1/11/2013 Membrane Bioreactor Phosphorus Removal Demonstration Study Steve Berggruen, P.E. – Regional Manager Milwaukee, Wisconsin

Upload: others

Post on 11-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Membrane Bioreactor Phosphorus  Removal Demonstration Study

Steve Berggruen, P.E. – Regional ManagerMilwaukee, Wisconsin

Page 2: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Background

• Testing conducted at the Ridgewood Estates WWTP – Milford, Michigan

• Test Period: Nine months (October – June)

Testing Program: Physical/Chemical Phosphorus Removal through a

Membrane Bioreactor (MBR) System. Reduction of nitrogen compounds and 

Bio‐P (attempted)

Page 3: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Pilot Plant Objectives

• Show capability of MBR system to reduced effluent TP to < 0.03 mg/l

Demonstrate ability of system to removed conventional pollutants including  

nitrogen species

• Demonstrate long‐term system operation with little or no maintenance

Produce design information regarding sustainable flux at varying MLSS 

concentrations and waste temperatures

Page 4: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Membrane Bioreactor (MBR)

•High Quality Effluent

• Small Footprint

• Simple to Operate

Page 5: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Membrane Bioreactors

Modification of the traditional activated sludge processCombine aeration, clarification and filtration into a

single step (reduced footprint)

Page 6: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Process and System Overview

•Automatic 3‐mm fine screen

•Anoxic (AX) Basin

•Pre‐Aeration (PA) Basin 

•Membrane Bioreactor (MBR) Basin

Page 7: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Pilot Study Process Configuration

AX Zone PA Zone MBR

Recycle

P1Feed

Permeate

Page 8: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Pilot Study Process Configuration

(Alternate – Phase 2)

Page 9: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

MBR System

Page 10: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Anoxic (AX) Basin

Page 11: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Pre‐Aeration Basin 

Page 12: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

MBR with Submerged Membrane Unit

Page 13: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Flat‐Plate Membrane Structure

Page 14: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

The Submerged Membrane Unit (SMU)

ManifoldMembrane case

Membrane cartridge

Diffuser case

Diffuser

Permeate Tube

Page 15: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

15

CIP Cartridge Distribution

Cleaning takes approximately 2‐4 hour / MBR basin, using a dilute solution of 0.5% Sodium 

Hypochlorite or Citric Acid

In‐situ cleaning of membranes without draining MLSS•

Chlorine dosage less than that typically used for filamentous microorganism control•

No tank liners required

Page 16: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Wastewater Characteristics

Parameter Average Minimum Maximum Unit

CBOD5 392.6 180.0 1095.0 mg/l

NH3 26.1 15.5 52.8 mg/l

T‐P 5.6 3.2 8.2 mg/l

TSS 626.5 147.5 1970.0 mg/l

Note: Flow to pilot plant set at 1.5 gpm (2,160 gpd)

Page 17: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Testing Program ‐

Phosphorus

• Data collected over a four month period

• Two alum dosing rates tested (1 gpd / 2 gpd)

• Effluent TP rise at 1 gpd alum

• Average effluent TP < 0.03 mg/l

• 43 effluent samples

• TP less than detectable in 28% of samples

• No SA conducted on optimal dose or point

Page 18: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Impact of Chemical Addition  Location on Phosphorus Removal

0.01.02.03.04.05.06.07.08.0

0.0 1.0 2.0 3.0 4.0 5.0

PO

4-P

Con

cen

trat

ion

Al/P molar ratio

Example of applied Al/P molar ratiofor effluent P conc.

Anoxic

INTERNAL RECYCLE

M

AerobicAerobic

Anaerobic

0.01.02.03.04.05.06.07.08.0

0.0 1.0 2.0 3.0 4.0 5.0

PO

4-P

Con

cen

trat

ion

Al/P molar ratio

Example of applied Al/P molar ratiofor effluent P conc.

Anoxic

INTERNAL RECYCLE

M

AerobicAerobic

Anaerobic

Chemical addition point affects Al/P ratio

(Stensel, 2003)

Page 19: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Pilot Operating Conditions & Results

•MLSS

•Temperature

•Effluent BOD

•Effluent Nitrogen 

•Effluent Phosphorus

Page 20: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Operational Overview

•MLSS:

6,940 –

26,180 mg/l

•Temperature:

6.2 – 15.8 degrees C

•HRT:

21 hours

•SRT:

57 days

•F:M

0.03 1/day or less

Page 21: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Effluent Overview

• Effluent TSS:

2.5 mg/l (ave)

• Effluent BOD:

16.8 mg/l (Phase 1), 5.4 mg/l (Phase 2)*

• Effluent N:

11.4 mg/l NH3‐N (Phase 1), 0.3 mg/l NH3‐N (Phase 2)*

13.6 mg/l TIN (Phase 1), 2.6 mg/l TIN (Phase 2)*

• Effluent P:

0.05 mg/l (all data points)

0.03 mg/l (at optimal dosage)

*Phase 2 included increased blower speed for full nitrification and increased recycle of nitrates back to AX 

Page 22: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

MBR MLSS Concentration Profile

Page 23: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Recorded Water (Sludge) Temperatures

0

2

4

6

8

10

12

14

16

18

11/8 11/22 12/6 12/20 1/3 1/17 1/31 2/14 2/28 3/14 3/28

Date

Tem

pera

ture

(deg

C)

Design Temperature

Page 24: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Permeate BOD Profile

Page 25: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Permeate Nitrogen Profile

Phase 2

Phase 2→

Page 26: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Phosphorus Trending

0

1

2

3

4

5

6

7

10/14 10/28 11/11 11/25 12/9 12/23 1/6 1/20 2/3 2/17 3/3 3/17 3/31

Date

Con

cent

ratio

n (m

g/l)

INF P

EFF PAlum Dosing

Page 27: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Membrane Performance

• Sustained Flux:

10 gfd•

Excellent results despite variable MLSS and low T• Transmembrane Pressure (TMP): 

0.4 – 0.6 psi (ave) •

1.6. – 1.8 psi (peak)

• Permeability: 

42 gfd/psi (ave) during both phases• Membrane Maintenance:

No irreversible or permanent fouling detected•

Only one clean‐in‐place (CIP) procedure in 9 months•

3‐hour cleaning period using 0.5% bleach solution

Page 28: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Conclusions

•Show capability of MBR system to reduced effluent TP to < 0.03 mg/l. YES

•Demonstrate ability of system to removed conventional pollutants

including nitrogen 

species. YES (somewhat)

•Demonstrate long‐term system operation with little or no maintenance YES

•Produce design information regarding sustainable flux at varying

MLSS concentrations 

and waste temperatures YES

Page 29: Removal Demonstration Study - WWOA€¦ · 1/11/2013. Membrane Bioreactor Phosphorus Removal Demonstration Study. Steve Berggruen, P.E. –Regiona. l Manager. Milwaukee, Wisconsin

1/11/2013

Thank You