regional funding advice rfa 2 transport programme management
DESCRIPTION
Regional Funding Advice RFA 2 TRANSPORT Programme Management. Peter Brown. RFA 2 Principles. This is about delivery of existing strategic objectives and priorities:RES, RSS (including RTS), SW Skills Strategy and not developing new strategies - PowerPoint PPT PresentationTRANSCRIPT
Regional Funding Advice RFA 2
TRANSPORT
Programme ManagementPeter Brown
•This is about delivery of existing strategic objectives
and priorities:RES, RSS (including RTS), SW Skills
Strategy
and not developing new strategies
•Specific funding priorities each year to
2018/19……(and beyond ?)
•Integration across funding streams - thematic and spatial (transcending boundaries) Importance of place
•Option to ‘vire’ between and combine funding
streams to achieve outcomes
RFA 2 Principles
Integrated Investment Approach
Transport £2,882m
Economic Development£2,177m
Skills
Housing & Regeneration£4,460m
Total RFA c£9.5bn
(2008/9 – 2018/19)
RFA 2 Principles
Success for RFA2 will be measured bythe extent to which expenditure in these blocks can be coordinated and focussed to achieve agreed strategic outcomes for the region and for particular places as stated in approved strategies
Transport is scheme specific
How important is transport , given that transport is not an end in itself ?!
Role of the RTS and RFA funding is
• To help make the Spatial Strategy work – SSCTs – assist growth & regeneration
• To support the RES/economy – address connectivity
RFA 2 Transport
As well, need to tackle Key Strategic Transport Issues in SW :
• Effects of increasing Congestion
• Peripherality/ resilience of networks
• Accessibility & Social Exclusion
• Impact of traffic growth on environment and
climate change
RFA 2 Transport
Growth areas Growth areas (RSS/Way Ahead)(RSS/Way Ahead)
Strategically SignificantCities and Towns 21 SSCTs
RFA 2 Transport
The Regional Role : •Regional bodies are asked to organise the advice to ministers aboutpriorities. Regional bodies are not scheme promoters
•Regional Assembly Secretariat organises overall programme management and reports to DfT. Programme ‘refresh’ periodically
•Individual schemes are promoted by local authorities or by HA; realissues about local authority capacity
•All schemes have to pass through DfT appraisal process to gain programme entry. DfT asks regional bodies (RA/RDA) to confirmregional priority
RFA 2 Transport
• Major Schemes included as RFA1 & RFA2– Local transport major schemes (over £5m) including
maintenance schemes
– Highways Agency investment (over £5m) on roads of regional significance (i.e. not M4 & M5)
• New for RFA2– Local integrated transport and maintenance block (post
2010/11) – size & distribution
– Effects of RFA2 on carbon dioxide emissions
– Rail
Ground Rules
RFA2 Transport Funding
0
50
100
150
200
250
2008
-09
2010
-11
2012
-13
2014
-15
2016
-17
2018
-19
£m
Major Block
Funding Issues/ Pressures
• RFA flat rate increase by 2% per annum but current construction inflation @ 10% pa (?)
• RFA now to include major maintenance schemes >£5m
• Can include Rail but no extra money in RFA• HA connectivity schemes largely beyond funding
scope of RFA budget
Conclusion….£90m pa does not go far.
RFA 2 Transport
Schemes Underway Scheme Sponser 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
A419 Commonhead Junction Highways Agency 9.4A30 A382 Merrymeet Junction Highways Agency 8.4A30 Bodmin Indian Queens Highways Agency 44.2 16.1Barnstaple Western Bypass Devon 11.4 0.5 0.8 0.1 0.1 0.7
Approved schemes not yet underway Scheme Sponser 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
A38 Dobwalls Bypass Highways Agency 6.6 21.0 7.6A419 Blunsdon Bypass Highways Agency 7.2 21.5 10.9Poole Bridge Regeneration Initiative Poole 2 8 3Greater Bristol Bus Network West of England Authorities 5 9 12 17 0Taunton Third Way & Northern Distributor Road Somerset 6 7 1 1A354 Weymouth Relief Road* Dorset 1 16 28 9 16 2
Schemes which do not yet have approval Scheme Sponser 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Integratged Transport Gloucester Parkway Gloucestershire 7 18 1East of Exeter (Phase 2) A30 Junction Improvement to Junction 29 Devon 2 6 4East of Plymouth Developments Stage 1 including Deep Lane Junction Plymouth 13 13 13 13Exeter PUA Infrastructure Devon 4 4 5 6Bath Public Transport Package inc Newbridge P&R & Bath Rapid Transit Bath and NE Somerset 13 14 13 2South Bristol Ring Road (A38-A370 Red Route) West of England Authorities 10 3 3 3 3Bristol Rapid Transit - Hengrove North Fringe West of England Authorities 12 2 2 2 2Weston-super-Mare area Package (Phase 1) West of England Authorities 3 3 3 3 3Bristol Rapid Transit - Ashton Vale/Emersons Green) West of England Authorities 7 7 7 7Bristol Rapid Transit - Bath/Cribbs Causeway West of England Authorities 6 6 6 6South Bristol Ring Road (Hengrove-A38) West of England Authorities 5 5 5 5A358 Ilminster to Taunton/A303 Ilminster Bypass Highways Agency 80A350 Westbury Bypass* Wiltshire 10 18 5Truro Transport Package* Cornwall 1 1 1 11 11Camborne Pool Redruth Transport Package* Cornwall 1 0 2 9 9 11South Devon Link Road A380 (Kingskerswell Bypass)* Devon 30 30 30Gloucester/Cheltnehmam Park and Ride* Gloucestershire 7 6 6 6 6Callington Road Link* West of England Authorities 5 4 4 4 4Exeter HQPT* Devon 15 15 15 15Gloucester A40 Improvements / Widening* Gloucestershire 2 2 2 2North Swindon Strategy* Swindon 13 13 13 13SE Dorset ITS (network control and information)* SE Dorset 4 4 4 4
Previously approved scheme not yet underway Scheme Sponser 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
A303 Stonehenge (depending outcome of Stonehenge Review) Highways Agency
Miscellaneous Scheme Sponser 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Contribution to Regional Infrastructure Fund 10 10 5 5Newquay Airport (Small Scale Scheme from Table 3e) Cornwall CC 5 17Isles of Scilly Ferry (Small Scale Scheme from Table 3e) Cornwall CC 6 11 7 Contribution to Regional Capacity Building Fund 1 1 1 1 1
2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16TOTAL ESTIMATED SPEND OF TABLES 1 & 2 & MISC (SEPT 06) 93 108 133 109 98 105 139 81 81 161REGIONAL ALLOCATION/PLANNING ASSUMPTION 86 88 90 92 94 96 98 100 102 105PERCENTAGE OVERBUDGET 8% 22% 48% 19% 5% 9% 41% -19% -21% 53%
* denotes scheme from region's table 2ANotes1. Totals in the far-right hand column do not include 2006/07 and only relate to RFA period (2007/08 - 2015/16). 2.Figures in Total column are subject to rounding
Estimated Spend in RFA Refresh September 2006
Position of Schemes as given to RFA Refresh Panel by Scheme Promoters Estimated Spend in RFA Refresh September 2006
Estimated Spend in RFA Refresh September 2006
Estimated Spend in RFA Refresh September 2006
Estimated Spend in RFA Refresh September 2006
Programme Management Challenges• Spending the allocation…..delivery a key concern • Managing the programme – avoid bunching • Avoiding over-optimistic assumptions about
timescales and costs• Complex urban package proposals need time and
capacity to be worked up• Minimising delays in appraisal process…DfT• RFA 2 may be over subscribed – what are the key
priorities ? Only 20% over programme allowed
RFA 2 Transport
Estimated RFA Spend
0
20
40
60
80
100
120
140
160
180
200
2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16
Year
£ (
Mil
l) Regional Funding Allocation
Total Estimated Spend (Sept 06)
Total Estimated Spend (Apr 08)
Programme ManagementIssues
RFA 2 TransportProgramme Management Techniques Possibilities
1 5 years firm the rest flexible
2 Funding Envelopes
3 Stretch the Programme to 2026
4 Cash Limits on schemes
Programme Management Approach RFA1
FORWARD PROGRAMME
(2006/7 – 2010/11)
£438m (38%)
EMERGING PROGRAMME
(2011/12 – 2015/16)
£690m (60%)
RIF = £30m (2%)
Involving Stakeholders
• Regular meetings with Technical Officers and Directors of local authorities
• Regional Transport Board (elected members & SEEPs) provide a steer on priorities
• Engagement with Regional Transport Forum
• Wider involvement – all RFA2 strands
RFA 2 Transport
Stages
Oct Nov Dec Jan Feb
1. Evidence & analysis
2. ‘Block’ priorities
3. Develop draft integrated advice
4. Develop final advice
5. Sign-off and submission
Process – Process – a tight timetablea tight timetable