Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
1,600 - - - - - - - - - Sarrat 1 Bonga #1 RIS :
1,085 - - - - - - - - - Laoag City 2 Bonga #3 RIS :
2,470 - - - - - - - - - San Nicolas 3 Bonga #2 RIS :
- - - - - - - - - TOTAL ILOCOS NORTE 5,155
ILOCOS SUR
29,845 - - - - - - - - - San Ildefonso 1 Banaoang PIS : Support to
Operation
- - - - - - - - - TOTAL ILOCOS SUR 29,845
- - - - - - - - - 35,000 TOTAL REGION 1 - Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
44,300 - - - - - - - - - Camalaniuga
n 1 Magapit PIS : -
17,400 - - - - - - - - - Amulung 2 Iguig-Alcala-Amulung Pump
Irrigation System : -
18,300 - - - - - - - - - Solana 3 Solana Pump Irrigation System : -
- - - - - - - - - TOTAL CAGAYAN 80,000
- - - - - - - - - 80,000 TOTAL REGION 2 (PROPER) - Repair, Operation and Maintenance of National Irrigation System Pump
Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
21,880 - - - - - - - - - Burgos 1 Magat RIS : Division III
31,700 - - - - - - - - - Gamu 2 Magat RIS : Division III
900 - - - - - - - - - Angadanan 3 Magat RIS : Division IV
21,130 - - - - - - - - - Angadanan 4 Magat RIS : Division IV
900 - - - - - - - - - Reina
Mercedes 5 Magat RIS : Division IV
1,060 - - - - - - - - - San Isidro 6 Magat RIS (Licaray PS) : Division I
2,430 - - - - - - - - - San Isidro 7 Magat RIS, Patanad PS : Division
II
- - - - - - - - - TOTAL ISABELA 80,000
- - - - - - - - - 80,000 TOTAL REGION 2 (MARIIS) - Repair, Operation and Maintenance of National Irrigation System Pump
Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
16,000 - - - - - - - - - Bustos 1 Angat RIS (AMRIS) :
Angat-Bustos-Pandi IA
9,000 - - - - - - - - - Pandi 2 Angat RIS (AMRIS) : Bustos-Pandi
IA
5,000 - - - - - - - - - San Rafael 3 Angat RIS (AMRIS) : Kapatiran PIS
- - - - - - - - - TOTAL BULACAN 30,000
PAMPANGA
10,000 - - - - - - - - - Arayat 1 Pampanga Delta RIS :
- - - - - - - - - TOTAL PAMPANGA 10,000
TARLAC
500 - - - - - - - - - Anao 1 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
500 - - - - - - - - - Pura 2 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
500 - - - - - - - - - Ramos 3 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
1,200 - - - - - - - - - Victoria 4 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
800 - - - - - - - - - Concepcion 5 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
1,500 - - - - - - - - - Lapaz 6 Tarlac Groundwater Irrigattion System : Repair, operation, maintenance of pumps and engines
- - - - - - - - - TOTAL TARLAC 5,000
- - - - - - - - - 45,000 TOTAL REGION 3 (PROPER) - Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LAGUNA
6,000 - - - - - - - - - Cabuyao City 1 Cabuyao East PIS :
- - - - - - - - - TOTAL LAGUNA 6,000
- - - - - - - - - 6,000 TOTAL REGION 4A - Repair, Operation and Maintenance of National Irrigation System Pump
Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAMARINES SUR
5,000 - - - - - - - - - Cabusao 1 Libmanan Cabusao PIS : Supply and delivery of fuel, oil and maintenance works of LCPIS
5,000 - - - - - - - - - Libmanan 2 Libmanan Cabusao PIS : Supply and delivery of fuel, oil and
maintenance works of LCPIS
- - - - - - - - - TOTAL CAMARINES SUR 10,000
- - - - - - - - - 10,000 TOTAL REGION 5 - Repair, Operation and Maintenance of National Irrigation System Pump
Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair, Operation and Maintenance of National Irrigation System Pump Irrigations Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
22,000 - - - - - - - - - Butuan City 1 Lower Agusan River PIS : Repair and Maintenance of PUMPS and Engines and Structures
- - - - - - - - - TOTAL AGUSAN DEL NORTE 22,000
AGUSAN DEL SUR
13,376 - - - - - - - - - Veruela 1 Sta. Josefa PIS : Repair and Maintenance of PUMPS and Engines and Structures
- - - - - - - - - TOTAL AGUSAN DEL SUR 13,376
- - - - - - - - - 35,376 TOTAL REGION 13 - Repair, Operation and Maintenance of National Irrigation System Pump
Irrigations Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PANGASINAN
11,500 - - - - - - - - - Urdaneta City 1 Regional Office - Region 1 :
- - - - - - - - - TOTAL PANGASINAN 11,500
- - - - - - - - - 11,500 TOTAL REGION 1 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BENGUET
11,500 - - - - - - - - - La Trinidad 1 Regional Office - CAR :
- - - - - - - - - TOTAL BENGUET 11,500
- - - - - - - - - 11,500 TOTAL CAR - Heavy Equipment Procurement for
Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
34,500 - - - - - - - - - Cauayan City 1 Regional Office - Region 2 : Heavy Equipment Procurement for Irrigation Systems
- - - - - - - - - TOTAL ISABELA 34,500
- - - - - - - - - 34,500 TOTAL REGION 2 (PROPER) - Heavy Equipment
Procurement for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
34,500 - - - - - - - - - Cauayan City 1 Head Office-MARIIS : 1 Unit @ (Wheeled Excavator, Dump Truck, Wheeled Loader, Crawler
Dozer)
- - - - - - - - - TOTAL ISABELA 34,500
- - - - - - - - - 34,500 TOTAL REGION 2 (MARIIS) - Heavy Equipment
Procurement for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
26,500 - - - - - - - - - San Rafael 1 Regional Office - Region 3 :
- - - - - - - - - TOTAL BULACAN 26,500
- - - - - - - - - 26,500 TOTAL REGION 3 (PROPER) - Heavy Equipment
Procurement for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
19,500 - - - - - - - - - Cabanatuan
City 1 Head Office-UPRIIS :
- - - - - - - - - TOTAL NUEVA ECIJA 19,500
- - - - - - - - - 19,500 TOTAL REGION 3 (UPRIIS) - Heavy Equipment
Procurement for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LAGUNA
11,500 - - - - - - - - - Pila 1 Regional Office - Region 4A :
- - - - - - - - - TOTAL LAGUNA 11,500
- - - - - - - - - 11,500 TOTAL REGION 4A - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ORIENTAL MINDORO
34,500 - - - - - - - - - Calapan City 1 Regional Office - Region 4B : 1 Unit @ (Wheeled Excavator, Dump Truck, Wheeled Loader,
Crawler Dozer)
- - - - - - - - - TOTAL ORIENTAL MINDORO 34,500
- - - - - - - - - 34,500 TOTAL REGION 4B - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAMARINES SUR
11,500 - - - - - - - - - 1 Regional Office - Region 5 :
Concreting of service roads
- - - - - - - - - TOTAL CAMARINES SUR 11,500
- - - - - - - - - 11,500 TOTAL REGION 5 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOILO CITY
34,500 - - - - - - - - - Jaro 1 Regional Office - Region 6 : 1 Unit @ (Wheeled Excavator, Dump Truck, Wheeled Loader,
Crawler Dozer)
- - - - - - - - - TOTAL ILOILO CITY 34,500
NEGROS OCCIDENTAL
11,500 - - - - - - - - - Bago City 1 Regional Office - NIR : Wheeled Excavator, Dump Truck
- - - - - - - - - TOTAL NEGROS OCCIDENTAL 11,500
- - - - - - - - - 46,000 TOTAL REGION 6 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
19,500 - - - - - - - - - Tagbilaran
City 1 Regional Office - Region 7 :
- - - - - - - - - TOTAL BOHOL 19,500
- - - - - - - - - 19,500 TOTAL REGION 7 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LEYTE (NORTHERN)
26,500 - - - - - - - - - Tacloban City 1 Regional Office - Region 8 :
- - - - - - - - - TOTAL LEYTE (NORTHERN) 26,500
- - - - - - - - - 26,500 TOTAL REGION 8 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
34,500 - - - - - - - - - Labangan 1 Regional Office - Region 9 : 1 Unit @ (Wheeled Excavator, Dump Truck, Wheeled Loader,
Crawler Dozer)
- - - - - - - - - TOTAL ZAMBOANGA DEL SUR 34,500
- - - - - - - - - 34,500 TOTAL REGION 9 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN DE ORO CITY
11,500 - - - - - - - - - Cagayan de
Oro City 1 Regional Office - Region 10 :
Purchase of Heavy Equipment
- - - - - - - - - TOTAL CAGAYAN DE ORO CITY 11,500
- - - - - - - - - 11,500 TOTAL REGION 10 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
DAVAO CITY
26,500 - - - - - - - - - Davao City 1 Regional Office - Region 11 : 1 Unit @ (Wheeled Excavator, Dump Truck, Crawler Dozer)
- - - - - - - - - TOTAL DAVAO CITY 26,500
- - - - - - - - - 26,500 TOTAL REGION 11 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NORTH COTABATO
34,500 - - - - - - - - - Midsayap 1 Regional Office - Region 12 :
- - - - - - - - - TOTAL NORTH COTABATO 34,500
- - - - - - - - - 34,500 TOTAL REGION 12 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Heavy Equipment Procurement for Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
11,500 - - - - - - - - - Butuan City 1 Regional Office - Region 13 :
- - - - - - - - - TOTAL AGUSAN DEL NORTE 11,500
- - - - - - - - - 11,500 TOTAL REGION 13 - Heavy Equipment Procurement
for Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
70 - - - - - - - - - Bacarra 1 (NMC) North Main Canal &
Pasuquin Extn RIS :
80 - - - - - - - - - Sarrat 2 Bonga #1 RIS :
80 - - - - - - - - - Laoag City 3 Bonga #3 RIS :
92 - - - - - - - - - Dingras 4 Dingras RIS :
220 - - - - - - - - - Laoag City 5 Laoag Vintar RIS :
50 - - - - - - - - - Bangui 6 Bolo RIS :
80 - - - - - - - - - San Nicolas 7 Bonga #2 RIS :
- - - - - - - - - TOTAL ILOCOS NORTE 672
ILOCOS SUR
483 - - - - - - - - - San Ildefonso 1 Banaoang PIS : Support to Operation
143 - - - - - - - - - Santa Lucia 2 Sta. Lucia-Candon NIS : Support to Operation
80 - - - - - - - - - Santa Maria 3 Sta. Maria-Burgos NIS : Support to Operation
138 - - - - - - - - - Tagudin 4 Tagudin NIS : Support to Operation
- - - - - - - - - TOTAL ILOCOS SUR 844
LA UNION
500 - - - - - - - - - Bangar 1 Amburayan RIS : Trainings &
Support Services to IA
335 - - - - - - - - - Agoo 2 Masalip RIS : Trainings & Support
Services to IA
- - - - - - - - - TOTAL LA UNION 835
PANGASINAN
84 - - - - - - - - - Bugallon 1 Dumuloc RIS : IA Strengthening
153 - - - - - - - - - San Fabian 2 San Fabian RIS : IA Strengthening
192 - - - - - - - - - Mangaldan 3 Sinocalan RIS : IA Strengthening
323 - - - - - - - - - Urdaneta City 4 Agno RIS : IA Strengthening
16 - - - - - - - - - Santo Tomas 5 Lower Agno RIS : IA
Strengthening
1,200 - - - - - - - - - Urdaneta City 6 Regional Office - Region 1 : IA
Strengthening
414 - - - - - - - - - Asingan 7 Agno RIS : IA Strengthening
287 - - - - - - - - - San Manuel 8 Agno RIS : IA Strengthening
157 - - - - - - - - - San Nicolas 9 Ambayoan RIS : IA Strengthening
151 - - - - - - - - - San Quitin 10 Dipalo RIS : IA Strengthening
287 - - - - - - - - - Rosales 11 Lower Agno RIS : IA
Strengthening
- - - - - - - - - TOTAL PANGASINAN 3,264
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 5,615 TOTAL REGION 1 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
7 - - - - - - - - - Tubo 1 Dacuag SIS : Conduct Training /
IA strengthening
15 - - - - - - - - - Boliney 2 Kilong-Olao SIS : Conduct
Training / IA strengthening
49 - - - - - - - - - Licuan-Baay 3 Nagatotong CIP Ph 2 : Conduct
Training / IA strengthening
11 - - - - - - - - - Bucay 4 Siwasiw SIS : Conduct Training /
IA strengthening
34 - - - - - - - - - Licuan-Baay 5 Tumalip SIS : Conduct Training /
IA strengthening
- - - - - - - - - TOTAL ABRA 116
APAYAO
24 - - - - - - - - - Flora 1 Anninipan SIS : Conduct
Training - IA Strengthening
18 - - - - - - - - - Calanasan 2 Bidbido SIS : Conduct Training - IA Strengthening
21 - - - - - - - - - Pudtol 3 Cabaggaoan SIS : Conduct Training - IA Strengthening
24 - - - - - - - - - Calanasan 4 Cadaclan Proper SIS : Conduct Training - IA Strengthening
11 - - - - - - - - - Calanasan 5 Capigo SIS : Conduct Training - IA Strengthening
24 - - - - - - - - - Cabugao 6 Guimitan SIS : Conduct
Training - IA Strengthening
22 - - - - - - - - - Conner 7 Manag SIS : Conduct Training - IA Strengthening
33 - - - - - - - - - Luna 8 Tala SIS : Conduct Training - IA Strengthening
18 - - - - - - - - - Calanasan 9 Upper Farina SIS : Conduct Training - IA Strengthening
798 - - - - - - - - - Pudtol, Luna 10 West Apayao Abulug IS : Conduct Training - IA Strengthening
- - - - - - - - - TOTAL APAYAO 993
BENGUET
8 - - - - - - - - - Bokod 1 Agupen SIS : IA Strengthening, Trainings, and Other Support Services
20 - - - - - - - - - Tuba 2 Apni SIS : IA Strengthening, Trainings, and Other Support
Services
21 - - - - - - - - - Kabayan 3 Babalak SIS : IA Strengthening, Trainings, and Other Support Services
13 - - - - - - - - - Buguias 4 Bileng SIS : IA Strengthening, Trainings, and Other Support
Services
7 - - - - - - - - - Itogon 5 Bingo SIS : IA Strengthening, Trainings, and Other Support Services
17 - - - - - - - - - Atok 6 Boneng Mongol SIS : IA Strengthening, Trainings, and
Other Support Services
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
17 - - - - - - - - - Kapangan 7 Cabilisan SIS : IA Strengthening, Trainings, and Other Support Services
20 - - - - - - - - - Tuba 8 Camoeg SIS : IA Strengthening, Trainings, and Other Support Services
21 - - - - - - - - - La Trinidad 9 Cayob SIS : IA Strengthening, Trainings, and Other Support Services
11 - - - - - - - - - La Trinidad 10 Central Bahong CIP : IA Strengthening, Trainings, and
Other Support Services
16 - - - - - - - - - La Trinidad 11 Cosaran SIS : IA Strengthening, Trainings, and Other Support Services
22 - - - - - - - - - Mankayan 12 Dagadag Makingao CIP : IA Strengthening, Trainings, and
Other Support Services
14 - - - - - - - - - Kabayan 13 Dipeg-Kitikit-Telmod SIS : IA Strengthening, Trainings, and Other Support Services
6 - - - - - - - - - Sablan 14 Disdis SIS : IA Strengthening, Trainings, and Other Support Services
21 - - - - - - - - - Bokod 15 Kuros SIS : IA Strengthening, Trainings, and Other Support Services
22 - - - - - - - - - Buguias 16 Magmagaling CIP : IA Strengthening, Trainings, and
Other Support Services
21 - - - - - - - - - Kapangan 17 Masacoco SIS : IA Strengthening, Trainings, and Other Support Services
5 - - - - - - - - - Kabayan 18 Mawini SIS : IA Strengthening, Trainings, and Other Support Services
11 - - - - - - - - - Itogon 19 Nagsial-Arais SIS : IA Strengthening, Trainings, and Other Support Services
703 - - - - - - - - - La Trinidad 20 Regional Office - CAR : IA Strengthening, Trainings, and
Other Support Services
15 - - - - - - - - - La Trinidad 21 Timoy-Balangbang SIS : IA Strengthening, Trainings, and Other Support Services
- - - - - - - - - TOTAL BENGUET 1,011
IFUGAO
17 - - - - - - - - - Hungduan 1 Bukhul CIP : Conduct training/ IA
strengthening
31 - - - - - - - - - Tinoc 2 Guhadan CIP : Conduct training/
IA strengthening
450 - - - - - - - - - Lamut 3 Hapid IS : Conduct training/ IA
strengthening
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10 - - - - - - - - - Hingyon 4 Intubaybay CIP : Conduct
training/ IA strengthening
10 - - - - - - - - - Lagawe 5 Onon-Nahtitan CIP : Conduct training/ IA strengthening
11 - - - - - - - - - Hingyon 6 Palantag -Umalbong SIS : Conduct training/ IA strengthening
- - - - - - - - - TOTAL IFUGAO 529
ISABELA
828 - - - - - - - - - Quezon 1 Upper Chico RIS : IA
Strengthening
- - - - - - - - - TOTAL ISABELA 828
KALINGA
21 - - - - - - - - - Tabuk City 1 Bagang Manok SIS : IA
Strengthening
11 - - - - - - - - - Pinukpuk 2 Bakkayon CIP : IA Strengthening
15 - - - - - - - - - Tabuk City 3 Battong SIS : IA Strengthening
22 - - - - - - - - - Pasil 4 Bulanao Lagod CIP : IA Strengthening
77 - - - - - - - - - Pinukpuk 5 Camallogan CIP : IA Strengthening
28 - - - - - - - - - Pinukpuk 6 Cossim Coddog CIP : IA Strengthening
21 - - - - - - - - - Tabuk City 7 Dananao CIP : IA Strengthening
14 - - - - - - - - - Tabuk City 8 Dullig CIP : IA Strengthening
15 - - - - - - - - - Tabuk City 9 Kamakguan SIS : IA Strengthening
34 - - - - - - - - - Rizal 10 Kapapayaan SIS : IA
Strengthening
14 - - - - - - - - - Tinglayan 11 Kinnang CIP : IA Strengthening
21 - - - - - - - - - Tabuk City 12 Lachap Ileb SIS : IA Strengthening
21 - - - - - - - - - Tabuk City 13 Lap-atan CIP : IA Strengthening
24 - - - - - - - - - Tabuk City 14 Pataga Malalao SIS : IA Strengthening
9 - - - - - - - - - Tinglayan 15 Sor-uc CIP : IA Strengthening
21 - - - - - - - - - Tinglayan 16 Talin CIP : IA Strengthening
724 - - - - - - - - - Tabuk City 17 Upper Chico RIS : IA Strengthening
28 - - - - - - - - - Pinukpuk 18 Wagud CIP : IA Strengthening
- - - - - - - - - TOTAL KALINGA 1,120
MT. PROVINCE
5 - - - - - - - - - Bontoc 1 Agyo SIS : IA Strengthening, Trainings, and Other Support
Services
11 - - - - - - - - - Tadian 2 Bayokan-Lawed CIP : IA Strengthening, Trainings, and Other Support Services
20 - - - - - - - - - Sadanga 3 Dungadong SIP : IA Strengthening, Trainings, and
Other Support Services
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
27 - - - - - - - - - Sabangan 4 Nabadngan CIP : IA Strengthening, Trainings, and Other Support Services
11 - - - - - - - - - Natonin 5 Tudoy Tafangao SIS : IA Strengthening, Trainings, and Other Support Services
18 - - - - - - - - - Barlig 6 Tumallan CIP : IA Strengthening, Trainings, and Other Support Services
- - - - - - - - - TOTAL MT. PROVINCE 92
- - - - - - - - - 4,689 TOTAL CAR - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
5,897 - - - - - - - - - Cauayan City 1 Regional Office - Region 2 :
- - - - - - - - - TOTAL ISABELA 5,897
- - - - - - - - - 5,897 TOTAL REGION 2 (PROPER) - Irrigation Management
Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
5,115 - - - - - - - - - Cauayan City 1 Head Office-MARIIS :
- - - - - - - - - TOTAL ISABELA 5,115
- - - - - - - - - 5,115 TOTAL REGION 2 (MARIIS) - Irrigation Management
Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AURORA
88 - - - - - - - - - Casiguran 1 Amro RIS :
66 - - - - - - - - - Baler 2 Disalit Creek IS :
- - - - - - - - - TOTAL AURORA 154
BATAAN
52 - - - - - - - - - Dinalupihan 1 Colo Layac Balsik RIS :
48 - - - - - - - - - Hermosa 2 Colo Layac Balsik RIS :
- - - - - - - - - TOTAL BATAAN 100
BULACAN
84 - - - - - - - - - Balagtas 1 Angat RIS (AMRIS) :
232 - - - - - - - - - Baliwag 2 Angat RIS (AMRIS) :
57 - - - - - - - - - Bocaue 3 Angat RIS (AMRIS) :
63 - - - - - - - - - Bulakan 4 Angat RIS (AMRIS) :
186 - - - - - - - - - Bustos 5 Angat RIS (AMRIS) :
41 - - - - - - - - - Calumpit 6 Angat RIS (AMRIS) :
102 - - - - - - - - - Guiguinto 7 Angat RIS (AMRIS) :
140 - - - - - - - - - Malolos 8 Angat RIS (AMRIS) :
102 - - - - - - - - - Pandi 9 Angat RIS (AMRIS) :
18 - - - - - - - - - Paombong 10 Angat RIS (AMRIS) :
183 - - - - - - - - - Plaridel 11 Angat RIS (AMRIS) :
170 - - - - - - - - - Pulilan 12 Angat RIS (AMRIS) :
52 - - - - - - - - - San Ildefonso 13 Angat RIS (AMRIS) :
55 - - - - - - - - - San Rafael 14 Angat RIS (AMRIS) :
1,344 - - - - - - - - - San Rafael 15 Regional Office - Region 3 :
- - - - - - - - - TOTAL BULACAN 2,829
PAMPANGA
76 - - - - - - - - - Floridablanca 1 Porac Gumain RIS :
40 - - - - - - - - - Guagua 2 Porac Gumain RIS :
251 - - - - - - - - - Lubao 3 Porac Gumain RIS :
257 - - - - - - - - - Arayat 4 Pampanga Delta RIS :
136 - - - - - - - - - Mexico 5 Pampanga Delta RIS :
208 - - - - - - - - - Santa Ana 6 Pampanga Delta RIS :
186 - - - - - - - - - Apalit 7 Angat RIS (AMRIS) :
323 - - - - - - - - - Candaba 8 Angat RIS (AMRIS) :
223 - - - - - - - - - San Luis 9 Angat RIS (AMRIS) :
69 - - - - - - - - - San Simon 10 Angat RIS (AMRIS) :
140 - - - - - - - - - Candaba 11 Pampanga Delta RIS :
96 - - - - - - - - - San Luis 12 Pampanga Delta RIS :
44 - - - - - - - - - San Simon 13 Pampanga Delta RIS :
- - - - - - - - - TOTAL PAMPANGA 2,049
TARLAC
470 - - - - - - - - - Camiling 1 Camiling RIS :
149 - - - - - - - - - Mayantoc 2 Camiling RIS :
105 - - - - - - - - - Santa Ignacia 3 Camiling RIS :
306 - - - - - - - - - Tarlac City 4 Tarlac RIS :
45 - - - - - - - - - Victoria 5 Tarlac RIS :
36 - - - - - - - - - Capas 6 San Miguel-Odonel RIS :
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
76 - - - - - - - - - Lapaz 7 San Miguel-Odonel RIS :
- - - - - - - - - TOTAL TARLAC 1,187
ZAMBALES
20 - - - - - - - - - San
Marcelino 1 STRIS :
94 - - - - - - - - - Botolan 2 Bucao RIS :
178 - - - - - - - - - Santa Cruz 3 Nayom RIS :
111 - - - - - - - - - Palauig 4 Upper Bagsit RIS :
- - - - - - - - - TOTAL ZAMBALES 403
- - - - - - - - - 6,722 TOTAL REGION 3 (PROPER) - Irrigation Management
Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
49 - - - - - - - - - San Ildefonso 1 Peñaranda River Irrigation
System :
179 - - - - - - - - - San Miguel 2 Peñaranda River Irrigation
System :
- - - - - - - - - TOTAL BULACAN 228
NUEVA ECIJA
119 - - - - - - - - - Aliaga 1 Aliaga IS :
69 - - - - - - - - - Aliaga 2 Murcon Creek Irrigation System :
68 - - - - - - - - - Guimba 3 Pampanga River Irrigation System (SDC) :
143 - - - - - - - - - Zaragoza 4 Pampanga-Bongabon River Irrigation System Extension :
64 - - - - - - - - - Licab 5 Talavera River Irrigation System
Lower :
134 - - - - - - - - - Quezon 6 Talavera River Irrigation System Lower :
182 - - - - - - - - - Santo Domingo
7 Talavera River Irrigation System Lower :
83 - - - - - - - - - Talavera 8 Talavera River Irrigation System Lower :
182 - - - - - - - - - Talavera 9 Talavera River Irrigation System Lower :
158 - - - - - - - - - Rizal 10 Pampanga River Irrigation
System :
484 - - - - - - - - - Science City of Muñoz
11 Pampanga River Irrigation System (SDC) :
131 - - - - - - - - - Talugtug 12 Pampanga River Irrigation System (SDC) :
158 - - - - - - - - - Llanera 13 Talavera River Irrigation System Lower :
34 - - - - - - - - - Llanera 14 Talavera River Irrigation System Lower :
16 - - - - - - - - - Lupao 15 Talavera River Irrigation System
Lower :
148 - - - - - - - - - San Jose City 16 Talavera River Irrigation System Lower :
108 - - - - - - - - - Science City of Muñoz
17 Talavera River Irrigation System Lower :
1,852 - - - - - - - - - Cabanatuan City
18 Head Office-UPRIIS :
12 - - - - - - - - - Cabanatuan City
19 Murcon Creek Irrigation System :
238 - - - - - - - - - General
Natividad 20 Pampanga River Irrigation
System :
167 - - - - - - - - - Cabanatuan City
21 Pampanga-Bongabon River Irrigation System :
180 - - - - - - - - - Santa Rosa 22 Pampanga-Bongabon River Irrigation System :
85 - - - - - - - - - San Leonardo 23 Pampanga-Bongabon River Irrigation System :
167 - - - - - - - - - Jaen 24 Pampanga-Bongabon River Irrigation System Extension :
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
254 - - - - - - - - - San Antonio 25 Pampanga-Bongabon River
Irrigation System Extension :
163 - - - - - - - - - Cabiao 26 Peñaranda River Irrigation System :
207 - - - - - - - - - Gapan City 27 Peñaranda River Irrigation System :
17 - - - - - - - - - Peñaranda 28 Peñaranda River Irrigation System :
101 - - - - - - - - - San isidro 29 Peñaranda River Irrigation System :
- - - - - - - - - TOTAL NUEVA ECIJA 5,724
PAMPANGA
176 - - - - - - - - - Candaba 1 Peñaranda River Irrigation
System :
- - - - - - - - - TOTAL PAMPANGA 176
TARLAC
60 - - - - - - - - - Victoria 1 Pampanga River Irrigation
System (SDC) :
- - - - - - - - - TOTAL TARLAC 60
- - - - - - - - - 6,188 TOTAL REGION 3 (UPRIIS) - Irrigation Management Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
154 - - - - - - - - - Nasugbu 1 Palico RIS :
- - - - - - - - - TOTAL BATANGAS 154
CAVITE
36 - - - - - - - - - Bacoor City 1 Molino RIS :
146 - - - - - - - - - Tanza 2 Matanda RIS :
109 - - - - - - - - - Tanza 3 Tres Cruzes RIS :
37 - - - - - - - - - General Trias
City 4 Vargas (Bankud) RIS :
255 - - - - - - - - - Naic 5 Balayungan RIS :
36 - - - - - - - - - Naic 6 Culong-Culong RIS :
73 - - - - - - - - - Maragondon 7 Kay-Akle RIS :
36 - - - - - - - - - Naic 8 Sahing RIS :
- - - - - - - - - TOTAL CAVITE 728
LAGUNA
43 - - - - - - - - - Santa Rosa
City 1 Diezmo RIS :
60 - - - - - - - - - Santa Rosa
City 2 Macabling RIS :
26 - - - - - - - - - Cabuyao City 3 Cabuyao East PIS :
42 - - - - - - - - - Bay 4 Mabacan RIS :
55 - - - - - - - - - Calamba City 5 San Cristobal RIS :
54 - - - - - - - - - Calamba City 6 San Juan RIS :
32 - - - - - - - - - San Pablo
City 7 Malaunod RIS :
184 - - - - - - - - - Pagsanjan 8 Balanac RIS :
13 - - - - - - - - - Lumban 9 Lumban RIS :
69 - - - - - - - - - Famy 10 Mayor RIS :
1,077 - - - - - - - - - Pila 11 Regional Office - Region 4A :
239 - - - - - - - - - Pila 12 Sta. Cruz RIS :
180 - - - - - - - - - Santa Maria 13 Sta. Maria RIS :
- - - - - - - - - TOTAL LAGUNA 2,074
QUEZON
300 - - - - - - - - - Infanta 1 Agos RIS :
215 - - - - - - - - - Pagbilao 2 Dumacaa RIS :
51 - - - - - - - - - Sariaya 3 Hanagdong RIS :
119 - - - - - - - - - Tiaong 4 Lagnas RIS :
- - - - - - - - - TOTAL QUEZON 685
- - - - - - - - - 3,641 TOTAL REGION 4A - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
200 - - - - - - - - - Sablayan 1 Amnay RIS : IA strengthening and
sustainance
200 - - - - - - - - - Magsaysay 2 Caguray RIS : IA strengthening
and sustainance
200 - - - - - - - - - Rizal 3 Lumintao RIS : IA strengthening
and sustainance
150 - - - - - - - - - Santa Cruz 4 Pagbahan RIS : IA strengthening
and sustainance
- - - - - - - - - TOTAL OCCIDENTAL MINDORO 750
ORIENTAL MINDORO
150 - - - - - - - - - Calapan 1 Baco-Bucayao RIS : IA strengthening and sustainance
150 - - - - - - - - - Bansud 2 Bansud RIS : IA strengthening
and sustainance
100 - - - - - - - - - Bongabong 3 Bongabong RIS : IA strengthening and sustainance
150 - - - - - - - - - Victoria 4 Mag-Asawang Tubig RIS : IA strengthening and sustainance
200 - - - - - - - - - Pinamalayan 5 Pula RIS : IA strengthening and sustainance
1,519 - - - - - - - - - Calapan City 6 Regional Office - Region 4B : IA strengthening and sustainance
100 - - - - - - - - - Bulalacao 7 San Juan SIP : IA strengthening
and sustainance
- - - - - - - - - TOTAL ORIENTAL MINDORO 2,369
PALAWAN
100 - - - - - - - - - El Nido 1 Aberawan SIP : IA strengthening
and sustainance
100 - - - - - - - - - El Nido 2 New Ibajay SIP : IA strengthening
and sustainance
100 - - - - - - - - - Brooke's
Point 3 Babangon SIP : IA strengthening
and sustainance
200 - - - - - - - - - Narra 4 Batang-Batang RIS : IA
strengthening and sustainance
150 - - - - - - - - - Narra 5 Malatgao RIS : IA strengthening
and sustainance
156 - - - - - - - - - Aborlan 6 Ibato Iraan SRIP : IA
strengthening and sustainance
- - - - - - - - - TOTAL PALAWAN 806
ROMBLON
100 - - - - - - - - - San Fernando 1 Cantingas RIS : IA strengthening
and sustainance
- - - - - - - - - TOTAL ROMBLON 100
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 4,025 TOTAL REGION 4B - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
40 - - - - - - - - - Ligao City 1 Cabilogan-San Juan RIS :
40 - - - - - - - - - Polangui 2 Hibiga RIS (HRIS IA) :
118 - - - - - - - - - Oas 3 Mahaba RIS (TAPSS IA) :
39 - - - - - - - - - Ligao City 4 NASISI RIS-BAHAMAS IA :
39 - - - - - - - - - Ligao City 5 OGSONG RIS-ORIS IA :
40 - - - - - - - - - Oas 6 South Quinale RIS :
- - - - - - - - - TOTAL ALBAY 316
CAMARINES NORTE
20 - - - - - - - - - Labo 1 Matogdon RIS :
355 - - - - - - - - - Daet 2 Daet-Talisay RIS :
20 - - - - - - - - - Vinzons 3 Matogdon RIS :
- - - - - - - - - TOTAL CAMARINES NORTE 395
CAMARINES SUR
237 - - - - - - - - - Libmanan 1 Libmanan Cabusao PIS :
1,494 - - - - - - - - - Naga City 2 Regional Office - Region 5 :
88 - - - - - - - - - Bombon 3 Tigman-Hinagyanan-Inarihan RIS
:
142 - - - - - - - - - Calabanga 4 Tigman-Hinagyanan-Inarihan RIS
:
71 - - - - - - - - - Calabanga 5 Tigman-Hinagyanan-Inarihan RIS
:
54 - - - - - - - - - Magarao 6 Tigman-Hinagyanan-Inarihan RIS
:
355 - - - - - - - - - San Jose 7 Cagaycay RIS :
132 - - - - - - - - - Baao 8 Barit RIS :
132 - - - - - - - - - Iriga City 9 Barit RIS :
131 - - - - - - - - - Nabua 10 Barit RIS :
829 - - - - - - - - - Buhi 11 Buhi-Lalo RIS :
158 - - - - - - - - - Baao 12 Rida RIS :
- - - - - - - - - TOTAL CAMARINES SUR 3,823
SORSOGON
198 - - - - - - - - - Bulan 1 San Ramon RIS :
- - - - - - - - - TOTAL SORSOGON 198
- - - - - - - - - 4,732 TOTAL REGION 5 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AKLAN
750 - - - - - - - - - Banga, Ibajay 1 Aklan-Panakuyan RIS :
- - - - - - - - - TOTAL AKLAN 750
ANTIQUE
431 - - - - - - - - - Sibalom 1 Sibalom-San Jose RIS :
- - - - - - - - - TOTAL ANTIQUE 431
CAPIZ
121 - - - - - - - - - Mambusao 1 Mambusao RIS :
- - - - - - - - - TOTAL CAPIZ 121
ILOILO
193 - - - - - - - - - Tigbauan 1 Sibalom RIS :
377 - - - - - - - - - Santa Barbara, San Miguel
2 Aganan-Sta. Barbara RIS :
816 - - - - - - - - - Pototan, Mina
3 Jalaur-Suage RIS :
109 - - - - - - - - - Barotac Viejo 4 Barotac Viejo RIS :
- - - - - - - - - TOTAL ILOILO 1,495
ILOILO CITY
1,455 - - - - - - - - - Jaro 1 Regional Office - Region 6 :
- - - - - - - - - TOTAL ILOILO CITY 1,455
NEGROS OCCIDENTAL
2,799 - - - - - - - - - Bago City 1 Bago RIS :
500 - - - - - - - - - Binalbagan 2 Pangiplan RIS :
- - - - - - - - - TOTAL NEGROS OCCIDENTAL 3,299
- - - - - - - - - 7,551 TOTAL REGION 6 - Irrigation Management Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
20 - - - - - - - - - Catigbian 1 Baclayon (Hagbuaya) SIS :
10 - - - - - - - - - Antequera 2 Biasong (Bicahan) SIP :
10 - - - - - - - - - Tubigon 3 Genonacan SIP :
950 - - - - - - - - - Tagbilaran
City 4 Regional Office - Region 7 :
35 - - - - - - - - - Tubigon 5 Tubigon SRIS :
659 - - - - - - - - - San Miguel 6 Bohol Integrated Irrigation
System (Bayongan IS) :
109 - - - - - - - - - Ubay 7 Bohol Integrated Irrigation
System (Capayas IS) :
83 - - - - - - - - - Talibon 8 Bohol Integrated Irrigation
System (Talibon SRIS) :
10 - - - - - - - - - Clarin 9 Caboy-Villaflor SIS :
20 - - - - - - - - - Dagohoy 10 Cagawasan SWIP :
25 - - - - - - - - - San Isidro 11 Cansague Sur (Masunoy) SIP :
45 - - - - - - - - - Ubay 12 Ilaya SRIS :
25 - - - - - - - - - Danao 13 Sto. Niño SIS :
10 - - - - - - - - - Dimiao 14 Banban-Catunggan SIS :
25 - - - - - - - - - Bilar 15 Bilar SIP :
860 - - - - - - - - - Pilar 16 Bohol Integrated Irrigation
System (Malinao IS) :
10 - - - - - - - - - Duero 17 Cansuhay-Ilaud SIS :
20 - - - - - - - - - Batuan 18 Cantijong SIS :
20 - - - - - - - - - Jagna 19 Cantuyoc-Canjubo SIS :
20 - - - - - - - - - Valencia 20 Cutcutan SIP :
20 - - - - - - - - - Bilar 21 Duwangon SIS :
20 - - - - - - - - - Dimiao 22 Lapsaon SIS :
20 - - - - - - - - - S-Bullones 23 San Isidro SIS :
10 - - - - - - - - - Garcia
Hernandez 24 Victoria Antipolo SIS :
- - - - - - - - - TOTAL BOHOL 3,036
CEBU
65 - - - - - - - - - Carcar City 1 Can-asujan SRIS :
15 - - - - - - - - - Dalaguete 2 Dugyan CIP :
15 - - - - - - - - - Tuburan 3 Kaputatan SIP :
20 - - - - - - - - - Balamban 4 Matun-og SIP :
20 - - - - - - - - - Barili 5 Mayana SIS :
- - - - - - - - - TOTAL CEBU 135
CEBU CITY
10 - - - - - - - - - Cebu City 1 Budlaan SIP :
15 - - - - - - - - - Cebu City 2 Camarsila SIP :
- - - - - - - - - TOTAL CEBU CITY 25
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 3,196 TOTAL REGION 7 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LEYTE (NORTHERN)
103 - - - - - - - - - Santa Fe 1 Binahaan North RIS : IA
strengthening
103 - - - - - - - - - Tanauan 2 Lower Binahaan RIS : IA
strengthening
138 - - - - - - - - - Alangalang 3 Mainit RIS : IA strengthening
2,025 - - - - - - - - - Tacloban City 4 Regional Office - Region 8 : Staff
trainings
103 - - - - - - - - - Palo 5 Tibak RIS : IA strengthening
46 - - - - - - - - - MacArthur 6 Balire North RIS : IA
strengthening
46 - - - - - - - - - MacArthur 7 Balire South RIS : IA
strengthening
103 - - - - - - - - - Pastrana 8 Binahaan South RIS : IA
strengthening
138 - - - - - - - - - Dulag 9 Daguitan RIS : IA strengthening
275 - - - - - - - - - Dulag 10 Gibuga RIS : IA strengthening
138 - - - - - - - - - Dagami 11 Guinarona RIS : IA strengthening
46 - - - - - - - - - Mayorga 12 Ibawon RIS : IA strengthening
138 - - - - - - - - - Burauen 13 Marabong RIS : IA strengthening
138 - - - - - - - - - Barugo 14 Pongso RIS : IA strengthening
138 - - - - - - - - - Ormoc City 15 Bao RIS : IA strengthening
206 - - - - - - - - - Abuyog 16 Bito RIS : IA strengthening
172 - - - - - - - - - Hilongos 17 Hindang-Hilongos RIS : IA
strengthening
- - - - - - - - - TOTAL LEYTE (NORTHERN) 4,056
LEYTE (SOUTHERN)
34 - - - - - - - - - Hinunangan 1 Das-ay RIS : IA strengthening
- - - - - - - - - TOTAL LEYTE (SOUTHERN) 34
SAMAR (NORTHERN)
117 - - - - - - - - - Las Navas 1 Catubig IS : IA strengthening
- - - - - - - - - TOTAL SAMAR (NORTHERN) 117
SAMAR (WESTERN)
117 - - - - - - - - - Basey 1 Basey IS : IA strengthening
- - - - - - - - - TOTAL SAMAR (WESTERN) 117
- - - - - - - - - 4,324 TOTAL REGION 8 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
337 - - - - - - - - - Dumingag 1 Dipolo RIS : Irrigation Management Transfer Support Services (IMTSS)
650 - - - - - - - - - Labangan 2 Labangan RIS : Irrigation Management Transfer Support
Services (IMTSS)
472 - - - - - - - - - Labangan 3 Regional Office - Region 9 : Irrigation Management Transfer Support Services (IMTSS)
1,410 - - - - - - - - - Molave, Mahayag,
Tambulig
4 Salug RIS : Irrigation Management Transfer Support
Services (IMTSS)
- - - - - - - - - TOTAL ZAMBOANGA DEL SUR 2,869
ZAMBOANGA SIBUGAY
18 - - - - - - - - - Diplahan 1 Upper Sibuguey RIS Extension Project : Irrigation Management Transfer Support Services (IMTSS)
700 - - - - - - - - - Bayog 2 Sibuguey Valley IS : Irrigation Management Transfer Support Services (IMTSS)
- - - - - - - - - TOTAL ZAMBOANGA SIBUGAY 718
- - - - - - - - - 3,587 TOTAL REGION 9 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
164 - - - - - - - - - Baungon 1 Bubunawan RIS :
42 - - - - - - - - - Talakag 2 Talakag IS Phase I :
287 - - - - - - - - - Maramag 3 Muleta RIS :
82 - - - - - - - - - Maramag 4 Roxas-Kuya RIS :
246 - - - - - - - - - Valencia City 5 Manupali RIS :
1,614 - - - - - - - - - Valencia City 6 Pulangui RIS :
- - - - - - - - - TOTAL BUKIDNON 2,435
CAGAYAN DE ORO CITY
1,139 - - - - - - - - - Cagayan de
Oro City 1 Regional Office - Region 10 :
- - - - - - - - - TOTAL CAGAYAN DE ORO CITY 1,139
LANAO DEL NORTE
246 - - - - - - - - - Lala,Kapataga
n 1 Maranding RIS :
- - - - - - - - - TOTAL LANAO DEL NORTE 246
LANAO DEL SUR
205 - - - - - - - - - Taraka,
Bayabao 1 Rugnan RIS :
150 - - - - - - - - - Butig 2 Malaig RIS :
- - - - - - - - - TOTAL LANAO DEL SUR 355
MISAMIS ORIENTAL
164 - - - - - - - - - Balingasag 1 Balingasag RIS :
- - - - - - - - - TOTAL MISAMIS ORIENTAL 164
- - - - - - - - - 4,339 TOTAL REGION 10 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
COMPOSTELA VALLEY
650 - - - - - - - - - Compostela 1 Batutu RIS : Support to IAs
- - - - - - - - - TOTAL COMPOSTELA VALLEY 650
DAVAO CITY
1,025 - - - - - - - - - Davao City 1 Regional Office - Region 11 :
Support to IA's
- - - - - - - - - TOTAL DAVAO CITY 1,025
DAVAO DEL NORTE
70 - - - - - - - - - Kapalong 1 Libuganon Left RIS : Support to
IAs
375 - - - - - - - - - Asuncion 2 Saug RIS : Support to IAs
231 - - - - - - - - - Santo Tomas 3 Kipaliku RIS : Support to IAs
297 - - - - - - - - - Carmen 4 Lasang RIS : Support to IAs
630 - - - - - - - - - Santo Tomas 5 Libuganon RIS : Support to IAs
- - - - - - - - - TOTAL DAVAO DEL NORTE 1,603
DAVAO DEL SUR
238 - - - - - - - - - Matanao 1 Mal RIS : Support to IAs
242 - - - - - - - - - Hagonoy 2 Padada RIS : Support to IAs
- - - - - - - - - TOTAL DAVAO DEL SUR 480
DAVAO ORIENTAL
550 - - - - - - - - - Lupon 1 Lupon IS : Support to IA's
- - - - - - - - - TOTAL DAVAO ORIENTAL 550
- - - - - - - - - 4,308 TOTAL REGION 11 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
865 - - - - - - - - - Cotabato City 1 Maguindanao IMO :
- - - - - - - - - TOTAL MAGUINDANAO 865
NORTH COTABATO
1,906 - - - - - - - - - Midsayap 1 Regional Office - Region 12 :
1,816 - - - - - - - - - Kidapawan City
2 Cotabato IMO :
- - - - - - - - - TOTAL NORTH COTABATO 3,722
SOUTH COTABATO
997 - - - - - - - - - Koronadal
City 1 South Cotabato IMO :
- - - - - - - - - TOTAL SOUTH COTABATO 997
SULTAN KUDARAT
791 - - - - - - - - - Isulan 1 Sultan Kudarat IMO :
- - - - - - - - - TOTAL SULTAN KUDARAT 791
- - - - - - - - - 6,375 TOTAL REGION 12 - Irrigation Management Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
466 - - - - - - - - - Butuan City 1 Lower Agusan River PIS : IA
Strengtening
1,175 - - - - - - - - - Butuan City 2 Regional Office - Region 13 : IA
Strengtening
280 - - - - - - - - - Cabadbaran
City 3 Cabadbaran-Taguibo RIS : IA
Strengtening
- - - - - - - - - TOTAL AGUSAN DEL NORTE 1,921
AGUSAN DEL SUR
466 - - - - - - - - - Bayugan City 1 Andanan RIS : IA Strengtening
277 - - - - - - - - - Prosperidad 2 Gibong RIS : IA Strengtening
160 - - - - - - - - - Veruela 3 Baobo RIS : IA Strengtening
225 - - - - - - - - - Trento 4 Simulao RIS : IA Strengtening
150 - - - - - - - - - Santa Josefa 5 Sta. Josefa PIP : IA Strengtening
- - - - - - - - - TOTAL AGUSAN DEL SUR 1,278
SURIGAO DEL SUR
200 - - - - - - - - - Cantilan/Mad
rid 1 Cantilan IS :
483 - - - - - - - - - Tago/San
Miguel 2 Tago RIS :
- - - - - - - - - TOTAL SURIGAO DEL SUR 683
- - - - - - - - - 3,882 TOTAL REGION 13 - Irrigation Management Transfer
Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CENTRAL OFFICE
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Irrigation Management Transfer Support Services (IMTSS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PMO/CO
14,000 - - - - - - - - - Central Office 1 IMTSS-Central Office :
- - - - - - - - - TOTAL PMO/CO 14,000
- - - - - - - - - 14,000 TOTAL CENTRAL OFFICE - Irrigation Management
Transfer Support Services (IMTSS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
350 - - - - - - - - - Carasi 1 Aggasi SWIP : Detailed
Engineering
300 - - - - - - - - - Vintar 2 Bago-Danao PCIS : Detailed
Engineering
165 - - - - - - - - - Bangui 3 Buagao SIP : Detailed
Engineering
4,000 - - - - - - - - - Badoc 4 Tibangran SRIP : Detailed
Engineering
- - - - - - - - - TOTAL ILOCOS NORTE 4,815
ILOCOS SUR
200 - - - - - - - - - Magsingal 1 Maas-asin CIS : Detailed Engineering
250 - - - - - - - - - Sinait 2 Marnay SIP : Feasibility Study
180 - - - - - - - - - Sinait 3 Sta. Cruz CIS : Detailed
Engineering
180 - - - - - - - - - Alilem 4 Alilem CIS : Detailed Engineering
200 - - - - - - - - - Suyo 5 Baringcucurong CIS : Detailed Engineering
300 - - - - - - - - - Narvacan 6 Cabarsican SIP : Feasibility Study
220 - - - - - - - - - Burgos 7 Dirdirig SIP : Feasibility Study
20,000 - - - - - - - - - Salcedo 8 General Gregorio Del Pilar Project : Detailed Engineering
19,212 - - - - - - - - - Quirino 9 Ilocos Sur Transbasin Project :
Detailed Engineering
180 - - - - - - - - - Santiago 10 Lang-ayan CIS : Detailed Engineering
180 - - - - - - - - - Lidlidda 11 Namatting Anggapang CIS : Detailed Engineering
- - - - - - - - - TOTAL ILOCOS SUR 41,102
LA UNION
150 - - - - - - - - - Luna 1 Ayaoan Weste CIS : Detailed
Engineering
100 - - - - - - - - - SanFernando
City 2 Bato CIS : Detailed Engineering
10,000 - - - - - - - - - San Juan 3 San Felipe SRIP : Feasibility Study
100 - - - - - - - - - San Juan 4 Saracat CIS : Detailed
Engineering
80 - - - - - - - - - Rosario 5 Alipang CIS : Detailed
Engineering
80 - - - - - - - - - Bauang 6 Dupacpac CIS : Detailed
Engineering
80 - - - - - - - - - Pugo 7 Ken Ambo CIS : Detailed
Engineering
80 - - - - - - - - - Pugo 8 Pagbayagan CIS : Detailed
Engineering
119 - - - - - - - - - Tubao 9 Pugdol CIS : Detailed Engineering
100 - - - - - - - - - Naguilian 10 San Antonio CIS : Detailed
Engineering
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
80 - - - - - - - - - Burgos 11 Tumapoc CIS : Detailed
Engineering
90 - - - - - - - - - Burgos 12 Upper Agpay CIS : Detailed Engineering
- - - - - - - - - TOTAL LA UNION 11,059
PANGASINAN
24 - - - - - - - - - Dasol 1 Alilao Dosoc CIS : Detailed
Engineering
15 - - - - - - - - - Alaminos City 2 Alos-Paed CIS : Detailed
Engineering
15 - - - - - - - - - Burgos 3 Cacayasen CIS : Detailed
Engineering
9 - - - - - - - - - Alaminos City 4 Conconig CIS : Detailed
Engineering
10,000 - - - - - - - - - Mabini 5 Mabini Agricultural Development
Project : Updating of FS
16 - - - - - - - - - Dasol 6 Magsaysay/Bobonot CIS :
Detailed Engineering
15 - - - - - - - - - Mangatarem 7 Casilagan CIS : Detailed
Engineering
45 - - - - - - - - - Mangatarem 8 Sapang CIS : Detailed
Engineering
81 - - - - - - - - - Calasiao 9 Sinocalan RIS : Detailed
Engineering
130 - - - - - - - - - Santa
Barbara 10 Sinocalan RIS : Detailed
Engineering
126 - - - - - - - - - Urdaneta City 11 Agno RIS : Detailed Engineering
15 - - - - - - - - - Sison 12 Asan CIS : Detailed Engineering
9 - - - - - - - - - Sison 13 Asan Norte CIS Phase 2 :
Detailed Engineering
100 - - - - - - - - - Natividad 14 Ambayoan RIS : Detailed
Engineering
100 - - - - - - - - - San Nicolas 15 Ambayoan RIS : Detailed
Engineering
90 - - - - - - - - - Balungao 16 Caballaybaan CIS : Detailed
Engineering
24 - - - - - - - - - Umingan 17 Cabangaran CIS : Detailed
Engineering
15 - - - - - - - - - Umingan 18 Carosalisan CIS : Detailed
Engineering
120 - - - - - - - - - San Quitin 19 Dipalo RIS : Detailed Engineering
60 - - - - - - - - - Umingan 20 Dipalo RIS : Detailed Engineering
15 - - - - - - - - - Umingan 21 Tangal Padua CIS : Detailed
Engineering
- - - - - - - - - TOTAL PANGASINAN 11,024
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 68,000 TOTAL REGION 1 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
600 - - - - - - - - - Bucay 1 Bucay CIP : Conduct Project investigation and Feasibility Study
600 - - - - - - - - - Penarrubia 2 Caoa-Baybayabas CIP : Conduct Project investigation and
Feasibility Study
700 - - - - - - - - - La Paz 3 La Paz PIP : Conduct Detailed
Engineering activities
1,500 - - - - - - - - - Penarrubia 4 Sinalang CIP : Conduct Project investigation and Feasibility Study
600 - - - - - - - - - Penarrubia 5 Sta. Rosa CIP : Conduct Project investigation and Feasibility
Study
- - - - - - - - - TOTAL ABRA 4,000
APAYAO
10,000 - - - - - - - - - Pudtol 1 Lower Apayao River IP : Preparation of Design & Plan & Program of Work
500 - - - - - - - - - Calanasan 2 Rabaw CIP : Conduct Feasibility
study
500 - - - - - - - - - Kabugao 3 Upper Buyucan CIP : Conduct
Feasibility study
12,000 - - - - - - - - - Calanasan 4 Ziwanan-Zimigui River Irrigation Project : Conduct Feasibility study
- - - - - - - - - TOTAL APAYAO 23,000
BENGUET
800 - - - - - - - - - Kibungan 1 Amlang Creek-Napsong CIP : Conduct Project investigation
and Feasibility Study
800 - - - - - - - - - La Trinidad 2 Jappa-Minak-Conet CIP : Conduct Project investigation and Feasibility Study
800 - - - - - - - - - Kibungan 3 Kel-as Creek-Badeo Proper CIP : Conduct Project investigation
and Feasibility Study
800 - - - - - - - - - Kapangan 4 Laoangan CIP : Conduct Project investigation and Feasibility Study
800 - - - - - - - - - Mankayan 5 Las-igan CIP : Preparation of Design & Plan & Program of
Work
- - - - - - - - - TOTAL BENGUET 4,000
IFUGAO
500 - - - - - - - - - Mayoyao 1 Arjub Aggihaw CIP : Conduct
detail engineering
500 - - - - - - - - - Lamut 2 Binong CIP : Conduct project validation and feasibility
500 - - - - - - - - - Tinoc 3 Hakba Taba CIP : Conduct project validation and feasibility
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
500 - - - - - - - - - Kiangan 4 Hikkot-Dugong SIP : Conduct project validation and feasibility
500 - - - - - - - - - Kiangan 5 Mamennaw -Ahhin CIP : Conduct
detail engineering
500 - - - - - - - - - Mayoyao 6 Nattum CIP : Conduct project
validation and feasibility
500 - - - - - - - - - Kiangan 7 Palo CIP : Conduct project
validation and feasibility
500 - - - - - - - - - Mayoyao 8 Tumataw Balat CIP : Conduct
project validation and feasibility
- - - - - - - - - TOTAL IFUGAO 4,000
KALINGA
1,000 - - - - - - - - - Tabuk City 1 Dalnacan Malong CIP : Conduct
& Preparation of Feasibility Study
500 - - - - - - - - - Tanudan 2 Mapatong CIP : Conduct of Detailed Survey and Preparation of Design and POW
1,000 - - - - - - - - - Tabuk City 3 Pasunglao CIP : Conduct &
Preparation of Feasibility Study
1,000 - - - - - - - - - Pasil 4 Polon Creek-Colayo Masigid CIP : Conduct & Preparation of
Feasibility Study
500 - - - - - - - - - Tanudan 5 Raburab CIP : Conduct of Detailed Survey and Preparation of Design and POW
- - - - - - - - - TOTAL KALINGA 4,000
MT. PROVINCE
500 - - - - - - - - - Paracelis 1 Bangad CIP : Detailed surveying,
Design and Plans Preparation
600 - - - - - - - - - Paracelis 2 Makilo-Catao CIP : Detailed surveying, Design and Plans Preparation
600 - - - - - - - - - Paracelis 3 Maliggon CIP : Project Investigation and Feasibility Study Preparation
600 - - - - - - - - - Paracelis 4 Panapa CIP : Project Investigation and Feasibility Study Preparation
600 - - - - - - - - - Paracelis 5 Sakakang CIP : Project Investigation and Feasibility
Study Preparation
500 - - - - - - - - - Paracelis 6 Wala Mabato SWIP : Detailed surveying, Design and Plans Preparation
600 - - - - - - - - - Bauko 7 Watten-Laeg CIP : Detailed surveying, Design and Plans
Preparation
- - - - - - - - - TOTAL MT. PROVINCE 4,000
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 43,000 TOTAL CAR - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
500 - - - - - - - - - Solana 1 Ubong SWIP : FSDE
- - - - - - - - - TOTAL CAGAYAN 500
ISABELA
17,767 - - - - - - - - - Tumauini 1 Balasig SRIP : DE
11,000 - - - - - - - - - Tumauini 2 Tumauini River Multipurpose
Project : DE
3,207 - - - - - - - - - San Mariano 3 Ilaguen MIPP : DE
2,000 - - - - - - - - - Dinapigue 4 Dibubunan SSIP : FSDE
- - - - - - - - - TOTAL ISABELA 33,974
NUEVA VIZCAYA
429 - - - - - - - - - Ambaguio 1 Bebeng SIP : FSDE
280 - - - - - - - - - Kasibu 2 Dine SIP : Project ID
750 - - - - - - - - - Kasibu 3 Macate Mini Impounding Dam :
FSDE
567 - - - - - - - - - Dupax del
Norte 4 Upper Bingo Bitnog SIP : FSDE
- - - - - - - - - TOTAL NUEVA VIZCAYA 2,026
QUIRINO
200 - - - - - - - - - Nagtipunan 1 Dabobo SSIP : FSDE
150 - - - - - - - - - Nagtipunan 2 Ompowe SSIP : FSDE
150 - - - - - - - - - Nagtipunan 3 Tamsi SSIP : FSDE
- - - - - - - - - TOTAL QUIRINO 500
- - - - - - - - - 37,000 TOTAL REGION 2 (PROPER) - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATAAN
20,000 - - - - - - - - - Pilar 1 Pantingan SRIP : Detailed
Engineering
- - - - - - - - - TOTAL BATAAN 20,000
NUEVA ECIJA
1,000 - - - - - - - - - Licab 1 Aquino CIP : FS & DE
1,000 - - - - - - - - - Aliaga 2 Bibiclat CIP : FS & DE
1,200 - - - - - - - - - Licab 3 Sta. Maria PIP : FS & DE
1,000 - - - - - - - - - San Jose City 4 Abar 1st CIP : FS & DE
600 - - - - - - - - - Lupao 5 Alalay Grande CIP : FS & DE
1,000 - - - - - - - - - Pantabangan 6 Cadaclan 1 CIP : FS & DE
1,000 - - - - - - - - - Pantabangan 7 Cadaclan 2 CIP : FS & DE
600 - - - - - - - - - Rizal 8 Canaan East Capisungan Pilatok CIP : FS & DE
900 - - - - - - - - - Pantabangan 9 Malbang PIP : FS & DE
700 - - - - - - - - - General Tinio 10 Bilarang Hipon SWIP : FS & DE
800 - - - - - - - - - General Tinio 11 Binumbunan SRIP : FS & DE
800 - - - - - - - - - General Tinio 12 Conveño SWIP : FS & DE
700 - - - - - - - - - General Tinio 13 Mabicalbical SWIP : FS & DE
1,000 - - - - - - - - - Gapan City 14 Maburak CIP : FS & DE
800 - - - - - - - - - General Tinio 15 Mantin Village SWIP : FS & DE
800 - - - - - - - - - General Tinio 16 Minalungao SWIP : FS & DE
800 - - - - - - - - - General Tinio 17 Pugad Hangin SWIP : FS & DE
800 - - - - - - - - - General Tinio 18 Pulong Bukaka SWIP : FS & DE
700 - - - - - - - - - General Tinio 19 Sapang Baltas SWIP : FS & DE
800 - - - - - - - - - General Tinio 20 Sapang Buli SWIP : FS & DE
800 - - - - - - - - - General Tinio 21 Sapang Palanas SWIP : FS & DE
700 - - - - - - - - - General Tinio 22 Sapng Buo SWIP : FS & DE
800 - - - - - - - - - Gapan City 23 Sitio Bibit SWIP : FS & DE
800 - - - - - - - - - General Tinio 24 Tambo SWIP : FS & DE
- - - - - - - - - TOTAL NUEVA ECIJA 20,100
PAMPANGA
7,000 - - - - - - - - - Floridablanca 1 Upper Gumain Irrigation Project :
Detailed Engineering
10,000 - - - - - - - - - Arayat 2 Pampanga Delta RIS : FS on series of Dam in
PDRIS-Cong.Dadong
7,000 - - - - - - - - - Mexico 3 San Juan CIP : Feasibility Study
- - - - - - - - - TOTAL PAMPANGA 24,000
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
TARLAC
3,900 - - - - - - - - - Santa Ignacia 1 Bayating SWIP : Detailed
Engineering
- - - - - - - - - TOTAL TARLAC 3,900
ZAMBALES
10,000 - - - - - - - - - Cabangan 1 Cabangan SRIP : Conduct of Feasibility Study / Detailed Eng'g
- - - - - - - - - TOTAL ZAMBALES 10,000
- - - - - - - - - 78,000 TOTAL REGION 3 (PROPER) - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
10,000 - - - - - - - - - Carranglan 1 Maringalo Dam Irrigation Project
:
15,000 - - - - - - - - - Cabanatuan
City 2 Lower Cabu Irrigation Project :
15,000 - - - - - - - - - Gabaldon 3 Lubingan Irrigation Project :
- - - - - - - - - TOTAL NUEVA ECIJA 40,000
- - - - - - - - - 40,000 TOTAL REGION 3 (UPRIIS) - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of
Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
1,030 - - - - - - - - - Calatagan 1 Lipahan CIS : Detailed
Engineering
800 - - - - - - - - - Padre Garcia 2 Cawongan CIS : Detailed
Engineering
800 - - - - - - - - - San Juan 3 Pinagbayanan CIS : Detailed
Engineering
2,500 - - - - - - - - - Rosario 4 San Isidro SIP : Feasibility Study
6,762 - - - - - - - - - Lipa City 5 Lumbang SIP : Feasibility Study
- - - - - - - - - TOTAL BATANGAS 11,892
CAVITE
5,000 - - - - - - - - - Bacoor City 1 Molino RIS : Detailed Engineering
800 - - - - - - - - - Dasmariñas 2 San Agustin RIS : Detailed Engineering
1,600 - - - - - - - - - General Trias
City 3 Butas RIS : Detailed Engineering
800 - - - - - - - - - General Trias City
4 Butas-Lawang Bato RIS : Detailed Engineering
800 - - - - - - - - - General Trias City
5 Butas-Marcelo RIS : Detailed Engineering
800 - - - - - - - - - Tanza 6 Matanda RIS : Detailed Engineering
3,130 - - - - - - - - - Alfonso 7 Alfonso SIP : Feasibility Study
3,130 - - - - - - - - - Amadeo 8 Amadeo SIP : Feasibility Study
800 - - - - - - - - - Maragondon 9 Balayungan RIS : Detailed Engineering
620 - - - - - - - - - Naic 10 Balayungan RIS : Detailed
Engineering
2,700 - - - - - - - - - Magallanes 11 Caluangan SIP : (Kapantayan/ Caluangan) Feasibility Study
800 - - - - - - - - - Naic 12 Sahing RIS : Detailed Engineering
- - - - - - - - - TOTAL CAVITE 20,980
LAGUNA
1,200 - - - - - - - - - Siniloan 1 Lam-ao Late SIP : Feasibility
Study
- - - - - - - - - TOTAL LAGUNA 1,200
QUEZON
1,860 - - - - - - - - - Polillo 1 Anawan SIP : Feasibility Study
920 - - - - - - - - - Polillo 2 Canicanian CIS : Detailed
Engineering
2,200 - - - - - - - - - Polillo 3 Catabad SIP : Feasibility Study
920 - - - - - - - - - Polillo 4 Taluong CIS : Detailed
Engineering
10,000 - - - - - - - - - Lucena City 5 Dumacaa RIS : Detailed
Engineering
1,900 - - - - - - - - - Pitogo 6 Cawayanin SIP : Feasibility Study
1,870 - - - - - - - - - San Andres 7 Talisay SIP : Feasibility Study
10,000 - - - - - - - - - Alabat 8 Ilangin-Alabat SRIP : Feasibility
Study
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,760 - - - - - - - - - Atimonan 9 Sapaan SIP : Feasibility Study
- - - - - - - - - TOTAL QUEZON 31,430
RIZAL
573 - - - - - - - - - Baras 1 Baras PIP : Feasibility Study
575 - - - - - - - - - Jalajala 2 Jala-Jala PIP : Feasibility Study
1,100 - - - - - - - - - Morong 3 Palagat SIP : Feasibility Study
1,100 - - - - - - - - - Morong 4 Paros SIP : Feasibility Study
575 - - - - - - - - - Pililla 5 Pililla PIP : Feasibility Study
575 - - - - - - - - - Tanay 6 Tanay PIP : Feasibility Study
- - - - - - - - - TOTAL RIZAL 4,498
- - - - - - - - - 70,000 TOTAL REGION 4A - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
193 - - - - - - - - - Torrijos 1 Buangan CIP : DE
160 - - - - - - - - - Santa Cruz 2 Dolores CIP : DE
- - - - - - - - - TOTAL MARINDUQUE 353
OCCIDENTAL MINDORO
1,000 - - - - - - - - - Looc 1 Balikyas SIP : Data Gathering, Profile Writing, Survey Works, Detailed Design and POW Preparation
687 - - - - - - - - - Lubang 2 Barak Maliit SIP : Data Gathering, Profile Writing, Survey Works, Detailed Design and POW Preparation
701 - - - - - - - - - Santa Cruz 3 Cabagan SIP : Data Gathering, Profile Writing, Survey Works, Detailed Design and POW Preparation
469 - - - - - - - - - Magsaysay 4 Caguray RIS : Pre-Engineering Activities
726 - - - - - - - - - Lubang 5 Sala SIP : Data Gathering, Profile Writing, Survey Works, Detailed Design and POW Preparation
- - - - - - - - - TOTAL OCCIDENTAL MINDORO 3,583
ORIENTAL MINDORO
2,000 - - - - - - - - - Roxas 1 Bongabong RIP : Updating of FS
1,020 - - - - - - - - - Bulalacao 2 Caguray SIP : Updating of FS
930 - - - - - - - - - Bulalacao 3 Cavillian-Tambangan SIP :
Updating of FS
930 - - - - - - - - - Bulalacao 4 Gatol SIP : Updating of FS
943 - - - - - - - - - Bulalacao 5 Talibong SIP : Updating of FS
- - - - - - - - - TOTAL ORIENTAL MINDORO 5,823
PALAWAN
785 - - - - - - - - - El Nido 1 Bagong Bayan SIP : FS & DE
650 - - - - - - - - - Taytay 2 Bato SIP : FS & DE
1,148 - - - - - - - - - San Vicente 3 Inarayan SIP : FS & DE
975 - - - - - - - - - Taytay 4 Libertad SIP : FS & DE
520 - - - - - - - - - Taytay 5 Nalbot SIP : FS & DE
805 - - - - - - - - - Narra 6 Talabongan Tagbanato SIP : FS &
DE
936 - - - - - - - - - Taytay 7 Talog SIP : FS & DE
960 - - - - - - - - - Taytay 8 Timburan SIP : FS & DE
1,185 - - - - - - - - - Narra 9 Caraniogan SIP : FS & DE
735 - - - - - - - - - Roxas 10 Tumarbong SIP : FS & DE
- - - - - - - - - TOTAL PALAWAN 8,699
ROMBLON
342 - - - - - - - - - Santa Maria 1 Concepcion SIP : FSDE
200 - - - - - - - - - Cajidiocan 2 Gutivan SIP : FS
- - - - - - - - - TOTAL ROMBLON 542
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - 19,000 TOTAL REGION 4B - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
140 - - - - - - - - - Tabaco City 1 Ca-San-Ra CIP :
150 - - - - - - - - - Daraga 2 Malobago CIP :
100 - - - - - - - - - Legazpi City 3 Mariawa CIP :
80 - - - - - - - - - Guinobatan 4 Minto CIP :
280 - - - - - - - - - Libon 5 Pantao CIP :
120 - - - - - - - - - Oas 6 Parantik CIP :
- - - - - - - - - TOTAL ALBAY 870
CAMARINES NORTE
500 - - - - - - - - - Labo 1 Abuyog CIP :
5,400 - - - - - - - - - Labo 2 Bosigon IP :
500 - - - - - - - - - Labo 3 Calabasa CIP :
500 - - - - - - - - - Labo 4 Macababalo CIP :
500 - - - - - - - - - Capalonga 5 Maligaya CIP :
350 - - - - - - - - - Paracale 6 Pasalakday CIP :
500 - - - - - - - - - Capalonga 7 San Antonio CIP :
350 - - - - - - - - - Mercedes 8 Mambulaga CIP :
350 - - - - - - - - - Basud 9 Mandazo CIP :
500 - - - - - - - - - Jose
Panganiban 10 Tamisan CIP :
300 - - - - - - - - - Jose Panganiban
11 Tanza CIP :
- - - - - - - - - TOTAL CAMARINES NORTE 9,750
CAMARINES SUR
250 - - - - - - - - - Del Gallego 1 Compusta CIP :
4,000 - - - - - - - - - Lupi 2 Haguimit SRIP : ECC works
2,000 - - - - - - - - - Ragay 3 Paculago SRIP : Detailed
Engineering works (Phase 1)
250 - - - - - - - - - Del Gallego 4 Palaspas CIP :
220 - - - - - - - - - Libmanan 5 Mambayawas PIP :
300 - - - - - - - - - Libmanan 6 Palong Mangawa CIP :
2,000 - - - - - - - - - Ocampo 7 Ocampo SRIP :
15,000 - - - - - - - - - Pili 8 Pili SRIP : Feasibility study works
500 - - - - - - - - - Caramoan 9 Bahay Tabgon CIP :
220 - - - - - - - - - Goa 10 Digdigon CIP :
500 - - - - - - - - - Goa 11 Hiwacloy CIP :
500 - - - - - - - - - Goa 12 Leelin State CIP :
500 - - - - - - - - - Lagonoy 13 Pinamihagan CIP :
850 - - - - - - - - - Garchitorena 14 San Vicente CIP :
40,000 - - - - - - - - - Libmanan 15 Bicol River Irrigation System
Improvement Project :
- - - - - - - - - TOTAL CAMARINES SUR 67,090
CATANDUANES
250 - - - - - - - - - Caramoran 1 Iyao CIP :
150 - - - - - - - - - San Andres 2 Mayngaway CIP :
150 - - - - - - - - - Viga 3 Osmeña CIP :
- - - - - - - - - TOTAL CATANDUANES 550
MASBATE
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
250 - - - - - - - - - Cataingan 1 Cagbatang CIP :
- - - - - - - - - TOTAL MASBATE 250
SORSOGON
670 - - - - - - - - - Donsol 1 Manguiao Tuba CIP :
600 - - - - - - - - - Bulan 2 Anic CIP :
10,000 - - - - - - - - - Irosin 3 Batang Gumapia SWIP :
600 - - - - - - - - - Juban 4 Catan-agan CIP :
320 - - - - - - - - - Bulan 5 Gerona CIP :
300 - - - - - - - - - Bulan 6 Sta Remedios SWIP :
- - - - - - - - - TOTAL SORSOGON 12,490
- - - - - - - - - 91,000 TOTAL REGION 5 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAPIZ
35,000 - - - - - - - - - 12 Towns in Capiz, Roxas City & 3 Towns in Iloilo
1 Panay River Basin Integrated Development Project (PRBIDP) : Additional for conduct of DE
- - - - - - - - - TOTAL CAPIZ 35,000
ILOILO
10,000 - - - - - - - - - Lemery 1 Almiñana SRIP : Conduct
Feasibility Study (Re-FS)
16,000 - - - - - - - - - San Rafael 2 Aripdip CIP : Conduct of
Feasibility Study
35,000 - - - - - - - - - Sara 3 Asue River Multi-purpose Project
: Conduct Feasibility Study
19,000 - - - - - - - - - San Rafael 4 San Dionisio SRIP : Conduct of Feasibility Study
17,000 - - - - - - - - - San Rafael 5 San Florentino SRIP : Conduct of Feasibility Study
- - - - - - - - - TOTAL ILOILO 97,000
NEGROS OCCIDENTAL
600 - - - - - - - - - Toboso 1 Magtuod SIP : Detailed
Engineering
1,000 - - - - - - - - - Talisay City 2 Imbang IP : Detailed Engineering
1,800 - - - - - - - - - Silay City 3 Malogo IP : Detailed Engineering
12,000 - - - - - - - - - Victorias City 4 Victorias Mill : Feasibility Study
1,000 - - - - - - - - - Bago City 5 Bago RIS : Detailed Engineering
1,500 - - - - - - - - - Binalbagan 6 Binalbagan CIP : Detailed
Engineering
500 - - - - - - - - - Hinobaan 7 Sangke CIP : Detailed Engineering
300 - - - - - - - - - Ilog 8 Tabo CIP : Feasibility Study
16,300 - - - - - - - - - Hinobaan 9 Tyabanan SRIP : Feasibility Study
- - - - - - - - - TOTAL NEGROS OCCIDENTAL 35,000
- - - - - - - - - 167,000 TOTAL REGION 6 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
96 - - - - - - - - - Balilihan 1 Buyog Sur CIP : Feasibility Study,
Detailed Engineering
240 - - - - - - - - - Maribojoc 2 Ponsod SIP : Feasibility Study,
Detailed Engineering
120 - - - - - - - - - Antequera 3 Viga SIP : Feasibility Study,
Detailed Engineering
20,000 - - - - - - - - - Danao 4 Bohol Northeast Basin Multi-Purpose Dam Project : Detailed Engineering
240 - - - - - - - - - San Miguel 5 Cagawasan (San Miguel) CIP : Feasibility Study, Detailed
Engineering
5,000 - - - - - - - - - Danao 6 Hibale SRIP : Detailed
Engineering
6,000 - - - - - - - - - Trinidad 7 San Isidro Banlasan SRIP :
Feasibility Study
5,810 - - - - - - - - - Alicia 8 Bagasico SRIP : Feasibility Study
120 - - - - - - - - - Sevilla 9 Cabangcalan SIP : Feasibility
Study, Detailed Engineering
2,000 - - - - - - - - - Alicia 10 Cabatang SRIP : Feasibility Study
10,000 - - - - - - - - - Guindulman 11 Catungawan SRIP : Detailed
Engineering
144 - - - - - - - - - Duero 12 Imelda SIP : Feasibility Study,
Detailed Engineering
180 - - - - - - - - - Sierra
Bullones 13 Libertad SIP : Feasibility Study,
Detailed Engineering
144 - - - - - - - - - Dimiao 14 Limokon Ilaud SIP : Feasibility
Study, Detailed Engineering
180 - - - - - - - - - Dimiao 15 Limokon Ilaya SIP : Feasibility
Study, Detailed Engineering
- - - - - - - - - TOTAL BOHOL 50,274
CEBU
280 - - - - - - - - - Carcar City 1 Napo PIP : Feasibility Study,
Detailed Engineering
1,860 - - - - - - - - - Dalaguete 2 Dalaguete SIP : Feasibility Study
700 - - - - - - - - - Balamban 3 Bayong SIP : Feasibility Study, Detailed Engineering
2,000 - - - - - - - - - Toledo City 4 Canlumampao CIS : Feasibility Study, Detailed Engineering
420 - - - - - - - - - Toledo City 5 Loay SIP : Feasibility Study, Detailed Engineering
525 - - - - - - - - - Medellin 6 Manan-aw PIP : Feasibility Study, Detailed Engineering
2,170 - - - - - - - - - Carmen 7 Mangitngit SIP : Feasibility Study
3,255 - - - - - - - - - Alegria 8 Cambais CIP : Feasibility Study
947 - - - - - - - - - Dumanjug 9 Kanghalo SIP : Feasibility Study
1,050 - - - - - - - - - Alegria 10 Malalag SIP : Feasibility Study, Detailed Engineering
1,302 - - - - - - - - - Alegria 11 Samuyao Antogon CIP : Feasibility Study
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - TOTAL CEBU 14,509
CEBU CITY
217 - - - - - - - - - Lusaran,
Cebu City 1 Manggabon PIP : Feasibility
Study
- - - - - - - - - TOTAL CEBU CITY 217
NEGROS ORIENTAL
7,000 - - - - - - - - - Amlan 1 Janti-anon IP : Detailed
Engineering and ECC
4,500 - - - - - - - - - Tanjay City 2 Tanjay-Bais IP-Ursumco :
Feasibility Study
11,500 - - - - - - - - - Siaton 3 Dagangdang-Tampaga IP :
Detailed Engineering
2,000 - - - - - - - - - Bayawan City 4 Kalumboyan CIS Ext'n. : Feasibility Study and Detailed
Engineering
- - - - - - - - - TOTAL NEGROS ORIENTAL 25,000
- - - - - - - - - 90,000 TOTAL REGION 7 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BILIRAN
500 - - - - - - - - - Caibiran 1 Matin-ao CIS : Conduct of FS&DE
500 - - - - - - - - - Almeria 2 Naga-Naga CIP : Conduct of
FS&DE
500 - - - - - - - - - Almeria 3 Palayan ng Bayan : Conduct of
FS&DE
- - - - - - - - - TOTAL BILIRAN 1,500
LEYTE (NORTHERN)
350 - - - - - - - - - Leyte 1 Consuegra CIP : Conduct of FS & DE
8,000 - - - - - - - - - San Isidro 2 San Isidro SRIP : Conduct of Preliminary FS
350 - - - - - - - - - Ormoc City 3 Bagombong CIS : Conduct of
FSDE
350 - - - - - - - - - Ormoc City 4 Gaas CIP : Conduct of FSDE
350 - - - - - - - - - Kananga 5 Kananga Poblacion CIS : Conduct of FSDE
200 - - - - - - - - - Merida 6 Lundag CIS : Conduct of FS
200 - - - - - - - - - Kananga 7 Natubgan CIS : Conduct of FSDE
300 - - - - - - - - - Kananga 8 Rizal CIS : Conduct of FSDE
200 - - - - - - - - - Merida 9 San Jose CIS : Conduct of FS
350 - - - - - - - - - Albuera 10 Tinag-an CIP : Conduct of FSDE
300 - - - - - - - - - Albuera 11 Togonon CIS : Conduct of FSDE
350 - - - - - - - - - Baybay 12 Gabas CIP : Conduct of FSDE
350 - - - - - - - - - Baybay 13 Kansungka CIP : Conduct of FSDE
350 - - - - - - - - - Baybay 14 Maganhan CIP : Conduct of FSDE
300 - - - - - - - - - Baybay 15 Maybog CIS : Conduct of FSDE
- - - - - - - - - TOTAL LEYTE (NORTHERN) 12,300
LEYTE (SOUTHERN)
500 - - - - - - - - - Hinundayan 1 Cabongbongan CIP : Conduct of
FS & DE
500 - - - - - - - - - Maasin 2 Cagnitoan-Hanginan CIP :
Conduct of FS & DE
500 - - - - - - - - - Hinunangan 3 Tabion CIP : Conduct of FS & DE
- - - - - - - - - TOTAL LEYTE (SOUTHERN) 1,500
SAMAR (EASTERN)
400 - - - - - - - - - Can-Avid 1 Caghalong CIP : Conduct of FS &
DE
400 - - - - - - - - - Can-Avid 2 Camantang CIP : Conduct of FS &
DE
400 - - - - - - - - - Can-Avid 3 Mabuhay CIP : Conduct of FS &
DE
2,000 - - - - - - - - - Oras 4 Bantayan CIP : Conduct of FS &
DE
1,000 - - - - - - - - - Oras 5 Cagtuog CIP : Conduct of FS & DE
- - - - - - - - - TOTAL SAMAR (EASTERN) 4,200
SAMAR (NORTHERN)
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
300 - - - - - - - - - Mondragon 1 Cablangan CIP : Conduct of FS &
DE
300 - - - - - - - - - Mondragon 2 Camambanan CIP : Conduct of FS & DE
300 - - - - - - - - - Pambujan 3 Pambujan IP : Conduct of FS & DE
- - - - - - - - - TOTAL SAMAR (NORTHERN) 900
SAMAR (WESTERN)
3,000 - - - - - - - - - San Jorge 1 Gandara IP-Bungliw SRIP :
conduct of detailed eng'g
400 - - - - - - - - - Calbayog City 2 Panoypoy CIP : conduct of
detailed eng'g
400 - - - - - - - - - Calbayog City 3 Taliwara CIP : conduct of FS
1,000 - - - - - - - - - Basey 4 Basey IS Extn : conduct of
detailed eng'g
400 - - - - - - - - - Basey 5 Basiao CIP : Conduct of FS
2,000 - - - - - - - - - Pinabacdao 6 Lale SRIP : Updating of FS
400 - - - - - - - - - San Jose de
Buan 7 Manangday CIP : conduct of
detailed eng'g
- - - - - - - - - TOTAL SAMAR (WESTERN) 7,600
- - - - - - - - - 28,000 TOTAL REGION 8 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
SULU
1,000 - - - - - - - - - Talipao 1 Bandang SIP : Conduct of F.S. &
D.E. activities
1,000 - - - - - - - - - Patikul 2 Kaunayan SIP : Conduct of F.S. &
D.E. activities
1,000 - - - - - - - - - Indanan 3 Sasac SIP : Conduct of F.S. & D.E.
activities
- - - - - - - - - TOTAL SULU 3,000
ZAMBOANGA CITY
500 - - - - - - - - - Limpapa, Zamboanga City
1 Limpapa SIP : Conduct of F.S. & D.E. activities
1,865 - - - - - - - - - Mercedes, Zamboanga
city
2 Mercedes (Supplemental Source)
: Conduct of F.S. & D.E. activities
- - - - - - - - - TOTAL ZAMBOANGA CITY 2,365
ZAMBOANGA DEL NORTE
500 - - - - - - - - - Katipunan 1 Kinas SIP :
1,860 - - - - - - - - - Manukan 2 Patunan SIP :
500 - - - - - - - - - Sindangan 3 Titik SIP :
250 - - - - - - - - - Labason 4 Canuto S Enerio SIP :
250 - - - - - - - - - Labason 5 Kipit SIP :
250 - - - - - - - - - Labason 6 Nasibak SIP :
250 - - - - - - - - - Leon B.
Postigo 7 Sipakong SIP :
250 - - - - - - - - - Tampilisan 8 Tampilisan SIP :
300 - - - - - - - - - Liloy 9 Timankayok SIP :
500 - - - - - - - - - Godod 10 Titik SIP :
- - - - - - - - - TOTAL ZAMBOANGA DEL NORTE 4,910
ZAMBOANGA DEL SUR
1,860 - - - - - - - - - Dimataling 1 Dimataling SIP : Conduct of F.S. &
D.E. Activities
- - - - - - - - - TOTAL ZAMBOANGA DEL SUR 1,860
ZAMBOANGA SIBUGAY
1,000 - - - - - - - - - Tungawan 1 Tungawan SIP :
1,865 - - - - - - - - - Diplahan 2 Upper Sibuguey RIS Extension
Project :
- - - - - - - - - TOTAL ZAMBOANGA SIBUGAY 2,865
- - - - - - - - - 15,000 TOTAL REGION 9 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various
Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
4,365 - - - - - - - - - Quezon 1 Delapa SRIP (DE) : Detailed
Engineering
- - - - - - - - - TOTAL BUKIDNON 4,365
LANAO DEL NORTE
7,800 - - - - - - - - - Kapatagan, Salvador
1 Kapatagan Valley IIP : Feasibility Study
10,200 - - - - - - - - - Sultan Naga Dimaporo
2 Sultan Naga Dimaporo SRIP : Pre-FS and FS
- - - - - - - - - TOTAL LANAO DEL NORTE 18,000
MISAMIS OCCIDENTAL
2,630 - - - - - - - - - Calamba 1 Calamba IIP (DE) : Detailed
Engineering
- - - - - - - - - TOTAL MISAMIS OCCIDENTAL 2,630
MISAMIS ORIENTAL
14,150 - - - - - - - - - Claveria 1 Claveria SRIP : Detailed
Engineering
2,855 - - - - - - - - - Talisayan 2 Sibantang CIP : Feasibility Study
& Detailed Engineering
- - - - - - - - - TOTAL MISAMIS ORIENTAL 17,005
- - - - - - - - - 42,000 TOTAL REGION 10 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
COMPOSTELA VALLEY
14,600 - - - - - - - - - Monkayo 1 Awao SRIP : Conduct of
Feasibility Study
800 - - - - - - - - - Compostela 2 Kabalubwan SIP : Conduct of
Feasibility Study
800 - - - - - - - - - Compostela 3 Kabawasan SIP : Conduct of
Feasibility Study
12,000 - - - - - - - - - Montevista 4 Linoan SRIP : Conduct of Detailed
Engineering
500 - - - - - - - - - Monkayo 5 Malokdok SIP : Conduct of
Detailed Engineering
13,400 - - - - - - - - - Montevista 6 Manat NIP : Conduct of Detailed
Engineering
800 - - - - - - - - - Compostela 7 Upper Ambawan SIP : Conduct of
Feasibility Study
400 - - - - - - - - - Laak 8 Amor Cruz SIP : Conduct of
Detailed Engineering
400 - - - - - - - - - Laak 9 Candiis SIP : Conduct of Detailed
Engineering
400 - - - - - - - - - Laak 10 Il Papa SIP : Conduct of Detailed
Engineering
400 - - - - - - - - - Laak 11 Kaligutan SIP : Conduct of
Detailed Engineering
- - - - - - - - - TOTAL COMPOSTELA VALLEY 44,500
DAVAO CITY
2,500 - - - - - - - - - Davao City 1 Carcatabawi SIP : Conduct of Feasibility Study and Detailed Engineering
- - - - - - - - - TOTAL DAVAO CITY 2,500
DAVAO DEL NORTE
600 - - - - - - - - - Talaingod 1 Amor Cruz SIP : Conduct of
Feasibility Study
800 - - - - - - - - - Kapalong 2 Florida-Libuganon SIP : Conduct
of Feasibility Study
300 - - - - - - - - - Talaingod 3 Kalagutay SIP : Detailed
Engineering
500 - - - - - - - - - Tagum 4 San Agustin SIP : Conduct of
Feasibility Study
600 - - - - - - - - - Kapalong 5 Suaon SIP : Conduct of Feasibility
Study
300 - - - - - - - - - Panabo 6 Buenavista SIP : Conduct of
Feasibility Study
300 - - - - - - - - - Carmen 7 Lower Tuganay SIP : Conduct of
Feasibility Study
300 - - - - - - - - - Panabo 8 Mabunao SIP : Conduct of
Feasibility Study
600 - - - - - - - - - Santo Tomas 9 Sta. Cruz SIP : Conduct of
Feasibility Study
- - - - - - - - - TOTAL DAVAO DEL NORTE 4,300
DAVAO DEL SUR
10,000 - - - - - - - - - Matanao 1 Asbang SRIP (FSDE) : Reassessment/Reevaluation of Feasibility Study Report
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 - - - - - - - - - Kiblawan 2 Bagong Negros SIP : Conduct of Feasibility Study and Detailed Engineering
600 - - - - - - - - - Kiblawan 3 Kisulan SIP : Conduct of Feasibility Study and Detailed Engineering
16,100 - - - - - - - - - Bansalan 4 Miral SRIS : Reassessment of FS and conduct of DE Report thru consulting services
500 - - - - - - - - - Matanao 5 New Silay SIP : Conduct of
Feasibility Study
- - - - - - - - - TOTAL DAVAO DEL SUR 28,200
DAVAO OCCIDENTAL
500 - - - - - - - - - Jose Abad
Santos 1 Culaman SIP : Feasibility Study
800 - - - - - - - - - Malita 2 Datu Danwata SIP : Detailed
Engineering
- - - - - - - - - TOTAL DAVAO OCCIDENTAL 1,300
DAVAO ORIENTAL
400 - - - - - - - - - Cateel 1 Baliwagan SIP : Conduct of Feasibility Study (FS)
300 - - - - - - - - - Baganga 2 Mahan-ub SIP : Conduct of Feasibility Study (FS)
500 - - - - - - - - - Lupon 3 Don Mariano SIP : Conduct
Feasibility Study Activities
- - - - - - - - - TOTAL DAVAO ORIENTAL 1,200
- - - - - - - - - 82,000 TOTAL REGION 11 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
19,760 - - - - - - - - - Upi 1 Upi RIP :
- - - - - - - - - TOTAL MAGUINDANAO 19,760
NORTH COTABATO
6,608 - - - - - - - - - Alamada 1 Lib-Mal Transbasin :
250 - - - - - - - - - Midsayap 2 Libungan RIS :
15,000 - - - - - - - - - Tulunan 3 Tulunan Small Reservoir Irrigation Project : Detailed Engineering
200 - - - - - - - - - Kabacan 4 Kabacan RIS :
200 - - - - - - - - - Tulunan 5 Malasila RIS :
250 - - - - - - - - - Pikit 6 Maridagao RIS :
200 - - - - - - - - - Mlang 7 Mlang RIS :
- - - - - - - - - TOTAL NORTH COTABATO 22,708
SARANGANI
517 - - - - - - - - - Malapatan 1 Banlas SIP :
405 - - - - - - - - - Alabel 2 Basak SIP :
524 - - - - - - - - - Maasim 3 Bual SIP :
754 - - - - - - - - - Malapatan 4 Kinam SIP :
285 - - - - - - - - - Malapatan 5 Kisoy SIP :
524 - - - - - - - - - Maasim 6 Lamlabong SIP :
695 - - - - - - - - - Malungon 7 Macnit SIP :
476 - - - - - - - - - Malapatan 8 Nabol SIP :
354 - - - - - - - - - Polomolok 9 Water Rock SIP :
- - - - - - - - - TOTAL SARANGANI 4,534
SOUTH COTABATO
72 - - - - - - - - - Polomolok 1 Glamang CIS :
1,159 - - - - - - - - - Polomolok 2 Koronadal Proper SIP :
36 - - - - - - - - - Tampakan 3 Lmt CIS :
69 - - - - - - - - - Polomolok 4 Magsaysay-Polomolok CIS :
68 - - - - - - - - - Polomolok 5 Silway 7 CIS :
1,300 - - - - - - - - - Santo Niño, Surallah, Norala
6 Ala RIS :
90 - - - - - - - - - Lake Sebu 7 Bacdulong CIS :
400 - - - - - - - - - Banga, Norala, Sto.
Nino
8 Banga RIS :
181 - - - - - - - - - Koronadal
city 9 Bo. 7 CIS :
15 - - - - - - - - - Koronadal city
10 Cacub CIS :
110 - - - - - - - - - Koronadal city
11 Carpenter SWIP :
120 - - - - - - - - - Lake Sebu 12 Duengas CIS :
3,000 - - - - - - - - - T'boli 13 Lake Holon SWIP :
57 - - - - - - - - - Lake Sebu 14 Lake Sebu CIS :
70 - - - - - - - - - Norala 15 Lambusong CIS :
290 - - - - - - - - - Banga 16 Lamcot SWIP :
45 - - - - - - - - - Tantangan 17 Luayan CIS :
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
585 - - - - - - - - - Koronadal
city 18 Magsaysay CIS :
51 - - - - - - - - - Banga 19 Malaya CIS :
65 - - - - - - - - - Koronadal city
20 Mani CIS :
270 - - - - - - - - - Koronadal City, Tantangan
21 Marbel #1 RIS :
305 - - - - - - - - - Koronadal
City, Lutayan 22 Marbel #2 RIS :
110 - - - - - - - - - Koronadal
city 23 Rotonda SWIP :
20 - - - - - - - - - Lake Sebu 24 Talisay CIS :
60 - - - - - - - - - Tantangan 25 Tantangan CIS :
672 - - - - - - - - - Norala 26 Tinago SWIP :
- - - - - - - - - TOTAL SOUTH COTABATO 9,220
SULTAN KUDARAT
259 - - - - - - - - - Lambayong 1 Lambayong RIS (Baumol Extn) :
20,000 - - - - - - - - - Bagumbayan 2 Kabulnan 2 Multipurpose Irrigation & Power Project : Detailed Engineering
443 - - - - - - - - - Bagumbayan 3 Kataan SIP :
12,884 - - - - - - - - - Lebak 4 Lebak Intergrated RIP :
79 - - - - - - - - - Lebak 5 Marigaeg CIS :
115 - - - - - - - - - President
Quirino 6 Sition Lagon SIP :
- - - - - - - - - TOTAL SULTAN KUDARAT 33,780
- - - - - - - - - 90,002 TOTAL REGION 12 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
28,000 - - - - - - - - - Remedios T.
Romualdez 1 Agay-Tagnote SRIP : Feasibility
Study
28,000 - - - - - - - - - Jabonga 2 Puyo SRIP : Feasibility Study
- - - - - - - - - TOTAL AGUSAN DEL NORTE 56,000
AGUSAN DEL SUR
10,000 - - - - - - - - - Prosperidad 1 Malihaw SRIP :
- - - - - - - - - TOTAL AGUSAN DEL SUR 10,000
SURIGAO DEL SUR
9,000 - - - - - - - - - Tago/San
Miguel 1 Tago RIS :
- - - - - - - - - TOTAL SURIGAO DEL SUR 9,000
- - - - - - - - - 75,000 TOTAL REGION 13 - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CENTRAL OFFICE
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PMO/CO
13,000 - - - - - - - - - Central Office 1 Baua RIS Improvement Project :
Cagayan (FS & DE)
5,000 - - - - - - - - - Central Office 2 Maringalo Dam IP : UPRIIS (FS &
DE)
30,000 - - - - - - - - - Central Office 3 Project Coordination, Investigation and Validation, Feasibility Study, Support to Study Mission, Expenses and Procurement Requirement :
10,000 - - - - - - - - - Central Office 4 Solar Power Energy Source :
MARIIS (FS & DE)
12,000 - - - - - - - - - Central Office 5 Visitacion RIS : Cagayan (FS & DE)
- - - - - - - - - TOTAL PMO/CO 70,000
- - - - - - - - - 70,000 TOTAL CENTRAL OFFICE - Feasibility Study, Detailed Engineering and Pre-Engineering Activities of Various Projects (FSDE)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS SUR
400 - 16 - - - - - - - Bantay 1 STW w/in An-Annam CIS : Supply of Irrigation Pump/Engine with accesories
200 - 8 - - - - - - - San Ildefonso 2 STW w/in Bungro CIS : Supply of Irrigation Pump/Engine with
accesories
400 - 16 - - - - - - - Santo
Domingo 3 STW w/in Dumpipi CIS : Supply of
Irrigation Pump/Engine with accesories
480 - 16 - - - - - - - Santo
Domingo 4 STW w/in Lagatit CIS : Supply of
Irrigation Pump/Engine with
accesories
200 - 8 - - - - - - - Bantay 5 STW w/in Nagtripitian CIS : Supply of Irrigation Pump/Engine with accesories
400 - 16 - - - - - - - Candon 6 STW w/in Sta. Lucia-Candon NIS : Supply of Irrigation Pump/Engine
with accesories
400 - 16 - - - - - - - Santa Maria 7 STW w/in Sta. Maria-Burgos NIS : Supply of Irrigation Pump/Engine with accesories
400 - 16 - - - - - - - Santa Maria 8 STW w/in Suso CIS : Supply of Irrigation Pump/Engine with
accesories
- - - - - - - 112 - TOTAL ILOCOS SUR 2,880
- - - - - - - 112 - 2,880 TOTAL REGION 1 - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
1,900 - 27 - - - - - - - Bangued 1 Aria PIS : Installation of 13
pumps and engines
450 - 6 - - - - - - - Bucay 2 Bucay PIS : Installation of 3
pumps and engines
450 - 6 - - - - - - - Tayum 3 Tayum PIS : Installation of 3
pumps and engines
- - - - - - - 39 - TOTAL ABRA 2,800
APAYAO
800 - - - - - - - - - Luna 1 Luna PIS : Supply and Delivery of 8 units Pumps & Engine
1,750 - - - - - - - - - Flora 2 Pudtol PIS : Supply and Delivery of 18 units Pumps & Engine
- - - - - - - - - TOTAL APAYAO 2,550
BENGUET
1,175 - 40 - - 2 3 - - - La Trinidad 1 BSU PIS : Installation of pipeline & rehabilitation of canal
structure
- - - 3 2 - - 40 - TOTAL BENGUET 1,175
ISABELA
1,000 - - - - - - - - - Quezon 1 UCRIS PIS : Procurement and installation of pump and pump engines.
- - - - - - - - - TOTAL ISABELA 1,000
KALINGA
1,625 - - - - - - - - - Rizal 1 Rizal PIS : Procurement and installation of pump and pump engines.
- - - - - - - - - TOTAL KALINGA 1,625
MT. PROVINCE
1,100 - 6 - - - - - - - Paracelis 1 Bananao PIS : Procurement/Delivery and Installation of Water Pumps.
- - - - - - - 6 - TOTAL MT. PROVINCE 1,100
- - - - 3 2 - 85 - 10,250 TOTAL CAR - Repair of Groundwater Pump Irrigation
Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
195 - 3 - - - - - - - Tumauini 1 Bayabo (TIS) : 1 Unit Engine;
Shallow Tube Well
240 - 4 - - - - - - - Santo Tomas 2 Matakayan IA : 2 Unit Engine;
Shallow Tube Well
185 - 3 - - - - - - - Tumauini 3 Ugad (TIS) : 1 Unit Engine;
Shallow Tube Well
975 - 15 - - - - - - - San Manuel 4 Namnama CIS : 5 Unit Engine;
Shallow Tube Well
24,000 - - - - - - - - - Cauayan City 5 Regional Office - Region 2 : Maintenance, repair of pumping stations/faciltities and supply/ delivery/ installation/ commissioning of pumps
- - - - - - - 25 - TOTAL ISABELA 25,595
- - - - - - - 25 - 25,595 TOTAL REGION 2 (PROPER) - Repair of Groundwater
Pump Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
60,000 - - - - - - - - - Bustos 1 ANBUSPA : Replacement of
pump/motor/c.panel
- - - - - - - - - TOTAL BULACAN 60,000
TARLAC
3,000 - - - - - - - - - Anao 1 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
6,000 - - - - - - - - - Pura 2 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
5,500 - - - - - - - - - Ramos 3 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
3,600 - - - - - - - - - Victoria 4 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
3,000 - - - - - - - - - Concepcion 5 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
6,400 - - - - - - - - - Lapaz 6 Tarlac Groundwater Irrigattion System : Repair of Groundwater Pump Irrigation System
- - - - - - - - - TOTAL TARLAC 27,500
- - - - - - - - - 87,500 TOTAL REGION 3 (PROPER) - Repair of Groundwater
Pump Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAVITE
2,000 - - - - - - - - - Gen. Mariano Alvarez
1 F. De Castro PCIS : Rehab of
Pump Facilities
1,000 - - - - - - - - - Gen. Mariano
Alvarez 2 Pasong Saguing PCIS : Rehab of
Pump Facilities
5,250 - 35 - - - - - - - Maragondon 3 Mabacao Pump IS : Rehab of
Pump Facilities
- - - - - - - 35 - TOTAL CAVITE 8,250
LAGUNA
24,750 - - - 1.62 1 - - - - Cabuyao City 1 Cabuyao East PIS : Pump Works, Repair of Pump House & Construction of Canal Lining
1,340 - - - - - - - - - Lumban 2 Binambang PCIS : Proc & Del of
15 units Centrifugal Pump
- - - - 1 1.62 - - - TOTAL LAGUNA 26,090
QUEZON
3,600 - - - - - - - - - Calauag 1 Pansol PCIS : Installation of
Pumps & Accessories
- - - - - - - - - TOTAL QUEZON 3,600
RIZAL
7,300 - 62 - - - - - - - Morong 1 Wawa PCIS : Construction of Intake & Canal Lining
- - - - - - - 62 - TOTAL RIZAL 7,300
- - - - - 1 1.62 97 - 45,240 TOTAL REGION 4A - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
3,000 - 75 - - - - - - - Calintaan 1 Tanyag PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete
accessories.
- - - - - - - 75 - TOTAL OCCIDENTAL MINDORO 3,000
- - - - - - - 75 - 3,000 TOTAL REGION 4B - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
GUIMARAS
250 - 5 - - - - - - - San Lorenzo 1 Igcawayan PIS : Supply and
Delivery of Pump and Engine
250 - 5 - - - - - - - Nueva
Valencia 2 Lanipe PIS : Supply and Delivery
of Pump and Engine
1,600 - 10 - 0.50 - - - - - San Lorenzo 3 M. Chavez PIS : Repair and rehab
of canal lining
250 - 3 - - - - - - - Nueva
Valencia 4 Oracon PIS : Supply and Delivery
of Pump and Engine
- - - - - 0.50 - 23 - TOTAL GUIMARAS 2,350
ILOILO
2,000 - 10 - 0.20 1 - - - - Guimbal 1 Binanua-an IS : Construction of Pump Irrigation Facilities
- - - - 1 0.20 - 10 - TOTAL ILOILO 2,000
- - - - - 1 0.70 33 - 4,350 TOTAL REGION 6 - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CEBU
3,000 - 15 1.50 - 1 - - - - Carcar City 1 Calidngan PIS : Rehabilitation/Restoration of Irrigation Pipelines & Structures
2,400 - 8 1.00 - 1 - - - - Naga City 2 Naalad PIS : Restoration of
Irrigation Pipelines & Structures
3,000 - - 1.50 - 1 - - - - Consolacion 3 Panas II PIS : Rehabilitation of
Irrigation Pipelines & Structures
1,000 - - 0.65 - 1 - - - - Malabuyoc 4 Palaypay PIS : Rehabilitation of
Irrigation Pipelines & Structures
- - - - 4 - 4.65 23 - TOTAL CEBU 9,400
4.65 - - - - 4 - 23 - 9,400 TOTAL REGION 7 - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Repair of Groundwater Pump Irrigation Systems (RGPIS) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
DAVAO DEL SUR
3,600 - 20 - - - - - - - Hagonoy 1 Padada RIS PIP : Procurement of mobile surface pump with complete accessories
- - - - - - - 20 - TOTAL DAVAO DEL SUR 3,600
- - - - - - - 20 - 3,600 TOTAL REGION 11 - Repair of Groundwater Pump
Irrigation Systems (RGPIS)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
5,000 - - - 0.25 6 - - - - Bacarra 1 (NMC) North Main Canal & Pasuquin Extn RIS : Canal Lining & Canal Structure
2,500 - 19 - 0.68 - - - - - Bangui 2 Bolo RIS : Canal Lining
5,000 - - - - 1 - - - - Piddig 3 Cura RIS : Canal Lining & Canal
Structure
19,000 - - - 3.00 7 - - - - Laoag City 4 Laoag Vintar RIS : Canal Lining &
Canal Structure
3,876 - - - 0.16 - - - - - Vintar 5 Laoag Vintar RIS : Canal Lining
4,500 - - - 1.05 - - - - - Dingras 6 Dingras RIS : Canal Lining
5,000 - - - 1.30 - - - - - Nueva Era 7 Nueva Era RIS : Canal Lining
2,500 - - - 1.39 - - - - - Marcos 8 Papa RIS : Canal Lining
35,000 - - - 0.92 1 - - - - Vintar 9 (NMC) North Main Canal & Pasuquin Extn RIS : Canal Lining
& Canal Structure
25,000 - - - 1.11 - - - - - Bacarra 10 Laoag Vintar RIS : Canal Lining
- - - - 15 9.85 - 19 - TOTAL ILOCOS NORTE 107,376
ILOCOS SUR
5,000 - 50 - 0.54 3 - - - - Bantay 1 Banaoang PIS : Canal Lining &
Canal Structures
5,000 - - - 0.37 3 - - - - Magsingal 2 Banaoang PIS : Canal Lining
5,000 - 58 - 0.70 3 - - - - San Ildefonso 3 Banaoang PIS : Canal Lining , Canal Structures & Drainage Structures
3,500 - 52 - 0.25 1 - - - - San Vicente 4 Banaoang PIS : Canal Lining
5,000 - - - 0.58 3 - - - - Santo
Domingo 5 Banaoang PIS : Canal Lining
13,433 - - - - - - - - - Cabugao 6 Gaco NIS : Protection Works, Drainage Canal, Canal Lining &
Canal Structures
5,000 - - - 0.50 2 - - - - Santa Lucia 7 Sta. Lucia-Candon NIS : Canal
Lining & Canal Structures
6,000 - - - 0.20 - - - - - Burgos 8 Sta. Maria-Burgos NIS : Canal Lining
10,000 - - - 1.53 - - - - - Tagudin 9 Suyo-Tagudin NIS : Canal Lining
20,000 - - - - - - - - - Santa Lucia 10 Sta. Lucia-Candon NIS : Protection Works Upstream L/S & R/S
- - - - 15 4.66 - 160 - TOTAL ILOCOS SUR 77,933
LA UNION
4,000 - - - 1.10 - - - - - Balaoan 1 Amburayan RIS : Canal Lining
4,000 - - - 0.18 - - - - - Bangar 2 Amburayan RIS : Canal Lining
3,400 - - - 0.37 - - - - - Luna 3 Amburayan RIS : Canal Lining
4,000 - - - 0.90 - - - - - Agoo 4 Masalip RIS : Canal Lining
3,500 - 40 - 0.91 - - - - - Aringay 5 Masalip RIS : Canal Lining
4,000 - 25 - 0.18 - - - - - Santo Tomas 6 Masalip RIS : Canal Lining
2,000 - 25 - 0.40 - - - - - Tubao 7 Masalip RIS : Canal Lining
3,752 - - - 0.34 - - - - - Sudipen 8 Amburayan RIS : Canal Lining
- - - - - 4.38 - 90 - TOTAL LA UNION 28,652
PANGASINAN
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
8,000 - - 2.00 0.90 2 - - - - Malasiqui 1 Agno RIS : Canal Lining & Canal
Structures
7,869 - - - 1.00 2 - - - - Santa Barbara
2 Agno RIS : Canal Lining & Canal Structures
4,000 - - - 0.80 1 - - - - Calasiao 3 Sinocalan RIS : Canal Lining & Canal Structures
5,000 - - - 1.00 3 - - - - Manaoag 4 Agno RIS : Canal Lining & Canal Structures
6,000 - 10 - 0.80 2 - - - - Mangaldan 5 Agno RIS :
8,000 - - - 1.00 3 - - - - Mangaldan 6 Sinocalan RIS : Canal Lining & Canal Structures
6,000 - - - 0.80 2 - - - - Binalonan 7 Agno RIS : Canal Lining & Canal
Structures
6,000 - - - 0.80 2 - - - - Laoac 8 Agno RIS : Canal Lining & Canal Structures
6,000 - - - 0.80 2 - - - - Urdaneta City 9 Agno RIS : Canal Lining & Canal Structures
6,000 - - - 1.00 2 - - - - Villasis 10 Agno RIS : Canal Lining & Canal Structures
8,000 - - - 0.80 2 - - - - Asingan 11 Agno RIS : Canal Lining & Canal Structures
8,000 - - - 0.50 2 - - - - Tayug 12 Agno RIS : Canal Lining & Canal
Structures
12,500 - - - 1.00 3 - - - - San Nicolas 13 Ambayoan RIS : Canal Lining & Canal Structures
12,000 - - - 1.00 3 - - - - San Quintin 14 Dipalo RIS : Canal Lining & Canal Structures
- - - - 31 12.20 2.00 10 - TOTAL PANGASINAN 103,369
2.00 - - - - 61 31.09 279 - 317,330 TOTAL REGION 1 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
APAYAO
20,000 - - - 0.40 1 - - - - Luna 1 West Apayao Abulug IS : Construction of canal lining & Canal Structures
10,350 - - - 0.20 1 - - - - Pudtol 2 West Apayao Abulug IS : Construction of canal lining &
Canal Structures
- - - - 2 0.60 - - - TOTAL APAYAO 30,350
CAGAYAN
20,000 - - - 0.52 2 - - - - Abulug 1 West Apayao Abulug IS : Construction of Canal Lining & Canal Structures
20,000 - - - 3.00 4 - - - - Pamplona 2 West Apayao Abulug IS : Construction of Canal Lining &
Canal Structures
- - - - 6 3.52 - - - TOTAL CAGAYAN 40,000
IFUGAO
76,743 - - - - 1 - - - - Lamut 1 Hapid IS : Construction of
Diversion Dam
- - - - 1 - - - - TOTAL IFUGAO 76,743
ISABELA
7,000 - - - 1.75 - - - - - Quezon 1 Upper Chico RIS : Procurement & Installation of Steelgates and Canal Lining of 8.75 km Existing
Earth Canals
- - - - - 1.75 - - - TOTAL ISABELA 7,000
KALINGA
13,000 - - - 4.00 3 - - - - Pinukpuk 1 Upper Chico RIS : Procurement & Installation of Steelgates and Canal Lining of 8.75 km Existing
Earth Canals
10,000 - - - 3.00 - - - - - Tabuk City 2 Upper Chico RIS : Procurement & Installation of Steelgates and Canal Lining of 8.75 km Existing
Earth Canals
- - - - 3 7.00 - - - TOTAL KALINGA 23,000
- - - - - 12 12.87 - - 177,093 TOTAL CAR - Restoration/Rehabilitation/Repair of
Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
8,000 - 6 - - - - - - - Baggao 1 Baggao Irrigation System : Canal
Lining/Structures
7,100 - 20 - - - - - - - Buguey 2 Banurbur Creek Irrigation System
: Canalization works
7,000 - 10 - - - - - - - Gonzaga 3 Baua River Irrigation System : Const'n. of Concr. Ogee of intake
10,000 - - - - - - - - - Camalaniuga
n 4 Magapit PIS : Drainage Canal
30,000 - - - - - - - - - Santa Ana 5 Visitacion Irrigation System : Const'n. of Pumps, Canal Lining,Structures, Check structures
24,341 - 100 - - - - - - - Ballesteros 6 East Apayao Abulug IS : Canal
Lining/Structures
3,000 - - - - - - - - - Pamplona 7 Pamplona Pump Irrigation System : Construction of
turnouts
3,833 - 35 - - - - - - - Lasam 8 Zinundungan River IS : Canal
Lining/Structures
4,000 - - - 1.00 - - - - - Amulung 9 Iguig-Alcala-Amulung Pump Irrigation System : Canal Lining/Structures
8,000 - 15 - - - - - - - Tuao 10 Lower Chico River Irrigation
System : Canal Lining/Structures
4,056 - 20 - - - - - - - Peñablanca 11 Pinacanauan River Irrigation System : Canal Lining/Structures
7,670 - 16 - - - - - - - Solana 12 Solana Pump Irrigation System :
Canal Lining/Structures
10,000 - - - - - - - - - Solana 13 Solana Pump Irrigation System :
(Pangul Creek) Drainage System
20,000 - - - - - - - - - Amulung 14 Iguig-Alcala-Amulung Pump Irrigation System : Construction of Slope Protection Works at Amulung Pump Intake Pilot Channel NIA-IAAPIS
- - - - - 1.00 - 222 - TOTAL CAGAYAN 147,000
ISABELA
2,500 - - 0.20 - - - - - - Tumauini 1 Tumauini Irrigation System : Canalization works
2,909 - 20 - - - - - - - Mallig 2 Mallig River Irrigation System : Canal, Canal Lining & Repair of Canal Structures
7,000 - - 0.07 1.43 9 - - - 4.16 San Agustin 3 Dabubu RIP : Rehab of Existing Earth Canal, Constn of Concrete Canal Lining, Construction of canal Structures
25,000 - 30 - - - - - - - Cabagan 4 San Pablo Cabagan Irrigation System : Canal Lining, Desilting of Canals & Repair of Strs.
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4.16 - - - 9 1.43 0.27 50 - TOTAL ISABELA 37,409
NUEVA VIZCAYA
25,500 - - - 4.70 6 - - - - Bayombong 1 Colocol NIS : Canal and Canal
Structures
9,000 - - - 7.44 - - - - - Bagabag 2 Nueva Vizcaya-Bagabag IS
(NVBIS) : Canal lining
- - - - 6 12.14 - - - TOTAL NUEVA VIZCAYA 34,500
QUIRINO
158,000 - 500 - - - - - - - Saguday 1 Addalam River Irrigation System (ADRIS) : Canalization Works, Canal Lining, and Canal
Structures
- - - - - - - 500 - TOTAL QUIRINO 158,000
0.27 4.16 - - - 15 14.57 772 - 376,909 TOTAL REGION 2 (PROPER) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
IFUGAO
15,481 - - - 0.49 - - - - - Alfonso Lista 1 Magat RIS : Division III
- - - - - 0.49 - - - TOTAL IFUGAO 15,481
ISABELA
2,400 - - - 0.10 - - - - - Aurora 1 Magat RIS : Division III
3,000 - - - 0.66 - - - - - Naguilian 2 Magat RIS : Division IV
9,131 - - - 0.40 - - - - - Roxas 3 Magat RIS : Division III
23,500 - - - 0.70 - - - - - San Manuel 4 Siffu RIS : Division III
8,500 - - - 0.74 - - - - - Alicia 5 Magat RIS : Division IV
8,586 - - - 0.49 - - - - - Cabatuan 6 Magat RIS : Division IV
6,914 - - - 0.75 - - - - - Reina
Mercedes 7 Magat RIS : Division IV
5,000 - - - 0.74 - - - - - San Mateo 8 Magat RIS : Division IV
9,500 - - - 0.65 - - - - - San Mateo 9 Magat RIS : Division II
5,000 - - - 0.29 - - - - - Cordon 10 Baligatan DD : Division I
2,870 - - - 0.27 - - - - - Ramon 11 Baligatan DD : Division I
25,000 - - - 1.20 - - - - - Ramon 12 Magat RIS : HO
10,000 - - - 0.50 - - - - - Ramon 13 Magat RIS : Division II
6,700 - - - 1.00 - - - - - San Isidro 14 Magat RIS : Division II
3,374 - - - 0.15 - - - - - San Isidro 15 Magat RIS : Division I
5,626 - - - 0.35 1 - - - - Santiago City 16 Magat RIS : Division I
15,000 - - - 0.38 - - - - - Burgos 17 Siffu RIS : Division III
7,000 - - - 0.15 - - - - - San Manuel 18 Siffu RIS : Division III
5,500 - - - 0.50 - - - - - Alicia 19 Magat RIS : Division II
11,500 - - - 1.95 - - - - - Angadanan 20 Magat RIS : Division II
8,000 - - - 0.50 - - - - - San Mateo 21 Magat RIS : Division II
10,000 - - - 1.35 - - - - - Alicia 22 Magat RIS : Division IV
8,000 - - - 1.35 - - - - - Angadanan 23 Magat RIS : Division IV
7,000 - - - 0.57 - - - - - Cauayan 24 Magat RIS : Division IV
9,488 - - - 0.50 - - - - - Roxas 25 Magat RIS : Division III (Construction of Concrete Canal Lining)
10,800 - - - 0.94 - - - - - Alicia 26 Magat RIS : Division II (Construction of Concrete Canal
Lining)
10,000 - - - 0.60 - - - - - Luna 27 Magat RIS : Division IV (Construction of Concrete Canal Lining)
3,500 - - - 0.22 - - - - - Echague 28 Magat RIS : Division I (Construction of Concrete Canal Lining)
10,000 - - - 1.20 - - - - - Ramon 29 Magat RIS : HO (Construction of Concrete Canal Lining)
6,130 - - - 0.32 - - - - - Ramon 30 Magat RIS : Division I (Construction of Concrete Canal Lining)
- - - - 1 19.52 - - - TOTAL ISABELA 257,019
QUIRINO
3,000 - - - 0.15 - - - - - Cabarroguis 1 Baligatan DD : Division I
6,500 - - - 0.15 - - - - - Diffun 2 Baligatan DD : Division I
4,000 - - - 0.20 - - - - - Saguday 3 Baligatan DD : Division I
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - 0.50 - - - TOTAL QUIRINO 13,500
- - - - - 1 20.52 - - 286,000 TOTAL REGION 2 (MARIIS) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATAAN
20,000 - - - 1.00 1 - - - - Dinalupihan 1 Colo Layac Balsik RIS : Repair
Rehab of CLBRIS
- - - - 1 1.00 - - - TOTAL BATAAN 20,000
BULACAN
5,000 - - - 0.50 - - - - - Baliwag 1 Angat RIS (AMRIS) : (Impv't. of Lateral D) Canal Lining
5,000 - - - 0.50 - - - - - Baliwag 2 Angat RIS (AMRIS) : (Impv't. of Lateral B) Canal Lining
10,000 - - - 1.00 - - - - - Guiguinto 3 Angat RIS (AMRIS) : (Impv't. of Lateral J SS ) Improvement of Canal
5,000 - - - 0.50 - - - - - Plaridel 4 Angat RIS (AMRIS) : (Impv't. of
Lateral E) Improvement of Canal
30,000 - - - 2.00 - - - - - Baliuag 5 Angat RIS (AMRIS) : Improvement of NMC Baliuag Area Sta. 12+500-Sta. 14+500
30,000 - - 10.00 - - - - - - Baliuag 6 Angat RIS (AMRIS) : Dredging of Bittukang Manok Creek Baliuag
Area Sta. 1+300-Sta. 11+300
30,000 - - - 2.20 - - - - - Pandi 7 Angat RIS (AMRIS) : Repair/Rehabilitation of Lateral D SS (Grouted Rip Rap) Pandi Area Sta. 4+100-Sta. 7+000
20,000 - - - 2.00 - - - - - Bocaue 8 Angat RIS (AMRIS) : Rehabilitation of Canal Lining
10,000 - - - 1.00 - - - - - Plaridel 9 Angat RIS (AMRIS) : Rehabilitation of Canal Lining
10,000 - - - 1.00 - - - - - San Ildefonso 10 Angat RIS (AMRIS) : Rehabilitation of Canal Lining/Roadways
10,000 - - - 1.00 - - - - - San Ildefonso 11 Angat RIS (AMRIS) : Rehabilitation of Canal
Lining/Drainage
15,000 - - - 0.64 - - - - - Bustos 12 Angat RIS (AMRIS) : Slope Protection (Grouted Rip-Rap) of SMC
10,000 - - - 0.80 - - - - - San Rafael 13 Angat RIS (AMRIS) : Repair and Rehabilitation of Lateral A to Z @
Brgy. Pansumaloc
15,000 - - - 1.20 - - - - - San Rafael 14 Angat RIS (AMRIS) : Construction of canal lining of Lateral A-1 @ Brgy. San Roque
15,000 - - - 0.50 - - - - - San Rafael 15 Angat RIS (AMRIS) : Improvement of Adia Maningsing
Creeek @ Brgy. Pulong Bayabas
20,000 - - - 2.00 - - - - - Baliuag 16 Angat RIS (AMRIS) : Lateral D
grouted riprap
20,000 - - - 0.80 - - - - - Bustos 17 Angat RIS (AMRIS) : Embankment
protection grouted riprap
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 - - - 1.00 - - - - - Baliuag 18 Angat RIS (AMRIS) : Lateral D-1,
Canal Lining
10,000 - - - 1.60 - - - - - Baliuag 19 Angat RIS (AMRIS) : Lateral F, Canal Lining
20,000 - - - 0.60 - - - - - San Rafael 20 Angat RIS (AMRIS) : Improvement of Various Irrigation facilities
10,000 - - - 0.80 - - - - - San Rafael 21 Angat RIS (AMRIS) : Improvement of Various
Irrigation facilities
- - - - - 21.64 10.00 - - TOTAL BULACAN 310,000
NUEVA ECIJA
30,000 - - - 1.50 - - - - - Cabiao 1 Pampanga Delta RIS : Construction of 2.40m irrigation
System @ Brgy. Bagong Sikat
- - - - - 1.50 - - - TOTAL NUEVA ECIJA 30,000
PAMPANGA
10,000 - - - 0.40 - - - - - Floridablanca 1 Caulaman RIS : Continuation of
Diversion Works
15,000 - - - - 1 - - - - Candaba 2 Pampanga Delta RIS : Canalization and repair of
steelgates
5,000 - - - 0.56 - - - - - Candaba 3 Angat RIS (AMRIS) :
Improvement of Lateral C-2-0
5,000 - - - 0.56 - - - - - Candaba 4 Angat RIS (AMRIS) : Improvement of Lateral C-2
5,000 - - - 0.56 - - - - - Candaba 5 Angat RIS (AMRIS) : Improvement of Lateral C-2-A
5,000 - - - 0.56 - - - - - Candaba 6 Angat RIS (AMRIS) : Improvement of Lateral C-2-C
10,000 - - - 1.00 - - - - - Candaba 7 Angat RIS (AMRIS) : Improvement of Lat.C Northside
5,000 - - - 0.56 - - - - - Candaba 8 Angat RIS (AMRIS) :
Improvement of Lateral C-2-B
15,000 - - - 0.60 1 - - - - Guagua 9 Porac Gumain RIS : Canalization
and Canal Structures
10,000 - 65 - 1.00 1 - - - - Lubao,
Floridablanca 10 Porac Gumain RIS : Canalization
and Steelgates - Gumain River
20,000 - - - 1.50 1 - - - - Lubao, Guagua
11 Porac Gumain RIS : Repair/ Rehab of PGRIS
10,000 - 65 - 1.00 1 - - - - Lubao,
Guagua 12 Porac Gumain RIS : Canalization
and Steelgates - Porac River
20,000 - 200 - - 1 - - - - Mexico 13 Pampanga Delta RIS : Diversion Works, Canalization and Steelgate
10,000 - - - 1.20 - - - - - Candaba 14 Angat RIS (AMRIS) : Improvement of Lateral B
(UMD-SS)
10,000 - - - 1.20 - - - - - Candaba 15 Angat RIS (AMRIS) : Improvement of Lateral A (UMD-SS)
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 - - - 1.20 - - - - - Candaba 16 Angat RIS (AMRIS) : Improvement of Lateral A (UMD-NS)
10,000 - - - 1.20 - - - - - Candaba 17 Angat RIS (AMRIS) : Improvement of Lateral A-1 (UMD-NS)
5,000 - - - 0.60 - - - - - Candaba 18 Angat RIS (AMRIS) : Improvement of Lateral C-Extra
5,000 - - - 0.80 - - - - - Candaba 19 Angat RIS (AMRIS) : Improvement of Lateral C-Extra (UMD)
5,000 - - - 0.60 - - - - - Candaba 20 Angat RIS (AMRIS) :
Improvement of Lateral C-3-A
10,000 - - - 1.00 - - - - - Candaba 21 Angat RIS (AMRIS) : Improvement of Lateral B-LMD #1
15,000 - - - 1.50 - - - - - Candaba 22 Angat RIS (AMRIS) : Improvement of NMC-LMD #1
10,000 - - - 1.00 - - - - - San Luis 23 Angat RIS (AMRIS) : Improvement of Lateral A-LMD#2
10,000 - - 2.50 0.60 - - - - - San Luis 24 Angat RIS (AMRIS) :
Improvement of Lat.B
- - - - 6 19.20 2.50 330 - TOTAL PAMPANGA 235,000
TARLAC
20,000 - - - 2.00 - - - - - Camiling 1 Camiling RIS : Improvement of
Main Canal
9,000 - - - 0.50 - - - - - Camiling 2 Camiling RIS : Canal Lining
10,000 - - - 0.70 - - - - - Camiling/Ma
yantoc 3 Camiling RIS : Improvement of
Main Canal
25,000 - - - 2.50 - - - - - Camiling 4 Camiling RIS :
- - - - - 5.70 - - - TOTAL TARLAC 64,000
ZAMBALES
3,000 - - - - - - - - - Santa Cruz 1 Bayto RIS : Rehab of Ogee Dam (Bayto RIS)
- - - - - - - - - TOTAL ZAMBALES 3,000
12.50 - - - - 7 49.04 330 - 662,000 TOTAL REGION 3 (PROPER) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
20,000 - - 24.20 - - - - - - San Ildefonso 1 Peñaranda River Irrigation System : Improvement/Rehabilitation of Drainage Facilities @ San Ildefonso
20,000 - - 24.10 - - - - - - San Miguel 2 Peñaranda River Irrigation System : Improvement/Rehabilitation of Drainage Facilities @ San Miguel
10,000 - - 13.18 - - - - - - San Ildefonso 3 Peñaranda River Irrigation System : Rehabilitation and Improvement of Drainage
Channel
10,000 - - 11.90 - - - - - - San Miguel 4 Peñaranda River Irrigation System : Rehabilitation and Improvement of Drainage
Channel
- - - - - - 73.38 - - TOTAL BULACAN 60,000
NUEVA ECIJA
20,000 - - 5.50 2.25 10 - - - 4.59 Guimba 1 Pampanga River Irrigation System (SDC) : Concrete Lining of Sub-Lateral E-9
20,727 - - - 0.79 - - - - - Santo
Domingo 2 Talavera River Irrigation System
Lower : Improvement of Main Canal,SDA
20,727 - - - 0.80 - - - - - Rizal 3 Pampanga River Irrigation System : Concrete Lining of PRIS MC
727 - - 0.30 - - - - - - Rizal 4 Pampanga River Irrigation System (SDC) : Desilting of SDC
Intake
2,693 - - - 0.44 - - - - - Cabanatuan
City 5 Pamaldan-Cinco Cinco Irrigation
System : Improvement of Lateral V
2,290 - - - - 1 - - - - Cabanatuan
City 6 Pampanga-Bongabon River
Irrigation System : Repair of Checkgate
2,745 - - - - 2 - - - - General Natividad
7 Platero Irrigation System : Modification of Checkgates of DC-2a & DC-2b
13,000 - - 7.50 0.80 2 - - - - Jaen 8 Pampanga-Bongabon River Irrigation System Extension : Improvement of Lateral C, D, A-1,
A-1d, A-1d1, & A-1f
10,000 - - - 1.54 - - - - - San Leonardo 9 Pampanga-Bongabon River Irrigation System : Construction and Rehabilitation of Mambangnan-Nieves Irrigation System @ Brgy. Nieves
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
50,000 - - 19.45 - - - - - - General Natividad & Cabanatuan City
10 Platero Irrigation System : Improvement of DC2 at Division 3
10,000 - - - - - - - - - Talugtug, Guimba,
11 Pampanga River Irrigation System (SDC) : Canal Improvement Desilting (Mechanized)
10,000 - - - - - - - - - Talugtug, Guimba, Cuyapo
12 Pampanga River Irrigation System (SDC) : Canal Improvement Desilting (Mechanized)
10,000 - - 3.03 - - - - - - Cabanatuan City
13 Aliaga IS : Improvement of Lateral AM
25,000 - - 15.00 1.00 - - - - - San Leonardo 14 Pampanga-Bongabon River Irrigation System : Improvement of Lateral G - Division III
25,000 - - 6.05 - - - - - - Rizal, Llanera 15 Pampanga River Irrigation System : Improvement of DC1 Sta. 0+001-6+050
16,500 - - - - - - - - - Cuyapo 16 Pampanga River Irrigation System (SDC) : Rehabilitation and Improvement of Banbanaba
SWIP
16,500 - - - 2.80 - - - - - Victoria 17 Pampanga River Irrigation System (SDC) : Concrete Lining of
Sub-Lateral E-10
20,000 - - - 4.00 - - - - - Gapan City 18 Peñaranda River Irrigation System : Construction of CHB Lining @ Lateral C-1 & Lateral C-8
4.59 - - - 15 14.42 56.83 - - TOTAL NUEVA ECIJA 275,909
PAMPANGA
10,086 - - - 1.70 - - - - - Candaba 1 Peñaranda River Irrigation System : Rehabilitation/Improvement of Irrigation Facilities Lateral Cx-8b @ Magumbali
10,617 - - - 1.73 - - - - - Candaba 2 Peñaranda River Irrigation System : Rehabilitation/Improvement of Irrigation Facilities Lateral Cx-9 @ Salapungan
18,545 - - - 3.22 - - - - - Candaba 3 Peñaranda River Irrigation System : Rehabilitation/Improvement of Irrigation Facilities Lateral Cx-10 @ Mapaniqui
16,843 - - - 2.75 - - - - - Candaba 4 Peñaranda River Irrigation System : Rehabilitation/Improvement of Irrigation Facilities Lateral C9-D @ Tagulod
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 - - 3.49 1.28 - - - - - Candaba 5 Peñaranda River Irrigation System : Construction of CHB Lining @ Lateral CX-12 & Dredging of Drainage Channel
20,000 - - 2.00 2.73 - - - - 33.75 Candaba 6 Peñaranda River Irrigation System : Construction of Concrete Lining @ Lateral C-9 Ext'n & Dredging of Drainage Channel
20,000 - - 6.11 2.56 - - - - - Candaba 7 Peñaranda River Irrigation System : Construction of CHB Lining @ Lateral C9-b3 &
Dredging of Drainage Channel
33.75
- - - - 15.97 11.60 - - TOTAL PAMPANGA 106,091
141.81 38.34
- - - 15 30.39 - - 442,000 TOTAL REGION 3 (UPRIIS) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
9,380 - - - 0.47 - - - 0.90 - Nasugbu 1 Palico RIS : Construction of Canal
Lining
20,000 - - - 0.80 - - - - - Nasugbu 2 Palico RIS : Construction of Canal
Lining
- 0.90 - - - 1.27 - - - TOTAL BATANGAS 29,380
CAVITE
18,000 - - - - 1 - - - - Bacoor City 1 Ligas Dam (Molino RIS) : Construction and Protection & Desilting
75,000 - - - - 1 - - - - Bacoor City 2 Molino RIS : Construction of
Protection of Diversion Works
7,000 - - - - 1 - - - - Bacoor City 3 Sintas Na Bato Dam(Molino RIS) : Construction of Protection
Works & Desilting
5,000 - - - - 1 - - 0.02 - Imus 4 Julian RIS : Construction of Protection Works
5,000 - - - 0.43 - - - - - Imus 5 Pasong Kastila RIS : Construction of Protection Works and Canal Lining
10,000 - - - 0.45 - - - - - Dasmariñas 6 Embarcadero RIS : Construction of Diversion Works and Canal
Lining
12,000 - - - - 2 - - - - General Trias
City 7 Bankud (Vargas) RIS :
Construction of Canal Lining
7,000 - - - 1.38 1 - - 0.46 - General Trias City
8 Butas RIS : Construction of Canal Lining
5,000 - - - - 1 - - - - General Trias City
9 Plucena-Bayan RIS : Construction Of Protection Works of Dam
20,000 - - - - 1 - - - - Bacoor City 10 Baluctot RIS (Pasong Buaya) : Construction of Dam Protection
Works
- 0.48 - - 9 2.26 - - - TOTAL CAVITE 164,000
LAGUNA
5,000 - - - 0.40 - - - - - Magdalena 1 Balanac RIS : Construction of
Canal Lining
5,900 - - - 0.86 - - - - - Pila 2 Sta. Cruz RIS : Construction of
Canal Lining
4,000 - - - 0.24 1 - - - - Santa Maria 3 Sta. Maria RIS : Construction of
Canal Lining
- - - - 1 1.50 - - - TOTAL LAGUNA 14,900
QUEZON
18,000 - 68 - - - - - - - Infanta 1 Agos RIS : Construction of Spur Dike, Protection Works & Canal
Structures
2,000 - - - 0.62 4 - - - - Sariaya 2 Hanagdong RIS : Construction of
Canal Structures
5,000 - - - 0.69 - - - - - Tiaong 3 Lagnas RIS : Construction of Canal Structures
- - - - 4 1.30 - 68 - TOTAL QUEZON 25,000
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - 1.38 - - 14 6.34 68 - 233,280 TOTAL REGION 4A - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
15,000 - - - 0.90 - - - - 1.50 Rizal 1 Lumintao RIS : Const'n. of Canal Struc. & Lined Canal, Drainage Struc. & Rehab of Service Road
14,126 - - - 0.60 - - - - - Magsaysay 2 Caguray RIS : Const'n. of Canal Struc. & Lined Canal & Project
facilities.
1.50 - - - - 1.50 - - - TOTAL OCCIDENTAL MINDORO 29,126
ORIENTAL MINDORO
72,810 - - - 4.24 1 - - - - Calapan City 1 Baco-Bucayao RIS : Canal Structures
32,000 - - - 4.16 2 - - - - Naujan 2 Mag-Asawang Tubig RIS : Canal Structures
21,140 - - - 3.00 - - - - - Bansud 3 Bansud RIS : Canal Structures
34,700 - - - 3.87 - - - - - Pinamalayan 4 Pula RIS : Canal Structures
2,000 - - - 0.30 - - - - - Bansud 5 Bansud RIS : Canal Structures
2,000 - - - 0.22 - - - - - Pinamalayan 6 Pula RIS : Canal Structures
- - - - 3 15.79 - - - TOTAL ORIENTAL MINDORO 164,650
PALAWAN
19,322 - - - 3.60 4 - - - - Narra 1 Batang-Batang RIS : Const.of
canal lining and structure
19,322 - - - 2.40 7 - - - - Narra 2 Malatgao RIS : Const.of canal
lining and structure
- - - - 11 6.00 - - - TOTAL PALAWAN 38,644
- 1.50 - - - 14 23.29 - - 232,420 TOTAL REGION 4B - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
4,500 - - - 1.42 1 - - - - Ligao City 1 Cabilogan-San Juan RIS (POW #1) : upgrading of Rubber Dam, 64 meters Siphon at Lateral A &
drainage Canal at Lateral A
5,500 - - - - - - - - - Oas 2 Cabilogan-San Juan RIS (POW #1) : upgrading of Rubber Dam, 64 meters Siphon at Lateral A &
drainage Canal at Lateral A
4,050 - - - 3.15 1 - - - - Ligao City 3 Cabilogan-San Juan RIS (POW #2) : const. of comb. Rd xing & cut & Cover & drainage canal #1 of 2775.30m & drainage canal #2 of 373.75m
4,950 - - - - - - - - - Oas 4 Cabilogan-San Juan RIS (POW #2) : const. of comb. Rd xing & cut & Cover & drainage canal #1 of 2775.30m & drainage canal #2 of 373.75m
3,200 - - - - - - - - - Ligao City 5 Mahaba RIS-MAZO IA : Repair of CHB Lining at Main Canal & old Canal of Dam #2
1,600 - - - - - - - - - Polangui 6 Mahaba RIS-TAPS IA : Repair of CHB Lining at Lateral E & Demolition of Old Damaged CHB Lining at Lateral D
2,296 - - - - - - - - - Ligao City 7 NASISI RIS-BAHAMAS IA : Const. of MFD=1000m & Fab. & Inst.
11 units Rect. Slide Steel Gates
3,304 - - - - - - - - - Oas 8 NASISI RIS-BAHAMAS IA : Const. of MFD=1000m & Fab. & Inst.
11 units Rect. Slide Steel Gates
2,800 - - - - - - - - - Libon 9 South Quinale RIS : retrofitting of Rubber Dam, Repair of Lat. A & const. of RMC Extn & Repair of Steel gates
7,200 - - - 0.39 - - - - - Oas 10 South Quinale RIS : retrofitting of Rubber Dam, Repair of Lat. A & const. of RMC Extn & Repair of Steel gates
- - - - 2 4.96 - - - TOTAL ALBAY 39,400
CAMARINES NORTE
5,000 - 10 - - - - - - - Labo 1 Matogdon RIS (POW #1) : Constn of protection works, constn of 1
drainage crossing; CHB lining
5,000 - 20 - - - - - - - Vinzons 2 Matogdon RIS (POW #1) : Constn of protection works, constn of 1
drainage crossing; CHB lining
12,500 - 55 - - - - - - - Talisay,
Vinzons 3 Daet-Talisay RIS : Constn of
intake
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
50,000 - 173 - - - - - - - Vinzons 4 Matogdon RIS (POW #2) : Cut & Cover, CHB Lining, Protection works at Lateral D and Main Canal
- - - - - - - 258 - TOTAL CAMARINES NORTE 72,500
CAMARINES SUR
31,180 - 75 - - - - - - - Libmanan &
Cabusao 1 Libmanan-Cabusao PIS : Repair
and Restoration of 8.77km Drainage Excavation, 9.79km Canal Desilting and 2km 10cm CHB Lining
4,131 - 10 - - - - - - - Bombon 2 Tigman-Hinagyanan-Inarihan RIS (POW #1) : Repair/Rehab of Main Canal & Replacement of
Steelgates
2,313 - 5 - - - - - - - Calabanga 3 Tigman-Hinagyanan-Inarihan RIS (POW #1) : Repair/Rehab of Main Canal & Replacement of
Steelgates
7,602 - 20 - - - - - - - Canaman 4 Tigman-Hinagyanan-Inarihan RIS (POW #1) : Repair/Rehab of Main Canal & Replacement of
Steelgates
2,478 - 7 - - - - - - - Magarao 5 Tigman-Hinagyanan-Inarihan RIS (POW #1) : Repair/Rehab of Main Canal & Replacement of
Steelgates
10,000 - - - 2.70 - - - - - San Jose 6 Cagaycay RIS : Construction of
CHB Lining
5,000 - 15 - - - - - - - Bombon 7 Tigman-Hinagyanan-Inarihan RIS (POW #2) : Restoration and rehabilitation works at THIRIS
2,800 - 9 - - - - - - - Calabanga 8 Tigman-Hinagyanan-Inarihan RIS (POW #2) : Restoration and
rehabilitation works at THIRIS
9,200 - 26 - - - - - - - Canaman 9 Tigman-Hinagyanan-Inarihan RIS (POW #2) : Restoration and rehabilitation works at THIRIS
3,000 - 8 - - - - - - - Magarao 10 Tigman-Hinagyanan-Inarihan RIS (POW #2) : Restoration and
rehabilitation works at THIRIS
- - - - - 2.70 - 175 - TOTAL CAMARINES SUR 77,704
SORSOGON
10,000 - - - 1.00 - - - - - Bulan 1 San Ramon-San Francisco RIS
(POW #1) :
50,000 - - - 7.40 - - - - - Bulan 2 San Ramon-San Francisco RIS (POW #2) : Improvement of Canal linings
- - - - - 8.40 - - - TOTAL SORSOGON 60,000
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - 2 16.06 433 - 249,604 TOTAL REGION 5 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AKLAN
9,000 - - - 0.30 1 - - - - Banga 1 Aklan RIS (East Side) :
Improvement of drainage
6,000 - - - 0.75 - - - - - Makato 2 Aklan RIS (West Side) : Construction of Bench Flume and
Mechanized Desilting of Canals
10,000 - 60 - 0.50 - - - - - Ibajay 3 Panakuyan RIS : Construction of
Bench Flume
- - - - 1 1.55 - 60 - TOTAL AKLAN 25,000
ANTIQUE
5,000 - 20 - 0.10 - - - - - Hamtic 1 Sibalom-San Jose RIS : Prop. Canal Lining, Rehabilitation of Dam(Proper, Extn I, Extn. II)
13,000 - 50 - 0.70 - - - - - Patnongon 2 Sibalom-San Jose RIS : Prop.
Desilting and bench flume
20,000 - 30 - 0.90 - - - - - San Jose 3 Sibalom-San Jose RIS : Prop. Canal Lining, Rehabilitation of Dam(Proper, Extn I, Extn. II)
20,000 - 60 - 0.20 - - - - - San Remigio 4 Sibalom-San Jose RIS : Prop. Canal Lining, Rehabilitation of Dam(Proper, Extn I, Extn. II)
20,000 - 50 - 0.45 - - - - - Sibalom 5 Sibalom-San Jose RIS : Prop. Canal Lining, Rehabilitation of
Dam(Proper, Extn I, Extn. II)
12,000 - 20 - 0.80 - - - - - Hamtic 6 Sibalom San Jose IS : Porp. Canal Lining
- - - - - 3.15 - 230 - TOTAL ANTIQUE 90,000
CAPIZ
12,190 - 10 - 0.80 2 - - - - Mambusao 1 Mambusao RIS : const. of bench
flume
- - - - 2 0.80 - 10 - TOTAL CAPIZ 12,190
ILOILO
11,500 - - - 1.50 1 - - - - Oton 1 Aganan RIS : Construction of Canal Lining/Desilting/Dredging of Dam/improvement of Abilay
Sur area
3,000 - - - 0.56 - - - - - Tigbauan 2 Sibalom RIS : Construction of
Bench Flume
11,000 - - - 2.74 - - - - - Tigbauan 3 Sibalom RIS : Construction of
Canal Lining
27,000 - - 2.50 3.50 - - - - - Pototan 4 Jalaur Proper : Construction of
Canal Lining and drainage
18,000 - - - 1.40 - - - - - Mina 5 Suague RIS : Construction of Canal Lining/Desilting/Dredging
of Dam
5,500 - - - 0.80 - - - - - Pototan 6 Suague RIS : Construction of
Canal Lining
14,000 - - - 2.60 - - - - - Dumangas 7 Jalaur Extension : Construction of Canal Lining
12,000 - - - 2.60 - - - - - Dingle 8 Jalaur Proper : Construction of Canal Lining
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
8,000 - - - - - - - - - Barotac Viejo 9 Barotac Viejo RIS : Improvement of drainage and desilting
1,500 - - - 0.30 - - - - - Oton 10 Aganan RIS : Improvement of Tuburan-Bita Sur- Bita Norte - Mambog - Caboloan Sur
IS (const. of bench flume)
3,000 - - - 0.60 - - - - - Tigbauan 11 Sibalom RIS : Improvement of Olo Barroc-Barroc Irrigation
System (const. of bench flume)
- - - - 1 16.60 2.50 - - TOTAL ILOILO 114,500
NEGROS OCCIDENTAL
5,000 - 20 - - - - - - - Bago City 1 Bago RIS : Rehab of canal lining
and canal structures
8,000 - 20 - - 15 - - - - Binalbagan 2 Pangiplan RIS : Rehab of canal
lining and canal structures
- - - - 15 - - 40 - TOTAL NEGROS OCCIDENTAL 13,000
2.50 - - - - 19 22.10 340 - 254,690 TOTAL REGION 6 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
45,000 - 50 - 10.00 3 - - - - San Miguel 1 Bohol Integrated Irrigation System (Bayongan IS) : Construction of MFD Lined Canal
and Structures
20,380 - 30 - 5.00 6 - - - - Ubay 2 Bohol Integrated Irrigation System (Capayas IS) : Construction of MFD Lined Canal
and Structures
23,000 - 10 - 5.00 8 - - - - Talibon 3 Bohol Integrated Irrigation System (Talibon SRIS) : Construction of MFD Lined Canal
and Structures
47,620 - 60 - 8.00 - - - - - Pilar 4 Bohol Integrated Irrigation System (Malinao IS) : Construction of MFD Lined Canal
and Structures
- - - - 17 28.00 - 150 - TOTAL BOHOL 136,000
- - - - - 17 28.00 150 - 136,000 TOTAL REGION 7 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LEYTE (NORTHERN)
10,000 - 12 - 1.40 - - - - - Alangalang 1 Binahaan North RIS : const. of Protection Dike- .094 kms., & canal lining
7,000 - 10 - 2.65 1 - - - - Santa Fe 2 Binahaan North RIS : const. of
canal lining & struc
2,000 - - - 1.01 - - - - - Palo 3 Binahaan South RIS : const. of
canal lining
3,000 - - - 0.81 - - - - 0.73 Tanauan 4 Guinarona RIS : const. of canal
lining
6,000 - 15 - 1.29 1 - - - - Tanauan 5 Lower Binahaan RIS : const. of
canal lining & struc
10,000 - 30 - 1.75 5 - - - - Alangalang 6 Mainit RIS : const. of canal lining
& struc
5,000 - 15 - 0.57 1 - - - - San Miguel 7 Mainit RIS : const. of canal lining
& struc
6,000 - 10 - 1.43 - - - - - Palo 8 Tibak RIS : const. of canal lining &
struc
2,000 - - - 0.49 - - - - - Santa Fe 9 Tibak RIS : const. of canal lining
2,000 - - - 0.70 - - - - - MacArthur 10 Balire North RIS : const. of canal
lining
3,000 - - - - 1 - - - - MacArthur 11 Balire South RIS : const. of elev. Flume 30mts. & fag/inst of steel
gates
9,000 - 10 - 2.53 1 - - - - Pastrana 12 Binahaan North RIS : const. of
canal lining & struc
1,000 - 5 - 0.39 - - - - - Dagami 13 Binahaan South RIS : const. of
canal lining
9,000 - 10 - 3.43 15 - - - - Pastrana 14 Binahaan South RIS : const. of
canal lining & struc
3,000 - - - 0.59 - - - - - Burauen 15 Daguitan RIS : const. of canal
lining
2,500 - - - 0.99 - - - - - Dulag 16 Daguitan RIS : const. of canal
lining & control facilities
2,500 - - - 0.80 2 - - - - Julita 17 Daguitan RIS : const. of canal
lining & struc
5,000 - - - 1.06 - - - - - Dulag 18 Gibuga RIS : imprvt of drainage
canals & fab/inst of steelgates
5,000 - - - 1.17 - - - - - Mayorga 19 Gibuga RIS : imprvt of drainage
canals & fab/inst of steelgates
3,000 - - - 1.28 - - - - - Dagami 20 Guinarona RIS : const. of canal
lining
3,000 - - - 1.05 1 - - - - Tabontabon 21 Guinarona RIS : const. of canal
lining & control facilities
4,000 - - - 0.87 - - - - - Mayorga 22 Ibawon RIS : imprvt of drainage
canals & fab/inst of steelgates
5,000 - 10 - 1.89 - - - - - Dagami 23 Lower Binahaan RIS : const. of
canal lining & struc
4,000 - 25 - 1.19 - - - - - Tabontabon 24 Lower Binahaan RIS : const. of
canal lining
3,000 - - - 0.76 - - - - 0.28 Burauen 25 Marabong RIS : const. of canal lining, & imprvt of service roads
3,000 - - - 1.34 - - - - - Julita 26 Marabong RIS : const. of canal
lining
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 - - - 0.78 1 - - - - Tabontabon 27 Marabong RIS : const. of canal lining, canal struc & control facilities
10,000 - - - 1.57 9 - - - - Barugo 28 Pongso RIS : const. of canal lining
& struc
8,000 - - - 1.50 7 - - - - Ormoc City 29 Bao RIS : const. of canal lining &
struc
4,000 - - - 0.65 1 - - - - Abuyog 30 Bito RIS : const. of canal lining
4,000 - - - 1.68 - - - - - Javier 31 Bito RIS : const. of canal lining ,
fab/inst of steelgates
5,000 - - - - 1 - - - - Hilongos 32 Hindang-Hilongos RIS : repair of flume, check struc & fab/inst of
steelgates
5,000 - - - 1.83 - - - - - Hindang 33 Hindang-Hilongos RIS : const. of canal lining
20,000 - - - - - - - - 2.79 Javier and Abuyog
34 Bito RIS : Const. of PHF @ BG IA and Construction of Service Roads @ Lat. "E" (2.052 kms.)& Lat. "F" (0.741 kms.)
3.80 - - - 47 39.45 - 152 - TOTAL LEYTE (NORTHERN) 177,000
LEYTE (SOUTHERN)
5,000 - - - 1.45 - - - - - Hinunangan 1 Das-ay RIS : const of canal lining,
fab/inst of steelgates
- - - - - 1.45 - - - TOTAL LEYTE (SOUTHERN) 5,000
SAMAR (WESTERN)
10,000 - 168 - 2.73 15 - - - - Basey 1 Basey IS : const. of canal lining &
struc
- - - - 15 2.73 - 168 - TOTAL SAMAR (WESTERN) 10,000
- 3.80 - - - 62 43.63 320 - 192,000 TOTAL REGION 8 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
20,654 - - - - - - - - - Dumingag 1 Dipolo RIS : Improvement of NIS
Facilities
38,000 - - - - - - - - - Labangan 2 Labangan RIS : Improvement of
NIS Facilities
48,500 - - - - - - - - - Molave 3 Salug RIS : Improvement of NIS
Facilities
10,000 - - 8.00 - - - - - - Bayog 4 Sibuguey Valley IS : Improvement
of NIS Facilities
- - - - - - 8.00 - - TOTAL ZAMBOANGA DEL SUR 117,154
ZAMBOANGA SIBUGAY
14,000 - - - 2.43 10 - - - - Diplahan 1 Sibuguey Valley IS : Construction of Canalization and Desilting of Canal
14,000 - - - 2.00 10 - - - - Siay 2 Sibuguey Valley IS : Construction of Canalization and Canal Structures
- - - - 20 4.43 - - - TOTAL ZAMBOANGA SIBUGAY 28,000
8.00 - - - - 20 4.43 - - 145,154 TOTAL REGION 9 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
5,000 - 25 - - - - - - - Talakag 1 Talakag IS Phase I : Repair of irrigation facilities and restoration of non-operation
ares. Desilting of canals
10,000 - 60 - 1.64 10 - - - - Maramag 2 Muleta RIS : Repair of irrigation facilities and restoration of non-operation ares. Desilting of
canals
13,000 - 2 - 3.70 8 - - - - Quezon 3 Pulangui RIS : Repair of irrigation facilities and restoration of non-operation ares. Desilting of
canals
10,000 - 25 - 0.74 7 - - - - Maramag 4 Roxas-Kuya RIS : Repair of irrigation facilities and restoration of non-operation
ares. Desilting of canals
60,000 - 45 - - 10 - - - - Valencia City 5 Pulangui RIS : Repair of irrigation
facilities
- - - - 35 6.09 - 157 - TOTAL BUKIDNON 98,000
LANAO DEL NORTE
30,000 - 100 - - - - - - - Lala,Kapatagan
1 Maranding RIS : Repair of irrigation facilities and restoration of non-operation ares. Desilting of canals
- - - - - - - 100 - TOTAL LANAO DEL NORTE 30,000
LANAO DEL SUR
35,000 - 60 - 1.00 - - - - - Taraka 1 Rugnan RIS : Repair of irrigation facilities and restoration of non-operation ares. Desilting of canals
- - - - - 1.00 - 60 - TOTAL LANAO DEL SUR 35,000
MISAMIS ORIENTAL
133,000 - 100 - - - - - - - Balingasag 1 Balingasag RIS : Protection works and land development. Desilting
of canals
- - - - - - - 100 - TOTAL MISAMIS ORIENTAL 133,000
- - - - - 35 7.09 417 - 296,000 TOTAL REGION 10 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
COMPOSTELA VALLEY
31,770 - - - 5.38 4 - - - - Compostela 1 Batutu RIS : Construction of check structures canalization with canal structures, rehab. of
canal & canal structures
- - - - 4 5.38 - - - TOTAL COMPOSTELA VALLEY 31,770
DAVAO DEL NORTE
12,500 - - - 0.70 - - - - - Kapalong 1 Libuganon Left RIS : Canalization of Main Canal and Installation of 2 Engine Motors at diversion dam steel gate
14,500 - - 2.10 1.60 1 - - - - Asuncion 2 Saug RIS : Canalization of Lateral C West, Desilting of Lateral D West, River Rechanneling and reconstruction of headgate of lateral b west
14,200 - - 1.00 1.80 - - - - - Santo Tomas 3 Kipaliku RIS : Canalization of lateral A and Installation of Steel Gates
10,800 - - - 2.40 - - - - - Braulo E.
Dujali 4 Libuganon RIS : Canalization of
Lateral D-7& Installation of Steel
Gates
10,800 - - - 1.60 - - - - - Santo Tomas 5 Libuganon RIS : Canalization of Lateral Canal & Installation of Steel Gates
20,000 - - 7.40 - - - - - - Carmen 6 Lasang RIS : Improvement of
Drainage Canals
40,000 - - 5.00 1.60 - - - - - Carmen 7 Libuganon RIS : Improvement of Canals and Drainage System and
canalization of lateral
40,000 - - 9.00 - - - - - - Carmen 8 Libuganon RIS : Improvement of Canals and Drainage System
- - - - 1 9.70 24.50 - - TOTAL DAVAO DEL NORTE 162,800
DAVAO DEL SUR
35,500 - - - 5.46 3 - - - - Hagonoy 1 Padada RIS : Canal lining of existing earth canals &
modification of canal structures
- - - - 3 5.46 - - - TOTAL DAVAO DEL SUR 35,500
DAVAO ORIENTAL
26,800 - - - 5.82 7 - - - - Banaybanay 1 Lupon IS : (Package 1) Canal Lining and Repair of Canal Structures at Lat. A, Lat. A-1 and A1-A
11,800 - - 8.66 - - - - - - Banaybanay 2 Lupon IS : Road Surfacing of Service Roads & Access Roads & Desilting of Drainage System
43,400 - - - - - - - - - Lupon 3 Lupon IS : (Package 3) Modification of Dam, Const. of Protection Works and River
Rechanneling
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
6,300 - - 4.70 - - - - - - Lupon 4 Lupon IS : Road Surfacing of Service Roads & Access Roads & Desilting of Drainage System
- - - - 7 5.82 13.36 - - TOTAL DAVAO ORIENTAL 88,300
37.86 - - - - 15 26.36 - - 318,370 TOTAL REGION 11 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
28,000 - 50 1.00 0.20 1 - - - - Datu Paglas 1 Alip RIS : Construction of Canal,
canal lining and structures
32,000 - 120 3.00 0.50 3 - - - - Shariff Aguak 2 Kabulnan RIS : Construction of Canal, canal lining and structures
19,000 - 100 - - - - - - - Mamasapano 3 KRIS-Mamasapano RIS : Improvement of Diversion
Structures
4,130 - - 2.70 - - - - - - Talayan, Guindulungan
4 Talayan RIS : Construction of
canal
- - - - 4 0.70 6.70 270 - TOTAL MAGUINDANAO 83,130
NORTH COTABATO
22,169 - - - 10.29 2 - - - - Libungan 1 Libungan RIS : Construction of
Canal lining and Structures
24,386 - - - 3.77 - - - - - Pikit 2 Maridagao RIS : (UMSA)Construction of Canal lining
15,518 - - - 9.56 - - - - - Pikit 3 Maridagao RIS : Construction of Canal lining
11,084 - - 2.11 2.50 - - - - - Kabacan 4 Kabacan RIS : Construction of Canal and canal lining
15,518 - - - 9.40 - - - - - Carmen 5 Maridagao RIS : Construction of
Canal and canal lining
13,084 - - - 2.00 2 - - - - M'lang 6 Mlang RIS : Construction of Canal lining and Structures
13,084 - - - 2.00 2 - - - - Tulunan 7 Malasila RIS : Construction of Canal lining and Structures
- - - - 6 39.52 2.11 - - TOTAL NORTH COTABATO 114,843
SOUTH COTABATO
8,492 - - 5.00 - - - - - - General
Santos City 1 Siluay-Buayan RIS : Canal
Desilting at Main Canal
10,500 - - 3.00 0.80 6 - - - - Banga 2 Ala RIS Dam 1 : Construction of
Canal, canal lining and structures
9,000 - - 3.00 0.50 4 - - - - Santo Niño 3 Ala RIS Dam 1 : Construction of Canal, canal lining and structures
9,657 - - 3.00 0.20 2 - - - - Surallah 4 Ala RIS Dam 1 : Construction of
Canal, canal lining and structures
12,600 - - 3.00 0.78 4 - - - - Norala 5 Ala RIS Dam 2 : Construction of Canal, canal lining and structures
13,500 - - 3.00 1.10 5 - - - - Santo Niño 6 Ala RIS Dam 2 : Construction of
Canal, canal lining and structures
5,300 - - - 0.70 - - - - - Banga 7 Banga RIS : Construction of Canal
lining
5,500 - - - 0.80 - - - - - Norala 8 Banga RIS : Construction of Canal
lining
5,200 - - - 0.50 - - - - - Santo Niño 9 Banga RIS : Construction of Canal
lining
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,200 - - - 1.00 - - - - - Koronadal
City 10 Marbel #1 RIS : Construction of
Canal lining
5,300 - - - 1.20 4 - - - - Tantangan 11 Marbel #1 RIS : Construction of Canal lining and Structures
7,600 - - - 2.00 4 - - - - Koronadal City
12 Marbel #2 RIS : Construction of Canal lining and Structures
- - - - 29 9.58 20.00 - - TOTAL SOUTH COTABATO 97,849
SULTAN KUDARAT
16,000 - - - 1.20 8 - - - - Isulan 1 Ala RIS Dam 2 : Construction of
Canal lining and Structures
10,000 - 30 - 1.20 13 - - - - Lambayong 2 Lambayong (Lagao) RIS : Construction of Canal lining and
Structures
10,178 - - - 2.30 4 - - - - Lutayan 3 Marbel #2 RIS : Construction of
Canal lining and Structures
- - - - 25 4.70 - 30 - TOTAL SULTAN KUDARAT 36,178
28.81 - - - - 64 54.50 300 - 332,000 TOTAL REGION 12 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
30,000 - 28 - 9.85 3 - - - - Butuan City 1 Lower Agusan River PIS : Canalization, Desilting and Drainage Facilities
25,000 - 57 - 1.21 - - - - - Cabadbaran
City 2 Cabadbaran-Taguibo RIS :
25,000 - 56 - 1.21 - - - - - Cabadbaran
City 3 Cabadbaran-Taguibo RIS :
10,000 - 60 7.35 - - - - - - Butuan City 4 Lower Agusan River Pump IS :
Drainage Desiltation works
- - - - 3 12.27 7.35 201 - TOTAL AGUSAN DEL NORTE 90,000
AGUSAN DEL SUR
15,582 - 170 - - 6 - - - - Bayugan City 1 Andanan RIS : Canalization, Desilting, Drainage Facilities and
Structures, Slope Protection
8,000 - 113 3.00 - 5 - - - - Prosperidad 2 Gibong RIS : Canalization, Desilting, Drainage Facilities and
Structures, Slope Protection
5,000 - 90 - - - - - - - Veruela 3 Baobo RIS : Canalization, Desilting, Drainage Facilities and Structures, Slope
Protection,Office Repair
140,000 - 600 - - - - - - - Santa Josefa 4 Sta. Josefa PIS : Canalization, Desilting, Drainage Facilities and
Structures, Slope Protection
2,000 - - 1.00 0.30 3 - - - - Bayugan City 5 Andanan RIS : Canalization, Desilting, Drainage Facilities and Structures, Slope Protection,
Office Repair
2,000 - - - 0.07 3 - - - - Prosperidad 6 Gibong RIS : Desilting, Drainage Facilities and Structures, Slope
Protection
2,000 - - - 0.03 10 - - - - Trento 7 Simulao RIS : Canalization, Desilting, Drainage Facilities and Structures
- - - - 27 0.40 4.00 973 - TOTAL AGUSAN DEL SUR 174,582
SURIGAO DEL SUR
11,000 - 20 - 1.80 1 - - - - Tago 1 Tago RIS :
2,000 - - - - 1 - - - - Cantilan 2 Cantilan IS :
27,000 - 20 - 5.30 - - - - - Tago 3 Tago RIS :
- - - - 2 7.10 - 40 - TOTAL SURIGAO DEL SUR 40,000
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
11.35 - - - - 32 19.77 1,214 - 304,582 TOTAL REGION 13 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (National Systems)-RRENIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
6,770 - - - 0.17 1 - - - - Bacarra 1 Bangsirit CIS : Canal Lining &
Modf. Of D/D
5,000 - 25 - 0.73 - - - - - Pasuquin 2 Cadaclan Pasayacan CIS : Canal
Lining
4,000 - - - 0.78 2 - - - - Pagudpud 3 San Agustin CIS : Canal Lining &
Canal Structure
2,000 - - - 0.55 - - - - - Bacarra 4 Sanjera Duripes : Canal Lining
2,000 - - - 0.51 - - - - - Bacarra 5 Sanjera Quelor : Canal Lining
3,000 - - - 0.44 - - - - - Bacarra 6 Zanjera Diniega CIS : Canal Lining
2,500 - - - 0.59 2 - - - - Bacarra 7 Zanjera Macupit : Canal Lining &
Canal Structure
2,000 - - - 0.42 1 - - - - Bacarra 8 Zanjera Sales : Canal Lining &
Canal Structure
2,000 - - - 0.22 2 - - - - Bacarra 9 Zanjera Sta.Pila : Canal Lining &
Canal Structure
1,500 - - - 0.43 - - - - - Bacarra 10 Zanjera Surgui CIS : Canal Lining
4,000 - - - 1.60 4 - - - - Dingras 11 Elizabeth-Lanas-Barong Irrigation
System : Canal Lining
3,000 - - - 1.10 20 - - - - Batac 12 Nagurayan Diversion Dam (Zanjera Palongpong) : Canal Lining
3,000 - - - 1.20 5 - - - - San Nicolas 13 San Guillermo SWIP : Canal
Lining
2,700 - - - 0.99 1 - - - - Pinili 14 Darat Apatot Lubong CIS : Canal
Lining
- - - - 38 9.75 - 25 - TOTAL ILOCOS NORTE 43,470
ILOCOS SUR
10,000 - - - 1.00 3 - - - - Bantay 1 Nagtripitian CIS (Phase II) : Repair of Dam, Dredging, Provision of Steel Gate,Canal
Lining & Canal Structures
5,000 - - - 0.50 6 - - - - Magsingal 2 Napo CIS : Protection Works,Provision of Steel gate &
Canal Lining
12,000 - - - - - - - - - Cabugao 3 Simmabusa Nagbayruangan CIS : Repair of Dam, Dredging, Canal Lining & Canal Structures
5,000 - 15 - - - - - - - Sinait 4 Tubigay CIS : Modification of
Diversion Works
5,000 - - - - - - - - - San Emilio 5 Banukal CIS : Repair of Dam
3,300 - - - 0.46 - - - - - Narvacan 6 Lungog CIS : Canal Lining
5,000 - 54 - 0.20 - - - - - Galimuyod 7 Sampaloc CIS : Modification of
Diversion Works & Canal Lining
5,000 - - - - - - - - - Candon City 8 Caoplasan NIS : Protection Works
@ Diversion Upstream R/S
10,000 - 125 - 0.26 4 - - - - Magsingal 9 Napo CIS Phase II : Improvement of the existing Diversion structure, and construction of canal lining & canal structures
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - 13 2.42 - 194 - TOTAL ILOCOS SUR 60,300
LA UNION
1,500 - - - 0.72 10 - - - - Luna 1 Cabalitocan #1 CIS : Canal Lining
& Canal Structures
10,000 - - - - 1 - - - - San Juan 2 Nagsabaran CIS : Repair of Dam
2,000 - 17 - 0.80 - - - - - Naguilian 3 Binmotobot CIS : Canal Lining
5,000 - - - 1.60 - - - - - Rosario 4 Bued #1 CIS : Canal Lining
600 - - - - - - - - - Burgos 5 Caoayan CIS : Supply & Delivery of Irrigation
Pumps/Engine
472 - - - 0.12 - - - - - Rosario 6 Ken Dennis CIS : Canal Lining
2,000 - 20 - - - - - - - Burgos 7 Lower Agpay CIS : Supply & Delivery of Irrigation Pumps/Engine
9,800 - 24 - 0.04 1 - - - - Naguilian 8 Naguilian CIS : Canal Lining, Protection Works & Canal
Structures
1,000 - 12 - 0.47 - - - - - Bagulin 9 Suyo Central CIS : Canal Lining
20,000 - 120 9.90 6.30 3 - - - - San Juan 10 San Felipe CIS : Dredging and Rehabilitation of Dam, Canals, canal lining & canal structures
10,000 150 - 6.25 - - - - - - San Juan 11 Cacapian CIS : Rehabilitation and Construction of Irrigation Line
Canal
- - - - 15 10.05 16.15 193 150 TOTAL LA UNION 62,372
PANGASINAN
7,000 - - - 1.30 5 - - - - Agno 1 Baruan CIS (Phase III) : Canal Lining & Const'n of Dugwell w/ pump & engine
3,000 - 15 - 0.60 3 - - - - Infanta 2 San Felipe CIS : Canal Lining
& Canal Structures
3,000 - - - 0.80 4 - - - - Sual 3 Victoria CIS : Canal Lining &
Canal Structures
8,227 - 80 - 1.50 8 - - - - Mangatarem 4 Bogtong Bolo CIS (Ph II) : Canal
Lining & Canal Structures
5,000 - - - 1.10 3 - - - - Bugallon 5 Bolaoen CIS : Diversion Works
5,000 - - - - - - - - - Labrador 6 Bolosan CIS :
5,000 - - - 1.40 6 - - - - Aguilar 7 Calsib CIS : Canal Lining &
Canal Structures
7,000 - - - - - - - - - Labrador 8 Sikling CIS :
7,000 - - 0.70 - 1 - - - - San Jacinto 9 Labney Balanay CIS (Ph II) : Canal
Lining & Canal Structures
7,000 - - - 1.50 3 - - - - Sison 10 Alibeng CIS : Canal Lining & Canal
Structures
2,000 - - - 0.80 4 - - - - Sison 11 Turod CIS : Canal Lining &
Canal Structures
4,000 - - - 0.50 4 - - - - Umingan 12 Carosalisan CIS : Canal Lining &
Canal Structures
7,000 - - - 0.70 3 - - - - Santa Maria 13 Mabolo CIS : Canal Lining & Canal
Structures
5,000 - - - 0.40 4 - - - - Umingan 14 San Juan CIS : Canal Lining &
Canal Structures
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 - - - - - - - - - Labrador 15 Bolo CIS : Canal Lining & Canal
Structures
10,000 - - - - - - - - - Mangatarem 16 Cabaluyan CIS (Ph. II) : Canal Lining & Canal Structures
10,000 - - - - - - - - - Mangatarem 17 Pila CIS : Canal Lining & Canal Structures
10,000 - - - - - - - - - Bani 18 Masidem SRIS : Canal Lining & Canal Structures
20,000 - - - - 1 - - - - Alaminos City 19 Alos-Conconig CIS : Const. of new diversion dam
5,000 - - - 0.80 3 - - - - San Nicolas 20 Cameing CIS : Canal Lining &
Canal Structures
5,000 - - - 1.10 2 - - - - San Nicolas 21 Tangal Mayor CIS : Canal Lining & Canal Structures
20,000 - - - 1.80 6 - - - - Asingan 22 Sinapog CIS : Canal Lining & Canal Structures
- - - - 60 14.30 0.70 95 - TOTAL PANGASINAN 165,227
16.85 - - - - 126 36.51 507 150 331,369 TOTAL REGION 1 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
2,500 - - - 1.30 5 - - - - Tubo 1 Amtuagan CIS : Repair of 1.3kms canal lining & const. 5 units canal structures
10,000 - 50 - 3.00 5 - - - - La Paz 2 Demet CIS : Construction of 3kms canal lining & 5 units canal
structure
2,500 - 3 - 0.85 4 - - - - Tubo 3 Pacacan Lagawan CIS : Restoration of 0.85km canal lining & 4 units canal structures
3,000 - 29 - 2.20 5 - - - - Tubo 4 Quili CIS : Repair of 2.2kms canal lining & const. 5 units canal
structures
2,000 - - - - - - - - - La Paz 5 Demet CIS (Canan) : Restoration of canal lining & canal structures
10,000 - - - 4.50 7 - - - - La Paz 6 Bagatoy CIS : Rehabilitation
20,000 - - - - - - - - - Manobo 7 Manabo CIS : Repair of Diversion
dam
- - - - 26 11.85 - 82 - TOTAL ABRA 50,000
APAYAO
7,150 - - - 0.80 4 - - - - Calanasan 1 Casiggaman CIS : Construction of
canal lining & Canal Structures
20,000 - - - 2.00 12 - - - - Conner 2 Bagombong CIS : Construction of canal lining & Canal Structures
10,350 - - - 1.50 10 - - - - Calanasan 3 Bidbido SIS : Construction of
canal lining & Canal Structures
- - - - 26 4.30 - - - TOTAL APAYAO 37,500
BENGUET
5,000 - 5 - - 6 3 - - - Tublay 1 Chagao Lubas CIS (Sedong PIS, Amtahy CIS, Daclan CIS) : Installation of pipeline &
rehabilitation of canal structure
1,500 - 10 - - 6 3 - - - Kibungan 2 Nangayangan-Talibuy-ok ICS : Installation of pipeline & rehabilitation of canal structure
5,000 - 10 - 0.20 6 1 - - - La Trinidad 3 Timoy CIS : Installation of pipeline, construction of
diversion & canal structure
10,000 - - - - - - - - - Tuba 4 Labney CIS : Installation of pipeline, construction of diversion & canal structure
5,000 - - - - 6 6 - - - Tuba 5 Parasipis CIS : Installation of pipeline, construction of
diversion & canal structure
5,000 - - - - 6 5 - - - Tuba 6 Tadiangan CIS : Installation of
pipeline & canal structure
- - - 17 30 0.20 - 25 - TOTAL BENGUET 31,500
IFUGAO
1,000 - - - 0.60 - - - - - Kiangan 1 Aliguyon CIS : Construction of canal lining
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,000 - - - 0.65 2 - - - - Aguinaldo 2 Awayan Butac CIS : Construction of canal lining and canal structure
1,300 - - - 0.70 - - - - - Hungduan 3 Balentimol CIS : Construction of
canal lining
2,000 - - - 1.20 - - - - - Banaue 4 Bayninan CIS : Construction of
canal lining
1,700 - - - 0.80 - - - - - Hungduan 5 Bihukto CIS : Construction of
canal lining
1,500 - - - 0.80 - - - - - Hungduan 6 Bukhul SIS : Construction of canal
lining
2,340 - - - 0.70 - - - - - Hingyon 7 Bulon-Tudawi CIS : Construction
of canal lining
4,000 - - - 2.20 4 - - - - Hungduan 8 Camiling Awa CIS : Construction of canal lining and canal structure
1,000 - - - 0.50 - - - - - Kiangan 9 Cappugan Baay CIS : Construction of canal lining
1,300 - - - 0.20 1 - - - - Lagawe 10 Dilan CIS : Construction of canal lining and canal structure
1,500 - - - 0.48 1 - - - - Banaue 11 Kinakin CIS : Construction of
canal lining and canal structure
910 - - - 0.70 - - - - - Mayoyao 12 Mad-oy Bugnay CIS : Construction of canal lining
1,000 - - - 0.70 - - - - - Banaue 13 Najbalit CIS : Construction of canal lining
2,000 - 12 - 0.72 - - - - - Aguinaldo 14 Pajpaj Gohtimo CIS : Construction of canal lining
2,700 - - - 0.80 - - - - - Kiangan 15 Poley Baguinge CIS : Construction of canal lining
2,000 - - - 0.80 - - - - - Asipulo 16 Pula CIS : Construction of canal
lining
1,000 - - - 1.00 1 - - - - Mayoyao 17 Teggolop Halajud CIS : Construction of canal lining and canal structure
- - - - 9 13.55 - 12 - TOTAL IFUGAO 29,250
KALINGA
500 - - - 0.17 - - - - - Tinglayan 1 Agabo CIS : Construction of Canal
Lining
500 - - - 0.19 - - - - - Lubuagan 2 Ambuclao CIS : Construction of
Canal Lining
6,000 - - - 1.44 1 - - - - Tabuk City 3 Amlao CIS (Mabato) : Construction of Canal Lining and Turn-out
1,000 - - - 0.39 - - - - - Tabuk City 4 Annayod CIS : Construction of
Canal Lining
500 - 10 - 0.20 - - - - - Rizal 5 Annayup CIS : Construction of
Canal Lining
1,000 - 3 - 0.29 1 - - - - Rizal 6 Anonang CIS : Construction of
Canal Lining and Turn-out
1,000 - - - 0.39 - - - - - Pasil 7 Bato Sadol Tawiling CIS :
Construction of Canal Lining
500 - - - 0.24 - - - - - Tabuk City 8 Binongsay (Malin-awa) CIS :
Construction of Canal Lining
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
500 - - - 0.21 - - - - - Lubuagan 9 Bontoc Sugoc CIS : Construction
of Canal Lining
1,000 - - - 0.24 - - - - - Tabuk City 10 Cabaruan Sucbot CIS : Construction of Canal Lining
500 - - - 0.19 - - - - - Pasil 11 Dalupa CIS : Construction of Canal Lining
500 - - - 0.16 - - - - - Pasil 12 Dangtalan CIS (Kuwantil) : Construction of Canal Lining
1,500 - - - 0.59 - - - - - Balbalan 13 Gaang Mabalusa CIS : Construction of Canal Lining
500 - - - 0.20 - - - - - Lubuagan 14 Gonggonga-as CIS : Construction
of Canal Lining
2,000 - 21 - - 1 - - - - Tabuk City 15 Malalao CIS : Construction of Siphon
500 - - - 0.20 - - - - - Pasil 16 Malucsad CIS (Tawiling Sallubot Puya-ao)* : Construction of Canal Lining
2,000 - - - 0.46 1 - - - - Rizal 17 Nabuluan Romualdez CIS : Construction of Canal Lining and
Elevated Flume
500 - - - 0.18 - - - - - Tanudan 18 Pagugo CIS (Binaliwan) :
Construction of Canal Lining
1,000 - - - 0.44 - - - - - Tanudan 19 Pattikian CIS (Pugo) : Construction of Canal Lining
500 - - - 0.18 - - - - - Tinglayan 20 Purag CIS : Construction of Canal Lining
500 - - - 0.22 - - - - - Tinglayan 21 Sacran CIS : Construction of Canal Lining
500 - - - 0.16 - - - - - Tanudan 22 Sadog CIS : Construction of Canal Lining
500 - - - 0.16 - - - - - Lubuagan 23 Saod Sucnip (Posjo Sector) CIS :
Construction of Canal Lining
500 - - - 0.20 - - - - - Tinglayan 24 Tangilig CIS : Construction of Canal Lining
8,000 - - - 1.15 - - - - - Balbalan 25 Tapao Mapatayan CIS : Construction of Canal Lining
- - - - 4 8.25 - 34 - TOTAL KALINGA 32,000
MT. PROVINCE
2,000 - 7 - 0.30 3 1 - - - Bontoc 1 Amfalla CIS : Rehabilitation of damaged/Deteriorated
canal,pipes and structures.
1,894 - - - 0.35 2 - - - - Bauko 2 Banao CIS : Rehabilitation of damaged/Deteriorated canal and structures.
1,500 - - - - 3 1 - - - Sagada 3 Buasao Tanulong CIS : Rehabilitation of damaged pipeline and construction of Reservoir Tanks.
4,650 - - - 2.20 16 - - - - Sagada 4 Data Guilom CIS (Inga,Sabangen,Pokaw,Butil) : Rehabilitation of damaged/Deteriorated canal and structures.
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 - 2 - 0.10 1 - - - - Bauko 5 Deccan CIS : Rehabilitation of
damaged Diversion structure.
4,000 - - - 1.50 5 - - - - Bauko 6 Lokamaoy CIS : Rehabilitation of damaged/Deteriorated canal and structures.
1,500 - - - 0.90 3 - - - - Besao 7 Magaki Catengan CIS (Mam-is ) : Rehabilitation of damaged/Deteriorated canal and
structures.
1,000 - - - - 2 - - - - Natonin 8 Pongao Cis : Rehabilitation of
damaged canal and structure.
2,500 - 10 - 0.60 3 - - - - Sadanga 9 Sadanga Upland CIS : Rehabilitation of damaged canal and structures.
2,500 - - - 0.60 5 - - - - Bontoc 10 Sangngan CIS : Rehabilitation of damaged/Deteriorated canal and structures.
1,500 - - - 0.28 3 - - - - Besao 11 Sap-ay Gueday CIS : Rehabilitation of damaged/Deteriorated canal and
structures.
3,500 - - - 1.50 6 - - - - Barlig 12 Socochat CIS : Rehabilitation of damaged/Deteriorated canal and structures.
2,500 - 5 - 0.12 1 - - - - Bontoc 13 Talubin CIS : Rehabilitation of damaged canal and structure.
1,500 - - - 0.70 1 - - - - Besao 14 Tokok CIS : Rehabilitation of damaged/Deteriorated canal and structure.
1,500 - 8 - 0.35 1 - - - - Sagada 15 U-od Gusadan CIS (Naganggang Sector) : Rehabilitation of
damaged canal and structure.
- - - 1 55 9.50 - 32 - TOTAL MT. PROVINCE 35,044
- - - - 18 150 47.65 185 - 215,294 TOTAL CAR - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
3,500 - 30 - - - - - - - Santa Ana 1 Cannagan CIS : Repair of Intake
Structure, farm to market road
3,000 - 5 - - - - - - - Santa Ana 2 Culanto CIS : Const'n. of Canal
Lining/Structures
3,000 - 10 - - - - - - - Santa Ana 3 Gamba Arubacquit CIS : Repair of
diversion structure
29,300 - 200 - - - - - - - Baggao 4 Intal Hacienda : Desilting of
MC/Const'n. Canal Structure
3,500 - - - 0.80 - - - - - Santa Ana 5 Maipudor CIS : Const'n. of Check Structure,Canal Lining/Structures
4,000 - 10 - - - - - - - Santa
Teresita 6 Masi- Aridawen CIS :
Construction of Canal & Canal
Structures
4,000 - 10 - - - - - - - Santa
Teresita 7 Mission CIS : Construction of
Canal & Canal Structures
3,500 - 5 - - - - - - - Santa Ana 8 Nabannatan CIS : Construction of check structure, canal & canal structures
3,000 - 15 - - - - - - - Santa Ana 9 Niludin CIS : Repair of Intake
Structure, farm to market road
6,500 - 8 - - - - - - - Santa Ana 10 Patunungan CIS : Const'n. of Check Structure,Canal
Lining/Structures
3,000 - 5 - - - - - - - Santa Ana 11 Rapoli CIS : Const'n. of Check Structure,Canal Lining/Structures
3,500 - 3 - - - - - - - Santa Ana 12 San Juan CIS : Repair of Check
Structure,Canal Lining/Structures
3,000 - 15 - - - - - - - Sanchez Mira 13 Battuguit-Cassacagan SWIS : CHB
Lining
5,000 - 10 - - - - - - - Sanchez Mira 14 Capanickian CIS : Canal Lining
and Embankment Protection
5,000 - 50 - - - - - - - Claveria 15 Educar CIS : CHB Lining & Canal
Structures
2,000 - 10 - - - - - - - Santa
Praxedes 16 Lattong SWIP : Construction of
Canal & Canal Structures
15,000 - 10 - - - - - - - Sanchez Mira 17 Nagkarasuan CIS : Earthfill dam
2,000 - - - 1.98 5 - - - - Claveria 18 Nagsanga CIS : CHB Lining &
Canal Structures
3,000 - 10 - - - - - - - Sanchez Mira 19 Namilagan CIS : Canal Lining
and Embankment Protection
5,000 - 10 - - - - - - - Sanchez Mira 20 Pangyan CIS : Canal Lining and
Embankment Protection
2,000 - 21 - - - - - - - Santo Niño 21 Sidiran CIS : Canal Lining/Thr.
Crossing
5,000 - 50 - - - - - - - Sanchez Mira 22 Takaweng-San Miguel CIS :
Const'n. of CHB lining
2,500 - 30 - - - - - - - Peñablanca 23 Buyun CIS : Canal
Lining/Structures
2,800 - - - - - - - - - Amulung 24 Gumarang CIS : Canal
Lining/Structures
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,500 - 20 - - - - - - - Solana 25 Lingu CIS : Canal
Structure/Canalization
3,400 - - - 0.50 - - - - - Solana 26 Siggayu SWIP : Repair of impounding Dam/Canal Lining/Structures
4,000 - 103 - - - - - - - Tuao 27 Sto. Tomas CIS : Canal
Lining/Structures
6,000 - - - 1.00 - - - - - Solana 28 Ubong CIS : Canal
Lining/Structures
13,000 - - - - - - - - - Gonzaga 29 Lusong CIS : Construction of
Diversion Structure
- - - - 5 4.28 - 640 - TOTAL CAGAYAN 154,000
ISABELA
5,000 - 40 - - - - - - - Dinapigue 1 Dinapigue CIS : Canal Lining, Desilting of Canals, Canal Structures & Slope Protection
30,000 - 20 - - - - - - - Delfin Albano 2 Delfin Albabo CPIS (Cong Rodolfo Albano) : Supply, Delivery & Installation of engine, pumps & accessories. Restoration of MC & Lats. and desilting of intake channel
7,000 - - - - - - - - - San Mariano 3 San Mariano CPIS (Cong Ana Go) : Construction of pipeline and
desilting
20,000 - 60 - - - - - - - Angadanan 4 Sinalugan CPIP (ANAK-IP Partylist) : Canalization works & Canal Structures
- - - - - - - 120 - TOTAL ISABELA 62,000
NUEVA VIZCAYA
3,000 - 45 - - - - - - - Villaverde 1 Bintawan Tanap CIS : Canal
Lining
1,500 - - - 0.56 1 - - - - Aritao 2 Kirang Impounding Dam : Canal
Lining
2,000 - 5 - - - - - - - Kasibu 3 Lucawan CIS : Canal Lining &
Canal Str.
1,500 - 10 - - - - - - - Santa Fe 4 Mankate Upper CIS : Canal lining
2,000 - - - 0.38 1 - - - - Aritao 5 Simmanguer CIS : Canal structure
(repair/rehab of siphon)
1,000 - - - - - - - - - Aritao 6 Anayo CIS : Canal Lining & Protection Works
2,000 - - - 0.46 - - - - - Dupax del
Norte 7 Benay-Wangeon CIS : Revetment
(Rep/Rehab of Pilot Channel)
2,000 - - - - - - - - - Aritao 8 Bone South CIS : Canal Lining
3,000 - - - 0.21 - - - - - Dupax del Sur 9 Duppes Mangayang CIS : Revetment (Rep/Rehab of Pilot Channel)
1,000 - - - - - - - - - Kasibu 10 Highlander Irrigation Cordon CIS : Pumps
2,000 - - - 0.78 - - - - - Santa Fe 11 Imugan Farmers CIS : Canal Lining
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,000 - - - 0.30 - - - - - Dupax del
Norte 12 Ineangan-Mabila CIS (Madiana
CIS) : Canal Lining & Canal Structure
2,000 - - - 0.31 - - - - - Dupax del
Norte 13 Mabunga CIS : Canal Lining &
Canal Structure
2,000 - - - 0.82 - - - - - Bambang 14 Mauan-Camambugan CIS : Canal
Lining
2,000 - - - 0.19 - - - - - Bambang 15 Mauan-Patalan-Kanganggaan CIS
: Protection Works
2,000 - - - 0.50 1 - - - - Aritao 16 Tabueng-Tucanon CIS : Canal
Lining & Protection Works
2,000 - - - - - - - - - Aritao 17 Upper-Lower Baan CIS : Canal
Lining
2,000 - - - 0.73 - - - - - Aritao 18 Yaway-Tupa Farmers CIS : Canal
Lining & Protection Works
- - - - 3 5.24 - 60 - TOTAL NUEVA VIZCAYA 35,000
QUIRINO
1,500 - 15 - - - - - - - Aglipay 1 Alicia CIS : Canalization Works, Canal Lining, and Canal Structures
1,500 - 5 - - - - - - - Cabarroguis 2 AMBUCLAO CIS : Canalization Works, Canal Lining, and Canal
Structures
1,500 - 16 - - - - - - - Aglipay 3 Bingan CIS : Canalization Works, Canal Lining, and Canal Structures
2,600 - 30 - - - - - - - Maddela 4 Dumabuena Villa CIS : Canalization Works, Canal Lining,
and Canal Structures
4,000 - 15 - - - - - - - Diffun 5 Dumalinta CIS : Canalization Works, Canal Lining, and Canal Structures
3,050 - 10 - - - - - - - Nagtipunan 6 Giayan CIS : Canalization Works, Canal Lining, and Canal
Structures
3,850 - 16 - - - - - - - Diffun 7 Lower Nagbitin CIS : Canalization Works, Canal Lining, and Canal Structures
2,000 - - - 0.20 - - - - - Cabarroguis 8 UPPER TUCOD CIS : Canalization Works, Canal Lining, and Canal
Structures
- - - - - 0.20 - 107 - TOTAL QUIRINO 20,000
- - - - - 8 9.72 927 - 271,000 TOTAL REGION 2 (PROPER) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATAAN
5,000 - - - 0.40 2 - - - - Morong 1 Bayan Dati CIS : Canalization,
Canal Structures
3,000 - - - 0.10 1 - - - - Dinalupihan 2 Pentor CIS : Canalization & Canal
Structures
25,000 - - - - 1 - - - - Balanga City 3 Abu-Abo CIS : Repair/improvement of Abu-abo Diversion Dam
30,000 - - - 1.50 1 - - - - Abucay 4 Calaguiman CIS : Rehabilitation/Improvement of Upper and Lower Calaguiman Dam and Construction of Additional Irrigation System
40,000 - - - 1.50 1 - - - - Samal 5 Imelda CIS : Rehabilitation of Imelda Earth Dam and Construction of Irrigation System
at Imelda Samal
- - - - 6 3.50 - - - TOTAL BATAAN 103,000
NUEVA ECIJA
25,000 - 110 - 1.30 - - - - - Aliaga, Bongabon, Carranglan, Gabaldon, Guimba, Laur, Llanera, Lupao, Pantabangan, Rizal, Munoz, San Jose City, Talugtog, Zaragoza, Gen. Tinio, Palayan, Penaranda, Cabiao
1 Nueva Ecija CIS : Improvement of CIS
- - - - - 1.30 - 110 - TOTAL NUEVA ECIJA 25,000
PAMPANGA
5,000 - - - 0.50 - - - - - Magalang 1 San Nicolas II CIS : Canalization,
3,000 - - - 0.20 - - - - - Santa Rita 2 Panganan CIS : Canalization, &
Canal Structure
4,000 - - - 0.20 - - - - - Arayat 3 Bitas Libutad CIS : Canalization, &
Steelgates
5,000 - - - 0.40 - - - - - Santa Ana 4 Upper San Agustin CIS : Repair
works and canalization
15,000 - - - - 1 - - - - Mabalacat 5 Sta. Maria CIS : Slope Protection
- - - - 1 1.30 - - - TOTAL PAMPANGA 32,000
TARLAC
5,000 - - - 0.48 - - - - - Mayantoc 1 Ambalingit CIS : Rehabilitation of
Canal System
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 - - - 0.62 - - - - - San Jose 2 WBIIS (Bulelatin) : Rehab. of
Canal System
3,500 - - - 0.58 - - - - - San Jose 3 WBIIS (Mangilog) : Rehab. of Canal System
4,000 - - - 0.12 - - - - - Concepcion 4 Balutu 1 CIS : Impvt / Rehab. of Slope Protection
3,000 - - - 0.80 1 - - - - Capas 5 Bueno CIP : Construction of Canal System
- - - - 1 2.60 - - - TOTAL TARLAC 19,500
ZAMBALES
1,500 - - - 0.20 1 - - - - Candelaria 1 Taposo CIS : Rehab of Canal
System
13,500 - - - - - - - - - Iba 2 Upper Prenza CIS : Rehabilitation
of Diversion Works
10,000 - - - 1.60 2 - - - - Castillejos 3 Cavite CIS : Canal system
5,000 - - - 0.30 - - - - - San
Marcelino 4 Naglabusan CIS : canal lining,
slope protection
5,000 - - - 0.80 - - - - - Subic 5 Nibangon CIS : canal lining
- - - - 3 2.90 - - - TOTAL ZAMBALES 35,000
- - - - - 11 11.60 110 - 214,500 TOTAL REGION 3 (PROPER) - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ANTIPOLO CITY
1,444 - - - 0.50 2 - - - - Antipolo City 1 Lower Kilingan CIS : Repair/ Rehabilitation of Irrigation Structure
6,161 - - - 1.00 5 - - - - Antipolo City 2 Pinugay CIS : Procurement , Delivery & Installation of Centrifugal Pump,Installation of HDPE Pipe & Canal Lining
2,204 - - - 0.60 - - - - - Antipolo City 3 Tignoy CIS : Installation of HDPE Pipe & Construction of Canal
Lining
- - - - 7 2.10 - - - TOTAL ANTIPOLO CITY 9,809
BATANGAS
5,200 - - - - - - - - - Calatagan 1 Balibago CIS : Construction of
Diversion Works
1,500 - - - - - - - - - San Juan 2 Pulang Bato CIS : Construction of Diversion Works
8,750 - - - - - - - - - Rosario 3 Timbugan CIS : Construction of Canal Structures
5,000 - - - 1.50 - - - - - Lobo 4 Jaybanga CIS : Restoration of existing canal lining
10,000 - - - - 1 - - - - Lobo 5 Lobo CIS : Restoration of existing canal lining
5,000 - - - 0.80 - - - - - Lobo 6 Malitlit CIS : Construction of
canal lining @ Brgy. Jaybanga
5,000 - - - - 2 - - - - Lobo 7 Nagtalungtong CIS : Diversion works and canal structures @ Brgy. Nagtalungtong
10,000 - - - - 2 - - - - Padre Garcia 8 Balimbing CIS : Brgy. Maugat Canal Structures and Protection
Works
10,000 - - - - 1 - - - - Padre Garcia 9 Cawongan CIS : Protection works
25,000 - - - - 1 - - - - Padre Garcia 10 Patubig ng Bayan CIS : Protection
works
10,000 - - - - 2 - - - - Padre Garcia 11 Quilo-Quilo CIS : Canal Structures and Diversion Works
- - - - 9 2.30 - - - TOTAL BATANGAS 95,450
CAVITE
2,000 - - - - - - - - - Carmona 1 Lantic II CIS : Rehab of Pump
Facilities
2,000 - - - 0.51 - - - - - Ternate 2 Golova CIS : Construction of
Canal Lining
5,000 - - - 1.42 - - - - - Maragondon 3 Magay CIS : Construction of
Canal Lining
- - - - - 1.93 - - - TOTAL CAVITE 9,000
LAGUNA
5,000 - - - 1.22 - - - - - Biñan 1 Timbao Bukal Tubigan CIS : Construction of Canal Structures
3,466 - - - 0.50 - - - - - Majayjay 2 Amonoy CIS : Construction of Canal Lining
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,000 - - - 0.40 - - - - - Famy 3 Lilian CIS : Construction of Canal
Lining
5,300 - - - 0.50 1 - - - - Siniloan 4 LSPU CIS : Construction of Protection Works(500m.) D/S & U/S of newly const. Check str.
- - - - 1 2.61 - - - TOTAL LAGUNA 15,766
QUEZON
2,500 - - - - - - - - - Lucban 1 Igang CIS : Construction of Canal
Structures
8,000 - 50 - - - - - - - Panukulan 2 Lipata CIS : Rehab & Construction of Canal structures
3,000 - - - 1.10 1 - - - - Sariaya 3 Canda CIS : Construction of Canal
Structures
2,000 - - - 0.90 - - - - - Alabat 4 Angeles CIS : Rehab of Diversion Works & Construction of Canal
Structures
1,500 - - - - - - - - - Alabat 5 Babawangan CIS : Rehab of Diversion Works & Construction
of Canal Structures
2,000 - - - 0.21 - - - - - Alabat 6 Bacong CIS : Rehab of Diversion Works Canal & Construction of
Canal Structures
6,000 - 30 - - - - - - - Guinayangan 7 Dancalan-Caimawan CIS : Resto/Rehab/Construction of Diversion Works & Canal
Structures
3,000 - - - - - - - - - Tagkawayan 8 Del Rosario CIS : Construction of
Canal Structures
1,500 - - - 0.71 2 - - - - Lopez 9 Jongo CIS : Rehab of Diversion Works & Construction of Canal Structures
1,600 - - - - - - - - - Quezon 10 Magsino CIS : Rehab of Diversion Works & Construction of Canal
Structures
2,500 - - - - - - - - - Quezon 11 Mascarina CIS : Construction of
Canal Structures
1,500 - - - - - - - - - Alabat 12 Pambuena Villa Gordon CIS : Rehab of Diversion Works &
Construction of Canal Structures
2,000 - - - - - - - - - Quezon 13 Silangan CIS : Construction of
Canal Structures
8,000 - 50 - - - - - - - Guinayangan 14 Sintones-Arbismen :
Construction of Canal Structures
2,000 - - - - - - - - - Calauag 15 Villa San Isidro CIS : Construction of Canal Structures
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,500 - - - 0.23 - - - - - Alabat 16 Villa Victoria CIS : Rehab of Diversion Works & Construction of Canal Structures
3,000 - - - 0.60 3 - - - - Burdeos 17 Caniwan CIS : Rehabilitation of irrigation line canal in Brgy. Caniwan Burdeos
18,000 - - - - 1 - - - - Sampaloc 18 Banot CIS : Construction/Improvement of Protection works and improvement of existing
diversion works
12,000 - 44 - 2.00 7 - - - - Mauban 19 Santol-Polo CIS : Construction of canal lining and construction/rehabilitation/repair of canal structures
6,000 - - - 1.59 2 - - - - Unisan 20 Bahay Buaya CIS : Const. of Canal lining and Canal Structures
13,000 - - - 2.75 6 - - - - San Narciso 21 Busokbusokan CIS : Const. of
Canal lining and Canal Structures
8,000 - - - 1.20 3 - - - - San Francisco 22 Casay CIS : Const. of Canal lining and Canal Structures
6,000 - - - 0.90 3 - - - - Buenavista 23 Hagonghong CIS : Const of Canal Lining
15,000 - - - 2.50 7 - - - - Padre Burgos 24 Iba. Kinagunan CIS : Conts. of Div. Works and Structutres
6,000 - - - 0.70 4 - - - - San Francisco 25 Inabuan CIS : Const. of Canal lining and Canal Structures
6,000 - - - 1.30 4 - - - - Catanuan 26 Pacabit CIS : Canal Lining and
River Protection Works
4,000 - - - 1.00 4 - - - - San Francisco 27 Pagsangahan CIS : Const. of Canal lining and Canal Structures
10,000 - - - 2.00 4 - - - - Unisan 28 Panaon CIS : Const. of Canal
lining and Canal Structures
3,000 - - - 0.60 2 - - - - Macalelon 29 San Vicente CIS : Const. of Canal
lining and Canal Structures
3,000 - - - 0.86 3 - - - - San Francisco 30 Tayuman CIS : Const. of Canal
lining and Canal Structures
6,000 - - - 0.65 1 - - - - San Narciso 31 Buenavista CIS : Const. of Canal lining and Canal Structures
7,000 - - - 0.50 1 - - - - Mulanay 32 Canuyep-F. Nanadiego CIS : Const. of Canal lining and Canal Structures and Prot. Works
7,000 - - - 0.70 1 - - - - Padre Burgos 33 Sipa CIS : Const. of Canal lining and Canal Structures and Prot.
Works
- - - - 58 23.01 - 174 - TOTAL QUEZON 181,600
RIZAL
5,000 - 20 - - - - - - - Binangonan 1 Kay Kansa CIS : Construction of
Canal Lining
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,391 - - - 1.55 - - - - - Tanay 2 Salang Matanda CIS :
Construction of Canal Lining
- - - - - 1.55 - 20 - TOTAL RIZAL 9,391
- - - - - 75 33.50 194 - 321,016 TOTAL REGION 4A - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
2,920 - - - 0.89 1 - - - - Torrijos 1 Busay CIS : Repair of diversion dam, canal structure and canal lining
2,588 - - - 0.80 1 - - - - Santa Cruz 2 Lipa CIS : Const.of canal
structures
4,200 - - - 1.50 - - - - - Torrijos 3 Malindig CIS : Const.of canal
structure and canal lining
3,220 - - - 1.77 3 - - - - Boac 4 Pawa-Tagwak CIS : Const.of protection works and canal
structures
3,350 - - - 0.12 2 - - - - Torrijos 5 Sibuyao CIS : Const.of canal lining
29,290 - - - 7.50 5 - - - - Santa Cruz 6 Tagum-Angas SRIS : Const.of
canal lining
10,000 - - - 2.20 3 - - - - Mogpog 7 Laon Mataas na Bayan CIS : Const.of protection works and canal structures
2,000 - - - 0.35 - - - - - Buenavista 8 Malbog CIS : Const.of canal lining
2,000 - - - 0.35 - - - - - Santa Cruz 9 Tawiran CIS : Const.of canal
lining
- - - - 15 15.48 - - - TOTAL MARINDUQUE 59,568
OCCIDENTAL MINDORO
5,000 - - - 0.50 2 - - - - San Jose 1 Batasan CIS : Const'n. of Canal Struc. & Lined Canal, Drainage Struc. at Secondary Intake
Structure & Terminal Facilities
18,500 - - - 1.00 - - - - - San Jose 2 Cacia (NIDC) : Const.of canal
lining
9,500 - - - 0.20 1 - - - - Calintaan 3 Gutad CIS : Const'n. of Supp. Intake, Training Wall at Main Intake Struc., Install of Gabions, Canal Struc. & Lined Canal, Drainage Struc. & terminal Facilities Facilities
7,000 - - - 0.50 - - - - - Calintaan 4 Peri CIS : Const'n. of Canal Struc. & Lined Canal, Drainage Struc. & Project Facilities
5,375 - - - 0.10 1 - - - - Abra de Ilog 5 Tuay CIS : Const'n. of Main. Intake Structure, Canal Struc. & Lined Canal, Drainage Struc. & Project Facilities
7,500 - - - - - - - - - Santa Cruz 6 Baribuan CIS : Const'n. of Canal Struc. & Lined Canal, Drainage Struc. & Terminal Facilities
12,000 - - - - 2 - - - - Looc 7 Borol CIS : Const'n. of Canal Struc. & Lined Canal, Drainage Struc. & Project Facilities
20,000 - 400 - - - - - - - San Jose 8 Central CIS : Repair and Improvement of Irrigation Facilities
5,000 - - - - 1 - - - - Lubang 9 Tilik CIS : Upgrading and
Rehabilitation of Existing Dam
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - 7 2.30 - 400 - TOTAL OCCIDENTAL MINDORO 89,875
ORIENTAL MINDORO
11,737 - 100 - - - - - - - Victoria 1 Malayas CIS : Canal Structures
3,000 - - - 0.61 - - - - - Mansalay 2 Panulong-La Purisima CIS :
construction of canal lining
7,000 - - - 1.60 5 - - - - Bansud 3 Salcedo CIS : Diversion Works
&Canal Structures
8,000 - - - 2.11 4 - - - - Gloria 4 Upper Banus CIS : Construction of Checkgate, Canal Lining and
structures
25,000 - - - 0.43 - - - - - Naujan 5 Sto. Niño-Nag-Iba SIS : Construction of Sto. Nino-Nag-Iba, SIP/Extension
3,000 - - - 0.75 - - - - - Gloria 6 Lower Banus CIS : Construction
of canal lining
4,000 - - - 0.80 1 - - - - Bansud 7 Tangon CIS : Construction of
canal lining
1,000 - - - 0.20 - - - - - Mansalay 8 Panulong-La Purisima CIS :
construction of canal lining
5,000 - - - 1.20 - - - - - Bongabong 9 Malitbog CIS : Const.of canal
lining
- - - - 10 7.70 - 100 - TOTAL ORIENTAL MINDORO 67,737
PALAWAN
20,780 - 105 - - - - - - - San Vicente 1 Caruray-Kinabuyukan CIS : Const.of canal structure and
canal lining
10,000 - - - 1.00 2 - - - - El Nido 2 New Ibajay SIS : Const.of Canal lining & structure
5,000 - - - 0.30 - - - - - El Nido 3 Sibaltan SIS : Const.of canal lining & access road
8,000 - 25 - - - - - - - Brooke's Point
4 Babangon SIS : Const.of canal structure and canal lining
15,000 - 40 - - - - - - - Rizal 5 Candawaga CIS : Const.of canal lining
15,000 - 60 - 1.08 - 1 - - - Bataraza 6 Tarusan CIS : Installation of HDPE
& Const.of canal lining
12,000 - 25 - 0.97 5 - - - - Brooke's Point
7 Tigaplan CIS : Const.of canal structure and canal lining
10,000 - 12 - 2.00 2 - - - - Puerto Princesa City
8 Inagawan CIS : Const.of canal lining and structure
15,000 - - - 0.50 - 1 - - - Taytay 9 Abongan CIS (Left) : Const.of canal lining and structure
10,000 - 20 - - - - - - - Dumaran 10 Layok CIS : Const.of canal lining
5,000 - - - 0.94 - - - - - Roxas 11 Malico I CIS : Const.of canal lining
6,000 - 50 - - - - - - - Roxas 12 Sandoval SIS : Const.of canal
lining
2,000 - - - 0.58 - - - - - Bataraza 13 Bono Bono CIS : Repair/Rehab of Bono-bono CIS @ Brgy. Bono-bono
3,000 - - - 0.78 2 - - - - Brooke's
Point 14 Rabok-Magugurang CIS :
Repair/Rehab of Rabuk-Magugurang CIS @ Brgy.
Malis
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 - - - 0.39 - - - - - Brooke's
Point 15 Tamlang CIS : Repair/Rehab of
Tamlang CIS @ Brgy. Tamlang
3,000 - - - 0.62 2 - - - - Bataraza 16 Bulalacao CIS : Const.of canal lining
3,000 - - - 0.30 - - - - - Bataraza 17 Iwahig Kulandanum CIS : Const.of canal lining
3,000 - - - 0.25 - - - - - Bataraza 18 Taysay CIS : Const.of canal lining
- - - 2 13 9.71 - 337 - TOTAL PALAWAN 148,780
ROMBLON
5,740 - - - 0.80 1 - - - - Santa Fe 1 Danao Sur CIS : Repair of Diversion Dam, Construction of Canal Structures & Concrete Lining
3,500 - - - - 1 - - - - Odiongan 2 Gabawan II CIS : Desilting of Diverstion works, Construction of Protection works, installation of steelgates & Const.of Canal structure
2,000 - - - 1.00 2 - - - - Looc 3 Limon Sur CIS : Construction ofCanal Structures & Concrete Lining
3,500 - - - 1.00 4 - - - - Odiongan 4 Malilico Recto CIS : Repair of Diversion Works & Contruction of Concrete Lining & Canal Structure
- - - - 8 2.80 - - - TOTAL ROMBLON 14,740
- - - - 2 53 37.98 837 - 380,700 TOTAL REGION 4B - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
3,000 - 30 - - - - - - - Tabaco City 1 San Antonio CIS : Const. of return flor struct. & repair of aux. intake. Const. of sup Farm Ditch =400m & MFD=607.50m & repair of Aux. MC
3,000 - - - - - - - - - Malinao 2 Tanawan CIS : Canalization
Works
6,000 - 15 - - - - - - - Malinao 3 Tuliw-Pawa CIS : Replacement of CP-12 Sluice Steel gate, Repair of 55m Service Roads, CHB Lining of 551m LMC & 192m Lat. A
1,350 - 15 - - - - - - - Legazpi City 4 Bagong Abre CIS : Protection works of abt. 20m & CHB Lining of MC of abt. 241.60m
1,500 - 15 - - - - - - - Manito 5 Balasbas CIS : Construction of
CHB Lined Canal at Lateral A
1,500 - - - - - - - - - Legazpi City 6 Banquerohan CIS : Protection works and canal lining (Protection works and embankment protection at Diversion)
2,000 - 20 - - - - - - - Daraga 7 Gabawan CIS : Construction of
CHB Lined Canal at Lateral A
1,350 - - - - - - - - - Legazpi City 8 San Joaquin-Bigaa CIS : Protection works at Left side of Free Flow Intake #2
1,500 - - - - 2 - - - - Legazpi City 9 Tamaoyan CIS : Protection works and canal lining (Protection works and embankment protection at Diversion)
8,000 - 100 - - - - - - - Polangui &
Libon 10 Agos-Sta. Cruz CIS : Continuation
for the restoration of the rubber dam
1,000 - 10 - - - - - - - Guinobatan 11 Malobago CIS : Repair of canals
1,500 - 15 - - - - - - - Legazpi City 12 San Francisco CIS :
2,000 - - - 0.50 - - - - - Camalig 13 Upper Libod Extension CIS :
1,000 - 10 - - - - - - - Polangui 14 Lidong-Maynaga CIS : CHB Lining & repair of
canals/embankments.
2,000 - 20 - - - - - - - Libon 15 Lower Talisay CIS : Add'l. Intake U/S of Left MC and CHB Lining &
repair of canals/embankments.
2,000 - 20 - - - - - - - Pio Duran 16 Marigondon CIS : Construction of
canal lining and structures
2,000 - 10 - - - - - - - Guinobatan 17 Masarawag CIS : Add'l. Check Structure, CHB Lining & repair of canals/embankments.
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,000 - - - - - - - - - Bacacay 18 Bayandong CIS : Protection works and canal lining (Protection works and embankment protection at Diversion)
5,000 - 10 - - - - - - - Santo
Domingo 19 SS Misan CIS : Canalization and
Protection Works of Main Canal
5,000 - - - - - - - - - Ligao City & Oas
20 Badian-Catburawan CIS : STWs and CHB Lining & repair of canals/embankments.
2,000 - - - - - - - - - Polangui 21 Buhay na Kudos CIS : CHB Lining & repair of canals/embankments.
3,000 - - - - - - - - - Camalig 22 Libod-Bariw CIS : Protection Works for the Service Area.
3,000 - - - - - - - - - Pio Duran 23 Lidong-Maynaga CIS : CHB Lining & repair of canals/embankments.
4,000 - - - - - - - - - Libon 24 Lower Talisay CIS : Construction of add'l. Structure Intake and
CHB Canalization Works
3,000 - - - - - - - - - Pio Duran 25 Marigondon CIS : CHB Lining & repair of canals/embankments.
3,000 - - - - - - - - - Guinobatan 26 Masarawag CIS : Add'l. Check Structure, CHB Lining & repair of canals/embankments.
- - - - 2 0.50 - 290 - TOTAL ALBAY 73,700
CAMARINES NORTE
3,000 - - - - 1 - - - - Santa Elena 1 Cabuluan II CIS : Repair of 3
siphon; canal lining
7,000 - - - 0.50 3 - - - - Capalonga 2 Camagsaang-Munti CIS : CHB
lining
10,000 - - - - - - - - - Capalonga 3 Mataque CIS : Repair of Diversion
Works
3,000 - - - 0.70 2 - - - - Mercedes 4 Hinipaan CIS : Repair of 3 siphon;
canal lining
2,500 - - - 0.40 - - - - - San Vicente 5 Nabua CIS : CHB lining
3,000 - - - 0.50 2 - - - - Basud 6 Tuaca CIS : Repair of 3 siphon;
canal lining
4,500 - - - 0.30 2 - - - - Santa Elena 7 Cabuluan I CIS : CHB lining
4,000 - - - 0.50 2 - - - - Santa Elena 8 Tinawid CIS : CHB lining, repair of 3 units siphon & protection works
- - - - 12 2.90 - - - TOTAL CAMARINES NORTE 37,000
CAMARINES SUR
3,000 - - - 0.77 - - - - - Ragay 1 Amomokpok CIS : Continuation
of CHB Lined Canal
6,000 - - - 0.45 1 - - - - Minalabac 2 Catanusan PIS : Repair/Rehab of Canal Structures, Canal Lining & Pumpsite
4,000 - - - - - - - - - Libmanan 3 Escalante PIS : Repair of pumpsite
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 - - - - 1 - - - - Libmanan 4 Inalahan PIS : Canalization Works
10,000 - - - 1.50 2 - - - - Minalabac 5 Inguinan PIS : Continuation of CHB Lined Canal & structure
6,000 - - - 0.57 4 - - - - San Fernando 6 Planza PIS : Completion of CHB lined Canal/Canal Structures/Repair of Steelgates
7,000 - - - 0.56 - - - - - Libmanan 7 Potot PIS : Continuation of CHB Lined Canal and Repair of
Pumpsite and Pump engine
5,000 - - - 0.32 3 - - - - Lagonoy 8 Himanag CIS : Continuation of CHB Lined Canal & repair of dam
5,400 - - - 0.83 - - - - - Tigaon 9 Panagan CIS : Continuation of
CHB Lined Canal
2,000 - - - - 1 - - - - Bula 10 Lanipga PIS : continuation in the
construction of canal structure
2,000 - - - 0.36 - - - - - Baao 11 Quipalna CIS : Repair of irrigation facilities
3,000 - - - - 2 - - - - Lupi 12 Bulawan Jr. CIS : Repair/Rehab of
Irrigation facilities
3,100 - - - 1.16 1 - - - - Ragay 13 Liboro CIS : Repair/Rehab of Irrigation facilities
7,900 - - - 1.04 15 - - - - Del Gallego 14 Pamplona CIS : Repair/Rehab of Irrigation facilities
3,000 - - - 1.02 - - - - - Ragay 15 Panaytayan CIS : Repair/Rehab of Irrigation facilities
10,000 - - - 0.13 - - - - - Canaman 16 Mangayawan PIS : Repair/Rehab og Canal and Pumpsite
- - - - 30 8.71 - - - TOTAL CAMARINES SUR 81,400
CATANDUANES
1,000 - 15 - - - - - - - Bagamanoc 1 Bugao CIS :
1,700 - 2 - - - - - - - Viga 2 Burgos-San Jose CIS :
2,000 - 2 - - - - - - - Gigmoto 3 Sicmil CIS : Diversion works,
Lined Canal& Canal Structures
2,000 - - - 0.50 1 - - - - Viga 4 Soboc CIS :
1,000 - - - 0.20 1 - - - - Baras 5 Tilod-sta Maria CIS : Diversion works, Lined Canal& Canal Structures
2,000 - - - 0.50 - - - - - Viga 6 Tinago CIS : Diversion works,
Lined Canal& Canal Structures
300 - - - 0.05 1 - - - - Bagamanoc 7 Pangcayanan CIS : Repair of
Irrigation Canal
- - - - 3 1.25 - 19 - TOTAL CATANDUANES 10,000
MASBATE
1,000 - - - 0.20 1 - - - - Monreal 1 Matang Tubig CIS : Construction of CHB Canal Lining
11,000 - - - 2.80 3 - - - - Uson 2 Bontolan CIS : Construction of Canal Structures and CHB Lining
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
18,000 - - - - - - - - - Placer 3 Pili CIS : Construction of canal
lining and structures
2,000 - - - 0.20 1 - - - - Uson 4 Pinangapugan CIS : Construction of Canal Structures & CHB Canal Lining
5,000 - - - - - - - - - Dimasalang 5 Umawas-Gaid CIS : Construction
Canal lining & Canal Structures
- - - - 5 3.20 - - - TOTAL MASBATE 37,000
SORSOGON
5,000 - - - 0.50 - - - - - Castilla 1 Pili CIS : Canal Lining
5,500 - 10 - 1.00 - - - - - Donsol 2 San Isidro SWIS : Construction
Canal lining & Canal Structures
4,500 - - - 1.20 - - - - - Bulan 3 Lahong CIS :
5,000 - - - 0.70 1 - - - - Irosin 4 Tabon-Tabon CIS : Construction of Canal Structures & CHB Canal
Lining
3,000 - - - 0.25 1 - - - - Prieto Diaz 5 Calao CIS : Repair/Rehabilitation of existing Calao CIS (Main Canal)
3,000 - - - - 1 - - - - Irosin 6 Gabao CIS : Repair/Rehabilitation
of Existing Gabao CIS
- - - - 3 3.65 - 10 - TOTAL SORSOGON 26,000
- - - - - 55 20.21 319 - 265,100 TOTAL REGION 5 - Restoration/Rehabilitation/Repair of Existing
Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AKLAN
2,000 - - - 0.40 1 - - - - Altavas 1 Cabugao-Dalipdip CIS :
Construction of Bench Flume
2,029 - 8 0.25 - 1 - - - - Malinao 2 Cogon CIS : Construction of
Bench Flume
540 - - - - 1 - - - - Malay 3 Dumlog CIS : Construction of
Augmentation Check
1,000 - - - 0.30 - - - - - Malinao 4 Liloan-Malandayon CIS :
Construction of Bench Flume
1,200 - - - 0.35 - - - - - Balete 5 Morales CIS : Construction of
Bench Flume
800 - 8 - 0.20 - - - - - Ibajay 6 Naisud-Regador CIS :
Construction of Bench Flume
- - - - 3 1.25 0.25 16 - TOTAL AKLAN 7,569
ANTIQUE
6,000 - - - 1.60 4 - - - - San Remigio 1 Aningalan CIP : Const. of PVC Pipes, Benchflume
3,000 - - - 1.00 1 - - - - Sebaste 2 Bacalan Alegre CIS : Extension of Benchflume
2,000 - - - 0.70 - - - - - Barbaza 3 Barbaza CIS : Const. Benchflume
2,000 - - - 0.35 1 - - - - Bugasong 4 Bugasong CIS : Extension of Benchflume, Rehabilitation of Dam
2,000 - - - 0.30 - - - - - Sebaste 5 Callan CIS : Extension of
Benchflume, Thresher X-ing
2,000 - - - 0.50 - - - - - Culasi 6 Camancijan CIS : Rehabilitation
ofDam
1,000 - - - 0.30 - - - - - San Remigio 7 Carawisan CIS : Benchflume
3,000 - - - 0.50 - - - - - Culasi 8 Carit-an CIS : Extension of
Benchflume,
3,000 - - - 2.10 6 - - - - Valderrama 9 Caswon CIS : Siphon, Benchflume
3,000 - - - 0.50 - - - - - Tobias
Fornier 10 Dao CIS : Benchflume
5,000 - - - 0.30 - - - - - Sibalom 11 Egaña CIS : Siphon, Benchflume
1,500 - - - 0.30 - - - - - San Remigio 12 Eguirendon CIS : Siphon,
Benchflume
10,000 - - - 0.70 - - - - - Bugasong 13 Igbalangao-Ilaures CIS : Siphon,
Benchflume
4,000 - - - 0.20 1 - - - - Patnongon 14 Igbobon CIS : Modification Of
dam
23,500 - - - 4.50 - - - - - Laua-an 15 Laua-an CIS : Extension of
Benchflume(Laterals)
300 - - - 0.10 - - - - - Valderrama 16 Lublub CIS : Benchflume
3,000 - - - 0.70 - - - - - Pandan 17 Luhod Bayang CIS : Closed
Conduit, Benchflume
2,000 - - - - 1 - - - - Culasi 18 Naba CIS : Repair of Existing Dam, Extension of Benchflume(Laterals)
2,000 - - - 0.70 - - - - - Culasi 19 Panganta CIS : Const. of bench flume & canal str.
Page 1 of 5 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
7,700 - - - 1.20 1 - - - - San Jose 20 Pantao PIS : Pedestal of Steel Pipes, Extension of Pipes, const. of bench flume
7,300 - - - 1.30 3 - - - - San Jose 21 San Pedro PIS : Submersible Pump,Steel Pipes ,const. bench flume
2,000 - - - 0.70 1 - - - - Valderrama 22 Upper Binanogan Igang : Siphon, Benchflume
5,000 - - - 0.40 - - - - - Valderrama 23 Valderrama CIS : Rehabilitation ofDam
10,000 - - 2.00 - - - - - - Bugasong 24 Cubay North CIS : Prop.
Benchflume
3,000 - 20 0.50 - - - - - - San Remegio 25 Tubudan-Nagbangi CIS : Restoration of Pipelines, Benchflume
- - - - 19 18.95 2.50 20 - TOTAL ANTIQUE 113,300
CAPIZ
500 - - - 0.05 1 - - - - Panay 1 Agbalo II PCIS : Const. of bench
flume & canal str.
2,500 - 15 - - 1 - - - - Panay 2 Bago Grande CIS : Const. of
bench flume
1,000 - 10 - 0.20 2 - - - - Panitan 3 Salocon PCIS : Const. of bench
flume & canal str.
1,000 - 5 - 0.15 1 - - - - Panitan 4 Tabuc Norte PCIS : Const. of
bench flume & canal str.
20,500 - - - 4.50 4 - - - - Dumarao 5 Badbaran CIS : Const. of bench
flume & canal str. (Lat B-2)
3,000 - - - 0.30 2 - - - - Jamindan 6 Baye-baye PCIS : Const. of bench
flume & canal strs.
5,000 - 20 - 0.40 1 - - - - Dao 7 Nasunogan PCIS : Const. of
Pumping Plant & bench flume
2,000 - - - - 1 - - - - Dumarao 8 San Juan CIS (Logupan Area) : Const. of bench flume & canal str.
2,500 - - - 0.50 1 - - - - Dumarao 9 San Juan CIS (Tabunan Area) : Const. of bench flume & canal
str.
3,000 - 5 - - 1 - - - - Dumalag 10 Santa Rita CIS : Const. of bench
flume & canal str.
- - - - 15 6.10 - 55 - TOTAL CAPIZ 41,000
ILOILO
2,000 - - - 0.70 - - - - - Igbaras 1 Batinganay CIS : Construction of Bench Flume
2,000 - - - 0.70 1 - - - - Igbaras 2 Passi CIS : Repair /Rehab. /Construction of intake and Canal lining
2,000 - - - 0.70 1 - - - - Igbaras 3 Sitio Cabubugan CIS : Construction of Bench Flume & check structure
1,500 - - - 0.50 - - - - - Igbaras 4 Sitio Utas CIS : Construction of Bench Flume
2,000 - - - 0.70 - - - - - San Joaquin 5 Siwaragan CIS : Construction of Bench Flume
Page 2 of 5 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 - - - 0.40 1 - - - - Anilao 6 Agtambo CIS : Construction of Bench Flume and Repair of Intake
2,600 - - - 1.00 - - - - - San Enrique 7 Agutayan CIS : Construction of
Bench Flume
3,400 - - - 1.77 - - - - - Barotac Viejo 8 Agtaracan CIS : Construction of
Bench Flume
4,500 - - - 1.20 1 - - - - San Rafael 9 Apo SRIS : Rehab of dam, bank
protection and canal strs.
2,000 - - - 1.00 - - - - - Barotac Viejo 10 Lipata CIS : Construction of
Bench Flume
3,000 - - - 1.90 - - - - - San Rafael 11 San Dionisio CIS : Construction of
Bench Flume
3,500 - - - 1.80 - - - - - Lemery 12 San Jose CIS : Construction of
Bench Flume
2,000 - - - 0.98 1 - - - - Barotac Viejo 13 Santiago CIS : Repair of Check Str. & Construction of Bench
Flume
3,500 - - - 0.70 - - - - - Sara 14 Serruco CIS : Construction of Bench Flume
3,000 - - - 0.60 - - - - - Guimbal 15 Anono-o IS : Construction of
Bench Flume
3,000 - - - 0.60 - - - - - Igbaras 16 Brgy. No 4 Jovellar-Ligtus CIS : Construction of Bench Flume
1,000 - - - 0.20 - - - - - Miagao 17 Igpandan-Cawayanan CIS : Construction of Bench Flume
1,000 - - - 0.10 1 - - - - Guimbal 18 Lubacan CIS : Const. of Bench Flume and Pump Irrig. Facilities
1,000 - - - 0.10 - - - - - Guimbal 19 Nahapay CIS : Supply, Installation and Delivery of Pump and Engine and Construction of Bench Flume
1,500 - - - 0.30 - - - - - Oton 20 Rizal Turog-Turog CIS : Improvement of Rizal-Turog-Turog-Cadinglian CIS (const. of bench flume)
1,000 - - - 0.20 - - - - - Miagao 21 Saring-Cagbang IS : Construction of Bench Flume
3,000 - - - 0.60 - - - - - San Joaquin 22 Siwaragan CIS : Construction of Bench Flume
1,000 - - - 0.20 - - - - - Miagao 23 Ticdalan-Tumagboc IS :
Construction of Bench Flume
- - - - 6 16.95 - - - TOTAL ILOILO 50,500
NEGROS OCCIDENTAL
12,750 - - - 2.71 - - - - - Don Salvador
Benedicto 1 Benejiwan CIS : Rehab of canal
lining and canal structures
4,500 - - - 1.99 6 - - - - Cadiz City 2 Hda. Unson CIS : Rehab of canal
lining and canal structures
5,728 - 35 - 5.54 1 - - - - Himamaylan
City 3 Bingig CIS : Rehab of canal lining
and canal structures
1,885 - - - 0.67 2 - - - - La Castellana 4 Camandag CIS : Rehab of canal
lining and canal structures
Page 3 of 5 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,000 - 40 - 2.39 1 - - - - Hinobaan 5 Hinoba-an CIS : Rehab of canal
lining and canal structures
2,000 - 2 - 1.00 - - - - - Cauayan 6 Buclao CIS : Rehabilitation of Irrigation Facilities @ Brgy Tuyom ( Buclao IA)
1,000 - 10 - - - - - - - Candoni 7 Cabia-an CIS : Rehabilitation of Irrigation Facilities @ Brgy
Cabia-an (Nailan Farmer's IA)
500 - 2 - 0.20 - - - - - Candoni 8 Caningay CIS : Rehabilitation of Irrigation Facilities @ Brgy Caningay (Panacan IA)
2,000 - 15 - 1.00 - - - - - Hinoba-an 9 Canlabac SWIS : Rehabilitation of Irrigation Facilities @ Brgy Bacuyanangan (CANLABAC
SWISA)
2,000 - 5 - 0.80 1 - - - - Cauayan 10 Cauayan CIS : Rehabilitation of Irrigation Facilities @ Brgy
Poblacion (Maguey IA)
2,000 - 20 - - - - - - - Hinoba-an 11 Culipapa CIS : Rehabilitation of Irrigation Facilities @ Brgy Culipapa & Brgy. Culipapa Farmer's & IA
1,500 - 30 - - - - - - - Candoni 12 Guinobatan SWIS : Rehabilitation of Irrigation Facilities @ Brgy Caningay (Guinobatan SWISA)
2,000 - 10 - 1.00 - - - - - Kabankalan 13 Matanguilon CIS : Rehabilitation of Irrigation Facilities @ Brgy Camingawan (Matanguilon IA)
2,000 - 5 - 1.35 - - - - - Ilog 14 MBCIIS (Canlamay) : Rehabilitation of Irrigation Facilities @ Brgy Canlamay (Canlamay IA)
1,000 - 5 - 1.20 - - - - - Kabankalan 15 MBCIIS (Magballo) : Rehabilitation of Irrigation Facilities @ Brgy Magballo ( Magballo IA)
2,000 - 2 - 1.00 - - - - - Cauayan 16 Palaypay CIS : Rehabilitation of Irrigation Facilities @ Brgy Tuyom ( Palaypay IA)
2,000 - 20 - - - - - - - Candoni 17 Payauan SWIS : Rehabilitation of Irrigation Facilities @ Brgy Payauan ( Payauan SWISA)
2,000 - 10 - 1.00 2 - - - - Candoni 18 Tablas SWISA : Rehabilitation of Irrigation Facilities @ Brgy Payauan ( Tablas SWISA)
3,000 - 40 - - - - - - - Kabankalan 19 Tapi-Ilang Ilang CIS : Rehabilitation of Irrigation Facilities @ BrgyTapi (Ilang Ilang,
Talaptap IA)
- - - - 13 21.85 - 251 - TOTAL NEGROS OCCIDENTAL 54,863
Page 4 of 5 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2.75 - - - - 56 65.10 342 - 267,232 TOTAL REGION 6 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 5 of 5 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
3,000 - - - 1.19 4 - - - - Maribojoc 1 Aliguay CIS : Rehabilitation of Canal Structures and Canal Lining
13,000 - - - 1.88 3 10 - - - Maribojoc 2 Busao-Agahay-Cabawan-Aliguay CIP : Rehabilitation of Canal
Structures and Canal Lining
2,000 - - - 0.53 2 - - - - Buenavista 3 Buga-ong-Cantuba CIS : Rehabilitation of Canal Structures and Canal Lining
4,000 - - - 0.90 8 - - - - Jagna 4 Alejawan : Rehabilitation of
Canal Structures and Canal Lining
2,300 - 6 - 0.34 2 - - - - Anda 5 Badiang CIS : Rehabilitation of Canal Structures and Canal Lining
1,000 - - - 0.20 4 - - - - Loay 6 Botoc CIS : Rehabilitation of
Canal Structures and Canal Lining
6,000 - - - 2.00 10 - - - - Sierra
Bullones 7 Bugsoc Integrated CIS :
Rehabilitation of Canal Structures and Canal Lining
1,400 - 8 - - - - - - - Bilar 8 Cajago CIS : Restoration of Canal
Structures and Canal Lining
3,000 - - - 1.00 8 - - - - Alicia 9 Camba-ol CIS : Rehabilitation of Canal Structures and Canal Lining
3,500 - 20 - - - - - - - Pilar 10 Cansumbang CIS : Restoration of
Canal Structures and Canal Lining
5,200 - - - 1.80 10 - - - - Candijay 11 Gabayan CIS : Rehabilitation of Canal Structures and Canal Lining
3,000 - - - 0.95 7 - - - - Carmen 12 Himatao CIS : Rehabilitation of
Canal Structures and Canal Lining
1,400 - 8 - - - - - - - Bilar 13 Ilaud (Bilar) CIS : Rehabilitation of Canal Structures and Canal Lining
5,000 - - - 1.30 3 - - - - Loboc 14 Jimili-an CIS : Restoration of
Canal Structures and Canal Lining
1,400 - 8 - - - - - - - Valencia 15 La Victoria CIS : Restoration of Canal Structures and Canal Lining
2,500 - - - 0.55 1 - - - - Loboc 16 Loboc Integrated CIS : Rehabilitation of Canal
Structures and Canal Lining
2,000 - - - 0.30 3 - - - - Duero 17 Madua-San Isidro CIS : Rehabilitation of Canal Structures and Canal Lining
800 - - - 0.31 4 - - - - Duero 18 Mambo-ol CIS : Rehabilitation of
Canal Structures and Canal Lining
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,125 - 5 - 0.80 6 - - - - Carmen 19 Montevedeo CIS : Restoration of Canal Structures and Canal Lining
1,425 - - - 0.80 5 - - - - Carmen 20 Nueva Fuerza CIS : Rehabilitation of Canal Structures and Canal Lining
2,500 - - - 0.80 5 - - - - Batuan 21 Pamongbong CIS : Rehabilitation of Canal Structures and Canal Lining
1,000 - - - 0.20 4 - - - - Sierra
Bullones 22 San Isidro CIS : Rehabilitation of
Canal Structures and Canal Lining
1,730 - 10 - - - - - - - Pilar 23 San Vicente-Inaghuban CIS : Restoration of Canal Structures and Canal Lining
3,500 - - - 0.59 - - - - - Mabini 24 Tangkigan CIS : Rehabilitation of
Canal Structures and Canal Lining
3,000 - - - 1.00 8 - - - - Candijay 25 Tugas CIS : Rehabilitation of Canal Structures and Canal Lining
- - - 10 97 17.44 - 65 - TOTAL BOHOL 75,780
CEBU
2,500 - - - 0.50 1 - - - - Carcar City 1 Can-asujan SRIS : Rehabilitation of Irrigation Canals & Structures
1,500 - - - 0.50 1 - - - - Sibonga 2 Lamakan CIS : Rehabilitation of
Irrigation Canals & Structures
1,000 - - 0.60 - 1 - - - - San Fernando 3 Magsico CIS : Rehabilitation of
Irrigation Canals & Structures
2,000 - - - 0.08 1 - - - - Argao 4 Anajao CIS : Rehabilitation of
Irrigation Canals & Structures
2,500 - - - 0.70 1 - - - - Argao 5 Argao CIS : Rehabilitation of
Irrigation Canals & Structures
10,000 - - - 0.80 2 - - - - Balamban 6 Arpili Buanoy CIS : Rehabilitation
of Irrigation Canals & Structures
400 - - 0.02 - 1 - - - - Tabogon 7 Ulbo PIS : Rehabilitation of
Irrigation Pipelines & Structures
4,600 - - - 0.46 1 - - - - Dumanjug 8 Dumanjug CIS : Rehabilitation of Irrigation Canals & Structures
2,450 - 10 - 0.50 1 - - - - Alegria 9 Lepanto CIS : Rehabilitation/Restoration of
Irrigation Canals & Structures
5,000 - - 4.00 - - - - - - Sibonga 10 Busay Bato CIS :
10,000 - - 5.50 - - - - - - Minglanilla 11 Campo 7 PIP : Construction of
irrigation Pipelines
5,000 - - 4.50 - - - - - - Sibonga 12 Manatad CIS :
3,879 - - - 0.78 1 - - - - Asturias 13 Bago CIS : Rehabilitation of
Irrigation Canals & Structures
1,860 - - 3.00 - - - - - - Balamban 14 Mt. Manunggal CIS : Rehabilitation of Irrigation Pipelines & Structures
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 - - - 0.70 1 - - - - Moalboal 15 Tomonoy CIS : Rehabilitation of
Irrigation Canals & Structures
- - - - 12 5.02 17.62 10 - TOTAL CEBU 55,689
CEBU CITY
2,000 - 5 1.80 - - - - - - Tabunan,
Cebu City 1 Batallon CIS :
Rehabilitation/Restoration of
Irrigation Pipelines & Structures
1,900 - 3 1.70 - - - - - - Tabunan,
Cebu City 2 Pinton CIS :
Rehabilitation/Restoration of Irrigation Pipelines & Structures
- - - - - - 3.50 8 - TOTAL CEBU CITY 3,900
NEGROS ORIENTAL
6,750 - - - 0.93 4 - - - - Ayungon 1 Maaslum CIS : Canal lining, canal
structures and terminal facilities
1,000 - - - 0.10 1 - - - - La Libertad 2 Solonggon CIS : Canal lining of earth canal and canal structure
4,000 - - - - 1 - - - - Sibulan 3 Calabnugan CIS : Repair of diversion works and protection dike
2,387 - 50 - 0.20 1 - - - - Mabinay 4 Mabinay CIS : Rehab of canal
lining and canal structures
3,500 - - - - 1 - - - - Siaton 5 Caticugan CIS : Repair of cut and
cover/diversion channel
5,500 - - - - 1 - - - - Siaton 6 Datag CIS : Repair/improvement of protection works
2,000 - - - 0.60 1 - - - - Bais City 7 Lonoy CIS : Canal lining of earth canal and repair of canal structure
1,000 - - - 0.30 1 - - - - Bais City 8 Sab-ahan CIS : Canal lining of
earth canal and canal structure
- - - - 11 2.13 - 50 - TOTAL NEGROS ORIENTAL 26,137
SIQUIJOR
8,500 - 12 - - - - - - - Lazi 1 Cangomantong CIS : Construction of Diversion Works, Canal Structures & Concrete
Canal Lining
1,600 - - - 0.45 3 - - - - Maria 2 Cantaroc CIS : Construction of Canal Structures & Concrete Canal Lining
700 - - - 0.20 3 - - - - Lazi 3 Lazi CIS : Construction of Canal Structures & Concrete Canal
Lining
650 - - - 0.18 3 - - - - Maria 4 Maria CIS : Construction of Canal Structures & Concrete Canal Lining
5,000 - 25 - - - - - - - Siquijor 5 Simacolong CIS : Improvement of Existing Diversion Works, Canal Structures & Concrete Canal Lining
- - - - 9 0.83 - 37 - TOTAL SIQUIJOR 16,450
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
21.12 - - - 10 129 25.42 170 - 177,956 TOTAL REGION 7 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BILIRAN
7,200 - 40 - 0.86 6 - - - - Biliran 1 Biliran CIS : Construction of Diversion Works, Canal and Farm Level System
3,000 - 20 - 0.51 1 - - - - Naval 2 Talustusan CIS : Repair of Canal
and Road System
2,000 - 15 - 0.10 - - - - - Kawayan 3 Tubig-Ginoo CIS : Construction of
Canal System
3,000 - 20 - 0.11 10 - - - - Naval 4 Villa Caneja CIS : Construction of Canal, Farm Level and Road
System
4,000 - 20 - - 1 - - - - Culaba 5 Virginia-Binongtoan CIS : Repair
of Diversion Works
- - - - 18 1.58 - 115 - TOTAL BILIRAN 19,200
LEYTE (NORTHERN)
7,000 - 50 - 0.18 8 - - - - Alangalang 1 Buenavista CIS : Construction of Canal System
5,400 - 30 - 0.24 2 - - - - Babatngon 2 Rizal CIS : Repair of Diversion Works and Construction of Canal, Farm Level and Road SystemConstruction of Canal and Farm Level System
3,000 - - - 0.40 1 - - - - Tanauan 3 Sta. Elena CIS : Construction of
Canal System
2,000 - 10 - 0.78 2 - - - - Jaro 4 Alahag CIS : Repair of Diversion Works and Construction of Canal, Farm Level and Road SystemConstruction of Canal and Farm Level System
4,500 - 40 - 0.88 - - - - - La Paz 5 Balante-Alegria CIS : Construction of Protection Works @ Diversion Works and Canal System
2,000 - 30 - 0.55 1 - - - - Dagami 6 Hitongnob CIS : Construction of
Canal and Farm Level System
5,000 - 30 - 1.03 4 - - - - Carigara 7 Lobistan CIS : Construction of Canal System
2,000 - 20 - 0.76 9 - - - - Jaro 8 Macanip CIS : Construction of Canal, Farm Level and Road System
3,000 - - - 1.46 7 - - - - Burauen 9 Malitbogay CIS : Construction of
Canal System
2,000 - 20 - 0.45 5 - - - - Tunga 10 Pasakay-amahit CIS :
Construction of Canal System
1,000 - 22 - - - - - - - Calubian 11 Laray CIS : Construction of Canal
System
4,000 - - - 0.80 3 - - - - Palompon 12 Agbanga CIS : Improvement of Diversion Works and Construction of Canal and Farm
Level System
2,000 - 30 - 0.83 - - - - - Palompon 13 Binagyohan CIS : Construction of
Canal System
4,000 - 65 - 1.21 3 - - - - Kananga 14 Libertad CIS : Construction of
Canal and Farm Level System
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,500 - - - 0.83 3 - - - - Palompon 15 Tabunok CIS : Construction of
Canal and Drianage System
8,000 - 40 - - - - - - - Kananga 16 Tugbong CIS : Construction of Protection Works @ Diversion Works
5,000 - 130 - - 1 - - - - Bato 17 Amagos CIS : Repair of Diversion
Works
5,000 - 78 - 0.78 6 - - - - Matalom 18 Esperanza CIS : Construction of
Canal and Farm Level System
5,000 - 35 - 0.74 1 - - - - Hilongos 19 Tabunok CIS : Improvement of Diversion Works and Construction of Canal and Farm
Level System
7,000 - 58 - 0.42 2 - - - - Abuyog 20 Paguite CIS : Repair of HDPE, imprvt/rehab of extg siphon & canal linings
12,000 - 48 - 0.07 9 - - - - Carigara 21 Hiluctogan-Canlampay CIS : repair of dam, const. of 7 units chute, drainage structures, turnouts & protection works
- - - - 67 12.41 - 736 - TOTAL LEYTE (NORTHERN) 91,400
LEYTE (SOUTHERN)
5,000 - 30 - 0.69 2 - - - - Hinunangan 1 Badiangon-Tahusan CIS : Repair/Construction of Canal
System System
6,000 - 35 - - 1 - - - - Sogod 2 Buac CIS : Repair of canals
5,000 - 35 - 0.70 3 - - - - Bontoc 3 Malibago-Esperanza CIS : Repair of Diversion Works and Construction of Canal, Drainage
and Road System
2,300 - 25 - 0.33 1 - - - - Maasin City 4 Maria Clara CIS : Repair of Diversion Works and Canal System
2,300 - 30 - 0.44 2 - - - - Libagon 5 Nahulid CIS : Repair of Diversion Works and Construction of Canal
System
2,000 - 10 - 0.29 - - - - - San Juan 6 Pong-oy CIS : Repair of Diversion Works and Canal System
2,000 - 16 - 0.86 1 - - - - Hinunangan 7 Otama-Biasong CIS :
Construction / Improvement
2,000 - 16 - 0.26 4 - - - - Libagon 8 Tigbao CIS : Construction /
Improvement
16,000 86 54 - 3.94 16 - - - - Silago 9 Tubaon CIS : Construction /
Improvement
- - - - 30 7.51 - 251 86 TOTAL LEYTE (SOUTHERN) 42,600
SAMAR (EASTERN)
5,000 - - - 0.95 9 - - - - Dolores 1 Aroganga CIS : const. of canal
lining & struc
4,000 - - - 0.04 - - - - - MacArthur 2 Calma CIS : repair of dam & const
of canal lining
5,000 - 40 - 0.60 - - - - - San Julian 3 Libas CIS : repair of dam & const
of canal lining
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
20,000 - - - 5.17 6 - - - - Dolores 4 San Pascual CIS : const of canal lining, drainage & canal struc and turn outs
11,500 - 50 - 3.66 14 - - - - Balangiga 5 Balangiga CIP : For Completion ( Const. of Canal lining & turnouts & road struc)
2,500 - 10 - 0.37 - - - - - Borongan 6 San Jose CIS : Repair/Rehabilitation (repair of main canal , dam & flume)
6,000 - 15 - 1.30 1 - - - - Llorente 7 Surok-Antipolo CIS : Construction
(const. of teruvian & conc. Canal)
- - - - 30 12.09 - 115 - TOTAL SAMAR (EASTERN) 54,000
SAMAR (NORTHERN)
1,500 - - - 0.27 4 - - - - Allen 1 Allen CIS : const. of canal lining &
struc
2,500 - 10 - 1.18 11 - - - - Allen 2 Jubasan CIS : const. of canal
lining & struc
1,500 - - - 0.06 8 - - - - Allen 3 Kinaguitman CIS : const. of canal
lining & struc
2,000 - - - 0.42 2 - - - - Rosario 4 Rosario CIS : const. of canal lining
& struc
3,000 - - - 0.09 - - - - - San Roque 5 Coroconog CIS : const. of canal
lining
4,200 - 10 - 0.09 - - - - - Palapag 6 Mapno CIS : const. of canal lining
- - - - 25 2.11 - 20 - TOTAL SAMAR (NORTHERN) 14,700
SAMAR (WESTERN)
3,000 - 5 - 1.23 - - - - - Calbayog City 1 Cag-anibong CIS : repair/impvt of
dam & canal lining
5,000 - 20 - 1.24 2 - - - - Calbayog City 2 Danao CIS : repair/impvt of canal
lining
3,500 - - - 1.60 4 - - - - Santa
Margarita 3 Napuro CIS : repair/impvt of
canal lining
3,000 - 32 - 0.03 1 - - - - Tarangnan 4 Pajo CIS : repair/impvt of dam &
canal lining & struc
2,000 - - - 1.18 1 - - - - Santa
Margarita 5 Panaruan CIS : repair/impvt of
dam & canal lining & struc
2,000 - 5 - 0.23 3 - - - - Calbayog City 6 Ton-ok CIS : const of supp. Dam
& canal lining
4,000 - 20 - - 1 - - - - Motiong 7 Calapi CIS : const, of cut & cover
3,000 - 10 - 1.25 - - - - - Jiabong 8 Camaruboan CIS : repair/impvt
of canal lining
2,000 - 5 - - 1 - - - - Calbayog City 9 Mabini CIS : const of supp. Dam
& canal lining
3,000 - - - 1.36 1 - - - - Jiabong 10 Parina-Macabitas CIS : repair/impvt of dam & canal lining & struc
4,000 - 30 - 1.12 - - - - - Paranas 11 Tutubigan CIS : repair/impvt of canal lining
- - - - 14 9.24 - 127 - TOTAL SAMAR (WESTERN) 34,500
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - 184 44.94 1,364 86 256,400 TOTAL REGION 8 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BASILAN
15,000 - 20 - 2.00 - - - - - Lantawan 1 Banas CIS : Repair of D.W. &
Canal Lining
30,000 - 20 - 2.60 - - - - - Maluso 2 Batongal CIS : Repair of D.W. &
Canal Lining
20,000 - 25 - 1.50 - - - - - Lamitan City 3 Colonia CIS : Repair of D.W. &
Canal Lining
20,000 - - - - - - - - - Isabela City 4 Kapatagan CIS : Const'n of D.W.,
Canal & Canal Structures
35,000 - - - 3.00 - - - - - Lamitan City 5 Lamitan CIS : Canal Lining
15,000 - 15 - 2.20 - - - - - Isabel City 6 Sumagdang CIS : Repair of D.W.
& Canal Lining
15,000 - 15 - 1.20 - - - - - Sumisip 7 Basak CIS : Repair of Canals &
Canal Structs.
10,000 30 - - 1.50 6 - - - - Sumisip 8 Lower Binembengan : Const'n of D.W., Canal & Canal Structures
- - - - 6 14.00 - 95 30 TOTAL BASILAN 160,000
SULU
4,000 - - - - - - - - - Indanan 1 Buansa CIS : Improvmnt of
Canalization
- - - - - - - - - TOTAL SULU 4,000
ZAMBOANGA CITY
10,000 - - - - - - - - - Pasonanca, Zamboanga City
1 Preza Mayor CIS : Improvement
of IS Facilities
3,000 - - - 1.97 - - - - - Boalan, Zamboanga
City
2 Boalan CIS : Improvement of IS
Facilities
3,000 - - - 0.79 - - - - - Bolong, Zamboanga City
3 Bolong CIS : Improvement of IS
Facilities
3,000 - - - 0.85 - - - - - Curuan, Zamboanga
City
4 Curuan CIS : Improvement of IS
Facilities
5,000 - - - 1.50 2 - - - - Dabuy, Zamboanga City
5 Dabuy CIS : Improvement of IS
Facilities
4,000 - - - 1.01 - - - - - Manicahan, Zamboanga
City
6 Manicahan CIS : Improvement of
IS Facilities
14,000 - - - - - - - - - Mercedes, Zamboanga City
7 Mercedes CIS : Improvement of
IS Facilities
8,000 - - - - - - - - - Quiniput, Zamboanga
City
8 Quinipot CIS : Improvement of IS
Facilities
8,000 - - - - 1 - - - - Tictapol, Zamboanga City
9 Tictapol CIS : Improvement of IS
Facilities
4,000 - - - - - - - - - Vitali, Zamboanga
City
10 Vitali CIS : Improvement of IS
Facilities
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
15,000 - - - 1.00 - - - - - Pasonanca, Zamboanga City
11 Preza Mayor CIS : Repair of Dam
5,000 - - 0.89 - - - - - - Talisayan, Zamboanga City
12 Talisayan CIS : Concreting of
canals
- - - - 3 7.12 0.89 - - TOTAL ZAMBOANGA CITY 82,000
ZAMBOANGA DEL NORTE
2,000 - 40 - 2.06 8 - - - - Piñan 1 Bacuyong CIS : Improvement of
IS Facilities
8,000 - 10 - 3.67 4 - - - - Polanco 2 Lapayan Baja CIS : Improvement
of IS Facilities
1,252 - - - 0.98 4 - - - - Dapitan City 3 Ma. Cristina CIS : Improvement
of IS Facilities
8,000 - - - - - - - - - Roxas 4 Dohinob CIS : Improvement of IS
Facilities
2,500 - 10 - 0.13 6 - - - - Manukan 5 Don Jose Aguirre CIS :
Improvement of IS Facilities
8,000 - - - 4.00 3 - - - - Sindangan 6 Inuman CIS : Improvement of IS
Facilities
4,000 - 15 - 2.71 6 - - - - Sindangan 7 Sindangan CIS : Improvement of
IS Facilities
1,000 - - - 0.93 2 - - - - Katipunan 8 Sinuyak CIS : Improvement of IS
Facilities
3,000 - - - 0.64 2 - - - - Bacungan 9 Bacungan CIS : Improvement of
IS Facilities
2,500 - - - 0.13 3 - - - - Siocon 10 Bulacan CIS : Improvement of IS
Facilities
2,000 - 75 - 0.62 5 - - - - Labason 11 Dansalan CIS : Improvement of IS
Facilities
3,500 - - - 1.64 5 - - - - Labason 12 Labason CIS Ext'n. : Improvement
of IS Facilities
6,000 - 100 - 4.30 - - - - - Siocon 13 Lituban CIS : Improvement of IS
Facilities
8,000 - - - 1.93 3 - - - - Labason 14 Lower Bobongan CIS :
Improvement of IS Facilities
2,000 - - - - - - - - - Siocon 15 S. Cabral CIS : Improvement of IS
Facilities
2,000 - 20 - 0.87 8 - - - - Siocon 16 Siocon CIS : Improvement of IS
Facilities
6,000 - - - 1.12 4 - - - - Labason 17 Upper Bobongan CIS :
Improvement of IS Facilities
- - - - 63 25.73 - 270 - TOTAL ZAMBOANGA DEL NORTE 69,752
ZAMBOANGA DEL SUR
1,500 - - - 0.71 10 - - - - Midsalip 1 Bibilop CIS : Improvement of IS
Facilities
11,000 - 35 - 0.45 3 - - - - Midsalip 2 Boloron CIS : Improvement of IS
Facilities
1,000 - - - 0.80 5 - - - - Aurora 3 Gubaan CIS : Improvement of IS
Facilities
3,000 - - - 1.20 5 - - - - Ramon
Magsaysay 4 Katipunan CIS : Improvement of
IS Facilities
1,000 - 8 - 0.47 4 - - - - Ramon
Magsaysay 5 Liargao CIS : Improvement of IS
Facilities
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 - - - 2.20 38 - - - - Pagadian City 6 Manga CIS : Improvement of IS
Facilities
2,000 - - - 0.80 16 - - - - Tambulig 7 San Vicente CIS : Improvement of IS Facilities
3,000 - - - 1.02 4 - - - - Mahayag 8 Sicpao CIS : Improvement of IS Facilities
1,000 - 10 - 0.20 6 - - - - Mahayag 9 Sicpao CIS Extn : Improvement of IS Facilities
2,000 - - - 0.54 - - - - - Santa Cruz-Boniao
10 Sta. Cruz - Boniao CIS : Improvement of IS Facilities
2,000 - - - 1.30 16 - - - - Tambulig 11 Tambulig : Improvement of IS
Facilities
4,000 - - - 2.03 7 - - - - Midsalip 12 Timbaboy CIS : Improvement of IS Facilities
10,000 - - - 2.60 22 - - - - Tukuran 13 TUKURAN CIS : Improvement of IS Facilities
5,000 - 16 - 1.60 - - - - - Lakewood 14 Biswangan CIS : Improvement of IS Facilities
2,000 - - - 0.90 11 - - - - Kumalarang 15 Bogayo CIS : Improvement of IS Facilities
2,000 - - - 1.10 11 - - - - Guipos 16 Bogwac I CIS : Improvement of IS
Facilities
2,000 - - - 0.80 12 - - - - GUIPOS 17 Canunan Balongating : Improvement of IS Facilities
2,500 - - - 1.20 12 - - - - Dumalinao (Sumadat)
18 Dumalinao CIS : Improvement of IS Facilities
1,000 - - - 1.00 5 - - - - Kumalarang 19 Kumalarang CIS : Improvement of IS Facilities
2,500 - 30 - 1.20 9 - - - - Tigbao 20 Libayoy CIS : Improvement of IS Facilities
2,000 - - - 1.20 9 - - - - Tigbao 21 Limas CIS : Improvement of IS
Facilities
- - - - 205 23.31 - 99 - TOTAL ZAMBOANGA DEL SUR 64,500
ZAMBOANGA SIBUGAY
1,000 - - - 0.30 3 - - - - Alicia 1 Bella CIS : Construction of
Canalization and Canal Structures
1,000 - - - 0.30 3 - - - - Payao 2 La Fortuna CIS : Construction of Canalization and Canal Structures
2,000 - - - 0.60 6 - - - - Buug 3 Lower Labrador CIS : Construction of Canalization and
Canal Structures
1,000 - - - 0.30 3 - - - - Imelda 4 Lumpanac CIS : Construction of Canalization and Canal Structures
2,000 - - - 0.20 4 - - - - Titay 5 Azusano CIS : Construction of Canalization, Canal Structures &
Slope Protection
2,500 - - - 1.10 8 - - - - Titay 6 Batayan II CIS Existing : Construction of Canalization and Canal Structures
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 - - - 0.30 3 - - - - Kabasalan 7 Buayan-Calapan CIS : Construction of Slope Protection
1,000 - - - 0.30 3 - - - - Kabasalan 8 Kabasalan CIS : Construction of
Slope Protection
2,500 - - - 0.45 4 - - - - Titay 9 Kalawit CIS (Titay Area) : Construction of Canalization and
Canal Structures
1,000 - - - 0.30 3 - - - - Buug 10 Lower Labrador CIS :
1,000 - - - 0.30 3 - - - - Tungawan 11 Lower Tungawan CIS : Construction of Canalization and Canal Structures
1,000 - - - 0.30 3 - - - - Tungawan 12 Tungawan CIS : Construction of Canalization and Canal Structures
2,000 - - - 0.60 6 - - - - Buug 13 Upper Labrador CIS : Construction of Canalization and Canal Structures
1,500 - - - 0.45 4 - - - - Tungawan 14 Upper Tungawan CIS : Construction of Canalization and
Canal Structures
20,000 - - - - - - - - - Titay 15 Achasol- Bangco Irrigation
System : Drainage System
- - - - 56 5.80 - - - TOTAL ZAMBOANGA SIBUGAY 42,500
0.89 - - - - 333 75.97 464 30 422,752 TOTAL REGION 9 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
7,500 - 85 - - - - - - - Manolo
Fortich 1 Diclum CIS : Repair of irrigation
facilities and restoration of non-operation ares
1,500 - 10 - 0.38 - - - - - Manolo
Fortich 2 Gaboc CIS : Repair of irrigation
facilities and restoration of
non-operation ares
5,000 - 20 - 1.13 - - - - - Manolo
Fortich 3 Kalinda CIS : Repair of irrigation
facilities and restoration of non-operation ares
2,500 - 20 - 0.80 - - - - - Manolo
Fortich 4 Sankanan CIS : Repair of
irrigation facilities and restoration of non-operation ares
4,500 - 35 - - - - - - - Talakag 5 Ticalaan CIS : Repair of irrigation facilities and restoration of
non-operation ares
2,000 - - - 0.50 2 - - - - Malaybalay 6 Apo Macote CIS : Repair of irrigation facilities and restoration of non-operation ares
3,000 - 15 - 2.70 - - - - - Cabanglasan 7 Bobonawan CIS : Repair of irrigation facilities and restoration of non-operation ares
3,000 - 5 - 0.71 - - - - - Cabanglasan 8 Capinonan CIS : Repair of irrigation facilities and restoration of non-operation ares
2,000 - 10 - 0.68 - - - - - Malaybalay 9 Sinanglanan CIS : Repair of irrigation facilities and restoration of non-operation ares
10,000 - 50 - 1.00 - - - - - Malaybalay 10 St. Peter CIS : Repair of irrigation facilities and restoration of
non-operation ares
3,000 - 25 - 0.61 1 - - - 0.69 Maramag 11 Danggawan CIS : Repair of irrigation facilities and restoration of non-operation ares
3,000 - 25 - 0.80 1 - - - - Maramag 12 La Roxas CIS : Repair of irrigation facilities and restoration of
non-operation ares
3,000 - - - 1.50 1 - - - - Kibawe 13 Old Kibawe CIS : Repair of irrigation facilities and restoration of non-operation ares
2,000 - 25 - 0.50 - - - - - Quezon 14 Salawagan CIS : Repair of irrigation facilities and restoration of non-operation ares
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 - - - 0.50 - - - - - Maramag 15 San Roque Panadtalan CIS : Repair of irrigation facilities and restoration of non-operation ares
4,000 - 27 - 1.13 1 - - - - Quezon 16 Sinuda CIS : Repair of irrigation facilities and restoration of non-operation ares
10,000 - 3 - 3.00 2 - - - - Kalilangan 17 Ninoy Aquino CIS : Repair of
irrigation facilities
4,000 - - - 1.60 - - - - - Pangantucan 18 Pangantucan CIS : Repair of
irrigation facilities
8,000 - - - 2.00 4 - - - - Kalilangan 19 West Poblacion CIS : Repair of
irrigation facilities
0.69 - - - 12 19.54 - 355 - TOTAL BUKIDNON 79,000
CAGAYAN DE ORO CITY
3,648 - - - - - - - - - Cagayan de
Oro City 1 Taglimao CIS : Repair of irrigation
facilities and restoration of
non-operation ares
3,000 - 10 - - - - - - - Cagayan de
Oro City 2 Tambo CIS : Repair of irrigation
facilities and restoration of non-operation ares
4,000 - 15 - - - - - - - Cagayan de
Oro City 3 Indahag CIS : Repair of irrigation
facilities and restoration of
non-operation ares
5,000 - 15 - - - - - - - Cagayan de
Oro City 4 Palalan CIS : Repair of irrigation
facilities and restoration of
non-operation ares
- - - - - - - 40 - TOTAL CAGAYAN DE ORO CITY 15,648
CAMIGUIN
7,000 - 18 - - 1 - - - - Mambajao 1 KBL CIS : Repair/Rehab of diversion dam
2,000 - 5 - - - - - - - Sagay 2 Sagay CIS : Repair of irrigation facilities and restoration of non-operation ares
3,000 - - - - - - - - - Mambajao 3 KBL CIS : Repair of irrigation
facilities
- - - - 1 - - 23 - TOTAL CAMIGUIN 12,000
ILIGAN CITY
3,000 - - - 0.50 - - - - - Iligan City 1 Digkilaan CIS : Repair/Rehab of
irrigation facilities
2,400 - - - - - - - - - Iligan City 2 Iligan PIS : Repair of irrigation
facilities
- - - - - 0.50 - - - TOTAL ILIGAN CITY 5,400
LANAO DEL NORTE
14,000 - 50 - - - - - - - Tubod 1 Bulod CIS : Repair of irrigation facilities and restoration of non-operation ares
4,000 - - - - - - - - - Kolambugan 2 Kulasihan CIS : Repair of
irrigation facilities
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
25,000 - 160 - 5.00 - - - - - Kauswagan 3 Bulod CIS : Communal Irrigation System @ Barangay Cayontor
- - - - - 5.00 - 210 - TOTAL LANAO DEL NORTE 43,000
LANAO DEL SUR
4,000 - 15 - - - - - - - Wao 1 Katutungan CIS : Repair of irrigation facilities and restoration of non-operation
ares
4,000 - - - 0.30 - - - - - Wao 2 Kilikili CIS : Repair of irrigation
facilities
- - - - - 0.30 - 15 - TOTAL LANAO DEL SUR 8,000
MISAMIS OCCIDENTAL
26,600 - 100 - - - - - - - Baliangao 1 Baliangao CIS : Repair of irrigation facilities and restoration of non-operation ares
3,000 - 3 - - - - - - - Lopez Jaena 2 Mansabay CIS : Repair of irrigation facilities and restoration of non-operation ares
6,000 - 15 - - - - - - - Plaridel 3 Tipolo CIS : Repair of irrigation facilities and restoration of non-operation ares
10,000 - - - - - - - - - Ozamis City 4 Labo CIS : Repair of irrigation facilities. Construction of protection works
30,000 - - - - - - - - - Ozamiz City 5 Labo CIS : construction of main canal, concreting of lateral canals and construction of drainage canal
- - - - - - - 118 - TOTAL MISAMIS OCCIDENTAL 75,600
MISAMIS ORIENTAL
13,000 - 50 - - - - - - - Gingoog City 1 Bal-ason CIS : Repair of irrigation
facilities and protection works
4,000 - 16 - - - - - - - Magsaysay 2 Magsaysay CIS : Repair of irrigation facilities and restoration of non-operation
ares
10,000 - 15 - - - - - - - Balingoan 3 Mapua-Dahilig CIS : Repair of irrigation facilities and restoration of non-operation
ares
17,145 - 20 - - - - - - - Gingoog City 4 Kalagunoy CIS : Construction of
canal and canal structures
10,000 - 15 - - - - - - - Gingoog City 5 Malinao CIS : Construction of
canal and canal structures
10,000 - 15 - 1.00 2 - - - - 6 Sioan CIS : Construction of canal
and canal structures
- - - - 2 1.00 - 131 - TOTAL MISAMIS ORIENTAL 64,145
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- 0.69 - - - 15 26.34 892 - 302,793 TOTAL REGION 10 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
COMPOSTELA VALLEY
8,000 - - - 0.44 - - - - - Monkayo 1 Lower Naboc CIS : Rehab of Maba dam, Construction of canal, desilting of maba river and construction of protection Dike
8,000 - - - 0.10 - - - - - Compostela 2 Ngan CIS : Rehab of dam, Canal ,
structures & protection dike
8,000 - - - 0.22 1 - - - - Monkayo 3 Salvacion CIS : Construction of check structure @ Samuag
Creek, canal and canal structure
10,000 - 10 - 0.37 1 - - - - Nabunturan 4 Cabidianan CIS : Modification of dam and rehab of canal and
canal structures.
10,000 - - - 0.23 2 - - - - Mawab 5 Nuevo Iloco CIS : Dam modification, construction of check structures and protection dike @ Diversion canal (Dapon Area), canalization
- - - - 4 1.36 - 10 - TOTAL COMPOSTELA VALLEY 44,000
DAVAO DEL SUR
25,000 - - - 0.90 - - - - - Bansalan 1 Badoma CIS : Rehabilitation of diversion dam and construction of canal, protection dike and IA
building.
- - - - - 0.90 - - - TOTAL DAVAO DEL SUR 25,000
DAVAO ORIENTAL
71,080 - - - - 1 - - - - Cateel 1 Cateel Integrated Irrig. System : Modification of dam and construction of Protection Dike
3,000 - - 0.15 - - - - - - Baganga 2 Masao CIS : Construction of Protection Works , 100 m HDPE and Completion of IA Bldg and Solar Drier
6,000 - - - - - - - - - Lupon 3 Cocornon-Tagboa CIS : Construction of Protection Dike
and repair of Service Road
15,000 - - - - - - - - - Cateel 4 Cateel IS : Rehabilitation and
repair of Left Main Canal
10,000 - - 0.10 0.34 2 - - - - Caraga 5 Manorigao I CIS : Construction of irrigation facilities covering brgys. San Luis
- - - - 3 0.34 0.25 - - TOTAL DAVAO ORIENTAL 105,080
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
0.25 - - - - 7 2.60 10 - 174,080 TOTAL REGION 11 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
4,268 - - - 0.40 1 - - - - Buldon 1 Dinganen CIS :
5,019 - - - 0.55 2 - - - - Sultan
Kudarat 2 Pigkalagan CIS :
4,754 - - - 0.19 - - - - 1.20 Guindulunga
n 3 Bagan CIS :
5,112 - - - 0.30 2 - - - - Datu Paglas 4 Bunawan CIS :
1.20 - - - 5 1.44 - - - TOTAL MAGUINDANAO 19,153
NORTH COTABATO
2,000 - - - 0.45 - - - - - Alamada 1 Banatalan CIS : Construction of Canal lining
5,000 - - - - 1 - - - - Alamada 2 Paruayan CIS : Construction of Canal Structures
5,000 - - 1.44 0.48 1 - - - - Kidapawan City
3 Gasan-Esmar CIS :
5,000 - - - 1.18 4 - - - - Kidapawan
City 4 Paco Binoligan CIS :
7,000 - - - 0.87 5 - - - - Arakan 5 Badiangon CIS :
3,896 - - - 0.39 1 - - - - Kabacan 6 Bangilan CIS :
15,000 - - - - 1 - - - - Tulunan 7 Damawato CIS :
- - - - 13 3.37 1.44 - - TOTAL NORTH COTABATO 42,896
SARANGANI
9,000 - - - - 1 - - - - Alabel 1 Domolok - Tokawal CIS :
3,001 - - - 0.50 1 - - - - Maitum 2 Suli_Blucon CIS :
2,637 - 5 - 0.40 - - - - - Maitum 3 Tarucao Lanao CIS :
1,500 - - - 0.12 - - - - - Kiamba 4 Tuguis CIS :
- - - - 2 1.02 - 5 - TOTAL SARANGANI 16,138
SOUTH COTABATO
1,617 - - - - 1 - - - - General
Santos City 1 Conel CIS :
2,838 - - - 1.10 5 - - - - Polomolok 2 Glamang CIS :
1,600 - - - 0.90 5 - - - - Tampakan 3 Lmt CIS :
3,000 - - - 1.20 7 - - - - Polomolok 4 Magsaysay-Polomolok CIS :
6,500 - - - - 1 - - - - General
Santos City 5 San Jose CIS :
3,000 - - - 0.80 6 - - - - Polomolok 6 Silway 7 CIS :
4,000 - - - - - - - - - Lake Sebu 7 Bacdulong CIS :
7,000 - - - 3.80 13 - - - - Koronadal
City 8 Bo. 7 CIS :
2,000 - - - 0.70 4 - - - - Surallah 9 Buenavista CIS :
500 - - - 0.20 1 - - - - Koronadal
City 10 Cacub CIS :
2,000 - - - 0.70 8 - - - - Koronadal
City 11 Cadidang CIS :
2,000 - - - 0.20 2 - - - - Banga 12 Cinco CIS :
2,000 - - - 0.60 3 - - - - Surallah 13 Duengas CIS :
2,000 - - - 1.10 4 - - - - Lake Sebu 14 Lake Sebu CIS :
2,000 - - - 1.10 6 - - - - Norala 15 Lambusong CIS :
1,500 - - - 0.70 6 - - - - Tantangan 16 Luayan CIS :
35,000 - - - - 1 - - - - Koronadal
City 17 Magsaysay CIS :
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
500 - - - 0.20 3 - - - - Koronadal
City 18 Magsaysay Extension CIS :
2,200 - - - 0.20 5 - - - - Banga 19 Malaya CIS :
2,000 - - - 1.10 10 - - - - Koronadal City
20 Mani CIS :
500 - - - 0.30 3 - - - - Lake Sebu 21 Talisay CIS :
2,000 - - - 1.00 8 - - - - Tantangan 22 Tantangan CIS :
600 - - - - 2 - - - - Norala 23 Tinago CIS :
30,000 - 208 - - 2 - - - - Koronadal City
24 Magsaysay CIS : Construction of Right & Left Protection of Dam (200m); Construction of Siphon (522 m); and construction of Silt Retention downstream of dam (2
units)
25,000 - - - - - 1 - - - Koronadal
City 25 Magsaysay CIS : Construction of
Protection Works, HDPE Pipes,
- - - 1 106 15.90 - 208 - TOTAL SOUTH COTABATO 141,355
SULTAN KUDARAT
3,000 - - 0.03 0.60 3 - - - - Columbio 1 Malingen-Dalol CIS :
8,000 - 30 - 0.30 3 - - - - Sen. Ninoy
Aquino 2 Basag CIS :
5,000 - - 0.40 0.20 2 - - - - Lebak 3 Basak #1 CIS :
15,518 - 51 - 0.60 3 - - - - Palimbang 4 Dumolol CIS :
3,500 - - 0.04 0.54 2 - - - - Palimbang 5 Kitao CIS :
3,000 - - - - - - - - - Palimbang 6 Maguid CIS :
7,000 - 15 - 0.30 2 - - - - Palimbang 7 Namat-Masla CIS :
4,000 - - - 0.36 2 - - - - Lebak 8 Nuling CIS :
7,000 - - - 0.70 3 - - - - Bagumbayan 9 Tuka SaRIP CIS :
4,500 - - - 0.40 2 - - - - Esperanza 10 Villamor CIS :
- - - - 22 4.00 0.47 96 - TOTAL SULTAN KUDARAT 60,518
1.91 1.20 - - 1 148 25.73 309 - 280,060 TOTAL REGION 12 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
10,000 - 5 - 1.93 2 - - - - Butuan City 1 Basag CIS : Improvement of Canalization and Canal Structures
2,500 - 8 - 1.89 - - - - - Butuan City 2 Camayahan CIS : Canal Lining
2,500 - 8 0.20 0.50 - - - - - Butuan City 3 Maguinda CIS : Earth Canal and
Canal Lining
5,000 - 13 - 0.50 - - - - - Jabonga 4 Jaliobong CIS :
4,000 - 13 - - - - - - - Kitcharao 5 Mamkas-Mahayahay CIS :
4,000 - 10 - 1.50 3 - - - - Buenavista 6 Rizal CIS :
2,000 - - - 0.97 - - - - - Magallanes 7 Taod-oy CIS :
- - - - 5 7.29 0.20 57 - TOTAL AGUSAN DEL NORTE 30,000
AGUSAN DEL SUR
7,444 - 15 - - 1 - - - - Bayugan City 1 Bucac CIS : Dam Repair, Creek Straightening, and Structures,
Slope Protection
10,000 - 5 - 1.00 4 - - - - Bunawan 2 Baobo CIS : Canalization, Access Road and Structures
25,000 - 15 - 1.00 6 - - - - Santa Josefa 3 Sayon CIS : Canalization, Desilting, Drainage Facilities and Structures
- - - - 11 2.00 - 35 - TOTAL AGUSAN DEL SUR 42,444
DINAGAT ISLANDS
3,200 - 4 - 0.45 - - - - - Loreto 1 Cambinliw CIS :
3,600 - 3 - 0.55 - - - - - Dinagat 2 Cayetano-Luna CIS :
2,200 - 3 - 0.50 1 - - - - Basilisa 3 Ferdinand CIS :
- - - - 1 1.50 - 10 - TOTAL DINAGAT ISLANDS 9,000
SURIGAO DEL NORTE
17,000 - - - 2.00 4 - - - - Bacuag 1 Campo CIS :
40,000 - - - - 20 - - - - Surigao City 2 Surigao CIS :
10,000 - - - 1.70 - - - - - Tubod 3 Tubod CIS :
5,000 - - - 2.00 - - - - - Placer 4 Amoslog CIS :
4,000 - - - 1.00 - - - - - Del Carmen 5 Bagacay CIS :
9,000 - - - 1.50 - - - - - San Isidro 6 Buhing Kalipay CIS :
7,500 - - - 2.00 - - - - - Taganaan 7 Himamaug CIS :
6,000 - - - 0.60 4 - - - - Del Carmen 8 Jamoyawon CIS :
9,000 - - - 1.20 - - - - - Socorro 9 Pamosaingan CIS :
3,000 - - - 0.62 1 - - - - Socorro 10 Rizal CIS :
8,000 - - - 2.00 - - - - - Pilar, Siargao 11 San Roque CIS :
7,000 - - - 1.00 - - - - - Socorro 12 Songkoy CIS :
2,000 - 5 - 0.55 - - - - - Socorro 13 Hondrado CIS : Canal Lining
3,000 - 8 - 0.70 3 - - - - Burgos 14 Kamalig CIS : Canal Structure & Lining
2,600 - 8 - 0.61 1 - - - - Santa Monica 15 Sta. Monica CIS : Canal Structure & Lining
2,400 - 5 - 0.38 4 - - - - Santa Monica 16 Tangbo CIS : Canal Structure & Lining
- - - - 37 17.86 - 26 - TOTAL SURIGAO DEL NORTE 135,500
SURIGAO DEL SUR
1,000 - 6 - 0.13 5 - - - - Lanuza 1 Bocaue CIS :
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 - 5 - - 1 - - - - San Miguel 2 Bolhoon CIS :
2,000 - - - - 1 - - - - San Agustin 3 Hubo Left Main Canal CIS :
2,000 - - - - 1 - - - - San Agustin 4 Hubo Rigth Main Canal CIS :
1,000 - - - - 1 - - - - San Miguel 5 Mabuhay CIS :
4,000 - 5 - 0.42 2 - - - - Carmen 6 Malibho CIS :
1,500 - 10 - 0.50 5 - - - - Marihatag 7 Marihatag-Mararag CIS :
2,500 - - - - 1 - - - - Tandag City 8 Maticdum CIS :
1,000 - - - - 2 - - - - Cagwait 9 Tagmalinao CIS :
2,000 - 20 - - 1 - - - - Barobo 10 Camp Bagang CIS :
2,000 - 15 - - 1 - - - - Barobo 11 Guinhalinan CIS :
2,000 10 - - 0.30 3 - - - - Hinatuan 12 Loyola Mansailao CIS :
2,000 - 20 - - 1 - - - - Hinatuan 13 Tarusan PIS :
1,056 - 12 - - 1 - - - - Hinatuan 14 Tidman CIS :
2,000 - 5 - 1.00 - - - - - Lingig 15 Union CIS :
20,000 - 15 - 0.40 5 - - - - Bislig City 16 Borboanan CIS :
4,000 - 30 - 0.69 3 - - - - Barobo 17 Camp Bagang CIS :
5,000 - 15 - 2.00 3 - - - - Barobo 18 Guinhalinan CIS :
5,000 - 15 - 1.26 1 - - - - Bislig City 19 Mone CIS :
20,000 - 15 - 1.50 5 - - - - Bislig City 20 San Isidro CIS :
30,000 - 15 - 0.40 5 - - - - Lingig 21 San Roque CIS :
3,000 - 30 - 0.50 - - - - - Hinatuan 22 Tarusan PIS :
5,000 - 8 - 2.20 2 - - - - Hinatuan 23 Tidman CIS :
8,000 - 10 - 1.00 5 - - - - Lingig 24 Union CIS :
16,000 40 - - 2.23 10 - - - - Barobo 25 Camp Bagang CIS : Canalization &
Canal Structures
10,000 - 25 - 2.50 15 - - - - Lingig 26 Lingig CIP : Canalization & Canal Structures
12,000 15 - - 2.40 12 - - - - Bislig City 27 Mabog CIP : Canalization & Canal Structures
10,000 - 10 - 1.00 - - - - - Bislig City 28 San Isidro CIS : Canalization
15,000 - 35 - 2.50 6 - - - - Tagbina 29 Soriano CIP : Canalization & Canal Structures
7,000 - 35 - 1.00 5 - - - - Lingig 30 Union CIS : Canalization & Canal Structures
- - - - 103 23.93 - 356 65 TOTAL SURIGAO DEL SUR 197,056
0.20 - - - - 157 52.58 484 65 414,000 TOTAL REGION 13 - Restoration/Rehabilitation/Repair of Existing Irrigation Systems (Communal Systems)-RRECIS
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
2,000 - - - - 1 - - - - Marcos 1 Automated Weather Station Dingras Field Office : Telemetry Railfall Station
10,000 - - - - 1 - - - - Dingras 2 Dingras RIS : Protection Works
- - - - 2 - - - - TOTAL ILOCOS NORTE 12,000
ILOCOS SUR
5,000 - - - 0.14 - - - - - Bantay 1 Banaoang PIS : Main Canal Protection Works,Desilting @
Perimeter fence, intake & canals
2,000 - - - - - - - - - Magsingal 2 Banaoang PIS : Main Canal
Protection Works
5,000 - - - 0.30 - - - - - Santo
Domingo 3 Banaoang PIS : Protection Works
& Desilting of Canals
5,000 - - - - - - - - - Cabugao 4 Gaco NIS : Protection Works, Provision of Steel gates and Desilting of Canals
5,500 - - - 0.11 - - - - - Santa Lucia 5 Sta. Lucia-Candon NIS : Protection Works, Desilting of Canals, Provision of Steelgates
2,000 - - - - - - - - - Santa Maria 6 Sta. Maria-Burgos NIS : Canal
Lining & Canal Structures
- - - - - 0.55 - - - TOTAL ILOCOS SUR 24,500
LA UNION
4,000 - - - - 1 - - - - Sudipen 1 Amburayan RIS : Canal
Protection Works
3,000 - - - - 1 - - - - Tubao 2 Masalip RIS : Modification of
Dam Revetment
- - - - 2 - - - - TOTAL LA UNION 7,000
- - - - - 4 0.55 - - 43,500 TOTAL REGION 1 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
APAYAO
10,000 - - - - - - - - - Luna 1 West Apayao Abulug IS : Construction of Drainage Canal & Structures
- - - - - - - - - TOTAL APAYAO 10,000
CAGAYAN
8,250 - - - - - - - - - Abulug 1 West Apayao Abulug IS : Construction of Drainage Canal & Structures
- - - - - - - - - TOTAL CAGAYAN 8,250
IFUGAO
9,500 - - - - 1 - - - - Lamut 1 Hapid IS : Flood Protection works, Fabrication /installation
of steelgates
- - - - 1 - - - - TOTAL IFUGAO 9,500
KALINGA
18,250 - - - - - - - - - Pinukpuk 1 Upper Chico RIS : Construction of
Protection Works
- - - - - - - - - TOTAL KALINGA 18,250
- - - - - 1 - - - 46,000 TOTAL CAR - Climate Change Adaptation Works
(National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
10,000 - - - - - - - - - Buguey 1 Banurbur Creek Irrigation System : Steel Gates and Flood Control
15,000 - - - - - - - - - Camalaniuga
n 2 Magapit PIS : Rehab of Drainage
Outlet Gates
24,000 - - - - - - - - - Ballesteros 3 East Apayao Abulug IS : Const. of
Check Gates & Flood Protection
- - - - - - - - - TOTAL CAGAYAN 49,000
ISABELA
1,000 - - - - - - - - - Cabagan 1 San Pablo Cabagan Irrigation System : Furnishing & Installation of Steel Gates
1,000 - - - - - - - - - Tumauini 2 Tumauini Irrigation System : Furnishing & Installation of Steel Gates
- - - - - - - - - TOTAL ISABELA 2,000
- - - - - - - - - 51,000 TOTAL REGION 2 (PROPER) - Climate Change
Adaptation Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
IFUGAO
2,500 - - - - 4 - - - - Alfonso Lista 1 Magat RIS : Division III
1,500 - - - - - - - - - Alfonso Lista 2 Magat RIS : DRD
1,500 - - - - - - - - - Lagawe 3 Magat RIS : DRD
1,500 - - - - - - - - - Lamut 4 Magat RIS : DRD
1,500 - - - - - - - - - Mayoyao 5 Magat RIS : DRD
- - - - 4 - - - - TOTAL IFUGAO 8,500
ISABELA
990 - - 2.26 - - - - - - Alicia 1 Magat RIS : Division II
1,000 - - - - 3 - - - - Alicia 2 Magat RIS : Division IV
1,000 - - - - 3 - - - - Angadanan 3 Magat RIS : Division IV
1,780 - - 5.94 - - - - - - Angadanan 4 Magat RIS : Division II
760 - - 2.53 - - - - - - Cabatuan 5 Magat RIS : Division II
2,500 - - - - 5 - - - - Cabatuan 6 Magat RIS : Division IV
1,500 - - - - 3 - - - - Cauayan 7 Magat RIS : Division IV
1,000 - - - - 3 - - - - Luna 8 Magat RIS : Division IV
1,000 - - - - 3 - - - - Reina
Mercedes 9 Magat RIS : Division IV
310 - - - - 1 - - - - Cordon 10 Baligatan DD : Division I
350 - - - - 1 - - - - Ramon 11 Baligatan DD : Division I
345 - - - - 2 - - - - Echague 12 Magat RIS : Division I
1,100 - - 3.67 - - - - - - Ramon 13 Magat RIS : Division II
350 - - - - 1 - - - - San Isidro 14 Magat RIS : Division I
1,350 - - 3.20 - - - - - - San Isidro 15 Magat RIS : Division II
2,420 - - 4.50 - - - - - - San Mateo 16 Magat RIS : Division II
420 - - - - 2 - - - - Santiago City 17 Magat RIS : Division I
1,500 - - - - - - - - - Aurora 18 Magat RIS : DRD
1,500 - - - - - - - - - Cabatuan 19 Magat RIS : DRD
1,500 - - - - - - - - - Gamu 20 Magat RIS : DRD
8,000 - - - - - - - - - Ramon 21 Magat RIS : DRD
4,000 - - - - - - - - - San Mateo 22 Magat RIS : DRD
- - - - 27 - 22.10 - - TOTAL ISABELA 34,675
NUEVA VIZCAYA
1,500 - - - - - - - - - Ambaguio 1 Magat RIS : DRD
1,500 - - - - - - - - - Bagabag 2 Magat RIS : DRD
1,500 - - - - - - - - - Bambang 3 Magat RIS : DRD
1,500 - - - - - - - - - Dupax Del
Norte 4 Magat RIS : DRD
1,500 - - - - - - - - - Quezon 5 Magat RIS : DRD
- - - - - - - - - TOTAL NUEVA VIZCAYA 7,500
QUIRINO
631 - - - - 2 - - - - Diffun 1 Baligatan DD : Division I
594 - - - - 2 - - - - Saguday 2 Baligatan DD : Division I
- - - - 4 - - - - TOTAL QUIRINO 1,225
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
22.10 - - - - 35 - - - 51,900 TOTAL REGION 2 (MARIIS) - Climate Change
Adaptation Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PAMPANGA
5,000 - - - - 1 - - - - Candaba 1 AMRIS Maasim River Slope
Protection : Slope protection
20,000 - - - - - - - - - Floridablanca 2 Porac Gumain RIS : Protection
Works (Solib Checkgate)
20,000 - - - - - - - - - Lubao 3 Porac Gumain RIS : Protection
Works (Sto. Cristo Checkgate)
- - - - 1 - - - - TOTAL PAMPANGA 45,000
TARLAC
5,000 - - - 0.20 - - - - - Camiling 1 Camiling RIS : Canal Lining
- - - - - 0.20 - - - TOTAL TARLAC 5,000
- - - - - 1 0.20 - - 50,000 TOTAL REGION 3 (PROPER) - Climate Change
Adaptation Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
7,778 - - - - - - - - - Lupao 1 Macanae Irrigation System :
Reforestation
14,111 - - - - - - - - - Pantabangan 2 Establishment of Mixed Refo and Agro Spp. Plantation : Watershed Management Program : Supply & Delivery of Seedlings
2,500 - - - - - - - - - Jaen 3 Pampanga-Bongabon River Irrigation System Extension :
Improvement of Malaiba Creek
11,111 - - - - - - - - - San Antonio 4 Pampanga-Bongabon River Irrigation System Extension : Improvement of Papaya Creek
3,167 - - - - - - - - - Guimba 5 Supply, Delivery, Installation and Integration with the Existing System of Satellite Telemetries @ Guimba :
3,167 - - - - - - - - - Science City
of Muñoz 6 Supply, Delivery, Installation and
Integration with the Existing System of Satellite Telemetries @ Science City of Muñoz :
10,000 - - - - - - - - - Guimba 7 Supply, delivery, installation and integration with the existing system of 3 units satellite based telemetry rainfall and river gauge station : Supply, delivery, installation and integration with the existiing system of 3 units satellite based telemetry rainfall and river gauge station
- - - - - - - - - TOTAL NUEVA ECIJA 51,834
TARLAC
3,166 - - - - - - - - - Victoria 1 Supply, Delivery, Installation and Integration with the Existing System of Satellite Telemetries @ Victoria :
- - - - - - - - - TOTAL TARLAC 3,166
- - - - - - - - - 55,000 TOTAL REGION 3 (UPRIIS) - Climate Change
Adaptation Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
12,000 - - - - 1 - - 2.09 - Lian 1 Palico RIS : Protection Works
(Flood Protection)
6,000 - - - - 1 - - 0.63 - Nasugbu 2 Palico RIS : Protection Works
(Flood Protection)
- 2.72 - - 2 - - - - TOTAL BATANGAS 18,000
CAVITE
1,000 - - - - 8 - - - - Naic 1 Culong-Culong RIS : Steel Gates
3,000 - - - - 1 - - - - Maragondon 2 Kay-Akle RIS : River Gauge Station
1,000 - - - - 10 - - - - Maragondon 3 Kay-Akle RIS : Steel Gates
- - - - 19 - - - - TOTAL CAVITE 5,000
LAGUNA
500 - - - - 5 - - - - Famy 1 Mayor RIS : Installation of
Steelgates
5,000 - - - - 1 - - - - Famy 2 Mayor RIS : Flood Protection
Works
300 - - - - 4 - - - - Mabitac 3 Mayor RIS : Installation of
Steelgates
200 - - - - 3 - - - - Siniloan 4 Mayor RIS : Installation of
Steelgates
1,000 - - - - 3 - - - - Santa Maria 5 Sta. Maria RIS : Installation of
Intake Structure
- - - - 16 - - - - TOTAL LAGUNA 7,000
QUEZON
10,000 - - - - 1 - - - - Lucena City 1 Dumacaa RIS : (Mayao Dam)
River Protection Works
10,000 - - - - 1 - - - - Infanta 2 Agos RIS : River Protection Works
- - - - 2 - - - - TOTAL QUEZON 20,000
- - 2.72 - - 39 - - - 50,000 TOTAL REGION 4A - Climate Change Adaptation Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
7,350 - - - - 2 - - - - Santa Cruz 1 Tagum-Angas SRIS : Supply, Delivery, Installation and Integration of 2 units satellite telemetry water level sensor with data monitoring system
- - - - 2 - - - - TOTAL MARINDUQUE 7,350
OCCIDENTAL MINDORO
6,996 - - - - 1 - - - - Santa Cruz 1 Pagbahan RIS : Procurement/Installation of
various steelgates
- - - - 1 - - - - TOTAL OCCIDENTAL MINDORO 6,996
ORIENTAL MINDORO
7,458 - - - - 1 - - - - Calapan City 1 Baco-Bucayao RIS : Supply, Delivery Installation and Commissioning of 1 unit warning siren equipment with public address system console
2,380 - - - - 1 - - - - Pinamalayan 2 Pula RIS : Supply, Delivery, Installation and Integration of 1 unit telemetry water level sensor with data monitoring system
- - - - 2 - - - - TOTAL ORIENTAL MINDORO 9,838
PALAWAN
8,316 - - - - 43 - - - - Narra 1 Malatgao/Batang-batang RIS : Procurement and installation of
steelgates (43 units)
- - - - 43 - - - - TOTAL PALAWAN 8,316
- - - - - 48 - - - 32,500 TOTAL REGION 4B - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
24,393 - - - - - - - - - Ligao City 1 NASISI RIS-BAHAMAS IA : Retroffiting of Ogee Dam to downstream Apron
15,607 - - - - - - - - - Ligao City 2 OGSONG RIS-ORIS IA : Retroffiting of Ogsong Ogee Dam
to downstream Apron
- - - - - - - - - TOTAL ALBAY 40,000
- - - - - - - - - 40,000 TOTAL REGION 5 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ANTIQUE
3,000 - - - - 20 - - - - Belison 1 Sibalom-San Jose RIS : Replacement of Steelgates, MTO
Gates, Staff Gauges, Rain Gauges
2,500 - - - - 15 - - - - Hamtic 2 Sibalom-San Jose RIS : Replacement of Steelgates, MTO
Gates, Staff Gauges, Rain Gauges
3,000 - - - - 20 - - - - San Jose 3 Sibalom-San Jose RIS : Replacement of Steelgates, MTO
Gates, Staff Gauges, Rain Gauges
3,000 - - - - 20 - - - - Sibalom 4 Sibalom-San Jose RIS : Replacement of Steelgates, MTO
Gates, Staff Gauges, Rain Gauges
- - - - 75 - - - - TOTAL ANTIQUE 11,500
CAPIZ
6,000 - - - - 7 - - - - Mambusao 1 Mambusao RIS : steelgates
- - - - 7 - - - - TOTAL CAPIZ 6,000
ILOILO
3,850 - - - - 7 - - - - Oton 1 Sibalom RIS : Furnish &
installation of steelgates
6,500 - - - - 1 - - - - San Miguel 2 Aganan RIS : Furnish & installation of steelgates, diversion works, const of canal lining
2,150 - - - - 5 - - - - Dingle 3 Jalaur Extension : Furnish and
installation of steel gates
3,000 - - - - - - - - - Dingle 4 Jalaur RIS : Furnish & installation
of steelgates
3,000 - - - - - - - - - Dingle 5 Jalaur RIS : Supply, delivery and integration with existing NIS of
satellite telemetires
3,000 - - - - - - - - - Leon 6 Sibalom RIS : Supply, delivery and integration with existing NIS of satellite telemetires
3,000 - - - - - - - - - Santa
Barbara 7 Sta. Barbara RIS : Supply, delivery
and integration with existing NIS
of satellite telemetires
3,000 - - - - - - - - - Mina 8 Suage RIS : Supply, delivery and integration with existing NIS of
satellite telemetires
- - - - 13 - - - - TOTAL ILOILO 27,500
NEGROS OCCIDENTAL
6,000 - - - - 2 - - - - Bago City 1 Bago RIS : Modification of Check Structures, replacement of steelgates and mechanism & Supply and Installation of telemetry
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 - - - - 15 - - - - Binalbagan 2 Pangiplan RIS : 1 Telemetry Rainfall. 1 rivergauge, steelgates repair / mechanization (13 units)
- - - - 17 - - - - TOTAL NEGROS OCCIDENTAL 10,000
- - - - - 112 - - - 55,000 TOTAL REGION 6 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
8,000 - - - - 10 - - - - San Miguel 1 Bohol Integrated Irrigation System (Bayongan IS) : Supply and Installation of Steel Gates
6,000 - - - - 8 - - - - Ubay 2 Bohol Integrated Irrigation System (Capayas IS) : Supply and
Installation of Steel Gates
6,000 - - - - 8 - - - - Talibon 3 Bohol Integrated Irrigation System (Talibon SRIS) : Supply and Installation of Steel Gates
10,000 - - - - 14 - - - - Pilar 4 Bohol Integrated Irrigation System (Malinao IS) : Supply and Installation of Log Boom and Steel Gates
- - - - 40 - - - - TOTAL BOHOL 30,000
- - - - - 40 - - - 30,000 TOTAL REGION 7 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
10,500 - - - - 1 - - - - Labangan 1 Labangan RIS : Siltation Control
Project (bench flume)
24,000 - - - - 8 - - - - Molave 2 Salug RIS : Flood Protection
Works
- - - - 9 - - - - TOTAL ZAMBOANGA DEL SUR 34,500
- - - - - 9 - - - 34,500 TOTAL REGION 9 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
DAVAO DEL SUR
40,000 - - - - - - - - - Hagonoy 1 Padada RIS : Installation of 16 units Steel Gates, construction of protection dike @ Padada Dam/Sacub dam/Parat dam,improvement of drainage canals and construction of check structures for drainage re-use to irrigate other areas that could not be served by existing irr
- - - - - - - - - TOTAL DAVAO DEL SUR 40,000
- - - - - - - - - 40,000 TOTAL REGION 11 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
6,500 - - - - - - - - - Butuan City 1 Cabadbaran-Taguibo RIS :
Protection Works of Dam
6,500 - - - - - - - - - Butuan City 2 Lower Agusan River PIS :
Protection Works of Siphon
- - - - - - - - - TOTAL AGUSAN DEL NORTE 13,000
AGUSAN DEL SUR
9,000 - - - - - - - - - Bayugan City 1 Andanan RIS : Canal Protection Works
5,000 - - - - - - - - - Prosperidad 2 Gibong RIS : Canal Protection Works
5,000 - - - - - - - - - Veruela 3 Baobo RIS : Canal Protection Works
5,000 - - - - - - - - - Trento 4 Simulao RIS : Canal Protection
Works
- - - - - - - - - TOTAL AGUSAN DEL SUR 24,000
SURIGAO DEL SUR
6,000 - - - - - - - - - Madrid 1 Cantilan IS : Canal Protection
Works
7,000 - - - - - - - - - Tago 2 Tago RIS : Canal Protection
Works
- - - - - - - - - TOTAL SURIGAO DEL SUR 13,000
- - - - - - - - - 50,000 TOTAL REGION 13 - Climate Change Adaptation
Works (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PANGASINAN
10,000 - - - 1.10 5 - - - - Asingan 1 Aragaag CIS : Modification of diversion works, canal lining & canal structures
5,000 - - - - 1 - - - - San Quintin 2 Baro-Baligayan CIS : Canal
Lining & Canal Structures
- - - - 6 1.10 - - - TOTAL PANGASINAN 15,000
- - - - - 6 1.10 - - 15,000 TOTAL REGION 1 - Climate Change Adaptation
Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
3,000 - - - - 1 - - - - Aliaga 1 Pantoc CIS : Repair of Sluiceway
- - - - 1 - - - - TOTAL NUEVA ECIJA 3,000
PAMPANGA
3,000 - - - - - - - - - Mexico 1 Anao CIS : Repair of Diversion,
Canalization
3,000 - - - - - - - - - San Fernando 2 Sikuako CIP : Protection Works
- - - - - - - - - TOTAL PAMPANGA 6,000
TARLAC
1,000 - - - 0.10 - - - - - Moncada 1 Calamay CIS : Canalization
5,000 - - - - - - - - - Concepcion 2 San Martin CIP : Construction of
drainage and canalization
- - - - - 0.10 - - - TOTAL TARLAC 6,000
- - - - - 1 0.10 - - 15,000 TOTAL REGION 3 (PROPER) - Climate Change
Adaptation Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LAGUNA
5,000 - - - - 1 - - - - Victoria 1 San Benito CIS : Flood Protection
Works
- - - - 1 - - - - TOTAL LAGUNA 5,000
QUEZON
5,000 - - - - 2 - - - - Sariaya 1 Manggalang Birhenan CIS : River Protection Works and Construction of Canal Structures
- - - - 2 - - - - TOTAL QUEZON 5,000
- - - - - 3 - - - 10,000 TOTAL REGION 4A - Climate Change Adaptation
Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
5,000 - - - - - - - - - Pio Duran 1 Caratagan CIS : Rechanneling
Upstream of Diversion Dam
10,000 - - - - - - - - - Libon 2 Prisa -Left Quinale CIS : Retroffiting of Barrage Dam and Protection Works
- - - - - - - - - TOTAL ALBAY 15,000
- - - - - - - - - 15,000 TOTAL REGION 5 - Climate Change Adaptation
Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AKLAN
2,000 - - - - 1 - - - - Ibajay 1 Naisud-Regador CIS : Steelgates, repair of dam and desilting
- - - - 1 - - - - TOTAL AKLAN 2,000
ANTIQUE
3,000 - - - - 10 - - - - San Remigio 1 Banayan CIS : Turn-outs &
drainage outfall
1,100 - - - - 12 - - - - Barbaza 2 Barbaza CIS : Turn-outs
2,000 - - - - 8 - - - - Culasi 3 Bitadton CIS : Turn-outs &
drainage outfall
1,100 - - - - 12 - - - - Bugasong 4 Bugasong CIS : Turn-outs
700 - - - - 7 - - - - Laua-an 5 Cairawan Lindero CIS : Turn-outs
1,100 - - - - 12 - - - - Culasi 6 Camancijan CIS : Turn-outs
700 - - - - 7 - - - - Laua-an 7 Casit-an CIS : Turn-outs
1,100 - - - - 12 - - - - Culasi 8 Culasi CIS : Turn-outs
700 - - - - 7 - - - - Tobias
Fornier 9 Dao CIS : Turn-outs
800 - - - - 10 - - - - Anini-y 10 Nato-Butuan CIS : Turn-outs
700 - - - - 7 - - - - San Remigio 11 San Rafael CIS : Turn-outs
- - - - 104 - - - - TOTAL ANTIQUE 13,000
CAPIZ
5,000 - - - - 3 - - - - Dumarao 1 Badbaran CIS : Replacement &
Furn. & inst'l. of Steelgates
- - - - 3 - - - - TOTAL CAPIZ 5,000
NEGROS OCCIDENTAL
2,000 - - - - 2 - - - - San Carlos City
1 Bagonbon CIS : Structure repair, modification of dam and embankment protection
3,000 - - - - 1 - - - - Sipalay City 2 Basak CIS : Riverbank protection
and restoration works
2,000 - - - - 3 - - - - Ilog 3 Magballo-Balicotoc-Canlamay Integrated Irrigation System : Diversion works/slope protection
2,000 - - - - 1 - - - - Sipalay City 4 Sipalay CIS : Riverbank protection and restoration works
- - - - 7 - - - - TOTAL NEGROS OCCIDENTAL 9,000
- - - - - 115 - - - 29,000 TOTAL REGION 6 - Climate Change Adaptation Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
1,500 - - - - 1 - - - - Tubigon 1 Tubigon (Ilihan) CIS : Const. of drainage protection & slope stabilization
2,000 - - - - 1 - - - - Ubay 2 Ilaya CIS : Const. of drainage interceptor canal & rehab. Of
existing facilities
1,000 - - - - 1 - - - - Alicia 3 Calingganay CIS : Const. of tributary canal & rehab. Of existing facilities
- - - - 3 - - - - TOTAL BOHOL 4,500
CEBU
4,500 - - - - 1 - - - - Carcar City 1 Can-asujan SRIS : Silt Entrapment
Structures for the Dam
- - - - 1 - - - - TOTAL CEBU 4,500
NEGROS ORIENTAL
500 - - - - 5 - - - - Zamboanguit
a 1 Calango SRIS : Watershed tree
plantation (500 trees) and slope
protection
500 - - - - 5 - - - - Dauin 2 Dauin SRIS : Watershed tree plantation (500 trees) and slope protection
500 - - - - 3 - - - - Zamboanguit
a 3 Nasig-id SRIS : Watershed tree
plantation (500 trees) and slope
protection
- - - - 13 - - - - TOTAL NEGROS ORIENTAL 1,500
- - - - - 17 - - - 10,500 TOTAL REGION 7 - Climate Change Adaptation
Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Climate Change Adaptation Works (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
2,000 - - - - - - - - - Butuan City 1 Maguinda CIS : Protection
Works/Canal
2,000 - - - - - - - - - Buenavista 2 Agong-ong CIS : Protection
Works
- - - - - - - - - TOTAL AGUSAN DEL NORTE 4,000
AGUSAN DEL SUR
2,000 - - - - - - - - - Talacogon 1 Kasilayan CIS : Protection Works
2,000 - - - - - - - - - San Luis 2 Laminga CIS : Protection Works
2,000 - - - - - - - - - Trento 3 Obian CIS : Protection Works
- - - - - - - - - TOTAL AGUSAN DEL SUR 6,000
DINAGAT ISLANDS
1,500 - - - 0.17 - - - - - Loreto 1 Campintac CIS : Canal Protection
Works
- - - - - 0.17 - - - TOTAL DINAGAT ISLANDS 1,500
SURIGAO DEL NORTE
2,000 - - - - - - - - - Claver 1 Daywan CIS : Canal Protection
Works
1,500 - - - - - - - - - Alegria 2 San Pedro CIS : Canal Protection
Works
- - - - - - - - - TOTAL SURIGAO DEL NORTE 3,500
SURIGAO DEL SUR
5,000 - - - - - - - - - San Agustin 1 Hubo RIS RMC : Canal Protection
Works
- - - - - - - - - TOTAL SURIGAO DEL SUR 5,000
- - - - - - 0.17 - - 20,000 TOTAL REGION 13 - Climate Change Adaptation
Works (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Upgrading/Rehabilitation of NIS damaged by Typhoon Yolanda PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LEYTE (NORTHERN)
50,439 - 15 - 5.71 9 - - - - Santa Fe 1 Tibak RIS : const. of Protection Dike- .34 kms., & canal lining & struc
35,000 - 15 - 7.02 1 - - - - MacArthur 2 Balire North RIS : const. of canal lining, repair of protection works
& fab/inst of steel gates
12,083 - - - 3.67 2 - - - 0.60 Burauen 3 Daguitan RIS : const. of canal lining, & imprvt of service
roads
12,083 - - - 3.32 - - - - 2.30 Julita 4 Daguitan RIS : const. of canal lining, canal stru & imprvt of service roads
19,828 - - - 5.84 - - - - - Tabontabon 5 Guinarona RIS : const. of canal lining, canal struc & slope
protection works of 0.135 kms
45,548 - 93 - 14.08 2 - - - - Tanauan 6 Guinarona RIS : const. of canal lining, canal struc & slope protection works of0.625 kms
5,000 - - - 1.65 - - - - - Tabontabon 7 Marabong RIS : const. of canal
lining,
2.90 - - - 14 41.29 - 123 - TOTAL LEYTE (NORTHERN) 179,981
- 2.90 - - - 14 41.29 123 - 179,981 TOTAL REGION 8 - Upgrading/Rehabilitation of NIS
damaged by Typhoon Yolanda
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CENTRAL OFFICE
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Comprehensive Agrarian Reform Program-Irrigation Component (CARP-IC) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NATIONWIDE
501,532 1,168 715 3.20 31.62 245 8 - - - Central Office 1 For the Requirement of the Program Beneficiaries Development Component of the Comprehensive Agrarian Reform Program :
- - - 8 245 31.62 3.20 715 1,168 TOTAL NATIONWIDE 501,532
3.20 - - - 8 245 31.62 715 1,168 501,532 TOTAL CENTRAL OFFICE - Comprehensive Agrarian
Reform Program-Irrigation Component (CARP-IC)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS SUR
7,000 - - - - - - 19,775 - - Santo
Domingo 1 Banaoang PIS : Slope Protection
- - 19,775 - - - - - - TOTAL ILOCOS SUR 7,000
LA UNION
500 - - - - - - 1,270 - - Sudipen 1 Amburayan RIS : Coconet Slope Protection
500 - - - - - - 1,270 - - Agoo 2 Masalip RIS : Coconet Slope Protection
- - 2,540 - - - - - - TOTAL LA UNION 1,000
PANGASINAN
500 - - - - - - 700 - - Rosales 1 Acop SRIS : Coconet Slope
Protection
500 - - - - - - 700 - - San Nicolas 2 Ambayoan RIS : Coconet Slope
Protection
500 - - - - - - 700 - - Rosales 3 San Angel SRIP : Coconet Slope
Protection
- - 2,100 - - - - - - TOTAL PANGASINAN 1,500
- - - 24,415 - - - - - 9,500 TOTAL REGION 1 - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
15,000 - - - - - - 24,192 - - Pamplona 1 West Apayao Abulug IS : Construction of protection Works
- - 24,192 - - - - - - TOTAL CAGAYAN 15,000
KALINGA
15,000 - - - - - - 20,000 - - Tabuk City 1 Upper Chico RIS : Procurement & Installation of Coconet for Protection
- - 20,000 - - - - - - TOTAL KALINGA 15,000
- - - 44,192 - - - - - 30,000 TOTAL CAR - Coconet Slope Protection in National
Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
1,500 - - - - - - 1,000 - - Baggao 1 Baggao Irrigation System :
Coconet Slope Protection
1,500 - - - - - - 1,000 - - Buguey 2 Banurbur Creek Irrigation System : Coconet Slope Protection
3,000 - - - - - - 4,615 - - Gonzaga 3 Baua River Irrigation System :
Coconet Slope Protection
2,000 - - - - - - 1,500 - - Gattaran 4 Dummun River Irrigation System
: Coconet Slope Protection
1,500 - - - - - - 2,260 - - Santa Ana 5 Visitacion Irrigation System :
Coconet Slope Protection
2,000 - - - - - - 1,500 - - Ballesteros 6 East Apayao Abulug IS : Coconet
Slope Protection
3,000 - - - - - - 3,800 - - Pamplona 7 Pamplona Pump Irrigation System : Coconet Slope Protection
1,500 - - - - - - 1,000 - - Amulung 8 Iguig-Alcala-Amulung Pump Irrigation System : Coconet Slope
Protection
1,500 - - - - - - 1,000 - - Tuao 9 Lower Chico River Irrigation System : Coconet Slope Protection
1,500 - - - - - - 1,000 - - Peñablanca 10 Pinacanauan River Irrigation System : Coconet Slope
Protection
1,500 - - - - - - 1,000 - - Solana 11 Solana Pump Irrigation System :
Coconet Slope Protection
12,000 - - - - - - 8,000 - - Lasam 12 Zinundungan River IS : Coconet
Slope Protection
- - 27,675 - - - - - - TOTAL CAGAYAN 32,500
ISABELA
800 - - - - - - 1,000 - - Cabagan 1 San Pablo Cabagan Irrigation
System : Slope Protection
1,000 - - - - - - 1,300 - - Tumauini 2 Tumauini Irrigation System : Slope Protection
3,500 - - - - - - 2,000 - - San Agustin 3 Dabubu RIP : Provision of Coconet w/ Gabions within Canal Embankments/ Sideslopes that are prone to erosions
4,000 - - - - - - 5,500 - - San Agustin 4 Dibuluan River Irrigation Project : Provision of Coconet w/ Gabions within Canal Embankments/ Sideslopes that are prone to erosions
- - 9,800 - - - - - - TOTAL ISABELA 9,300
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - 37,475 - - - - - 41,800 TOTAL REGION 2 (PROPER) - Coconet Slope
Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
5,065 - - - - - - 2,000 - - Roxas 1 Siffu RIS : Division III
3,600 - - - - - - 2,500 - - Alicia 2 Magat RIS : HO
3,485 - - - - - - 5,933 - - Cordon 3 Baligatan DD : Division I
1,445 - - - - - - 1,955 - - Echague 4 Magat RIS : Division I
3,000 - - - - - - 2,000 - - Ramon 5 Magat RIS : Division II
3,418 - - - - - - 2,880 - - Ramon 6 Magat RIS : Division I
2,900 - - - - - - 2,347 - - Santiago City 7 Magat RIS : Division I
5,000 - - - - - - 10,000 - - Cauayan City 8 Magat RIS : Division IV (Coconet Slope Protection Works)
- - 29,615 - - - - - - TOTAL ISABELA 27,913
NUEVA VIZCAYA
7,000 - - - - - - 7,870 - - Diadi 1 Magat RIS : DRD
- - 7,870 - - - - - - TOTAL NUEVA VIZCAYA 7,000
QUIRINO
1,187 - - - - - - 2,000 - - Diffun 1 Baligatan DD : Division I
- - 2,000 - - - - - - TOTAL QUIRINO 1,187
- - - 39,485 - - - - - 36,100 TOTAL REGION 2 (MARIIS) - Coconet Slope
Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
PAMPANGA
6,000 - - - - - - 8,500 - - Candaba 1 Pampanga Delta RIS : Coconet
- - 8,500 - - - - - - TOTAL PAMPANGA 6,000
- - - 8,500 - - - - - 6,000 TOTAL REGION 3 (PROPER) - Coconet Slope
Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
15,000 - - - - - - 1,700 - - Guimba 1 Pampanga River Irrigation System (SDC) : Coconet Slope Protection Works
15,000 - - - - - - 3,500 - - Pantabangan 2 Slope Protection along Pantabangan Access Road & Plantation Sites : Coconet Slope Protection Works
7,500 - - - - - - 10,700 - - San Antonio 3 Along Along Irrigation System : Coconet Slope Protection Works
@ Cabungan Creek
- - 15,900 - - - - - - TOTAL NUEVA ECIJA 37,500
NUEVA VIZCAYA
20,000 - - - - - - 4,600 - - Alfonso
Castañeda 1 Canili Dam : Coconet Slope
Protection
- - 4,600 - - - - - - TOTAL NUEVA VIZCAYA 20,000
- - - 20,500 - - - - - 57,500 TOTAL REGION 3 (UPRIIS) - Coconet Slope
Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
QUEZON
10,000 - - - - - - 22,907 - - Tayabas 1 Dumacaa RIS : (Alsam, Lakawan) Coconet Slope Protection
- - 22,907 - - - - - - TOTAL QUEZON 10,000
- - - 22,907 - - - - - 10,000 TOTAL REGION 4A - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
1,500 - - - - - - 1,500 - - Sablayan 1 Amnay RIS : Coconet Slope
Protection
- - 1,500 - - - - - - TOTAL OCCIDENTAL MINDORO 1,500
- - - 1,500 - - - - - 1,500 TOTAL REGION 4B - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAMARINES NORTE
2,400 - - - - - - 3,300 - - Daet 1 Daet-Talisay RIS : Coconets Slope Protection of Daet-Talisay RIS
- - 3,300 - - - - - - TOTAL CAMARINES NORTE 2,400
CAMARINES SUR
4,000 - - - - - - 5,800 - - Libmanan 1 Libmanan Cabusao PIS : Coconets Slope Protection of Libmanan-Cabusao PIS
- - 5,800 - - - - - - TOTAL CAMARINES SUR 4,000
SORSOGON
4,000 - - - - - - 5,000 - - Bulan 1 San Ramon-San Francisco RIS : Coconets Slope Protection of San
Ramon-San Francisco RIS
- - 5,000 - - - - - - TOTAL SORSOGON 4,000
- - - 14,100 - - - - - 10,400 TOTAL REGION 5 - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOILO
10,000 - - - - - - 11,000 - - San Miguel 1 Aganan RIS : Canal Slope
Protection
10,000 - - - - - - 2,700 - - Barotac Viejo 2 Barotac Viejo RIS : Canal Slope
Protection
10,000 - - - - - - 11,000 - - Dingle 3 Jalaur Extension : Canal Slope
Protection
10,000 - - - - - - 11,000 - - Santa
Barbara 4 Sta. Barbara RIS : Canal Slope
Protection
10,000 - - - - - - 11,000 - - Mina 5 Suage RIS : Canal Slope
Protection
- - 46,700 - - - - - - TOTAL ILOILO 50,000
- - - 46,700 - - - - - 50,000 TOTAL REGION 6 - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
4,000 - - - - - - 1,714 - - Labangan 1 Labangan RIS : Coconet Slope
Protection
4,650 - - - - - - 2,880 - - Molave 2 Salug RIS : Coconet Slope
Protection
- - 4,594 - - - - - - TOTAL ZAMBOANGA DEL SUR 8,650
ZAMBOANGA SIBUGAY
9,500 - - - - - - 5,100 - - Bayog 1 Sibuguey Valley IS : Coconet Slope Protection (Bayog Area)
7,500 - - - - - - 6,630 - - Diplahan 2 Sibuguey Valley IS : Coconet Slope Protection (Diplahan Area)
4,000 - - - - - - 2,297 - - Siay 3 Sibuguey Valley IS : Coconet
Slope Protection (Siay Area)
- - 14,027 - - - - - - TOTAL ZAMBOANGA SIBUGAY 21,000
- - - 18,621 - - - - - 29,650 TOTAL REGION 9 - Coconet Slope Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
DAVAO DEL SUR
5,000 - - - - - - 7,100 - - Matanao 1 Mal RIS : Instalation of 7,100 sq.m. Coconet Slope Protection Works
15,000 - - - - - - 21,400 - - Hagonoy 2 Padada RIS : Instalation of 21,400 sq.m. Coconet Slope Protection
Works
- - 28,500 - - - - - - TOTAL DAVAO DEL SUR 20,000
- - - 28,500 - - - - - 20,000 TOTAL REGION 11 - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
400 - - - - - - 275 - - Datu Paglas 1 Alip RIS :
- - 275 - - - - - - TOTAL MAGUINDANAO 400
NORTH COTABATO
450 - - - - - - 300 - - Libungan 1 Libungan RIS :
450 - - - - - - 300 - - Kabacan 2 Kabacan RIS :
450 - - - - - - 300 - - M'lang 3 Malasila RIS :
450 - - - - - - 300 - - Carmen 4 Maridagao RIS :
450 - - - - - - 300 - - M'lang 5 Mlang RIS :
- - 1,500 - - - - - - TOTAL NORTH COTABATO 2,250
SOUTH COTABATO
450 - - - - - - 300 - - Banga 1 Ala RIS Dam 1 :
450 - - - - - - 300 - - Santo Niño 2 Ala RIS Dam 2 :
450 - - - - - - 300 - - Tantangan 3 Marbel #1 RIS :
- - 900 - - - - - - TOTAL SOUTH COTABATO 1,350
SULTAN KUDARAT
400 - - - - - - 275 - - Isulan 1 Ala RIS Dam 2 :
- - 275 - - - - - - TOTAL SULTAN KUDARAT 400
- - - 2,950 - - - - - 4,400 TOTAL REGION 12 - Coconet Slope Protection in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
500 - - - - - - 430 - - Butuan City 1 Lower Agusan River PIS : Coconet
Slope Protection
900 - - - - - - 776 - - Las Nieves 2 Mat-I Ambacon Pinanaan Irrigation Project (MAP IP) : Coconet Slope Protection
- - 1,206 - - - - - - TOTAL AGUSAN DEL NORTE 1,400
AGUSAN DEL SUR
500 - - - - - - 150 - - Prosperidad 1 Gibong RIS : Coconet Slope
Protection
500 - - - - - - 150 - - Trento 2 Simulao RIS : Coconet Slope
Protection
- - 300 - - - - - - TOTAL AGUSAN DEL SUR 1,000
SURIGAO DEL SUR
1,000 - - - - - - 700 - - Madrid/Canti
lan 1 Cantilan IS : Coconet Slope
Protection
1,000 - - - - - - 700 - - San Miguel 2 Tago RIS : Coconet Slope
Protection
- - 1,400 - - - - - - TOTAL SURIGAO DEL SUR 2,000
- - - 2,906 - - - - - 4,400 TOTAL REGION 13 - Coconet Slope Protection in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
10,000 - - - 1.00 - - 14,000 - - Pasuquin 1 Capagayan CIS : Cococnet Slope
Protection w/ Canal Lining
4,000 - - - 0.32 - - 2,900 - - Bacarra 2 Ganagan CIS : Cococnet Slope
Protection w/ Canal Lining
- - 16,900 - - 1.32 - - - TOTAL ILOCOS NORTE 14,000
- - - 16,900 - - 1.32 - - 14,000 TOTAL REGION 1 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
APAYAO
5,000 - - - - - - 7,100 - - Luna 1 Tala SIS : Construction of
Protection works
- - 7,100 - - - - - - TOTAL APAYAO 5,000
- - - 7,100 - - - - - 5,000 TOTAL CAR - Coconet Slope Protection in Communal
Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
QUEZON
3,000 - - - - - - 2,500 - - Burdeos 1 Anibawan CIS : Slope Protection
4,000 - - - - - - 3,000 - - General
Nakar 2 Nakar CIS : Slope Protection
2,500 - - - - - - 4,710 - - Polillo 3 Sibulan CIS : Slope Protection
5,000 - - - - - - 4,170 - - Mulanay 4 Canuyep-F. Nanadiego CIS : Slope
Protection
3,000 - - - - - - 2,500 - - Buenavista 5 Hagonghong CIS : Slope
Protection
4,500 - - - - - - 3,000 - - Tagkawayan 6 Del Rosario CIS : Slope Protection
- - 19,880 - - - - - - TOTAL QUEZON 22,000
- - - 19,880 - - - - - 22,000 TOTAL REGION 4A - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
2,500 - - - - - - 2,500 - - Rizal 1 Upper Amman CIS : Coconet
Slope Protection
- - 2,500 - - - - - - TOTAL OCCIDENTAL MINDORO 2,500
ORIENTAL MINDORO
2,500 - - - - - - 2,303 - - Bansud 1 Palabiga-Manihala CIS : Coconet Slope Protection
- - 2,303 - - - - - - TOTAL ORIENTAL MINDORO 2,500
- - - 4,803 - - - - - 5,000 TOTAL REGION 4B - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAMARINES NORTE
1,560 - - - - - - 2,000 - - Basud 1 Pinagwarasan CIS : Coconets Slope Protection of Pinagwarasan CIS
2,940 - - - - - - 4,000 - - Santa Elena 2 San Vicente Basiad CIS : Coconets Slope Protection of San Vicente
Basiad CIS
- - 6,000 - - - - - - TOTAL CAMARINES NORTE 4,500
- - - 6,000 - - - - - 4,500 TOTAL REGION 5 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
SAMAR (WESTERN)
3,000 - - - - - - 4,860 - - Basey 1 Basey IS : Coconet Slope
Protection
- - 4,860 - - - - - - TOTAL SAMAR (WESTERN) 3,000
- - - 4,860 - - - - - 3,000 TOTAL REGION 8 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL NORTE
1,500 - - - - - - 500 - - Dipolog City 1 Diwan SIP : Installation of
coconet
1,000 - - - - - - 425 - - Sindangan 2 Lagag SIP : Installation of coconet
1,000 - - - - - - 425 - - Dipolog City 3 San Jose SIP : Installation of
coconet
1,500 - - - - - - 850 - - Siocon 4 Lituban CIS : Installation of
coconet
1,500 - - - - - - 850 - - Sibuco 5 Lunday CIS : Installation of
coconet
- - 3,050 - - - - - - TOTAL ZAMBOANGA DEL NORTE 6,500
ZAMBOANGA SIBUGAY
1,000 - - - - - - 459 - - Malangas 1 La Dicha SIP : Construction of Canalization and Coconet Slope Protection
1,000 - - - - - - 425 - - Payao 2 La Fortuna SIP : Construction of Canalization and Coconet Slope Protection
1,000 - - - - - - 450 - - Imelda 3 Lumpanac CIS : Construction of Canalization and Coconet Slope Protection
2,604 - - - - - - 1,140 - - Tungawan 4 Baluran-Tupilac SIP : Construction of Canalization and
Coconet Slope Protection
1,300 - - - - - - 590 - - Titay 5 Batayan CIS Extension & Existing : Construction of Canalization and Coconet Slope Protection
1,300 - - - - - - 600 - - Kabasalan 6 Kabasalan CIS : Construction of Canalization and Coconet Slope Protection
1,000 - - - - - - 400 - - Titay 7 Namnama CIS : Construction of Canalization and Coconet Slope
Protection
- - 4,064 - - - - - - TOTAL ZAMBOANGA SIBUGAY 9,204
- - - 7,114 - - - - - 15,704 TOTAL REGION 9 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NORTH COTABATO
1,000 - - - - - - 700 - - Alamada 1 Banatalan CIS :
- - 700 - - - - - - TOTAL NORTH COTABATO 1,000
SOUTH COTABATO
1,000 - - - - - - 700 - - Surallah 1 Bleboy CIS :
500 - - - - - - 350 - - Surallah 2 Buenavista CIS :
500 - - - - - - 350 - - Norala 3 Lambusong CIS :
1,000 - - - - - - 700 - - Banga 4 Lamkot CIS :
500 - - - - - - 350 - - Lake Sebu 5 Takonel CIS :
500 - - - - - - 350 - - Norala 6 Tinago CIS :
500 - - - - - - 350 - - Tantangan 7 Tinongcop CIS :
- - 3,150 - - - - - - TOTAL SOUTH COTABATO 4,500
- - - 3,850 - - - - - 5,500 TOTAL REGION 12 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Coconet Slope Protection in Communal Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
2,500 - - - - - - 2,000 - - Butuan City 1 Bilay CIS : Coconet Slope
Protection
1,000 - - - - - - 800 - - Butuan City 2 San Mateo CIS : Coconet Slope
Protection
1,000 - - - - - - 860 - - Butuan City 3 Tagpulangi CIS : Coconet Slope
Protection
500 - - - - - - 430 - - Nasipit 4 Culit CIS : Coconet Slope
Protection
- - 4,090 - - - - - - TOTAL AGUSAN DEL NORTE 5,000
SURIGAO DEL SUR
1,000 - - - - - - 700 - - Cagwait 1 Hinayhayan CIS : Installation of coconet
1,000 - - - - - - 700 - - San Agustin 2 Hubo CIS : Installation of coconet
1,000 - - - - - - 700 - - San Miguel 3 Libas Sud CIS : Installation of coconet
2,000 - - - - - - 1,000 - - Barobo 4 Guinhalinan CIS : Installation of coconet
1,000 - - - - - - 700 - - Hinatuan 5 Tidman CIS : Installation of coconet
- - 3,800 - - - - - - TOTAL SURIGAO DEL SUR 6,000
- - - 7,890 - - - - - 11,000 TOTAL REGION 13 - Coconet Slope Protection in
Communal Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
944 - - - - - - - 0.24 - Laoag City 1 Laoag Vintar RIS : Concreting of
Canal Service Road
- 0.24 - - - - - - - TOTAL ILOCOS NORTE 944
ILOCOS SUR
1,500 - - - - - - - - 1.00 Bantay 1 Banaoang PIS : Road Surfacing
1,414 - - - - - - - - 0.90 Magsingal 2 Banaoang PIS : Road Surfacing
2,000 - - - - - - - - 1.30 Santo Domingo
3 Banaoang PIS : Road Surfacing
1,500 - - - - - - - - 1.00 Cabugao 4 Gaco NIS : Road Surfacing
4,000 - - - - - - - - 2.13 Santa Maria 5 Sta. Maria-Burgos NIS : Road Surfacing
6.33 - - - - - - - - TOTAL ILOCOS SUR 10,414
LA UNION
1,947 - - - - - - - 0.43 - Santo Tomas 1 Masalip RIS : Concreting of Canal
Service Road
- 0.43 - - - - - - - TOTAL LA UNION 1,947
PANGASINAN
10,295 - - - - - - - 2.29 - Asingan 1 Agno RIS : Road Concreting
10,000 - - - - - - - 1.00 - San Quintin 2 Dipalo RIS : Concreting/Rehabilitation of
service roads
10,000 - - - - - - - 1.00 - San Quintin 3 Dipalo RIS : Concreting/Rehabilitation of service roads
- 4.29 - - - - - - - TOTAL PANGASINAN 30,295
- 6.33 4.96 - - - - - - 43,600 TOTAL REGION 1 - Improvement of Service Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
APAYAO
8,300 - - - - - - - - 10.00 Pudtol 1 West Apayao Abulug IS :
Improvement of Service Roads
10.00
- - - - - - - - TOTAL APAYAO 8,300
IFUGAO
2,000 - - - - - - - 0.91 - Lamut 1 Hapid IS : Concreting of service road
- 0.91 - - - - - - - TOTAL IFUGAO 2,000
KALINGA
8,300 - - - - - - - 0.38 1.13 Tabuk City 1 Upper Chico RIS : Improvement and Concreting of existing
service road.
1.13 0.38 - - - - - - - TOTAL KALINGA 8,300
- 11.13
1.29 - - - - - - 18,600 TOTAL CAR - Improvement of Service Roads in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
20,000 - - - - - - - 1.18 - Allacapan 1 East Apayao Abulug IS : Road
Metalling
- 1.18 - - - - - - - TOTAL CAGAYAN 20,000
ISABELA
18,600 - - - - - - - - 7.00 San Mariano 1 Ilaguen MIPP : Road Metalling/Gravelling of Access roads
7.00 - - - - - - - - TOTAL ISABELA 18,600
- 7.00 1.18 - - - - - - 38,600 TOTAL REGION 2 (PROPER) - Improvement of Service Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
1,000 - - - - - - - 0.10 - Alicia 1 Magat RIS : Division II
2,100 - - - - - - - 0.20 - Angadanan 2 Magat RIS : Division IV
1,000 - - - - - - - 0.10 - San Mateo 3 Magat RIS : Division II
1,000 - - - - - - - 0.09 - Ramon 4 Baligatan DD : Division I
2,000 - - - - - - - 0.08 - Ramon 5 Magat RIS : HO
5,000 - - - - - - - 0.75 - Aurora 6 Magat RIS : Division III
5,000 - - - - - - - 0.73 - San Manuel 7 Magat RIS : Division III
8,000 - - - - - - - 1.14 - Roxas 8 Siffu RIS : Division III
- 3.19 - - - - - - - TOTAL ISABELA 25,100
QUIRINO
1,000 - - - - - - - 0.11 - Saguday 1 Baligatan DD : Division I
- 0.11 - - - - - - - TOTAL QUIRINO 1,000
- - 3.30 - - - - - - 26,100 TOTAL REGION 2 (MARIIS) - Improvement of Service
Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATAAN
4,570 - - - - - - - - - Dinalupihan 1 Colo Layac Balsik RIS : Road
Concreting
- - - - - - - - - TOTAL BATAAN 4,570
BULACAN
10,000 - - - - - - - - - Baliwag 1 Angat RIS (AMRIS) : (North Main Canal) Road Concreting
12,500 - - - - - - - 1.00 - Plaridel 2 Angat RIS (AMRIS) : Service Roads @ Brgy. San Jose
12,500 - - - - - - - 1.00 - Plaridel 3 Angat RIS (AMRIS) : Service Roads @ Brgy. Bintog
- 2.00 - - - - - - - TOTAL BULACAN 35,000
PAMPANGA
8,000 - - - - - - - - - Arayat 1 Pampanga Delta RIS : Main
Canal - Road Concreting
- - - - - - - - - TOTAL PAMPANGA 8,000
- - 2.00 - - - - - - 47,570 TOTAL REGION 3 (PROPER) - Improvement of
Service Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
10,000 - - - - - - - - 33.75 San Miguel 1 Peñaranda River Irrigation System : Improvement of Canal Roadways @ San Miguel
33.75
- - - - - - - - TOTAL BULACAN 10,000
NUEVA ECIJA
6,525 - - - - - - - - 19.35 Guimba 1 Pampanga River Irrigation System (SDC) : Improvement of Irrigation Canal Roadways
6,525 - - - - - - - 0.38 - San Jose City 2 Talavera River Irrigation System Lower : PCCP at DC-1
2,424 - - - - - - - 0.40 - Cabanatuan City
3 Pampanga-Bongabon River Irrigation System : PCCP at PBRIS MC
1,566 - - - - - - - - 6.80 Santa Rosa 4 Pampanga-Bongabon River Irrigation System : Improvement
of Roadway at PBRIS
1,110 - - - - - - - - 6.40 Santa Rosa 5 Pampanga-Bongabon River Irrigation System : Improvement
of Roadway at MC Extension
1,425 - - - - - - - - 8.35 Jaen 6 Pampanga-Bongabon River Irrigation System : Improvement of Roadway at MC Extension,
Lateral C-1 & C-2
6,525 - - - - - - - 0.56 - Peñaranda 7 Peñaranda River Irrigation
System : PCCP @ Peñaranda
40.90
1.34 - - - - - - - TOTAL NUEVA ECIJA 26,100
- 74.65
1.34 - - - - - - 36,100 TOTAL REGION 3 (UPRIIS) - Improvement of Service Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
6,730 - - - - - - - 1.17 - Nasugbu 1 Palico RIS : Construction of
Concrete Pavement
- 1.17 - - - - - - - TOTAL BATANGAS 6,730
LAGUNA
3,770 - - - - - - - 0.46 - Magdalena 1 Balanac RIS : Improvement of Service Road
- 0.46 - - - - - - - TOTAL LAGUNA 3,770
QUEZON
3,500 - - - - - - - 0.68 - Sariaya 1 Hanagdong RIS : Repair &
Improvement of Service Roads
10,000 - - - - - - - 2.40 - Infanta 2 Agos RIS : Repair & Improvement
of Service Roads
- 3.08 - - - - - - - TOTAL QUEZON 13,500
- - 4.71 - - - - - - 24,000 TOTAL REGION 4A - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
39,990 - - - - - - - 6.52 - Santa Cruz 1 Tagum-Angas SRIS : Concreting
of irrigation service road
- 6.52 - - - - - - - TOTAL MARINDUQUE 39,990
OCCIDENTAL MINDORO
1,891 - - - - - - - - 3.06 Sablayan 1 Amnay RIS : Road surfacing
2,000 - - - - - - - - 3.24 Magsaysay 2 Caguray RIS : Road surfacing
1,890 - - - - - - - - 3.06 Rizal 3 Lumintao RIS : Road surfacing
1,801 - - - - - - - - 1.39 Santa Cruz 4 Pagbahan RIS : Road surfacing
10.75
- - - - - - - - TOTAL OCCIDENTAL MINDORO 7,582
PALAWAN
13,508 - - - - - - - 1.40 - Narra 1 Batang-Batang RIS : Const.of multi-purpose concrete
pavement
- 1.40 - - - - - - - TOTAL PALAWAN 13,508
- 10.75
7.92 - - - - - - 61,080 TOTAL REGION 4B - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
1,230 - - - - - - - 0.20 - Ligao City 1 NASISI RIS-BAHAMAS IA :
Concreting of service roads
1,770 - - - - - - - 0.30 - Oas 2 NASISI RIS-BAHAMAS IA :
Concreting of service roads
2,000 - - - - - - - 0.40 - Ligao City 3 OGSONG RIS-ORIS IA : Concreting
of service roads
- 0.90 - - - - - - - TOTAL ALBAY 5,000
CAMARINES NORTE
4,500 - - - - - - - 0.80 - Daet 1 Daet-Talisay RIS : Concreting of service roads
- 0.80 - - - - - - - TOTAL CAMARINES NORTE 4,500
CAMARINES SUR
3,000 - - - - - - - 0.40 - San Jose 1 Cagaycay RIS : Concreting of
service roads
50,000 - - - - - - - 5.50 - Libmanan 2 Libmanan-Cabusao PIS : Construction of road leading to Libmanan-Cabusao NIS, Brgy. Patag-Tarum Road
- 5.90 - - - - - - - TOTAL CAMARINES SUR 53,000
SORSOGON
3,000 - - - - - - - 1.50 - Bulan 1 San Ramon-San Francisco RIS :
Concreting of service roads
- 1.50 - - - - - - - TOTAL SORSOGON 3,000
- - 9.10 - - - - - - 65,500 TOTAL REGION 5 - Improvement of Service Roads in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAPIZ
4,000 - - - - - - - 0.40 - Mambusao 1 Mambusao RIS : Concreting of
Main Canal Service Road
- 0.40 - - - - - - - TOTAL CAPIZ 4,000
ILOILO
20,000 - - - - - - - 1.80 - San Miguel 1 Aganan RIS : Concreting of NIA Service Road
20,000 - - - - - - - 1.80 - Barotac Viejo 2 Barotac Viejo RIS : Concreting of NIA Service Road
5,000 - - - - - - - 0.40 - Barotac Viejo 3 Barotac Viejo RIS : Concreting of NIA Service Road
5,000 - - - - - - - 0.40 - Barotac Viejo 4 Barotac Viejo RIS : Concreting of NIA Service Road
5,000 - - - - - - - 0.40 - Barotac Viejo 5 Barotac Viejo RIS : Concreting of
NIA Service Road
5,000 - - - - - - - 0.40 - Barotac Viejo 6 Barotac Viejo RIS : Concreting of NIA Service Road
- 5.20 - - - - - - - TOTAL ILOILO 60,000
NEGROS OCCIDENTAL
3,000 - - - - - - - - - Bago City 1 Bago RIS : Improvement of
Service Roads
2,000 - - - - - - - - - Binalbagan 2 Pangiplan RIS : Improvement of
Service Roads
- - - - - - - - - TOTAL NEGROS OCCIDENTAL 5,000
- - 5.60 - - - - - - 69,000 TOTAL REGION 6 - Improvement of Service Roads in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
5,000 - - - - - - - - 4.50 San Miguel 1 Bohol Integrated Irrigation System (Bayongan IS) : Repair of Services Roads
3,500 - - - - - - - - 2.50 Ubay 2 Bohol Integrated Irrigation System (Capayas IS) : Repair of
Services Roads
2,500 - - - - - - - - 2.00 Talibon 3 Bohol Integrated Irrigation System (Talibon SRIS) : Repair of Services Roads
4,500 - - - - - - - - 3.00 Pilar 4 Bohol Integrated Irrigation System (Malinao IS) : Repair of
Services Roads
12.00
- - - - - - - - TOTAL BOHOL 15,500
- 12.00
- - - - - - - 15,500 TOTAL REGION 7 - Improvement of Service Roads in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA DEL SUR
2,320 - - - - - - - - - Dumingag 1 Dipolo RIS : Improvement of
service road
6,380 - - - - - - - - - Labangan 2 Labangan RIS : Improvement of
service road
8,000 - - - - - - - - - Labangan 3 Labangan RIS : Improvement of
service road
6,380 - - - - - - - - - Molave 4 Salug RIS : Improvement of
service road
- - - - - - - - - TOTAL ZAMBOANGA DEL SUR 23,080
ZAMBOANGA SIBUGAY
3,000 - - - - - - - 0.27 - Diplahan 1 Sibuguey Valley IS : Construction of Service Road
5,000 - - - - - - - 0.45 - Siay 2 Sibuguey Valley IS : Construction
of Service Road
- 0.72 - - - - - - - TOTAL ZAMBOANGA SIBUGAY 8,000
- - 0.72 - - - - - - 31,080 TOTAL REGION 9 - Improvement of Service Roads in
National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
1,000 - - - - - - - - 0.20 Baungon 1 Bubunawan RIS : Road surfacing
18,100 - - - - - - - - 30.00 Valencia City 2 Pulangui RIS : Road surfacing
30.20
- - - - - - - - TOTAL BUKIDNON 19,100
LANAO DEL NORTE
7,000 - - - - - - - - - Lala, Kapatagan
1 Maranding RIS : Road surfacing
- - - - - - - - - TOTAL LANAO DEL NORTE 7,000
- 30.20
- - - - - - - 26,100 TOTAL REGION 10 - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
DAVAO DEL NORTE
2,000 - - - - - - - 0.27 - Kapalong 1 Libuganon Left RIS : Concreting
of Service Road
2,000 - - - - - - - 0.27 - Asuncion 2 Saug RIS : Concreting of Service
Road
2,000 - - - - - - - 0.27 - Santo Tomas 3 Kipaliku RIS : Concreting of
Service Road
1,000 - - - - - - - 0.14 - Carmen 4 Lasang RIS : Concreting of Service
Road
1,200 - - - - - - - 0.17 - Panabo 5 Lasang RIS : Concreting of Service
Road
1,100 - - - - - - - 0.15 - Braulo E.
Dujali 6 Libuganon RIS : Concreting of
Service Road
1,000 - - - - - - - 0.13 - Carmen 7 Libuganon RIS : Concreting of
Service Road
1,100 - - - - - - - 0.15 - Santo Tomas 8 Libuganon RIS : Concreting of
Service Road
- 1.55 - - - - - - - TOTAL DAVAO DEL NORTE 11,400
DAVAO DEL SUR
3,300 - - - - - - - 0.45 - Matanao 1 Mal RIS : Concreting of Service Road
6,540 - - - - - - - 0.95 - Hagonoy 2 Padada RIS : Concreting of Service Road
- 1.40 - - - - - - - TOTAL DAVAO DEL SUR 9,840
DAVAO ORIENTAL
3,700 - - - - - - - 0.40 - Lupon 1 Lupon IS : Concreting of Service
Road
- 0.40 - - - - - - - TOTAL DAVAO ORIENTAL 3,700
- - 3.35 - - - - - - 24,940 TOTAL REGION 11 - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
788 - - - - - - - - 0.30 Datu Paglas 1 Alip RIS :
2,000 - - - - - - - - 0.80 Shariff Aguak 2 Kabulnan RIS :
1,000 - - - - - - - - 0.40 Talayan 3 Talayan RIS :
1.50 - - - - - - - - TOTAL MAGUINDANAO 3,788
NORTH COTABATO
1,384 - - - - - - - - 1.50 Libungan 1 Libungan RIS :
1,000 - - - - - - - - 1.20 Kabacan 2 Kabacan RIS :
1,000 - - - - - - - - 1.00 Tulunan 3 Malasila RIS :
2,276 - - - - - - - - 3.57 Carmen 4 Maridagao RIS :
1,000 - - - - - - - - 1.00 M'lang 5 Mlang RIS :
8.27 - - - - - - - - TOTAL NORTH COTABATO 6,660
SOUTH COTABATO
2,864 - - - - - - - - 0.50 General
Santos City 1 Siluay-Buayan RIS :
2,123 - - - - - - - - - Banga 2 Ala RIS Dam 1 :
2,123 - - - - - - - - - Norala 3 Ala RIS Dam 1 :
2,123 - - - - - - - - - Santo Niño 4 Ala RIS Dam 1 :
2,123 - - - - - - - - - Surallah 5 Ala RIS Dam 1 :
1,432 - - - - - - - - 0.90 Santo Niño 6 Banga RIS :
1,432 - - - - - - - - 0.90 Tantangan 7 Marbel #1 RIS :
1,432 - - - - - - - - 0.90 Koronadal City,
Tantangan
8 Marbel #2 RIS :
3.20 - - - - - - - - TOTAL SOUTH COTABATO 15,652
- 12.97
- - - - - - - 26,100 TOTAL REGION 12 - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Improvement of Service Roads in National Irrigation Systems PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
4,000 - - - - - - - 0.50 - Butuan City 1 Lower Agusan River PIS :
Concreting of Service roads
4,000 - - - - - - - 0.50 - Butuan City 2 Cabadbaran-Taguibo RIS :
Concreting of Service roads
- 1.00 - - - - - - - TOTAL AGUSAN DEL NORTE 8,000
AGUSAN DEL SUR
4,000 - - - - - - - 0.60 - Bayugan City 1 Andanan RIS : Concreting of Existing Andanan LMC and RMC
4,000 - - - - - - - 0.50 - Prosperidad 2 Gibong RIS : Concreting of Existing LMC and LMC
3,000 - - - - - - - 0.30 - Veruela 3 Baobo RIS : Concreting of Existing of Baobo Main Canal
- 1.40 - - - - - - - TOTAL AGUSAN DEL SUR 11,000
SURIGAO DEL SUR
3,000 - - - - - - - 0.30 - Cantilan 1 Cantilan IS :
4,100 - - - - - - - 0.60 - Tago 2 Tago RIS :
- 0.90 - - - - - - - TOTAL SURIGAO DEL SUR 7,100
- - 3.30 - - - - - - 26,100 TOTAL REGION 13 - Improvement of Service Roads
in National Irrigation Systems
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CENTRAL OFFICE
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
National Irrigation Sector Rehabilitation and Improvement Project (NISRIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NATIONWIDE
50,000 - - - - - - - - - Central Office 1 National Irrigation Sector Rehabilitation and Improvement Project (NISRIP) :
- - - - - - - - - TOTAL NATIONWIDE 50,000
- - - - - - - - - 50,000 TOTAL CENTRAL OFFICE - National Irrigation Sector
Rehabilitation and Improvement Project (NISRIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
7,500 10 - - - - - - - - Sarrat 1 Bonga #1 RIS : Repair of Vertical
Mixed Flow Pump
5,000 15 - - 1.29 7 - - - - Solsona 2 Labugaon RIS : Canal Lining &
Canal Structure
- - - - 7 1.29 - - 25 TOTAL ILOCOS NORTE 12,500
ILOCOS SUR
10,000 20 - - 0.87 - - - - - Santa Maria 1 Sta. Maria-Burgos NIS : Canal Lining
- - - - - 0.87 - - 20 TOTAL ILOCOS SUR 10,000
- - - - - 7 2.16 - 45 22,500 TOTAL REGION 1 - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
100,000 225 - 13.93 6.78 12 - - - - Quezon 1 Upper Chico RIS : Improvement of Existing Canal and Construction of Extension Canals
& Structures
- - - - 12 6.78 13.93 - 225 TOTAL ISABELA 100,000
13.93 - - - - 12 6.78 - 225 100,000 TOTAL CAR - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
20,000 - - - - - - - - - Gattaran 1 Dummun River Irrigation System : Canalization works (Lat C & Lat C Extra)
- - - - - - - - - TOTAL CAGAYAN 20,000
ISABELA
7,500 20 - - - - - - - - Mallig 1 Mallig River Irrigation System :
Canal, Canal Lining & Structures
- - - - - - - - 20 TOTAL ISABELA 7,500
- - - - - - - - 20 27,500 TOTAL REGION 2 (PROPER) - Extension/Expansion of Existing Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
7,020 10 - - - - - - - - San Isidro 1 Magat RIS : Division I
- - - - - - - - 10 TOTAL ISABELA 7,020
- - - - - - - - 10 7,020 TOTAL REGION 2 (MARIIS) - Extension/Expansion of
Existing Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BULACAN
15,000 - 80 4.00 1.00 - - - - - Hagonoy 1 Angat RIS (AMRIS) : (Lateral M)
Improvement of Canal
15,000 - 60 - 2.00 - - - - - Pulilan 2 Angat RIS (AMRIS) : (Lat. J-1 &
J-2) Improvement of Canal
- - - - - 3.00 4.00 140 - TOTAL BULACAN 30,000
TARLAC
20,000 - 100 - 1.40 - - - - - Santa Ignacia / Camiling
1 Camiling RIS : Improvement of Lateral P-17-B
10,000 - 50 - 1.00 - - - - - Tarlac City 2 Tarlac RIS : TASMORIS (TARRIS AREA) Improvement of Canal System
- - - - - 2.40 - 150 - TOTAL TARLAC 30,000
ZAMBALES
40,000 - 200 - 4.00 - - - - - San
Marcelino 1 STRIS-Mapanuepe : Construction
of Canal System
- - - - - 4.00 - 200 - TOTAL ZAMBALES 40,000
4.00 - - - - - 9.40 490 - 100,000 TOTAL REGION 3 (PROPER) - Extension/Expansion of
Existing Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LAGUNA
43,250 140 - - - - - - - - Victoria 1 Sta. Cruz RIS : Construction of
Canal Lining
5,000 6 - - - - - - - - Famy 2 Mayor RIS : Construction of
Canal Lining
- - - - - - - - 146 TOTAL LAGUNA 48,250
- - - - - - - - 146 48,250 TOTAL REGION 4A - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
41,770 12 - - 2.50 6 - - - - Sablayan 1 Amnay RIS : Const'n. of Diversion Works, Canal Struc. & Lined Canal, Drainage Struc. & Project Facilities at Interior Spring & Canal Structures & Line Canal at
Saligsig Libliban.
7,692 32 - - - - - - - - Santa Cruz 2 Pagbahan RIS : Const'n. of Canal Struc. & Lined Canal at Aribugan Left & Right and Main Canal &
Project Facilities.
59,341 90 - - - - - - - - Sablayan 3 Mongpong RIS : Const'n. of Diversion Works, Canal Struc. & Lined Canal, Drainage Struc. & Project Facilities at Brgy. Batong Buhay.
- - - - 6 2.50 - - 134 TOTAL OCCIDENTAL MINDORO 108,803
- - - - - 6 2.50 - 134 108,803 TOTAL REGION 4B - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
15,000 30 - - - - - - - - Talibon 1 Bohol Integrated Irrigation System (Talibon SRIS) : Construction of Irrigation
Facilities and Structures
- - - - - - - - 30 TOTAL BOHOL 15,000
- - - - - - - - 30 15,000 TOTAL REGION 7 - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
SAMAR (WESTERN)
80,000 200 - - 6.20 47 - - - 4.25 Basey 1 Basey IS Extension : const. of
canal lining & struc
4.25 - - - 47 6.20 - - 200 TOTAL SAMAR (WESTERN) 80,000
- 4.25 - - - 47 6.20 - 200 80,000 TOTAL REGION 8 - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (National Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
12,500 50 - - 1.50 3 - - - - Datu Paglas 1 Alip RIS : Construction of Canal
lining and Structures
60,000 200 - - 4.00 8 - - - - Mamasapano
, Ampatuan 2 Kabulnan RIS : Construction of
Canal lining and Structures
- - - - 11 5.50 - - 250 TOTAL MAGUINDANAO 72,500
SOUTH COTABATO
10,000 10 - - - 2 1 - - - General Santos City
1 Siluay-Buayan RIS : (Abtios,Nangka,Cabuling) Construction of Canal Structures and Installation of HDPE
40,000 - - - 1.00 8 - - - - General
Santos City 2 Siluay-Buayan RIS : (Btrep For
Completion) Construction of
Canal lining and Structures
2,000 20 - - 0.30 3 - - - - Santo Niño 3 Ala RIS Dam 1 : Construction of Canal lining and Structures
3,000 20 - - 0.30 - - - - - Norala 4 Ala RIS Dam 2 : Construction/Installation of HDPE
3,000 20 - - 0.30 5 - - - - Santo Niño 5 Ala RIS Dam 2 : Construction of
Canal lining and Structures
- - - 1 18 1.90 - - 70 TOTAL SOUTH COTABATO 58,000
SULTAN KUDARAT
7,000 15 - - 0.30 2 - - - - Isulan 1 Ala RIS Dam 2 : Construction of
Canal lining and Structures
22,500 30 - - - - - - - - Tacurong City 2 Tacurong IS : Improvement of
Diversion Structure
- - - - 2 0.30 - - 45 TOTAL SULTAN KUDARAT 29,500
- - - - 1 31 7.70 - 365 160,000 TOTAL REGION 12 - Extension/Expansion of Existing
Irrigation Systems (National Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
5,000 20 - - 1.35 - - - - - Bacarra 1 Alamaam CIS : Canal Lining
5,000 25 - - 0.91 - - - - - Bacarra 2 Sanjera Tubburan CIS : Canal
Lining
5,000 15 - - 1.28 - - - - - Pagudpud 3 Tanap A Dakel CIS : Canal Lining
5,000 20 - - 0.46 1 - - - - Burgos 4 Tanap Avis : Canal Lining & Canal
Structure
9,000 - - - - 1 - - - - Batac 5 Papasuc CIS (Phase I) :
Construction of D/D (part)
- - - - 2 4.00 - - 80 TOTAL ILOCOS NORTE 29,000
- - - - - 2 4.00 - 80 29,000 TOTAL REGION 1 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
11,000 25 - - 1.00 - - - - - Tayum 1 Abra CIS : Construction of 1 km
canal lining
5,000 25 - - 2.50 5 - - - - Danglas 2 Danglas CIS : Construction of 2.5 kms canal lining & 5 units canal structures
2,000 2 - - 0.35 1 - - - - Malibcong 3 Gacab CIS : Construction of 0.35 km canal lining & 1 unit canal
structures
2,000 20 - - 1.00 4 - - - - Tayum 4 Budac CIS : Construction of 1 km canal lining & 4 units of canal structures
30,000 50 100 - 5.00 - - - - - Tayum 5 Abra CIS :
- - - - 10 9.85 - 100 122 TOTAL ABRA 50,000
BENGUET
2,500 10 - - - 6 3 - - - Kabayan 1 Kagew CIS : Installation of pipeline & const'n. of canal structure
2,500 5 - - - 6 2 - - - Sablan 2 Kingking CIS : Installation of pipeline & const'n. of canal structure
2,000 8 - - - 10 2 - - - La Trinidad 3 Linusod CIS : Installation of pipeline & const'n. of canal
structure
4,500 15 - - - 5 3 - - - Kapangan 4 Liteng CIS : Installation of pipeline & const'n. of canal structure
3,000 18 - - - 11 4 - - - Buguias 5 Maalad CIS : Installation of pipeline & const'n. of canal structure
2,500 15 - - - 2 1 - - - Kapangan 6 Masacoco CIS : Installation of pipeline & const'n. of canal structure
2,500 10 - - - 4 3 - - - Tuba 7 San Pascual CIS : Installation of pipeline & const'n. of canal
structure
3,500 10 - - - 5 2 - - - Tuba 8 Umesbeng Caucalan CIS : Installation of pipeline & const'n. of canal structure
- - - 19 49 - - - 91 TOTAL BENGUET 23,000
IFUGAO
3,000 7 - - 1.30 3 - - - - Aguinaldo 1 Abalatan Aguer Mangit CIS : Construction of canal lining and canal structure
2,000 2 - - 0.80 - - - - - Aguinaldo 2 Adullo CIS : Construction of canal
lining
1,700 3 - - 0.50 2 - - - - Lagawe 3 Ampaganga CIS Phase 2 : Construction of canal lining and
canal structure
1,400 2 - - 0.50 2 - - - - Banaue 4 Dalipe CIS : Construction of canal
lining and canal structure
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 8 - - 1.80 4 - - - - Lagawe 5 Huyo CIS Phase 2 : Construction of canal lining and canal structure
3,000 7 - - 1.45 2 - - - - Mayoyao 6 Mapaway CIS : Construction of
canal lining and canal structure
1,000 4 - - 0.40 - - - - - Lagawe 7 Onon-Nahtitan CIS : Construction
of canal lining
3,000 4 - - 1.10 3 - - - - Banaue 8 Pula- Cambulo CIS : Construction of canal lining and canal
structure
1,000 5 - - 0.85 3 - - - - Asipulo 9 Tukgaw CIS : Construction of
canal lining and canal structure
1,500 2 - - 0.65 - - - - - Banaue 10 Uliwon CIS : Construction of canal lining and canal structure
- - - - 19 9.35 - - 44 TOTAL IFUGAO 21,600
KALINGA
1,000 4 - - 0.44 - - - - - Rizal 1 Aluminit CIS : Construction of
Canal Lining
5,000 6 - - - - - - - - Tabuk City 2 Balong Norte CIS : Construction
of Canal Lining and Turnout
1,000 4 - - 0.44 - - - - - Lubuagan 3 Bangkagen Amboli CIS :
Construction of Canal Lining
1,000 4 - - 0.39 - - - - - Tinglayan 4 Bi-ig Ungan (Nanggawa) CIS :
Construction of Canal Lining
1,000 5 - - 0.47 - - - - - Tabuk City 5 Cabnul Pinagan CIS :
Construction of Canal Lining
6,000 18 - - 2.12 2 - - - - Pinukpuk 6 Camallogan CIS : Construction of
Canal Lining and Turnouts
4,000 30 - - 1.89 2 - - - - Tinglayan 7 Chotar CIS : Construction of
Canal Lining and Turnouts
1,000 5 - - 1.06 1 - - - - Tanudan 8 Cogawe (Balikongkong) CIS : Construction of Canal Lining &
Canal Structures
1,000 4 - - 0.47 - - - - - Tabuk City 9 Lap-atan CIS : Construction of
Canal Lining
1,000 4 - - 0.35 - - - - - Tanudan 10 Lay-asan Daclag CIS (Ammaboy) : Construction of Canal Lining
2,000 5 - - 0.71 - - - - - Tinglayan 11 Mannis CIS : Construction of
Canal Lining
1,000 4 - - 0.44 - - - - - Rizal 12 Pangul CIS (EDSA) : Construction
of Canal Lining
1,600 4 - - 0.75 - - - - - Tabuk City 13 Suyang CIS : Construction of
Canal Lining
- - - - 5 9.53 - - 97 TOTAL KALINGA 26,600
MT. PROVINCE
5,000 10 - - 0.30 8 1 - - - Tadian 1 Cagubatan CIS : Installation of G.I. pipeline and construction of reservoir tanks.
5,000 10 - - 2.00 2 - - - - Paracelis 2 Catao CIS : Construction of concrete lined canal and canal structures.
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,000 1 20 - 0.70 1 - - - - Barlig 3 Lingoy CIS : Construction of concrete lined canal and canal structures.Install of pipeline.
3,000 3 - - 1.10 5 - - - - Bauko 4 Mapanawil CIS (Magwed Nabilig Bongyoan) : Construction of concrete lined canal and canal
structures.
2,500 4 - - 1.65 1 - - - - Barlig 5 Matanor CIS (Maliyang) : Construction of concrete lined
canal and canal structures.
1,972 6 - - 0.80 1 - - - - Barlig 6 Ogo-og CIS : Construction of concrete lined canal and canal structure.
3,000 4 - - 0.85 5 1 - - - Besao 7 Panabongen CIS : Construction of concrete lined canal and canal
structures.Install of pipeline.
- - - 2 23 7.40 - 20 38 TOTAL MT. PROVINCE 22,472
- - - - 21 106 36.13 120 392 143,672 TOTAL CAR - Extension/Expansion of Existing Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
QUIRINO
2,000 4 - - - - - - - - Diffun 1 Campasmento II CIS : Canalization Works, Canal Lining, and Canal Structures
4,000 10 - - - - - - - - Maddela 2 Divisoria Norte SWIS : Canalization Works, Canal Lining,
and Canal Structures
3,000 5 - - - - - - - - Diffun 3 Gabriela Silang CIS : Canalization Works, Canal Lining, and Canal Structures
- - - - - - - - 19 TOTAL QUIRINO 9,000
- - - - - - - - 19 9,000 TOTAL REGION 2 (PROPER) - Extension/Expansion of
Existing Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATAAN
5,000 35 - - 0.30 - - - - - Dinalupihan 1 Bayangkad CIS : Repair of Dam &
Canalization
7,000 40 - - 0.50 - - - - - Bagac 2 Banawang CIS : Canalization,
10,000 67 - - - - - - - - Balanga City 3 Bernabe CIS : Canalization &
Canal Structures
- - - - - 0.80 - - 142 TOTAL BATAAN 22,000
BULACAN
3,000 20 - - 0.30 - - - - - Doña Remedios Trinidad
1 Abo-Ibayo CIS : Canal extension
2,060 20 - - 0.10 - - - - - San Ildefonso 2 Colonia/Basuit SWIP : SWIP
10,000 - - - 1.00 - - - - - San Ildefonso 3 Upig SWIP :
- - - - - 1.40 - - 40 TOTAL BULACAN 15,060
NUEVA ECIJA
8,000 10 - - 0.30 2 - - - - Aliaga 1 Pantoc CIS : Canal system &
repair of dam
5,000 10 - - - 1 - - - - Talugtog 2 Alula-Villa-Rosario SWIP : Improvement of SWIP with Pump and Engine
20,000 100 - - 0.10 3 - - - - Carranglan 3 Bunga CIS : Dam / Canalization
10,000 20 - - - 1 - - - - Lupao 4 Mapangpang CIS : Canal System
7,000 10 - - 0.30 2 - - - - Lupao 5 Namulandayan CIS : Canal
System
3,000 10 - - 0.20 1 - - - - Bongabon 6 Inasan CIS : Dam/Line
Canal/Canal Structure
5,000 10 - - 0.30 2 - - - - Gabaldon 7 Tabasaka CIS : Canalization
4,000 10 - 1.00 - - - - - - General Tinio 8 Pulang Lupa SWIP : SWIP/pump
system
3,000 10 - - 0.20 - - - - - Peñaranda 9 San Joseph PIS : Canalization
- - - - 12 1.40 1.00 - 190 TOTAL NUEVA ECIJA 65,000
PAMPANGA
10,000 67 - - 0.50 - - - - - Magalang 1 San Ildefonso CIS (Kabayong
Sarol) : Canalization
12,000 80 - - 0.20 - - - - - Bacolor 2 Cabalantian CIS : Diversion works
& canalization,
10,000 70 - - 0.50 2 - - - - Bacolor 3 Cabambangan CIS : Canalization,
Canal Structure
10,000 67 - - 0.40 - - - - - Bacolor 4 Maliwalu CIS : Construction of
irrigation facilities
15,000 100 - - 0.20 1 - - - - Mexico 5 San Patricio II CIS : Diversion
works & canalization,
6,000 40 - - 0.40 - - - - - Bacolor 6 Sta. Ines CIS : Construction of
irrigation facilities
5,000 30 - - - 1 - - - - Macabebe 7 Macabebe CIS : Repair
Works,Steelgates,Canal Structure
- - - - 4 2.20 - - 454 TOTAL PAMPANGA 68,000
TARLAC
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,000 25 - - 0.80 - - - - - Victoria 1 Maluid CIS : Improvement of
Canal System
19,000 75 - - 1.20 1 - - - - Concepcion 2 Castillo PIP (Phase 2) : Procurement, Installation of Pump and Engine, Const. of Canal System
- - - - 1 2.00 - - 100 TOTAL TARLAC 24,000
ZAMBALES
8,000 15 - - 1.20 1 - - - - Subic 1 Sacatehan : Rehab of Dam and
Canal System
- - - - 1 1.20 - - 15 TOTAL ZAMBALES 8,000
1.00 - - - - 18 9.00 - 941 202,060 TOTAL REGION 3 (PROPER) - Extension/Expansion of
Existing Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LAGUNA
3,620 10 - - - - - - - - Calauan 1 Bangyas CIS : Construction of
Canal Lining
5,250 25 - - - - - - - - Calauan 2 Masiit CIS : Construction of Canal
Lining
14,000 60 - - - - - - - - Magdalena 3 Maimpez CIS : Construction of
Canal Lining
2,000 15 - - - - - - - - Mabitac 4 Paagahan CIS : Construction of Diversion Works & Canal System
- - - - - - - - 110 TOTAL LAGUNA 24,870
QUEZON
3,500 10 - - - - - - - - Polillo 1 Taluong CIS : Rehab of Canal System & Construction of Canal
Structures
6,200 30 - - - - - - - - Lucena City 2 Iba. Iyam CIS : Construction of Canal Structures
4,230 15 - - - - - - - - Lucena City 3 Iba. Talim CIS : Construction of Diversion Works & Canal Structures
3,000 12 - - - - - - - - Atimonan 4 Kulawit CIS : Construction of
Canal Structures
- - - - - - - - 67 TOTAL QUEZON 16,930
RIZAL
5,000 23 - - - - - - - - Jalajala 1 Lumang Nayon : Construction of
Canal Lining
4,000 20 - - - - - - - - Tanay 2 Salang Matanda CIS (Salang Bata CIS) : Construction of Canal Lining
2,194 20 - - - - - - - - Morong 3 San Juan CIS : Construction of
Canal Lining
- - - - - - - - 63 TOTAL RIZAL 11,194
- - - - - - - - 240 52,994 TOTAL REGION 4A - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
OCCIDENTAL MINDORO
7,000 30 - - 0.60 1 - - - - Abra de Ilog 1 Armaca CIP : Const'n. of Canal Struc. & Lined Canal & Project facilities.
10,000 36 - - 0.40 5 - - - - San Jose 2 Central CIS (Jomia) : Const'n. of Canal Struc. & Lined Canal &
Project facilities.
6,000 36 - - - 1 - - - - San Jose 3 Central CIS (Sapang Palay Area) : Const'n. of Canal Struc. & Lined Canal & Project facilities.
17,500 94 - - 0.67 2 - - - - San Jose 4 Central CIS (Sta. Fe Area) : Const'n. of Canal Struc. & Lined
Canal & Project facilities.
32,850 100 - - 1.30 5 - - - - Rizal 5 Upper Amman CIP : Const'n. of Canal Struc. & Lined Canal & Project facilities.
- - - - 14 2.97 - - 296 TOTAL OCCIDENTAL MINDORO 73,350
ORIENTAL MINDORO
22,745 91 - - - - - - - - Socorro 1 Calubayan CIS : Protection Works
&Canal Structures
40,000 270 - - - - - - - - Naujan 2 Sta. Maria CIS : Canal Structures
3,000 10 - - - - - - - - Bongabong 3 San Isidro CIS : Construction of canal lining, road crossing,
bullcart and turnout
- - - - - - - - 371 TOTAL ORIENTAL MINDORO 65,745
PALAWAN
10,000 30 - - 1.00 2 - - - - El Nido 1 Aberawan SIS : Const.of Canal
lining & structure
6,300 10 - - 0.86 1 - - - - Roxas 2 Bantoto CIS : Const.of canal
lining
12,000 40 - - 1.83 - - - - - Roxas 3 Malico II CIS : Const.of canal
lining
- - - - 3 3.69 - - 80 TOTAL PALAWAN 28,300
- - - - - 17 6.66 - 747 167,395 TOTAL REGION 4B - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
12,000 21 - - - - - - - - Oas 1 Mayao-Panonowan CIP : Intake structure and canalization works at Lateral A
20,000 40 80 - - - - - - - Tabaco City 2 San Francisco RIS : Continuation of canalization works &
appurtenant structures
- - - - - - - 80 61 TOTAL ALBAY 32,000
CAMARINES NORTE
9,250 50 - - - - - - - - Labo 1 Matogdon Extension CIS : Constn of pump system, CHB lining &
desilting
5,000 20 - - - - - - - - Mercedes 2 Manguisoc CIS : Constn of
pipeline; CHB lining
- - - - - - - - 70 TOTAL CAMARINES NORTE 14,250
- - - - - - - 80 131 46,250 TOTAL REGION 5 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AKLAN
13,550 30 - - - - - - - - Libacao 1 Rosal CIS : Construction of Canal
Structures
1,350 10 - - - - - - - - Tangalan 2 Tangalan CIS : Construction of
Canal Structures
- - - - - - - - 40 TOTAL AKLAN 14,900
CAPIZ
4,824 10 - - - - - - - - President Roxas
1 Manoling CIS : Const. Dam and Extn. Canals
6,000 8 - - - - - - - - Panitan 2 Pob. Ilawod PCIS : Const. of bench flume & canal strs.
2,500 5 - - - - - - - - Panay 3 Talasa PCIS : Const. of bench flume & canal strs.
- - - - - - - - 23 TOTAL CAPIZ 13,324
NEGROS OCCIDENTAL
2,040 15 - - - - - - - - Calatrava 1 Palala CIP : Canalization, Canal
Structures
5,000 20 10 - - - - - - - Cadiz City 2 Hiyang-hiyang CIS : Canalization,
Canal Structures
9,901 160 - - - - - - - - Cadiz City 3 V.F. Gustilo CIP : Canalization,
Canal Structures
2,173 10 - - - - - - - - Silay City 4 San Rafael CIS : Canalization,
Canal Structures
2,500 10 - - - - - - - - La Castellana 5 Malaga CIS : Canalization, Canal
Structures
- - - - - - - 10 215 TOTAL NEGROS OCCIDENTAL 21,614
- - - - - - - 10 278 49,838 TOTAL REGION 6 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
4,275 5 3 - 1.40 8 - - - - Maribojoc 1 Cansawon CIS : Construction of
Lined Canal
11,976 50 5 - - - - - - - Tubigon 2 Cawayanan-Bunacan-Bosongon CIS : Construction of Lined Canal and Structures
2,500 10 - - - - - - - - Antequera 3 Pasong (Bicahan) CIS : Construction of Lined Canal and
Structures
2,000 20 - - 0.45 2 - - - - Tubigon 4 Tubigon (Ilihan) CIS :
Construction of Lined Canal
2,500 6 - - - - - - - - Loboc 5 Bagumbayan CIS : Const. of Diversion Works,Canal Struc.& Canal Lining
1,500 5 - - - - - - - - Candijay 6 Cadapdapan CIS : Construction of
Lined Canal
1,500 5 - - 1.48 18 - - - - Jagna 7 Calabacita CIS : Construction of
Lined Canal and Structures
4,375 18 - - - - - - - - Garcia
Hernandez 8 Cambuyo CIS : Constr. of
Diversion Works,Canal Struc.&
Canal Lining
4,000 10 - - - - - - - - Alicia 9 La Hacienda (Ilaya) CIS : Construction of Lined Canal and Structures
2,000 8 - - - - - - - - Sierra
Bullones 10 Matin-ao CIS : Const. of Diversion
Works,Canal Struc.& Canal Lining
- - - - 28 3.33 - 8 137 TOTAL BOHOL 36,626
CEBU
2,000 7 - - - - - - - - Carcar City 1 Pit-os PIP : Construction of Irrigation Pipelines & Structures
2,000 7 - - - - - - - - Argao 2 Colawin (APO) PIS : Construction of Irrigation Pipelines & Structures
3,000 10 - - - - - - - - Medellin 3 Tindog CIS : Construction of
Irrigation Pipelines & Structures
5,000 40 - - - - - - - - Barili 4 Mayana CIS : Construction of
Irrigation Pipelines & Structures
- - - - - - - - 64 TOTAL CEBU 12,000
CEBU CITY
500 3 - - - - - - - - Agsungot,
Cebu City 1 Agsungot CIP : Construction of
Irrigation Pipelines & Structures
2,874 10 - - - - - - - - Paril, Cebu
City 2 Paril PIS : Construction of
Irrigation Pipelines & Structures
3,000 10 - - - - - - - - Lusaran,
Cebu City 3 Upper Lusaran CIS : Construction
of Irrigation Pipelines & Structures
- - - - - - - - 23 TOTAL CEBU CITY 6,374
NEGROS ORIENTAL
3,250 11 - - 1.20 1 - - - - Canlaon City 1 Lumapao CIS Ext'n : Canalization,
Canal Structures
10,686 45 - - 9.62 35 - - - - Canlaon City 2 Masulog CIS Ext'n. : Canalization,
Canal Structures
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,500 18 - - 1.00 13 - - - - Tanjay City 3 Asiotes CIS Extn : Canalization,
Canal Structures
5,250 20 - - - 1 - - - - Tanjay City 4 Lemon-Tugas CIS Ext'n. : Intake for re-use, pipeline and road crossing
10,000 60 - - 1.00 1 - - - - Siaton 5 Dulog CIS Ext'n. : Diversion Works, Canalization & Canal
Structures
7,500 25 - - 1.65 5 - - - - Zamboanguita
6 Mayabon/Calango CIS Ext'n : Canalization, Canal Structures
5,000 - - - - 1 - - - - Zamboanguit
a 7 Nasig-id SRIS : (Canama) Desilting
works @ dam impounding
1,500 6 - - 0.80 - - - - - Santa
Catalina 8 Sta. Catalina CIS Ext'n :
Canalization, Canal Structures
- - - - 57 15.27 - - 185 TOTAL NEGROS ORIENTAL 47,686
- - - - - 85 18.61 8 409 102,686 TOTAL REGION 7 - Extension/Expansion of Existing Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LEYTE (NORTHERN)
10,000 30 - - 1.09 7 - - - - Abuyog 1 Balocawehay CIS : const. of div. works & chute, canal linings & turnouts
- - - - 7 1.09 - - 30 TOTAL LEYTE (NORTHERN) 10,000
SAMAR (NORTHERN)
10,000 15 - - 2.55 18 - - - - Lavezares 1 San Miguel CIS : const. of canal
lining & struc
- - - - 18 2.55 - - 15 TOTAL SAMAR (NORTHERN) 10,000
- - - - - 25 3.64 - 45 20,000 TOTAL REGION 8 - Extension/Expansion of Existing Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ZAMBOANGA CITY
15,000 20 - - - 1 - - - - Curuan, Zamboanga City
1 Curuan CIS Extn. : Const'n of
ext'n facilities
- - - - 1 - - - 20 TOTAL ZAMBOANGA CITY 15,000
ZAMBOANGA DEL NORTE
5,000 5 - - - - - - - - Siocon 1 Pisawak CIS : Const'n of ext'n
facilities
10,000 10 - - - - - - - - Siocon 2 Siocon CIS & Ext'n : Const'n of
ext'n facilities
- - - - - - - - 15 TOTAL ZAMBOANGA DEL NORTE 15,000
ZAMBOANGA DEL SUR
7,500 15 - - 1.50 20 - - - - Ramon
Magsaysay 1 Katipunan CIS Ext'n : Const'n of
ext'n facilities
- - - - 20 1.50 - - 15 TOTAL ZAMBOANGA DEL SUR 7,500
- - - - - 21 1.50 - 50 37,500 TOTAL REGION 9 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
LANAO DEL SUR
5,000 20 - - 1.00 1 - - - - Lumba
Bayabao 1 Mapantao CIS :
19,760 100 - - 2.00 1 - - - - Masiu 2 Masiu CIS :
- - - - 2 3.00 - - 120 TOTAL LANAO DEL SUR 24,760
MISAMIS OCCIDENTAL
10,000 - 20 - - - - - - - Sapang Dalaga
1 Disoy CIP :
10,000 - - - - - - - - - Oroquieta City
2 Paypayan CIP :
5,000 - 25 - - - - - - - Clarin 3 Clarin CIS (Gadakinsur) :
10,000 10 - - - - - - - - Ozamis City 4 Dalicapan CIS :
- - - - - - - 45 10 TOTAL MISAMIS OCCIDENTAL 35,000
MISAMIS ORIENTAL
10,000 20 - - - - - - - - Gingoog City 1 Agay-ayan CIS :
5,000 10 - - - - - - - - Alubijid 2 Lourdes CIS :
- - - - - - - - 30 TOTAL MISAMIS ORIENTAL 15,000
- - - - - 2 3.00 45 160 74,760 TOTAL REGION 10 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
3,598 15 - - 0.16 1 - - - - Datu Odin
Sinsuat 1 Neketan CIS : Construction of
Canal lining and Structures
- - - - 1 0.16 - - 15 TOTAL MAGUINDANAO 3,598
SARANGANI
12,642 10 - - 0.20 5 1 - - - Alabel 1 Domolok-Tokawal CIS Extension : Construction of Canal lining, canal Structures and installation of HDPE
14,000 10 - - 1.00 3 - - - - Malungon 2 Lower Biangan CIS : Construction of Canal lining and Structures
- - - 1 8 1.20 - - 20 TOTAL SARANGANI 26,642
SULTAN KUDARAT
6,000 30 - - 0.30 3 - - - - Lutayan 1 Blingkong CIS : Construction of
Canal lining and Structures
10,500 30 - - 0.80 5 - - - - Isulan 2 Bual CIS : Construction of Canal
lining and Structures
6,750 20 - - 0.35 2 - - - - Lutayan 3 Palavilla CIS : Construction of
Canal lining and Structures
12,110 30 - - 0.80 5 - - - - Kalamansig 4 Sangay Paril CIS : Construction of
Canal lining and Structures
10,000 20 - - 0.80 4 - - - - Lebak 5 Tran CIS : Construction of Canal
lining and Structures
- - - - 19 3.05 - - 130 TOTAL SULTAN KUDARAT 45,360
- - - - 1 28 4.41 - 165 75,600 TOTAL REGION 12 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Extension/Expansion of Existing Irrigation Systems (Communal Systems) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
67,600 158 15 1.50 1.50 2 - - - - Santiago 1 Santiago CIS : Dam Repair, Canal
Structures & Canalization
- - - - 2 1.50 1.50 15 158 TOTAL AGUSAN DEL NORTE 67,600
1.50 - - - - 2 1.50 15 158 67,600 TOTAL REGION 13 - Extension/Expansion of Existing
Irrigation Systems (Communal Systems)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
2,000 5 - - 1.30 5 - - - - Bucay 1 Baay River-Bucay-Banbangcag-Nagbalitangan CIP : Construction of 1.3 km canal lining & 5 Units canal Structures
2,000 8 - - 1.00 3 - - - - Bucay 2 Calao CIS : Construction of 1 km canal lining & 3 Units canal
Structures
2,500 8 - - 0.35 3 - - - - Malibcong 3 Dungsal Gacab CIP : Construction of 0.35 km canal lining & 3 Units
canal Structures
3,000 5 - - 1.00 3 - - - - Malibcong 4 Dupagan River-Malibcong-Duldulao-Alug Papatayan CIP : Construction of 1 km canal lining & 3 Units canal Structures
3,000 14 - - 3.50 6 - - - - San Isidro 5 Kirmay Spring-San Isidro-San Marcial CIP : Construction of 3.5 kms canal lining & 6 Units canal Structures
- - - - 20 7.15 - - 40 TOTAL ABRA 12,500
APAYAO
4,000 - - - 0.67 5 - - - - Flora 1 Atok CIS : Construction of Canal
lining & Canal Structures
12,000 - - - - - - - - - Santa
Marcela 2 Panay PIS : Delivery and
Installation of 1 unit Pump & Engine w/ pumphouse
- - - - 5 0.67 - - - TOTAL APAYAO 16,000
BENGUET
5,000 14 - - 5.00 2 2 - - - Kapangan 1 Central - Liko - Baguiengey CIP : Installation of pipeline, const'n. of concrete canal & canal structure
3,875 9 - - - 2 1 - - - Tuba 2 Cobicob CIP : Installation of pipeline & const'n. of canal
structure
3,000 10 - - - 2 2 - - - Kabayan 3 Dingey- Inda Ambungdulan CIP : Installation of pipeline & const'n. of canal structure
2,500 10 - - 0.50 2 - - - - Kapangan 4 Domiwag CIP : Installation of pipeline, const'n. of concrete
canal & canal structure
2,500 7 - - - 2 3 - - - Atok 5 Papayew CIP : Installation of pipeline & const'n. of canal structure
2,500 7 - - - 2 3 - - - Kapangan 6 Paykek CIS : Installation of pipeline & const'n. of canal
structure
10,000 18 - - - 8 3 - - - Kibungan 7 Upper Ambalideng CIP : Installation of pipeline & const'n. of canal structure
Page 1 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - 13 20 5.50 - - 75 TOTAL BENGUET 29,375
IFUGAO
2,000 8 - - 1.20 - - - - - Lagawe 1 Agamang Creek-Montabiong Agamang SIP : Construction of
canal lining
1,500 - - - 0.80 - - - - - Asipulo 2 Amduntog Attaban CIS :
Construction of canal lining
7,000 10 - - - 6 2 - - - Asipulo 3 Banaaw Creek Banaaw-Camandag CIP : Construction of canal structure and procurement / installation of HDPE
600 - - - 0.55 - - - - - Banaue 4 Digdig-Happatan CIS :
Construction of canal lining
1,500 6 - - - 4 1 - - - Tinoc 5 Hana Ababa CIS : Construction of canal structure and procurement
/ installation of HDPE
3,500 - - - 1.11 2 - - - - Tinoc 6 Lana-Nambalwan CIS : Construction of canal lining, canal structure and procurement / installation of HDPE
1,100 6 - - 0.81 - - - - - Hungduan 7 Lona Creek-Galung-Lahdangen CIP : Construction of canal lining
1,000 7 - - 0.90 - - - - - Hingyon 8 Lugo Creek-O-ong CIP :
Construction of canal lining
5,000 23 - - 0.80 5 1 - - - Tinoc 9 Manaan River-Luhong CIP : Construction of canal lining, canal structure and procurement / installation of HDPE
1,500 5 - - 0.30 - - - - - Hingyon 10 Natob Creek -Hingyon CIP :
Construction of canal lining
3,500 23 - - 1.20 3 1 - - - Tinoc 11 Pah-adan CIS : Construction of canal lining, canal structure and procurement / installation of
HDPE
1,300 - - - 0.65 - - - - - Aguinaldo 12 Ta-ang CIS : Construction of canal
lining
1,500 5 - - 1.10 - - - - - Hungduan 13 Wael Creek-Poblacion Guinabang SIP : Construction of canal lining
- - - 5 20 9.42 - - 93 TOTAL IFUGAO 31,000
KALINGA
1,000 4 - - 0.69 - - - - - Tabuk City 1 Ammasungan Creek-Magnao Kopikop CIP : Construction of Canal Lining
1,000 4 - - 0.71 - - - - - Rizal 2 Animsiman Spring-Babalag West CIP : Construction of Canal Lining
Page 2 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
400 - - - - 2 - - - - Pinukpuk 3 Ba-ay (Gesang) CIS : Construction of Canal Lining & Turnouts
1,000 5 - - 0.63 1 - - - - Tabuk City 4 Balatoc Creek-Lucog CIP : Construction of Intake & Canal Lining
500 - - - 0.33 - - - - - Pasil 5 Balinciagao CIS : Construction of Canal Lining
1,000 3 - - 0.67 - - - - - Lubuagan 6 Bangbangkaw Matuun Creek-Antonio Canao CIP : Construction of Canal Lining
1,000 4 - - 0.70 1 - - - - Pinukpuk 7 Bangog Creek-Allaguia CIP : Construction of Intake & Canal Lining
500 - - - 0.33 - - - - - Lubuagan 8 Bawang CIS (Simayon) : Construction of Canal Lining
2,000 - - - 1.48 - - - - - Pasil 9 Bulanao Lagud CIS : Construction of Canal Lining
500 - - - 0.36 - - - - - Lubuagan 10 Butigue CIS (Pudpud Area) : Construction of Canal Lining
1,000 4 - - 0.65 - - - - - Pasil 11 Cadaclan Creek-Magsilay Bucos Bannawagan CIP : Construction of Canal Lining
1,000 5 - - 0.74 - - - - - Rizal 12 Cadao Creek-Babalag West Resetlement CIP : Construction of Canal Lining
2,000 - 17 - 1.33 - - - - - Tabuk City 13 Calaccad CIS : Construction of Canal Lining
700 3 - - 0.47 - - - - - Tanudan 14 Cal-ungan Buaya Creek-Pangul CIS : Construction of Canal Lining
1,000 3 - - 0.74 1 - - - - Pasil 15 Calwitan Creek-Colayo CIP : Construction of Intake & Canal Lining
1,000 4 - - 0.50 1 - - - - Pasil 16 Chartatad Creek-Chartad CIP : Construction of Intake & Canal Lining
500 2 - - 0.37 - - - - - Pinukpuk 17 Dalinag Creek-Apatan CIP :
Construction of Canal Lining
500 5 - - 0.36 - - - - - Tanudan 18 Donglayan River Pangul Tawang Liyang CIP : Construction of Canal
Lining
500 3 - - 0.33 - - - - - Tinglayan 19 Fitu Creek-Bugnay CIP : Construction of Canal Lining
1,000 3 - - 0.67 - - - - - Tinglayan 20 Futiki Creek-Sumadel CIP : Construction of Canal Lining
500 - - - 0.33 - - - - - Tabuk City 21 Gapang (kolmokong) CIS : Construction of Canal Lining
2,000 5 - - 1.48 - - - - - Tabuk City 22 Gweb Creek-Bulo Balawan CIP : Construction of Canal Lining
1,225 3 - - 0.30 2 - - - - Tabuk City 23 Igang Ubibi CIP Ph. 2 : Construction of Canal Lining & Turnouts
500 3 - - 0.29 - - - - - Pinukpuk 24 Kapegan Creek-Junction CIP :
Construction of Canal Lining
Page 3 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 3 - - 0.50 1 - - - - Tabuk City 25 Kolebong Creek-Bantay CIP : Construction of Intake & Canal Lining
700 - - - 0.47 - - - - - Tanudan 26 Korsaang Addatong CIS (Duyug) :
Construction of Canal Lining
1,000 3 - - 0.67 - - - - - Pinukpuk 27 Kotalit Creek-Pacawit CIP :
Construction of Canal Lining
1,000 3 - - 1.20 - - - - - Tanudan 28 Laglagan Woyawoy CIS :
Construction of Canal Lining
800 3 - - 0.60 - - - - - Lubuagan 29 Langa-an Creek-Upper Uma Bacao CIP : Construction of Canal
Lining
1,000 - - - 0.67 - - - - - Lubuagan 30 Lupnac CIS (Dayap-Tinaro) : Construction of Canal Lining
1,000 5 - - 0.60 - - - - - Rizal 31 Magasusu Creek-Liwan West Odran CIP : Construction of Canal Lining
800 3 - - 0.60 - - - - - Lubuagan 32 Mantube Creek-Dangoy Banna-ao CIP : Construction of
Canal Lining
1,000 5 - - 0.67 - - - - - Tabuk City 33 Manukol Creek-Bagumbayan Makanyaw CIP : Construction of Canal Lining
500 - - - 0.33 - - - - - Lubuagan 34 Olay CIS (Tablak-Lingoy) :
Construction of Canal Lining
1,000 5 - - 1.18 - - - - - Tabuk City 35 Ongap Creek-Lacnog CIP :
Construction of Canal Lining
1,000 4 - - 0.67 - - - - - Pasil 36 Pakak Creek-Balatoc Ligoy CIP :
Construction of Canal Lining
1,000 4 - - 0.67 - - - - - Tabuk City 37 Pangilinan CIS : Construction of
Canal Lining
500 3 - - 0.33 - - - - - Pasil 38 Puyukan Creek-Ableg CIP :
Construction of Canal Lining
1,000 4 - - 0.60 - - - - - Rizal 39 Spring CIP ph. 2 : Construction of
Canal Lining
500 2 - - 0.29 - - - - - Lubuagan 40 Sucnip Creek-Mabongtot-Kelip
CIP : Construction of Canal Lining
1,000 - - - 0.67 - - - - - Tabuk City 41 UCRIS MDC Ipil TSC2B (Sand-uy) : Construction of Canal Lining
2,000 5 - - 1.38 1 - - - - Tabuk City 42 Umao Spring-Callagado CIP : Construction of Intake & Canal Lining
- - - - 10 26.56 - 17 115 TOTAL KALINGA 39,125
MT. PROVINCE
2,000 - - - 1.10 2 - - - - Bontoc 1 Awa Dagdag (Nabahikor-Mabor-Hiwang CIS) : Construction of concrete lined canal and structures.
1,500 3 - - 0.60 4 - - - - Sabangan 2 Bao-angan CIP : Construction of concrete lined canal and
structures.
Page 4 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,600 8 - - 1.40 6 - - - - Sagada 3 Data Demang CIP : Construction of concrete lined canal and structures.
1,500 - - - 0.30 - - - - - Sadanga 4 Fokong CIS : Construction of
concrete lined canal.
1,200 3 - - 0.50 3 - - - - Sagada 5 Guedangang CIP : Construction of concrete lined canal and
structures.
4,000 16 - - 1.50 3 - - - - Sadanga 6 Guinawat Creek-Pakil-Labaan CIP : Construction of concrete lined canal and structures.
1,500 5 - - 0.60 1 - - - - Tadian 7 Gusadan CIS : Construction of concrete lined canal and structures.
1,500 - - - 0.50 1 - - - - Sagada 8 Kalignuan Mobileteng CIP : Construction of concrete lined canal and Intake structure.
2,000 - - - 0.40 2 - - - - Tadian 9 Kapayawan CIS : Construction of concrete lined canal and
structures.
1,000 10 - - 1.50 7 - - - - Bauko 10 Kuwabeng Creek-Bauko Boboan-Tangkikan CIP : Construction of concrete lined canal and structures.
1,200 - - - 1.20 5 - - - - Sagada 11 Lobo CIS : Construction of concrete lined canal and structures.
3,400 15 - - 0.80 12 2 - - - Bauko 12 Mallanas Creek-Bauko Makmak Kaddel CIP : Construction of concrete lined canal and
structures. Installn of pipeline.
3,500 - - - 2.10 5 - - - - Sadanga 13 Pakang Chaliwatey CIS : Construction of concrete lined canal and structures.
3,000 10 - - 0.34 2 - - - - Tadian 14 Pospos CIP : Construction of concrete lined canal and structures. Installn of pipeline.
1,600 - - - 0.60 2 - - - - Tadian 15 Sumadel CIS (Wanga) : Construction of concrete lined
canal and structures.
1,000 - - - 0.60 3 - - - - Sagada 16 Tubeng Malbo CIS : Construction of concrete lined canal and structures.
- - - 2 58 14.04 - - 70 TOTAL MT. PROVINCE 31,500
Page 5 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - 20 133 63.34 17 393 159,500 TOTAL CAR - Balikatan Sagip Patubig Program
(BSPP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 6 of 6 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Balikatan Sagip Patubig Program (BSPP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAGAYAN
10,000 - - - - - - - - - Abulug 1 East Apayao Abulug IS :
Upgrading/desilting of canal
10,000 - 20 - - - - - - - Solana 2 Solana Pump Irrigation System : Const'n. of Canal Lining/Structures
- - - - - - - 20 - TOTAL CAGAYAN 20,000
NUEVA VIZCAYA
2,000 - - - 0.58 - - - - - Dupax del Sur 1 Arwat CIS : Canal lining/ Embankment protection of
diversion dam
1,000 - - - 0.80 - - - - - Kayapa 2 Besong CIS : Canal Lining
2,000 - - - 0.43 - - - - - Bambang 3 Domang Sto Nino CIS : Canal Lining
1,500 - - - 0.53 - - - - - Quezon 4 Dumaliguia CIS : Canal Lining
2,000 - - - 0.17 - - - - - Dupax del Sur 5 Gabut Mangayang CIS : Canal
Lining
- - - - - 2.51 - - - TOTAL NUEVA VIZCAYA 8,500
- - - - - - 2.51 20 - 28,500 TOTAL REGION 2 (PROPER) - Balikatan Sagip Patubig
Program (BSPP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS SUR
160 8 - - - - - - - - Bantay 1 Bantay PIP : Supply of Irrigation
Pump/Engine with accesories
160 8 - - - - - - - - Cabugao 2 Cabugao PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Caoayan 3 Caoayan PIP : Supply of Irrigation
Pump/Engine with accesories
160 8 - - - - - - - - Magsingal 4 Magsingal PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - San Ildefonso 5 San Ildefonso PIP : Supply of Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - San Juan 6 San Juan PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - San Vicente 7 San Vicente PIP : Supply of Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - Sinait 8 Sinait PIP : Supply of Irrigation
Pump/Engine with accesories
160 8 - - - - - - - - Santa
Catalina 9 Sta. Catalina PIP : Supply of
Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Santo
Domingo 10 Sto. Domingo PIP : Supply of
Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - Vigan 11 Vigan PIP : Supply of Irrigation
Pump/Engine with accesories
160 8 - - - - - - - - Banayoyo 12 Banayoyo PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Lidlidda 13 Lidlidda PIP : Supply of Irrigation
Pump/Engine with accesories
160 8 - - - - - - - - Nagbukel 14 Nagbukel PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Narvacan 15 Narvacan PIP : Supply of Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - Salcedo 16 Salcedo PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - San Emilio 17 San Emilio PIP : Supply of Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - San Esteban 18 San Esteban PIP : Supply of Irrigation Pump/Engine with accesories
320 16 - - - - - - - - Santa 19 Santa PIP : Supply of Irrigation
Pump/Engine with accesories
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
160 8 - - - - - - - - Santiago 20 Santiago PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Santa Cruz 21 Sta. Cruz PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Santa Lucia 22 Sta. Lucia PIP : Supply of Irrigation Pump/Engine with accesories
160 8 - - - - - - - - Santa Maria 23 Sta. Maria PIP : Supply of Irrigation Pump/Engine with
accesories
160 8 - - - - - - - - Tagudin 24 Tagudin PIP : Supply of Irrigation Pump/Engine with accesories
- - - - - - - - 200 TOTAL ILOCOS SUR 4,000
LA UNION
417 13 - - - - - - - - Balaoan 1 Balaoan STW : Balaoan GIP: Supply & Delivery of Irrigation Pumps/Engine
417 13 - - - - - - - - Bangar 2 Bangar STW : Bangar GIP: Supply & Delivery of Irrigation
Pumps/Engine
834 24 - - - - - - - - Luna 3 Luna STW : Luna GIP: Supply & Delivery of Irrigation Pumps/Engine
5,760 57 - - - - - - - - Sudipen 4 San Francisco Sur PIP : Construction of Dugwells w/
Pumpsets
417 13 - - - - - - - - Sudipen 5 Sudipen STW : Sudipen GIP: Supply & Delivery of Irrigation Pumps/Engine
834 25 - - - - - - - - Aringay 6 Aringay STW : Aringay GIP: Supply & Delivery of Irrigation
Pumps/Engine
834 25 - - - - - - - - Bauang 7 Bauang STW : Bauang GIP: Supply & Delivery of Irrigation Pumps/Engine
417 12 - - - - - - - - Caba 8 Caba STW : Caba GIP: Supply & Delivery of Irrigation
Pumps/Engine
- - - - - - - - 182 TOTAL LA UNION 9,930
PANGASINAN
10,000 40 - - - - - - - - Anda 1 Awag STW : Proc./Delivery of
Water Pump & Engine
8,000 30 - - - - - - - - Alaminos City 2 Telbang STW : Proc./Delivery of Water Pump & Engine
5,000 - 20 - 0.60 3 - - - - San Jacinto 3 San Juan-Babasit PIP (Phase II) : Proc./Delivery of Water Pump & Engine and Canal Lining & Structures
500 10 - - - - - - - - Tayug 4 Tayug STW : Proc./Delivery of Water Pump & Engine
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
15,000 25 - 1.00 0.60 4 - - - - Manaoag 5 Pao SIP : Canal, canal lining, canal
structures and STW.
3,000 40 - - - - - - - - districwide 6 4th District STW : Provision of 7HP Diesel Engine with Pumps & accessories
- - - - 7 1.20 1.00 20 145 TOTAL PANGASINAN 41,500
1.00 - - - - 7 1.20 20 527 55,430 TOTAL REGION 1 - Establishment of Groundwater Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
5,000 20 - - - - - - - - La Paz 1 Naguilian PIP : Installation of 5 units of Solar Pumps or 15 units pumps & Engines
- - - - - - - - 20 TOTAL ABRA 5,000
APAYAO
1,000 12 - - - - - - - - Calanasan 1 Barorika PIP : Supply and Delivery of 10 units Pumps & Engine
1,000 12 - - - - - - - - Calanasan 2 Makaddil PIP : Supply and Delivery of 10 units Pumps & Engine
1,000 12 - - - - - - - - Calanasan 3 Upaw PIP : Supply and Delivery
of 10 units Pumps & Engine
9,000 48 - - - - - - - - Pamplona 4 West Apayao Abulug PIP : Supply and Delivery of 90 units Pumps & Engine
- - - - - - - - 84 TOTAL APAYAO 12,000
BENGUET
750 2 - - - 1 2 - - - La Trinidad 1 Ambiong PIP : Installation of pump & pipeline, const'n. of
canal structure
2,050 4 - - - 2 2 - - - Buguias 2 Baculongan Norte PIP : Installation of pump & pipeline, const'n. of canal structure
1,000 5 - - - - - - - - Kapangan 3 Konig PIP : Installation of pump & pipeline, const'n. of canal
structure
800 2 - - - 1 1 - - - Buguias 4 Natogtogan PIP : Installation of pump & pipeline, const'n. of canal structure
700 2 - - - 1 1 - - - La Trinidad 5 Pagal Beckel PIP : Installation of pump & pipeline, const'n. of
canal structure
2,000 5 - - - 1 1 - - - Bakun 6 Pegena PIP : Installation of pump & pipeline, const'n. of canal structure
2,200 6 - - - 1 1 - - - Bakun 7 Sipitan PIP : Installation of pump & pipeline, const'n. of canal
structure
2,500 7 - - - 2 3 - - - La Trinidad 8 Swamp PIP : Installation of pump & pipeline, const'n. of canal structure
- - - 11 9 - - - 33 TOTAL BENGUET 12,000
KALINGA
1,200 3 - - - 3 - - - - Tabuk City 1 Badul PIP : Procurement , Delivery of Pump & Pump
Engines & Drilling & Accessories
900 2 - - - 2 - - - - Pinukpuk 2 Balitang Allaguia PIP : Procurement , Delivery of Pump & Pump Engines & Drilling &
Accessories
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 4 - - - 4 - - - - Rizal 3 Bulbul PIP : Procurement , Delivery of Pump & Pump Engines & Drilling & Accessories
1,000 3 - - - 3 - - - - Tabuk City 4 Calanan-Tulyao PIP : Procurement , Delivery of Pump & Pump Engines & Drilling & Accessories
1,200 3 - - - 3 - - - - Pinukpuk 5 Camalog PIP : Procurement , Delivery of Pump & Pump Engines & Drilling & Accessories
1,000 3 - - - 3 - - - - Tabuk City 6 Eleb Wayaway PIP : Procurement , Delivery of Pump & Pump Engines & Drilling & Accessories
2,000 5 - - - 1 - - - - Tabuk City 7 Gitilen Solar Pump : Procurement & Construction of Solar Pump & Its Accessories
1,000 3 - - - 3 - - - - Tabuk City 8 Kabalinagan PIP (GENEB) : Procurement , Delivery of Pump & Pump Engines & Drilling &
Accessories
1,200 3 - - - 3 - - - - Tabuk City 9 Malalao PIP : Procurement , Delivery of Pump & Pump
Engines & Drilling & Accessories
1,500 4 - - - 4 - - - - Rizal 10 San Pascual PIP (Gawa) : Procurement , Delivery of Pump & Pump Engines & Drilling &
Accessories
- - - - 29 - - - 33 TOTAL KALINGA 12,000
MT. PROVINCE
8,950 8 - - - - - - - - Bauko 1 Cada Tilika PIP (Salin Balicanao CIP Ph 2) : Procurement/Delivery and Installation of Water Pumps. Installation of G.I. pipes and
construction of reservoir tanks.
- - - - - - - - 8 TOTAL MT. PROVINCE 8,950
- - - - 11 38 - - 178 49,950 TOTAL CAR - Establishment of Groundwater Pump
Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
7,600 - - - - - - - - - Cauayan City 1 Regional Office - Region 2 : Family Model Farm & Solar Pump
- - - - - - - - - TOTAL ISABELA 7,600
NUEVA VIZCAYA
250 - 6 - - - - - - - Solano 1 Bisla PIP : Pumps
630 - 9 - - - - - - - Quezon 2 Boliwao PIP : Pumps
250 - 6 - - - - - - - Solano 3 CamCam North PIP : Pumps
630 - 9 - - - - - - - Bambang 4 Dullao PIP : Pumps
630 - 15 - - - - - - - Bambang 5 Mabunga PIP : Pumps
630 - 15 - - - - - - - Bambang 6 Madiana PIP : Pumps
630 - 6 - - - - - - - Quezon 7 Nalubbunan PIP : Pumps
- - - - - - - 66 - TOTAL NUEVA VIZCAYA 3,650
- - - - - - - 66 - 11,250 TOTAL REGION 2 (PROPER) - Establishment of Groundwater Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (MARIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ISABELA
5,000 - - - - - - - - - Cauayan City 1 Magat RIS : HO
10,550 20 - - - - - - - - San Isidro 2 Magat RIS : Division I
- - - - - - - - 20 TOTAL ISABELA 15,550
QUIRINO
10,550 10 - - - - - - - - Saguday 1 Baligatan DD : Division I
- - - - - - - - 10 TOTAL QUIRINO 10,550
- - - - - - - - 30 26,100 TOTAL REGION 2 (MARIIS) - Establishment of
Groundwater Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AURORA
1,000 13 - - - - - - - - Dilasag 1 Aurora PIP : STW
1,000 13 - - - - - - - - Dinalungan 2 Aurora PIP : STW
1,000 13 - - - - - - - - Dingalan 3 Aurora PIP : STW
1,000 13 - - - - - - - - Dipaculao 4 Aurora PIP : STW
1,000 13 - - - - - - - - San Luis 5 Aurora PIP : STW
- - - - - - - - 65 TOTAL AURORA 5,000
BATAAN
10,000 130 - - - - - - - - Dinalupihan 1 Bataan PIP : Drip Irrigation
1,000 25 - - - - - - - - Dinalupihan 2 Bataan PIP : Shallow Tube Well
(STW)
1,000 25 - - - - - - - - Hermosa 3 Bataan PIP : Shallow Tube Well (STW)
5,000 40 - - - - - - - - Abucay/Hermosa/Orani
4 Bataan PIP : Shallow Tube Well (STW)
5,000 40 - - - - - - - - Bagac 5 Bataan PIP : Shallow Tube Well (STW)
2,000 20 - - - - - - - - Balanga City 6 Bataan PIP : Shallow Tube Well (STW)
5,000 40 - - - - - - - - Limay 7 Bataan PIP : Shallow Tube Well
(STW)
5,000 40 - - - - - - - - Orion 8 Bataan PIP : Shallow Tube Well (STW)
5,000 40 - - - - - - - - Pilar 9 Bataan PIP : Shallow Tube Well (STW)
- - - - - - - - 400 TOTAL BATAAN 39,000
BULACAN
5,000 70 - - - - - - - - Malolos 1 Bulacan STW : STW
5,000 70 - - - - - - - - Calumpit 2 Calumpit STW : STW
5,000 70 - - - - - - - - Pulilan 3 Pulilan PIP : STW
5,000 70 - - - - - - - - Baliuag 4 Baliuag PIP : STW
5,000 70 - - - - - - - - Plaridel 5 Plaridel PIP : STW
5,000 70 - - - - - - - - Angat 6 Bulacan PIP : STW
5,000 70 - - - - - - - - Doña Remedios
Trinidad
7 Bulacan PIP : STW
5,000 70 - - - - - - - - Norzagaray 8 Bulacan PIP : STW
5,000 70 - - - - - - - - San Ildefonso 9 Bulacan PIP : STW
5,000 70 - - - - - - - - San Miguel 10 Bulacan PIP : STW
5,000 70 - - - - - - - - San Rafael 11 Bulacan PIP : STW
- - - - - - - - 770 TOTAL BULACAN 55,000
NUEVA ECIJA
5,000 70 - - - - - - - - Aliaga 1 Aliaga PIP : STW
5,000 70 - - - - - - - - Cuyapo 2 Cuyapo : STW
5,000 70 - - - - - - - - Zaragoza 3 Zaragosa PIP : STW
5,000 70 - - - - - - - - Carranglan 4 Carranglan PIP : STW
2,000 50 - - - - - - - - Lupao 5 Lupao PIP : STW
5,000 70 - - - - - - - - Pantabangan 6 Pantabangan PIP : STW
5,000 70 - - - - - - - - Rizal 7 Rizal PIP : STW
5,000 70 - - - - - - - - San Jose City 8 San Jose PIP : STW
Page 1 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
8,000 120 - - - - - - - - Bongabon 9 Bongabon PIP : STW
8,000 120 - - - - - - - - Gabaldon 10 Gabaldon PIP : STW
8,000 120 - - - - - - - - Laur 11 Laur PIP : STW
2,595 40 - - - - - - - - Gapan City 12 Gapan PIP : STW
10,000 100 - - 1.00 1 - - - - General Tinio 13 Padolina PIP : STW
- - - - 1 1.00 - - 1,040 TOTAL NUEVA ECIJA 73,595
PAMPANGA
2,000 20 - - - - - - - - Mabalacat 1 Pampanga PIP : Shallow Tube
Well (STW)
2,000 20 - - - - - - - - Magalang 2 Pampanga PIP : Shallow Tube
Well (STW)
3,334 25 - - - - - - - - Floridablanca 3 Pampanga PIP : Shallow Tube
Well (STW)
3,334 25 - - - - - - - - Guagua 4 Pampanga PIP : Shallow Tube
Well (STW)
3,333 25 - - - - - - - - Lubao 5 Pampanga PIP : Shallow Tube
Well (STW)
3,333 25 - - - - - - - - Porac 6 Pampanga PIP : Shallow Tube
Well (STW)
3,333 25 - - - - - - - - Santa Rita 7 Pampanga PIP : Shallow Tube
Well (STW)
3,333 25 - - - - - - - - Sasmoan 8 Pampanga PIP : Shallow Tube
Well (STW)
3,000 25 - - - - - - - - Porac 9 PGRIS PIP : Shallow Tube Well
(STW)
3,000 25 - - - - - - - - Mexico 10 Divisoria PIP : Shallow Tube Well
(STW)
1,000 10 - - - - - - - - Arayat 11 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - Bacolor 12 Pampanga PIP : Shallow Tube
Well (STW)
2,000 20 - - - - - - - - Mexico 13 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - Santa Ana 14 Pampanga PIP : Shallow Tube
Well (STW)
3,000 25 - - - - - - - - Santa Ana 15 San Pablo PIP : Shallow Tube
Well (STW)
2,500 33 - - - - - - - - Candaba 16 Candaba PIP : Supply and Delivery of Water Pump and
Engine
2,000 - - - - - - - - - Candaba 17 Gulap PIS : Solar Powered Pumps
3,000 25 - - - - - - - - Minalin 18 Minalin PIP : Shallow Tube Well
(STW)
1,000 10 - - - - - - - - Apalit 19 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - Candaba 20 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - Minalin 21 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - San Luis 22 Pampanga PIP : Shallow Tube
Well (STW)
Page 2 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1,000 10 - - - - - - - - San Simon 23 Pampanga PIP : Shallow Tube
Well (STW)
1,000 10 - - - - - - - - Santo Tomas 24 Pampanga PIP : Shallow Tube Well (STW)
2,000 50 - - - - - - - - Apalit 25 Pampanga PIP (AMRIS Area) : Supply and Delivery of Water Pump and Engine
2,000 25 - - - - - - - - Candaba 26 Pampanga PIP (AMRIS Area) : Supply and Delivery of Water
Pump and Engine
2,000 20 - - - - - - - - San Luis 27 Pampanga PIP (AMRIS Area) : Supply and Delivery of Water Pump and Engine
2,000 20 - - - - - - - - San Simon 28 Pampanga PIP (AMRIS Area) : Supply and Delivery of Water Pump and Engine
2,500 33 - - - - - - - - San Luis 29 San Luis PIP : Supply and Delivery of Water Pump and Engine
- - - - - - - - 581 TOTAL PAMPANGA 62,000
TARLAC
4,000 53 - - - - - - - - Anao 1 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
5,000 66 - - - - - - - - Camiling 2 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
5,000 66 - - - - - - - - Mayantoc 3 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
5,000 66 - - - - - - - - Moncada 4 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
5,000 66 - - - - - - - - Paniqui 5 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
2,500 33 - - - - - - - - Pura 6 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
2,500 33 - - - - - - - - Ramos 7 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
3,000 47 - - - - - - - - San Manuel 8 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
3,000 47 - - - - - - - - Santa Ignacia 9 Tarlac PIP (District 1) : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
2,000 50 - - - - - - - - Gerona 10 Gerona PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4
Centrifugal Pump
5,000 66 - - - - - - - - San Jose 11 San Jose PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
Page 3 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,000 50 - - - - - - - - Tarlac City 12 Tarlac PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
7,000 93 - - - - - - - - Capas 13 Capas PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
5,000 65 - - - - - - - - Concepcion 14 Concepcion PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
5,000 66 - - - - - - - - Lapaz 15 Lapaz PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4
Centrifugal Pump
- - - - - - - - 867 TOTAL TARLAC 61,000
ZAMBALES
1,500 20 - - - - - - - - San
Marcelino 1 Linusungan PIP : Supply &
Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
1,500 20 - - - - - - - - Palauig 2 Liozon PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
1,500 20 - - - - - - - - San Narciso 3 Mabangcal PIP : Supply & Delivery of 8-9HP Diesel Engine
w/4x4 Centrifugal Pump
1,500 20 - - - - - - - - Iba 4 San Agustin PIP : Supply & Delivery of 8-9HP Diesel Engine w/4x4 Centrifugal Pump
- - - - - - - - 80 TOTAL ZAMBALES 6,000
- - - - - 1 1.00 - 3,803 301,595 TOTAL REGION 3 (PROPER) - Establishment of
Groundwater Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 4 of 4 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANGAS
2,000 20 - - - - - - - - Tingloy 1 Tingloy PIP : Purchased Delivery of Pump Engine & Accessories
5,000 75 - - - - - - - - Districtwide 2 Batangas PIP : Purchased delivery of pump engine &
accessories
10,000 35 - - - - - - - - San Luis 3 San Martin PIP : Installation of
submersible
10,000 20 - - - - - - - - San Luis 4 Sta. Monica PIP : Installation of
submersible
- - - - - - - - 150 TOTAL BATANGAS 27,000
- - - - - - - - 150 27,000 TOTAL REGION 4A - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
200 5 - - - - - - - - Santa Cruz 1 Lapu-Lapu PIP : Purchase of
engine pump and accessories
2,810 21 - - - - - - - - Torrijos 2 Bambangalon PIP : Construction
of STW pump
2,500 15 - - - - - - - - Santa Cruz 3 Ipil PIP : Construction of STW
pump
- - - - - - - - 41 TOTAL MARINDUQUE 5,510
OCCIDENTAL MINDORO
5,160 72 - - - - - - - - Calintaan 1 Calintaan PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
12,500 175 - - - - - - - - Calintaan 2 Concepcion PCIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
1,050 15 - - - - - - - - Mamburao 3 Mamburao PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
5,250 75 - - - - - - - - San Jose 4 Mukaffco PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
1,500 15 - - - - - - - - Calintaan 5 New Ilocos Tamaraw PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
1,050 15 - - - - - - - - Sablayan 6 Sablayan PIP : Const'n. of & Intallation of STW & Delivery of Pump, Engine w/ complete accessories.
- - - - - - - - 367 TOTAL OCCIDENTAL MINDORO 26,510
ORIENTAL MINDORO
7,500 150 - - - - - - - - Calapan City 1 Gutad PIP : Construction of Pumpworks, canal lining and
canal structure
- - - - - - - - 150 TOTAL ORIENTAL MINDORO 7,500
- - - - - - - - 558 39,520 TOTAL REGION 4B - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAPIZ
400 6 - - - - - - - - Panay 1 Bato STW : Supply and Delivery
of Pump and Engine
400 6 - - - - - - - - Pilar 2 Sinamongan STW : Supply and
Delivery of Pump and Engine
600 9 - - - - - - - - Sapian 3 Agtatacay Sur STW : Supply and
Delivery of Pump and Engine
600 9 - - - - - - - - Ivisan 4 Agustin Navarra STW : Supply and Delivery of Pump and Engine
400 6 - - - - - - - - Sigma 5 Cogon STW : Supply and Delivery
of Pump and Engine
125 3 - - - - - - - - Dumalag 6 Consolacion STW : purchase of 1
unit mobile pumps
600 9 - - - - - - - - Ivisan 7 Cudian STW : Supply and
Delivery of Pump and Engine
400 6 - - - - - - - - Sapian 8 Damayan STW : Supply and
Delivery of Pump and Engine
1,600 22 - - - - - - - - Dumalag 9 Dumalag STW : Supply and
Delivery of Pump and Engine
2,250 45 - - - - - - - - Jamindan 10 Jamindan STW : purchase of
mobile pumps
2,200 30 - - - - - - - - Mambusao 11 Mambusao STW : Supply and
Delivery of Pump and Engine
600 9 - - - - - - - - Sapian 12 Maninang STW : Supply and
Delivery of Pump and Engine
125 3 - - - - - - - - Dumalag 13 Sta. Cruz STW : purchase of 1
unit mobile pumps
1,000 14 - - - - - - - - Tapaz 14 Tapaz STW : Supply and Delivery
of Pump and Engine
- - - - - - - - 177 TOTAL CAPIZ 11,300
GUIMARAS
500 9 3 - - - - - - - Buenavista 1 Buenavista PIP : Supply and Delivery of 4 units Pump and
Engine
250 3 - - - - - - - - Nueva Valencia
2 Igdarapdap PIP : Supply and Delivery of Pump and Engine
500 12 - - - - - - - - Jordan 3 Jordan PIP : Supply and Delivery of 4 units Pump and Engine
125 3 - - - - - - - - Jordan 4 Lawi PIP : Supply and Delivery of
Pump and Engine
500 9 3 - - - - - - - Nueva
Valencia 5 Nueva Valencia PIP : Supply and
Delivery of 4 units Pump and
Engine
250 3 - - - - - - - - San Lorenzo 6 San Enrique PIP : Supply and Delivery of Pump and Engine
500 6 6 - - - - - - - San Lorenzo 7 San Lorenzo PIP : Supply and Delivery of 4 units Pump and Engine
500 12 - - - - - - - - Sibunag 8 Sibunag PIP : Supply and Delivery
of 4 units Pump and Engine
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
250 3 - - - - - - - - San Lorenzo 9 Tangao PIP : Supply and Delivery
of Pump and Engine
125 3 - - - - - - - - Buenavista 10 Tinadtaran PIP : Supply and Delivery of Pump and Engine
- - - - - - - 12 63 TOTAL GUIMARAS 3,500
ILOILO
250 6 - - - - - - - - Miagao 1 Tan-agan PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - Alimodian 2 Bancal PIP : Supply and Delivery
of Pump and Engine
250 6 - - - - - - - - Leon 3 Cabunga-an PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - Mina 4 Abat PIP : Supply and Delivery of
Pump and Engine
250 6 - - - - - - - - Maasin 5 Abay PIP : Supply and Delivery of
Pump and Engine
250 6 - - - - - - - - Calinog 6 Agcalaga PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - Janiuay 7 Aglabon PIP : Supply and Delivery
of Pump and Engine
250 6 - - - - - - - - Calinog 8 Guiso-Canabahan PIP : Supply
and Delivery of Pump and Engine
250 6 - - - - - - - - Cabatuan 9 Tigbauan Road PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - Badiangan 10 Tina PIP : Supply and Delivery of
Pump and Engine
250 6 - - - - - - - - Dingle 11 Agtatacay PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - San Dionisio 12 Bagacay PIP : Supply and Delivery
of Pump and Engine
250 6 - - - - - - - - Passi City 13 Mambiranan Paqueno PIP : Supply and Delivery of Pump and Engine
250 6 - - - - - - - - Lemery 14 Gerongan PIP : Supply and
Delivery of Pump and Engine
250 6 - - - - - - - - Concepcion 15 Lo-ong PIP : Supply and Delivery
of Pump and Engine
250 6 - - - - - - - - Carles 16 Nalumsan PIP : Supply and
Delivery of Pump and Engine
2,000 8 - - - - - - - - Barotac Viejo 17 San Miguel PIP : Construction of
Pump Irrigation Facilities
3,000 10 - - 0.20 2 - - - - Tubungan 18 Sibucauan PIP : Construction of
Pump Irrigation Facilities
- - - - 2 0.20 - - 114 TOTAL ILOILO 9,000
ILOILO CITY
7,600 - - - - - - - - - Jaro 1 Regional Office - Region 6 : Family Model Farm & Solar Pump
- - - - - - - - - TOTAL ILOILO CITY 7,600
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - 2 0.20 12 354 31,400 TOTAL REGION 6 - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CEBU
3,750 13 - - - - - - - - Sibonga 1 Bagacay II PIP : Construction of
Irrigation Pipelines & Structures
3,000 10 - - - - - - - - Carcar City 2 Poblacion III PIP : Construction of Irrigation Pipelines & Structures
20,339 100 - - - - - - - - Barili 3 Tal-ot PIP : Construction of
Irrigation Pipelines & Structures
3,000 10 - - - - - - - - Sogod 4 Ampongol II PIP : Construction of
Irrigation Pipelines & Structures
12,800 40 - - - - - - - - San Francisco, Camotes Is.
5 Cabungaan PIP : Construction of Irrigation Pipelines & Structures
10,500 34 - - - - - - - - San Francisco,
Camotes Is.
6 Campo PIP : Construction of
Irrigation Pipelines & Structures
10,800 36 - - - - - - - - San Francisco, Camotes Is.
7 Esperanza PIP : Construction of
Irrigation Pipelines & Structures
7,400 20 - - - - - - - - San Francisco,
Camotes Is.
8 Northern Poblacion PIP : Construction of Irrigation
Pipelines & Structures
9,600 32 - - - - - - - - San Francisco, Camotes Is.
9 Sta. Cruz PIP : Construction of
Irrigation Pipelines & Structures
3,600 8 - - - - - - - - Balamban 10 Luca PIP : Construction of
Irrigation Pipelines & Structures
9,661 - - - - - - - - - Barili 11 Tal-ot PIP :
- - - - - - - - 303 TOTAL CEBU 94,450
CEBU CITY
6,000 20 - - - - - - - - Adlaon, Cebu
City 1 Adalon II PIP : Construction of
Irrigation Pipelines & Structures
6,000 20 - - - - - - - - Paril, Cebu
City 2 Paril II PIP : Construction of
Irrigation Pipelines & Structures
3,000 10 - - - - - - - - Pung-ol Sibugay, Cebu City
3 Kaluktugan PIP : Construction of Irrigation Pipelines & Structures
3,500 12 - - - - - - - - Tagbao, Cebu City
4 Lungkuyab PIP : Construction of Irrigation Pipelines & Structures
14,500 58 - - - - - - - - Adlaon, Cebu City
5 Adlaon II PIP : Construction of Irrigation Pipelines & Structures
1,500 5 - - - - - - - - Budlaan, Cebu City
6 Budlaan II PIP : Construction of Irrigation Pipelines & Structures
2,500 8 - - - - - - - - Pulangbato,
Cebu City 7 Pulangbato PIP : Construction of
Irrigation Pipelines & Structures
1,500 5 - - - - - - - - Taptap, Cebu
City 8 Taptap II PIP : Construction of
Irrigation Pipelines & Structures
- - - - - - - - 138 TOTAL CEBU CITY 38,500
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - 441 132,950 TOTAL REGION 7 - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
SAMAR (WESTERN)
1,000 - 12 - - - - - - - Gandara 1 Bangahon PIS : proc/installation
og pump
1,000 - 10 - - - - - - - Gandara 2 Casandig PIS : proc/installation
og pump
900 - 9 - - - - - - - Jiabong 3 Bangon PIS : proc/installation og
pump
600 - - - - - - - - - Catbalogan 4 Catbalogan PIP : proc/installation
og pump
1,000 3 15 - - - - - - - Matuguinao 5 Matuguinao PIP :
proc/installation og pump
- - - - - - - 46 3 TOTAL SAMAR (WESTERN) 4,500
- - - - - - - 46 3 4,500 TOTAL REGION 8 - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Establishment of Groundwater Pump Irrigation Project (EGPIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
2,000 - - - - - - - - - Paglat 1 Tual PIP :
- - - - - - - - - TOTAL MAGUINDANAO 2,000
NORTH COTABATO
2,387 - - - - - - - - - Pikit 1 Inug-Ug PIP :
2,386 - - - - - - - - - Libungan 2 Ulimian PIP :
2,387 - - - - - - - - - Matalam 3 Taculen PIP :
- - - - - - - - - TOTAL NORTH COTABATO 7,160
- - - - - - - - - 9,160 TOTAL REGION 12 - Establishment of Groundwater
Pump Irrigation Project (EGPIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ILOCOS NORTE
25,000 - - - - - 6 - - - Piddig 1 Abucay SRIP : Pipeline
5,500 6 - - - - - - - - Bacarra 2 Malilitaw SWIP : Canal Lining &
Canal Structure
4,000 - - - 0.40 1 - - - - Paoay 3 Gabur CIS : Canal Lining & Modf.
Of D/D
6,000 10 - - 0.87 1 - - - - Paoay 4 Paswee Banatoc CIS : Canal
Lining & Modf. Of D/D
7,500 10 - - - 1 - - - - Batac City 5 Sta. Cruz de Nuto : Canal Lining &
Modf. Of D/D
- - - 6 3 1.27 - - 26 TOTAL ILOCOS NORTE 48,000
ILOCOS SUR
10,000 32 - 0.14 0.30 9 - - - - Sinait 1 Macabiag SIP : Intake Structure, Earth Canal, Canal Lining & Canal Structures
5,000 15 - 0.50 - - - - - - Bantay 2 Tagaytay SIP : Teruvian Intake &
Canalization
20,000 40 - - - - - - - - Cervantes 3 Kayan Camay SIP : Diversion Works, Canal Lining & Canal Structures
10,000 100 - - 0.08 - - - - - Santa 4 Santa PIP : Construction of Small Water Impounding Project, Canal Lining,Supply of Irrigation Pump/Engine w/accessories
and deep well development
5,000 10 - - - - - - - - Lidlidda 5 Sao SIP : Diversion Works
- - - - 9 0.38 0.64 - 197 TOTAL ILOCOS SUR 50,000
PANGASINAN
5,000 - - - 0.50 2 - - - - Bolinao 1 Luciente II SIP : Small Farm Reservoir, Canal Lining & Canal
Structure
10,000 20 - 1.00 - 1 - - - - Alaminos City 2 Macatiw SIP : Check Structure
& Canal Desiltation
5,000 30 - 0.50 - - - - - - Anda 3 Roxas SIP : Check Structure &
Canal Desiltation
30,000 100 - - - 5 5 - - - Mangatarem 4 Bantocaling PIP : Small Farm Reservoir, Tank System & Access Road
3,000 30 - 0.50 - - - - - - Urbiztondo 5 Batancaoa SIP (Ph II) : SFR & Embankment Protection w/
pump & engine
3,000 30 - 0.50 - - - - - - Urbiztondo 6 Baug SIP (Ph II) : SFR & Embankment Protection w/ pump & engine
3,000 30 - 0.50 - - - - - - Urbiztondo 7 Bayaoas SIP (Ph II) : SFR & Embankment Protection w/
pump & engine
3,000 30 - 0.50 - - - - - - Urbiztondo 8 Gueteb SIP (Ph II) : SFR & Embankment Protection w/ pump & engine
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 1
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
35,000 100 - - - 5 7 - - - Aguilar 9 Mapita SIP : Small Farm Reservoir, Tank System & Access Road
35,000 80 - - - 4 5 - - - Mangatarem 10 Muelang SIP/PIP : Small Farm Reservoir, Tank System & Access Road
15,000 30 - - - 2 2 - - - Bugallon 11 Salomague SIP : Small Farm Reservoir, Tank System & Access Road
15,000 130 - 1.00 1.50 6 - - - - Laoac 12 Botigue SIP : Diversion Works,
Canal Lining & Canal Structures
10,000 40 - - 1.00 4 - - - - Tayug 13 Bakigan SIP : Check Structure,
Canal Lining & Canal Structures
5,000 20 - - 0.60 3 - - - - Tayug 14 Bocno SIP : Check Structure,
Canal Lining & Canal Structures
5,000 20 - - 0.50 3 - - - - Umingan 15 Concepcion SIP : Check Structure, Canal Lining & Canal
Structures
5,000 20 - - 0.60 3 - - - - Umingan 16 Luna Weste SIP : Check Structure, Canal Lining & Canal Structures
10,000 40 - - 1.20 5 - - - - Tayug 17 Panganiban SIP : Diversion Works, Canal Lining & Canal Structures
5,000 20 - - 0.50 4 - - - - Umingan 18 San Vicente SIP : Check Structure, Canal Lining & Canal Structures
5,000 30 - - 0.50 4 - - - - Tayug 19 Tayug SIP : Check Structure,
Canal Lining & Canal Structures
5,000 30 - - 0.50 4 - - - - Tayug 20 Toketek STW : Shallow Tube
Wells
10,713 - - - - - - - - - Bugallon 21 South Magtaking SIP :
20,000 - - - - - - - - - Bani 22 Centro Toma SIP :
5,000 30 - - - - - - - - Bani 23 Dacap Sur SIP :
20,000 - - - - - - - - - Bolinao 24 Sampaloc SIP :
- - - 19 55 7.40 4.50 - 860 TOTAL PANGASINAN 267,713
5.14 - - - 25 67 9.05 - 1,083 365,713 TOTAL REGION 1 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ABRA
7,000 12 - - - 3 1 - - - Tineg 1 Bakbakalaw CIP : Installation of 1.4 kms pipeline, Const. of 1 unit
resevoir tank & 2 units Structure
3,000 12 - - 0.80 7 - - - - Tubo 2 Kilaman Creek-Tubo-Supo-Matibbuey SIP : Construction of 0.80 km canal lining & 7 Units canal Structures
3,500 8 - - 1.30 5 - - - - Sallapadan 3 Lugsat SIP : Installation of 4 kms pipeline, Const. of 1 unit resevoir
tank & 3 units Structure
5,000 10 - - - 3 4 - - - Langiden 4 Pai River-Langiden-Malapaao CIP : Installation of 4 kms pipeline, Const. of 1 unit resevoir tank & 3 units Structure
1,500 5 - - 0.90 5 - - - - Bangued 5 Ramramot SIP : Installation of 4 kms pipeline, Const. of 1 unit
resevoir tank & 3 units Structure
15,000 30 - - - - - - - - Dolores 6 Tineg River-Pilpilay-Cardona SIP : Installation of 4 kms pipeline, Const. of 1 unit resevoir tank & 3
units Structure
6,000 15 - - 3.00 4 - - - - Lagangilang 7 Usong Creek-Lagangilang-Nagtipulan-Pawan CIP : Construction of 3 kms canal lining & 4 Units canal Structures
- - - 5 27 6.00 - - 92 TOTAL ABRA 41,000
APAYAO
67,000 176 - - 4.99 15 - - - - Conner 1 Nabuangan River-Cupiz Maglangat Pigoc SIP : Construction of Diversion works, Canal lining & Canal Structures
- - - - 15 4.99 - - 176 TOTAL APAYAO 67,000
BENGUET
5,000 13 - - 0.90 2 - - - - Bokod 1 Bobok Bisal SIP : Installation of pipeline & const'n. of canal
structure
5,000 13 - - 0.50 3 1 - - - Kapangan 2 Conig,Pinipin,Salat,Getena Creek-Kapangan SIP : Installation of pipeline, const'n. of concrete canal & canal structure
10,000 25 - - 2.60 9 4 - - - Buguias 3 Lapalap River - Dagdag SIP Ph. 1 : Installation of pipeline, const'n. of concrete canal & canal structure
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 12 - - - 5 2 - - - Sablan 4 Sabdang Creek Sablan Poblacion SIP : Installation of pipeline & const'n. of canal structure
10,000 18 - - - 6 7 - - - Sablan 5 Shelpi Creek Sablan Peday-Patad SIP : Installation of pipeline & const'n. of canal structure
5,000 20 - - - 4 2 - - - Mankayan 6 Tam-awan Balili SIP : Installation of pipeline & const'n. of canal structure
5,000 10 - - - 3 2 - - - Tublay 7 Tublay Central SIP : Installation of pipeline & const'n. of canal structure
30,000 50 - - - 22 6 - - - Buguias 8 Nakidol Creek-Poblacion SIP Phase I :
- - - 24 54 4.00 - - 161 TOTAL BENGUET 74,000
IFUGAO
1,500 10 - - 1.20 - - - - - Kiangan 1 Cullalo Creek-Hucab Pattulao SIP
: Construction of canal lining
38,500 30 - 2.50 1.96 4 - - - - Aguinaldo 2 Damag River-Munggayang Manaot CIP Ph. 2 : Construction of canal/ canal lining and canal
structure
10,000 20 - - 1.80 3 1 - - - Tinoc 3 Pulag River-Ahin Pula-Nambaging CIP : Construction of canal lining, canal structure and procurement
/ installation of HDPE
- - - 1 7 4.96 2.50 - 60 TOTAL IFUGAO 50,000
KALINGA
4,000 12 - - 1.20 2 - - - - Rizal 1 Dagotadit Creek-Bulbul SIP :
Construction of Canal Lining
5,000 10 - - 0.30 1 - - - - Tabuk City 2 Lacnog CIP : Construction of Intake & Canal Lining
45,000 77 - - - 3 - - - - Pinukpuk 3 Wata CIP (Wagud Ammacian Taggay) Ph 2 : Construction of Canal Lining & Elevated Flumes
- - - - 6 1.50 - - 99 TOTAL KALINGA 54,000
MT. PROVINCE
9,000 30 - - 0.50 18 2 - - - Tadian 1 Awig River-Tadian Mabalite SIP : Construction of Intake structures and reservoir tanks. Installation
of Pipeline.
5,000 10 - - 1.50 8 - - - - Tadian 2 Bistalang Kayan SIP : Construction of Intake structures, concrete lined canal
and structures.
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT CAR
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
18,000 42 - - 2.00 6 9 - - - Sadanga 3 Mapanayag Creek-Sadanga Liang Dauran SIP : Installation of G.I. pipeline and construction of reservoir tanks.
12,000 30 - - - 8 3 - - - Bauko 4 Pangga Creek-Bauko Bansa CIP PH. 2 : Construction of concrete lined canal and canal structures.Installn of pipeline.
- - - 14 40 4.00 - - 112 TOTAL MT. PROVINCE 44,000
2.50 - - - 45 149 25.45 - 700 330,000 TOTAL CAR - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BATANES
2,000 2 - - - - - - - - Basco 1 Chawadi RC : Const'n. of RC Tank
& Distribution Pipe
2,000 2 - - - - - - - - Uyugan 2 Kayvaluganan RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Mahatao 3 Malngalngat RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Itbayat 4 Mauyen RC : Const'n. of RC Tank
& Distribution Pipe
2,000 2 - - - - - - - - Mahatao 5 Panatayan RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Ivana 6 Payaman RC : Const'n. of RC Tank
& Distribution Pipe
2,000 2 - - - - - - - - Itbayat 7 Raele RC : Const'n. of RC Tank &
Distribution Pipe
2,000 2 - - - - - - - - Basco 8 San Joaquin RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Uyugan 9 Saveet Itbud RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Itbayat 10 Sitio Valay RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Itbayat 11 Sitio Valung RC : Const'n. of RC
Tank & Distribution Pipe
2,000 2 - - - - - - - - Basco 12 Tuva Valay RC : Const'n. of RC
Tank & Distribution Pipe
- - - - - - - - 24 TOTAL BATANES 24,000
CAGAYAN
28,500 50 - - - - - - - - Pamplona 1 Bidduang SWIP : Earthfill Dam/Canal Lining/Structures
18,000 20 - - - - - - - - Claveria 2 Itaw-Magdalena SWIP : Earthfill Dam
- - - - - - - - 70 TOTAL CAGAYAN 46,500
ISABELA
8,000 - - - - - - - - - Roxas 1 Doña Concha CPIP : Construction of check structures with gates and operation & maintenance of pump irrigation system
12,000 - - - - - - - - - San Agustin 2 Masaya Sur Communal Irrigation Project : Canalization works,
construction of sluiceway gates
- - - - - - - - - TOTAL ISABELA 20,000
NUEVA VIZCAYA
5,000 15 - - - - - - - - Santa Fe 1 Acasia SIP Ph. 2 : Tanks and pipelines
50,000 236 - - - - - - - - Bayombong 2 Bansing Paitan SIP : Intake Canal
& Canal Str.
30,000 77 - - - - - - - - Kasibu 3 Lower Campote SIP : Div. works, Canal Lining & Appurtenant Str.
17,500 60 - - - - - - - - Bagabag 4 Pogonsino SIP : Intake Canal &
Canal Str.
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 2 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 7 - - - - - - - - Bayombong 5 Puswak Domang SIP Ph 2 : Tanks
and pipelines
135,500 100 - - - - - - - - Bayombong 6 Salvacion SIP Ph1 : Intake Canal & Canal Str.
15,000 52 - - - - - - - - Santa Fe 7 Unib SIP : Tanks and pipelines
20,000 80 - - - - - - - - Kasibu 8 Upper Mecca SIP : Diversion works, canal, canal structures, pipelines, water tanks, distribution pipes
- - - - - - - - 627 TOTAL NUEVA VIZCAYA 277,000
QUIRINO
12,500 50 - - - - - - - - Maddela 1 Southe Balluigi SIP : Diversion Works, Canalization Works, Canal Lining, and Canal Structures
- - - - - - - - 50 TOTAL QUIRINO 12,500
- - - - - - - - 771 380,000 TOTAL REGION 2 (PROPER) - Small Irrigation
Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AURORA
30,000 100 - - 1.50 1 - - - - Ma. Aurora 1 Bagtu-Obligacion CIP : Const. of
Div. Works & Conc. Canal Lining
- - - - 1 1.50 - - 100 TOTAL AURORA 30,000
BULACAN
5,000 50 - - - - - - - - Hagonoy 1 Hagonoy CIP : Construction of irrigation facilities
18,000 80 - - - - - - - - Angat 2 Laog PIP : Diesel Engine, Pump
- - - - - - - - 130 TOTAL BULACAN 23,000
NUEVA ECIJA
12,000 80 - 1.00 - 1 - - - - Bongabon 1 Ariendo CIP : Const. of Div.
Works & Earth Canal
- - - - 1 - 1.00 - 80 TOTAL NUEVA ECIJA 12,000
PAMPANGA
9,320 97 - - 0.50 - - - - - Magalang 1 Escaler CIP : Diversion Works,
Canalization
20,000 200 - - - 1 - - - - Mexico 2 Suklaban CIP : Diversion Works
17,000 32 - - 0.30 - - - - - Minalin 3 Bulak PIP : Deepwell w/ elevated
stilling pool
22,000 60 - - 0.30 - - - - - Apalit 4 Capalangan CIP : Construction of Diversion Works, Canalization
and Canal Structures
- - - - 1 1.10 - - 389 TOTAL PAMPANGA 68,320
TARLAC
11,000 50 - - 0.50 1 - - - - Anao 1 Capataan SWIP : Construction of Diversion Works and Canal Sytem
5,000 30 - - 0.40 - - - - - Mayantoc 2 Pitongbayog CIP : Construction of
irrigation facilities
10,000 50 - - - - - - - - Gerona 3 Rizal CIP : Construction of dam
and canal system
5,000 30 - - 0.80 2 - - - - Concepcion 4 Balukuk CIP : Construction of
Checkgate & canal system
12,680 75 - - 0.80 - - - - - La Paz 5 Guevarra CIP : Construction of
Canal System
10,000 50 - - 0.60 - - - - - Lapaz 6 Lomboy Danak Lauangcupang :
Construction of Canal System
10,000 50 - - 0.60 - - - - - Lapaz 7 Rio Chico Vicentina Creek : Impvt / Rehab. of Slope Protection and
Canal System
10,000 50 - - 1.80 2 - - - - Concepcion 8 San Nicolas Balas : Construction
of Checkgate & canal system
- - - - 5 5.50 - - 385 TOTAL TARLAC 73,680
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (PROPER)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
1.00 - - - - 8 8.10 - 1,084 207,000 TOTAL REGION 3 (PROPER) - Small Irrigation
Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 3 (UPRIIS)
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
NUEVA ECIJA
2,000 - - - - - - - - - Pantabangan 1 Sampaloc IP : Construction of
irrigation facilities
- - - - - - - - - TOTAL NUEVA ECIJA 2,000
- - - - - - - - - 2,000 TOTAL REGION 3 (UPRIIS) - Small Irrigation Projects
(SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4A
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ANTIPOLO CITY
15,000 35 - - - - - - - - Antipolo City 1 Payagwan SIP : Construction of
Diversion Dam & Canal Lining
- - - - - - - - 35 TOTAL ANTIPOLO CITY 15,000
CAVITE
20,000 50 - - - - - - - - Gen. Emilio Aguinaldo
1 Narvaez SIP Extension : Construction of Canal Lining
20,000 - - - - - - - - - Gen. Emilio Aguinaldo
2 Gen. Aguinaldo SIP Ext'n. : Construction of Concete Lining
- - - - - - - - 50 TOTAL CAVITE 40,000
QUEZON
4,500 12 - - - - - - - - Polillo 1 Binibitinan SIP : Construction of Diversion Works and Canal
Structures
7,200 20 - - - - - - - - Polillo 2 Sabang SIP : Construction of Diversion Works and Canal Structures
14,500 40 - - - - - - - - Pitogo 3 Amontay SIP : Construction of Diversion Works & Canal
Structures
45,000 120 - - - - - - - - Mulanay 4 Matataja SIP : Construction of Diversion Works & Canal Structures
20,000 60 - - - - - - - - Atimonan 5 Malusak-Talaba SIP : Construction of Diversion Works
& Canal Structures
10,000 25 - - - - - - - - Candelaria 6 Masalukot II SIP : Construction of Diversion Works & Canal Structures
20,000 30 - - - - - - - - Atimonan 7 Sapaan SIP : Construction of Diversion Works & Canal
Structures
- - - - - - - - 307 TOTAL QUEZON 121,200
- - - - - - - - 392 176,200 TOTAL REGION 4A - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MARINDUQUE
7,000 30 - - - - - - - - Mogpog 1 Bintakay SIP : Construction of
Protection Dike and canal lining
- - - - - - - - 30 TOTAL MARINDUQUE 7,000
OCCIDENTAL MINDORO
45,000 250 - - - - - - - - Abra de Ilog 1 Baluguhan SIP : Const'n. of Diversion Works, Canal Struc. & Canalization & other Appurtenant Struc.
- - - - - - - - 250 TOTAL OCCIDENTAL MINDORO 45,000
ORIENTAL MINDORO
30,150 150 - - - - - - - - Victoria 1 Pakyas Duongan Leido SIP : Diversion Works, Canalization &
Canal Structures
9,000 45 - - - - - - - - Mansalay 2 Don Pedro SIP : Diversion Works, Canalization & Canal Structures
- - - - - - - - 195 TOTAL ORIENTAL MINDORO 39,150
PALAWAN
13,000 50 - - - - - - - - Coron 1 Bintuan SIP : Construction of Diversion Works, Canal Lining and Canal Structures
25,000 60 - - - - - - - - Roxas 2 Magara SIP : Construction of Diversion Works, Canal Lining and Canal Structures
21,000 50 - - - - - - - - Coron 3 Malaod SIP : Construction of Diversion Works, Canal Lining
and Canal Structures
38,000 150 - - - - - - - - Taytay 4 Maubog SIP : Construction of Diversion Works, Canal Lining and Canal Structures
24,000 50 - - - - - - - - Coron 5 Minanga SIP : Construction of Diversion Works, Canal Lining
and Canal Structures
25,000 60 - - - - - - - - Roxas 6 Talakaegan SIP : Construction of Diversion Works, Canal Lining and Canal Structures
35,000 150 - - - - - - - - Bataraza 7 Inogbong SIP : Construction of Diversion Works, Canal Lining and Canal Structures
- - - - - - - - 570 TOTAL PALAWAN 181,000
ROMBLON
10,000 15 - - - - - - - - Odiongan 1 Tuguis SIP : Construction of
Diversion Dam & Canal Structure
- - - - - - - - 15 TOTAL ROMBLON 10,000
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 4B
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - 1,060 282,150 TOTAL REGION 4B - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
ALBAY
6,500 26 - - - - - - - - Tabaco City 1 Guinobat CIP : Construction of Checkgate, Canal Structure & Canalization Works
20,000 100 - - - - - - - - Malinao 2 Sagpan Kan Banwa CIP : Construction of Diversion Dam &
Connecting Canal
20,000 100 - - - - - - - - Tiwi 3 Tanabega CIP : Construction Teruvian Dam, Canal Structures,
& Canalization Works
7,000 - - - - - - - - - Camalig 4 Ilawod Camalig CIP : Construction of Headgate, Turn outs and CHB Lining Canalization
Works (Phase 2)
5,000 - - - - - - - - - Daraga 5 Malobago CIP : Construction of
canals and irrigation facilities
5,000 - - - - - - - - - Camalig 6 Quinartilan CIP (POW #1) : Continuation of CHB Lining Works (Phase 2)
5,000 - - - - - - - - - Daraga 7 Tagas-Alcala-Kilicao CIP :
Canalization Works (Phase 2)
44,500 180 - - - - - - - - Libon 8 Bulusan-Sta. Cruz CIP : Construction of falling shutter diversion works,Canal Structures and Canal Lining
12,500 50 - - - - - - - - Oas 9 Cagmanaba CIP : Construction of Diversion Works, Canal Networks
& Appurtenant Structures
5,000 20 - - - - - - - - Polangui 10 Ilaod CIP : Construction of
Diversion Dam & Canalization
12,500 50 - - - - - - - - Guinobatan 11 Mabalod-Tandarura CIP : Construction of Diversion Dam &
Canalization
7,000 - - - - - - - - - Guinobatan 12 Mapaco Banban CIP : Installation/Fabrication of Steelgate @ Dam#2 &CHB Lining of RMC #s 1&2 and Lateral A (Phase 2)
1,500 - - - - - - - - - Legazpi City 13 Arimbay CIP (Phase 2) :
Canalization Works (Phase 2)
2,000 - - - - - - - - - Camalig 14 Cabraran Pequeno CIP (Phase 2) :
Canalization Works (Phase 2)
1,500 - - - - - - - - - Legazpi City 15 Dita CIP (Phase 2) : Canalization
Works (Phase 2)
3,500 - - - - - - - - - Daraga 16 Inang Maharang CIP (Phase 2) :
Canalization Works (Phase 2)
6,000 - - - - - - - - - Manito 17 Itba CIP : Construction of
Diversion Dam & Canalization
3,000 - - - - - - - - - Daraga 18 Kimahat CIP (Phase 2) :
Canalization Works (Phase 2)
3,500 - - - - - - - - - Rapurapu is. 19 Mancao CIP (Phase 2) :
Canalization Works (Phase 2)
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
4,000 - - - - - - - - - Camalig 20 Quinartilan CIP (POW #2) :
Canalization Works (Phase 2)
10,000 - - - - - - - - - Daraga 21 Alobo-Gapo-Inarado CIP : Continuation of CHB Lining Works (Phase 2)
- - - - - - - - 526 TOTAL ALBAY 185,000
CAMARINES NORTE
10,000 - - - - - - - - - Santa Elena 1 Maulawin PIP : Construction of Diversion Works and Canalization (Phase 1)
16,750 - - - - - - - - - Basud 2 Dampingan CIP : Construction of Diversion Works, Canal Structures and Canalization (Phase 1)
10,000 - - - - - - - - - Mercedes 3 Colasi CIP : Constinuation of construction of canals and
irrigation facilities
6,250 20 - - - - - - - - Mercedes 4 Masalong-salong CIP : Construction of Diversion Works
& Canal Structures (Phase 1)
7,000 - - - - - - - - - Mercedes 5 Tarum CIP : Construction of Diversion Works & Canal Structures (Phase 1)
- - - - - - - - 20 TOTAL CAMARINES NORTE 50,000
CAMARINES SUR
2,000 40 - - - - - - - - Del Gallego 1 San Juan CIP : Canalization Works
(Phase 2)
30,000 80 - - - - - - - - Libmanan,
Pasacao 2 Tinalmud CIP : Const. of dam &
other irrig. Fac.
19,500 60 - - - - - - - - Pili 3 Caroyroyan Macandog CIP : Const. of checkgate & other irrig.
Fac.
10,500 60 - - - - - - - - Pili 4 Caroyroyan Sagurong CIP : Const. of dam & other irrig. Fac.
20,000 80 - - - - - - - - Ocampo 5 Dominanao CIP : Const. of
Pumpsite, & other irrig. Fac.
7,500 30 - - - - - - - - Pili 6 Hacienda Salamat CIP : Const. of
canal structures & canals
7,000 - - - - - - - - - Pili 7 Pili Cluster-Sagrada CIP (Phase 1) : Construction of irrigation
facilities
4,100 20 - - - - - - - - Bombon 8 San Francisco PIP (Phase 2) : Const. of Canal Structure, & other irrig. Fac. (Phase 2)
12,500 15 - - - - - - - - Tigaon 9 Tinawagan CIP : Const. of Intake
Struct. & irrig. Fac.
40,000 - - - - - - - - - Bato 10 Agos CIP (Phase 1) : Construction of Diversion Works, Canal
Structures and Canals
12,500 30 - - - - - - - - Ragay 11 Cabadisan CIP : Const. of dam &
other irrig. Fac. (Phase 1)
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 5
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - 415 TOTAL CAMARINES SUR 165,600
MASBATE
5,000 20 - - - - - - - - Monreal 1 Ighud-Rizal CIP : Construction of Diverion Works and Canalization
Works (Phase 1)
5,000 12 - - - - - - - - San Jacinto 2 Roosevelt CIP : Construction of Diversion Works, Canal Structures & Canalization Works
(Phase 1)
21,000 - - - - - - - - - Mandaon 3 Bat Ongan CIP : Construction of Diversion Works, Canal Structures & Canalization Works
(Phase 1)
10,000 20 - - - - - - - - Baleno 4 Canjonday CIP : Construction of Diversion Works, Canal Structures & Canalization Works
(Phase 1)
15,000 54 - - - - - - - - Aroroy 5 Mataba CIP : Construction of Diversion Works, Canal
Structures & Canalization Works
14,000 20 - - - - - - - - Uson 6 Morocborocan CIP : Construction of Diversion Works, Canal Structures & Canalization Works
(Phase 1)
- - - - - - - - 126 TOTAL MASBATE 70,000
- - - - - - - - 1,087 470,600 TOTAL REGION 5 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
CAPIZ
4,000 15 - - - - - - - - Panitan 1 Pasugue PCIP : const. of pumping
plant & bench flume
20,000 80 - - - - - - - - Tapaz 2 Carida PCIP : const. of pumping
plant & bench flume
4,000 18 - - - - - - - - Jamindan 3 Masgarau PCIP : const. of
pumping plant & bench flume
6,250 21 - - - - - - - - Jamindan 4 Molit PCIP : const. of pumping
plant & bench flume
4,000 8 - - - - - - - - Dumalag 5 Dolores CIP : Construction of diversion work and Bench Flume @ Brgy. Dolores
8,000 10 - - - - - - - - Dumalag 6 San Miguel CIP : Construction of Check structure and Bench
Flume @ Brgy. San Miguel
13,000 45 - - - - - - - - Dumalag 7 Sta. Monica CIP : Const. of dam and canal structure @ Brgy Sta. Monica
- - - - - - - - 197 TOTAL CAPIZ 59,250
GUIMARAS
3,000 15 - - - - - - - - Sibunag 1 Concodia CIP : Construction of
Diversion and Canal Structure
2,400 12 - - - - - - - - San Lorenzo 2 Paglamatan CIP : Construction of
Diversion and Canal Structure
4,680 18 - - - - - - - - San Lorenzo 3 Pandungan CIP : Construction of Diversion and Canal Structure
- - - - - - - - 45 TOTAL GUIMARAS 10,080
ILOILO
3,000 20 - - - - - - - - Miagao 1 Dawog CIP : Construction of
Diversion and Bench Flume
3,000 20 - - - - - - - - Santa
Barbara 2 Balibagan Este CIP : Construction
of Check Structure
2,000 15 - - - - - - - - Leon 3 Cabunga-an-Caboloan CIP :
Construction of Check Structure
3,000 20 - - - - - - - - Leon 4 Isian Norte CIP : Construction of
Check Structure
4,000 20 - - - - - - - - Maasin 5 Nasuli SWIP : Construction of Small Water Impounding Project
2,000 14 - - - - - - - - Sara 6 Aswe CIP : Construction of Check
Structure and Bench Flume
10,000 100 - - - - - - - - Balasan 7 Batuan CIP : Construction of
Bench Flume
5,000 20 - - - - - - - - Ajuy 8 Bay-ang SWIP : Construction of Small Water Impounding Project
5,000 20 - - - - - - - - San Rafael 9 Cabas-an CIP : Check canal
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 6
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
3,000 12 - - - - - - - - Miag-ao 10 Mat-y CIP : Const. of intake and
bench flume of Mat-y IP
10,000 25 - - - - - - - - Bingawan 11 Malitbog CIP : Construction of Check Structure and Bench Flume
10,000 30 - - - - - - - - Lambunao 12 Panuran-Pughanan CIP : Construction of Check Structure
and Bench Flume
- - - - - - - - 316 TOTAL ILOILO 60,000
NEGROS OCCIDENTAL
45,000 135 - - - - - - - - Calatrava 1 Ekogan Gamay SIP : Diversion Works, Canalization & Canal
Structures
10,277 30 - - - - - - - - Toboso 2 Magtuod SIP : Diversion Works,
Canalization & Canal Structures
13,500 90 - - - - - - - - Moises
Padilla 3 Quinten Remo SIP : Diversion
Works, Canalization & Canal Structures
10,000 50 - - - - - - - - Hinobaan 4 Sangke SIP : Canalization & Canal
Structures
- - - - - - - - 305 TOTAL NEGROS OCCIDENTAL 78,777
- - - - - - - - 863 208,107 TOTAL REGION 6 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BOHOL
3,750 15 - - - - - - - - Calape 1 Cabayugan SIP : Constr. of Diversion Works,Canal Struc.& Canal Lining
1,000 5 - - - - - - - - Dagohoy 2 Cagawasan SWIP : Construction
of Lined Canal
6,250 25 - - - - - - - - Inabanga 3 Cambitoon SIP : Constr. of Diversion Works,Canal Struc.&
Canal Lining
3,000 10 - - - - - - - - San Isidro 4 Cansague Sur (Masunoy) SIP :
Construction of Lined Canal
100,000 60 - - - - - - - - Buenavista 5 Catigbian CIS (SWIP) : Dam
Construcion and Canal Lining
26,875 41 - - - - - - - - Danao 6 Hibale-Nahud SIP : Construction of Lined Canal and Structures
5,684 10 - - - - - - - - Ubay 7 San Pascual SIP : Construction of
Pipeline and land Leveling
10,000 10 20 - - - - - - - Ubay 8 Ubay Stockfarm : Construction of
Lined Canal and Structures
10,000 30 - - - - - - - - Loboc 9 Basak Daku CIP : Const. of Intake, Concrete Canal Lining & River
Protection Dike
10,000 40 - - - - - - - - Carmen 10 Buenas Aires SIP : Constr. of Diversion Works,Canal Struc.& Canal Lining
8,000 10 15 - - - - - - - Bilar 11 Buhangon CIP : Pipeline
Construction
7,500 30 - - - - - - - - Sierra
Bullones 12 Cagyo SIP : Construction of Lined
Canal and Structures
3,750 15 - - - - - - - - Valencia 13 Cajam SIP : Const. of Intake
Structure & Canal
7,500 30 - - - - - - - - Valencia 14 Cansumpa SIP : Construction of
Lined Canal
2,500 10 - - - - - - - - Batuan 15 Cantijong SIP : Const. of Intake
Structure & Canal
1,500 5 - - - - - - - - Guindulman 16 Casbu SIP : Construction of Lined
Canal and Structures
3,750 15 - - - - - - - - Alicia 17 Dagohoy Ilaud SIP : Constr. of Diversion Works,Canal Struc.&
Canal Lining
2,500 10 - - - - - - - - Dimiao 18 Guindaguitan SIP : Constr. of Diversion Works,Canal Struc.& Canal Lining
2,500 10 - - - - - - - - Lila 19 Ka-akot SIP : Construction of
Lined Canal
10,000 20 - - - - - - - - Bilar 20 Kabigo SIP : Construction of
Irrigation Projects
2,500 33 - - - - - - - - Carmen 21 La Libertad : Const. of Diversion
Works,Canal Struc.& Canal Lining
7,500 30 - - - - - - - - Duero 22 Lobogon-Panakildan SIP : Constr. of Diversion Works,Canal Struc.&
Canal Lining
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 7
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
2,500 10 - - - - - - - - Batuan 23 Malapok SIP : Const. of Intake
Structure & Canal
12,500 50 - - - - - - - - Pilar 24 Upper Inaghuban SIP : Construction of Lined Canal and Structures
6,250 25 - - - - - - - - Garcia
Hernandez 25 Victoria-Antipolo SIP :
Construction of Concrete Lined
Canal and Structures
- - - - - - - 35 549 TOTAL BOHOL 257,309
CEBU
4,500 15 - - - - - - - - Liloan 1 Mulao II SIP : Construction of
Irrigation Pipelines & Structures
20,500 74 - - - - - - - - Alegria 2 Kawasan SIP : Construction of
Irrigation Pipelines & Structures
8,000 26 - - - - - - - - Tuburan 3 Colonia SIP : Construction of
Irrigation Pipelines & Structures
- - - - - - - - 115 TOTAL CEBU 33,000
NEGROS ORIENTAL
27,000 60 - - - - - - - - Canlaon City 1 Upper Binalbagan SIP :
Canalization, Canal Structures
12,000 31 - - - - - - - - Pamplona 2 Pamplona SIP : Canalization,
Canal Structures
10,000 40 - - - - - - - - Sibulan 3 San Antonio SIP : Canalization,
Canal Structures
9,881 40 - - - - - - - - Bayawan City 4 Kalumboyan SIP : Canalization &
Canal Structures
15,000 60 - - - - - - - - Siaton 5 Lower Mantuyop SIP :
Canalization, Canal Structures
5,619 23 - - - - - - - - Tanjay City 6 Sto. Niño SIP : Diversion Works,
Canalization & Canal Structures
- - - - - - - - 254 TOTAL NEGROS ORIENTAL 79,500
SIQUIJOR
4,000 15 - - - - - - - - Siquijor 1 Napo SIP : Construction of Canal
Structures
- - - - - - - - 15 TOTAL SIQUIJOR 4,000
- - - - - - - 35 933 373,809 TOTAL REGION 7 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BILIRAN
5,000 20 - - 0.81 11 - - - - Almeria 1 Capatagan CIP : Construction of
Canal and Farm Level System
3,000 10 - - 0.09 9 - - - - Naval 2 Imelda CIP : Construction of
Canal and Farm Level System
13,000 45 - - 0.42 30 - - - - Naval 3 Libtong CIP : Construction of Canal, Farm Level, Drainage and Road System
- - - - 50 1.32 - - 75 TOTAL BILIRAN 21,000
LEYTE (NORTHERN)
25,000 100 - - 6.98 25 - - - - San Miguel 1 Anapaw CIP : Construction of Diversion Works, Canal, Farm
Level, Drainage and Road System
15,612 52 - - 5.54 20 - - - - San Miguel 2 Busay CIP : Construction of Canal, Farm Level and Road System
10,000 80 - - 3.07 16 - - - - Jaro 3 Batug CIP : Construction of Diversion Works, Canal, Farm Level and Road System
7,638 8 - - 1.26 8 - - - - La Paz 4 Caltayan CIP : Completion of Diversion Works and Construction of Canal and Farm
Level System
15,000 30 - - 2.78 5 - - - - Dulag 5 Labiranan CIP : const. of canal
lining & struc
25,000 - - - - 1 - - - - San Isidro 6 Bunacan CIP : Construction of
Diversion Works
6,000 30 - - 1.40 5 - - - - Leyte 7 Sambulawan CIP : Construction of Diversion Works, Canal and
Farm Level System
7,500 30 - - 0.65 3 - - - - Albuera 8 San Pedro CIP : Construction of Diversion Works, Canal and Farm Level System
10,000 50 - - - - - - - - Abuyog 9 Mahagna CIP : Construction of Diversion Works, Canal and Farm Level System
14,000 66 - - 2.00 8 - - - - Baybay 10 San Juan CIP : Construction of Canal and Farm Level System
- - - - 91 23.68 - - 446 TOTAL LEYTE (NORTHERN) 135,750
LEYTE (SOUTHERN)
8,250 36 - - 1.30 8 - - - - Sogod 1 Kauswagan CIP : Construction of Diversion Works, Canal Farm
Level, Drainage and Road System
25,000 100 - - 1.64 28 - - - - Silago 2 Puntana CIP : Construction of Diversion Works, Canal Farm
Level, Drainage and Road System
12,500 50 - - 0.83 19 - - - - Saint Bernard 3 Sugangon CIP : Construction of Canal, Farm Level, Drainage and
Road System
- - - - 55 3.77 - - 186 TOTAL LEYTE (SOUTHERN) 45,750
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
SAMAR (EASTERN)
10,000 - - - 2.11 - - - - - Borongan 1 Borongan CIP : fab/inst. Of steel
gates, & canal linings
20,000 29 - - 9.08 19 - - - - Can-Avid 2 Jepaco CIP : const of canal lining & canal struc and turn outs
55,000 60 - - 12.39 48 - - - - Jipapad 3 Jipapad CIP : const of div works, canal lining, drainage & canal struc and turn outs , access roads =.950 kms & timber bridge 2 units
50,000 80 - - 3.80 21 - - - - Oras 4 Saurong CIP : const. of div. works & canal struc., canal linings & drainage struc. & turn outs &
access roads=2.394kms
41,000 100 - - 2.00 11 - - - - Sulat 5 Sto. Tomas CIP : const. of div. works & canal struc., canal linings & & turn outs
15,000 - - - 2.10 8 - - - - Sulat 6 Sulat CIP : fab/inst. Of steel
gates, & canal linings
30,000 30 - - - - - - - - Oras 7 Buntay CIP : const. of div. works & canal struc., canal linings &
drainage struc. & turn outs
- - - - 107 31.48 - - 299 TOTAL SAMAR (EASTERN) 221,000
SAMAR (NORTHERN)
32,000 70 - - 2.46 18 - - - - Mondragon 1 Cajecsan CIP : const. of div works
& canal lining & struct
35,000 106 - - 3.56 19 - - - - Catarman 2 Cal-igang CIP : const. of canal
lining & struc
3,000 8 - - - - - - - - San Jose 3 Dungon CIP : const. of canal
lining & struc
30,000 40 - - 2.36 14 - - - - Lavezares 4 Sinimangan CIP : const. of div
works & canal lining & struct
20,000 40 - - 3.70 78 - - - - Catarman 5 Washington CIP : const. of div
works & canal lining & struct
10,000 - - - 1.06 2 - - - - Gamay 6 Gamay CIP : const. of canal lining
& struc
12,000 80 - - 2.37 15 - - - - San Roque 7 Himabug-at CIP : const. of canal
lining & struc
- - - - 146 15.51 - - 344 TOTAL SAMAR (NORTHERN) 142,000
SAMAR (WESTERN)
12,000 50 - - 2.82 12 - - - - Calbayog City 1 Panoypoy CIP : const. of div
works & canal lining
5,000 20 - - 1.99 37 - - - - Paranas 2 Casandig CIP : const. of canal
lining & struc
10,000 30 - - 1.47 7 - - - - San Jose de
Buan 3 Manangday CIP : const. of div
works & canal lining
7,500 - - - - 1 - - - - Villareal 4 Plaridel CIP : const. of div works
- - - - 57 6.28 - - 100 TOTAL SAMAR (WESTERN) 34,500
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 8
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - 506 82.04 - 1,450 600,000 TOTAL REGION 8 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BASILAN
10,000 10 - - - - - - - - Lantawan 1 Tairan SIP : Const'n of PumpHouse, Reservoir & Pipelines
- - - - - - - - 10 TOTAL BASILAN 10,000
SULU
9,000 18 - - - - - - - - Patikul 1 Patikul SIP (Timpook) : Const'n of
new Irrig. System
5,000 - - - - - - - - - Panamao 2 Bon-Bon SIP : Const'n of new
Irrig. System
5,000 - - - - - - - - - Panglima
Estino 3 Jinggan SIP : Const'n of new Irrig.
System
- - - - - - - - 18 TOTAL SULU 19,000
ZAMBOANGA CITY
5,000 30 - - 2.00 10 - - - - Baluno, Zamboanga City
1 Baluno SIP : Const'n of new Irrig.
System
3,000 20 - - 3.00 8 - - - - Labuan, Zamboanga
City
2 Labuan SIP : Const'n of new Irrig.
System
27,000 40 - - - 1 - - - - Licomo, Zamboanga City
3 Lower Tigbao Licomo SIP :
Const'n of new Irrig. System
- - - - 19 5.00 - - 90 TOTAL ZAMBOANGA CITY 35,000
ZAMBOANGA DEL NORTE
5,000 10 - - 2.52 7 - - - - Mutia 1 Mutia SIP : Const'n of new Irrig.
System
20,000 80 - - 2.55 13 - - - - Serio Osmeña 2 San Isidro SIP : Const'n of new
Irrig. System
10,000 - - - 0.22 1 - - - - Manukan 3 Disakan SIP : Const'n of new Irrig.
System
20,000 60 - - 3.72 8 - - - - Sindangan 4 Lagag SIP : Const'n of new Irrig.
System
20,000 25 - - - - - - - - Manukan 5 Patunan SIP : Const'n of new
Irrig. System
10,000 20 - - 0.26 32 - - - - Dipolog City 6 San Jose SIP : Const'n of new
Irrig. System
20,000 40 - - 2.70 10 - - - - Siayan 7 Siayan SIP : Const'n of new Irrig.
System
12,000 40 - - - - - - - - Sindangan 8 Titik SIP : Const'n of new Irrig.
System
23,470 - 20 - 1.27 7 - - - - Salug 9 Lanawan SIP : Const'n of new
Irrig. System
8,000 15 - - 0.27 7 - - - - Liloy 10 Liloy SIP : Const'n of new Irrig.
System
15,000 - - - 3.04 5 - - - - Siocon 11 Pisawak SIP/ Kalayuhan : Const'n
of new Irrig. System
15,000 30 - - 2.46 10 - - - - Godod 12 San Pedro SIP : Const'n of new
Irrig. System
- - - - 100 19.01 - 20 320 TOTAL ZAMBOANGA DEL NORTE 178,470
ZAMBOANGA DEL SUR
15,000 260 - - 3.60 39 - - - - Midsalip 1 Canipay SIP : Const'n of new Irrig.
System
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
5,000 50 - - 1.80 28 - - - - Pagadian City 2 Ditoray - Upper Sibatang SIP :
Const'n of new Irrig. System
8,000 90 - - 2.60 28 - - - - Mahayag 3 Guripan SIP : Const'n of new Irrig. System
10,000 30 - - 3.80 43 - - - - Mahayag 4 Kasandal SIP : Const'n of new Irrig. System
8,000 45 - - 2.16 39 - - - - Pagadian City 5 Lourdes SIP : Const'n of new Irrig. System
4,000 20 - - 1.20 2 - - - - Pagadian City 6 Lower Sibatang SIP : Const'n of new Irrig. System
3,000 20 - - 1.90 15 - - - - Ramon
Magsaysay 7 Switch SIP : Const'n of new Irrig.
System
8,000 60 - - 2.20 27 - - - - Lakewood 8 Bagong Kahayag SIP : Const'n of new Irrig. System
13,000 50 - - 4.55 48 - - - - Lakewood 9 Baking SIP :
10,000 50 - - 2.15 25 - - - - San Pablo 10 Culasian SIP : Const'n of new Irrig. System
28,000 80 - - 3.60 68 - - - - Dinas 11 Dongos SIP : Const'n of new Irrig. System
5,000 40 - - 1.90 32 - - - - Dinas 12 Dongos SIP : Const'n of new Irrig. System
7,500 30 - - 2.20 26 - - - - Guipos 13 Katipunan SIP : Const'n of new
Irrig. System
7,500 30 - - 1.52 43 - - - - Tigbao 14 Upper Nilo SIP : Const'n of new Irrig. System
10,000 - - - - - - - - - Tigbao 15 Maragang SIP : Construction of Dam and Canalization
10,000 - - - - - - - - - Tigbao 16 POBLACION TIGBAO SIP : Construction of Dam and Canalization
- - - - 463 35.18 - - 855 TOTAL ZAMBOANGA DEL SUR 152,000
ZAMBOANGA SIBUGAY
4,000 8 - - - 1 - - - - Malangas 1 Catituan SIP : Construction of
Diversion Works
7,000 16 - - - 1 - - - - Imelda 2 Gandiangan SIP : Construction of
Diversion Works
4,000 16 - - 1.20 10 - - - - Malangas 3 Guilawa SIP : Construction of Canalization and Canal Structures
10,000 17 - - 1.00 15 - - - - Alicia 4 Ilisan SIP : Construction of Diversion Works, Canalization
and Canal Structures
4,000 20 - - 1.10 12 - - - - Imelda 5 La Victoria SIP : Construction of
Slope Protection
4,000 7 - - - 1 - - - - Malangas 6 Lipacan SIP : Construction of
Diversion Works
1,000 - - - 0.30 3 - - - - Alicia 7 Payongan SIP : Construction of Canalization and Canal Structures
5,000 25 - - 2.40 15 - - - - Siay 8 Balagon SIP : Construction of
Canalization and Canal Structures
7,000 10 - - - 1 - - - - Ipil 9 Ipil SIP :
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 9
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 10 - - - 1 - - - - Siay 10 Magsaysay SIP : Construction of
Diversion Works
4,000 12 - - - 1 - - - - Roseller Lim 11 R.T. Lim SIP : Construction of Diversion Works
5,000 11 - - 2.10 15 - - - - Titay 12 Sanito SIP : Construction of Canalization and Canal Structures
- - - - 76 8.10 - - 152 TOTAL ZAMBOANGA SIBUGAY 65,000
- - - - - 658 67.29 20 1,445 459,470 TOTAL REGION 9 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
BUKIDNON
8,500 15 - - 0.94 - - - - - Sumilao 1 Kisolon CIP Ext'n : Construction
of canal and canal structures
40,000 100 - - - - - - - - Impasugong 2 Kalabugao CIP : Construction of
canal and canal structures
45,000 150 - - 6.53 8 - - - - Malaybalay 3 Kulaman CIP Ext'n : Construction of canal and canal structures
4,000 20 - - 0.30 - - - - - Malaybalay 4 Zamboanguita CIP : Construction
of canal and canal structures
26,000 70 - - - - - - - - Valencia City 5 Cariis CIP : Construction of canal
and canal structures
- - - - 8 7.77 - - 355 TOTAL BUKIDNON 123,500
CAMIGUIN
25,000 20 - - - 1 5 - - - Mambajao 1 Itum CIP : Construction of pipeline
- - - 5 1 - - - 20 TOTAL CAMIGUIN 25,000
ILIGAN CITY
5,000 20 - - - - - - - - Iligan City 1 Maglabed CIP : Construction of
canal and canal structures
10,000 40 - - - - - - - - Iligan City 2 Mandulog CIP : Construction of
canal and canal structures
17,855 75 - - - - - - - - Iligan City 3 Mibolo-Tipanoy CIP : Construction of canal and canal
structures
- - - - - - - - 135 TOTAL ILIGAN CITY 32,855
LANAO DEL NORTE
25,000 60 - - - - - - - - Kauswagan 1 Cayontor CIP : Construction of diversion works and appurtenanct structures
20,000 50 - - - 1 - - - - Kauswagan 2 Codal CIP : Construction of diversion works and
appurtenanct structures
7,500 25 - - - 1 - - - - Sultan Naga Dimaporo
3 Bangaan CIP : Construction of diversion works and appurtenanct structures
20,000 50 - - - 1 - - - - Sultan Naga
Dimaporo 4 Segayan CIP : Construction of
diversion works and appurtenanct structures
- - - - 3 - - - 185 TOTAL LANAO DEL NORTE 72,500
LANAO DEL SUR
22,000 100 - - 1.20 1 - - - - Lumbatan 1 Lac CIP : Construction of canal
and canal structures
30,000 100 - - 2.00 1 - - - - Madamba 2 Uyaan CIP : Construction of canal
and canal structures
- - - - 2 3.20 - - 200 TOTAL LANAO DEL SUR 52,000
MISAMIS OCCIDENTAL
10,000 20 - - 1.00 - - - - - Calamba 1 Mabini del Pilar CIP : Construction of canal and canal
structures
- - - - - 1.00 - - 20 TOTAL MISAMIS OCCIDENTAL 10,000
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 10
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MISAMIS ORIENTAL
20,000 60 - - - 1 - - - - Alubijid 1 Altubo-Guinotang CIP : Construction of diversion works and appurtenanct structures
8,000 16 - - - 1 - - - - Opol 2 Dodiongan CIP : Construction of
canal and canal structures
6,000 12 - - - 1 - - - - Manticao 3 Lumbayao CIP : Construction of
canal and canal structures
10,000 20 - - - - - - - - Gingoog City 4 Hindangon CIP : Construction of
canal and canal structures
10,000 15 - - - - - - - - Sugbongcogo
n 5 Kaulayanan CIP : Construction of
canal and canal structures
30,000 20 - - - - - - - - Kinoguitan 6 Kinoguitan CIP : Construction of
canal and canal structures
20,000 100 - - - 1 - - - - Gingoog City 7 Loresa CIP : Construction of diversion works and
appurtenanct structures
30,000 30 - - - - - - - - Lagonglong 8 Umagos CIP : Construction of diversion works and appurtenanct structures
- - - - 4 - - - 273 TOTAL MISAMIS ORIENTAL 134,000
- - - - 5 18 11.97 - 1,188 449,855 TOTAL REGION 10 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
COMPOSTELA VALLEY
12,000 70 - - - - - - - - Maragusan 1 Bahi SIP : Construction of canal
and canal structures
33,000 100 - - - - - - - - Monkayo 2 Buay SIP : Construction of Dam,
canal and canal structures
6,400 25 - - - - - - - - Maragusan 3 Mapawa SIP : Construction of Canal and canal structures;Protection works U/S
& D/S of Dam
19,000 20 - - - - - - - - Laak 4 Kaligutan SIP : Construction of Lateral A Canal , and Rehabilitation of Existing SWIP
16,500 30 - - - - - - - - Laak 5 New Katipunan SIP : Construction of Canal and canal structures;Protection works U/S & D/S of existing Dam
12,500 - - - - - - - - - Nabunturan 6 New Panay SIP : Construction of canal and canal
structures;diversion works
25,000 100 - - - - - - - - Monkayo 7 Malokdok SIP : Construction of 2 units diversion dam at Begaan and Molokdok Creek in Brgys. Inambatan and Olaycon, all in municipality of Monkayo, canalization and appurtenant
structures.
5,000 10 - - - - - - - - Montevista 8 Bankerohan SIP : Construction of
additional irrigation facilities
10,000 33 - - - - - - - - Monkayo 9 Malokdok SIP : Construction of
irrigation facilities
10,000 20 - - - - - - - - Maragusan 10 Tupaz SIP : Construction of
additional irrigation facilities
- - - - - - - - 408 TOTAL COMPOSTELA VALLEY 149,400
DAVAO CITY
20,000 20 - - - - - - - - Davao City 1 Salapawan SIP : Construction of
Irrigation Facilities
22,500 40 - - - - - - - - Davao City 2 Carcatabawi SIP : Construction of diversion dam and irrigation facilities
9,000 25 - - - - - - - - Davao City 3 Saloy SIP : Construction of diversion dam and concreting of 0.827 km main canal, construction of 6 units canal structures and riprap of 0.20 km
drainage canal
9,000 30 - - - - - - - - Davao City 4 Titugop SIP : Construction of Diversion Dam and its appurtenances
- - - - - - - - 115 TOTAL DAVAO CITY 60,500
DAVAO DEL NORTE
2,000 - - - - - - - - - Santo Tomas 1 Tulalian CIP : Continuation of construction of canal at Lateral A-1(0.778km.)
Page 1 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - - TOTAL DAVAO DEL NORTE 2,000
DAVAO DEL SUR
3,750 15 - - - - - - - - Matanao 1 New Visayas SIP : Construction of check structure, concreting of 0.99 km main canal and construction of 5 units canal structure
15,000 - - - - - - - - - Matanao 2 San Jose SIP : Concreting of 4.18 km main canal, construction of 3 units canal structures and riprap of 0.615 km drainage canal
10,000 - - - - - - - - - Matanao 3 Sinawilan SIP : Construction of main and supplementary canal
and canal structures
25,000 100 - - - - - - - - Sulop 4 Tanwalang SIP : construction of dam and irrigation facilities to generate 100 has. new area
25,000 60 - - - - - - - - Kiblawan 5 Waterfall SIP : Construction of diversion dam, concreting of 6.995 km main canal and construction of 21 units canal structure
19,206 50 - - - - - - - - Kiblawan 6 Tanwalang SIP : Construction of
irrigation facilities
- - - - - - - - 225 TOTAL DAVAO DEL SUR 97,956
DAVAO ORIENTAL
8,000 - - - - - - - - - Cateel 1 Buguis-Maiti SIP : Construction of 1.2 kms. Canal Lining and 5 unit Canal Structures
5,000 - - - - - - - - - Caraga 2 Manorigao II SIP : Const. of additional 70 m Protection Dike d/s, Repair of 10 m (d/s), 22 m Prot. Dike along Main Canal, 1.19 kms. Canal Lining and 4 Unit Canal Structures
8,000 10 - - - - - - - - San Isidro 3 Bitaogan CIP : Construction of Diversion Dam Tower, Const. of 319.6 m Canal lining, 268.45 m HDPE and 6 unit Canal Structures
10,000 - - - - - - - - - Governor Generoso
4 Luzon SIP : Construction of 1.5 kilometers canal lining and 5 unit canal structures
10,000 - - - - - - - - - Governor
Generoso 5 Tiblawan SIP : Desilting at
Diversion Dam and Main Canal, 70 m Protection Dike along MC ,Construction of 1 unit Siphon and Repair of Siphon
- - - - - - - - 10 TOTAL DAVAO ORIENTAL 41,000
Page 2 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 11
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
- - - - - - - - 758 350,856 TOTAL REGION 11 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 3 of 3 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 12
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
MAGUINDANAO
15,969 50 - 1.00 0.90 6 - - - - Upi 1 Tinungkaan SIP :
31,938 100 - - 1.20 8 - - - - Talayan 2 Ahan SIP :
9,183 15 - - 1.50 - - - - - Mangudadat
u 3 Daladagan-Kalian SIP :
10,348 15 - - 1.20 3 - - - - Gen. S.K.
Pendatun 4 Upper Lasangan SIP :
25,000 - - - - - - - - - Parang 5 Nituan SIP :
- - - - 17 4.80 1.00 - 180 TOTAL MAGUINDANAO 92,438
NORTH COTABATO
10,500 50 - 0.73 2.68 14 - - - - Aleosan 1 Tomado SIP :
43,365 25 - - 2.77 6 - - - - Matalam 2 Kidama SIP :
12,500 50 - - 3.00 8 - - - - Banisilan 3 Sabang SIP :
- - - - 28 8.45 0.73 - 125 TOTAL NORTH COTABATO 66,365
SARANGANI
12,000 25 - - - 1 1 - - - Malungon 1 Datal Bila SIP :
15,000 10 - - - 1 1 - - - Malapatan 2 Kinam SIP :
17,650 15 - - - 1 1 - - - Malungon 3 Lower Macnit SIP :
20,000 10 - - - 1 1 - - - Malungon 4 Malabod SIP :
20,000 - - - - - - - - - Maasim 5 Amsipit SIP :
- - - 4 4 - - - 60 TOTAL SARANGANI 84,650
SOUTH COTABATO
16,891 60 - - 2.10 16 - - - - Lake Sebu 1 El' Alis SIP :
3,378 15 - - 0.60 5 - - - - Lake Sebu 2 Hanoon SIP :
3,514 29 - - 0.75 4 - - - - Surallah 3 Lamual SIP :
14,650 40 - - 2.08 20 - - - - Lake Sebu 4 Seven Lake SIP :
16,891 60 - - 2.00 17 - - - - Lake Sebu 5 T'Bong SIP :
40,808 200 - - - 3 3 - - - General
Santos City 6 Sinawal SIP :
- - - 3 65 7.53 - - 404 TOTAL SOUTH COTABATO 96,132
SULTAN KUDARAT
26,960 96 - - 0.60 4 - - - - Sen. Ninoy
Aquino 1 Buklod SIP :
15,000 57 - - 1.80 10 - - - - Palimbang 2 Kalupaan SIP :
39,500 162 - - 0.80 5 - - - - Esperanza 3 Numo SIP :
30,500 95 - - 1.20 10 - - - - Bagumbayan 4 SaRIP Pedregosa SIP :
- - - - 29 4.40 - - 410 TOTAL SULTAN KUDARAT 111,960
1.73 - - - 7 143 25.17 - 1,179 451,545 TOTAL REGION 12 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 1 of 1 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
AGUSAN DEL NORTE
10,000 - - - 0.80 3 - - - - Butuan City 1 Bilay SIP : Construction of Irrigation Facilities; Canalization,
Structures and Protection Works
9,000 - - - - 1 - - - - Butuan City 2 Bitan-agan SIP : Construction of Irrigation Facilities; Canalization,
Structures and Protection Works
39,800 70 - 3.00 3.00 13 - - - - Las Nieves 3 Mat-I -Magos SIP : Construction of Irrigation Facilities; Dam, Canalization, Structures and
Terminal Facilities
30,000 - - - 1.00 4 - - - - Las Nieves 4 San Mateo SIP : Construction of Irrigation Facilities; Canalization,
Structures and Terminal Facilities
- - - - 21 4.80 3.00 - 70 TOTAL AGUSAN DEL NORTE 88,800
AGUSAN DEL SUR
100,000 150 - - 3.00 20 - - - - La Paz 1 Bataan CIP : Construction of Irrigation Facilities; Dam, Canalization, Structures and Terminal Facilities
80,000 60 - - 1.00 3 - - - - Prosperidad 2 Sianib SIP : Construction of Irrigation Facilities; Dam, Canalization, Structures and Terminal Facilities
75,000 150 - - - 1 - - - - Veruela 3 Bacay SIP : Construction of Irrigation Facilities; Dam, Canalization, Structures and Terminal Facilities
50,000 80 - - 2.50 25 - - - - Bunawan 4 Kalingayan SIP : Construction of Irrigation Facilities; Dam, Canalization, Structures and Terminal Facilities
- - - - 49 6.50 - - 440 TOTAL AGUSAN DEL SUR 305,000
DINAGAT ISLANDS
7,600 20 - - 0.90 9 - - - - Libjo 1 Cagniog SIP :
3,000 4 - - 0.26 1 - - - - Basilisa 2 Edera CIP :
5,000 5 - - 0.80 10 - - - - Libjo 3 Garcia-Kudkuran SIP :
10,300 15 - - 1.50 10 - - - - Cagdianao 4 Maatas SIP :
13,100 15 - - 2.00 9 - - - - Libjo 5 Magsaysay SIP :
11,400 20 - - 0.90 5 - - - - Loreto 6 Panamaon CIP :
- - - - 44 6.36 - - 79 TOTAL DINAGAT ISLANDS 50,400
SURIGAO DEL NORTE
6,845 10 - - 1.00 4 - - - - Socorro 1 Inayaran SIP :
3,155 6 - - 0.17 2 - - - - Socorro 2 Lobo SIP :
10,000 25 - - 1.30 5 - - - - Sison 3 Patag CIS :
9,000 22 - - 1.18 4 - - - - Gigaquit 4 San Antonio CIP :
- - - - 15 3.65 - - 63 TOTAL SURIGAO DEL NORTE 29,000
SURIGAO DEL SUR
Page 1 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.
Repair & Rehabilitation Works
DETAILS BY PROGRAM/PROJECT REGION 13
Gravel Roads (Km)
Concrete Roads (Km)
Coconet
(Sq.m.)
HDPE Pipe (Km)
Canal Structures
(No.)
Earth Canal (Km)
Restore Area
(Ha)
New Area
(Ha) Allocation
(P'000)
REGION
Municipality
Concrete Lined
Canal (Km)
Small Irrigation Projects (SIP) PROGRAM
Republika ng Pilipinas
National Irrigation Administration (Pambansang Pangasiwaan ng Patubig)
FY 2018 IRRIGATION PROGRAM GAA (R.A. No. 10964)
10,000 - - - 2.50 10 - - - - Lanuza 1 Agsam CIP (for completion) :
10,000 30 - - 1.50 7 - - - - Bayabas 2 Amag SIP :
10,000 40 - - 3.50 10 - - - - Tago 3 Cabangahan SIP (completion) :
30,000 50 - - 4.50 30 - - - - San Miguel 4 Camagtong SIP :
14,000 35 - - 1.00 10 - - - - Cagwait 5 Pakpakon SIP :
16,000 30 - - 4.00 15 - - - - Bayabas 6 Punta SIP :
15,000 30 - - 3.50 20 - - - 2.50 Marihatag 7 Sta. Cruz SIP :
11,800 - - - 2.50 20 - - - - Tandag City 8 Tanabog SIP :
2.50 - - - 122 23.00 - - 215 TOTAL SURIGAO DEL SUR 116,800
3.00 2.50 - - - 251 44.31 - 867 590,000 TOTAL REGION 13 - Small Irrigation Projects (SIP)
Administrator
GEN RICARDO R VISAYA (RET)
Page 2 of 2 DATE GENERATED : January 25, 2018 NIA-AO-COR-PPD-INT-Form01 Rev.00
Digital copy posted in the NIA Website.