Regular Meeting of the Measure V West Side Regional Projects Committee LOCATION City of Dos Palos City-County Building 1554 Golden Gate Avenue Dos Palos, CA 93620 DATE Wednesday, February 7, 2018 TIME 2:00 P.M. West Side Regional Projects Committee Members City of Dos Palos Michael McGlynn, Councilman City of Gustine Pat Nagy, Councilman – Vice Chair City of Los Banos Mike Villalta, Mayor County of Merced, District 4 Lloyd Pareira, Supervisor – Chair County of Merced, District 5 Jerry O’Banion, Supervisor Packet Page 1

Upload: others

Post on 20-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Regular Meeting of the Measure V West Side Regional

Regular Meeting of the Measure V West Side Regional Projects Committee

LOCATION City of Dos Palos

City-County Building 1554 Golden Gate Avenue

Dos Palos, CA 93620

DATE Wednesday, February 7, 2018

TIME 2:00 P.M.

West Side Regional Projects Committee Members

City of Dos Palos Michael McGlynn, Councilman City of Gustine Pat Nagy, Councilman – Vice Chair City of Los Banos Mike Villalta, Mayor County of Merced, District 4 Lloyd Pareira, Supervisor – Chair County of Merced, District 5 Jerry O’Banion, Supervisor

Packet Page 1

Page 2: Regular Meeting of the Measure V West Side Regional

AGENDA

At least 72 hours prior to each regular Measure V West Side Regional Projects Committee meeting, a complete agenda packet is available for review on the Measure V website at www.measurev-mcag.com and at the MCAG office, 369 W. 18th Street, Merced, CA 95340. All public records relating to an open session item and copies of staff reports or other written documentation relating to items of business referred to on the agenda are on file at MCAG. Persons with questions concerning agenda items may call MCAG to make an inquiry regarding the nature of items described on the agenda.

TRANSLATION SERVICES

Translation Services are not provided at MCAG’s public meeting unless requested at least three (3) business days in advance. Please contact Eva Garibay at (209) 723-3153 x 108 during regularbusiness hours to request translation services.

Servicios de interpreté no son ofrecidos en las juntas públicas de MCAG al menos de que se soliciten tres (3) días de negoción en anticipación. Para solicitas estos servicios por favor contacte a Eva Garibay al (209) 723-3153 x 108 durante horas de oficina.

INDIVIDUALS WITH DISABILITIES

Representatives or individuals with disabilities should contact MCAG at (209)723-3153 at least three (3) days in advance of the meeting to request auxiliary aids or other accommodations necessary to participate in the public meeting.

PUBLIC COMMENTS

Members of the public wishing to address agenda items or comment on any item not on the agenda may do so during agenda item 2 – Public Comment. Persons may also address any item on the agenda during consideration of that item. Comments are limited to three (3) minutes per person. Please state your name and city or community of residence for the record. For items not on the agenda, no action will be taken. If it requires action, the item will be referred to staff and/or placed on the next agenda.

ADDITIONAL INFORMATION

Measure V www.measurev-mcag.com Merced County Association of Governments www.mcagov.org

Welcome to the Measure V West Side Regional Projects Committee Meeting

Packet Page 2

Page 3: Regular Meeting of the Measure V West Side Regional

Regular Meeting of the Measure V West Side Regional Projects Committee

Wednesday, February 7, 2018 – 2:00pm City of Dos Palos

City-County Building, 1554 Golden Gate Avenue Dos Palos, CA 93620

AGENDA

1. Roll Call

2. Public Comment

3. Approval of Agenda Action

4. Approval of Minutes from November 9, 2017 West Side Regional Projects Committee Meeting*

Action p.

5. Revenue Update* Info Nav Bagri p.

6. Discuss Regional Projects • Project Candidate Forms*• Development of the Implementation Plan• Technical Committee• Workshop with Financial Advisor

Info Stacie Dabbs p.

7. 2018 Measure V Schedule Stacie Dabbs

8. Other program updates • Local Projects Funding Agreements• Quarterly Reporting and Citizens Oversight

Committee

Stacie Dabbs

9. Adjourn

*Attachment

Packet Page 3

4

7

8

Page 4: Regular Meeting of the Measure V West Side Regional

DRAFT MINUTES MCAG Measure V West Side Regional Projects Committee November 9, 2017 1:00 PM

Guests Present:

Patrick Pittenger, Executive Director, MCAG Matt Fell, Senior Planner, MCAG Emily Haden, MCAG Counsel Kendall Flint, RGS Steve Flint, RGS Darrell Fonseca Greg Pimentel Ellen Hasness John Fulton Melanie Cowen Alex Terrazas

Item 1: Roll Call

Committee Members Present:

Pat Nagy (Vice-Chair) City of Gustine Mike Villalta City of Los Banos Mike McGlynn City of Dos Palos Lloyd Pareira (Chair) District 4 Supervisor Jerry O’Banion District 5 Supervisor

Item 2: Public Comment

There were no public comments.

Item 3: Approval of Agenda

Chairman Pareira called for a motion. Motion by Vice-Chair Nagy, seconded by Member O’Banion to approve the agenda. Motion approved.

Item 4: Approval of Minutes from August 16, 2017

Chairman Pareira called for a motion. Motion by Member O’Bannon, seconded by Vice-Chair Nagy to approve the minutes. Motion approved.

Packet Page 4

Page 5: Regular Meeting of the Measure V West Side Regional

Item 5: Governing Procedures

Patrick Pittenger stated that these Governing Procedures were adopted by the MCAG Governing Board and serve to guide the actions of the advisory committees. If any member wished to comment on the procedures they are welcome to do so. No comments have been submitted.

Item 6: Revenue Update

Mr. Pittenger reported that each month’s payments are estimates. The actual “true-up” revenues have been received at the end of the quarter. Each month’s revenues have come in lower than projected, but the true-up payments received have resulted in the revenues being right on track with projections. Local monies are flowing to the jurisdictions and regional monies are going to the County Treasurer.

Item 7: Draft Project Evaluation/Selection Criteria

Kendall Flint directed the committee to page 13 of the agenda packet, which lists potential criteria by which projects may be prioritized. Based on today’s discussion these criteria will be incorporated into a future projects summary report, so along with funding sources these criteria will be used to determine which projects go forward. It was suggested that the list be reduced. At yesterday’s meeting, the Eastside Committee decided on the following criteria:

• Funding• Safety• Connectivity• Reduce congestion/emissions (Increased mobility as a subset)• Readiness, and• Economic development (Goods movement as a subset)

It was asked yesterday if West Side and East Side must have the same criteria. So while that’s not required, the recommendations of both groups will go to the Governing Board for approval and the process might be smoother if both groups had the same criteria.

Ms. Flint said that following this meeting, staff will be sending out a form for projects evaluation that will be concise and will include projected revenue over time. Staff will fill out the form that lists the criteria and the funding sources, such as federal grants, SB 1 funds, and Measure V funds. When this committee reconvenes in February 2018 the committee will be able to compare each project to the others. Not all projects will meet all criteria. Once East Side and West Side committees finish their deliberations in the spring 2018, their recommendations will go to the Governing Board in the form of a draft Implementation Plan.

In response to a question regarding bus shelters, Mr. Pittenger indicated Measure V monies could be used for bus facilities, as well as ride share parking lots.

Packet Page 5

Page 6: Regular Meeting of the Measure V West Side Regional

Item 8: Draft Regional Projects List

Each jurisdiction will have until the middle of January 2018 to complete the project evaluation forms that detail candidate project information and how they meet the criteria. Staff will prepare a draft form and distribute it to all member agencies staff to review. Once all agencies’ information is received, staff will compile and disseminate for review in February. Project prioritization and selection will take place in May/June 2018 as part of the development of the draft Implementation Plan. In response to a question, staff indicated that since both groups are using the same criteria, it facilitates using the same evaluation form.

As a related matter, Mr. Pittenger advised that the MCAG Board retreat on November 17 will include KNN financial advisors for a discussion on funding options. Staff will provide more information on the topic at the February Committee meeting. In response to a question about limiting how much Measure V funds could be applied to any one project, the question was considered by the TRB, which advised that such a limit was not a good idea.

Item 9: Meeting Schedule

The Committee decided that its next meeting will be Wednesday, February 7, 2:00 PM at Dos Palos City Hall.

Item 10: Next Steps

Closing Comments: Mr. Pittenger provided information about the Self-Help Counties conference in San Francisco, which included a session on sales tax forecasting and the status of SB 1 monies.

Meeting adjourned at 1:52 PM

Packet Page 6

Page 7: Regular Meeting of the Measure V West Side Regional

Category of Funding

Yearly

Estimated

Allocation

Monthly

Estimated

Allocation

Eight month

Estimated

Allocation

Allocation

Percentage

First Six Months

(April-September) October November Total

Budget vs.

Actual

Variance over

(under)

Overall Total 15,000,000$ 1,250,000$ 10,000,000$ 100% 8,440,716$ 920,900$ 920,900$ 10,282,516$ 282,516$

Funding Directly to Local Jurisdictions

Atwater-General Transportation 80% 498,000$ 41,500$ 332,000$ 3.66% 276,565$ 31,857$ 31,857$ 340,279$ 8,278$

Atwater Alt Modes 20% 124,500$ 10,375$ 83,000$ 3.66% 69,141$ 7,964$ 7,964$ 85,070$ 2,070$

Atwater Total 622,501$ 51,875$ 415,000$ 3.66% 345,707$ 39,821$ 39,821$ 425,348$ 10,348$

Dos Palos-General Transportation 80% 197,522$ 16,460$ 131,681$ 0.75% 104,414$ 14,482$ 14,482$ 133,379$ 1,698$

Dos Palos Alt Modes-20% 49,380$ 4,115$ 32,920$ 0.75% 26,104$ 3,621$ 3,621$ 33,345$ 424$

Dos Palos Total 246,902$ 20,575$ 164,602$ 0.75% 130,518$ 18,103$ 18,103$ 166,724$ 2,122$

Gustine-General Transportation-80% 198,101$ 16,508$ 132,067$ 0.76% 104,746$ 14,516$ 14,516$ 133,778$ 1,710$

Gustine Alt Modes-20% 49,525$ 4,127$ 33,017$ 0.76% 26,186$ 3,629$ 3,629$ 33,444$ 428$

Gustine Total 247,626$ 20,635$ 165,084$ 0.76% 130,932$ 18,145$ 18,145$ 167,222$ 2,138$

Livingston-General Transportation-80% 292,210$ 24,351$ 194,807$ 1.67% 158,663$ 19,957$ 19,957$ 198,578$ 3,771$

Livingston Alt Modes-20% 73,052$ 6,088$ 48,702$ 1.67% 39,666$ 4,989$ 4,989$ 49,644$ 943$

Livingston Total 365,262$ 30,439$ 243,508$ 1.67% 198,329$ 24,947$ 24,947$ 248,222$ 4,714$

Los Banos- General Transportation-80% 630,814$ 52,568$ 420,542$ 4.95% 352,657$ 39,536$ 39,536$ 431,730$ 11,187$

Los Banos Alt Modes-20% 157,703$ 13,142$ 105,136$ 4.95% 88,164$ 9,884$ 9,884$ 107,932$ 2,797$

Los Banos Total 788,517$ 65,710$ 525,678$ 4.95% 440,822$ 49,420$ 49,420$ 539,662$ 13,984$

Merced City-General Transporation-80% 1,248,132$ 104,011$ 832,088$ 10.93% 706,334$ 75,231$ 75,231$ 856,795$ 24,707$

Merced City-Alt Modes-20% 312,033$ 26,003$ 208,022$ 10.93% 176,583$ 18,808$ 18,808$ 214,199$ 6,177$

City of Merced Total 1,560,165$ 130,014$ 1,040,110$ 10.93% 882,917$ 94,038$ 94,038$ 1,070,994$ 30,883$

Merced County-General Transportation-80% 2,935,221$ 244,602$ 1,956,814$ 27.28% 1,672,907$ 172,781 172,781 2,018,469$ 61,655$

County Alt Modes-20% 733,805$ 61,150$ 489,204$ 27.28% 418,227$ 43,195 43,195 504,617$ 15,414$

Merced County Total 3,669,027$ 305,752$ 2,446,018$ 27.28% 2,091,134$ 215,976$ 215,976$ 2,523,086$ 77,068$

Total Funding Directly to Jurisdictions 7,500,000$ 625,000$ 5,000,000$ 50.00% 4,220,358$ 460,450$ 460,450$ 5,141,258$ 141,258$

Funding for Regional Projects -

Eastside Regional 4,050,000$ 337,500$ 2,700,000$ 27% 2,278,993$ 248,643$ 248,643$ 2,776,279$ 76,279$

Westside Regional 2,550,000$ 212,500$ 1,700,000$ 17% 1,434,922$ 156,553$ 156,553$ 1,748,028$ 48,028$

Regional Total 6,600,000$ 550,000$ 4,400,000$ 44% 3,713,915$ 405,196$ 405,196$ 4,524,307$ 124,307$

Transit 750,000$ 62,500$ 500,000$ 5% 422,036$ 46,045$ 46,045$ 514,126$ 14,126$

Administration 150,000$ 12,500$ 100,000$ 1% 84,407$ 9,209$ 9,209$ 102,825$ 2,825$

Total 15,000,000$ 1,250,000$ 10,000,000$ 100% 8,440,716$ 920,900$ 920,900$ 10,282,516$ 282,516$

- - - - -

MCAG MEASURE V: ALLOCATED REVENUES TO DATE COMPARED TO ESTIMATED AMOUNTS(FIRST EIGHT MONTHS OF COLLECTIONS: APRIL 2017 -NOVEMBER 2017)

Actual Allocation of Sales TaxEstimated Budget Allocation

1/26/2018Packet Page 7

Page 8: Regular Meeting of the Measure V West Side Regional

Lead Agency Project Name Total Project Cost City of Los Banos Merced College Bike/Pedestrian Trail $1,200,000City of Los Banos Pioneer Road Widening $45,000,000City of Los Banos H Street, Badger Flat Road, Overland Avenue Widening $25,000,000City of Los Banos Mercey Springs Road, State Route 165 Widening $20,000,000City of Los Banos State Route 152 Bypass $450,000,000City of Dos Palos Center Avenue North $936,000City of Dos Palos Blossom Street East $2,488,310City of Gustine Carnation Road Improvements $2,460,000City of Gustine Hunt Road/Preston Road Improvements $5,575,000City of Gustine State Route 33/140 Roundabout $2,800,000County of Merced Henry Miller Road (from Hwy 33 to Turner Island) Road Project $5,010,000County of Merced Hutchens Road (from Indiana Road to Palm Ave) Road Project $260,000County of Merced Indiana Road (from Washington Rd to Hutchens Rd) Road Project $610,000County of Merced Ingomar Grade Road (from Badger Flat Rd to Cottonwood Dr) $510,000County of Merced Palm Avenue (from Hutchens Rd to Hwy 152) Road Project $710,000County of Merced Whitworth Road (from Netherton Rd to I-5) Road Project $2,810,000

Total $565,369,310As of 1.31.18

WEST SIDE REGIONAL CANDIDATE PROJECTS

Packet Page 8

Page 9: Regular Meeting of the Measure V West Side Regional

Packet Page 9

Page 10: Regular Meeting of the Measure V West Side Regional

Packet Page 10

Page 11: Regular Meeting of the Measure V West Side Regional

Packet Page 11

Page 12: Regular Meeting of the Measure V West Side Regional

Packet Page 12

Page 13: Regular Meeting of the Measure V West Side Regional

Packet Page 13

Page 14: Regular Meeting of the Measure V West Side Regional

Packet Page 14

Page 15: Regular Meeting of the Measure V West Side Regional

Packet Page 15

Page 16: Regular Meeting of the Measure V West Side Regional

Packet Page 16

Page 17: Regular Meeting of the Measure V West Side Regional

Packet Page 17

Page 18: Regular Meeting of the Measure V West Side Regional

Packet Page 18

Page 19: Regular Meeting of the Measure V West Side Regional

Packet Page 19

Page 20: Regular Meeting of the Measure V West Side Regional

Packet Page 20

Page 21: Regular Meeting of the Measure V West Side Regional

Packet Page 21

Page 22: Regular Meeting of the Measure V West Side Regional

Packet Page 22

Page 23: Regular Meeting of the Measure V West Side Regional

Packet Page 23

Page 24: Regular Meeting of the Measure V West Side Regional

PROJECT NAME: Center Avenue North (Area Project)

LEAD AGENCY: City of Dos Palos

PROJECT DESCRIPTION (location, scope and limits): Center Avenue North (Area Project) is

Center Avenue between Marguerite Street & Loraine Street, and Loraine Street between Center

Avenue and Dos Palos Avenue. Rehabilitates one of the city’s two arterials and its collector as a

complete street project. Has high traffic count, poor road quality, replaces storm drain system

to eliminate flooding/runoff, will improve seven intersections, reconstructs street, sidewalk,

curbs, gutters, into sustainable system that significantly reduces maintenance costs, links two

parks, recreation equipment & fields, nutrition site & senior center, together by improved

roadway, walk path/bike path, bus transit stop, city and county facilities. (Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report 2018 2018 100,000

Environmental Review, Project Approvals, Permits 2018 2018

101,000

Design (PS & E) 2018 2018 43,000

Acquire Right-of-Way Existing Existing n/a

Construction 2018 2019 692,000

Estimated Total Cost 936,000

Packet Page 24

Page 25: Regular Meeting of the Measure V West Side Regional

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

Banking Measure V Local 267,000, Banking Measure V Alt/Sidewalk Funds 50,000, Seeking Measure V Regional $200,000, Seeking SB 1 RMRA 201,000, Seeking Bike Path Grant 140,000, Have/Seeking Local Engineering/Environmental 43,000, Have City Storm Drain Funds 35,000. CONNECTIVITY Complete Streets, Regional Connections

Rehabilitates arterial and its connector into complete street project. Center Avenue runs from Merced County into the City of Dos Palos, into Fresno County. It bisects the City. This project links a County Park with two City Parks, their community halls, playgrounds, ballfields. It also provides linkage to a bus transit stop and a senior center and nutrition site.

SAFETY

This project replaces a very poor-quality street with numerous potholes and deviations into a smooth traversable street. It is currently impossible to walk this area entirely on sidewalk, once completed it will make ADA wheelchair access possible from park to park, site to site.

READINESS For Construction

Once the City completes its $35,000 storm drainage replacement, the street and sidewalk portions become shovel ready. The bike path/walk way will require additional time, but it is off the street and sidewalk right of way.

ECONOMIC DEVELOPMENT Including Goods Movement

As an arterial that bisects the City of Dos Palos, it is one of two streets in which virtually all goods are moved, the other being Blossom Street.

OTHER INFORMATION

This project is severable should bike path/walk way funding not be available. The storm drainage, sidewalk, curb, gutter, ramp, and street portions could proceed reducing project time and cost. This project is currently listed as item #7 on the potential regional projects list as of 01-08-18.

Packet Page 25

Page 26: Regular Meeting of the Measure V West Side Regional

PROJECT NAME: Blossom Street East (Area Project)

LEAD AGENCY: City of Dos Palos

PROJECT DESCRIPTION (location, scope and limits): Blossom Street East (Area Project) is

East Blossom Street from Palm Avenue (County) to Lucerne Avenue and Lucerne Avenue from

Colony Canal to Blossom Street, Willson Avenue from Colony Canal to Blossom Street, Leonard

Avenue from Colony Canal to DPHS Football/Soccer/Baseball Stadiums, Harris Avenue from

Colony Canal to DPHS Soccer Field. Rehabilitates one of the city’s two arterials and its collectors

as a complete street project. Has high traffic count, very poor road quality, replaces storm drain

system to eliminate flooding/runoff, replaces water lines, replaces sewer lines, replaces

overhead PG&E, Telephone, and Cable lines with underground lines, replaces worst sidewalks in

the county, handicapped access ramps, in a high traffic area, services the high school, improves

school bus transit, significantly improves student crossing safety at various intersections,

reconstructs street, sidewalk, curbs, gutters, into sustainable system that significantly reduces

maintenance costs. (Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report 2018 2019 200,000

Environmental Review, Project Approvals, Permits 2018 2019

201,000

Design (PS & E) 2018 2019 100,000

Acquire Right-of-Way Existing Existing Existing

Construction 2019 2020 1,380,000

Estimated Total Cost 2,488,310

Packet Page 26

Page 27: Regular Meeting of the Measure V West Side Regional

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

Banking Measure V Local 1,380,000, Banking Measure V Alt/Sidewalk Funds 155,000, Seeking Measure V Regional $400,000, Seeking School District/Bus Impact 248,831, PG&E, Telephone, Cable 261,000, Have City Water 180,000, Have City Sewer Funds 173,169, and Have City Storm Drain Funds 90,000. CONNECTIVITY Complete Streets, Regional Connections

Rehabilitates arterial and its connector into complete street project. Blossom Street runs from Merced County through Midway, through the City of Dos Palos, and back to Merced County. This project links several local communities of interest. It makes the high school and its facilities, classrooms, ballfields, bus transit, multi-use buildings accessible. Also improves walkability. SAFETY

It is currently impossible to walk this area entirely on sidewalk, or traverse in a wheelchair. This project will transform an area with possibly the worst quality streets and sidewalks, into a safe walkable, neighborhood and school area. It will also significantly improve the student access and crosswalk safety. READINESS For Construction

The City intends to begin replacing all of it water, sewer, storm drainage utilities, have overhead PG&E, telephone, and cable moved underground, and complete all engineering work to make this project shovel ready within two years. ECONOMIC DEVELOPMENT Including Goods Movement

As an arterial that bisects the City of Dos Palos, Blossom Street is one of two streets in which virtually all goods are moved, the other being Center Avenue. Further and perhaps more important, it is also the roadway access for nearly all local school students, teachers, administrators, busses, and visitors.

OTHER INFORMATION

This is a multi-agency project. The City anticipates assistance from the School District and various utilities such as PG&E. This project is currently listed as item #8 on the potential regional projects list as of 01-08-18.

Packet Page 27

Page 28: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Carnation Road Improvements

City of Gustine

The City proposes to rehabilitate the roadway of Carnation Ave between East Avenue and the WWTPGate. The proposed project will consist of a Roadway Reconstruction from EP to EP Approx. 24' wide.

Feb 2019 May 2019 10,000

Feb 2019 July 2019 50,000

Aug 2019 Nov 2019 2,400,000

2,460,000

Packet Page 28

Page 29: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

The City is actively seeking funds for the proposed project improvements from a variety of fundingsources. At this time the City has not yet secured funds for this project. The project could potentially bephased to reduce the initial project costs. The City may also pursue a project partnership with theprivate funding sources to reduce funding needs.

In addition to the roadway's normal daily traffic that connects farms to the City of Gustine the road alsoused by City Staff to access the WWTP. Carnation also connects to Kniebes Road which provides aconnection to SR-140.

The condition of the existing roadway is very poor and accumulates large amounts of dust and debris inareas where the roadway is failing. This dust and debris is stirred up as vehicles travel along the roadresulting in particulate matter emissions. The proposed project once constructed will provide emissionsreductions for both PM10 and PM2.5 emissions as dust and debris emission will be reduced.

The road's current condition poses safety concerns. As the roadway fails there is the potential to causedamage to vehicles or result in collisions with roadside objects. By improving the roadway these types ofdamage and collisions will be reduced.

The project is currently in the conceptual phase and an initial estimated project cost and scope hasbeen developed for purposes of seeking funding. The City is eager to move forward with the projectonce funding can be secured.

Carnation Avenue is currently used by local farmers to access a variety of crop fields and dairies locatedadjacent to the roadway.

Packet Page 29

Page 30: Regular Meeting of the Measure V West Side Regional

CAL IFORN IA

140

NO

RT

H

0 1500

SCALE IN FEET

PROJECT AREA

PROJECT AREA

TO THE CITY OF MERCED

Jan

11, 2018 - 2:42p

m

V:\C

OG

\945\03\cad

\exh

ib

its\P

ES

-R

FA

_E

xh

ib

its\p

ro

j_vicin

ity_m

ap

.d

wg

• • •

City of Gustine - Carnation Road Improvements - Project Location MapLOC

KN

IE

BE

S R

OA

D

WWTP

CARNATION ROAD

EA

ST

A

VE

NU

E

AIRPORT

Packet Page 30

AutoCAD SHX Text
NOTE: CONCEPTUAL DRAWING. FINAL DESIGN HAS NOT BEEN COMPLETED AND MAY DIFFER FROM WHAT IS SHOWN IN EXHIBIT.
AutoCAD SHX Text
Gouveia Engineering, Inc. • 456 Sixth Street • Gustine, California 95322 • (209) 854-3300456 Sixth Street • Gustine, California 95322 • (209) 854-3300Gustine, California 95322 • (209) 854-3300(209) 854-3300
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DGR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
01/10/18
Page 31: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Hunt Road/Preston Road Improvements

City of Gustine

The City proposes to rehabilitate the roadway of Hunt Road between SR-140 and Preston Ave andPreston Ave between Hunt Road and Old Santa Fe Grade. The proposed project will consist of aRoadway Reconstruction from EP to EP Approx. 24' wide.

Jan 2019 May 2019 20,000

Jan 2019 Jun 2019 55,000

July 2019 Oct 2019 5,500,000

5,575,00

Packet Page 31

Page 32: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

The City is actively seeking funds for the proposed project improvements from a variety of fundingsources. At this time the City has not yet secured funds for this project. The project could potentially bephased to reduce the initial project costs. The City may also pursue a project partnership with theCounty or possible private funding to reduce funding needs.

In addition to the roadway's normal daily traffic that connects farms to SR-140 the road also sees alarge amount of traffic during special events when the bull fighting ring is used. This is the onlyconnection to the bull fighting facilities.

The condition of the existing roadway is very poor and accumulates large amounts of dust and debris inareas where the roadway is failing. This dust and debris is stirred up as vehicles travel along the roadresulting in particulate matter emissions. The proposed project once constructed will provide emissionsreductions for both PM10 and PM2.5 emissions as dust and debris emission will be reduced.

The road's current condition poses safety concerns. As the roadway fails there is the potential to causedamage to vehicles or result in collisions with roadside objects. By improving the roadway these types ofdamage and collisions will be reduced.

The project is currently in the conceptualphase and an initial estimated project cost and scope has beendeveloped for purposes of seeking funding. The City is eager to move forward with the project oncefunding can be secured.

In addition to the traffic generated during special events at the bull fighting ring, Hunt Road and PrestonAvenue are used daily by local farmers to access a variety of crop fields and dairies located adjacent tothe roadway.

Packet Page 32

Page 33: Regular Meeting of the Measure V West Side Regional

CAL I FORN IA

140

CAL IFORN IA

33

NO

RT

H

0 1500

SCALE IN FEET

PROJECT AREA

PROJECT AREA

TO THE CITY OF MERCED

T

O

T

H

E

C

IT

Y

O

F

N

E

W

M

A

N

Jan

11, 2018 - 2:23p

m

V:\C

OG

\945\03\cad

\exh

ib

its\P

ES

-R

FA

_E

xh

ib

its\p

ro

j_vicin

ity_m

ap

.d

wg

• • •

City of Gustine - Hunt/Preston Ave Road Improvements - Project Location MapLOC

HU

NT

R

OA

D

PRESTON AVENUE

BULL

FIGHTING

RING

Packet Page 33

AutoCAD SHX Text
NOTE: CONCEPTUAL DRAWING. FINAL DESIGN HAS NOT BEEN COMPLETED AND MAY DIFFER FROM WHAT IS SHOWN IN EXHIBIT.
AutoCAD SHX Text
Gouveia Engineering, Inc. • 456 Sixth Street • Gustine, California 95322 • (209) 854-3300456 Sixth Street • Gustine, California 95322 • (209) 854-3300Gustine, California 95322 • (209) 854-3300(209) 854-3300
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DGR
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
01/10/18
Page 34: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

SR 33/140 Roundabout CML-5230(003)

City of Gustine

The City proposes to convert the existing T-intersection of 4th Street and 6th Avenue into a three-leggedroundabout with single approach and departure lanes. The southern leg of the roundabout will realignRailroad Avenue to directly connect to the new roundabout. The roundabout will also require transitionimprovements for roadway approaches on the other two legs. Along with the realignment of RailroadAvenue, a segment of South Avenue between Ash Avenue and 4th Street will be reconfigured to becomea Woonerf as part of the project’s adjacent improvements. The project footprint and street realignmentwill require the acquisition of additional right of way from at least two adjacent private properties.

3/18/11 5/1/18 225,000

3/18/11 10/31/18 100,000

7/5/18 11/7/18 175,000

3/1/19 7/4/19 2,300,000

2,800,000

Packet Page 34

Page 35: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

The City has obtained CMAQ funding for this project in the amount of $2,390,000 with a total localmatch of $310,000. The City is seeking funds in the amount of $310,000 to assist with the City's portionof the project costs.

The proposed project incorporates complete streets components for all modes of travel. The proposedproject includes a multi-use path, intersection lighting improvements and crossing improvements forpedestrians and bicyclists.

The proposed project provides emissions reductions for both PM10 and PM2.5 emissions. EmissionsReduction Calculations were prepared for the CMAQ funding application. Those calculations show theconstruction of the roundabout at this location will have approximately 0.12 kg/day in reducedemissions.

The project improves safety for both vehicle traffic and non-motorized traffic. For vehicle traffic, areduction in collision severity and incidents is well documented for roundabout intersections. Forpedestrians and bicyclists, the proposed improvements will provide a separated area for non-motorizedtravel as well as improved crossing facilities reducing the potential for collisions between motorized andnon-motorized traffic. Improved lighting in the project area will increase visibility reducing collisions.

The project is currently in the final stages of the PS&E phase with an estimated phase completion ofNovember of 2018. The project has environmental clearance. The City is preparing to obtain a right ofway consultant to assist with right of way acquisitions required for the project. The City anticipates theCON phase of the project to occur in late 2018.

The proposed project will improve movement of goods through the region as the project is located onSR-33/140 and is a commonly used connection between the SR-99 and I-5 corridors.

Packet Page 35

Page 36: Regular Meeting of the Measure V West Side Regional

CAL I FORN IA

140

CAL I FORN IA

33CAL I FORN IA

140

CAL I FORN IA

33

NO

RT

H

0 800

SCALE IN FEET

City of Gustine

Jan

11, 2018 - 2:34p

m

V:\C

OG

\945\03\cad

\exh

ib

its\P

ES

-R

FA

_E

xh

ib

its\p

ro

j_vicin

ity_m

ap

.d

wg

945.03

1

CONSTRUCT ROUNDABOUT ON SR-140/33 - CML-5230(003)

PROJECT LOCATION MAP

GOUVEIA ENGINEERING, INC.

CONSULTING ENGINEERS

••

PROJECT AREA

SCHMIDT PARK

EA

ST

A

VE

NU

E

NORTH AVENUE

SOUTH AVENUE

EA

ST

A

VE

NU

E

MEREDITH AVENUE

LA

UR

EL A

VE

NU

E

WE

ST

A

VE

NU

E

PARK

5

th

S

T

R

E

E

T

6

th

S

T

R

E

E

T

4

th

A

V

E

N

U

E

S

P

R

R

M

A

IN

L

IN

E

R

A

IL

R

O

A

D

A

V

E

N

U

E

4

th

S

T

R

E

E

T

PROJECT AREA

6

th

A

V

E

N

U

E

5

th

A

V

E

N

U

E

7

th

S

T

R

E

E

T

GR

OV

E A

VE

NU

E

Packet Page 36

AutoCAD SHX Text
FIGURE
AutoCAD SHX Text
PROJECT NUMBER
AutoCAD SHX Text
456 Sixth Street • Gustine, California 95322 Gustine, California 95322 Telephone (209) 854-3300 • Fax (209) 854-3600 Fax (209) 854-3600
AutoCAD SHX Text
Drawn By:
AutoCAD SHX Text
D. Reed
AutoCAD SHX Text
DATE
AutoCAD SHX Text
2/15/2012
Page 37: Regular Meeting of the Measure V West Side Regional

Packet Page 37

Page 38: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Henry Miller Road (from Highway 33 to Turner Island Road) Road Project

Merced County

Henry Miller Road (from Highway 33 to Turner Island Road) is approximately 17.0 miles and is located inthe southwest part of Merced County. The project will involve roadway reconstruction, road shoulderwork and the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

05/01/2020 11/30/2020 $5,000,000.00 *

$5,010,000.00

Packet Page 38

Page 39: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time. Merced County has already budgeted their localshare of Measure V funds for use on this project.

Improving Henry Miller Road from Highway 33 to Turner Island Road improves the connectivity betweenthese roads by the utilization of a new road surface.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 39

Page 40: Regular Meeting of the Measure V West Side Regional

Packet Page 40

Page 41: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Hutchens Road (From Indiana Road to Palm Avenue) Road Project

Merced County

Hutchens Road (From Indiana Road to Palm Avenue) is approximately 1.0 mile and is located in thesouthwest part of Merced County. The project will involve roadway reconstruction, road shoulder workand the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

06/01/2018 08/31/2018 $250,000.00 *

$260,000.00

Packet Page 41

Page 42: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time. Merced County has already budgeted their localshare of Measure V funds for use on this project.

This project will serve as an improved route from Indiana Road to Palm Avenue.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 42

Page 43: Regular Meeting of the Measure V West Side Regional

Packet Page 43

Page 44: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Indiana Road (From Washington Road to Hutchens Road) Road Project

Merced County

Indiana Road (From Washington Road to Hutchens Road.) is approximately 2.30 miles and is located inthe southwest part of Merced County. The project will involve roadway reconstruction, road shoulderwork and the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

06/01/2018 08/31/2018 $600,000.00 *

$610,000.00

Packet Page 44

Page 45: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time. Merced County has already budgeted their localshare of Measure V funds for use on this project.

This project will serve as an improved route from Washington Road to Hutchens Road.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 45

Page 46: Regular Meeting of the Measure V West Side Regional

Packet Page 46

Page 47: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Ingomar Grade Road (From Badger Flat Road to Cottonwood Dr.) Road Project

Merced County

Ingomar Grade Road (From Badger Flat Road to Cottonwood Dr.) is approximately 2.0 miles and islocated in the southwest part of Merced County. The project will involve roadway reconstruction, roadshoulder work and the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

01/01/2019 05/31/2019 $500,000.00 *

$510,000.00

Packet Page 47

Page 48: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time. Merced County has already budgeted their localshare of Measure V funds for use on this project.

This project will serve as an improved route connecting Badger Flat Road to Cottonwood Drive.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 48

Page 49: Regular Meeting of the Measure V West Side Regional

Packet Page 49

Page 50: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Palm Avenue (From Hutchens Road to Highway 152) Road Project

Merced County

Palm Avenue (From Hutchens Road to Highway 152) is approximately 2.5 miles and is located in thesouthwest part of Merced County. The project will involve roadway reconstruction, road shoulder workand the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

06/01/2018 08/31/2018 $700,000.00 *

$710,000.00

Packet Page 50

Page 51: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time. Merced County has already budgeted their localshare of Measure V funds for use on this project.

This project will serve as an improved route connecting Highway 152 and Hutchens Road.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 51

Page 52: Regular Meeting of the Measure V West Side Regional

Packet Page 52

Page 53: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 1

PROJECT NAME:

LEAD AGENCY:

PROJECT DESCRIPTION (location, scope and limits):

(Please attach a map of the project location)

PROPOSED SCHEDULE AND ESTIMATED COST BY PHASE:

Phase / Component Estimated Start

Estimated Completion

Estimated Cost

Project Study Report

Environmental Review, Project Approvals, Permits

Design (PS & E)

Acquire Right-of-Way

Construction

Estimated Total Cost

Whitworth Road (From Netherton Road to Highway 5) Road Project

Merced County

Whitworth Road (from Netherton Road to Highway 5) is approximately 10.5 miles and is located on thesouthwest part of Merced County. The project will involve roadway reconstruction, road shoulder workand the installation of pavement striping and markings.

$0.00

$0.00

03/01/2018 04/30/2018 $10,000.00 *

$0.00

06/01/2018 08/31/2018 $2,800,000.00 *

$2,810,000.00

Packet Page 53

Page 54: Regular Meeting of the Measure V West Side Regional

Regional Project Candidate Information and Evaluation Form

Page 2

Please briefly describe how the project meets the following criteria:

FUNDABILITY Committed funding; Leveraging funding from multiple agencies; Competitiveness for grants.

CONNECTIVITY Complete Streets, Regional Connections

REDUCE EMISSIONS Reduction in Vehicle Miles Traveled; Reduction in Single-Occupant Vehicle Use

SAFETY

READINESS For Construction

ECONOMIC DEVELOPMENT Including Goods Movement

OTHER INFORMATION

Additional funding sources are unknown at this time.

Whitworth Road serves as a major route to connect the City of Newman with Highway 99.

Emissions will be reduced through the increased use of this improved route, thus relieving trafficcongestion and associated emissions on other roadways.

The new roadway will increase safety by improving the condition of the road.

Ready for construction.

Improved movement of goods will be achieved by providing an improved route.

Packet Page 54