THE REPUBLIC OF AZERBAIJANTHE REPUBLIC OF AZERBAIJANMINISTRY OF TRANSPORTMINISTRY OF TRANSPORT
REGIONAL SEMINAR ON DEVELOPMENT OF REGIONAL SEMINAR ON DEVELOPMENT OF EFFICIENT AND EFFECTIVE LOGISTICS EFFICIENT AND EFFECTIVE LOGISTICS
SYSTEMSSYSTEMS
TRANSPORT SYSTEM OF AZERBAIJAN: OPPORTUNITIES TRANSPORT SYSTEM OF AZERBAIJAN: OPPORTUNITIES AND PERSPECTIVES FOR GLOBAL LOGISTICSAND PERSPECTIVES FOR GLOBAL LOGISTICS
MAY 7MAY 7--8, 2013 / HANGZHOU, CHINA8, 2013 / HANGZHOU, CHINA
Haydar TurabovSenior CounselorTransport Policy and Economy Division
RUSSİAN FEDERATİON
KAZAKHSTAN
TURKMENİSTAN
İRAN
TURKEY
BLACKSEA
CA
SPIAN
SEA
MEDİTERRANEANSEA
ROMANİA
BULGARİA
ASİAEUROPE
SCANDINAVIA ,BALTIC & RUSSIA
NEAR EAST
CHINA
EUROPE ASIA
NEAREAST
PERSİANGULF
SCANDİNAVİA, BALTIC & RUSSIA
NORTH
SOUTH
Black Sea
MediterraneanSea
Mersin
BosporusCaspian
Sea
Pan – European transport corridor № 4
CHINA
NEW ALYAT SEA NEW ALYAT SEA PORTPORT
KARS
BEYUK KYASIKAKHALKALAKY
MARABDA
CASPIANSEA
MISSING SEGMENT TO BE MISSING SEGMENT TO BE CONSTRUCTED: CONSTRUCTED: 105 KM105 KM
SEGMENT TO BE SEGMENT TO BE REHABILITATED: REHABILITATED: 503 KM503 KM
SEGMENT UNDER SEGMENT UNDER REHABILITATION: REHABILITATION:
503 KM503 KM
ALYATALYAT SEASEAPORTPORT
BEYUK KYASİK
BAKU
Baku-Iran
Baku-Russia
Bakı-Yevlakh-Balakan
Baku-Yevlakh-Khankandi
Baku-Geargia
ALYATSEA
PORTKARS
AKHALKALAKI
ISTANBUL
CASPIANSEA
Missing segment to beconstructed is 105
(km)
Segment to be rehabilitated is 503
km
EAST – WEST (TRACECA) TRANSPORT CORRIDOR
Pan – European transport corridor № 4
KAZAKHSTAN
Mediterranean sea
Bosporus
EXPECTED AMOUNT OF FREIGHT TRANSPORT EXPECTED AMOUNT OF FREIGHT TRANSPORT ON THE ON THE BAKBAKUU--TBTBIILLIISSII--KKARS ARS NEW RAILWAY LINENEW RAILWAY LINE
0
2
4
6
8
10
12
14
16
5 10 15
Million tons
YEARS
3-5
8-10
15 AND MORE
MAIN MARINE ROUTES MAIN MARINE ROUTES
Existing Baku Sea Port
Mahachkala
Astrachan
Aktau
Turkmanbashi
NekaNewshehr
Anzali
NEW ALYATNEW ALYATSEA PORTSEA PORT
NEW BAKU INTERNATIONAL SEA TRADE PORT KOMPLEXNEW BAKU INTERNATIONAL SEA TRADE PORT KOMPLEX
NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEXNEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX
KAZAKHSTAN
TURKMENİSTAN
BAKU
BEYUK KESİK
COMBINATION OF THE FREIGHT
TRANSPORT
RUSSİAN FEDERATİON
GEORGİA
REPUBLİC OF AZERBAİJAN
CASPIAN SEA
NEW ALYAT
SEA PORT
• ENLARGEMENT THROUGH ACCESSION TO “VIKING” PROJECT
MAIN HIGHWAY PROJECTSMAIN HIGHWAY PROJECTS
COMPLATED
UNDER CONSTRUCTIO
CONSIDERED
SHAMAKHI SHAMAKHI –– GUBA HIGHWAY PROJECTGUBA HIGHWAY PROJECT
TRANSPORT OPERATIONS INTELLIGENT MANAGEMENT SYSTEM
BAKBAKU BAY MARINE BRIDGEU BAY MARINE BRIDGE
NATIONAL ACADEMY OF CIVIL
AVIATION IS THE FIRST EDUCATION
CENTER IN THE REPUBLIC OF
AZERBAIJAN THAT PREPARE THE
SPECIALISTS ON LOGISTICS
MINISTRY OF ECONOMIC DEVELOPMENT
NATIONAL ACADEMY OF AVIATION
INSTITUTE OF ECONOMIC REFORMS
PROJECT ON ELABORATIONPROJECT ON ELABORATION
OF THEOF THE
““EXPLANATORY DICTIONARY OF EXPLANATORY DICTIONARY OF
LOGISTICS TERMSLOGISTICS TERMS””
“AZERBAIJAN AIRLINES” CJSC
EXPLANATORY DICTIONARY OF LOGISTICS TERMSEXPLANATORY DICTIONARY OF LOGISTICS TERMS
MINISTRY OF TRANSPORT REPUBLIC OF AZERBAIJAN
Haydar TurabovSenior CounselorTransport Policy and Economy Division
LAST 10 YEARSAVERAGE ANNUAL GROWTH OF TRANSPORT SECTOR
FREIGHT TRANSPORT – 3.8 % ;
TRANSIT TRANSPORT - 8.6 %;
PASSENGER TRANSPORT - 6.1 %.
SHARE OF TRANSPORT SECTOR ON GDP CONSIST OF 5.6 %
THE INVESTMENTS TO THE TRANSPORT SECTOR IN THE LAST 5 YEARS WERE 14.5 BILLION USD
THE COMPLETE RECONSTRUCTION OF THE SURFACE OF RAILWAY;
RECONSTRUCTION OF THE DIRECT POWER SUPPLY SYSTEM PASSING TO THE ALTERNATING POWER SUPPLY SYSTEM;
RECONSTRUCTION OF SIGNALIZATION, COMMUNICATION AND AUTOBLOCKING SYSTEMS;
RENOVATION OF ROLLING STOCK;
ESTABLIHSMENT OF CENTRALIZED MANAGEMENT SYSTEM;
INCREASING OF THE SPEED OF TRAINS UP TO 140 KM/H;
INCREASING OF TRANSPORTATION CAPACITY UP TO 35 %/
STATE PROGRAM ON RAILWAY SYSTEM DEVELOPMENT IN THE REPUB LIC OF AZERBAIJAN IN 2010-2014
24
“Marmara Project”Length 76,3 km
including:
Underwater part 1,4 km
Tunnel maximum deepness 56,0 m
Number of stations 40
Passenger transportation:
Existing 10 000 / hour
Considered 75 000 / hour
Maximum speed 100 km/hour
Expected average speed 45 km/hour
Interval between two trains 120-600seconds
Expected number of trains 440
Number of railway lines Two lined
Required time:
At present, by the railway + ferry-boat + railway
185 minutes
After implementation of the project
104 minutes
CONSTRUCTION OF NEW INTERNATIONAL PORT COMPLEX;
OBTAINED TANKERS : 43 TANKERS, INCLUDING : 11 TANKERS WITH 13 000 TONS CARRIAGE CAPACITY (NEW);
OBTAINED FERRIES: 13 FERRIES, INCLUDING: 7 FERRIES WITH 28 WAGON CAPACITY, 6 FERRIES WITH 52 WAGON CAPACITY(NEW).
MEASURES CARRIED OUT IN THE FIELD OFMARITIME TRANSPORT
2626
ТРАНСПОРТНО - ЛОГИСТИЧЕСКАЯ СИСТЕМА
В ТУРИСТИЧЕСКОМ СЕКТОРЕ
прибытие трансферы пребываниеобслуживан
ие
ОРГАНИЗАЦИЯ
ВИЗИТА
ЛОГИСТИЧЕСКОЕ
ОБЕСПЕЧЕНИЕ
ДО ПУТЕШЕСТВИЯ ВО ВРЕМЯ ПУТЕШЕСТВИЯ ОТПРАВЛЕНИЕ
I stage (up to 10 mln. tons, 50 thousand TEU)Terminals: 21 Dry cargo terminal 12 Ferry terminal 1Berths: 8
Ferry berth: 2Ro-Ro berth: 1For dry cargo and containers: 4Service berth: 1
II stage (up to 17 mln. tons, 150 thousand TEU)Terminals: 21 Dry cargo terminal 12 Ferry terminal 1Berths: 6
Ferry berth: 2For dry : 4
III stage (up to 25 mln., 1 mln. TEU)Terminal: 21 Container terminal: 12 Ferry terminal 1Berths: 7
Ferry berth: 2Dry cargo berth: 5
NEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEXNEW BAKU INTERNATIONAL SEA TRADE PORT COMPLEX