Reliability Engineering
Richard C. Fries, PE, CRECorporate Manager, Reliability EngineeringBaxter HealthcareRound Lake, Illinois
![Page 2: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/2.jpg)
Definition of Reliability
The probability, at a desired confidence level,
that a device will perform a specified function,
without failure,under stated conditions,
for a specified period of time
![Page 3: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/3.jpg)
Customer’s Definition of Reliability
A reliable product:
One that does what the customer wants,
when the customer wants to do it
![Page 4: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/4.jpg)
Reliability Basics
Reliability cannot be tested into a product
It must be designed and manufactured into it
Testing only indicates how much reliability is in the product
![Page 5: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/5.jpg)
Purpose of the Reliability Group
Determine the weaknesses in a design
AND correct them
before the device goes to the field
![Page 6: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/6.jpg)
Areas Covered by Reliability
Electrical
Mechanical
Software
System
![Page 7: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/7.jpg)
Electrical ReliabilityF
ailu
re R
ate
T im e
![Page 8: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/8.jpg)
Mechanical ReliabilityF
ailu
re R
ate
T im e
![Page 9: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/9.jpg)
Theoretical Software Reliability
Fa
ilure
Ra
te
T im eX -Axis
X-A
xis
![Page 10: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/10.jpg)
Practical Software ReliabilityF
ailu
re R
ate
T im eX -Axis
X-A
xis
![Page 11: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/11.jpg)
System ReliabilityF
ailu
re R
ate
T im e
![Page 12: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/12.jpg)
Set the Reliability Goal
Based on similar equipmentUsed as the basis for a reliability
budgetListed as Mean Time Between Failures
(MTBF) in hours or cyclesMTBF = the time at which 63% of the
units in the field will have failedMinimum goal is ten years with a 98%
reliability
![Page 13: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/13.jpg)
Parts Count Prediction
Uses MIL-HDBK-217
Indicates whether the design approximates the reliability goal
Indicates those areas of the design with high failure rates
![Page 14: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/14.jpg)
Chemical Compatibility
Test plastics with typically used chemical agents (alcohol, anesthetic agents, cleaning agents)
Cleaning agents are the worst
![Page 15: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/15.jpg)
Force Puller
![Page 16: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/16.jpg)
Component Testing
Cycle/life testing of individual components
Comparison of multiple vendors of components
Determine applicability for the intended use
![Page 17: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/17.jpg)
Philosophy of Testing
Test to have the units pass
Test with the addition of stresses to check the margins of functionality
![Page 18: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/18.jpg)
Types of Tests
Time terminated, failed parts replacedTime terminated, no replacementFailure terminated, failed parts
replacedFailure terminated, no replacementTest until first failureTest until all samples fail
![Page 19: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/19.jpg)
Determining Sample Size
Uses Chi-Square table
SS = Chi-square Value(MTBF goal)/2
Chi-square value includes confidence level and degrees of freedom = 2f+2
Component testing – 90% confidence levelLife testing – 95% confidence level
![Page 20: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/20.jpg)
Sample Calculation
Want to test valves to be used for 2,000,000 cycles per year with a 10% failure rate after 10 years
Reliability = e(-t/MTBF)MTBF = -t/ln Reliability = -20,000,000/ln 0.90 = 389,914,514 cycles
![Page 21: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/21.jpg)
Sample Calculation
MTBF = 389,914,514 cycles
Number of Samples Number of Cyles10 89,777,817
50 17,955,563 100 8,977,782
![Page 22: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/22.jpg)
Component Test Setup
![Page 23: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/23.jpg)
Component Test Setup
![Page 24: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/24.jpg)
Component Test Setup
![Page 25: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/25.jpg)
Calculating Sample MTBF
MTBF = (# of samples)(length of test) # of failures
![Page 26: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/26.jpg)
Calculating MTBF Where No Failures Occur
A sample MTBF cannot be calculatedA lower one-sided confidence limit is
calculated and the MTBF stated to be greater than that number
One-sided limit = 2(#units)(test time) Chi square value for the confidence limit and 2 degrees of freedom
![Page 27: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/27.jpg)
Sample Calculation for a No Failure Test
10 valves are tested for 10,000 cycles with no failures. Calculate using a 90% confidence level.
One-sided limit = 2(10)(10,000) 4.605 = 43,431 cycles MTBF > 43,431 cycles
![Page 28: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/28.jpg)
HALT
Acronym for Highly Accelerated Life Testing
Used to find the weak links in the design and fabrication process
Usually performed during the design phase
![Page 29: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/29.jpg)
HALT Testing
Possible stresses that can be applied:random vibrationrapid temperature transitionsvoltage marginingfrequency margining
The product is stressed far beyond its specifications
The test can be set up to find the destruct limits
![Page 30: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/30.jpg)
HALT Chamber
![Page 31: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/31.jpg)
Goal of HALT Testing
Overstress the productQuickly induce failuresBy applying the stresses in a
controlled, stepped fashion, while continuing monitoring for failures, the testing results in the exposure of the weakest points in the design
This test, if successful, will expose weak points in the design
![Page 32: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/32.jpg)
Environmental Testing
Operating temperature/humidityStorage temperature/humidityEMC
Surges/transients Brown-outs Electrocautery Cell phones
ESDAltitude
![Page 33: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/33.jpg)
Environmental Testing
AutoclaveShockVibrationShipping Tip testingThreshold testing
![Page 34: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/34.jpg)
Temperature Chamber
![Page 35: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/35.jpg)
Walk-In Temperature Chamber
![Page 36: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/36.jpg)
Autoclave Testing
![Page 37: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/37.jpg)
Customer Misuse
Excess weight on tabletopFluid spillageCross connection of wiresPulling unit by non-pulling partsWrong order of pressing keys“Knowing” how to operate the unit without
reading the manual
![Page 38: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/38.jpg)
Making a Design Foolproof
The biggest mistake engineers makewhen trying to make a design
completely foolproofis underestimating the ingenuity
of complete fools
![Page 39: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/39.jpg)
Failure Analysis
Failure: device does not operate according to its specification
Determine root cause of the failure
Suggest methods to address the failure
![Page 40: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/40.jpg)
Prototype Front Panel
![Page 41: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/41.jpg)
Plastic Structure
![Page 42: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/42.jpg)
Plastic Structure
![Page 43: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/43.jpg)
Autoclave Testing
![Page 44: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/44.jpg)
Manifold Port
![Page 45: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/45.jpg)
Prototype Port
![Page 46: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/46.jpg)
Life Testing
Operate the device in its typical environment and application
Use appropriate on/off cyclesCan be used to verify the reliability
goal or a specific period of time, such as the warranty period
![Page 47: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/47.jpg)
Tracking Reliability Growth in the Field
Collect manufacturing data on how many units were manufactured by month
Collect field failure data, by monthDevelop a reliability growth chart
![Page 48: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/48.jpg)
Reliability Growth Example
Ventilator Reliability Growth
0
20000
40000
60000
80000
1997 1998 1999 2000
Year of Report
MT
BF
(H
ou
rs)
![Page 49: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/49.jpg)
Reliability Growth Example
Ventilator Reliability Growth
0
50000
1996 1997 1998 1999 2000
Year of Report
MT
BF
(ho
urs
)
![Page 50: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/50.jpg)
Reliability Growth Example
Estimate of Two Vaporizer Builds
0
50000
100000
150000
200000
Year of Build
MT
BF
(h
ou
rs)
Pre-June, 1997Build
Post-June, 1997Build
![Page 51: Reliability Engineering Richard C. Fries, PE, CRE Corporate Manager, Reliability Engineering Baxter Healthcare Round Lake, Illinois](https://reader034.vdocuments.net/reader034/viewer/2022051400/5518bcf4550346a61f8b53d5/html5/thumbnails/51.jpg)
The Reliability Group
You make it,We’ll break it