KINGDOM OF SAUDI ARABIA Ministry of Transport PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LEN ITEM NO : 20301 SUMMARY OF Roadway Excavation SL NO LOCATION TOTAL QTY Done Qty. 1 544,946.82 509,416.74 2 SUMMARY OF CUTTING -I Left Side 462,228.83 449,060.52 3 Bridge 128+129.575 15,326.22 10,060.00 4 Bridge 172+600 30,229.50 4,494.33 5 Bridge 191+021 14,700.00 QUANTITY = 1,067,431.37 973,031.59 Contractor: Saudi Pan Kingdom (SAPAC) SUMMARY OF CUTTING -I RIGHT Side

Upload: rajaimran

Post on 14-Feb-2016

236 views

Category:

Documents


1 download

DESCRIPTION

a

TRANSCRIPT

Page 1: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20301

SUMMARY OF Roadway Excavation

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 544,946.82 509,416.74 35,530.08

2 462,228.83 449,060.52 13,168.31

3 Bridge 128+129.575 15,326.22 10,060.00 5,266.22

4 Bridge 172+600 30,229.50 4,494.33 25,735.17

5 Bridge 191+021 14,700.00 14,700.00

QUANTITY = 1,067,431.37 973,031.59 94,399.78 Cu.m

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Khatib & Alami

SUMMARY OF CUTTING -I RIGHT Side

SUMMARY OF CUTTING -I Left Side

Page 2: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20601

SUMMARY OF Embankment

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1#REF! #REF! #REF!

2 76,111.34 #REF! #REF!

3Bridge 128+129.575 #REF! #REF! #REF!

6Bridge 141+000 #REF! #REF!

4Bridge 172+600 #REF! #REF! #REF!

5Bridge 191+021 #REF! #REF!

QUANTITY = #REF! #REF! #REF! Cu.m

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Khatib & Alami (SAB)

SUMMARY OF FILLING-I RIGHT Side

SUMMARY OF FILLING-I Left Side

Page 3: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 20601

SUMMARY OF Sub Grade

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 124,887.07 111,435.89 13,451.17

###

2 114,134.72 101,566.72 12,568.00

###

3 142,623.09 136,604.89 6,018.20

###

4 130,711.65 125,049.17 5,662.48

###

5 89,723.70 61,549.22 28,174.48

###

6 74,490.71 58,382.71 16,108.01

###

7Bridge 128+129.575 22,655.02 16,662.43 5,992.59

###

8Bridge 172+600 38,882.34 7,000.00 31,882.34

###

9Bridge 191+021 31,279.39 31,279.39

###

Agg. Base Course

QUANTITY = 769,387.69 618,251.03 151,136.66 Cu.mB.B.CB.W.C

###

###

###

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

SUMMARY OF Sub Grade-I Right Side

SUMMARY OF Sub Grade-II Right Side

SUMMARY OF Sub Grade-I ( LEFT Side)

SUMMARY OF Sub Grade-11 ( LEFT Side)

SUMMARY OF Sub Grade-SIDE SLOPE ( LEFT Side)

SUMMARY OF Sub Grade-SIDE SLOPE ( RIGHT Side)

Page 4: Remaining Bbc

B.W.C

Page 5: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 3030101

SUMMARY OF AGGREGATE BASE COURSE GRADING

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 80,239.57 63,613.51 16,626.06

###

2 68,945.80 62,138.62 6,807.18

###

3 82,522.05 79,012.16 3,509.89

###

4 80,557.67 77,178.29 3,379.38

###

5Bridge 128+129.575 21,027.35 9,783.63 11,243.72

###

6Bridge 172+600 39,829.15 39,829.15

###

7Bridge 191+021 46,715.79 46,715.79

###

QUANTITY = 419,837.38 291,726.21 128,111.17 Cu.m

###

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

SUMMARY OF AGGREGATE BASE COURSE GRADING - I Right Side

SUMMARY OF AGGREGATE BASE COURSE GRADING - II Right Side

SUMMARY OF AGGREGATE BASE COURSE GRADING - I ( LEFT Side)

SUMMARY OF AGGREGATE BASE COURSE GRADING - II ( LEFT Side)

Page 6: Remaining Bbc

###

Page 7: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4020102

SUMMARY OF Bituminous Prime Coat - Grade MC-I

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 465,703.90 417,280.00 48,423.90

###

2SUMMARY OF MC - 01 ( LEFT Side) 551,300.43 521,062.24 30,238.19

###

3Bridge 128+129.575 71,777.96 15,758.03 56,019.93

###

4Bridge 172+600 119,105.66 119,105.66

###

5Bridge 191+021 147,367.49 147,367.49

###

QUANTITY = 1,355,255.44 954,100.27 401,155.17 Sq.m

###

###

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: khatib & Alami (SAB)

SUMMARY OF Bituminous Prime Coat - Grade MC-I Right Side

Page 8: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4050176

SUMMARY OF Bituminous Base Course ,Grade

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 46,133.39 41,076.00 5,057.39 ###

2 45,406.88 40,424.00 4,982.88 ###

3 SUMMARY OF BBC - 01 ( LEFT Side) 54,382.51 51,165.00 3,217.51 ###

4 SUMMARY OF BBC - 02 ( LEFT Side) 53,518.75 50,343.67 3,175.08 ###

5 Bridge 128+129.575 13,045.36 1,955.88 11,089.48 ###

6 Bridge 172+600 26,489.19 26,489.19 ###

7 Bridge 191+021 26,016.82 26,016.82 ###

QUANTITY = 264,992.89 184,964.55 80,028.34 Cu.m

###

###

CONTRACTOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Khatib & Alami (SAB)

SUMMARY OF Bituminous Base Course ,Grade -l Right Side

SUMMARY OF Bituminous Base Course ,Grade -ll Right Side

Page 9: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 4050376

SUMMARY OF Bitumin Wearing Course

SL NO LOCATION TOTAL QTY Done Qty. Remaining Qty. REMARKS

1 22,526.10 20,081.60 2,444.50 ###

2 SUMMARY OF BWC ( LEFT Side) 26,522.57 24,741.23 1,781.34 ###

3 Bridge 128+129.575 2,638.09 2,638.09 ###

4 Bridge 172+600 7,820.22 7,820.22 ###

5 Bridge 191+021 6,237.09 6,237.09 ###

Quantities 65,744.07 44,822.83 20,921.24 Cu.m

######

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Khatib & Alami (SAB)

SUMMARY OF Bitumin Wearing Course, Grade Right Side

Page 10: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030301

SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines Right Side 3,645.00

2 SUMMARY OF White Line ( LEFT Side) 4,331.25

3 Bridge 128+129.575 12,884.25

4 Bridge 172+600 15,957.00

5 Bridge 191+021 20,263.00

DONE QUANTITY OF White Line = 57,080.501 Sq.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

F11
Author: these all qty have no back up ,,,qty by eng
Page 11: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030302

SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines Right side 14,580.00

2 SUMMARY OF Yellow Line ( LEFT Side) 17,325.00

3 Bridge 128+129.575 5,982.46

4 Bridge 172+600 16,999.00

5 Bridge 191+021 4,124.82

DONE QUANTITY OF Yellow Line = 59,011.28 Sq.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 12: Remaining Bbc

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3ITEM NO : 9030701

SUMMARY OF SUMMARY OF Cat Eyes

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Cat Eyes (Right Side) 8121

2 SUMMARY OF Cat Eyes ( LEFT Side) 9,646

3 Bridge 128+129.575 1,708

4 Bridge 172+600 2,916

5 Bridge 191+021 2,732

6 Err:509 377

DONE QUANTITY OF Cat Eyes = 25,500 No.

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 13: Remaining Bbc

Summary of Section-1 Quantities

SL NO Description QTY Unit Ammount

1 Cutting #NAME? 5.00 #NAME?

2 Embankment #NAME? 7.00 #NAME?

3 SubGrade Err:509 12.00 Err:509

4 A.B.C #NAME? 43.00 #NAME?

5 Mc-1 Err:509 1.00 Err:509

6 B.B.C #NAME? 214.00 #NAME?

7 B.W.C #NAME? 429.00 #NAME?

8 White line - 20.00 -

9 Yellow line Err:509 20.00 Err:509

10 Cat Eyes 376.92 22.00 8,292.24

Total Ammount #NAME?