registration and information: swiss tunnel congress 2016 … · 2016-04-01 · gotthard base...

16
STS Conference Secretariat Registration and Information: Conference Secretariat Swiss Tunnel Congress 2016 Thomi Bräm Felsenstrasse 11 CH-5400 Baden Phone +41 56 200 23 33 Fax +41 56 200 23 34 Email [email protected] Conference Hotline: +41 79 411 73 46 (15.-17.6.2016 only) Hotel Reservations: The booking of rooms is the responsibility of participants. Accommodation is not included in the conference package. Reservations: www.luzern.com/en/hotels-accommodation Photo: Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss Tunnel Congress 2016 Lucerne Culture and Convention Centre Programm Swiss Tunnel Colloquium: Wednesday, 15 June 2016 Swiss Tunnel Congress: Thursday, 16 June 2016 Excursions: Friday, 17 June 2016 Translation from French, Italian and English into German (only 16.6.) Translation from German to English (15.6. and 16.6.) Traduction simultanée de l'allemand au français (seulement 16.6.)

Upload: others

Post on 20-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

STS Conference Secretariat

Registration and Information:

Conference Secretariat

Swiss Tunnel Congress 2016

Thomi Bräm

Felsenstrasse 11

CH-5400 Baden

Phone +41 56 200 23 33

Fax +41 56 200 23 34

Email [email protected]

Conference Hotline: +41 79 411 73 46 (15.-17.6.2016 only)

Hotel Reservations:

The booking of rooms is the responsibility of participants.

Accommodation is not included in the conference package.

Reservations: www.luzern.com/en/hotels-accommodation

Photo:

Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum

with the permission of AlpTransit Gotthard AG

Swiss Tunnel Congress 2016Lucerne Culture and Convention Centre

Programm

Swiss Tunnel Colloquium: Wednesday, 15 June 2016

Swiss Tunnel Congress: Thursday, 16 June 2016

Excursions: Friday, 17 June 2016

Translation from French, Italian and English into German (only 16.6.)

Translation from German to English (15.6. and 16.6.)

Traduction simultanée de l'allemand au français (seulement 16.6.)

Page 2: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

32

In June 2016 the Swiss Tunnelling Society will hold for the 15th time the annual Swiss Tunnelling Congress (STC) in the KKL Lucerne.

The STC has secured its fixed place in the calendar of the tunnel-ling engineer. Even if at present times have become quite difficult for the tunnelling engineer, especially for those involved in con-struction, it is still important, or today perhaps even more important, to take advantage of this platform for clients, planners, engineers,

suppliers, service providers, contractors and the tunnelling industry. The STC offers a welcome opportunity of learning at first hand about new developments in selec-ted tunnel projects both in Switzerland and other countries and it also provides an excellent chance to meet people and consolidate existing contacts.

The programme begins as usual on Wednesday afternoon with the Swiss Tunnel Colloquium, which is devoted to the theme «Fire and Safety», a theme that is omni-present in the media and is as topical as ever, especially in view of the controversial safety discussions on the renewal of the first Gotthard road tunnel and the con-struction of a second single tube tunnel through the Gotthard Massif.

We look forward with keen interest to the introductory lecture by the former mem-ber of the Swiss Federal Council; he is well known as an incisive and brilliant speaker.

The morning of the Congress day is devoted to international projects. In the after-noon, an interesting line-up of current projects in Switzerland shows that the activi-ty is still in full-flow, even if compared with the flourishing period of the past years, these are on a smaller scale.

Currently, in the whole of Switzerland people are asking themselves if we are a nation of tunnelling engineers, whether we were born like that or are there other reasons why today so much is spoken and written about tunnelling. In view of the scope of the projects presented in the newspapers this is a justified question, with the new tunnel system Altstetten-Rupperswil on the one hand, and the Cargo Souterrain, on the other, up to the Grimsel tunnel. The latter will eliminate the high voltage overhead line and provide at the same time a connection between the Bernese Oberland and the region of Goms, of great importance for tourism. These are currently some of the ambitious and farsighted ideas and projects. They are quite in unison with the motto of the WTC 2013 in Geneva: «Underground the way to the future». Thus there are still visions for the future!

Friday as usual is reserved for excursions.

It remains for me therefore to wish you an interesting congress, many exciting encounters and lasting impressions. I heartily welcome you to the STC 2016 in Lucerne.

Swiss Tunnelling Society

Luzi R. Gruber, President

Swiss Tunnel Congress 2016

The Swiss Tunnelling Society (STS) hosts the annual Swiss Tunnel Congress (STC) in the Lucerne Culture and Convention Centre (KKL Lucerne). In recent years this congress, which originally developed from the AlpTransit Conferences, has become a leading event for tunnelling engineers.

Over the previous year’s 800 participants from 12 countries attended the congress. The congress includes high level presentations and the traditional excur-sions to major construction sites in Switzerland.

STC 2016 is organised by the Steering Committee of the Swiss Tunnelling Society:

•LuziR.Gruber,Dipl.Ing. PresidentSTS •StefanMaurhofer,Dipl.Ing. Vice-PresidentSTS •MartinBosshard,Dipl.Ing. PastPresidentSTS •StefanMoser,Dr.sc.techn.,Dipl.Ing. SwissTunnelCongress •AdrianMüller,Dipl.Ing. SwissTunnelCongress •MatthiasNeuenschwander,Dipl.Ing. SwissTunnelCongress

Advisory Board

The Advisory Board has selected interesting projects and suggested to invite top-quality speakers from abroad. It endeavours to maintain a high quality of presentation. The Advisory Board Swiss Tunnel Congress 2016 comprises the following members: •MartinBosshard,Chairman,STS •MiguelFernández-BolloMartinez,AETOS •RobertGaller,Prof.Dr.,ITAAustria •RolandLeucker,Dr.,STUVA/DAUB •GiuseppeLunardi,SIG •JeanPhilippe,AFTES

A Warm Welcome

Page 3: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

54

14.30–15.00 Coffee Break

15.00 TunnelEscapeDoors–FindingsandRecognitions Based on 20 Years of Tunnelling

MichaelLierau,Dipl.Masch.Ing.ETH,MBAGWU Elkuch Group, Bendern

15.25 Escape Route Lighting in Road and Rail Tunnels: Current Practice, Technology and Challenges

Yves Rödiger, Betr. oec FHSG, EMBE HSG GIFAS-Electric GmbH, Rheineck

15.45 Providing Optimal Conditions for Rescue Teams in the Case of Fire Incidents in Tunnels

UrsKummer,Dipl.Bau-Ing.ETH International Fire Academy, Balsthal

16.10 Fire in the Gotthard Road Tunnel

BeatWalther,DeputyCommandant Emergency Fire Service Gotthard, Göschenen

16.30 Question Time / Closing Remarks

Followed by the opening of the exhibition and aperitif

18.30 End of the Colloquium

The theme «Fire and Safety» for rail and road tunnels is very extensive and many-sided. In this year’s colloquium the emphasis is on the fire event and the escape route. To start with the subject is reviewed from the perspective of the Federal Office of Transport (FOT), the licensing authority. Aspects from the planning and design of the ventilation system in a critical event lay the foundation for the important structures, such as escape doors and lighting on the escape route. How does one create optimal conditions for people who are fleeing for their lives? How do the rescue teams deal with these requirements in practice? Lecturers from the vantage points of the licensing authority, the owner, planning, industry, training of the rescue teams and the Gotthard road tunnel’s emergency fire ser-vice will answer these questions in step with current practice. As every year the Colloquium is directed towards students, young engineers, as well as all those experienced practitioners involved in the construction and operation of tunnel facilities.

12.00 Opening of the Conference Secretariat

13.00 Greetings

StefanMaurhofer,Dipl.Bau-Ing.FH/SIA Vice-PresidentSwissTunnellingSociety

«FIRE AND SAFETY» FoR RAIL AND RoAD TuNNELS

13.10 Fire and Safety in Rail Tunnels: SafetyAspectsfromtheApprovalAuthorityViewpoint

ChristophSchneider,Dipl.Masch.-Ing.FH/SIA, Federal Office of Transport, Berne

13.40 EmergencyVentilationinRoadTunnels

MarcoBettelini,Dr.sc.techn.,Dipl.Masch.-Ing.ETH/SIA, Amberg Engineering, Regensdorf

14.05 EmergencyVentilationinUndergroundRailwaySystems: Theory and Practical Experience from the Zurich Cross Rail

SeverinWälchli,Dr.sc.techn.ETH(Masch.Ing.),MASETHMTEC Pöyry Management Consulting (Schweiz) AG, Zurich

Swiss Tunnel Colloquium 2016 Colloquium Programme, 15 June 2016

Page 4: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

76

08.30 Opening of the Conference Secretariat

08.30 Welcome Coffee

INTRoDuCTIoN09.30 Opening Lecture

LuziR.Gruber,Dipl.Bau-Ing.ETH/SIA President Swiss Tunnelling Society

09.40 Opening Lecture: The Significance of the Gotthard Base Tunnel for Switzerland and Europe

Former member of Swiss Federal Council Moritz Leuenberger

Chairman of the Morning Session

MatthiasNeuenschwander,Dipl.Bau-Ing.ETH/SIA, Member of the Executive Board STS

MoRNING LECTuRES10.10 Grand Paris – Masterplan,130 km Tunnel

Philippe Yvin, Président SociétéduGrandParis,Saint-Denis

10.30 NewConstructionoftheU5,Berlin–LessonsLearnt

ChristianSpäth,Dipl.-Ing. Implenia Construction GmbH, Berlin

10.50 Hydropower Project Cerro del Águila, Perú 12 km of Tunnels in Complex Geomorphological Conditions

SelimM.Sayah,Dr.èssciences Lombardi AG, Minusio

11.10 – 11.30 Coffee Break

11.30 La nuova linea ferroviaria di alta capacità Milano - Genova

Ettore Pagani, Ing. Civile Politecnico di Milano Salini Impregilo S.p.A., Milano

11.50 Tunnel Chain St. Kanzian Planning and Execution Strategies for Support MeasuresinLacustrineClayDeposits

HannsWagner,Dipl.-Ing. ÖBB-Infrastruktur AG, Graz

12.10 MetrodePanamá,Línea1 The First Line of Panama City Transit System

DiegoGarcíaAldaya,MiningEngineerProfessional FCC Construcción, Madrid

12.30 The Rastatt Tunnel A Key Project in many Respects

HeinzEhrbar,Dipl.Bau-Ing.ETH/SIA DBNetzAG,FrankfurtamMain

12.50 Discussion

13.00 – 14.30 Lunch in the KKL Lucerne

Swiss Tunnel Congress 2016 Congress Programme, 16 June 2016

Page 5: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

98

16.00 MotorwayA9VispTunnel: 3 Advances – 3 Challenges

ChristianZimmermann,Dipl.Bau-Ing.HTL UlrichImbodenAG,Visp

16.20 Opening of the Longest Railway Tunnel in the World: Concept and Challenge for the Gotthard Base Tunnel

RenzoSimoni,Dr.sc.techn.,Dipl.Bau-Ing.ETH/SIA AlpTransit Gotthard AG, Luzern

16.40 The Winner of the ITA-Award 2015 EURASIA Tunnel, Istanbul

ÖncüGönenç,CivilEngineer,MSc Yapi Merkezi, Istanbul

17.00 Discussion

17.20 Closing remarks

LuziR.Gruber,Dipl.Bau-Ing.ETH/SIA President Swiss Tunnelling Society

Followed by an aperitif in front of the KKL

19.30 DinneratHotelSchweizerhof,Lucerne

Chairman of the Afternoon Session

StefanMoser,Dr.sc.techn.,MScETH/SIA, Member of the Executive Board STS

AFTERNooN LECTuRES

14.30 The West Link, Göteborg Challenges both underground and on the ground surface

Bo Larsson, MSc, Civil engineer, Chalmers University of Technology Swedish Transport Administration, Göteborg

14.50 DeepRepositoryforRadioactiveWasteinSwitzerland State of the Projects and Technical Challenges for Underground Construction

ThomasFries,Dipl.Bau-Ing.ETH/SIA Swiss technical competence centre in the field of deep geological disposalofradioactivewaste,Nagra,Wettingen

15.10 Innovation Track of Multi-Mode Machines for Complex Ground Conditions, From Grauholz, via Zurich to Kuala Lumpur

KarinBäppler,Dr.,Dipl.-Ing. Herrenknecht AG, Schwanau-Allmannsweier

15.30 – 16.00 Coffee Break

Swiss Tunnel Congress 2016 Congress Programme, 16 June 2016

Page 6: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

1110

The Swiss Tunnelling Society organises annually the Swiss Tunnel Congressheld in the Lucerne Culture and Convention Centre, with excursions onthe following day.

This year the participants can choose from the following four excursions:

A) Alptransit Ceneri Base Tunnel – Sigirino (TI) B) A9 Visp Tunnel (VS) C) Belchen Tunnel (SO/BL) D) Car parking for the castle area in Thun (BE)

Swiss Tunnel Excursions 2016

D) Schlossparking Thun

Luzern

Baden-Württemberg

C) Belchentunnel

A) Ceneri Basistunnel

B) Tunnel Visp

Site Visit, 17 June 2016

A) AlpTransit Ceneri Base Tunnel – Sigirino (TI)

Visit to the installations both above ground, especially the material handling and final storage place, and also below ground. From the intermediate attack Sigirino a minibus takes us into the tunnel and then we can explore on foot one of the two main tunnel drives. Following this, we will visit the construc-tion site in the Portal Area South (Vezia). With a length of 15.4 km between the North Portal Vigana near Camorino and the South Portal in Vezia, after the Gotthard Base Tunnel, the Ceneri Base Tunnel is the second largest tunnel pro-ject in Switzerland.

07.15 Meeting point at the Inseli car park (behind the KKL Lucerne)07.20 DepartureLucerne(bus)09.30 Arrival at the ATG construction site in Sigirino. Construction site visit in 2 groups (each of 25 persons) by minibus12.00 Lunch in the local construction works canteen in Sigirino13.30 DepartbybustotheportalconstructionsiteVezia13.45 Arrival at construction site and site visit14.45 Return to Lucerne. If required, transport to Bellinzona railway station17.00 Arrival at the Inseli car park (behind KKL Lucerne)

•Helmets,bootsandweatherproofjacketsprovided.•Forthosetravellingbycarthereareonlyalimitednumberofparkingspaces

available in the area of the Infopoint. Thus using the bus is recommended.•Thenumberofparticipantsislimited.

The costs of the excursion are included in the congress fee.

Page 7: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

1312

Swiss Tunnel Excursions 2016

B) A9 Construction site of Visp Tunnel

The tunnelling work for the Visp Tunnel has already started. Together with the Eyholz Tunnel, the Visp Tunnel is part of the southern bypass of the planned motorway A9 in the region of Visp. With this milestone, the realisation of the Visp Southern bypass is well on its way.

07.50 Meeting point at Lucerne railway station (probably on platform 8)08.00 DepartLucernewiththeSBBtrainthroughtheLötschbergTunnel10.02 ArrivalinVispSBBrailwaystation –Departurebypostalcoachtotheconstructionsite – Welcome, coffee, project presentation – Site visit13.00 Lunch14.30 Transport by postal coach to the railway station14.57 SBBtrainfromVisp17.00 Arrival in Lucerne

• Helmets,bootsandweatherproofjacketsprovided.• Forthosetravellingbycartherearenoparkingspacesavailable. Travel by train and postal coach is recommended.• Thenumberofparticipantsislimited.

The costs of the excursion are included in the congress fee.

Site Visit, 17 June 2016

C) Belchen Tunnel (So/BL)

The 3.2 km long auxiliary tunnel Belchen (RTB), part of the motorway A2, crosses the Jura mountains between Basle and Egerkingen. The stretch of mountain to be driven through consists to a large extent of swelling rock, i.e. Gypsum-Keuper and Opalinus Clay. The existing twin tube two-lane tunnels were completed in 1970, with separated direction of travel. Rehabilitation is now urgent. The purpose of the auxiliary tunnel Belchen, which is already under construction, is to alleviate the traffic restrictions resulting from the rehabilitation work. The main construction works for the RTB were started in September 2014, while the advance using a 14 m diameter TBM was started in February 2016.

08.15 Meeting point at the Inseli car park (behind the KKL Lucerne)08.20 DepartureLucerne(bus)09.30 Arrival Infocenter Belchen, portal Hägendorf project presentation and site visit (in groups)11.30 Lunch13.30 Return journey by bus to Lucerne15.15 Arrival in Lucerne

• Helmets,bootsandweatherproofjacketsprovided.• Forthosetravellingbycartherearenoparkingspacesavailable. Travel by train and postal coach is recommended.• Thenumberofparticipantsislimited.

The costs of the excursion are included in the congress fee.

Page 8: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

1514

organisation

Closing Date of Registration: 13 May 2016

Please register online under www.swisstunnel.ch or use the enclosed registration form.

Your registration is considered to be definite after receipt of your payment bythe Swiss Tunnelling Society:

CREDITSUISSEBaden,ClearingNo:4050,SwiftCode:CRESCHZZ54A

Payment in Swiss FrancsAccountNo: 820321-21IBAN: CH1804835082032121000

Payment in EuroAccountNo: 820321-22IBAN: CH8104835082032122000

At the beginning of June you will receive the congress documents, confirmation and the invoice receipt.

Advance notice of the Swiss Tunnel Congress 2017

The Swiss Tunnel Congress will take place from the 30 May to the 1 June 2017 at the KKL Lucerne.

Site Visit, 17 June 2016

D) Car parking for the castle area in Thun (BE)

In the Schlossberg (Castle Hill) in Thun work will be in progress until Autumn 2018 on the Parking City East Schlossberg project. Using the top-down under-ground construction method the structure, with eight mezzanine floors, is free of intermediate supports and it will provide 300 parking spaces. The excava-tion work for the two cavern calotte-shaped roofs has been in progress since the beginning of this year. The excavation is carried out using a road header machine.

07.40 Meeting point at the Inseli car park (behind the KKL Lucerne)07.45 DepartureLucerne(bus)09.30 Arrival at the installation site – Project presentation – Splitting up into groups / Equipping with protective clothing10.30 Site visit in groups12.30 Lunch 14.00 Return journey by bus to Lucerne15.45 Arrival in Lucerne

• Helmets,bootsandweatherproofjacketsprovided.• Forthosetravellingbycartherearenoparkingspacesavailable. Travel by train and postal coach is recommended.• Thenumberofparticipantsislimited.

The costs of the excursion are included in the congress fee.

Castle Thun

Page 9: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

1716

Evening Event, 16 June 2016

After the lectures an aperitif in front

of the KKL is offered by the Swiss

Tunnelling Society

Later, in the banqueting hall of the

first class Hotel Schweizerhof *****

you can indulge yourself with some

culinary delights.

Opening time 19.15 Uhr

Dinner 19.30Uhr

Dinnerisnotincludedinthe

congress fee and is billed separately.

Costs per person CHF/EUR 135.–

(incl.8%VAT),drinksincluded.

07.3

0 -

08.0

0

08.0

0 -

08.3

0

08.3

0 -

09.0

0

09.0

0 -

09.3

0

09.3

0 -

10.0

0In

tro

du

ctio

n10

.00

- 10

.30

10.3

0 -

11.0

0

11.0

0 -

11.3

0

11.3

0 -

12.0

0

12.0

0 -

12.3

0

12.3

0 -

13.0

0

13.0

0 -

13.3

0

13.3

0 -

14.0

0

14.0

0 -

14.3

0

14.3

0 -

15.0

0

15.0

0 -

15.3

0

15.3

0 -

16.0

0

16.0

0 -

16.3

0

16.3

0 -

17.0

0

17.0

0 -

17.3

0

17.3

0 -

18.0

0

18.0

0 -

18.3

0

18.3

0 -

19.0

0

19.0

0 -

19.3

0

19.3

0 - 2

4.00

20.3

0 -

23.0

0

Sw

iss

Tun

nel

Co

llo

qu

ium

Sw

iss

Tun

nel

Co

ng

ress

Excu

rsio

ns

Sw

iss

Tun

nel

Co

llo

qu

ium

Ap

eri

tif

Mo

rnin

gLe

ctu

res

Lun

ch

D) Car parking for the castle area in Thun (BE)

Frid

ay 1

7 J

un

e 2

01

6

C) Belchen Tunnel (SO/BL)

B) A9 Visp Tunnel (VS)

A) Alptransit Ceneri Base Tunnel – Sigirino (TI)

Aft

ern

oo

nLe

ctu

res

Ap

eri

tif

Exh

ibit

ion

Gu

est

s an

d

Sp

on

sors

Even

ing

Thu

rsd

ay,

16

Ju

ne 2

01

6

Welc

om

e /

Co

ffee

Din

ner

at

Sch

weiz

erh

of

Wed

nesd

ay,

15

Ju

ne 2

01

6

Registration Conf. Secretariat

Registration Conf. Secretariat

Exhibition

Ad

vis

ory

Bo

ard

M

eeti

ng

30.0

3.20

16

Programm Swiss Tunnel Congress 2016

Page 10: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

1918

Amberg Engineering AG

Amberg Loglay AG

Amberg Technologies AG

VersuchsStollen Hagerbach AG

ARGE Transco, Sedrun

Implenia, BilfingerBerger, Frutiger, Pizzarotti

ARGE Tunnel Visp, Visp

Armaspez Schweiz AG, Balsthal

Avesco AG, Langenthal

B + S AG, Bern

Main Sponsors

Sponsors Swiss Tunnel Congress 2016

Many thanks to all Sponsors!

Swiss Tunnel Congress 2016

Lectures, Excursion, Proceedings

STS-Member 520.–CHF/EUR+8%VAT=561.60

Non-Member 600.–CHF/EUR+8%VAT=648.–

Student 260.–CHF/EUR+8%VAT=280.80

Colloquium, Proceedings

STS-Member 165.–CHF/EUR+8%VAT=178.20

Non-Member 195.–CHF/EUR+8%VAT=210.60

Student 82.50CHF/EUR+8%VAT=89.10

Dinner

Dinner(drinksincluded) 125.–CHF/EUR+8%VAT=135.–

Excursion, Proceedings

OneExcursion 235.–CHF/EUR+8%VAT=253.80

Allpricesincl.8%VAT

All participants will receive the proceedings at the Swiss Tunnel Congress. The book can be obtained with the supplied voucher at the Conference Secretariat in the Lucerne Culture and Convention Centre. Participants who only take part in an excursion will receive the proceedings using the voucher when they enter the bus.

Cancellation conditions

• In the case of cancellation after the closing registration date and up to one week before the Congress, 50% of the costs will be refunded and the con-gress proceedings will be sent to you.

• In the case of cancellation within the last week before the Swiss Tunnel Congress, the full payment of the congress fee will be charged and the con-gress proceedings will be sent to you. Alternatively, you may nominate the person to take your place.

Registration

Page 11: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

2120

Sponsors Swiss Tunnel Congress 2016

Main Sponsors

BASF Construction Chemicals Europe AG, Kaisten

Basler & Hofmann AG, Zürich

Belloli SA, Grono Rowa Tunnelling Logistics AG, Wangen SZ

BG Ingénieurs Conseils SA BG Ingenieure und Berater AG, Lausanne

Consorzio Condotte Cossi, Lugano

Consorzio TAT, Los 554 Bodio/Los 452 Faido Implenia, Hochtief, Heitkamp, Salini Impregilo/CSC

Many thanks to all Sponsors!

Directions

By public transport

• From Zurich Airport by

train in 1 ¼ h

• From Geneva Airport by

train in 3 h

• The Lucerne Culture and

Convention Centre (KKL)

is in the immediate vicinity

of the Main Railway Station

in Lucerne.

By carParking is available in the vicinity of the KKL Lucerne in several multi-storey car

parks.

Lucerne Culture and Convention Centre (KKL)

Europaplatz 1

CH-6002 Luzern

Tel. +41 41 226 70 70

www.kkl-luzern.ch

Schweizerhof

KKL Luzern

Page 12: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

2322

Sponsors Swiss Tunnel Congress 2016

Main Sponsors

CSC Impresa Costruzioni SA, Lugano

EDY ToSCANo AG, Zürich

Emch + Berger AG, Bern

Frutiger AG, Thun

Gähler und Partner AG, Ennetbaden

Gasser Felstechnik AG, Lungern

Many thanks to all Sponsors!

The booking of rooms is the responsibility of participants.

You can make reservations via: www.luzern.com/en/hotels-accommodation

Accommodation is not included in the conference package.

Rail connections to Lucerne departure arrival in Lucerne Aarau 8.14 9.05

Basle 8.04 9.05

Bellinzona 6.34 8.41

Berne 8.00 9.00

Brig 6.49 9.00

Chur 7.16 9.25

Genevra 6.12 9.05

Lausanne 6.47 9.00

Locarno 6.04 8.41

Sion 6.25 9.00

St. Gallen 7.05 9.20

Winterthur 8.03 9.25

Zurich Main Station 8.04 8.49

Zurich Airport 8.18 9.25

Hotel Reservation

Page 13: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

2524

Sponsors Swiss Tunnel Congress 2016

Main Sponsors

Gruner AG, Basel

Heitkamp Construction Swiss GmbH, Dierikon

Herrenknecht AG, D-Schwanau

Holcim (Schweiz) AG, Zürich

ILF Beratende Ingenieure AG, Zürich

Implenia Schweiz AG, Wallisellen

Many thanks to all Sponsors!

Book «Tunnelling the Gotthard»

GOTTHARDTUNNELLING THE

Books are free for members of the Swiss Tunnelling Society and can be

ordered under www.swisstunnel.ch or with the form shown below:

«Tunnelling the Gotthard» The Success Story (ISBN 978-3-033-05485-1)

Name

Address

ZIP, City, Country

Phone

E-Mail

Signature

Send to: STS Swiss Tunnelling Society

Bachweg 3

CH-8133 Esslingen

The Success Story

Page 14: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

2726

Sponsors Swiss Tunnel Congress 2016

Many thanks to all Sponsors!

InfraTunnel SA, Marin

IM Maggia Engineering AG, Locarno IuB Engineering AG, Bern

Jura-Cement-Fabriken AG, Wildegg

Lombardi AG, Minusio

Marti Tunnelbau AG, Moosseedorf

Pini Swiss Engineers, Lugano

Swiss Tunnelling Society Bachweg 3 CH-8133 Esslingen

Phone +41 44 387 15 30 Fax +41 44 387 15 00 Email [email protected]

Application for Membership of STS

Single Member Collective Member Student Senior

CHF/EUR 50.- excl. VAT p.a. CHF/EUR 500.- excl. VAT p.a. CHF/EUR 20.- excl. VAT p.a. CHF/EUR 50.- excl. VAT p.a.

Name First Name

Company

Address

ZIP City

Phone Fax

Company Email www.

Private Address

ZIP City

Phone Fax

Private Email

Title

Education: Dr. sc. tech. or similar MSc ETH BSc FH other education Students ETH, FH, etc.

Member: SIA REG A REG B other experts

Address for correspondence:

Private Address Company Address

Place / Date

Signature

Membership of STS

Main Sponsors

Page 15: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

2928

Sponsors Swiss Tunnel Congress 2016

Main Sponsors

Pizzarotti SA, Bellinzona

PoRR Suisse AG, Altdorf

Pöyry Schweiz AG, Zürich

SFS unimarket AG, Heerbrugg

Sika Schweiz AG, Zürich

Walo Bertschinger AG, Zürich

Many thanks to all Sponsors!

Book Tunnelling Switzerland 2013

G. Anagnostou, H. Ehrbar (Eds.)

TUNNELLINGSW I T Z E R L AND

«TuNNELLING SWITZERLAND» Edition 2013 (ISBN 978-3-7281-3547-6)

This book can be obtained free of charge at the Conference Secretariat at the

Swiss Tunnel Congress 2016

Page 16: Registration and Information: Swiss Tunnel Congress 2016 … · 2016-04-01 · Gotthard Base Tunnel, Basler & Hofmann AG/Noë Flum with the permission of AlpTransit Gotthard AG Swiss

3130

Sponsors Swiss Tunnel Congress 2016

Co-Sponsors

A. Aegerter & Dr. o. Bosshardt AG, Basel

ACo Passavant AG, Netstal

Agir Aggregat AG, Affoltern am Albis

Allianz Suisse Versicherungen, Wallisellen

Atlas Copco (Schweiz) AG, Studen BE

Bekaert Maccaferri underground Solutions, Aalst (BE)

Brugg Contec AG, St.Gallen

BSF Swissphoto AG / Grünenfelder und Partner AG

CSD Ingénieurs, Lausanne

Doka Schweiz AG, Niederhasli

Dörken AG, Arlesheim

Elkuch Bator AG, Herzogenbuchsee

Ernst Basler + Partner AG, Zürich

Fanger Kran AG / Fanger Kies+Beton AG, Sachseln

Ferroflex AG, oberglatt

Many thanks to all Sponsors!

Co-Sponsors

FiReP International AG, Rapperswil

Fischer Rista AG, Reinach AG

JAuSLIN STEBLER AG, Muttenz

Kessler & Co AG, Zürich

Kummler+Matter SA, Région Romandie, Martigny

Liebherr-Baumaschinen AG, Reiden

Locher Ingenieure AG, Zürich

MAPEI SuISSE SA, Sorens

MEVA Schalungs-Systeme AG, Seon

Rascor International AG, Steinmaur

Rothpletz, Lienhard + Cie AG, Aarau

Saint-Gobain Weber AG, Baden-Dättwil

Solexperts AG, Mönchaltorf

Sterobit AG, Rudolfstetten

Toggenburger + Co AG, Winterthur

Many thanks to all Sponsors!