![Page 1: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/1.jpg)
Reliability-Centered Maintenance of
Distribution System Equipment
prof. Ing. Stanislav Rusek, CSc.doc. Ing. Radomír Go o, Ph.D.doc. Ing. Vladimír Král, Ph.D.andothers
![Page 2: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/2.jpg)
Introduction
Relation reliability vs. maintenance
1
2
![Page 3: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/3.jpg)
3
Impact of maintenance downtimes on reliability
Intensity of breakdowns P (yr -1)
Mean time of breakdowns P (h)
Intensity of maintenance U (yr -1)
Mean time of maintenance U (h)
![Page 4: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/4.jpg)
4
Model of ageing
I II III time
periodof early
breakdownsperiod of standard operation
period of operation
beyondservice life
![Page 5: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/5.jpg)
5
Distribution function of period unto breakdown
t . . . . breakdown time (hrs)t0 . . . . guaranteed period without breakdowns [hrs]
. . . . characteristics of wear and tear< 1 indicates period of early breakdowns= 1 indicates incidental breakdowns> 1 indicates wear and tear breakdowns
. . . . characteristic service life (hrs)
0
1tt
etF
![Page 6: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/6.jpg)
6
Goal: to maintain reliability with minimum costs
by carrying out coordinated maintenance, i.e.when such maintenance is carried out on severalelements which are in series from the point ofview of reliability (e.g. separate devices at theoutlet from a switching station), it is then carriedout usually in a single maintenance downtimewhat means that no addition of intensity ofmaintenance occurs.
by implementing the principle of reliability-centered maintenance.
![Page 7: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/7.jpg)
7
History of maintenance
Until the 50-ties of 20th centurySimple equipment usually amply dimensionedNot very high level of mechanisationCorrective maintenance“Operation until a breakdown”
time t
Technical condition
S (%)
100 %
t1 t2 t3 t4
t1, t2, ... const., S1 = S2 = ... = 0
![Page 8: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/8.jpg)
8
History of maintenanceIn the 50-ties through 70-ties of 20th
centuryPeriod after the World War TwoDevelopment of industry, more complicated equipmentFirst concept of Preventive (periodical) maintenance
t1 = t2 =... = const., S1,S2,... const.
time t
Technical condition
S (%)
100 %
t1 t2 t3 t4
![Page 9: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/9.jpg)
9
History of maintenance
In the 80-ties of 20th centuryDevelopment of measuring / metering / diagnostic methodsSubordination of maintenance to actual needs of equipment –“maintenance according to the condition”
t1, t2, ... const., S1 = S2 = ... = const.
time t
Technical condition
S (%)
100 %
t1 t2 t3 t4
mainte-nance
![Page 10: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/10.jpg)
10
History of maintenanceIn the 90-ties of 20th century
Effort for the highest possible efficiency of maintenanceUsually taking into account so called “equipment importance”Oncoming of reliability-centered maintenance
t1, t2, ... const., S1,S2,... const.
time t
Technical condition
S (%)
100 %
t1 t2 t3 t4
![Page 11: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/11.jpg)
RCM
Reliability-Centered Maintenance
2
11
![Page 12: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/12.jpg)
12
Reliability Centered Maintenance [RCM]
The goal of reliability-centered maintenance is tocreate such a maintenance strategy, so that theoverall operating costs are minimised whilepreserving required rates of reliability, safety andenvironment-friendly attitude in the equipment tobe operated.
![Page 13: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/13.jpg)
13
RCM Procedure
1. Determine all the equipment which is subject to maintenance andwhich therefore takes part in the RCM process.
2. Determine the function of such equipment.
3. Define resulting model of equipment ageing.
4. Determine the importance of such equipment.
5. Identify equipment breakdowns and related consequences
6. Set up the equations of overall operating costs related to suchequipment and find the most convenient form of maintenance.
![Page 14: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/14.jpg)
14
Breakdown consequencesSafety consequences – personal injury, equipment destruction, firebreaking out, endangering of public
Environmental consequences – pollution of atmosphere or watercourses, soil contamination, e.g. through an oil leakage during atransformer breakdown, radioactivity leakage during a nuclear powerstation breakdown
Operating consequences – direct economic losses due to any reductionof power generation / distribution and due to repair costs
Non-operating consequences – related to direct repair costs
Hidden consequences – due to breakdowns which are not evident on thefirst sight and can cause multiple breakdowns, such as malfunctions orsafety equipment failures
![Page 15: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/15.jpg)
15
General chart of RCM procedure
Logika
RCM
Program
údržby
za ízení
emíst ní
Zm na konstrukce nebo
ení
Preventivní údržba
Prediktivní údržba
Opravná údržba
Vým na
Analýza p vodních in
Stanovení rizik
Výpadky zákazník
intenzita a trvání
Náklady na výpadekzákazníka
Aktuální výkon komponentu a
trendy
Lidskézdroje
Koordinace se zákaznickým
asovým plánem
Regulace:Vládní
Bezpe nostníŽivotního prost edí
Výpadky zákazníkvodní p inyAnalýzy
Za ízení:PohotovostSpolehlivost
Údržba:Historie, praxe,Dokumentace
Efektivnost
Údržbové náklady
Zautomatizovaný systém správyúdržby
Regulation: Governmental
Safety Environment
Customer outages Original reasons
Analyses
Equipment: Readiness Reliability
Maintenance: History, experience
Documentation Efficiency
Maintenance costs
Logic of RCM
Risk determination
Relocation
Design or metering
modification
Preventive maintenance
Predictive maintenance
Repairing
maintenance
Replacement
Analysis of original
reasons
Coordination with customer time
scheduleHuman
resources
Equipment
maintenance
program
Computerized system of
maintenance administration
Customer outages: intensity and
duration
Customer outage costs
Actual performance of
resp. component and trends
![Page 16: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/16.jpg)
16
Criteria for selection of elements for RCM
1. Criteria which reflect the importance of individualelements for respective distribution systemoperator.
2. Criteria of this group should reflect“completeness” and sufficient quantity of inputdata for the implementation of RCM system.
3. “Third group” of criteria should take into accountthe returnability, i.e. the fact that the existingsystem of maintenance of certain elements willnot be possibly modified.
![Page 17: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/17.jpg)
17
Equipment importanceBy importance, it is understood the significance of respective equipment from the pointof view of impact of its outage on the system operation – such importance dependsdirectlyon the costs of such outage.
The importance of equipment therefore does not depend on the reliability of equipmentitself but on its position in the system.
TR 22/0,4 kV TR 22/0,4 kV
Importance
lower higher
[Big consumers] -industrial plantsSmall consumers -
households
![Page 18: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/18.jpg)
18
Possible approaches to the application of RCM
Optimisation of maintenance cycle Determination of order of elements for maintenance
Number of specific type elements is high. Number of elements of specific type is low.
Generally, respective specific type element is less important.
Respective specific type element is highly important.
It is impossible to estimate the cost of a specific type element.
It is necessary to set a limit from which it would be reasonable to start a maintenance process (not only economic parameters should be then taken into consideration).
When analysing an event (failure, outage), it is impossible to find out a specific element [responsible for such event]
When analysing an event (failure, outage), it is possible to find out a specific element…
Monitoring of equipment (also online) is recommendable, with the aim to determine the condition and importance of respective equipment elements.
![Page 19: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/19.jpg)
19
Determination of elements for the application of RCM
Optimization of the maintenance cycleDistribution Transformer Substation (DTS) HV/LVOverhead HV line (except of circuit breaker elements)
Determination of optimum order of elements formaintenance
transformers 110 kV/HVoutlet fields 110 kVlines 110 kVcircuit breaker elements in overhead HV lines
![Page 20: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/20.jpg)
Optimisation of maintenance cycle
Costs
3
20
![Page 21: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/21.jpg)
21
Cost equation
Equation of overall operation costs should becomposed for each equipment system and itslocal minimum should be found
NU . . .Equipment maintenance costs (CZK . yr -1)
NO . . . Repair costs (CZK . yr -1)
NV . . .Outage costs (CZK . yr -1)
ND . . .Other costs (CZK . yr -1)
)rok(K -1DVOUC NNNNN CZK . yr -1
![Page 22: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/22.jpg)
22
Example of cost equation
VOUC NNNN
UUU NN . 1 PKOO NN . 1
U
P
P e - 1 . PK
PNV N . P . T . PKVN
![Page 23: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/23.jpg)
23
Application of the methodology to DTS
Graf závislosti náklad - 2002 (DTS s údržbovými prostoji)
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
5500
6000
0 0,05 0,1 0,15 0,2 0,25
Intenzita údržby
Nák
lady
[K]
Celk. nákl.
Nákl.údrž.
Nákl. výp.
Nákl. na údržb. prostoj
Nákl. opr.
Optimum maintenance intensity in this case is 0.105 yr -1.
Cos
ts [C
ZK]
Maintenance intensity
Diagram of cost dependence - 2002
(DTS with maintenance downtimes)
Total costsMaintenance costs
Calculation costs
Maintenance downtime costs
Repair costs
![Page 24: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/24.jpg)
24
Division into groups according to their importance (or weight)
Methodology according to the structure of customers
Methodology according to the credits of DTSs
It is possible to divide DTSs only into three groups
Number of groups can be determined “arbitrarily”
There is no need to specify any boundaries between groups
Specification of boundary credit values is required
DTS with a Big Consumer (or at least Small Commercial Consumer) has always a higher priority, no matter how many other customers (Small Household Consumers) are in a group
The importance of any DTS depends on the number of customers and their weight (Big Consumer : Small Commercial Consumer : Small Household Consumer = 50:5:1)
The type of DTS is not taken into consideration
It is taken into consideration whether respective DTS is a “kiosk” type DTS or not
![Page 25: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/25.jpg)
25
Division of DTSs according to their credits
Credit expresses the importance [of a DTS]
NMOO Number of Small Household Consumers connected to a DTS
NMOP Number of Small Commercial Consumers connected to a DTS
NVO Number of Big Consumers connected to a DTS
kMOO coefficient of Small Household Consumers; value = 1
kMOP coefficient of Small Commercial Consumers; value = 5
kVO coefficient of Big Consumers; value = 50
Ttype parameter of a DTS; value = 2 for kiosk & building types, 1 for other types
P loadon a DTS (kW)
kP weight coefficient of the load; for the time being: value = 0
PVOVOMOPMOPMOOMOO kPTkNkNkNKredit )(
![Page 26: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/26.jpg)
26
Graphical division of DTSs into groups
1989
4966
1333
0
765
184
3368
43257
71607
34278
349788
408507
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Po et DTS Sou et VO Sou et MOP Sou et MOO
A
B
C
Number of DTSs Sum of BigCons Sum of SmCommCons Sum of SmHousCons
Metering Type
![Page 27: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/27.jpg)
27
Optimisation of maintenance cycle for DTS
Maintenance intensity
Cos
ts [C
ZK]
![Page 28: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/28.jpg)
Determination of optimum order of elements for
maintenanceCondition vs. importance
4
28
![Page 29: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/29.jpg)
29
Basic methodology principle
Determine the condition and importance of each element
Equipment importance
Equi
pmen
t rea
dine
ss
(Tec
hnic
al c
ondi
tion)
Equipment No.1 Equipment No.3
Equipment No.2
![Page 30: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/30.jpg)
30
Basic methodology principle
Maintenance plan setup
Tech
nica
l con
ditio
n
Equipment importance
Equipment No.1
Equipment No.2
Equipment No.3
Equipment No.4
Put out of operation
immediatelyMaintenance required as
soon as possible
Include into Plan of Maintenance for the next year
Inspection and diagnostics
required
![Page 31: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/31.jpg)
31
Application to high-voltage/power circuit breakers [110 kV]
Identify each element, its technical condition and importanceIdentification dataPower station
Field / outletPutting in operation [year]
Type of circuit breaker
Quenching mediumCircuit breaker serial No.
Produced in [year]
Drive typeDrive model
Drive serial No.Drive produced in [year]
Importance of circuit breakerPlace of installation
Type of line
Possibility to back up
Importance of power consumption area
Power transmitted per year
Technical condition of circuit breakerDate of last intervention
Tightness of quenching chamber
Date of last major overhaul of the compressor (drive)
Hours of compressor operation after major overhaul
Number of circuit breaking cycles after major overhaul
Date of last diagnostic tests
Evaluation of last diagnostic tests
Date of [last] evaluation of technical condition
Climatic conditions
Number of circuit breaking cycles [actual]
Hours of compressor operation [actual]
Condition of metal parts (corrosion, coating)
Condition of earthing parts
Condition of insulators
![Page 32: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/32.jpg)
32
Application to transformers 110 kV / HV
IdentificationTransformer node point
AbbreviationDesignationYear of productionSerial No.Number of operating hours in the period under considerationSn [MVA]cos
![Page 33: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/33.jpg)
33
Technical condition criteriaClimatic conditionsTime from last ordinary [minor] maintenance or repairType of machineAge of machineAge of tapping switchAge of transformer bushingVessel condition (corrosion, coating)LeakageCondition of control box and its electrical equipmentCablingNumber of switch-over eventsAverage hourly load (value not available)Evaluation of diagnostic tests
Application to transformers 110 kV / HV
![Page 34: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/34.jpg)
34
Criteria of importanceTransmitted power per yearPossibility of backup (transformer, HV line)Importance of connected HV lines
Application to transformers 110 kV / HV
![Page 35: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/35.jpg)
RCM Software
Database exploitation
5
35
![Page 36: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/36.jpg)
36
Block diagram
Sou adniceza ízení
Optimální údržbový cyklus
ProgramRCMKritéria
ležitost
TIS FIS
Regulace
Criteria
Regulation
Importance
RCM Program
Equipment coordinates
Optimum maintenance cycle
![Page 37: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/37.jpg)
37
DTS
Maintenance intensity 1/yr
Cos
ts [C
ZK]
Optimum value
Maintenance Repairs Outage Maintenance downtime Sanctions Total
Costs of
![Page 38: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/38.jpg)
38
Overhead line 22 kV
Maintenance intensity 1/yr
Cos
ts [C
ZK]
Costs of
Maintenance Repairs Outage Maintenance downtime Sanctions Total
Optimum value
![Page 39: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/39.jpg)
39
Circuit breakers 110 kV ELF
Equipment importance (%)
Tech
nica
l con
ditio
n (%
)
Overview
![Page 40: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/40.jpg)
40
Transformers 110 kV/HVTe
chni
cal c
ondi
tion
(%)
Equipment importance (%)
Overview
![Page 41: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/41.jpg)
Summary and conclusion
Current situation
6
41
![Page 42: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/42.jpg)
42
Summary and conclusionPeriodical application of RCM for planning of routine maintenance of distribution transformer stations (DTS)Application of RCM according to the situation for planning of general maintenance of 110 kV circuit breakersCompleted application of RCM to 110 kV/HV transformersCompleted application of RCM to 110 kV lines
Currently, verification [of the method] is in progress based on data provided by EZ Distribuce.
![Page 43: Reliability-Centered Maintenance of Distribution System Equipment · Reliability-Centered Maintenance of Distribution System Equipment prof. Ing. Stanislav Rusek, ... [RCM] The goal](https://reader032.vdocuments.net/reader032/viewer/2022030602/5ad0728a7f8b9a6c6c8e49df/html5/thumbnails/43.jpg)
Thank you for your attention …
Any questions?
43
Radomír Go oVŠB – Technical University OstravaDepartment of Power [email protected] (+420) 597 325 913