D]. The "retrieval period" is defined as "the time period required for removal of.the emplaced waste from the underground repository, if a decision to retrieve the waste is made". This period is set to 34 years (Flores, 1986).

ACTUAL RETRIEVAL

34 YR

FIRST WASTE EMPLACEMENT

Fig. 1 Retrieval Time Frame for Design Purposes [MacDougall et a l . , 19873

The results of the present study will contribute to the evalua- tion of compliance to some of the design criteria listed in the SCP-CDR and CD-SCP. These are:

0 The access and emplacement drifts will remain usable for at least 84 years.

The rock displacement in the drifts will be less than 0.152 m ( 6 in).

In the horizontal emplacement concept, the tempera- ture in the emplacement drifts will not exceed 5OoC for 50 years after waste emplacement.

In the horizontal emplacement concept, the minimum allowable radius of curvature for the horizontal axis of the borehole liner is 34 m (110 ft).

Page 13: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-3-

1.2 Objective

The objective of this report is to provide a document which, by example, may serve as a procedure to the type of numerical analy- ses that are helpful in evaluating the particular issue of sta- bility/instability of waste disposal rooms during the period of retrievability, and if necessary, the period of actual waste re- trieval. Access to and retrieval of the waste are assumed to take place through the disposal rooms.

1.3 Scope

The subject of room stability involves the evaluation of inelas- tic rock behavior such as the creation of new fractures in the intact rock caused by excessive shear stresses, and activities along pre-existing joints such as slip (caused by excessive shear stress along the joints) or opening (caused by tensile stresses across the joints or by a reduction in the compressive stresses). These activities may result from the excavation of the disposal rooms, the continuous heating of the rock because of the presence of the radioactive waste, and from the effects of forced ventila- tion which may be required to cool the rooms before entry for the purpose of inspection or waste retrieval if necessary.

The present study includes both vertical and horizontal waste em- placement concepts, meaning that single waste containers are placed in vertical boreholes along the disposal room floor, or that multiple waste containers are placed in long horizontal boreholes perpendicular to the room walls. The heat transfer as- sociated with the first 50 years (the retrievability period) of heating is predicted along with the induced thermal stresses, displacements, and inelastic rock behavior. At 50 years (the be- ginning of the retrieval period), forced convective cooling of the disposal room is initiated to prepare for the retrieval of any emplaced waste. For both the vertical and horizontal em- placement concepts, the convective cooling is continued for a time period sufficient to retrieve all the waste containers from one disposal room. Rock stresses, displacements, and inelastic behavior is also predicted during this period.

Page 14: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-4-

2.0 APPROACH

2.1 Assumptions and Idealizations

The effective use of numerical models to predict the thermal/me- chanical behavior of rock in the vicinity of a waste disposal room requires a number of assumptions and idealizations. Because the results of the numerical models may effect the repository de- sign, it is important that the assumptions and idealizations, if affecting the outcome of the model, contribute to conservative results. With respect to the heat transfer model, "higher" tem- peratures are conservative. With respect to the mechanical model, "higher" deviatoric stresses are conservative. In this study, assumptions and idealizations are such that "conserva- tive" or "worst case" conditions are reflected in the results.

The assumptions and idealizations are:

Instantaneous waste emplacement is used.

Emplacing all the waste instantly results in higher predicted temperatures throughout the rock than if sequential waste emplacement is performed. This is because more energy (in the form of heat generating waste) is immediately present to elevate the rock temperature.

The disposal room cross-section considered is at the center of a waste emplacement panel.

Choosing a cross-section of a disposal room at the center of a waste emplacement panel ensures that maximum temperatures will be predicted with minimum effect from the stand-off distance between emplace- ment panels (refer to Fig. 2). If the method sug- gested by St. John (1985) is applied to determine the radius of influence of a single waste container on rock temperatures as a function of time, it is found to be 164 m after approximately 50 years for the present problem (see Appendix A for this calcu- lation). This means the predicted rock temperatures are not likely to be affected by the panel stand-off distance in the present problem.

Page 15: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-5-

WASTE MAIN 21' DIAMETER

\ TUFF MAIN

'V DRIFTS

Fig. 2 Range of Thermal I n f l u e n c e a t Waste P a n e l Cen te r A f t e r 50 Years

Page 16: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-6-

Boiling of pore water is not included.

The welded tuff at the proposed repository horizon is expected to be about 80% saturated (MacDougall et al., 1987, Chapter 2). Therefore, when the rock temperatures reach 100°C, the pore water can be ex- pected to boil (assuming atmospheric boiling). If pore water boiling is not included in the model, the predicted rock temperatures will be conservative, because the energy that would have been expended in the phase change (liquid to vapor) is available to elevate the rock temperatures instead.

0 Waste retrieval takes place at the latest possible time.

To assume that waste retrieval will take place at the end of the retrievability period (i.e., 50 years after initial waste emplacement), allows the rock to be heated for a maximum amount of time. This re- sults in the highest possible rock temperatures relative to starting waste retrieval earlier.

Access to and retrieval of the nuclear waste will take place through the disposal rooms.

This assumption implies that a particular waste re- trieval scenario is used.

The disposal rooms are not backfilled prior to waste retrieval.

If the disposal rooms are backfilled, waste re- trieval would require the backfill to be removed to provide access to the waste containers. The effects of backfill are not considered in this study.

Being conservative in the predictions of the rock temperatures results (because of thermal expansion of the rock) in conserva- tive estimates of rock displacements and deviatoric stresses. In addition, when convective cooling of the disposal rooms begin, the largest possible thermal gradients will develop, bringing about the largest possible deviatoric stresses in the rock around the room periphery, and thus, the greatest potential for room in- stability.

Page 17: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

2.2 Numerical Models

The finite difference computer code FLAC [Fast Lagrangian Analy- sis of Continua, (ITASCA, 1988)] is used to simulate the thermal/ mechanical response of the rock. A plane strain model is used, and the rock is characterized as an elastic perfectly plastic ma- terial with ubiquitous vertical joints (planes of weakness). A Mohr-Coulomb failure criterion is used to determine if new frac- tures are created in the rock matrix (e.g., Brady and Brown, 1985). Figure 3 illustrates the Mohr-Coulomb failure criterion for the rock matrix for an arbitrary state of stress.

S H E A R S T R E S S (7)

A ROCK MATRIX

T

M F S = MATRIS FACTOR-OF-SAFETY = IF MFS 2 1 ( N O ROCK FRACTURING) IF MFS < 1 (POTENTIAL ROCK FRACTURING)

Fig. 3 Mohr-Coulomb Failure Criterion for a Rock Matrix

Page 18: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-8-

Slip or opening along the vertical planes of weakness is deter- mined by a Mohr-Coulomb criterion for joints [e.g., Goodman (1980)l. Figure 4 illustrates the Mohr-Coulomb criterion for the ubiquitous vertical joints. By allowing inelastic rock behavior to occur, the potential and extent of room instability may be evaluated.

SHEAR S T R E S S (7)

%;ION ANGLE

A

NOTE: JOINTS ARE VERTICAL 0, = NORMAL S T R E S S

7, = SHEAR S T R E S S ACROSS JOINT

B ALONG JOINT

-MOHR CIRCLE \ C NORMAL

0, 0 3 S T R E S S (D) * JFS = JOINT FACTOR-OF-SAFETY = IF JFS 2 1 ( N O JOINT SLIP) IFCJ, = TENSILE T H E N JFS = 0 (POTENTIAL JOINT OPENING)

Fig. 4 Mohr-Coulomb Failure Criterion for a Rock Joint

Page 19: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

The simultaneous mass and heat transfer (coupled convection/dif- fusion process) which occurs in forced ventilation of a waste disposal room is not included in FLAC. However, FLAC allows the use of convective boundaries by applying Newton's law of cooling (e.g., Pitts and Sissom, 1977). This requires the specification of a convective heat transfer coefficient and a temperature of the cooling "fluid", which in this case is air. Svalstad and Brandshaug (1981) compared the thermal response of a waste dis- posal room during forced ventilation, using separately, coupled convection/diffusion heat transfer and Newton's law af cooling. They found the thermal response to be similar when properly spe- cifying the heat transfer coefficient and the temperature of the ventilating air.

2.3 Conceptual Considerations

Emplacement of waste in vertical or horizontal boreholes are al- ternatives considered in the SCP-CDR for Yucca Mountain; there- fore, both concepts are included in this report. ,Figures 5 and 6 illustrate the vertical and the horizontal emplacement concepts, respectively.

Because two-dimensional models are used, the waste containers and emplacement boreholes cannot be modeled explicitly. Therefore, the discrete thermal power of the waste containers is distributed uniformly along the disposal room. In the case of vertical em- placement, this means the presence of a heat generating vertical plane along the axis of the room at the center of the floor. For the horizontal emplacement, the heat generating plane is horizon- tal along the axis of the room at the mid-height of both walls. The potential problem of room instability results from the com- pounded effect of heat transfer from individual waste containers at some distance. Because of the distance, the heat transfer ef- fect of the individual waste containers to the rock around the room will be damped. Therefore, the concept of using a heat gen- erating plane is an adequate idealization for both emplacement concepts.

Page 20: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-10-

SWIPLD PWO SHIELD P I

DEFENSE- - VFRTICAL FM PLACFMENT PLAN

OIHENYONS Swolm ARE EXCAWTED.

COMMINGLED WASTE VERTICAL EMPLACEMENT

!

I

Fig. 5 Plan and Cross-Sectional Views of the Vertical Commingled SF and DHLW Emplacement Configuration [MacDougall et al., 1987, Chapter 41

Page 21: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-11-

HORIZONTAL EMPLACEMENT DRIFT

3e.y

2. DETAILS BETK'EElri BOREHOLE AND CONTAINERS NO1 SHOWN.

Fig. 6 Plan and Cross-Sectional Views of the Horizontal Commingled SF and DHLW Emplacement Configuration [MacDougall et al., 1987, Chapter 41

Page 22: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-12-

The Areal Power DensiFy (APD), also called thermal loading (di- mensions used are W/m and kW/acre), may vary depending on the geometric scale of the numerical model being considered. On a far-field scale, which includes !he total repository area, the A P D being considered is 14.1 W/m (57 kW/acre) (Johnstone et al., 1984). On the scale of the present modfl (one waste emplacement panel), the APD is approximately 20 W/m (81 kW/acre) for the current layout of commingled SF and DHLW (MacDougall et al., 1987, Chapter 4). Because waste emplacement panel stand-off dis- tances are not included in the present model, the APD is higher than in the far-field model. Appendix B describes in detail the calculation used to determine the thermal loading for both the vertical and horizontal emplacement concepts.

Figure 7 illustrates the conceptual models of the vertical and horizontal waste emplacement. Because of symmetry, only one half of the disposal room and pillar needs to be included. The thermal boundary conditions are adiabatic. The two horizontal boundaries have been removed sufficiently far from the heat gen- erating waste to remain at the initial temperature of 26°C for the time period simulated.

The kinematic boundary conditions are also shown in Fig. 7, and are such that the two vertical boundaries are restricted from moving in the horizontal direction, while free to move in the vertical direction. The lower horizontal boundary is restricted from moving in the vertical direction, while free to move in the horizontal direction. The upper horizontal boundary is a free- to-move pressure boundary. The initial vertical and horizontal stresses applied to the models are -7 MPa and -3 .5 MPa, respec- tively (MacDougall et al., 1987, Chapter 2). Note, that com- pressive stresses are negative.

The following describes the sequence of events which are simu- lated, and explains some of the specifics related to the heat transfer in the disposal rooms.

Page 23: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-13-

Vertical Pressure = -7 M D a

_. A I

Y Y V " ' + t + V Y Adiabatic Boundary

Initial Conditions : Ti = 26OC = -3.5 MPa

Disposal Room 0, = -7 Mpa a ""I c 3 /

3.51 m Heat Generating SF and DHLW

a

300 m

.- a

Adiabatic Boundary ? + -

114 m G

(L+

Vertical Pressure = -7 MPa

Initial Condi1ions:Ti = 2s"C

Uxwr = -3.5 MPa

Disposal a, = -7 M P ~

.I

a

300 m

2.44 m

\ Heat Generating SF and DHLW

19.20 m

Fig. 7 Conceptual Models of the Disposal Rooms for Vertical and Horizontal Waste Emplacement

Page 24: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-14-

EXCAVATION OF THE DISPOSAL ROOM AT TIME = 0

Deformations and stresses are determined throughou rock.

INITIAL WASTE EMPLACEMENT AT TIME =

Heat transfer calculations start.

WASTE ISOLATION FROM 0 TO 50 YEARS

0

.he

The thermal/mechanical response of ,he rock is predicted, and results are recorded at selected times frequently enough to provide a perspective of the transient behavior of the temperatures and stresses in the rock. The dis- posal room is not ventilated during this period; there- fore, the heat transfer in the room is by thermal radia- tion, and some probably by free convection. FLAC does not include simulation of explicit thermal radiation; there- fore, to simulate some of these effects by conduction heat transfer, the material in the room is modeled (only with respect to heat transfer) as tuff from the repository hor- izon, except the thermal conductivity is increased from 2.29 W/m-K to 50 W/m-K.

WASTE RETRIEVAL FROM 50 YEARS TO 50 YEARS PLUS THE TIME REQUIRED TO RETRIEVE ALL THE WASTE FROM ONE DISPOSAL ROOM

The thermal/mechanical response of the rock is predicted during the period of forced convective cooling of the dis- posal room and the period of actual waste retrieval. It is only necessary to consider waste retrieval from one disposal room, because retrieval from subsequent rooms is identical. Forced ventilation to cool the disposal room starts at 50 years by applying Newton's law of cooling with the room periphery as a convective boundary. Deter- mination of the convective heat transfer coefficient used is shown in Appendix C. If 12 waste containers can be removed per day (MacDougall et al., 1987, Appendix L-2), it will take approximately 14 days to complete the waste retrieval of a disposal room for vertical emplacement, and about 65 days for horizontal emplacement. To be conserva- tive, the convective cooling of the disposal rooms is con- tinued for 120 days.

Page 25: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

3.0 MODEL INPUT PARAMETERS

3.1 Material Properties

The material properties used in the numerical models are taken from Chapter 2 of the SCP-CDR and are specific to the rock at the repository horizon (designated as thermal/mechanical unit TSw2 in the SCP-CDR, Chapter 2).

The mean value of the thermal properties and a range (where available) of one standard deviation from the mean are given in Table 1. Determination of the convective heat transfer coeffi- cient is shown in Appendix C.

Table 1

THERMAL PROPERTIES

[MacDougall et al., 19871

ROCK - PROPERTY

Thermal Conductivity (W/m-K) 2.29 f 0.17

Specific Heat Capacity (J/kg-K) 931

Convective Heat Tgansfer Coefficient (W/m -K)

--

Coefficient of Thermal Expansion (x E(-)

8.8

DISPOSAL ROOM

50.

931.

(a)

--

(a) Refer to Appendix C for the value of this parameter.

Page 26: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-16-

The mechanical properties of the rock mass are given in Table 2. The mean property value and a range (where available) of one standard deviation from the mean are given. Note, that only the mean values are used for the thermal and mechanical properties in these analyses.

Table 3-2

MECHANICAL PROPERTIES

[MacDougall et al., 19871

PROPERTY

Density (kg/m3)

Deformation Modulus (GPa)

Poisson ' s Ratio

Cohesion (MPa)

Angle of I n t e r n a l Friction (degrees)

Uniaxial Compressive Strength (MPa)

ROCK JOINTS

2320. -- 15.2 4 4.2 -- 0.22 4 0.05 -- 17.8 4 5.7 0 . 1 f 0.1

23 .5 4 0.15 28.4 (11 .8 to 3 8 . 7 ) *

-- 1 6 6 2 65

This is a range. *

Page 27: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-17-

3.2 Waste Form Characteristics

The initial power of a SF container at the time of emplacement may range from 2.3 kW to 3.4 kW (O'Brian, 1985). In this study, the initial power is set conservatively to 3.2 kW. The initial power of the DHLW container is chosen as 0.42 kW after Peters (1983).

The thermal decay characteristics of SF and DHLW are given by Peters (1983) for waste ten years out of the reactor:

Spent Fuel P(t) = 0.54 exp(ln(0.5)t/89.3) t 0.44 exp (In (0.5) t/12.8)

DHLW P(t) = 0.86 exp(ln(0.5)t/34.2) t 0.14 exp (In (0.5) 7/15.2)

where P(t) = normalized power, and

t = time in years.

The normalized power as a function of time, as described from the above equations as well as that given by Mansure (1985) for SF are shown in Fig. 8, As seen, the two approximations for SF are very similar.

Comparison of Power Decay Characteristics For Spent Fuel and Defense High Level Waste

1

0.9

0.7 o.8/

0.6+

0.1 t 04 4

0 10 20 30 40 50 60 70 80 90 100

Time (years)

+ Mansure (1 985)

8 Peters (1 983) - Peters

Fig. 8 Waste Form Normalized Power Decay

Page 28: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

4.0 DISCUSSION OF RESULTS

In preparation for waste retrieval, convective cooling of the disposal room is started 50 years after waste emplacement. In this study, it is assumed that waste retrieval will start when the disposal room floor temperature has decreased to less than 5OoC. To be conservative, the convective cooling of a disposal room (horizontal or vertical emplacement) continues during and beyond the period assumed to be necessary for retrieval of the waste. If twelve waste containers can be removed per day (MacDougall et al., 1987, Appendix L-2) , it will require about 14 days to completely remove the waste from a disposal room with vertical emplacement, and about 65 days for a room with horizon- tal emplacement. In the results that follow, the convective cooling of the disposal room has been continued for a period of 120 days.

4.1 Thermal Results

Rock temperatures are predicted at every nodal location through- out the time period simulated. Results are presented as tempera- ture contours and straight line temperature profiles at different times, and as temperature histories for specific locations. The initial temperature of the rock is 26OC.

4.1.1 Vertical Emplacement

Figures 9 to 11 show the predicted temperatures in the rock sur- rounding the waste containers and the disposal room. The temper- atures are illustrated as contours (isotherms) at 1, 25, and 50 years after waste emplacement. During this period, more and more of the rock is heated by the nuclear waste, and temperatures are increasing. Because of the short distance between the waste con- tainers and the disposal room, the temperature of the rock around the room starts to increase soon after waste emplacement. There is no ventilation of the disposal room until the end of 50 years. When ventilation is initiated, it has a dramatic effect on the room surface temperature as seen in Fig. 12. The immediate and substantial reduction of the temperature of the room floor, wall, and roof is consistent with the results obtained by Svalstad and Brandshaug (1981). The results in Fig. 12 are shown for ventila- tion air temperatures of 10°C and 20°C. Figure 12 also shows that the maximum temperature reached in the floor prior to venti- lation is 126OC.

Page 29: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-19-

LEGEND

Disposal Room For Vertical Waste

Emplacement

Time = 1 Y e u

Fig. 9 Predicted Temperature Contours ("C) Around the Waste Disposal Room f o r Vertical Emplacement 1 Year After Initial Waste Emplacement

Page 30: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-20-

LEGEND

Disposal Room For Vertical Waste

Emplacement

Time = 25 Yeara

Fig. 10 Predicted Temperature Contours ("C) Around the Waste Disposal Room for Vertical Emplacement 25 Years After Initial Waste Emplacement

Page 31: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-21-

LEGEND

Fig. 11 Predicted Temperature Contours ( O C ) Around the Waste Disposal Room for Vertical Emplacement 50 Years After Initial Waste Emplacement

Page 32: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-22-

50 Year Thermal History

Ventilation for 120 Days After 50 Years of Heahng

Air Temperature = 10 Deg. C

Temp (Celsius)

F i g .

( 0 I 0 20 40 60 m 100 9 2 0

Time (Days)

Ventilation for 120 Days After 50 Years of Heating

Air Temperature = 20 Dag. C

t

10 20 40 ea m 1w 120

Time (Days)

12 Predicted Temperature Histories Roof of the Waste Disposal Room ment .

in the F l o o r , Wall and f o r Vertical Emplace-

Page 33: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-23-

A different perspective of the predicted heat transfer in the rock is provided in Fig. 13, as temperatures along a horizontal straight line from the room wall into the pillar are shown at various times. It is obvious from Fig. 13 that high thermal gra- dients develop in the rock adjacent to the disposal room from the time when ventilation starts. The cool rock at the room surface and the high thermal gradients may result in a differential thermal contraction of the rock adjacent to the room. Therefore, the potential for falling rocks exists at the time of ventilation and waste retrieval.

Page 34: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-24-

Thermal Profiles Before Ventilalron

‘“T

(Celsius) #)

Temperature

“t . I I

Horizontal Distance Into the Pillar (m) 2 4 I I 10 12 14 16 16

Thermal Profiles After Ventilation

Air Temp = 10 Wrees

- + 5 Days - +20Oays

* +120Days

04 : : I

Horizontal Distance Into the Pillar (m) 0 2 4 6 I 10 12 14 18 18

Thermal Profiles After Ventilation

Air Temp - 20 Degrees

Temperature (Celsius)

04 I

Horizontal DiseanCe Into the Pillar (m) 0 P 4 I I 10 12 14 10 18

-.. +lDays - +2ODays

* +lMDays

Fig. 13 Predicted Temperature Profiles into the Pillar of the Waste Disposal Room for Vertical Emplacement

Page 35: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-25-

, 4 . 1 . 2 Horizontal Emplacement

For horizontal waste emplacement, the containers are located at much greater distance from the disposal room than for vertical emplacement. Because of the distance and the horizontal waste lay-out, more of the thermal energy diffuses in the vertical di- rection, and therefore, does not reach the disposal room. This results in lower temperatures of the rock around the disposal room than in the case of vertical emplacement.

Figures 14 to 16 illustrate the predicted temperatures as iso- therms in the rock around the disposal room after 10, 25, and 50 years (i.e., prior to the initiation of forced ventilation). Af- ter 50 years, a considerable region of rock has been heated be- cause of the presence of the waste. Figure 17 shows the pre- dicted thermal history of the disposal room floor, wall, and roof. The results indicate that the room surface temperature will exceed the maximum temperature criterion of 5OoC after 50 years, as listed in Chapter 2 of the SCP-CDR, and repeated in Chapter 1 of this report. However, the forced ventilation start- ing at 50 years substantially reduces the room surface rock temperature.

Temperatures are shown in Fig. 1 8 for various times up to 50 years along the horizontal straight line from the room wall into the pillar. The different curves illustrate the effect of the transient heat transfer.

Figure 19 shows the substantial thermal gradients in the rock around the room as a result of convective cooling for 120 days beyond 50 years. The results of ventilation air temperatures of 10 and 2OoC are included.

Page 36: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-26-

JOB TITLE I Rmdlctod T/U m o p -

FLAC Nerslon 2.032

LEGEND

Fig. 14 Predicted Temperature Contours ("C) Around the Waste Disposal Room for Horizontal Emplacement 10 Years After Initial Waste Emplacement

Page 37: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-27-

FLAC Nerdon 2-03)

LEGEND

L

Fig. 15 Predicted Temperature Contours (OC) Around the Waste Disposal Room for Horizontal Emplacement 25 Years After Initial Waste Emplacement

Page 38: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-28-

LEGEND

I

Fig. 16 Predicted Temperature Contours ("C) Around the Waste Disposal Room for Horizontal Emplacement 50 Years After Initial Waste Emplacement

Page 39: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-29- 50 Year Thermal History

Temperature (Celsius)

Time (Years)

Ventilation for 120 Days After 50 Years of Heating

Air Temperature = 10 Deg. C

"T

Temperature (Celsius)

-------- - -- ---- -- -----_ - - - - - - - - - -_ - - - - - - - - - - - - - - _ .-

20 'I 101

0 I

20 40 a0 80 100 120

T h e (Days)

Ventilation for 120 Days After 50 Years of Heating

Air Temperature = 20 Deg. C 70-

-------- --- - - - - - - - - - - --- ----- -------- - - - - - _ _

Disposal Room for Horizontal Waste Emplacement

20J 0

4 20 40 6a M lo0 120

Time (Days)

Fig. 17 Predicted Temperature Histories in the Floor , Wall and Roof of the Waste Disposal Room for Horizontal Emplace- ment

Page 40: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-30-

90

80

70

60 _ _ Temperature

(Celsius) 50

40

30

20

Thermal Profiles Before Ventilation

- Year0

+ Year 1

-c Year 10

8 Year30

-3t Year50

5 10 i 5 20 25 30

Horizontal Distance Into the Pillar (m)

Fig. 18 Predicted Temperature Profiles in the Pillar of the Waste Disposal Room for Horizontal Emplacement Prior to Waste Retrieval

Page 41: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-31-

Temperature (Celsius)

Temperature (Celsius)

Thermal Profiles After Ventilation

Air Temp = 10 Degrees

- Year50

+ + 5 Days - + 20 Days e + 60 Days i e + 120 Days

I 0 5 10 15 20 25 30

Horizontal Distance Into the Pillar (m)

Thermal Profiles After Ventilation

Air Temp = 20 Degrees

- Year50

+ +SDays - + 20 Days 8 + 60 Days +e + 120 Days

I 0 5 10 15 20 25 30

Horizontal Distance Into the Pillar (m)

Fig. 19 Predicted Temperature Profiles Into the Pillar of the Waste Disposal Room for Horizontal Emplacement During Waste Retrieval

Page 42: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-32-

4.2 Mechanical Results

Displacements, stresses, and joint slip are predicted in the me- chanical model. Results are presented, which show portions of the rock around the room where the vertical joints have slipped (failed in shear). Contours of predicted horizontal and shear stresses are shown, as well as the predicted roof to floor clo- sure and wall to wall closure.

4.2.1 Vertical Emplacement

The results of the mechanical model show that no new fractures are created in the rock around the disposal room as a result of room excavation or thermal expansion of the rock in the period following the emplacement of the waste. Figure 20 illustrates the predicted slip along pre-existing vertical joints as a result of room excavation. The slip is initiated because the shear stresses induced by excavating the room exceed the shear strength of the joints. Figure 2 1 illustrate the predicted shear and hor- izontal stresses in the rock as a result of excavation. Because the joints are vertical, these stresses are the same as the shear and normal stresses acting on the joints.

In Fig. 22, the predicted slip along the pre-existing vertical joints is shown after 50 years, and also after an additional 1 2 0 days of forced ventilation. There is very little additional joint slip induced as a result of the thermomechanical response of the rock for 50 years after room excavation and 120 days of forced ventilation beyond the 50 years. Using air of 10°C or 2OoC during ventilation has the same effect on the predicted joint slip.

The predicted 50 year history of roof to floor closure, and wall to wall closure are shown in Figure 23. Both the roof/floor and wall/wall close as a result of excavation. The deformations pre- dicted are very small, and far below the maximum amount of 0.152 m currently listed as a criterion in the SCP-CDR, Chapter 2.

Page 43: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-33-

LECENO

. . ..

..

..

. .

.. 0 -

0 . ... ... 0 .

0

Disposal Room For Vertical Waste

Emplacement

~i~~ = After Excavation

. .

Fig. 20 Predicted Slip Along Vertical Joints as a Result of Excavation of the Waste Disposal Room for Vertical Emplacement

Page 44: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

LECENO

- 0 Y O

LECENO

-34-

L1.l C . o r m 1 a v e t . C q l . oacn

Dispoaal Room For Vertical Waste

Emplacement

HORIZONTAL STRESS K Dimpoarl Room

For Vertical Iaate

STRESS

F i g . 2 1 Predicted Shea r and H o r i z o n t a l Stresses As a R e s u l t of Excava t ion of the Waste D i s p o s a l Room for Vert ica l Emplacement

Page 45: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

LECENO

DI8po8al Room For Vertical Wamte

Emplacement

Time = 50 Years

LEGEND j!. 1 . .. . -

.. .

.. .

.. .

.. . I . .. . ... . .. . .. ..

Di8po8al Room For Vertical wa8te

Emplacement

Time = 50 Years and 120 Day8

Fig. 22 Predicted Slip Along Vertical Joints Around the Waste Disposal Room for Vertical Emplacement at the Time of Waste Retrieval and After Waste Retrieval

Page 46: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-0.002

-0.003

-0.004

Closure -0.005 (m)

-0.006

-0.007

4.008

Fig. 23

Page 47: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-37-

Poor Fair ExcaptionallY Extremely VUY poor poor poor

As forced ventilation is initiated, the temperatures of the room surface rock decrease, resulting in thermal contraction of the rock. Depending on the system of rock fractures around the room, this effect may cause individual blocks of rock to become un- stable. The kinematics of individual blocks of rock is not in- cluded in the mechanical model; thus, this phenomenon is not pre- dicted in this study.

I

Good

Joint movement may not result in room instability, however, it does result in the potential of such an event. Because most of the joint slip results from the effect of excavation, the chart in Fig. 24 (after Hoek, 1979) can be used to approximate the re- quired ground support for the disposal rooms. When applied to the vertical emplacement rooms, assuming that the quality of the rock can be classified as "fair to good" according to the Geome- chanics Classification system (Bieniawski, 1974), only light ground support such as rockbolts, wire mesh, or shotcrete is es- timated to be required to maintain room stability.

0 '

0.1

0.2

0.3

0.4

0.5

OB

0.7

0.8 .- c. 2 0.9

0.001 0.01 0.1 1 .o 4 10 40 100

Elaic theory not JpplkJble in this am in which stability is controlled

weak rock bv StWCNrJl fe3tura J n d h Mly

- - - - - - -

Possible - rockbum aonditions

- i i o io i o do c €h i o i o 90 loo

I

Fig. 24 Suggested Ground Support As a Function of Induced Stresses and Rock Mass Quality [after Hoek, 19791

Page 48: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-38-

4.2.2 Horizontal Emplacement

The results of the mechanical model show that no new fractures are created in the rock around the disposal room for horizontally emplaced waste as a result of room excavation or rock thermal ex- pansion in the period following the emplacement of the waste. However, slip is predicted along the pre-existing vertical joints. Figure 25 illustrates the predicted joint slip as a re- sult of room excavation (at time = o ) , and 50 years after initial waste emplacement. The amount of joint slip predicted is about the same as for the disposal room with vertically emplaced waste. There is very little additional joint slip induced as a result of 50 years of thermomechanical rock response.

Figure 26 illustrates the predicted joint slip after 120 days of ventilation for air temperatures of 10°C and 2OoC. Very little additional joint slip results from the effect of ventilation.

Figure 27 illustrates the predicted shear and horizontal stresses in the rock after excavation. Because the joints are vertical, these stresses are the same as the shear and normal stresses that act on the joints.

The predicted closure history between the roof and floor as well as that of the walls is illustrated in Fig. 28. The deformations predicted are very small, and below the maximum amount of 0.152 m currently listed as a criterion in the SCP-CDR, Chapter 2.

Assuming that the quality of the rock can be classified as "fair to good" according to the Geomechanics Classification system (Bieniawski, 1 9 7 4 ) , the chart in Fig. 24 (after Hoek, 1979) can be used to estimate the required ground support. the rooms for horizontal waste emplacement, only light ground support such as rockbolts, wire mesh, or shotcrete is likely to be required to maintain room stability.

When applied to

Page 49: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

LEGEND

Disposal Room For Horizontal Waste

Emplacement

Time = After Excavation

. . . . . . . . . . . . .

LEGENO 1:. Disposal Room For Horizontal Waste

Emplacement

Time = 50 Years

3 . . : . . . . .

. . . .

. . . .

Fig. 25 Predicted Slip Along Vertical Joints Around the Waste Disposal Room for Horizontal Emplacement After Exca- vation and at the Time of Waste Retrieval

Page 50: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

LEGEND

a m m d w y p8.t - 0 w o

!!

. . . . . . i- . .

Disposal Room For Horizontal Waste

Emplacement

Time = 50 Years and

Ventilation Air Temperature = 10°C

120 Days

I. * . . . . . I . . .

. . . .

LEGEND .-

- ?I- - 0 Y O

Disposal Room For Horizontal Waste

Emplacement

Time = 50 Years and 120 Days I

I - . . Ventilation Air

Temperature = 2OoC

. . . . . . . . . . . . .

Fig. 26 Predicted Slip Along Vertical Joints Around the Waste Disposal Room for Horizontal Emplacement After 120 Days of Ventilation

Page 51: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

LECENO I Q

HORIZONTAL I,

Fig. 27 Predicted Shear and Horizontal Stresses As a Result of Excavation of the Waste Disposal Room for Horizontal Emplacement

Page 52: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-42-

CLOSURE HISTORY Disposal Room for

Horizontal Emplacement

h -o*0021 -0.003 \ -0.004

Closure (m) -0.005

-0.006

-0.008 1 0 10 20 30 40

Time (Years)

- Roof to Floor + Wall to Wall

50 60

Fig. 28 Predicted History of the Roof to Floor Closure and the Wall to Wall Closure of the Waste Disposal Room for Horizontal Emplacement

Page 53: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-43-

5.0 SUMMARY AND CONCLUSIONS

The response of the rock to the excavation of the disposal rooms, heating by the nuclear waste, and cooling by forced ventilation has been investigated, considering separately vertical and hori- zontal emplacement of the waste. The focus of the analyses has been toward effects that may compromise the structural stability of the rooms. Because two-dimensional models were used, the sta- bility of individual container boreholes could not be investi- gated. The effects of particular interest, therefore, have been the predictions of any inelastic behavior of the rock around the disposal room, such as the creation of new fractures from exces- sive shear stresses, and also slip or opening of pre-existing vertical joints.

From the results of the analyses a set of conclusions can be made which apply to both disposal rooms (i.e., vertical or horizontal waste emplacement) investigated, unless specifically stated oth- erwise.

No new fractures are created from excessive shear stresses in the rock around the disposal room as a result of room excavation, 50 years of thermomechan- ical rock response, or 120 days of convective cool- ing in preparation for waste retrieval. Fracturing may occur around the boreholes, but this could not be examined in this study.

Slip along pre-existing vertical joints in the rock is predicted around the disposal room as a result of room excavation.

Fifty (50) years of thermomechanical rock response has little effect on the development of joint slip beyond that predicted from room excavation alone.

Assuming that the rock can be classified as "fair to good" according to the Geomechanics Classification system (Bieniawski, 1974), only light ground support such as rockbolts, wire mesh, or shotcrete is esti- mated to be necessary to maintain rock stability.

Page 54: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-44-

Conclusions which relate specifically to some of the design criteria listed in the SCP-CDR, Chapter 2, can also be stated:

After 50 years, the maximum predicted rock surface temperature of the disposal room for horizontal waste emplacement is 6OoC, which exceeds the allow- able maximum of 5OoC according to the design cri- terion.

The maximum predicted deformation of the disposal room is of the order of 0.005 m, which is substan- tially below the maximum of 0.152 m, according to the design criterion.

The radius of curvature of the axis of the horizon- tal borehole is significantly larger than the mini- mum of 34 m allowed by the design criterion.

Note that all of the above conclusions reflect the current under- standing of the in-situ conditions, thermal and mechanical pro- perties, and structure of the rock at the proposed repository site as reported in the SCP-CDR. Should any of these parameters change, the results of this study will change, which may affect the conclusions. No attempt was made in this study to determine the effects of uncertainties in the parameters on the predicted thermal/mechanical rock response.

The input files used for FLAC in these analyses are included in Appendix D.

Page 55: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-45-

6.0 RECOMMENDATIONS FOR FUTURE STUDIES

In this study, the thermal/mechanical response of the rock was determined using an average set of input parameters. However, uncertainties are associated with the input parameters to the numerical model (e.g., thermal rock properties, mechanical rock properties, initial conditions). To provide for a repository de- sign that has a high probability of meeting the performance ob- jectives, it is necessary to understand what the effects of pa- rameter uncertainties are with respect to the thermal/mechanical response of the rock. Future studies, therefore, should include an assessment of the effect of these uncertainties on the rock response and ability to isolate the nuclear waste.

The current study characterizes the rock as a continuum. Al- though ubiquitous vertical joints are included, the presence of these joints is initiated only by a critical state of stress (i.e., a state of stress that exceeds the strength of the joints according to a Mohr-Coulomb criterion). Future studies should also include discontinuum models (e.g., Shi and Goodman, 1988; Cundall, 1980; Cundall, 1988; Williams et al., 1985), which are capable of explicitly characterizing the intact rock and the rock joints and, therefore, provide additional information that may help to resolve the issue of stability/instability of the rock around the disposal rooms.

Page 56: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-46-

7.0 REFERENCES

Bieniawski, 2. T. "Geomechanics Classification of Rock Masses and Its Application in Tunnelling," Proc. Third International Conqress on Rock Mechanics (Denver, 19741, Vol. 11A, pp. 27-32. Denver: ISM, 1974.

Brady, B.H.G., and E. T. Brown. Rock Mechanics for Underqround Mininq. London: George Allen & Unwin, 1985.

Cundall, P. A. "UDEC - A Generalized Distinct Element Program for Modelling Jointed Rock," Report PCAR-1-80, Peter Cundall Associ- ates; Contract DAJA37-79-C-0548, European Research Office, U.S. Army, March 1980.

Cundall, P. A. "Formulation of a Three-Dimensional Distinct Ele- ment Model - Part I: A Scheme to Detect and Represent Contacts in a System Composed of Many Polyhedral Blocks," Int. J. Rock Mech., Min. Sci. & Geomech. Abstr., 25, 107-116 (1988).

Flores, Richard J. "Retrievability: Strategy for Compliance Demonstration, SAND84-2242, January 1986.

Goodman, R. E. Introduction to Rock Mechanics. New York: John Wiley & Sons, 1980.

Hoek, Evert. "The Role of Modeling in the Design of Nuclear Waste Repositories - The Design Engineer's Viewpoint," Proceed- inqs of a Workshop on Thermomechanical Modelins for a Hardrock Waste Repository (June 19791, pp. 33-43. Berkeley: Lawrence Livermore Laboratory, 1979.

Itasca Consulting Group, Inc. FLAC (Fast Laqransian Analysis of Continua). Minneapolis: Itasca Consulting Group, 1988.

Johnstone, J. Keith, Ralph R. Peters, and Paul F. Gnirk. Unit Evaluation at Yucca Mountain, Nevada Test Site: Summarv Report and Evaluation. SAND83-0372. June 1984.

MacDougall, Hugh R., Leo W. Scully, and Joe R. Tillerson (Compil- ers). Site Characterization Plan Conceptual Desiqn Report. SAND84-2641. September 1987.

Page 57: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

-47-

Mansure, A. J. "Expected Temperatures for Spent Fuel Borehole Walls and Drifts," Memo to R. J. Flores, Sandia Keystone Memo 6310-85-8, April 15, 1985.

NWPA (Nuclear Waste Policy Act of 1982), Public Law 97-425, 96 Stat. 2201, 42 USC 10101, Washington, D.C., January 1983.

O'Brien, Paul D. "Reference Nuclear Waste Descriptions for a Geologic Repository at Yucca Mountain, Nevada, 'I SAND84-1848, Sep- tember 1985.

Peters, Ralph R. "Thermal Response to Emplacement of Nuclear Waste in Long, Horizontal Boreholes," SAND82-2497, April 1983.

Pitts, Donald R., and Leighton E. Sissom. Schaum's Outline of Theory and Problems of Heat Transfer. New York: McGraw-Hill Book Company, 1977,

Shi, G.-H. and R. E. Goodman. ''Discontinuous Deformation Analy- sis - A New Method for Computing Stress, Strain and Sliding of Block Systems," in Key Questions in Rock Mechanics: Proceedinss of the 29th U.S. Symposium (University of Minnesota, June 1988), pp. 381-393. Rotterdam: A. A. Balkema, 1988.

St. John, C. M. "Thermal Analysis of Spent Fuel Disposal in Ver- tical Emplacement Boreholes in a Welded Tuff Repository," SAND84- 7207, November 1985.

Svalstad, D. K. and T. Brandshaug. "Forced Ventilation Analysis of a Commercial High-Level Nuclear Waste Repository in Tuff," SAND81-7206, December 1981.

Williams, J. R., G. Hocking and G. G. W. Mustoe. "The Theoreti- cal Basis of the Discrete Element Method," Proceedinqs of the International Conference on Advances in Numerical Methods in Enqineerinq (University of Swansea, U.K., 1985).

U. S. Department of Energy (DOE). Consultation Draft Site Char- acterization Plan Overview, Yucca Mountain Site, Nevada Research and Development Area, Nevada. Nuclear Waste P o l i c y Act, Section 113. January 1988.

U. S. Department of Energy (DOE). "Generic Requirements for a Mined Geologic Disposal System, Appendix D, 'Department of Energy Position on Retrievability and Retrieval for a Geologic Reposi- tory," OGR/B-2, DOE/RW-0090, Office of Civilian Radioactive Waste Management, Washington, D.C., September 1986.

Page 58: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI
Page 59: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

APPENDIX A

DETERMINATION OF THE RADIUS OF THERMAL INFLUENCE

S t . John (1985) examined t h e r a d i u s of thermal i n f l u e n c e o f a s i n g l e waste c o n t a i n e r as a f u n c t i o n of t i m e , s o t h a t t h e s i z e of the area r e q u i r e d i n a model c o u l d be de te rmined . The e q u a t i o n f o r t e m p e r a t u r e change a t a d i s t a n c e , R, from a d e c a y i n g p o i n t s o u r c e of i n i t i a l s t r e n g t h Qo i s g i v e n by ( C h r i s t i a n s o n , 1 9 7 9 ) :

where A = decay c o n s t a n t ,

K = t h e r m a l d i f f u s i v i t y ,

t = t i m e , and

w ( z ) = complex e r r o r f u n c t i o n .

It i s s e e n t h a t t he t e m p e r a t u r e change decays from the p o i n t s o u r c e approx ima te ly p r o p o r t i o n a l t o

St. John (1985) s u g g e s t s t h a t R 2 / 4 K t = 4 i s s u f f i c i e n t t o e n s u r e a small t e m p e r a t u r e change. T h i s r e q u i r e s t h a t

where t is t i m e i n y e a r s .

Apply ing Equa t ion A-2 t o t he p r e s e n t problem f o r a t i m ? p e r i o d of 5 0 years, and a thermal d i f f u s i v i t y of t u f f o f 3 3 . 4 4 m /year, the r a d i u s o f thermal i n f l u e n c e , R, i s de te rmined t o be approx ima te ly 164 m.

Page 60: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

A-2

REFERENCE

Christianson, Mark. TEMP3D: A Computer Proqram for Determininq Temperatures Around Sinqle or Arrays of Constant or Decayinq Heat Sources-Users’ Guide and Manual. University of Minnesota Report to BWIP. December 1979.

St. John, C. M. “Thermal Analysis of Spent Fuel Disposal in Ver- tical Displacement Boreholes in a Welded Tuff Repository,” SAND84-7207, November 1985.

Page 61: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

APPENDIX B

DETERMINATION OF THE THERMAL LOADING

Figure B-1 illustrates the lay-out of the waste containers for vertical emplacement (MacDougall et al., 1987). The appropriate thermal loading at the center of the waste panel for times of 50 years or less can be determined from this figure. The shaded area in Fig. B-1 represents a unit area, over which the initial power of one half SF and one half! DHLW container should be aver- aged. The shaded area is 87.8 m . With an initial power of 3200 W per SF container and loading is determined to be 20.6 W/m or 83.3 kW/acre.

420 W per DHpW container, the thermal

VERTICAL EMPLACEMENT PLAN

Fig. B-1 Layout of Waste Containers for Vertical Emplacement [after MacDougall et al., 1987, Chapter 4 1

Page 62: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

B-2

In Fig. B-2, the lay-out of the waste is shown for horizontal em- placement (MacDougall et al., 1987, Chapter 4 ) . The shaded area in the figure represents the unit area, over which the initial power of 28 SF and 182DHLW containers should be averaged. The shaded area is 4864 m . With an initial power of 3 2 0 0 W per SF container, and 420 W pe,r DHLW container, the thermal loading is determined to be 2 0 W/m or 80.8 kW/acre.

WASTE WIN 21’ DIAMETER

\ TUFF WAIN

DETAIL 1 OF HORIZONTAL EMPLACEMENT DIMENSIONS

SERVICE WAIN IS” X n ’ W

NO SPACE BETWEEN BOREHOLE ENDS

(SPACE SHOWN FOR ILLUSTRATION ONLY)

23’ D I M T E R PERIMETER DRIFT

-sf BozDaLEs u v BOREHaES

‘W DRIFTS

Fig. B-2 Layout of Waste Containers for Horizontal Emplacement [after MacDougall et al., 1987, Chapter 41

Page 63: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

B-3

REFERENCE

MacDougall, Hugh R., Leo W. Scully, and Joe R. Tillerson (Compil- ers). Site Characterization Plan Conceptual Desiqn Report. SAND84-2641. September 1987.

Page 64: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

APPENDIX C

DETERMINATION OF CONVECTIVE HEAT TRANSFER COEFFICIENTS

The convective heat transfer coefficient used to simulate forced ventilation of the disposal rooms is determined from the Sieder- Tate equation (Pitts and Sissom, 1977) :

N U = - - - 0.02 k (C-1)

where Nu = the average Nusselt number,

- h = the average convective heat transfer coefficient,

Dh = the hydraulic diameter of the disposal room,

k = thermal conductivity of the air,

Re = Reynolds number,

Pr = Prandtl number,

pb - - dynamic viscosity of the bulk air, and Ps - - dynamic viscosity of the air at the convective bound-

ary (the air is assumed to be 5OoC at the boundary)

Equation C-1 is valid for Re > 10,000 and 1/D > 60, where "1" is the length of the duct (in this case, the disposal room). The properties of air used are taken from Pitts and Sissom (1977), p. 314.

The Reynolds number, Re, for the disposal rooms is determined from

vDh Re = -

u

Page 65: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

c-2

where V = air velocity,

Dh = hydraulic diameter of the disposal rooms, and

1) = kinematic air viscosity.

Because the disposal rooms are not circular, the hydraulic diam- eter is determined from

4A Dh = -

P (C-3)

where A = the cross-sectional area of the disposal room, and

P = length of the room perimeter.

The hydraulic diameter, Dh, determined for the disposal rooms of vertical and horizontal waste emplacement (MacDougall et al., 1987, Chapter 4) are given in Table C-1.

Table C-1

HYDRAULIC DIAMETER

P Dh (m) (m)

Waste Emplacement Concept

Vertical

Horizontal

30.64 21.32 5.75

23.. 94 19.49 4.91

Reynolds number, Re, is determined from Eq. (C-2) . An air velo- city of 1 m/s is assumed, and two air temperatures, 10°C and 20°C, are considered.

Page 66: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

c-3

Table C-2

REYNOLDS NUMBER

Waste Emplacement V Dh 2) Re Concept (m/ S 1 (m) (m2/s)

Vertical Tair = 10°C

Vert i c a1 Tair = 20°C

Horizontal Tai, = 10°C

Horizontal Tair = 20°C

1. 5.75 1.36e-5 423,469

1.

1.

1.

5.75 1.48e-5 388,099

4.91 1.36e-5 361,029

4.91 1.48e-5 331,757

The Reynolds numbers listed in Table C-2 are all greater than 10,000 and, therefore, satisfy the conditions of Eq. (C-1). The second condition that must be satisfied to use Eq. (C-1) is 1/Dh > 60. The length, 1, of the disposal rooms are approxi- mately 400 m (MacDougall et al., 1987, Chapter 4). Table C-3 shows that this ratio is satisfied for the disposal rooms of vertical and horizontal waste emplacement.

Page 67: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

c-4

Table C-3

RATIO OF 1/D

Waste Emplacement Concept 1 Dh 1/Dh (m) (m)

Vert i ca 1

Horizontal

~~

400 5.75 70

400 4.91 81

The average Nusselt number and convective heat transfer coeffi- cient determined are listed in Table C-4.

Table C-4.

AVERAGE NUSSELT NUMBER AND CONVECTIVE HEAT TRANSFER COEFFICIENT

- h2 -

Nu (W/m -K) k Dh

- Re (W/m-K) (m) Pb Pr x10-*

Waste Emplacement Concept PS

Vert i cal Tair = 10°C 0.99 0.713 423,469 2.49 5.75 645 2.79

Vertical Tair = 20°C 0.99 0.710 388,099 2.57 5.75 601 2.68

Horizontal Tair = 10°C 0.99 0.713 361,029 2.49 4.91 568 2.88

Horizontal Tair = 20°C 0.99 0.710 331,757 2.57 4.91 530 2.78

Page 68: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

c-5

REFERENCE

MacDougall, Hugh R., Leo W. Scully, and Joe R. Tillerson (Compil- ers). Site Characterization Plan Conceptual Desiqn Report. SAND84-2641. September 1987.

Pitts, Donald R., and Leighton E. Sissom. Schaum’s Outline of Theorv and Problems of Heat Transfer. New York: McGraw-Hill Book Company, 1977,

Page 69: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

APPENDIX D

FLAC INPUT FILES

D-1. FLAC INPUT FILE FOR VERTICAL EMPLACEMENT

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * * T H E R M A L / M E C H A N I C A L A N A L Y S I S *

* Input f i l e t o FLAC f o r determining t h e e f f e c t of v e n t i l a t i o n * * (Blast Cooling) on d i s p o s a l room s t a b i l i t y dur ing waste r e t r i e v a l . * * Vert ical emplacement scheme ... * * NRC Contract 02-85-002, Task O r d e r No. 006. *

* *

* * f********************************************************************** * GR 13,40 MOD UBIQUITOUS ; (ub iqu i tous rock j o i n t model) THMOD I S 0 ; ( i s o t r o p i c thermal model)

*--- CONSTRUCT THE FINITE DIFFERENCE MESH BY VARIOUS *--- GEOMETRIC ADJUSTMENTS GEN 0.,-150. 0.,150. 19.2,150. 19.2,-150. GEN O . , O . 0.,6.71 2.44,6.71 2.44,O. I-1,6 J=20,28 GEN 2.44,O. 2.44,6.71 19.2,6.71 19.2,O. R 1.5,l. I=6,14 J=20128

*--- The borehole above t h e waste con ta ine r ... GEN 0 . I -3.1 0. I 0 . .37, 0. .37, -3.1 1 ~ 1 ~ 2 J=15,20 *--- To t h e r i g h t of borehole and under f l o o r ... GEN .37,-3.1 .37,0. 2.44,O. 2.44,-3.1 I=2,6 5 ~ 1 5 ~ 2 0 *--- The container i n s i d e t h e borehole ... GEN 0.,-7.62 0.,-3.1 .37,-3.1 .37,-7.62 I=1,2 J=10115 *--e T o t h e r i g h t of t h e con ta ine r and under f l o o r ...... GEN .37,-7.62 .37,-3.1 2.44,-3.1 2.44,-7.62 I=2,6 J=10,15 *--- To t h e r i g h t of borehole and under p i l l a r ... GEN 2.44,-3.10 2.44,O. 19.2,o. 19.2,-3.1 R 1.5,l. I=6,14 J=15,20 GEN 2.44,-7.62 2.44,-3.1 19.2,-3.1 19.2,-7.62 R 1.5,1. 1 ~ 6 ~ 1 4 J=10115 *--- Below the con ta ine r and under p i l la r ... GEN 0. I -30. o., -7.62 2.44,-7.62 2.44, -30. R 1. I .67 I=l, 6 J=5,10 GEN 2.44, -30. 2.44,-7.62 19.2,-7.62 19.2,-30. R 1.5, .67 I=6,14 J=5,10 GEN 0.,-150. 0.,-30. 19.2,-30. 19.2,-150. R 1.,.80 I=1,14 J51r5 *--, Adjus t ing t h e lower p a r t of mesh t o achieve better

*

*

Page 70: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2

* element aspect ratios ... GEN R 1 . 2 , l . 1=1114 J=5 GEN R 1.05'1. I=1 ,14 J=4 GEN R l .Il. I - l I 8 J=6 *--- Adjusting the mesh above the disposal room ... GEN 0 . , 7 . O., 30. 2 .44 '30. 2 .44 '7 . R 1. I 1 . 7 1x1 '6 J=29,35 GEN 2 .44 ,7 . 2 .44 '30. 19 .2 ,30 19 .2 ,7 . R 1.5 1 . 7 1=6114 J=2g135 *--- Adjusting the mesh to the top of the model ... GEN 0. I 30 . 0 . , 150 . 19 .2 ,150 . 19 .2 ,30 . R 1. ,1.3 I=l, 1 4 J=351 4 1 GEN R 1.3'1. I=1,14 5-35 GEN R 1.25'1. 1=1114 J=36 GEN R 1 . 2 , l . 1=1114 5-37 GEN R 1.1,l. 131'14 5-38

*--- Constructing the crown of the room by indiv. nodal adjustments ... I N 1 X=2.44 1-6 J=26 I N 1 Y=5.22 I=6 5-26 I N 1 X-2.30 I=6 J=27 I N 1 Y=5.50 136 J=27 I N 1 X=2.10 I16~J-28 I N 1 Y-5.90 I=6 J=28 I N 1 X=1.65 1-5 5=28 I N 1 Y=6.20 1-5 5-23 I N 1 X=1.30 I=4 J=28 I N 1 Y-6.40 I=4 J=28 I N 1 X = l . O O 1-3 5-28 I N 1 Y=6.55 1x3 J=28 I N 1 X=0.50 I=2 J=28 I N 1 Y=6.65 I=2 J=28 I N 1 X12.50 I=7 J=28 I N 1 Y=6.00 1=7 J=28 I N 1 Y=6.43 1-8 5-28 I N 1 Y=5.60 I=7 5-27 I N 1 Y = 5 . 1 5 I=7 J=26

*--- Second row of nodal points above crown ... I N 1 X=O .55 I=2 J=29 I N 1 Y=6.95 I=2 J=29 I N 1 Xxl.10 I=3 J=29 I N 1 Ye6.85 I=3 J=29 I N 1 X=1.45 I=4 5-29 I N 1 Yx6.70 114,J=29 I N 1 X = 1 . 7 5 I=5 J=29 I N 1 Y=6.55 I=5 J=29 I N 1 X=2.10 1 1 6 J7-29 I N 1 Y-6.35 I = 6 J=29 I N 1 X-2.50 I s 7 J=29 I N 1 Y=6.35 1=7 5-29

*

*

*

Page 71: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

*--- Third row of nodal points above crown ... IN1 Y=7.60 111 5-30 IN1 X=0.60 1-2 5-30 IN1 Y-7.55 1=2,5=30 IN1 X-1.15 1-3 J=30 IN1 Y37 .50 I=3,5-30 IN1 X=1.60 I=4 5-30 IN1 Yx7.40 1=4 5-30 IN1 X=2.00 1=5 5-30 IN1 Ys7.30 I=5 J=30 IN1 X-2.40 1-6 5-30 IN1 Y27.20 I=6 5130 IN1 X-2.75 1-7 5-30 IN1 Y=7.30 I=7 5130

*--- Forth row of nodal points above crown ... GEN LINE 0.,8.6 2.78,8.3

*--- Some additional mesh adjustments ... GEN LINE 3.291,6.43 19.2,6.43

*--- ASSIGN MATERIAL PROPERTIES (REF: SCP-CDR CHAP. 2, SEC. 2.3.1) *--- USING THE JOINT PROPERTIES AND "ROCK MASS" PROPERTIES. *--- ALSO USING THE MOST RECENT RESULTS FROM DATA ANALYSIS, *--- TABLES 2-4, 2-6, AND 2-7. *--- THE ROCK IS CHARACTERIZED AS AN ELASTIC/PLASTIC MATERIAL *--- WITH UBIQUITOUS JOINTS. A MOHR-COULOMB FAILURE CRITERION *--- IS USED FOR BOTH THE INTACT ROCK AND THE JOINTS ...

*

*

*

* *--- Rock Mass: PROP SHEAR=6.23E3 BULK=9.O5E3 COH-17.8 ;(ma) PROP DENS=2320. ;(kg/m"3) PROP FRIC-2 3.5 ; (degrees 1

*--- Rock Joints: PROP JCOH-0 -1 ; (ma) PROP JFRIC=28.4 JANG=9O. ;(degrees)

*

* *--- THERMAL PROPERTIES OF THE ROCK ... * (Ref: SCP-CDR Chap. 2, Sec. 2.3.1.9, Table 2-9) PROP CON-2.29 ; (W/mK) PROP SPE=931. ; (J/kgK) PROP THEX-8.83-6 ; (1/K) *

Page 72: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-4

*--- SET KINEMATIC BOUNDARY CONDITIONS ... * (The two vertical boundaries are symmetry planes, thus, * they are restricted from moving in the horizontal (x) * direction. The bottom horizontal boundary is restricted * from moving in the vertical (y) direction. The top * horizontal boundary is a free-to-move pressure boundary. * * initial vertical stress.) FIX Y I=l,14 J=1 FIX X 1-1 J=1,41 FIX X 1=14 J=1,41

*--- DEFINE THE INITIAL STRESS FIELD (MPa) ... * (The initial vertical stress is about -7 MPa at * the disposal room horizon. The horizontal Stress * is determined as 0.5 x SYY.) IN1 SXX=-3.5 ; (ma) IN1 SYY=-7.0 ; (MPa) APPLY PRES=7 . O I=1,14 J=41 ; (MPa)

The pressure is acting downward, and is equal to the

*

*--- REFERENCE: SCP-CDR CHAP. 2, SEC. 2.3.1.9

* *--- SET THE INITIAL TEMPERATURE TO 26 DEG. CELSIUS ... IN1 TEMP=26. ;(Degree Celsius)

*--- SET THERMAL BOUNDARY CONDITIONS ... *--- THE BOUNDARIES ARE BY DEFAULT ADIABATIC (thermally insulated)

*

* *--- SET THE CRITERIA FOR AUTOMATIC TERMINATION OF EXECUTION ... SET F-1E-2 ;Out-of-balance force (Mega Newton) SET CLOCK-120 ;Maximum execution time (minutes) SET STEP~SOOO ;Maximum number of time steps * *--- EXCAVATE THE DISPOSAL ROOM (save results) ... MOD NULL 1-1,s J=20,27 TIT

SOLVE SAVE NRCV-MO.SAV

*--- THERMAL PROPERTIES OF THE DISPOSAL ROOM FROM 0 TO 50 YEARS.

Time is After Initial Excavation, Vert. Empl. (NRC-F)

*

* * the element size and associated thermal diffusivity. Using * air in the disposal room with an "equivalent" conductivity * results in a maximum time step of insufficient length to * complete the analysis within a reasonable time period. * Therefore, the room is given thermal properties of TSw2 tuff, * but with the thermal conductivity increased about 22 times * to 50 W/mK.

(The maximum thermal time step in FLAC is determined from

The size of the room elements are also increased. *

Page 73: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-5

*--- CHANGE THE ELEMENT SIZES IN THE ROOM SO THAT AS LARGE A TIME STEP *--- AS POSSIBLE MAY BE USED ... * (This is done by r e s t o r i n g a thermal region i n t h e room, and * * region t o f i t t h e e n t i r e room.)

THMOD IS0 I=2,3 J=24,26

*--- Fit t h e r e s t o r e d thermal region t o t h e e n t i r e room ... GEN O . , O . 0.,6.71 1.65,6.2 2.44,o. I=2,4 5=24,27

surrounding it by n u l l zones, and then "s t re tch ing" t h e thermal

*

*

*

IN1 X-1.0 Y=6.55 1-3 5-27 IN1 X=2.44 Y-5.22 I=4 J=26 IN1 X=2.44 Y-2.516 1-4 5-25 IN1 X=1.405 Y=O.O 1-3 5-24 IN1 X-2.250 Y=5.456 1-6 J=27 IN1 X-0.5 Y-6.63 1-2 5-28 IN1 X-1.325 Y-6.375 1-4 J=28 IN1 X=2.045 Y=5.71 1-6 5128

*--- Assign thermal p r o p e r t i e s t o t h e

PROP CON-50. 1=11 5 J=20,27 ; (W/mK) PROP SPE=931. I=1,5 J=20127 ; (J/kgK) PROP DENS=2320. 1 ~ 1 ~ 5 J=20,27 ;(kg/m^ PROP THEX=O. I=1,5 J=20,27 ; (l/K)

*

*

*

r e s t o r e d thermal region ...

*--- DEFINE INTBRFACE BETWEEN THE THERMAL REGION AND THE *--- DISPOSAL ROOM SURFACE ... INTER 1 ASIDE 1,20 2,20 3,20 4,20 5,20 6,20 6,21 6,22 6,23 6,24 INTER 1 ASIDE 6,25 6,26 6,27 6,28 5,28 4,28 3,28 2,28 1,28 INTER 1 BSIDE 2,27 3,27 4,27 4,26 4,25 4,24 3,24 2,24

*--- Assign p r o p e r t i e s t o t h e i n t e r f a c e ... * (Make s u r e t h e s t i f f n e s s p r o p e r t i e s a r e small s o t h a t * no i n t e r a c t i o n with t h e mechanical behavior of t h e * room occurs . Also make s u r e s t r e n g t h p r o p e r t i e s * are h igh so t h a t no f a i l u r e occurs . )

*

*

* INTER 1 KS=l.E-6 KN=l.E-6 TB=1.E2 COH=l.E2 FRICz45. GLUED * *--- ASSIGN THE DECAYING HEAT SOURCE WHICH SIMULATES THE *--- COMMINGLED SF AND DHLW ...

Page 74: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D- 6

* (The thermal decay characteristics are from Peters, 1983, * SAND-2497. The initial heat generating power per meter * of room length is 792 W. Because of symmetry only half * * have dimension l/sec and not l/year, which is commonly * used in the literature ... THAPP FLUX 41.8 -2.463-10 Is1 J=10,15 ;(SPENT FUEL FIRST TERM) THAPP FLUX 34.1 -1.723-9 Is1 J=10,15 ;(SPENT FUEL SECOND TERM) THAPP FLUX 8.8 -6.433-10 I=1 J=10,15 ;(DHLW FIRST TERM) THAPP FLUX 1.4 -1.453-9 1-1 J=10,15 ;(DHLW SECOND TERM)

*--- DEFINE NODAL POINTS FOR WHICH TEMP. HISTORIES ARE RECORDED ...

of this power is applied. Note that the decay coefficients

*

* THIS NSTEP=10 ;Record results every 10 time steps ... THIS TEMP I=1 J=20 ;Location at the f l o o r center ... THIS TEMP 1=6 5923 ;Location at the rib center ... THIS TEMP 1=1 J=28 ;Location at the crown center ... THIS TEMP 1=1 5-12 ;Location at the waste container center ... * *--- START THE HEAT TRANSFER SOLUTION USING THE EXPLICIT SCHEME ... THSOLVE CLOCK=6.e3 TEMP=5.E2 STEP=lOOOOO AGE=7

SET THDT=14400. ; Time step of 4 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=30 IMPLICIT ; 1 month

SET THDT=28800. ; Time step of 8 hrs. THSOLVE CLOCK=6.E3 TEMP=§.E2 STEP=lOOOOO AGE=6O IMPLICIT ; 2 months

SET THDT=43200. ; Time step of 12 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=365 IMPLICIT ; 1 year TIT

SAVE NRCV-Tl.SAV

*

*

*

Predicted temperatures after 1 year, Vert. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 1 YEAR OF HEATING ... SOLVE TIT

SAVE NRCV_Ml.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 2.5 YEARS ... SET THDT=64800. ; Time step of 18 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=912.5 IMPLICIT ; 2.5 years TIT

SAVE NRCV-TZ.SAV

Predicted T/M response after 1 year. Vert. Empl. (NRC-F)

*

Predicted temperatures after 2.5 years, Vert. Empl. (NRC-F)

*

Page 75: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

0-7

*--- PREDICT THE MECHANICAL RESPONSE OF 2.5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-Mz.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 5 YEARS ... SET THDT=86400. ; Time step of 24 hrs. THSOLVE CLOCK=G.E3 TEMP=S.E2 STEP=lOOOOO AGE-1825 IMPLICIT ; 5 years TIT

SAVE NRCV-TS.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-MS.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 7.5 YEARS ... SET THDT=86400. ; Time step of 24 hrs. THSOLVE CLOCK=G.E3 TEMP=S.E2 STEP=100000 AGE=2737.5 IMPLICIT ; 7.5 years TIT

SAVE NRCV-T7.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 7.5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-M’I.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 10 YEARS ... SET THDT=86400. ; Time step of 24 hrs. THSOLVE CLOCK=G.E3 TEMP=S.E2 STEP=100000 AGE=3650 IMPLICIT ; 10 years TIT

SAVE NRCV-TlO.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 10 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-MlO.SAV

Predicted T/M response after 2.5 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 5 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 5 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 7.5 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 7.5 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 10 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 10 years. Vert. Empl. (NRC-F)

*

Page 76: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-8

*--- CONTINUE HEAT TRANSFER SOLUTION TO 15 YEARS ... SET THDTx345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGEz5475 IMPLICIT ; 15 years TIT

SAVE NRCV-Tl5.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 15 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-Ml5.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 20 YEARS ... SET THDTz604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-7300 IMPLICIT ; 20 years TIT

SAVE NRCV-T20.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 20 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-M20.SAV

*,-- CONTINUE HEAT TRANSFER SOLUTION TO 25 YEARS ... SET THDT=604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE=9125 IMPLICIT ; 25 years TIT

SAVE NRCV-TZ5.SAV

Predicted temperatures after 15 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 15 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 20 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 20 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 25 years, Vert. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 25 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-US. SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 30 YEARS ... SET THDT=604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE=10950 IMPLICIT ; 30 years TIT

SAVE NRCV-T30.SAV

predicted T/M response after 25 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 30 years, Vert. Empl. (NRC-F)

*

Page 77: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

*--- PREDICT THE MECHANICAL RESPONSE OF 30 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-M30.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 35 YEARS ... SET THDT-604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE-12775 IMPLICIT ; 35 years TIT

SAVE NRCV-T3S.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 35 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-M35.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 40 YEARS ... SET THDTr604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=14600 IMPLICIT ; 40 years TIT

SAVE NRCV-T4O.SAV

Predicted T/M response after 30 years. Vert.. Empl. (NRC-F)

*

Predicted temperatures after 35 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 35 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 40 years, Vert. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 40 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-MIO.SAV

*-,- CONTINUE HEAT TRANSFER SOLUTION TO 45 YEARS ... SET THDT=604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=16425 IMPLICIT ; 45 years TIT

SAVE NRCV-T45.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 45 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-M45.SAV

Predicted T/M response after 40 years. Vert. Empl. (NRC-F)

*

Predicted temperatures after 45 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 45 years. Vert. Empl. (NRC-F)

*

Page 78: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-10

*--- CONTINUE HEAT TRANSFER SOLUTION TO 50 YEARS ... SET THDT-604800. ; Time step of 7 days ... THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=100000 AGE=18250 IMPLICIT ; 50 years TIT

SAVE NRCV-T50.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YEARS OF HEATING ... SOLVE TIT

SAVE NRCV-MSO.SAV

Predicted temperatures after 50 years, Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 years. V e r t . Empl. (NRC-F)

*

Page 79: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-11

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * * S T A R T C O N V E C T I V E C O O L I N G T O *

* P R E P A R E F O R W A S T E R E T R I E V A L * * *

* * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * *--- APPLY THE CONVECTIVE HEAT TRANSFER COEFFICIENT (h=2.68 W/mmK) *--- TO THE ROOM PERIPHERY, AND ASSIGN THE TEMPERATURE OF THE COOLING *--- AIR (20 degrees C) AT THE TIME OF WASTE RETRIEVAL (50 YEARS) ... THMOD NULL I=2,3 J=2 4,2 6 THAPP CONV 2.68 20. I=1,6 5-20 THAPP CONV 2.68 20. 1-6 J=20,28 THAPP CONV 2.68 20. I-1,6 5128

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE-18255 TIT

SAVE NRCV-TJ1.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 5 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M51.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=18260 TIT

SAVE NRCV-T52.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 10 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-MS2.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18270 TIT

SAVE NRCV-TS3.SAV

*

*

Predicted temperatures after 50 yrs & 5 ds. Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 5 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs 61 10 ds. Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 10 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 20 ds. Vert. Empl. (NRC-F)

*

Page 80: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-12

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 20 DAYS OF HEATING ... SOLVE TIT

SAVE NRCVmM53.SAV

THSOLVE CLOCK==6.E3 TEMP=5.E2 STEP=lOOOOO AGE-18290 TIT

SAVE NRCV-T5Q.SAV

Predicted T/M response after 50 yrs 20 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 y r s & 40 ds. Vert. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 40 DAYS OF HEATING ... SOLVE TIT

Predicted T/M response after 50 yrs 40 ds. Vert. Empl. (NRC-F) SAVE NRCVmM54.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=18310 TIT

SAVE NRCV-T55.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 60 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M55.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=100000 AGE=18330 TIT

SAVE NRCV-TS6.SAV

*-,, PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 80 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M56.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE=18350 TIT

SAVE NRCV-TS7.SAV

*

Predicted temperatures after 50 yrs C 60 ds. Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 60 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 80 ds. Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 80 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs 61 100 ds. Vert. Empl. (NRC-F)

*

Page 81: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-13

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 100 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M57.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE-18370 TIT

SAVE NRCV-T58.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 120 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M58.SAV

Predicted T/M response after 50 yrs 100 ds. Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 120 ds. Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 120 ds. Vert. Empl. (NRC-F)

* *

Page 82: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-14

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * * S T A R T C O N V E C T I V E C O O L I N G T O *

* P R E P A R E F O R W A S T E R E T R I E V A L *

* U S I N G A C O O L I N G A I R T E M P O F * * 1 0 D E G R E E S C E L S I U S *

* *

* *

* * * * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * *--- Restart the thermomechanical analysis performed up to 50 years ... res nrcv-m50.sav *

* * *--- APPLY THE CONVECTIVE HEAT TRANSFER COEFFICIENT (h-2.79 W/mmK) *e-- TO THE ROOM PERIPHERY, AND ASSIGN THE TEMPERATURE OF THE COOLING *--- AIR (10 degrees C) AT THE TIME OF WASTE RETRIEVAL (50 YEARS) ... *--- NOTE THAT THE CONVECTIVE HEAT TRANSFER COEFFICIENT IS DIFFERENT *--- FOR DIFFERENT TEMPERATURES OF THE COOLING AIR ... * THMOD NULL I=2,3 J=24,26 THAPP CONV 2.79 10. I=1,6 5-20 THAPP CONV 2.79 10. 1-6 J=20,28 THAPP C O W 2.79 10. I=1,6 5128

THSOLVE CLOCK-6.E3 TEMP=5.E2 STEP=lOOOOO AGE318255 TIT

SAVE NRCV-T61.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 5 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-MC1.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP-100000 AGE=18260 TIT

SAVE NRCV-T62 .SAV

*

Predicted temperatures after 50 yrs & 5 ds. 1 0 ° C Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 5 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 10 ds..lO°C Vert. Empl. (NRC-F)

*

Page 83: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 10 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M62.SAV

THSOLVE CLOCK=6.E3 TEMJ?=5.E2 STEP=100000 AGE-18270 TIT

SAVE NRCV-T63.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 20 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-MC3.SAV

THSOLVE CLOCK=C.E3 TEMP=5.E2 STEP-100000 AGE-18290 TIT

SAVE NRCV-T64.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 40 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M64.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18310 TIT

SAVE NRCV-T65.SAV

*--, PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 60 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-MC5.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=100000 AGE-18330 TIT

SAVE NRCV-TC6.SAV

Predicted T/M response after 50 yrs 10 ds. 10°C Vert. -1. (NRC-F)

*

Predicted temperatures after 50 yrs & 20 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 20 ds. 1 0 ° C Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 40 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 40 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 60 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 60 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 80 ds. 10°C Vert. Empl. (NRC-F)

*

D-15

Page 84: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-16

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 80 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M66.SAV

THSOLVE CLOCK=G.E3 TEMP=S.E2 STEP=lOOOOO AGE=18350 TIT

SAVE NRCV-T 67 . SAV *--- PREDICT THE MECHJ'NICAL RESPONSE OF 50 YRS & 100 DAYS OF HEATING ... SOLVE TIT

Predicted T/M response after 50 yrs 80 ds. 10°C Vert. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 100 ds. lo°C Vert. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 100 ds. lo°C Vert. Empl. (NRC-F) SAVE .,RCV-M67. SAV * THSOLVE CLOCK=G.E3 TEMP=S.E2 STEP=~ooooo AGE=18370 TIT

SAVE NRCV-T68.SAV Predicted temperatures after 50 yrs & 120 ds. lo°C Vert. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 120 DAYS OF HEATING ... SOLVE TIT

SAVE NRCV-M68.SAV Predicted T/M response after 50 yrs 120 ds. 10°C Vert. Empl. (NRC-F)

Page 85: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 FLAC I n p u t F i l e f o r H o r i z o n t a l Emplacement

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *

T H E R M A L / M E C H A N I C A L A N A L Y S I S *

I n p u t f i l e t o FLAC f o r d e t e r m i n i n g t h e e f f e c t o f v e n t i l a t i o n *

H o r i z o n t a l emplacement scheme ... * NRC C o n t r a c t 02-85-002, Task Order N o . 006. *

*

( B l a s t C o o l i n g ) on d i s p o s a l room s t a b i l i t y d u r i n g waste r e t r i e v a l . *

* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * GR 25 ,32 MOD UBIQUITOUS ; ( u b i q u i t o u s r o c k j o i n t model ) THMOD I S 0 ; ( i s o t r o p i c t h e r m a l model ) * *--- CONSTRUCT THE F I N I T E DIFFERENCE MESH BY VARIOUS *--- GEOMETRIC ADJUSTMENTS g e n 0 . , -150. 0 . , 150 . 1 1 4 . , 150 . 1 1 4 . , - 1 5 0 .

*--- G e n e r a t e t h e room r e g i o n ... g e n O . , O . 0 . ,2 . 1 1 4 . , 2 . 1 1 4 . , 0 . i = 1 , 2 6 j=15 ,19

*--- G e n e r a t e t h e r e g i o n 50 m above t h e room ... g e n 0.,2. 0.,50. 3.51,50. 3 . 5 1 , 2 . r . 9 , 1 . 4 i = 1 , 6 j=19,27

*--- G e n e r a t e t h e r e g i o n 50 m below t h e room ... gen O.,-50 O.,O. 3.51,O. 3.51,-50 r 0 .9 ,0 .65 i = 1 , 6 j=7 ,15

*--- G e n e r a t e t h e r e g i o n o f f t h e r o o f / w a l l c o r n e r ... g e n 3.51,2. 3.51,50. 17.5,50 17.5,2. r 1 . 5 , 1 . 4 i-6,12 j=19 ,27

*--- G e n e r a t e t h e d i s p o s a l room ... g e n O . , 0 . 0 . , 2 . 3 . 5 1 , 2 . 3.51,O. r 0 . 9 , l i = 1 , 6 j=15 ,19

* --- G e n e r a t e t h e r e g i o n o f f t h e w a l l / f l o o r c o r n e r ... gen 3 .51 , -50 . 3.51,O. 17.5,O. 17 .5 , -50 . r 1.5,.65 i = 6 , 1 2 j=7,15

*--- G e n e r a t e t h e r e g i o n n e x t t o t h e w a l l ... g e n 3.51,O. 3 . 5 1 , 2 . 1 7 . 5 , 2 . 17.5,O. R 1 .5 , l . I=6 ,12 J=15,19

*--- G e n e r a t e t h e r e g i o n above b o r e h o l e ... g e n 1 7 . 5 , 2 . 17.5,50. 32 .16 ,50 . 32 .16 ,2 . r 0 . 7 , 1 . 4 i = 1 2 , 1 5 j=19,27

*

*

*

*

*

*

*

*

*

Page 86: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

0-18

*--- Generate t h e region below borehole ... gen 17.5,-50. 17.5,O. 32.16,O. 32.16,-50. r 0 .7 ,0 .65 i=12 ,15 j=7 ,15

*--- Generate t h e region next t o borehole ... gen 17.5,O. 1 7 . 5 , 2 . 32 .16 ,2 . 32.16,O. r 0 . 7 , l . i=12 ,15 j=15,19

*--- Generate t h e region above borehole ... gen 32 .16 ,2 . 32.16,50. 44 .35 ,50 . 44 .35 ,2 . r 1 . , 1 .4 i=15,17 j=19,27

*--- Generate t h e region below borehole ... gen 32.16,-50 32.16,O. 44.35,O. 44.35,-50. r 1 . , 0 . 6 5 i=15,17 j-7,15

*--- Generate t h e region next t o borehole ... gen 32.16,O. 32 .16 ,2 . 44.35,2. 44.35,O. i=15 ,17 j=15,19

*--- Generate t h e region above borehole ... gen 44 .35 ,2 . 44.35,50. 92.51,50. 92.51,2. r 1 . , 1 . 4 i = 1 7 , 2 3 j=19,27

*--- Generate t h e region below borehole ... gen 44.35,-50 44.35,O. 92.51,O. 92.51,-50. r 1 . , 0 . 6 5 i=17 ,23 j=7 ,15

*--- Generate t h e region next t o borehole ... gen 44.35,O. 44.35,2. 92 .51 ,2 . 92.51,O. i=17 ,23 j=15,19

*--- genera te t h e region above borehole ... gen 92 .51 ,2 . 92.51,SO. 114 . ,50 . 114 . ,2 . r 1 . ,1 .4 i=23 ,26 j=19,27

*--- Generate the region below borehole ... gen 92.51,-50 92.51,O. 1 1 4 . , 0 . 114 . , -50. r 1 . , 0 .65 i=23, 26 j=7 ,15

*--- Generate t h e region next t o borehole ... gen 92.51,O. 92.51,2. 1 1 4 . , 2 . 114 . ,0 . i=23 ,26 j=15,19

*--- It appears there are more than s u f f i c i e n t elements i n t h e v e r t i c a l *--- d i r e c t i o n . Therefore, n u l l zones a r e introduced, and the remaining *--- m e s h "stretched" t o f i t ... mod n u l l i=1 ,25 j=30,32 mod n u l l i=1,25 j=1,3

*--- "Stretching" above the room ... gen 0 . ,50 . 0 . ,150. 10 . ,150 . 3 .51,50. r 1.,1.5 i = 1 , 6 j=27,30 gen 3 .51 ,50 . 10 . ,150 . 114 . ,150 . 114. ,50. r 1.1,1.5 i=6 ,26 j=27,30

*

*

*

*

*

*

*

*

*

*

*

*

*

*

*

Page 87: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

*--- Change some of the aspect ratios ... gen r 1.05,l. i=14,26 j-27 gen r l.,l. i-20,26 j=27

*--- "Stretching" below the room ... gen 0. , -150. 0. , -50. 3.51, -50. lo.,-150. r 1. , . 67 i=1,6 j=4,7 gen 10. ,-150. 3.51,-50. 114.,-50. 114.,-150. I: 1.1, .67 i=6,26 j=4,7

*--- Change some of the aspect ratios ... gen r 1.05,l. i-14,26 j-7 gen r l.,l. i=20126 j=7 *,-, Construct room by individual nodal adjustments ... * (First row of nodal points ... ) ini x-0. y-3.96 i-1 j=19 ini x-.85 y==3.772 i-2 j=19 ini xp1.63 p3.6 is3 j=19 ini x-2.323 y-3.01 1-4 j-19 ini x=2.948 y-2.478 i-5 j=19 * (Second row of nodal points . . . I ini x=O. y-4.4 i-1 j-20 ini x=.90 ~ ~ 4 . 2 0 i-2 j=20 ini x=1.70 y=4.0 i-3 j-20 ini x=2.40 y-3.40 i-4 j-20 ini x-3.05 ~32.90 i-5 j-20 ini x-3.70 ~32.40 i-6 j-20 * (Improve refinement . . . ) ini x-4.18 y-2.46 i-7 j-20 ini ~ ~ 5 . 1 9 y-2.57 i-8 j-20 ini x-6.71 y-2.74 i-9 j-20 ini x-8.98 y-3.01 i-10 j=20 * (Third row of nodal points ... ) ini x-0.00 y-5.40 i-1 j=21 ini ~ ~ 1 . 0 0 y-5.20 1-2 j=2l ini ~ ~ 1 . 8 0 yp5.00 i=3 j=21 ini x-2.50 y-4.40 i-4 j-21 ini x=3.15 y-3.90 i-5 j-21 ini xb3.80 y-3.40 i-6 j=21 * (Improve refinement . . . I ini x-4.18 y-3.49 i=7 j=21 ini x-5.19 y-3.72 i=8 j=21 ini x=6.71 y-4.06 i=9 j-21 ini x-8.98 y-4.58 1-10 j=21 * (Forth row of nodal points ... )

*

*

*

Page 88: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-20

ini x=O.OO y-7.4 i-1 j=22 ini x=1.00 y=7.20 i=2 j=22 ini ~5.1.80 y-7.00 i=3 j=22 ini x=2.50 ~16.40 i=4 j-22 ini x=3.15 y=5.90 i-5 j=22 ini x=3.80 y-5.40 i=6 j=22 * (Improve refinement ... ) ini x=4.18 y=5.52 i-7 j=22 ini x=5.19 y-5.83 i = 8 j-22 ini ~16.71 y-6.31 i=9 j=22 ini x=8.98 y-7.02 i=lO j=22 * (Fifth row of nodal points ...) ini x=1.00 y=11.70 i=2 j=23 ini x=1.80 y-11-50 i=3 j=23 ini x=2.50 y=10.90 i-4 j-23 ini x=3.15 y=10.40 i=5 j=23 ini x=3.90 y=9.90 1-6 j=23 * (Improve refinement . . . I ini x=4.18 y=9.97 i=7 j=23 ini x=5.19 yr10.21 i-8 j=23 ini x-6.71 y-10.57 i=9 j=23 ini x=8.98 y=11.10 i=10 j=23 * *--- ASSIGN MATERIAL PROPERTIES (REF: SCP-CDR CHAP. 2, SEC. 2.3.1) *--- USING THE JOINT PROPERTIES AND "ROCK MASS" PROPERTIES.

*--- TABLES 2-4, 2-6, AND 2-7. *--- THE ROCK IS CHARACTERIZED AS AN ELASTIC/PLASTIC MATERIAL *--- WITH UBIQUITOUS JOINTS. A MOHR-COULOMB FAILURE CRITERION *--- IS USED FOR BOTH THE INTACT ROCK AND THE JOINTS ...

*--- ALSO USING THE MOST RECENT RESULTS FROM DATA ANALYSIS,

* *--- Rock Mass: PROP SHEAR-6.23E3 BULK=9.05E3 COH=17.8 ;(MPa) PROP DENS=2320. ; (kg/mA3) PROP FRIC=23.5 ; (degrees)

*--- Rock Joints: PROP JCOH=O.1 ; (ma) PROP JFRIC=28.4 JANGI90. ;(degrees)

*--- THERMAL PROPERTIES OF THE ROCK ... * (Ref: SCP-CDR Chap. 2, Sec. 2.3.1.9, Table 2-91 PROP CON-2.29 ; (W/mK) PROP SPE=931. ; (J/kgK) PROP THEX=8.8E-6 ; (1/K)

*

*

*

Page 89: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 1

*--- SET KINEMATIC BOUNDARY CONDITIONS ... * (The two v e r t i c a l boundaries are symmetry planes, thus , * t hey are restricted from moving i n t h e ho r i zon ta l ( x ) * d i r e c t i o n . The bottom hor i zon ta l boundary is restricted * from moving i n t h e v e r t i c a l (y) d i r ec t ion . The t o p * h o r i z o n t a l boundary is a free-to-move pressure boundary. * The pressure i s ac t ing downward, and is equal t o t h e * i n i t i a l v e r t i c a l stress. Note t h a t t h e n u l l zones * * thus , u s i n g 4 t o 30 i n s t e a d of 1 t o 3 3 . )

FIX Y I=1,26 J=4 FIX X 111 J = 4 , 3 0 FIX X I=26 J=4,30

prev ious ly introduced a f f e c t s t h e s p e c i f i e d range of J,

*

* *--- DEFINE THE I N I T I A L STRESS FIELD (MPa) ... *--- REFERENCE: SCP-CDR CHAP. 2, SEC. 2.3.1.9 * (The i n i t i a l v e r t i c a l stress i s about -7 MPa a t * t h e disposal room horizon. The ho r i zon ta l stress * is determined a s 0.5 x SYY.) IN1 SXX=-3.5 ; (MPa) I N 1 SYY=-7.0 ; (ma) APPLY PRES=7.0 I=1,26 J=30 ; (ma) * *--- SET THE I N I T I A L TEMPERATURE TO 26 DEG. CELSIUS ... I N 1 TEMP=26. ; (Degree Ce l s ius )

*--- SET THERMAL BOUNDARY CONDITIONS ... *--- THE BOUNDARIES ARE BY DEFAULT ADIABATIC

*--- SET THE CRITERIA FOR AGTOMATIC TERMINATION OF EXECUTION ...

*

( thermally in su la t ed ) *

SET F=1E-2 ;Out-of-balance f o r c e (Mega Newton) SET CLOCK-120 ;Maximum execurion time (minutes) SET STEP=SOOO ;Maximum number of time steps

*--- EXCAVATE THE DISPOSAL ROOM (save r e s u l t s ) ... MOD NULL I=1,5 J=15,18 T I T

SOLVE SAVE NRCH-MO.SAV

*

T i m e is Af te r I n i t i a l Excavation, Hor iz . Empl . (NRC-F)

*

Page 90: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-22

*--- THERMAL PROPERTIES OF THE DISPOSAL ROOM FROM 0 TO 50 YEARS. * * the element size and associated thermal diffusivity. Using * air in the disposal room with an "equivalent" conductivity * results in a maximum time step of insufficient length to * complete the analysis within a reasonable time period. * Therefore, the room is given thermal properties of TSw2 tuff, * but with the thermal conductivity increased about 22 times * to 50 W/mK. The size of the room elements are also increased.

(The maximum thermal time step in FLAC is determined from

* *--- CHANGE THE ELEMENT SIZES IN THE ROOM SO THAT AS LARGE A TIME STEP *--- AS POSSIBLE MAY BE USED ... * (This is done by restoring a thermal region in the room, and * surrounding it by null zones, and then "stretching" the thermal * region to fit the entire room.) * THMOD IS0 I=2,3 J=17

*--- Fit the restored thermal region to the entire room ... ini x=O.OO y=O.OO i=2 j=17 ini x=O.OO y-3.96 i-2 j=18 ini ~ ~ 1 . 6 2 9 y-0.00 i-3 j=17 ini x=1.630 y=3.60 i-3 j-18 ini x=3.51 y-0.00 i=4 j=17 ini ~13.51 y-2.00 i=4 j=18

*--- Assign thermal properties to the restored thermal region ... PROP CONs50. I=2,3 5=17 ;(W/mK) PROP SPE=931. I=2,3 J=17 ;(J/kgK) PROP DENS=2320. I=2,3 5=17 ; (kg/mA3) PROP THEX-0. I=2,3 J=17 ; (l/K)

*--- DEFINE INTERFACES BETWEEN THE THERMAL REGION AND THE *--- DISPOSAL ROOM SURFACE ...

*

*

*

*

*

* INTER 1 ASIDE 1,15 2,15 3,15 4,15 5,15 6,15 6,16 6,17 6,18 6,19 INTER 1 ASIDE 5,19 4,19 3,19 2,19 1,19 INTER 1 BSIDE 2,18 3,18 4,18 4,17 3,17 2,17 *

Page 91: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 3

*--- Assign properties to the interfaces ... * (Make sure the stiffness and strength properties are * small so that no interaction with the mechanical behavior * of the room occurs.)

INTER 1 KS-l.E-6 K N ~ . E - ~ TB=O. COHsO. FRICzO. UNGLUED

*--- ASSIGN THE DECAYING HEAT SOURCE WHICH SIMULATES THE *--- COMMINGLED SF AND DHLW ... * (The thermal decay characteristics are from Peters, 1983, * SAND-2497. The initial heat generating power per meter * Because of symmetry only half * of this power is applied. Note that the decay coefficients * have dimension l/sec and not l/year, which is commonly * used in the literature ... THAPP FLUX 16.6 -2.463-10 I=17,26 J-17 ;(SPENT FUEL FIRST TERM) THAPP FLUX 13.5 -1.723-9 1 ~ 1 7 ~ 2 6 Ja17 ;(SPENT FUEL SECOND TERM) THAPP FLUX 2.5 -6.433-10 1=15,23 5-17 ;(DHLW FIRST TERM) THAPP FLUX 0.4 -1.453-9 1 ~ 1 5 ~ 2 3 J-17 ;(DHLW SECOND TERM)

*--- DEFINE NODAL POINTS FOR WHICH TEMP. HISTORIES ARE RECORDED ...

*

*

of room length is 792 W.

*

*

* THIS NSTEP=10 ;Record results every 10 time steps ... THIS TEMP 1=1 J=15 ;Location at the floor center ... THIS TEMP 1-6 J=17 ;Location at the rib center ... THIS TEMP 1=1 J-19 ;Location at the crown center ... THIS TEMP I=20 5117 ;Location at the borehole center ... * *--- START THE HEAT TRANSFER SOLUTION USING THE EXPLICIT SCHEME ... THSOLVE CLOCK=6.e3 TEMP=5.E2 STEP-100000 A G E 4

SET THDT=14400. ; Time step of 4 hrs. *

~ THSOLVE CLOCK=6.E3 TEMP-5.E2 STEP-100000 AGE-30 IMPLICIT ; 1 month * SET THDT128800. ; Time step of 8 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE-60 IMPLICIT ; 2 months

SET THDT=43200. ; Time step of 12 hrs. THSOLVE CLOCK=6.E3 TEMP-5.E2 STEP=lOOOOO AGE=365 IMPLICIT ; 1 year TIT

SAVE NFXH_Tl.SAV

I *

Predicted temperatures after 1 year, Horiz. Empl. (NRC-F)

*

Page 92: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 4

*--- PREDICT THE MECHANICAL RESPONSE OF 1 YEAR OF HEATING ,.. SOLVE TIT

SAVE NRCH_Ml.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 2.5 YEARS ... SET THDT=64800. ; Time step of 18 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=912.5 IMPLICIT ; 2.5 years TIT

SAVE NRCH-T2. SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 2.5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH_Mz.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 5 YEARS ... SET THDT=86400. ; Time step of 24 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=1825 IMPLICIT ; 5 years TIT

SAVE NRCH-TS.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH_MS.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 7.5 YEARS ... SET THDT-86400. ; Time step of 24 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=2737.5 IMPLICIT ; 7.5 years TIT

SAVE NEZCH_T’?.ShV

*--- PREDICT THE MECHANICAL RESPONSE OF 7.5 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-MT.SAV *

Predicted T/M response after 1 year. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 2.5 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 2.5 years. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 5 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 5 years. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 7.5 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 7.5 years. Horiz. Empl. (NRC-F)

Page 93: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-25

*--- CONTINUE HEAT TRANSFER SOLUTION TO 10 YEARS ... SET THDT=86400. ; Time step of 24 hrs. THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE=3650 IMPLICIT ; 10 years TIT

SAVE NRCH_TlO.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 10 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-MlO.SAV

Predicted temperatures after 10 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 10 years. Horiz. Empl. (NRC-F)

* *--- CONTINUE HEAT TRANSFER SOLUTION TO 15 YEARS ... SET THDT-172800. ; Time step of 2 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE-5475 IMPLICIT ; 15 years TIT

SAVE NRCH-TlS.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 15 YEARS OF HEATING ...

Predicted temperatures after 15 years, Horiz. Empl. (NRC-F)

*

SOLVE TIT

SAVE NRCH-Ml5.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 20 YEARS ...

Predicted T/M response after 15 years. Horiz. Empl. (NRC-F)

*

SET THDT-259200. ; Time step of 3 days ... THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP-100000 AGE-7300 IMPLICIT ; 20 years TIT

SAVE NRCH-T2O.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 20 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M2o.SAV

*-e- CONTINUE HEAT TRANSFER SOLUTION TO 25 YEARS ... SET THDT-258200. ; Time step of 3 days ... THSOLVE CLOCK-6.E3 TEMP=5.E2 STEP=lOOOOO AGEt9125 IMPLICIT ; 25 years TIT

SAVE NRCH_TZS.SAV

Predicted temperatures after 20 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 20 years. Horiz. Empl. (NRC-F)

*

Predicted temperatues after 25 years, Horiz. Empl. (NRC-F)

*

Page 94: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 6

*--- PREDICT THE MECHANICAL RESPONSE OF 25 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M25.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 30 YEARS ... SET THDT~345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP==lOOOOO AGE~10950 IMPLICIT ; 30 years TIT

SAVE NRCH-T30.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 30 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M30.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 35 YEARS ... SET THDT1345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=12775 IMPLICIT ; 35 years TIT

SAVE NRCH-T35.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 35 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M35.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 40 YEARS ... SET THDT1345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP==lOOOOO AGE=14600 IMPLICIT ; 40 years

Predicted T/M response after 25 years. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 30 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 30 years. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 35 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 35 years. Horiz. Empl. (NRC-F)

*

TIT

SAVE NRCH_T$O.SAV Predicted temperatures after 40 years, Horiz. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 40 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M4O.SAV Predicted T/M response after 40 years. Horiz. Empl. (NRC-F)

*

Page 95: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-27

*--- CONTINUE HEAT TRANSFER SOLUTION TO 45 YEARS ... SET THDT-345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE116425 IMPLICIT ; 45 years TIT

SAVE NRCHeT45.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 45 YEARS OF HEATING ... SOLVE TIT

SAVE NRCH-M45.SAV

*--- CONTINUE HEAT TRANSFER SOLUTION TO 50 YEARS ... SET THDT-345600. ; Time step of 4 days ... THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE=18250 IMPLICIT ; 50 years TIT

SAVE NRCH_TSO.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YEARS OF HEATING ... SOLVE TIT

SAYE NRCH-MS 0 . SAV

Predicted temperatures after 45 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 45 years. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 years, Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 years. Horiz. Empl. (NRC-F)

*

Page 96: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 8

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * * S T A R T C O N V E C T I V E C O O L I N G T O *

* P R E P A R E F O R W A S T E R E T R I E V A L *

* ( V E N T I L A T I O N A I R T E M P 0 F 20 OC) *

* *

* *

* * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * *--- APPLY THE CONVECTIVE HEAT TRANSFER COEFFICIENT (h-2.78 W/mmK)

*--- AIR (20 degrees C) AT THE TIME OF WASTE RETRIEVAL (50 YEARS) ... THMOD NULL I=2,3 53.17 THAPP CONV 2.78 20. I=1,6 J=15 THAPP C O W 2.78 20. 1=6 J=15,19 THAPP CONV 2.78 20. I=1,6 J=19

THSOLVE CLOCK=6.E3 TEMP==5.E2 STEP=lOOOOO AGE=18255 TIT

SAVE NRCH-TS1.SAV

*,-- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 5 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M51.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18260 TIT

SAVE NRCH-T52.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 10 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M52. SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE-18270 TIT

SAVE NRCH-T53.SAV

*--- TO THE ROOM PERIPHERY, AND ASSIGN THE TEMPERATURE OF THE COOLING

*

*

Predictedtemperatures after 50 yrs & 5 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 5 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 10 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 10 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 20 ds. Horiz. Empl. (NRC-F)

*

Page 97: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-2 9

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS C 20 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS3.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18290 TIT

SAVE NRCH-TS4.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS C 40 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-Ms4.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=100000 AGEt18310 TIT

SAVE NRCH-TSS.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 60 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS5.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18330 TIT

SAVE NRCH-TS6.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 80 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS6.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE=18350 TIT

SAVE NRCH-TS7.SAV

Predicted T/M response after 50 yrs 20 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs ti 40 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 40 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 60 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 60 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs 6; 80 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 80 ds. Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 100 ds. Horiz. Empl. (NRC-F)

*

Page 98: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-30

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 100 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS7.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE=18370 TIT

SAVE NRCH-TS8.SAV

*,-, PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 120 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS8.SAV

Predicted T/M response after 50 yrs 100 ds. Horiz. Ernpl. (NRC-F)

*

Predicted temperatures after 50 yrs & 120 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 120 ds. Horiz. Empl. (NRC-F)

* *

D-30

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 100 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS7.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE=18370 TIT

SAVE NRCH-TS8.SAV

*,-, PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 120 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MS8.SAV

Predicted T/M response after 50 yrs 100 ds. Horiz. Ernpl. (NRC-F)

*

Predicted temperatures after 50 yrs & 120 ds. Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 120 ds. Horiz. Empl. (NRC-F)

* *

Page 99: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * * * S T A R T C O N V E C T I V E C O O L I N G T O *

* P R E P A R E F O R W A S T E R E T R I E V A L * * *

* * * ( V E N T I L A T I O N A I R T E M P O F 10°C) * * * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . * RES NRCH-MS0.SAV

*--- APPLY THE CONVECTIVE HEAT TRANSFER COEFFICIENT (h=2.88 W/mmK) *--- TO THE ROOM PERIPHERY, AND ASSIGN THE TEMPERATURE OF THE COOLING *--- AIR (10 degrees C) AT THE TIME OF WASTE RETRIEVAL (50 YEARS) ... *--- Note that the convective heat transfer coefficient is different *--- for different air temperatures and different room geometries ... TIiMOD NULL I=2,3 J=17 THAPP CONV 2.88 10. I=1,6 5=15 THAPP CONV 2.88 10. 1-6 J=15,19 THAPP CONV 2.88 10. I=1,6 J-19

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE118255 TIT

SAVE NRCH-T61.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 5 DAYS OF HEATING ... SOLVE TIT

SAVE NRCHmM61.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=lOOOOO AGEs18260 TIT

SAVE NRCH-T62.SAV

*

*

*

Predicted temperatures after 50 yrs & 5 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 5 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 10 ds. 10°C Horiz. Empl. (NRC-F)

*

Page 100: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-32

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 10 DAYS OF HEATING ... SOLVE TIT

SAVE NRCHWM62.SAV

THSOLVE CLOCK=6.E3 TEMP=S.E2 STEP=100000 AGE118270 TIT

SAVE NRCH-T 63. SAV

Predicted T/M response after 50 yrs 10 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 20 ds. 10°C Horiz. Empl. (NRC-F)

* *--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 20 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M63. SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGEg18290 TIT

SAVE NRCH-T64.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 40 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MG 4 . SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=100000 AGE-18310 TIT

SAVE NRCH-T65.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 60 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M65.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP-100000 AGE-18330 TIT

SAVE NRCH-T 6 6. SAV

Predicted T/M response after 50 yrs 20 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 40 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 40 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 60 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 60 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 80 ds. 10°C Horiz. Empl. (NRC-F)

*

Page 101: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

D-33

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 80 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M66.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGE=18350 TIT

SAVE NRCH-T67.SAV

*--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 100 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-MC7.SAV

THSOLVE CLOCK=6.E3 TEMP=5.E2 STEP=lOOOOO AGEx18370 TIT

SAVE NRCH-T 68 . SAV *--- PREDICT THE MECHANICAL RESPONSE OF 50 YRS & 120 DAYS OF HEATING ... SOLVE TIT

SAVE NRCH-M68.SAV

Predicted T/M response after 50 yrs 80 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 100 ds. 10' Horiz. Ernpl. (NRC-F)

*

Predicted T/M response after 50 yrs 100 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted temperatures after 50 yrs & 120 ds. 10°C Horiz. Empl. (NRC-F)

*

Predicted T/M response after 50 yrs 120 ds. 10°C Horiz. Empl. (NRC-F)

Page 102: REG/ - UNT Digital Library/67531/metadc697011/... · Waste Storage Investigation (NNWSI) Project as potentially the first radioactive waste repository in the United States. The NNWSI

I

RC CORM 335 1.871 RCM 1102, Xll. 3POP

EL INSTRUCTIONS ON THE REVERSE

US. NUCLEAR REGULATORY COMMISSION

BIBLIOGRAPHIC DATA SHEET

TITLE AN0 SUBTITLE

Stability of Disposal Rooms During Waste Retrieval

AUTHOR IS1

T. Brandshaug

, PERFORMING ORSANIZA'I ION NAME AN0 MAILING ADDRESS (InctudeZtp Co&/

Itasca Consulting Group, Inc. Suite 210 1313 5th Street SE Minneapolis, Minnesota 55414

Division of High-Level Waste Management Office of Nuclear Material Safety & Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555

0. SPONSORING ORGANIZATION NAME A N 0 MAILING ADDRESS I Inr ludeZ~Codd

- 1 2 SUPPLEMENTARY NOTES

. REPORT NUMBER IASSI~M~ by P W 8 : DPS, add Vd. No.. I any1

NUREG/CR-5335

3 LEAVEBLANK

4 OAT€ REPORT COMPLETE0

MONTH YEAR I

I

October 1988 6 OAT€ REPORT ISSUED

MONTH VEAR

March 1989 8 PROJECTITASKIWORK UNIT NUMBER

NRC - 0 2 - 8 5 - 0 0 2 9 FIN OR GRANT NUMBER

D1016 111. TYPE OF REPORT

Topical

August 1988 - October 1988 b, PER100 COVEREO IIduain 6 . r l

J. ABSTRACT 1l00 voro~ or r . ~ i

This report presents the results of a numerical analysis to determine the stability of waste disposal rooms for vertical and horizontal emplacement during the period of waste retrieval. It is assumed that waste retrieval starts 50 years after the initial em- placement of the waste, and that access to and retrieval of the waste containers take place through the disposal rooms. It is further assumed that the disposal rooms are not backfilled. Convective cooling of the disposal rooms in preparation for waste re- trieval is included in the analysis. Conditions and parameters used were taken from the Nevada Nuclear Waste Storage Investigation (NNWSI) Project Site Characterization Plan Conceptual Design Report (MacDougall et al., 1987).

Thermal results are presented which illustrate the heat transfer response of the rock adjacent to the disposal rooms. Xechanical results are presented which illustrate the predicted distribution of stress, joint slip and room deformations for the period of time investigated.

Under the assumption that the host rock can be classified as "fair to good" using the Geomechanics Classification system (Bieniawski, 1974), only light ground support would appear to be necessary €or the disposal rooms to remain stable.

IS AVAILABILITY STATEMENT I 4 OOCUMENT ANALVSIS - KEVWOROSIOLSCRIPTORS

nuclear waste

geologic disposal

). IOENTIFIERSIOPEN.ENOE0 TERMS

retrieval

ventilation

Unclassified

Unclassified IThs w o r f l