regional training seminar on gts techniques and procedures guangzhou, 7 - 10 december 1998 1 lecture...

14
Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Upload: nicole-nelson

Post on 27-Mar-2015

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1

Lecture 9

Operational GTS management

Page 2: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 2

Page 3: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 3

Management of GTS operations

• Catalogue of meteorological bulletins

• Routeing catalogues

• Monitoring results

Page 4: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 4

Catalogue of meteorological bulletins

• Content of the catalogue of meteorological bulletins (Volume C1):– Volume C1 should include the bulletins transmitted

for global, inter-regional and regional exchanges – The abbreviated heading, the code form and a

description of the content is provided for each bulletin

• Presently, the WMO Members provide the Secretariat with the required information to update the Volume C1

Page 5: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 5

Access to the Volume C1

• Paper format• Volume C1 is mailed to WMO Members twice a year

• Updating is distributed weekly in the GTS METNO messages and bi-monthly in the Operational Newsletter

• Electronic media• Volume C1 is distributed on a diskette format

• Volume C1 is available in the WMO FTP server under ftp://www.wmo.ch/wmo-ddbs/Pub9volcyymmddd.flatfil

• The information in the server is updated weekly

Page 6: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 6

Improvement of the updating of Volume C1

– Significant differences between the content of Volume C1 and the bulletins actually exchanged on the GTS were noted by GTS meetings

– CBS agreed:• That the maintenance of Volume C1 by RTHs on the

MTN would be the best means to ensure that the information is correct and regularly updated

• On formats and procedures for the maintenance of the Volume C1 by RTHs on the MTN

– CBS invited Members to start the implementation of the new Volume C1 as from 1 March 1999

Page 7: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 7

Maintenance of Volume C1 by RTHs

Valid catalogue files

WMO Secretariat

Responsible zones

...

NMC

NMC

RTHWMO Members

Advanced notification files

...

Responsible RTHs

... Valid cataloguefiles

...

Advanced notificationfiles

...

...

Messages of amendments on bulletinsby e-mail, fax or GTS addressed message

FTP PUT with e-mail notification

FTP GET or by diskette FTP GETGEZTGETGET

Page 8: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 8

Routeing catalogues

• Objectives:– To ensure the consistency of the data exchange

between GTS centres– To inform all GTS centres of the bulletins actually, or

potentially, available at any GTS centre

Page 9: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 9

Formats of the Routeing catalogues• For each abbreviated heading, a record should comprise the

following fields:

Fieldnumber

Content Width

1 Abbreviated heading TTAAii CCCC 11

2 GTS circuit from which the bulletin is received 4

3 GTS circuit to which the bulletin is sent 4

As many additional fields in the format of field No.3 asadditional circuits to which the bulletin is sent

Sample of structure:

"SMAA01 EGRR","RJTD","ANOU","DEMS","NFFN","NTAA""SMAA01 EGRR","KWBC","NZKL""SMAA10 KWBC","EGRR “,"DEMS","NFFN","NTAA","NZKL"

Page 10: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998

10

Routeing catalogues• Content

– The routeing catalogue of a GTS centre:• Should include the abbreviated of the bulletins

– Received and/or transmitted on any GTS point-to-point circuit connected to the centre, via satellite distribution system of HF broadcasts, on any circuit established under a bilateral agreement

– Scheduled to be received by the GTS centre, even if not actually forwarded on the GTS

• Should be updated monthly if possible, but less than every three months

Page 11: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998

11

Routeing catalogues• Access

– Each RTH, operating an FTP, server should make available its routeing catalogue on its FTP server

– The RTH, not operating an FTP server, should transfer it into the WMO FTP server

– Information on the means and procedures to access to the routeing directories of RTH is compiled in the WMO FTP server

– RTH Offenbach operates a mirror site of the part of the WMO FTP server related to the routeing catalogues

Page 12: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998

12

Monitoring results

• The monitoring results permit to determine:– Deficiencies in the routeing of data by comparing the

availability of data between centres • e.g. the list of silent stations for a centre but not silent

for other centres may be determined; then the list of bulletins received by the other centres, which included the reports from the list of silent stations, may be defined

Page 13: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998

13

Monitoring results

• The monitoring results permit to determine:– Non-adherence to WMO standard and practices, e.g.

• SYNOP reports from RBSN stations not compiled into bulletins for global exchange

• Bulletins with same abbreviated headings but with different contents

– The bulletins received during a monitoring exercise but not included in the Volume C1

Page 14: Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998 1 Lecture 9 Operational GTS management

Regional Training Seminar on GTS Techniques and Procedures Guangzhou, 7 - 10 December 1998

14

Improvement of the the content of the catalogues

• Comparisons between the sets of abbreviated headings included in the Volume C1, in the routeing catalogues and in the monitoring results:

– Showed major differences between these sets– Stressed the need:

• For an harmonisation of the contents of the routeing catalogues