rendimientos y dosificaciones

113
AREA TOTAL M2 ESPESOR M3 TON. CEM. 106 0.10 11.13 3.87 CEMENTO 6.18 ARENA 7.01 GRAVA 106 0.04 4.24 1.21 CEMENTO 5.29 ARENA BODEGA TOTAL KG BULTO COMPRAR SUMA 100 5.09 CEMENTO 5085.88 101.72 1 101 4 11.47 ARENA 6 10 4 7.01 GRAVA 6 10

Upload: madikai98

Post on 25-Nov-2015

152 views

Category:

Documents


6 download

TRANSCRIPT

DOSIFICACION DOSIFICACION PARA CONCRETOSEJEMPLO DE CUANTIFICACION

MATERIALF'c= (KG/CM)AREA TOTAL50100150200250M2ESPESORM3TON. CEM.CEMENTO0.17700.26200.30600.34800.38801060.1011.133.87CEMENTOARENA0.46700.60500.58000.55500.53506.18ARENA GRAVA0.70100.63000.63000.63000.63007.01GRAVAAGUA0.20200.20200.20200.20200.2020

DOSIFICACION PARA MORTEROS

MATERIALPROPORCION1:031:041:051:06CEMENTO0.45800.35500.28600.2400TN1060.044.241.21CEMENTOARENA1.13101.24301.24801.2810M35.29ARENAAGUA0.24100.24300.23700.2340M3BODEGATOTALKGBULTOCOMPRARSUMA1005.09CEMENTO5085.88101.721101411.47ARENA610DOSIFICACION PARA MORTEROS CTO. CAL-AGUA47.01GRAVA610

MATERIALPROPORCION1:1:61:2:61:3:121:3:20CEMENTO0.21000.23000.12400.0810TNARENA0.12500.21500.17300.1160M3CALHIDRA1.17400.92100.98901.0900M3AGUA0.28500.27600.24000.2400M3ACERO CORRUGADO Y LISO

DIAMETROSECCIONPESONo

PULG.MMM2KG/MKG /PZA.PZA/TON

1/4"6.3500.320.25023.003335/16"7.9000.490.3882.54.662153/8"9.5000.710.56636.791471/2"2.7001.270.997411.96845/8"15.9001.991.566518.79533/4"19.1002.872.262627.14371"25.4005.074.003848.04211 1/2"38.10011.359.01812108.229

CUADRILLASCATEGORIASALARIO VIGENTEF.S.R.SALARIO INTEGRADOPEON35.851.8064.53OFICIAL ALBAIL52.251.7792.48CARPINTERO48.601.7786.02YESERO48.301.7785.49PLOMERO50.001.7788.50AZULEJERO51.051.7790.36ELECTRICISTA51.051.7790.36PINTOR49.801.7788.15VELADOR46.301.7781.95FIERRERO50.251.7788.94ALMACENISTA47.101.7783.37HERRERO50.251.7788.94CABO DE ALBAILERIA1.66107.89CABO FIERRERO1.66105.48CABO DE CARPINTERIA1.66103.41CABO PINTOR1.66104.90CABO PLOMERO1.66105.15CABO ELECTRICISTA1.66106.40

CUAD-11 OF. ALBAIL + 1 PEON + 0.10 CABO167.80CUAD-21 FIERRERO + 1 PEON + 0.10 CABO164.02CUAD-31 CARPINTERO + 1 AYUD. + 0.10 CABO160.89CUAD-41 HERRERO + 1 PEON + 0.10 CABO164.02CUAD-51 PINTOR + 1 AYUD. + 0.10 CABO163.17CUAD-61 IMPERMEABILIZADOR + 1 AYUD. + 0.10 CABO167.80CUAD-71 ELECTRICISTA + 1 AYUD. + 0.10 CABO165.53CUAD-81 PLOMERO + 1 AYUD. + 0.10 CABO163.55CUAD-91 AZULEJERO + 1 AYUD. + 0.10 CABO165.68CUAD-101 OPER. REVOLV. + 2 PEONES + 0.10 CABO232.33CUAD-111 YESERO + 1 AYUD. + 0.10 CABO160.81CUAD-121 SOLDADOR + 1 AYUD. + 0.10 CABO164.02CUAD-131 PEON + 0.10 CABO75.32

RENDTOS MANO OBRACATALOGO DE RENDIMIENTOS DE MANO DE OBRACLAVECONCEPTOUNIDADRENDIMIENTOA0000 PRELIMINARESA0001LIMPIEZA DE TERRENOM2100.00A0002TRAZO Y NIVELACION DE TERRENOM2100.00A0003LIMPIEZA, TRAZO Y NIVELACION EXCLUSIVAMENTE EN CALLESM2100.00A0004DESHIERBE DE TERRENOM350.00A0005DESPALME DE TERRENO HASTA 25 CMS DE PROFUNDIDAD PARA QUITAR CAPA DE TIERRA VEGETAL. INCLUYE: DESHENRAICE Y ACARREO LIBRE DENTRO Y FUERA DE LA OBRA.M33.00B0000 EXCAVACIONB0001EXCAVACION A MANO EN TERRENO TIPO "A" de 0.00 a 2.00 MTS. DE PROFUNDIDAD SECCION OBLIGADA. INCLUYE: AFINE DE TALUDES Y ACARREO A 20 MTS.M32.00B0002EXCAVACION A MANO EN TERRENO TIPO "B" de 0.00 a 2.00 MTS. DE PROFUNDIDAD SECCION OBLIGADA. INCLUYE: AFINE DE TALUDES Y ACARREO A 20 MTS.M31.85B0003EXCAVACION A MANO EN TERRENO TIPO "B" de 2.00 a 3.00 MTS. DE PROFUNDIDAD.M31.15B0004EXCAVACION A MANO EN TERRENO TIPO "B" EN AGUA.M30.50B0005EXCAVACION A MANO EN TERRENO TIPO "C" de 0.00 a 2.00 MTS. DE PROFUNDIDAD SECCION OBLIGADA. INCLUYE: AFINE DE TALUDES Y ACARREO A 20 MTS.M31.25B0006EXCAVACION A MANO EN TERRENO TIPO "C" de 2.00 a 3.00 MTS. DE PROFUNDIDAD.M30.80C0000 ACARREOSC0001ACARREO EN CARRETILLA DE ATERILA TIPO "A", "B" Y "C", PRODUCTO DE EXCAVACION A ESTACIONES DE 20 MTS.M35.00C0002ACARREO EN CARRETILLA DE ATERILA TIPO "A", "B" Y "C", PRODUCTO DE EXCAVACION A ESTACIONES DE 50 MTS.M33.00C0003ACARREO DE CEMENTO EN FORMA MANUAL A 50 MTS.TON3.00C0004ACARREO DE MATERIAL EN BOTE A UNA DISTANCIA DE 10 MTS.M33.00C0005SUBIR CALICHE EN PRIMERA PLANTAM32.00C0006ACARREO DE MATERIAL PRODUCTO DE EXCAVACION EN BOTE A UNA DISTANCIA DE 30 MTS.M33.34C0007SUBIR BLOCK EN PRIMERA PLANTA.PZA150.00C0008ACARREO DE TUBERIA DE CONCRETO DE 8" DE DIAMETRO EN FORMA MANUAL A UNA DISTANCIA APROXIMADAMENTE DE 70 MTS.PZA90.00C0009ACARREO DE TUBERIA DE CONCRETO DE 12" DE DIAMETRO EN FORMA MANUAL A UNA DISTANCIA APROXIMADAMENTE DE 70 MTS.PZA70.00C0010CARGA Y DESCARGA DE MATERIAL RECUPERABLE: TEJA, TABIQUE, BLOCK, ETC. INCLUYE: ACARREO EN CARRETILLA HASTA 50 MTS. ESTIBADO Y ACOMODADO.PZA2,500.00C0011ACARREO DE AGUA EN CARRETILLA A UNA DISTANCIA DE 100 MTS. EN BOTES DE 19 LTS. EN TERRENO PLANO.LTS2,050.00C0012ACARREO DE CEMENTO EN FORMA MANUAL A 100 MTS.TON1.75C0013SUBIR BLOCK EN SEGUNDA PLANTA.PZA130.00C0014SUBIR BLOCK EN TERCERA PLANTA.PZA120.00C0015SUBIR BLOCK EN CUARTA PLANTA.PZA110.00C0016SUBIR BLOCK EN QUINTA PLANTA.PZA100.00C0017CARGA DE TIERRA O ESCOMBRO EN CAMIONM36.00D0000 RELLENOSD0001RELLENO Y COMPACTACION DE MATERIAL CON PIZON DE MANO EN CAPAS DE 15 CMS DE ESPESOR INCLUYE: ACARREO LIBRE MEDIDO O COMPACTADO.M32.00D0002RELLENO A MANO SIN COMPACTARM36.00E0000 CIMBRASE0001CIMBRA DE LOSA COMUNM29.00E0002CIMBRA DE LOSA APARENTE CON CIMBRAPLAYM26.00E0003ENCOFRADA DE TRABES DE 15x40 CMSML8.00E0004COLOCACION DE CIMBRA PARA FALDON EN LOSA DE AZOTEA HASTA UN METRO DE ALTURAML5.00E0005CIMBRA PARA COLUMNA DE 0.50x0.50x3.00 MTS.PZA1.00E0006CIMBRA PARA COLUMNA DE 0.80x0.80x3.00 MTS.PZA0.50E0007CIMBRA PARA TANQUE, ALBERCA Y OTRO TIPO DE FALDON.M26.00E0008CIMBRA EN ESCALERAM23.00E0009CIMBRA PARA ARCO CON MADERA DE PINOM24.50E0010DESCIMBRADO DE LOSAS Y TRABESM225.00E0011COLOCACION DE FONDOS DE CADENAS DE CERRAMIENTO Y TRABES.ML12.00E0012HECHURA DE ANDAMIOS HASTA TERCERA PLANTA.ML25.00E0013CIMBRADO Y DESCIMBRADO EN MUROS APARENTESM25.00E0014CIMBRA EN CIMENTACIONM210.00E0015CIMBRA EN MUROS Y COLUMNAS NO APARENTES INCLUYE: HABILITADO Y DESCIMBRADOM26.00F0000 CAMINOS Y PUENTESF0001OPERACIN DE PAPEOM210.00F0002TENSADO DE ACERO DE 1 1/2" DE DIAMETRO CON TIRFO DE 10 TON.ML330.00F0003HABILITADO DE MADERA EN PUENTE COLGANTEPZA100.00F0004COLOCACION DE MAYA CICLON EN PUENTE COLGANTEML40.00F0005TRASPALEO Y NIVELACION DE MATERIAL DE REVESTIMIENTO EN CAPAS DE 10 CMS.M36.00F0006COLOCACION Y TENSADO DE CABLE DE ACERO DE 3/8" A 3/4" DE DIAMETRO.ML100.00F0016COLOCACION DE TUBO FO.GO. DE 2" AHOGADO EN COLUMNA DE CONCRETO ARMADO PARA BARANDAL.ML25.00F0017COLOCACION DE PORTON DE LAMINA DE 2x2.50 MTS.PZA1.50G0000 PLANTILLAS Y CONCRETOSG0001PLANTILLA DE TABIQUEML18.00G0002PLANTILLA DE CONCRETO HECHO EN OBRA F'c=50 Y F'c=100 KG/CM2, CON ESPESOR PROMEDIO DE 5 CMS.M220.00G0003HECHURA DE MEDIA CAA PULIDA DE CONCRETO DE 10 CMS. DE ANCHO.ML15.00G0004CONCRETO CICLOPEO EN CIMENTACIONM31.50G0005CONCRETO PARA RAMPA DE CAMIONES DE 15 Y 20 CM DE ESPESOR.ML7.00G0006HECHURA DE MEDIA CAA DE CEMENTO ARENA EN MUROS Y AZOTEAS EN TRAMOS GRANDES.ML25.00G0007PUNTAS DE TRABE COLADAS, ARMADAS Y PERFILADAS EN FORMA DE PECHO DE PALOMA.PZA1.00G0008FABRICACION DE TABIQUE DE 12x20x40 CMS.PZA90.00G0009BASE DE CONCRETO SECCION TRAPEZOIDAL 80x40x80 CMS PARA RECIBIR POSTE METALICO INCLUYE COLOCACION DE ANCLAS.PZA2.00G0010RODAPIE DE CONCRETO F'c=150 KG/CM2 DE 15x20 CMS, ARMADO CON VARILLA DE 3/8" Y ESTRIBOS 25 CMS.ML9.00H0000 ACERO PARA REFUERZOH0001HABILITADO DE ACERO CON VARILLA DE 3/8" HASTA 2" DE DIAMETRO.KG100.00H0002ARMADO DE COLUMNA DE 28x28 CMS Y DE 30x30 CMS.ML6.00H0003ARMADO DE CADENA DE 15x20 CMS CON VARILLAS DE 3/8"ML25.00H0004ARMADO DE TRABES DE 15x40 CMS HASTA 2.90 MTS. DE ALTURA CON VARILLA DE 3/8"ML10.00H0005EMPARRILLADO DE LOSA CON SILLETAS DE 3/8"M29.00H0006EMPARRILLADO DE LOSA SIN SILLETA CON VARILLA DE 3/8"M210.00H0007COLOCACION DE MALLALAC.M250.00I0000 CIMENTACIONESI0001ZAPATA ARMADA Y COLADA DE 120x120 CMS CON DADO DE 30x30 CMS.PZA1.00I0002ZAPATA CORRIDA CON VARILLA DE 3/8"M27.00I0003ZAPATA COLADA CORRIDA DE 12 CMS DE ESPESOR CON VARILLAS DE 3/8" DE DIAMETRO INCLUYE: ARMADO Y COLADO.M27.00I0004ZAMPEADO DE PIEDRA BRAZA EN SECO EMBOQUILLADO CON MORTERO CEMENTO-ARENA 1:5M210.00I0005ZAPATA PARA BASE DE HASTA BANDERA, CIMBRADO, ARMADO Y COLADO DE 1.00x1.00 MTS.PZA3.00I0006CONTRATRABES, ARMADA Y COLADA DE 20x40 CMS CON VARILLAS DE 5/16"ML6.00I0007ANCLAJE DE CASTILLO DE 0.30x0.30x1.00 MTS.PZA6.00I0008ZAPATA ARMADA Y COLADA DE 80x80 CMS CON DADO DE 30x30 CMS. ARMADA CON VARILLAS DE 3/8" DE DIAMETRO Y 10 CM DE ESPESORPZA2.00I0009IMPERMEABILIZACION EN CADENAS CON UNA CAPA DE CARTON ASFALTICAML35.00

J0000 TRABES, CADENAS, CASTILLOS Y COLUMNASJ0001TRABE DE CONCRETO DE 30x50 CMS, ARMADO CON VARILLA DE 3/4" Y ESTRIBOS DE 3/8" DE DIAMETRO A CADA 15 Y 20 CMS, F'c=200 KG/CM2. INCLUYE: ARMADO, CIMBRADO, COLADO Y DESCIMBRADO.ML2.00J0002TRABE CUMBRERA DE 15x50 CMS, ARMADO CON 6 VARILLAS DE 1/2" Y ESTRIBOS DE 1/4" DE DIAMETRO A CADA 15 Y 20 CMS, F'c=200 KG/CM2. INCLUYE: ARMADO, CIMBRADO, COLADO Y DESCIMBRADO.ML2.50J0003TRABE DE CONCRETO DE 20x40 CMS, ARMADO CON 5 VARILLAS DE 1/2", BASTON EN APOYOS Y ESTRIBOS DE 1/4" DE DIAMETRO A CADA 15 Y 20 CMS, F'c=200 KG/CM2. INCLUYE: ARMADO, CIMBRADO, COLADO Y DESCIMBRADO. ACABADO APARENTE.ML3.00J0004TRABE DE CONCRETO DE F'C=200KG/CM2 DE 20X40 CMS ARMADO CON 5 VR. DE No.4 BASTON Y APAYOS, EST. DE No.2 @ 20 CMS INCLUYE ARMADO, CIMBRADO Y DECIMBRADO, ACABADO APARENTE.ML2.50J0006CIMBRADO Y COLADO DE CADENA DE 15x20 CMS ARMADO CON ARMEXML10.00J0007CADENA Y CASTILLO DE 20x21 CMS. CIMBRADO, COLADO Y ARMADO CON ARMEXML7.00J0008CIMBRADO Y COLADO DE CADENA DE 15x30 CMS ARMADO CON ARMEXML7.00J0009CIMBRADO Y COLADO DE CADENA DE 20x28 CMS ARMADO CON ARMEXML7.00J0010CADENA Y CASTILLO DE 15x15 CMS. CIMBRADO, APARENTE UNA CARA, COLADO Y ARMADO CON ARMEXML6.00J0010CADENA Y CASTILLO DE 15x30 CMS. CIMBRADO, APARENTE UNA CARA, COLADO Y ARMADO.ML5.00J0011CADENA Y CASTILLO DE 15x15 CMS. CIMBRADO, APARENTE UNA CARA, COLADO Y ARMADO CON VARILLA DE 3/8".ML8.00J0012CADENA Y CASTILLO DE 15x20 CMS. CIMBRADO, APARENTE UNA CARA, COLADO Y ARMADO.ML5.00J0013CADENA Y CASTILLO DE 15x20 CMS. CIMBRADO, APARENTE UNA CARA, COLADO Y ARMADO CON VARILLA DE 3/8".ML5.00J0014CADENA Y CASTILLO DE 15x20 CMS. CIMBRADO, COLADO Y ARMADO CON VARILLA DE 3/8".ML7.00J0015CADENA Y CASTILLO DE 15x30 CMS. CIMBRADO, COLADO Y ARMADO CON VARILLA DE 3/8".ML6.00J0016CADENA Y CASTILLO DE 15x30 CMS. CIMBRADO, APARENTE DOS CARAS, COLADO Y ARMADO CON VARILLA DE 3/8".ML5.00J0017CASTILLO AHOGADO EN BLOCK HUECO CON 2 VARILLASML20.00J0018COLUMNA ENCOFRADA Y COLADA DE 30x20 CMS, HASTA 3.00 MTS. DE ALTURA.PZA1.50J0019COLADO DE CADENA DE 15x15 CMS. ARMADA CON ARMEXML11.00K0000 MUROSK0001MAMPOSTERIA DE PIEDRA DE 0.70 MTS. DE BASE HASTA 2.00 MTS. DE ALTURA EN MURO COMUN.M32.00K0002MAMPOSTERIA DE PIEDRA BRAZA ASENTADO CON MORTERO CEM-ARE 1:5, APARENTE UNA CARA HASTA 2 MTS. DE ALTURA.M31.50K0003MAMPOSTERIA DE PIEDRA BRAZA ASENTADO CON MORTERO CEM-ARE 1:5, APARENTE DOS CARAS HASTA 2 MTS. DE ALTURA.M31.00K0004MURO CHAPADO CON PIEDRA MATATENAM23.00K0005MURO CHAPADO CON PIEDRA LAJA APARENTEM23.00K0006MURO CHAPADO CON MATERIAL DE CANTERA COMBINADO CON OTRO MATERIAL.M22.50K0007MURO DE TABIQUE ROJO COMUN CAPUCHINO ASENTADO CON MORTERO CEM-CAL-ARENA 1:5:12 ACABADO COMUN.M26.00K0008MURO DE TABIQUE ROJO COMUN DE 14 CMS DE ESPESOR ASENTADO CON MORTERO CEM-CAL-ARENA 1:3:12 ACABADO COMUNM212.0045037.5K0009MURO DE TABIQUE ROJO COMUN DE 21 CMS DE ESPESOR ASENTADO CON MORTERO CEM-CAL-ARENA 1:3:12 ACABADO COMUNM24.00K0010MURO DE TABIQUE ROJO COMUN DE 28 CMS DE ESPESOR ASENTADO CON MORTERO CEM-CAL-ARENA 1:3:12 ACABADO COMUNM24.00K0011MURO DE TABIQUE ROJO COMUN DE 14 CMS DE ESPESOR ASENTADO CON MORTERO CEM-CAL-ARENA 1:3:12 ACABADO APARENTE DOS CARAS.M23.00K0012MURO DE TABIQUE DE 14 CMS DE ESPESOR APARENTE UNA CARA.M24.00K0013ENRASE DE TABIQUE DE 50 CMS DE ALTOM24.00K0014MURO DE TABICON DE 10x14x28 CMS.M28.00K0015MURO DE BLOCK DE 15x20x40 CMS APARENTE DOS CARAS ASENTADO CON MORTERO CEM-ARE 1:5M24.50K0016MURO DE BLOCK APARENTE DOS CARAS RELLENADO EN PRIMER NIVEL DE 15x20x40 CMS.M23.50K0017MURO DE BLOCK DE 15x20x40 CMS APARENTE UNA CARA ASENTADO CON MORTERO CEM-ARE 1:5M26.00K0018MURO DE BLOCK DE 10x20x40 CMS ASENTADO CON MORTERO CEM-ARENA 1:5, ACABADO COMUN.M28.00K0019MURO DE BLOCK CON VARILLA HORIZONTAL CADA DOS HILADAS Y VERTICAL CADA 50 CMS.M25.00K0020COLOCACION DE AZULEJO DE 10x10 CMS EN MUROSM25.00K0021HECHURA DE CORTES EN MUROSML15.00K0022COLOCACION DE CELOCIA DE 30x30 CMS.M24.00K0023COLOCACION DE ARENA PARA FILTRO EN MUROS HASTA UN METRO DE ALTURA.M210.00K0024MURO DE TABLAROCA APARENTE DOS CARASM27.00L0000 APLANADOSL0001APLANADO EN MURO ACABADO RUSTICOM212.00L0002APLANADO EN MURO ACABADO ESPONGEADO FINOM210.00L0003APLANADO EN MURO ACABADO RUSTICO CON GRAVA TRITURADAM29.00L0004APLANADO EN MURO ACABADO PULIDO CON LLANAM27.00L0005APLANADO EN MURO ACABADO PULIDO CON CEMENTO GRISM27.00L0007APLANADO EN MURO ACABADO SERROTEADO CON GRAVA DE 3/4"M26.00L0008APLANADO CON YESO EN MUROSM28.00L0009APLANADO EN LOSA ACABADO ESPONGEADO FINOM28.00L0010APLANADO EN LOSA ACABADO PULIDO CON LLANAM27.00L0011APLANADO EN MUROS EXTERIORES DE VARIOS NIVELES ACABADO FINO.M25.00L0011APLANADO CON YESO EN PLAFON ACABADO PULIDOM25.00L0012TIROL EN MUROS Y PLAFONES ACABADO RUSTICOM210.00L0013TIROL EN MUROS Y PLAFONES ACABADO PLANCHADOM28.00L0014EMBOQUILLADO CON PLANA ACABADO ESPONGEADO.ML20.00L0015EMBOQUILLADO DE CORTES DE AZULEJOS DE 45.ML6.00L0016EMBOQUILLADO ACABADO PULIDO CON CEMENTO GRIS.ML15.00L0018REPISON COLADO DE CEMENTO INCLUYE EMBOQUILLADO.ML3.00L0017EMBOQUILLADO CON YESO ACABADO PULIDOML15.00L0019GUSANEADO EN MUROS ACABADO APARENTEML8.00L0021COLOCACION DE PLAFON A BASE DE FIBRACEL Y SOPORTE CON CANALES METALICOS DE CARGA Y LISTONES. INCLUYE JUNTEO CON REDIMIX, CINTA UNION, ATORNILLADO Y RESANADO CON YESO.M27.00L0022MARTELINADO FINO SOBRE MUROS.M24.00L0023MARTELINADO FINO SOBRE LOSAS Y TRABES.M23.00M0000 PISOS Y RECUBRIMIENTOSM0002FIRME DE CONCRETO RUSTICO DE 6 CMS DE ESPESORM215.00M0003FIRME DE CONCRETO RUSTICO DE 10 CMS DE ESPESOR. INCLUYE: NIVELACION Y COMPACTACION.M212.00M0004FIRME DE CONCRETO DE 8 CMS DE ESPESOR ACABADO RUSTICOM29.00M0005FIRME DE CONCRETO ACABADO PULIDO DE 10 CMS DE ESPESOR, INCLUYE: NIVELACION Y COMPACTACIONM28.00M0006FIRME DE CONCRETO ESCOBILLADO DE 10 CMS DE ESPESORM28.00M0007FIRME DE CONCRETO ACABADO Y MAESTRIADO PARA RAMPA DE CAMIONES.M27.00M0008FIRME DE CONCRETO DE 10 CM DE ESPESOR ARMADO CON MALLA-LAC ACABADO RUSTICO.M29.00M0009FIRME DE CONCRETO DE 10 CMS DE ESPESOR ARMADO CON VARILLA DE 3/8" 30 CMS AMBOS SENTIDOS.M29.00M0010COLOCACION DE AZULEJO DE 10x10 CMS EN PISOS CON PEGAZULEJOM25.00M0010MARMOL COLADO EN COLUMNAM21.00M0011PISO DE MOSAICO DE 20x20 CM DE PASTAM26.00M0012PISO DE MOSAICO DE 20x20 CM VENECIANOM25.00M0013PISO DE MARMOL DE 10x10 CMSM23.00M0014PISO DE MARMOL DE 10x20 CMSM24.50M0015PISO DE LOSETA DE 30x30 CMSM27.00M0016PISO DE MARMOL DE 10x30 CMSM25.00M0016HECHURA DE CORTES EN PISOSML15.00M0017PISO DE BALDOSIN FRAGUADO CON COLORM25.00M0019COLOCACION DE LOSETA EN ESCALERA DE 17x30x120 CMS.PZA4.00M0021COLOCACION DE ZOCLO DE PASTA Y GRANITOML20.00M0022COLOCACION DE LOSETA DE PASTA CEMENTO-ARENA REMETIDO ACABADO ESPONJEADOML10.00M0023LOSA PRECOLADA DE 40x60 Y 10 CMS DE ESPESORPZA8.00M0024PICAR PISO DE CONCRETO PARA RECIBIR FINOM225.00M0025MARTELINADO FINO SOBRE PISOSM25.00N0000 AZOTEASN0001GOTERO REMETIDO O RESALTADOML6.00N0002COLADO DE LOSA EN PRIMERA PLANTA O CIMENTACION CON CONCRETO F'c=200 KG/CM2M31.00N0003COLADO DE LOSA EN SEGUNDA PLANTA CON CONCRETO F'c=200 KG/CM2M30.75N0004COLADO DE LOSA EN TERCERA Y CUARTA PLANTA CON CONCRETO F'c=200 KG/CM2M30.50N0005COLOCACION DE PETATILLO EN AZOTEA FRAGUADO NORMALM29.00N0006COLOCACION DE TEJA DE BARRO EN AZOTEAM214.00N0007CHAFLAN DE CONCRETO EN AZOTEA DE 10x10 CMS ENTRE LOSA Y PRETIL.ML20.00N0008COLOCACION DE TINACO CON BASE Y APLANADOPZA0.67N0009LOSA LIGERA CON VIGUETA Y BOVEDILLA, COLOCACION DE MALLA CON NERVADURA Y COLADA.M24.00N0010IMPERMEABILIZANTES EN AZOTEAM215.00N0011ENTORTADO DE LOSA DE AZOTEA CON CEMENTO-ARENA 1:5M225.00N0012COLOCACION DE LECHADA EN PISO O LOSAM225.00N0013NERVADURA ARMADA CON VARILLA DE 3/8"ML15.00O0000 HERRERIA Y DESMANTELAMIENTOO0001COLOCACION DE HERRERIA EN PIEZAS DE 2.50 M2 EN ADELANTEM27.00O0002COLOCACION DE PUERTASPZA2.00O0003COLOCACION Y EMBOQUILLADO DE PUERTASPZA1.50O0004COLOCACION DE HERRERIAS EN JARDINERASML7.00O0005COLOCACION DE CRISTAL FLOTADO DE 5 O 6 MM.M225.00O0006COLOCACION DE BANCAS METALICASPZA4.00O0007COLOCACION DE CERRADURAS EN PUERTAS DE MADERAPZA15.00O0008COLOCACION DE ESCALERA MARINAML5.00O0009DESMONTAR PUERTAS Y VENTANAS METALICASM210.00O0010DESMONTAR CRISTALES, MATERIAL RECUPERABLEM211.00O0011DESMONTAR PUERTAS Y VENTANAS DE MADERA MATERIAL RECUPERABLEM225.00O0012COLOCACION DE HERRERIA EN PIEZAS MENORES A 2.50 M2M24.00O0013COLOCACION DE JAMBAS DE ALUMINIO ANODIZADO NATURAL INCLUYE OPERADOR.ML40.00O0014COLOCACION DE PORTON TUBULAR CON MALLA CICLONPZA2.00O0015COLOCACION DE TABLERO DE CANCHA DE BASQUETBOL DE 1.80x1.20 MTS. CON MARCO DE ANGULO ESTRUCTURAL.PZA3.00P0000 INSTALACIONES HIDRAULICAS Y SANITARIASP0001COLOCACION DE ACCESORIOS DE BAOJGO1.00P0002COLOCACION DE FREGADERO O LAVADEROPZA1.00P0003REGISTRO CIEGO DE 30*30*30, Y 30*39*30 Y 30*20*40 CMS.PZA2.00P0004INSTALACION DE BOMBA DE 1/2 H.P. (INCLUYE TUBERIA DE SUCCION Y DESCARGUE AL TINACO)PZA1.00P0005COLOCACION DE MUEBLES SANITARIOSPZA4.00P0006DESMONTAR MUEBLES SANITARIOSPZA7.00P0007SALIDA Y COLOCACION DE COLADERASPZA2.00P0008REPARACION DE SALIDA HIDRAULICAS. INCLUYE DEMOLICION Y RESANESPZA2.00P0009COLOCACION DE LLAVES DE NARIZ DE 1/2PZA20.00P0010SALIDA Y COLOCACION DE MUEBLES SANITARIOS CON TUBO HIDRAULICO COBRE "M" Y SANIT. PVC CON CAMPANA ANGER LISO. INCLUYE COL. DE MUEBLE B.P. Y VALVULA DE CONTROL GENERAL PZA1.00P0011COLOCACION DE TINACO INCLUYE BASE APLANADO Y CONEXIONES A LA ALIMENTACIONPZA0.67P0012COLOCACION DE TUBERIA DE PVC DE 4" DE DIAMETRO PARA AGUAS NEGRASML10.00P0013COLOCACION DE TUBERIA DE COBRE DE 1/2"DE DIAMETRO PARA RAMALEO. INCLUYE SOLDADURA.ML15.00Q0000 ELECTRICIDADQ0001COLOCACION DE CHALUPASPZA25.00Q0002COLOCACION DE TAQUETES DE MADERAPZA25.00Q0003SALIDA DEL CENTRO Y CONTACTOS M0NOFASICOS INCLUYE TENDIDO DE TUBERIA Y CAJAS EN LOSAS, CABLEADO, COLOC. DE FOCOS, TAPAS. PLACAS, APAGADORES Y PRUEBA (BALANCEO DE CARGAS)SAL2.00Q0004ARMADO Y COLOCACION DE LUMINARIAS FLUORESCENTE DE EMPOTRAR EN PLAFOND DE 4*39 W.PZA4.00Q0005ARMADO Y COLOCACION DE LUMINARIAS FLUORESCENTE TIPO CAPFCE DE 2/74 W.PZA4.00Q0006COLOCACION DE SISTEMA DE TIERRA PARA ACOMETIDA BIFASICA Y TRIFASICA ( VARILLA COPPERWLD TUBO COND. PVC PESADO CONECTOR, REDUCCION BUSHING, ABRAZADERAS Y ANCLASPZA4.00Q0007COLOCACION DE BASES PARA MEDIDORPZA5.00Q0008COLOCACION DE TABLERO DE CONTROL Q-2PZA5.00Q0009COLOCACION DE LUMINARIAS 30*30PZA12.00Q0010RANURADO EN MUROS PARA ENMANGUERARML15.00Q0011ENBOQUILLADOS DE CHALUPAS PARA CONTACTOS Y APAGADORESPZA20.00R0000 AGUA POTABLER0001REGISTRO PARA COLOCAR VALVULA DE 1*1*1 MTS. CON BASE DE PLANTILLA DE CONCRETO, MUROS DE TABIQUE, CASTILLO, CADENA Y TAPA DE CONCRETO APLANADO INTERIOR INCLUYE EXC. FALTANTE.PZA0.50R0002COLOCACION DE POLIDUCTO DE 1" DE DIAMETRO PARA AGUA POTABLEML200.00R0003COLOCACION DE POLIDUCTO DE 2" DE DIAMETRO PARA AGUA POTABLEML100.00R0004COLOCACION DE TUBERIA PVC. DE 2" DE DIAMETRO INCLUYE MANIOBRASML50.00R0005COLOCACION DE TUBERIA PVC. DE 3" DE DIAMETRO INCLUYE MANIOBRASML40.00R0006COLOCACION DE TUBERIA PVC. DE 4" DE DIAMETRO INCLUYE MANIOBRASML35.00R0007COLOCACION DE TUBERIA PVC. DE 6" DE DIAMETRO INCLUYE MANIOBRASML30.00R0008COLOCACION DE TUBERIA PVC. DE 8" DE DIAMETRO INCLUYE MANIOBRASML25.00R0009COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 2" DE DIAMETRO INCLUYE MANIOBRASML16.00R0010COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 3" DE DIAMETRO INCLUYE MANIOBRASML15.00R0011COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 4" DE DIAMETRO INCLUYE MANIOBRASML14.00R0012COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 6" DE DIAMETRO INCLUYE MANIOBRASML10.00R0013COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 8" DE DIAMETRO INCLUYE MANIOBRASML8.00R0014COLOCACION DE TUBERIA DE FIERRO FUNDIDO DE 10" DE DIAMETRO INCLUYE MANIOBRASML6.00R0016COLOCACION DE PIEZAS ESPECIALES DE 3 A 4" DE DIAMETROPZA4.00R0017COLOCACION DE PIEZAS ESPECIALES PVC. DE 4 A 6" DE DIAMETROPZA4.00R0018COLOCACION DE PIEZAS ESPECIALES DE FIERRO FUNDIDOPZA1.00R0019TOMA DOMICILIARIA A BASE DE TUBERIA GALV. DE 1/2" DE DIA. INCLUYE COL. ABRAZADERA PVC. NUDO DE INSERCION, NIPLE, TUERCA UNION,CODO COPLE Y TUBERIA DE 6 MTS.LOTE2.00R0020TENDIDO DE TUBO DE FIERRO GALVANIZACION C-40 DE 13 Y 25 MM. INCLUYE CONEXIONESML50.00R0021TENDIDO DE TUBO DE FIERRO GALVANIZACION C-40 DE 38MM. INCLUYE CONEXIONESML35.00R0022TENDIDO DE TUBO DE FIERRO GALVANIZACION C-40 DE 63MM. INCLUYE CONEXIONESML25.00R0023REGISTRO DE TABIQUE DE 1.50x1.00 MTS HASTA 2.00 MTS DE PROFUNDIDAD INCLUYE CADENAS Y CASTILLOS DE CONCRETO Y APLANADO.PZA0.50S0000 DRENAJES0001COLOCACION DE TUBO DE CEMENTO DE 10*90 CMS. JUNTEADO CON MORTERO CEM-ARENA 1:5ML35.00S0002COLOCACION DE TUBO DE CEMENTO DE 15*90 CMS. JUNTEADO CON MORTERO CEM-ARENA 1:5ML30.00S0003COLOCACION DE TUBO DE CEMENTO DE 20*90 CMS. JUNTEADO CON MORTERO CEM-ARENA 1:5ML25.00S0004COLOCACION DE TUBO DE CEMENTO DE 30*90 CMS. JUNTEADO CON MORTERO CEM-ARENA 1:5ML20.00S0005COLOCACION DE TUBO DE CEMENTO DE 40*90 CMS. JUNTEADO CON MORTERO CEM-ARENA 1:5ML15.00S0006REGISTRO DE TABIQUE APLANADO PULIDO DE 40*60 CMS. HASTA UN METRO DE ALTURA SIN TAPADERAPZAS1.00S0007HECHURA DE TAPA DE POZOS DE VISITA DE CONCRETO ARMADO DE 90 CMS. DE DIAMETRO Y 15 CMS DE ESPESORPZA3.00S0008POZO DE VISITA DE 120*60*150 CMS. TERMINADO SIN TAPAPZA0.50S0009HECHURA DE CANAL PARA RECIBIR AGUA PLUVIALES APLANADO PULIDO CON CEMENTO 40*15*40ML4.00S0010COLOCACION DE TUBO DE CONCRETO ARMADO PARA ALCANTARILLADO DE 1.22 MTS. DE DIAMETRO POR 1.40 DE LARGOPZA2.00S0011HECHURA DE TUBOS DE CONCRETO DE 1.50 MTS. DE DIAMETRO Y 0.90 MTS. DE LARGO DE 7 CMS. DE ESPESOR CON UN F C=200 KG/CM2 CON VS. N 3 A CADA 9 CMS. PERIMETRALMENTEPZA1.00S0012AUMENTADO EN POZO DE VISITA CON TAPPZA1.00S0013COLOCACION DE TAPA DE REGISTRO CON MARCO DE FIERROPZA1.50S0014CAMA DE ARENA PARA RECIBIR TUBOML20.00S0015BROCAL DE CONCRETO ARMADO EN POZO DE VISITAPZA2.00S0016COLOCACION DE CONCHAS DE LAMINA DE 90*90 CMS. PARA ALCANTARILLADOML6.00S0017COLOCACION DE TUBO DE CEMENTO DE 45*90 CMS.ML12.50S0018COLOCACION DE TUBO DE CEMENTO DE 50*90 CMS.ML10.00T0000 ALUMBRADO PUBLICOT0001COLOCACION DE LAMPARAS EN POSTES DE ALUMBRADO PUBLICO, CABLEADO Y CONECTADOPZA4.00T0002REHABILITACION DE LUMINARIA SUB-URBANA DE 150 WATTS V. M. INCLUYE DESMONTAJE REVISION REPARACION Y MONTAJE DE LA MISMAPZA2.00T0003REHABILITACION DE LUMINARIA TIPO ESFERA 150 WATTS V. M. INCLUYE DESMONTAJE REVICION REPARACION Y MONTAJEPZA2.00T0004COLOCACION INSTALACION Y PRUEBA DE CONTACTOR PARA ALUMBRADO PUBLICO EN POSTE EXISTENTE DE C.F.E. 2*30 AMP. 220 V.PZA5.00T0005RETIRO Y COLOCACION DE CABLEADO EXISTENTE PARA ALUMBRADO PUBLICOML50.00U0000 PAVIMENTO Y EMPEDRADOSU0001CALAFATEO CON PIEDRA BOLA Y MORTERO CEMENTO ARENA EN ACCESO DE PLAZA CIVICA Y ANDADORESML25.00U0002CONCRETO FC=200 KG/CM2 DE 15 CMS. DE ESPESRO EN CALLE CON CEMENTO NORMAL T.M.A. 3/4" ELABORADO EN OBRAM26.00U0003EMPEDRADO DE CALLE CON PIEDRA BOLA CON MORTERO CEMENTO-ARENA.M210.00U0004EMPEDRADO CON PIEDRA BOLA CONSOLIDADO CON ARENA INCLUYE COMPACTACION Y NIVELACIONM212.00U0005DESEMPEDRADO DE CALLESM215.00U0006CALAFATEO EN CALLESM.L.25.00U0007COLOCACION DE ADOQUIN EN PISO. INCLUYE CAMA DE ARENAM29.00U0008TOPE VIAL DE CONCRETO HIDRAULICO DE 10 CMS DE ESPESOR EN EL CENTRO Y 50 CMS DE BASE CON UN FC= 200KG/CM2 INCLUYE CIMBRADO Y DESCIMBRADO.ML15.00U0009CORTE CON SIERRA EN CONCRETOML50.00U0010COLOCACION DE REJILLA METALICA CON ANGULO DE 4*4*1/4" EN CALLES: INCLUYE ANCLAJE Y NIVELACION.M26.00U0011ESTAMPADO EN PAVIMENTO DE CONCRETO HIDRAULICO CON MOLDE METALICO TIPO ADOQUINM250.00U0012RIEGO A MANO DE EMULSION FR-3 PARA RECIBIR REVOLTURAM230.00U0013FABRICACION DE REVOLTURA CON EMULSION FR-3 ARENA-GRAVA M31.50U0014RELLENO CON REVOLTURA FR-3 ARENA Y GRAVA COMPACTADO CON PIZON DE MANOM32.00U0015TENDIDO DE MATERIAL MEJORADO PARA REVESTIMIENTO CON PALA Y 20 CMS DE ESPESORM225.00U0017HECHURA DE ESTRIADO PARA VIBRADORES SOBRE CONCRETO HIDRAULICOM28.00V0000 GUARNICIONES Y BANQUETASV0001GUARNICION DE CONCRETO DE 15*20*25 CMSML10.00V0002GUARNICION DE CONCRETO DE 15*20*45 CMSML6.00V0003CUNETA DE CONCRETO, INCLUYE: CIMBRADO Y COLADO EN SECCION DE 0.5*1.00 M Y 10 CMS DE ESPESORML8.00V0004HECHURA DE ESCALONES EN RAMPA DE ESCALERASML8.00V0005BANQUETA DE CONCRETO DE 8.0 CMS DE ESPESOR PULIDO, ESCOBILLADO PASADO VOLTEADORM27.00V0006RODAPIE DE PIEDRA DE 30*30 CMS.M31.00V0007FORJADO DE NARIZML12.00V0008CONSTRUCCION DE JARDINERAS CON TABIQUE 10*14*28CMS JUNTEADO CON MORTERO CEMENTO-ARENA DE 90*90*100 CMS, INCLUYE: FABRICACION DE LOSA SUPERIOR ARMADA.PZA0.65V0009CEJA DE CONCRETO F`C= 150 KG/CM2 SECCION PROMEDIO 10*13 CM ARMADO CON VARILLA No 3 Y BASTON No. 2 25 CMS DE LONGITUD CON CIMBRA APARENTEML10.00W000 LIMPIEZA Y PINTURAW0001PINTURA VINILICA EN MUROS Y PLAFONES A 2 MANOSM225.00W0002PINTURA DE ESMALTE EN HERRERIA A 2 MANOSM27.00W0003PINTURA EN CHAMBRANA METALICA A 2 MANOSML20.00W0004PINTURA DE ESMALTE EN MUROS, INCLUYE: PREPARACION DE LA SUPERFICIE A 2 MANOSML12.00W0005PINTURA DE ESMALTE EN LINEAS DE CANCHA DE BASQUETBOL, INCLUYE TRAZOPZA0.50W0006PINTURA DE ESMALTE EN LARGUEROS Y MONTENESML50.00W0007RASPADO Y LIMPIEZA DE PINTURA EN HERRERIA CON ESPATULA Y CEPILLOM28.00W0008RASPADO Y LIMPIEZA DE PINTURA EN MUROSM220.00W0009LIMPIEZA EN MUROS Y PISOS CON CEPILLO, AGUA Y JABONM240.00W0010PICADO Y RASPADO PARA QUITAR TIROL EN MAL ESTADOM215.00W0011PINTURA VINILICA EN MUROS Y PLAFONES DE 3 A 7 MTS. DE ALTURA, INCLUYE: COLOCACION DE ANDAMIOSM220.00W0012PINTURA ESMALTE EN HERRERIA DE 3 A 7 MTS. DE ALTURA, INCLUYE COLOCACION DE ANDAMIOSM25.00W0013PINTURA DE ESMALTE EN TABLEROS Y AROS DE CANCHA DE BASQUETBOLPZA2.00W0014PINTURA VINILICA EN LOSA Y TRABES DE CONCRETOM225.00X0000 COLOCACION DE TECHUMBREX0001DESMONTAR VIGAS Y REGLAS DE MADERA EN TECHADO DE AZOTEA MEDIDA POR SUPERFICIE CUBIERTAM215.00X0002DESMONTAR TEJA DE BARRO CON RECUPERACION DE MATERIALM212.50X0003DESMONTAR LAMINA DE ASBESTO MEDIDA POR SUPERFICIE DE CONTACTOM220.00X0004DESMONTAR LAMINA GALVANIZADA MEDIDA POR SUPERFICIE DE CONTACTOM225.00X0005COLOCACION DE LAMINA ZINTROM230.00X0006COLOCACION DE LAMINA DE ASBESTO (6.1*1.00)M230.00X0007COLOCACION DE LAMINA DE ASBESTO (2.6*1.00)M240.00X0008COLOCACION DE CABALLETE DE LAMINA CON GANCHOS Y TUERCASML100.00Y0000 DEMOLICIONY0001DEMOLICION DE CONCRETO ARMADOM30.50Y0002DEMOLICION DE PISOS DE MOSAICOM212.00Y0003DEMOLICION DE MUROS DE MAMPOSTERIAM31.00Y0004 DEMOLICION DE MUROS DE TABIQUE O BLOCKS, INCLUYE CADENAS Y CASTILLOSM215.00Y0005 DEMOLICION DE MUROS DE TABIQUE O BLOCKS, INCLUYE CADENAS Y CASTILLOS, APLANADO INTERIOR Y EXTERIORM212.0045037.5Y0006DEMOLICION DE APLANADOS EN MUROSM225.00Y0007DEMOLICION DE CONCRETO SIMPLEM31.00Y0008DEMOLICION DE PAVIMENTO ASFALTICOM26.00Y0009DESMANTELAMIENTO DE TUBERIA CEMEN- ARENA DE 15 A 30 CMS DE DIAMETROML50.00Y0010LEVANTAR IMPERMEABILIZANTE DAADO, INCLUYE LIMPIEZA DE LA SUPERFICIEM230.00Y0011HECHURA DE AGUJERO PARA LA COLOCACION DE EQUIPO DE CLIMA INCLUYE, EMBOQUILLADOPZA2.00 Z0000 VARIOS, CERCAS Y ENMALLADOSZ0001COLOCACION DE TUBO GALVANIZADO DE 2" DE DIAMETRO PARA COLOCAR MALLA CICLON HASTA 3 MTS. DE ALTURA INCLUYE CORTES DADO DE CONCRETO DE 20*20*30 CMS, ANCLAJE, NIVELACION Y PLOMEOPZA15.00Z0002COLOCACION DE MALLA CICLONM225.00Z0003REINSTALACION DE MALLA CICLONM2100.00Z0004CERCA DE ALAMBRE DE PUAS CON POSTES DE CONCRETO DE 12*12*170 CMS. Y 5 HILOSML15.00Z0005CERCA DE ALAMBRE DE PUAS CON POSTES DE MADERA DE 3*3*2 MTS. DE ALTURA.ML35.00Z0006FABRICACION DE LETRERO DE OBRA DE 0.915x0.7625m., TABLERO FABRICADO CON PERFIL TUBULAR DE 2"x2" CAL. 18, CON LAMINA NEGRA CAL. 18, UNIDA AL TABLERO CON SOLDADURA 3-32 (1/8") A CADA 20 CMS. POR TODO EL PERIMETRO, INCLUYE: PINTURA,PZA1.00

REND. MAQUINARIATABULADOR DE RENDIMIENTO DE MAQUINARIA PARA CONSERVACION Y CONSTRUCCION DE CAMINOS RURALESTRABAJO DE CONSTRUCCIONTIPO DE TRABAJO MAQ.R4ENDIMIENTODIESEL

1DESPALME DE BANCO DE MATERIAL CON TRACTOR D5220 M3/TURNO150 LTS/TURNOD51.00 KM/TURNO150 LTS/TURNO2DESMONTE POR HECTAREA CON TRACTOR D80.86 M3/TURNO400 LTS/TURNOD70.70 M3/TURNO315 LTS/TURNOD50.60 M3/TURNO150 LTS/TURNO3DESPALME CON TRACTORD8500 M3/TURNO400 LTS/TURNOD7400 M3/TURNO315 LTS/TURNOD5300 M3/TURNO150 LTS/TURNO4EXCAVACION EN CORTE DEBAJO DE LA SUBRASANTE CON D8400 M3/TURNO400 LTS/TURNOTRACTOR D7300 M3/TURNO315 LTS/TURNOD5220 M3/TURNO150 LTS/TURNO5SOBRE ACARREO DE MATERIALES PRODUCTO DE LAS 250 M3/TURNOEXCAVACIONES DE CORTES DEBAJO DE LA SUBRASANTE.6FORMACION Y COMPACTACION DE TERRAPLENES D8400 M3/TURNO400 LTS/TURNOADICIONALES CON SUS CUAS.CON TRACTOR D7300 M3/TURNO315 LTS/TURNOD5200 M3/TURNO150 LTS/TURNO7EXTRACCION DE MATERIAL PARA REVESTIMIENTO CON D8450 M3/TURNO400 LTS/TURNOTRACTORD7300 M3/TURNO315 LTS/TURNOD5250 M3/TURNO150 LTS/TURNO8RASTREO Y CONFIGURACION DE CUNETAS CON TRACTORD81 KM/TURNO400 LTS/TURNOD71 KM/TURNO315 LTS/TURNOD50.5 KM/TURNO150 LTS/TURNO9RASTREO Y CONFIGURACION DE CUNETAS CON TRACTORMOTO0.70 KM/TURNO120 LTS/TURNO10EXTRACCION DE DERRUMBES CON TRACTOR D8200 M3/TURNO400 LTS/TURNOD7150 M3/TURNO315 LTS/TURNOD5100 M3/TURNO150 LTS/TURNO11CARGA DE MATERIALES PARA REVESTIMIENTOTRAXCAVO 108 M3/TURNO80 LTS/TURNO( A CAMIONES )O PAILODER

12ACRREO DE MATERIALES PARA REVESTIMIENTOCAMION VOLTEO0 A 5.00 KM. 108 M3/TURNO90 LTS/TURNO6 A 12 KM.60 M3/TURNO90 LTS/TURNO

13OPERACIN DE TENDIDO Y REAFINAMIENTOMOTO250 M3/TURNO120 LTS/TURNO

14OPERACIN DE COMPACTADODYDCA60 M3/16 LTS./HORA

NOTA:TURNOS DE 8.00 HORASSI SE TRABAJAN 3.00 HORAS EXTRAORDINARIAS POR MAQUINA EL GASTO DE DIESEL SE INCREMENTA UN 38%

COSTOS OPERADORES 26/OCT,/2005 COMPACTADOR $ 2000 QUINCENALES TRACTOR $ 2000 QUINCENALES RETROEXACADORA $ 1800 QUINCENALESCHOFER VOLTEO $ 1500 QUINCENALES

TARJETA P.U. UNIVERSIDAD VALLE DEL GRIJALVAESPECIALIDAD EN CONSTRUCCINMATERIA: PROGRAMACION Y CONTROL DE OBRACATEDRTICO: M. A. C. DANIEL ADRIAN RUIZ SIBAJAALUMNOS:Fecha:16 de octubre del 2011Yarely del Carmen Ramrez BaizabalGustavo Salazar MoralesLugar: TAPACHULA, CHIS.

ANALISIS DE PRECIOS UNITARIOSCASA HABITACION 93.35 M2

CdigoConceptoUnidadCostocantidadImporte%Anlisis: A01.01 Unidad: M2TRAZO Y NIVELACIN EN REA DE DESPLANTE DE EDIFICACIONES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES CALHIDRATON$1,244.00 0.000200$0.256.17% HILO CAAMOPZA$35.13 0.001000$0.040.99% VARILLA DE 3/8" 9.5 MMKG$12.50 0.020000$0.256.17%Subtotal: MATERIALES$0.5413.33%MANO DE OBRA TOPOGRAFOJOR$177.00/100.000000$1.7743.70% AYUDANTE ESPECIALIZADOJOR$131.98/100.000000$1.3232.59%Subtotal: MANO DE OBRA$3.0976.30%EQUIPO Y HERRAMIENTA EQUIPO DE TOPOGRAFIAHOR$6.70/25.000000$0.276.67% HERRAMIENTA MENOR%$3.09 0.030000$0.092.22% EQUIPO DE SEGURIDAD%$3.09 0.020000$0.061.48%Subtotal: EQUIPO Y HERRAMIENTA$0.4210.37%Costo directo$4.05INDIRECTOS8%$0.32SUBTOTAL $4.37UTILIDAD10%$0.41PRECIO UNITARIO$4.78(* CUATRO PESOS 78/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 128 Importe: 611.84Anlisis: A01.02 Unidad: M2LIMPIEZA Y DESHIERBE DEL TERRENO, ATAQUE OBLIGADO A MANO; INCLUYE: ACARREO A 20 METROS,ACOMODO PARA SU POSTERIOR EXTRACCIN, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MANO DE OBRA CUADRILLA No 1 (1 PEON)JOR$143.01/100.000000$1.4395.33%Subtotal: MANO DE OBRA$1.4395.33%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$1.43 0.030000$0.042.67% EQUIPO DE SEGURIDAD%$1.43 0.020000$0.032.00%Subtotal: EQUIPO Y HERRAMIENTA$0.074.67%Costo directo$1.50INDIRECTOS8%$0.12SUBTOTAL $1.62UTILIDAD10%$0.15PRECIO UNITARIO$1.77(* UN PESOS 77/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 128 Importe: 226.56Anlisis: A01.03 Unidad: M3DESPALME DE TERRENO A MAQUINA HASTA 25 CMS DE PROFUNDIDAD, PARA QUITAR CAPA DE TIERRAVEGETAL; INCLUYE: ACARREO A UNA DISTANCIA DE 20.00 MTS, MEDIDO SUELTO, DESENRAICE,HERRAMIENTA MENOR NECESARIA PARA LA REMOCIN, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

EQUIPO Y HERRAMIENTA MOTONIVELADORA CAT. 120 H DE 140 HPHOR$568.52*0.010000$5.6937.51% TRACTOR DE ORUGAS CAT D6R 165 HP, 18000 KGHOR$632.00*0.015000$9.4862.49%Subtotal: EQUIPO Y HERRAMIENTA$15.17100.00%Costo directo$15.17INDIRECTOS8%$1.21SUBTOTAL $16.38UTILIDAD10%$1.52PRECIO UNITARIO$17.90(* DIECISIETE PESOS 90/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 12.8 Importe: 229.12Anlisis: A01.04 Unidad: M3ACARREOS EN CAMIN CON CARGA MANUAL DE TIERRA Y MATERIAL MIXTO, PRODUCTO DE LASEXCAVACIONES QUE NO SEAN ROCA, MEDIDO SUELTO. PRIMER KILMETRO PAVIMENTO Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MANO DE OBRA CUADRILLA No 1 (1 PEON)JOR$143.01/5.000000$28.6027.18%Subtotal: MANO DE OBRA$28.6027.18%EQUIPO Y HERRAMIENTA CAMION DE VOLTEO DE 7 M3HOR$300.78/4.000000$75.2071.46% HERRAMIENTA MENOR%$28.60 0.030000$0.860.82% EQUIPO DE SEGURIDAD%$28.60 0.020000$0.570.54%Subtotal: EQUIPO Y HERRAMIENTA$76.6372.82%Costo directo$105.23INDIRECTOS8%$8.42SUBTOTAL $113.65UTILIDAD10%$10.52PRECIO UNITARIO$124.17(* CIENTO VEINTICUATRO PESOS 17/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 12.8 Importe: 1589.38Anlisis: A01.05 Unidad: M3/KACARREOS EN CAMIN DE TIERRA Y MATERIAL MIXTO, PRODUCTO DE LAS EXCAVACIONES QUE NO SEANROCA, MEDIDO SUELTO, DEMOLICIONES DE MAMPOSTERIA, DEMOLICIONES DE CONCRETO, TALA DEARBOLES. KM 2 AL KM 20 EN PAVIMENTO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

EQUIPO Y HERRAMIENTA CAMION DE VOLTEO DE 7 M3HOR$300.78/50.000000$6.02100.00%Subtotal: EQUIPO Y HERRAMIENTA$6.02100.00%Costo directo$6.02INDIRECTOS8%$0.48SUBTOTAL $6.50UTILIDAD10%$0.60PRECIO UNITARIO$7.10(* SIETE PESOS 10/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 64 Importe: 454.4Anlisis: A02.01 Unidad: M3EXCAVACIN A MANO EN TERRENO TIPO "B" DE 0.0 A 2.0 O METROS DE PROFUNDIDAD SECCINOBLIGADA; INCLUYE: ACARREO A 20 METROS, AFINES DE TALUDES, TRASPALEOS, AFINES DEFONDO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MANO DE OBRA CUADRILLA No 1 (1 PEON)JOR$143.01/2.040000$70.1095.24%Subtotal: MANO DE OBRA$70.1095.24%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$70.10 0.030000$2.102.85% EQUIPO DE SEGURIDAD%$70.10 0.020000$1.401.90%Subtotal: EQUIPO Y HERRAMIENTA$3.504.76%Costo directo$73.60INDIRECTOS8%$5.89SUBTOTAL $79.49UTILIDAD10%$7.36PRECIO UNITARIO$86.85(* OCHENTA Y SEIS PESOS 85/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 46.68 Importe: 4054.16Anlisis: A02.02 Unidad: M2PLANTILLA DE CONCRETO HECHO EN OBRA F'c=50 KG/CM2 CON UN ESPESOR PROMEDIO DE 6 CM.INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/20.000000$14.4621.03%Subtotal: MANO DE OBRA$14.4621.03%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$14.46 0.030000$0.430.63% EQUIPO DE SEGURIDAD%$14.46 0.020000$0.290.42%Subtotal: EQUIPO Y HERRAMIENTA$0.721.05%BASICOS CONCRETO DE F'C=50 KG/CM2M3$875.32 0.061200$53.5777.92%Subtotal: BASICOS$53.5777.92%Costo directo$68.75INDIRECTOS8%$5.50SUBTOTAL $74.25UTILIDAD10%$6.88PRECIO UNITARIO$81.13(* OCHENTA Y UN PESOS 13/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 58.36 Importe: 4734.75Anlisis: A02.03 Unidad: M3MAMPOSTERA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:5 EN CIMENTACIN;INCLUYE: ACARREO, PLOMEO, HERRAMIENTA MENOR, MANO DE OBRA. Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES PIEDRA BRAZAM3$142.00 1.300000$184.6033.45%Subtotal: MATERIALES$184.6033.45%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/4.500000$64.2811.65%Subtotal: MANO DE OBRA$64.2811.65%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$64.28 0.030000$1.930.35% EQUIPO DE SEGURIDAD%$64.28 0.020000$1.290.23%Subtotal: EQUIPO Y HERRAMIENTA$3.220.58%BASICOS MORTERO CEMENTO ARENA 1:5M3$999.02 0.300000$299.7154.31%Subtotal: BASICOS$299.7154.31%Costo directo$551.81INDIRECTOS8%$44.14SUBTOTAL $595.95UTILIDAD10%$55.18PRECIO UNITARIO$651.13(* SEISCIENTOS CINCUENTA Y UN PESOS 13/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 28.19 Importe: 18355.35Anlisis: A02.04 Unidad: MANCLAJE DE CASTILLO EN CIMENTACIN DE 14 X 21 CMS. CON CONCRETO F'c=150 KG/CM2 ARMADOCON 4 VARILLAS No. 3 Y ESTRIBOS DEL No. 2 A CADA 15 CMS; INCLUYE: ANCLAJE A 1.00 MTS.,ACARREO, CIMBRA COMN, CON MADERA DE PINO DE 3a., CIMBRADO, DESCIMBRADO, MATERIALES,HERRAMIENTA MENOR, MANO DE OBRA. Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES VARILLA DE 3/8" 9.5 MMKG$12.50 3.920000$49.0036.74% ALAMBRE RECOCIDOKG$14.50 0.050000$0.730.55%Subtotal: MATERIALES$49.7337.28%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/6.600000$43.5332.64%Subtotal: MANO DE OBRA$43.5332.64%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$43.53 0.030000$1.310.98% EQUIPO DE SEGURIDAD%$43.53 0.020000$0.870.65%Subtotal: EQUIPO Y HERRAMIENTA$2.181.63%BASICOS CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.= 19 MM, RESISTENCIA NORMALM3$998.41 0.038000$37.9428.45%Subtotal: BASICOS$37.9428.45%Costo directo$133.38INDIRECTOS8%$10.67SUBTOTAL $144.05UTILIDAD10%$13.34PRECIO UNITARIO$157.39(* CIENTO CINCUENTA Y SIETE PESOS 39/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1.6 Importe: 251.82Anlisis: A02.05 Unidad: MANCLAJE DE CASTILLOS EN CIMENTACIN DE 14X14CM.CON CONCRETO F'c=150KG/CM2 ARMADO CON 4VARILLAS No. 3 Y ESTRIBOS DEL No. 2 A CADA 20 CMS; INCLUYE: ANCLAJE A 1.00 MTS,ACARREO, CIMBRA CON MADERA DE PINO DE 3a., CIMBRADO, DESCIMBRADO, MATERIALES, HERRAMIENTAMENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES VARILLA DE 3/8" 9.5 MMKG$12.50 3.330000$41.6337.44% ALAMBRE RECOCIDOKG$14.50 0.050000$0.730.66%Subtotal: MATERIALES$42.3638.09%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/6.600000$43.5339.15%Subtotal: MANO DE OBRA$43.5339.15%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$43.53 0.030000$1.311.18% EQUIPO DE SEGURIDAD%$43.53 0.020000$0.870.78%Subtotal: EQUIPO Y HERRAMIENTA$2.181.96%BASICOS CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.= 19 MM, RESISTENCIA NORMALM3$998.41 0.023170$23.1320.80%Subtotal: BASICOS$23.1320.80%Costo directo$111.20INDIRECTOS8%$8.90SUBTOTAL $120.10UTILIDAD10%$11.12PRECIO UNITARIO$131.22(* CIENTO TREINTA Y UN PESOS 22/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 24 Importe: 3149.28Anlisis: A02.06 Unidad: M3RELLENO DE EXCAVACIONES PARA ESTRUCTURAS Y/O PARA ALCANZAR NIVELES DE PROYECTO, EN CAPASDE 20 CMS DE ESPESOR, COMPACTADAS CON PISON AL 90% , SEGN PRUEBA PROCTOR, INCORPORANDOEL AGUA NECESARIA; INCLUYE: ACARREOS, MEDIDO COMPACTO CON MATERIAL PRODUCTO DE LAEXCAVACIN, EXTENDIDO DEL MATERIAL, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES AGUA ( MANEJO)M3$15.00 0.100000$1.502.15%Subtotal: MATERIALES$1.502.15%MANO DE OBRA CUADRILLA No 1 (1 PEON)JOR$143.01/2.200000$65.0093.19%Subtotal: MANO DE OBRA$65.0093.19%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$65.00 0.030000$1.952.80% EQUIPO DE SEGURIDAD%$65.00 0.020000$1.301.86%Subtotal: EQUIPO Y HERRAMIENTA$3.254.66%Costo directo$69.75INDIRECTOS8%$5.58SUBTOTAL $75.33UTILIDAD10%$6.98PRECIO UNITARIO$82.31(* OCHENTA Y DOS PESOS 31/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 14.15 Importe: 1164.69Anlisis: A02.07 Unidad: M2FIRME DE CONCRETO F'c=100 KG/CM2 DE 10 CM DE ES PESOR; INCLUYE: NIVELACIN,COMPACTACIN, ACARREO, LIMPIEZA, CURADO, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''PZA$17.00 0.150000$2.552.12% AGUA ( MANEJO)M3$15.00 0.010000$0.150.12%Subtotal: MATERIALES$2.702.24%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/12.000000$24.1120.02%Subtotal: MANO DE OBRA$24.1120.02%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$24.11 0.030000$0.720.60% EQUIPO DE SEGURIDAD%$24.11 0.020000$0.480.40%Subtotal: EQUIPO Y HERRAMIENTA$1.201.00%BASICOS CONCRETO DE F'c=100 KG/CM2. HECHO EN OBRA, T.M.A=19 MM, RESISTENCIA NORMALM3$879.95 0.105000$92.3976.74%Subtotal: BASICOS$92.3976.74%Costo directo$120.40INDIRECTOS8%$9.63SUBTOTAL $130.03UTILIDAD10%$12.04PRECIO UNITARIO$142.07(* CIENTO CUARENTA Y DOS PESOS 07/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 57 Importe: 8097.99Anlisis: A02.08 Unidad: KGACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO.2 Fy = 2400 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA MENOR,MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.070000$1.025.86% ALAMBRONKG$12.50 1.070000$13.3876.81%Subtotal: MATERIALES$14.4082.66%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.48%Subtotal: MANO DE OBRA$2.8716.48%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.52% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.34%Subtotal: EQUIPO Y HERRAMIENTA$0.150.86%Costo directo$17.42INDIRECTOS8%$1.39SUBTOTAL $18.81UTILIDAD10%$1.74PRECIO UNITARIO$20.55(* VEINTE PESOS 55/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 15.26 Importe: 313.59Anlisis: A03.09 Unidad: KGACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO. 3 Fy = 4200 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA MENOR,MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.050000$0.734.26% VARILLA DE 3/8" 9.5 MMKG$12.50 1.070000$13.3878.11%Subtotal: MATERIALES$14.1182.37%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.75%Subtotal: MANO DE OBRA$2.8716.75%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.53% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.35%Subtotal: EQUIPO Y HERRAMIENTA$0.150.88%Costo directo$17.13INDIRECTOS8%$1.37SUBTOTAL $18.50UTILIDAD10%$1.71PRECIO UNITARIO$20.21(* VEINTE PESOS 21/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 31.48 Importe: 636.21Anlisis: A02.10 Unidad: KGACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO.4, 5, 6 AL 12 Fy=4200 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.050000$0.734.26% VARILLA CORRUGADA ACER DIF. DIAM. POR KGKG$12.50 1.070000$13.3878.11%Subtotal: MATERIALES$14.1182.37%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.75%Subtotal: MANO DE OBRA$2.8716.75%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.53% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.35%Subtotal: EQUIPO Y HERRAMIENTA$0.150.88%Costo directo$17.13INDIRECTOS8%$1.37SUBTOTAL $18.50UTILIDAD10%$1.71PRECIO UNITARIO$20.21(* VEINTE PESOS 21/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 11.93 Importe: 241.11Anlisis: A02.11 Unidad: M3CONCRETO F'c=150 KG/CM2 FABRICADO EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DELAGREGADO SER DE (3/4") Y SU CALIDAD Y BANCO DE PROCEDENCIA, DEBERN SER APROBADOS PORLA SECRETARIA, INCLUYE: ACARREO, MUESTREO, COLADO, VIBRADO, CURADO, DESPERDICIO,REVOLVEDORA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MANO DE OBRA CUADRILLA No 22 (1 ALBAIL + 5 PEONES)JOR$836.43*0.083272$69.656.30%Subtotal: MANO DE OBRA$69.656.30%EQUIPO Y HERRAMIENTA VIBRADOR PARA CONCRETOHOR$28.27 0.500000$14.141.28% HERRAMIENTA MENOR%$69.65 0.030000$2.090.19% EQUIPO DE SEGURIDAD%$69.65 0.020000$1.390.13%Subtotal: EQUIPO Y HERRAMIENTA$17.621.59%BASICOS CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.= 19 MM, RESISTENCIA NORMALM3$998.41 1.020000$1,018.3892.11%Subtotal: BASICOS$1,018.3892.11%Costo directo$1,105.65INDIRECTOS8%$88.45SUBTOTAL $1,194.10UTILIDAD10%$110.57PRECIO UNITARIO$1,304.67(* UN MIL TRESCIENTOS CUATRO PESOS 67/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 0.76 Importe: 991.55Anlisis: A03.01 Unidad: MCADENA O CASTILLO DE CONCRETO F'C=150KG/CM2 DE 15 X 15 CMS. ARMADO CON 4 VARILLAS No.3,ESTRIBOS No. 2 A CADA 20 CMS. CON CIMBRA DE MADERA DE PINO DE 3A; INCLUYE: HABILITADO,CIMBRADO, DESCIMBRADO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES VARILLA DE 3/8" 9.5 MMKG$12.50 2.600000$32.5028.00% ALAMBRONKG$12.50 0.800000$10.008.62% ALAMBRE RECOCIDOKG$14.50 0.100000$1.451.25% CLAVOS DE 2 A 4 "KG$17.00 0.100000$1.701.46% DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''PZA$17.00 0.500000$8.507.32%Subtotal: MATERIALES$54.1546.65%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/8.000000$36.1631.15%Subtotal: MANO DE OBRA$36.1631.15%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$36.16 0.030000$1.080.93% EQUIPO DE SEGURIDAD%$36.16 0.020000$0.720.62%Subtotal: EQUIPO Y HERRAMIENTA$1.801.55%BASICOS CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.= 19 MM, RESISTENCIA NORMALM3$998.41 0.024000$23.9620.64%Subtotal: BASICOS$23.9620.64%Costo directo$116.07INDIRECTOS8%$9.29SUBTOTAL $125.36UTILIDAD10%$11.61PRECIO UNITARIO$136.97(* CIENTO TREINTA Y SEIS PESOS 97/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 156.2 Importe: 21394.71Anlisis: A03.02 Unidad: MCADENA O CASTILLO DE CONCRETO F'C=150KG/CM2 DE 15 X 20 CMS. ARMADA CON 4 VARILLAS No. 3ESTRIBOS No. 2 A CADA 20 CMS. CON CIMBRA DE MADERA DE PINO DE 3A; INCLUYE: HABILITADO,CIMBRADO, DESCIMBRADO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES VARILLA DE 3/8" 9.5 MMKG$12.50 2.600000$32.5022.11% ALAMBRONKG$12.50 0.850000$10.637.23% ALAMBRE RECOCIDOKG$14.50 0.100000$1.450.99% CLAVOS DE 2 A 4 "KG$17.00 0.100000$1.701.16% DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''PZA$17.00 0.500000$8.505.78%Subtotal: MATERIALES$54.7837.27%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/5.000000$57.8539.36%Subtotal: MANO DE OBRA$57.8539.36%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$57.85 0.030000$1.741.18% EQUIPO DE SEGURIDAD%$57.85 0.020000$1.160.79%Subtotal: EQUIPO Y HERRAMIENTA$2.901.97%BASICOS CONCRETO DE F'c=150 KG/CM2, HECHO EN OBRA, T.M.A.= 19 MM, RESISTENCIA NORMALM3$998.41 0.031500$31.4521.40%Subtotal: BASICOS$31.4521.40%Costo directo$146.98INDIRECTOS8%$11.76SUBTOTAL $158.74UTILIDAD10%$14.70PRECIO UNITARIO$173.44(* CIENTO SETENTA Y TRES PESOS 44/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 225.46 Importe: 39103.78Anlisis: A03.03 Unidad: M2MURO DE 14Cm. ESP. DE TABIQUE ROJO COMUN. ASENTADO CON MORTERO CEM-ARENA 1:5. ACABADOCOMUN. HASTA UNA ALTURA DE 3M. INCLUYE: ACARREOS A 20 MTS. DESPERDICIOS, LIMPIEZA,MATERIALES, ANDAMIOS, MANO DE OBRA EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES TABIQUE ROJO RECOCIDOMIL$1,200.00 0.064000$76.8048.54%Subtotal: MATERIALES$76.8048.54%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/7.000000$41.3226.12%Subtotal: MANO DE OBRA$41.3226.12%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$41.32 0.030000$1.240.78% ANDAMIOS%$41.32 0.050000$2.071.31% EQUIPO DE SEGURIDAD%$41.32 0.020000$0.830.52%Subtotal: EQUIPO Y HERRAMIENTA$4.142.62%BASICOS MORTERO CEMENTO ARENA 1:5M3$999.02 0.036000$35.9622.73%Subtotal: BASICOS$35.9622.73%Costo directo$158.22INDIRECTOS8%$12.66SUBTOTAL $170.88UTILIDAD10%$15.82PRECIO UNITARIO$186.70(* CIENTO OCHENTA Y SEIS PESOS 70/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 110.02 Importe: 20540.73Anlisis: A03.04 Unidad: M2MURO DE 14Cm. ESP. DE TABIQUE ROJO COMUN. ASENTADO CON MORTERO CEM-ARENA 1:5. ACABADOCOMUN. HASTA UNA ALTURA DE 3 A 6M. INCLUYE: ACARREOS A 20 MTS. DESPERDICIOS, LIMPIEZA,MATERIALES, ANDAMIOS, MANO DE OBRA EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES TABIQUE ROJO RECOCIDOMIL$1,200.00 0.064000$76.8047.04%Subtotal: MATERIALES$76.8047.04%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/6.300000$45.9228.12%Subtotal: MANO DE OBRA$45.9228.12%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$45.92 0.030000$1.380.85% ANDAMIOS%$45.92 0.050000$2.301.41% EQUIPO DE SEGURIDAD%$45.92 0.020000$0.920.56%Subtotal: EQUIPO Y HERRAMIENTA$4.602.82%BASICOS MORTERO CEMENTO ARENA 1:5M3$999.02 0.036000$35.9622.02%Subtotal: BASICOS$35.9622.02%Costo directo$163.28INDIRECTOS8%$13.06SUBTOTAL $176.34UTILIDAD10%$16.33PRECIO UNITARIO$192.67(* CIENTO NOVENTA Y DOS PESOS 67/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 105.19 Importe: 20266.96Anlisis: A03.05 Unidad: M2MURO DE 14 CM DE ESPESOR CON TABICON 10x14x28 ASENTADO CON MEZCLA CEMENTO - ARENA 1:5,ACABADO COMUN, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

MATERIALES TABICON LIGERO EXTRA DE 12x7x24PZA$2.15 52.000000$111.8060.85%Subtotal: MATERIALES$111.8060.85%MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/8.000000$36.1619.68%Subtotal: MANO DE OBRA$36.1619.68%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$36.16 0.030000$1.080.59% EQUIPO DE SEGURIDAD%$36.16 0.020000$0.720.39%Subtotal: EQUIPO Y HERRAMIENTA$1.800.98%BASICOS MORTERO CEMENTO ARENA 1:5M3$999.02 0.034000$33.9718.49%Subtotal: BASICOS$33.9718.49%Costo directo$183.73INDIRECTOS8%$14.70SUBTOTAL $198.43UTILIDAD10%$18.37PRECIO UNITARIO$216.80(* DOSCIENTOS DIECISEIS PESOS 80/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 47.6 Importe: 10319.68Anlisis: A03.06 Unidad: KGACERO DE REFUERZO EN ESTRUCTURA CON ALAMBRON No. 2 Fy= 2400 KG/CM2 INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, SILLETAS, DOBLECES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.070000$1.025.86% ALAMBRONKG$12.50 1.070000$13.3876.81%Subtotal: MATERIALES$14.4082.66%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.48%Subtotal: MANO DE OBRA$2.8716.48%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.52% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.34%Subtotal: EQUIPO Y HERRAMIENTA$0.150.86%Costo directo$17.42INDIRECTOS8%$1.39SUBTOTAL $18.81UTILIDAD10%$1.74PRECIO UNITARIO$20.55(* VEINTE PESOS 55/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 5 Importe: 102.75Anlisis: A03.07 Unidad: KGACERO DE REFUERZO EN ESTRUCTURA DIMETRO No. 3 Fy= 4200 KG/CM2 INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, SILLETAS, DOBLECES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.050000$0.734.26% VARILLA DE 3/8" 9.5 MMKG$12.50 1.070000$13.3878.11%Subtotal: MATERIALES$14.1182.37%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.75%Subtotal: MANO DE OBRA$2.8716.75%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.53% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.35%Subtotal: EQUIPO Y HERRAMIENTA$0.150.88%Costo directo$17.13INDIRECTOS8%$1.37SUBTOTAL $18.50UTILIDAD10%$1.71PRECIO UNITARIO$20.21(* VEINTE PESOS 21/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 113.9 Importe: 2301.92Anlisis: A03.08 Unidad: KGACERO DE REFUERZO EN LOSAS Y TRABES DE ENTREPISO CON VARILLA No. 3 Fy=4000 KG/CM2;INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.050000$0.734.53% VARILLA DE 3/8" 9.5 MMKG$12.50 1.070000$13.3883.05%Subtotal: MATERIALES$14.1187.59%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29 0.006612$1.9011.79%Subtotal: MANO DE OBRA$1.9011.79%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$1.90 0.030000$0.060.37% EQUIPO DE SEGURIDAD%$1.90 0.020000$0.040.25%Subtotal: EQUIPO Y HERRAMIENTA$0.100.62%Costo directo$16.11INDIRECTOS8%$1.29SUBTOTAL $17.40UTILIDAD10%$1.61PRECIO UNITARIO$19.01(* DIECINUEVE PESOS 01/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 275.97 Importe: 5246.19Anlisis: A03.09 Unidad: KGACERO DE REFUERZO EN LOSAS Y TRABES DE AZOTEA CON VARILLA NUM. 3 Fy=4000 KG/CM2;INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES ALAMBRE RECOCIDOKG$14.50 0.050000$0.734.26% VARILLA DE 3/8" 9.5 MMKG$12.50 1.070000$13.3878.11%Subtotal: MATERIALES$14.1182.37%MANO DE OBRA CUADRILLA No 6 (1 FIERRERO + 1 AYUDANTE)JOR$287.29/100.000000$2.8716.75%Subtotal: MANO DE OBRA$2.8716.75%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$2.87 0.030000$0.090.53% EQUIPO DE SEGURIDAD%$2.87 0.020000$0.060.35%Subtotal: EQUIPO Y HERRAMIENTA$0.150.88%Costo directo$17.13INDIRECTOS8%$1.37SUBTOTAL $18.50UTILIDAD10%$1.71PRECIO UNITARIO$20.21(* VEINTE PESOS 21/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 265.77 Importe: 5371.21Anlisis: A03.10 Unidad: M2CIMBRA PARA LOSAS Y TRABES DE ENTREPISO APARENTE CON CIMBRAPLAY DE PINO DE 16 MM;INCLUYE: CIMBRADO Y DESCIMBRADO (ESTRUCTURAS DE CONCRETO.), ANDAMIOS, MADERA DE PINO DETERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES, (BARROTES, POLINES Y CHAFLANES).HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''PZA$17.00 0.200000$3.403.08% BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25''PZA$17.00 0.400000$6.806.15% POLIN DE PINO DE 3a DE 3.5"x3."x8.25''PZA$17.00 0.400000$6.806.15% ALAMBRE RECOCIDOKG$14.50 0.100000$1.451.31% DIESELLTO$9.00 0.300000$2.702.44% CLAVOS DE 2 A 4 "KG$17.00 0.200000$3.403.08% TRIPLAY DE PINO 1CARA W.P. NACIONAL DE 16 MMPZA$340.00 0.083000$28.2225.54% CHAFLAN DE PINO DE 1a DE 3/4"x3/4"x8.25''PZA$7.00 1.000000$7.006.33%Subtotal: MATERIALES$59.7754.09%MANO DE OBRA CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)JOR$289.94/6.000000$48.3243.72%Subtotal: MANO DE OBRA$48.3243.72%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$48.32 0.030000$1.451.31% EQUIPO DE SEGURIDAD%$48.32 0.020000$0.970.88%Subtotal: EQUIPO Y HERRAMIENTA$2.422.19%Costo directo$110.51INDIRECTOS8%$8.84SUBTOTAL $119.35UTILIDAD10%$11.05PRECIO UNITARIO$130.40(* CIENTO TREINTA PESOS 40/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 49.38 Importe: 6439.15Anlisis: A03.11 Unidad: M2CIMBRA PARA LOSAS Y TRABES DE AZOTEA APARENTE CON CIMBRAPLAY DE PINO DE 16 MM.;INCLUYE: CIMBRADO Y DESCIMBRADO (ESTRUCTURA DE CONCRETO), ANDAMIOS, MADERA DE PINO DETERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES (BARROTES, POLINES Y CHAFLANES),HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES DUELA DE PINO DE 3a DE 3/4"x3.5"x8.25''PZA$17.00 0.500000$8.506.97% BARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25''PZA$17.00 0.400000$6.805.57% POLIN DE PINO DE 3a DE 3.5"x3."x8.25''PZA$17.00 0.300000$5.104.18% ALAMBRE RECOCIDOKG$14.50 0.300000$4.353.57% DIESELLTO$9.00 0.300000$2.702.21% CLAVOS DE 2 A 4 "KG$17.00 0.300000$5.104.18% TRIPLAY DE PINO 1CARA W.P. NACIONAL DE 16 MMPZA$340.00 0.083000$28.2223.13% CHAFLAN DE PINO DE 1a DE 3/4"x3/4"x8.25''PZA$7.00 1.500000$10.508.61%Subtotal: MATERIALES$71.2758.41%MANO DE OBRA CUADRILLA No 7 (1 CARP. O.N. + AYUDANTE)JOR$289.94/6.000000$48.3239.60%Subtotal: MANO DE OBRA$48.3239.60%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$48.32 0.030000$1.451.19% EQUIPO DE SEGURIDAD%$48.32 0.020000$0.970.80%Subtotal: EQUIPO Y HERRAMIENTA$2.421.98%Costo directo$122.01INDIRECTOS8%$9.76SUBTOTAL $131.77UTILIDAD10%$12.20PRECIO UNITARIO$143.97(* CIENTO CUARENTA Y TRES PESOS 97/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 49.38 Importe: 7109.24Anlisis: A03.12 Unidad: M3CONCRETO SIMPLE DE F c=200 Kg/Cm2 FABRICADO EN OBRA CON REVOLVEDORA PARA: PARA LOSAS YTRABES DE ENTREPISO. TAMAO MXIMO DEL AGREGADO 19 MM. (3/4"), BANCO DE PROCEDENCIAAPROBADO POR LA SECRETARIA; INCLUYE: ACARREO DENTRO DE LA OBRA, COLADO, VIBRADO, CURADO,MUESTREO, DESPERDICIO, MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES ARENAM3$166.00 0.530000$87.987.59% GRAVAM3$200.00 0.640000$128.0011.04% AGUA ( MANEJO)M3$15.00 0.235000$3.530.30% CEMENTO GRISTON$2,200.00 0.350000$770.0066.43%Subtotal: MATERIALES$989.5185.36%MANO DE OBRA CUADRILLA No 22 (1 ALBAIL + 5 PEONES)JOR$836.43*0.172712$144.4612.46%Subtotal: MANO DE OBRA$144.4612.46%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$144.46 0.030000$4.330.37% REVOLVEDORA P/CONCRETO DE 1 SACO 8 DE HPHOR$35.93 0.500000$17.971.55% EQUIPO DE SEGURIDAD%$144.46 0.020000$2.890.25%Subtotal: EQUIPO Y HERRAMIENTA$25.192.17%Costo directo$1,159.16INDIRECTOS8%$92.73SUBTOTAL $1,251.89UTILIDAD10%$115.92PRECIO UNITARIO$1,367.81(* UN MIL TRESCIENTOS SESENTA Y SIETE PESOS 81/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 7.41 Importe: 10135.47Anlisis: A03.13 Unidad: M3CONCRETO SIMPLE DE F c=200 Kg/Cm2 FABRICADO EN OBRA CON REVOLVEDORA PARA: LOSAS Y TRABESDE AZOTEA . TAMAO MXIMO DEL AGREGADO 19 MM. (3/4"), BANCO DE PROCEDENCIA APROBADO PORLA SECRETARIA; INCLUYE: ACARREO DENTRO DE LA OBRA, COLADO, VIBRADO, CURADO, MUESTREO,DESPERDICIO, MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES ARENAM3$166.00 0.530000$87.987.55% GRAVAM3$200.00 0.640000$128.0010.99% AGUA ( MANEJO)M3$15.00 0.235000$3.530.30% CEMENTO GRISTON$2,200.00 0.350000$770.0066.12%Subtotal: MATERIALES$989.5184.97%MANO DE OBRA CUADRILLA No 22 (1 ALBAIL + 5 PEONES)JOR$836.43 0.178880$149.6212.85%Subtotal: MANO DE OBRA$149.6212.85%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$149.62 0.030000$4.490.39% REVOLVEDORA P/CONCRETO DE 1 SACO 8 DE HPHOR$35.93 0.500000$17.971.54% EQUIPO DE SEGURIDAD%$149.62 0.020000$2.990.26%Subtotal: EQUIPO Y HERRAMIENTA$25.452.19%Costo directo$1,164.58INDIRECTOS8%$93.17SUBTOTAL $1,257.75UTILIDAD10%$116.46PRECIO UNITARIO$1,374.21(* UN MIL TRESCIENTOS SETENTA Y CUATRO PESOS 21/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 7.41 Importe: 10182.9Anlisis: A03.14 Unidad: M3CONCRETO SIMPLE DE F c=200 Kg/Cm2 FABRICADO EN OBRA CON REVOLVEDORA PARA: COLUMNAS.TAMAO MXIMO DEL AGREGADO 19 MM. (3/4"), BANCO DE PROCEDENCIA APROBADO POR LASECRETARIA; INCLUYE: ACARREO DENTRO DE LA OBRA, COLADO, VIBRADO, CURADO, MUESTREO,DESPERDICIO, MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

MATERIALES ARENAM3$166.00 0.530000$87.987.59% GRAVAM3$200.00 0.640000$128.0011.04% AGUA ( MANEJO)M3$15.00 0.235000$3.530.30% CEMENTO GRISTON$2,200.00 0.350000$770.0066.43%Subtotal: MATERIALES$989.5185.36%MANO DE OBRA CUADRILLA No 22 (1 ALBAIL + 5 PEONES)JOR$836.43 0.172712$144.4612.46%Subtotal: MANO DE OBRA$144.4612.46%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$144.46 0.030000$4.330.37% REVOLVEDORA P/CONCRETO DE 1 SACO 8 DE HPHOR$35.93 0.500000$17.971.55% EQUIPO DE SEGURIDAD%$144.46 0.020000$2.890.25%Subtotal: EQUIPO Y HERRAMIENTA$25.192.17%Costo directo$1,159.16INDIRECTOS8%$92.73SUBTOTAL $1,251.89UTILIDAD10%$115.92PRECIO UNITARIO$1,367.81(* UN MIL TRESCIENTOS SESENTA Y SIETE PESOS 81/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 0.35 Importe: 478.73Anlisis: A04.01 Unidad: M2APLANADO DE MURO CON MORTERO CEMENTO-ARENA 1:3, ACABADO CON PLANA DE MADERA; INCLUYE:REMATES, BOQUILLAS, PREPARACIN DE LA SUPERFICIE, PLOMEADO, ANDAMIOS, MANO DE OBRA Y TODOLO NECESARIO PARA SU CORRECTA EJECUCION. (DE 0.00 A 3.00 MTS DE ALTURA)

MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/10.000000$28.9339.88%Subtotal: MANO DE OBRA$28.9339.88%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$28.93 0.030000$0.871.20% ANDAMIOS%$28.93 0.050000$1.452.00% EQUIPO DE SEGURIDAD%$28.93 0.020000$0.580.80%Subtotal: EQUIPO Y HERRAMIENTA$2.904.00%BASICOS MORTERO CEMENTO ARENA 1:3M3$1,357.00 0.030000$40.7156.12%Subtotal: BASICOS$40.7156.12%Costo directo$72.54INDIRECTOS8%$5.80SUBTOTAL $78.34UTILIDAD10%$7.25PRECIO UNITARIO$85.59(* OCHENTA Y CINCO PESOS 59/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 220.01 Importe: 18830.66Anlisis: A04.02 Unidad: M2APLANADO DE MURO CON MORTERO CEMENTO-ARENA 1:3, ACABADO CON PLANA DE MADERA; INCLUYE:REMATES, BOQUILLAS, PREPARACIN DE LA SUPERFICIE, PLOMEADO, ANDAMIOS, MANO DE OBRA Y TODOLO NECESARIO PARA SU CORRECTA EJECUCION. (DE 3.01 A 6.00 MTS DE ALTURA).

MANO DE OBRA CUADRILLA No 5 (1 ALBAIL+1 PEON)JOR$289.27/9.000000$32.1442.26%Subtotal: MANO DE OBRA$32.1442.26%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$32.14 0.030000$0.961.26% ANDAMIOS%$32.14 0.050000$1.612.12% EQUIPO DE SEGURIDAD%$32.14 0.020000$0.640.84%Subtotal: EQUIPO Y HERRAMIENTA$3.214.22%BASICOS MORTERO CEMENTO ARENA 1:3M3$1,357.00 0.030000$40.7153.52%Subtotal: BASICOS$40.7153.52%Costo directo$76.06INDIRECTOS8%$6.08SUBTOTAL $82.14UTILIDAD10%$7.61PRECIO UNITARIO$89.75(* OCHENTA Y NUEVE PESOS 75/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 210.41 Importe: 18884.3Anlisis: A04.03 Unidad: M2SUMINISTRO Y APLICACIN DE PINTURA VINILICA DE 5000 CICLOS DE LAVADO COMO MINIMO CALIDAD"A" SEGUN LA NOM-U-97-1981 EN MUROS Y PLAFONES , INCLUYE: LIMPIEZA, PREPARACION DE LASUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA, ANDAMIOS Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES SELLADORLT$43.80 0.100000$4.3814.87% PINTURA VINILICA PRO-1000 PLUS 300, BCO. Y COLS. REGS.LT$52.00 0.240000$12.4842.38%Subtotal: MATERIALES$16.8657.25%MANO DE OBRA CUADRILLA No 8 (1 PINTOR + AYUDANTE)JOR$286.17/25.000000$11.4538.88%Subtotal: MANO DE OBRA$11.4538.88%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$11.45 0.030000$0.341.15% ANDAMIOS%$11.45 0.050000$0.571.94% EQUIPO DE SEGURIDAD%$11.45 0.020000$0.230.78%Subtotal: EQUIPO Y HERRAMIENTA$1.143.87%Costo directo$29.45INDIRECTOS8%$2.36SUBTOTAL $31.81UTILIDAD10%$2.95PRECIO UNITARIO$34.76(* TREINTA Y CUATRO PESOS 76/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 529.18 Importe: 18394.3Anlisis: A04.04 Unidad: M2LOSETA CERAMICA 30X30 EN PISOS ASENTADO CON MORTERO CEMENTO-ARENA 1:4 Y JUNTEADO CON JUNTACREST O SIMILAR; INCLUYE: CORTES, AJUSTES, DESPERDICIOS, NIVELACIN, MANO DE OBRA, LIMPIEZA YTODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES LOSETA INTERCERAMICM2$100.00 1.070000$107.0058.73% BOQUILLA PARA AZULEJOKG$10.00 0.900000$9.004.94%Subtotal: MATERIALES$116.0063.67%MANO DE OBRA CUADRILLA No 11 (1 AZULEJERO + AYUD.)JOR$289.59/7.000000$41.3722.71%Subtotal: MANO DE OBRA$41.3722.71%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$41.37 0.030000$1.240.68% EQUIPO DE SEGURIDAD%$41.37 0.020000$0.830.46%Subtotal: EQUIPO Y HERRAMIENTA$2.071.14%BASICOS MORTERO CEMENTO ARENA 1:4M3$1,083.70 0.021000$22.7612.49%Subtotal: BASICOS$22.7612.49%Costo directo$182.20INDIRECTOS8%$14.58SUBTOTAL $196.78UTILIDAD10%$18.22PRECIO UNITARIO$215.00(* DOSCIENTOS QUINCE PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 98.76 Importe: 21233.4Anlisis: A04.05 Unidad: M2IMPERMEABILIZACIN (FESTER O SIMILAR EN CALIDAD Y COSTO) EN FRIO CON UNA CAPA DEMICROPRIMER O ACRITON ELIDER DILUIDO EN AGUA AL 19:1 O SIMILAR, 2 CAPAS DE MICROFEST O 2CAPAS DE ACRITON ELIDER O SIMILAR, UNA CAPA DE MEMBRANA FESTERFLEX O UNA CAPA DE MALLAREVOFLEX O SIMILAR, ACABADO CON DOS MANOS DE FESTER BLANC COLOR BLANCO, TERRACOTA OSIMILAR, INCLUYE: LIMPIEZA Y PREPARACIN DE LA SUPERFICIE, ACARREOS VERTICALES ACUALQUIER ALTURA (GARANTA DE 3 AOS) Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES MICROPRIMER19L$430.00 0.250000$107.5038.81% MICROFEST19L$490.00 0.250000$122.5044.23% FESTERFLEX 1.00x10 M10M2$190.00 0.105000$19.957.20%Subtotal: MATERIALES$249.9590.24%MANO DE OBRA CUADRILLA No 12 (1 COLOCADOR + AY.)JOR$289.59*0.084861$24.578.87%Subtotal: MANO DE OBRA$24.578.87%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$24.57 0.030000$0.740.27% ANDAMIOS%$24.57 0.050000$1.230.44% EQUIPO DE SEGURIDAD%$24.57 0.020000$0.490.18%Subtotal: EQUIPO Y HERRAMIENTA$2.460.89%Costo directo$276.98INDIRECTOS8%$22.16SUBTOTAL $299.14UTILIDAD10%$27.70PRECIO UNITARIO$326.84(* TRESCIENTOS VEINTISEIS PESOS 84/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 49.38 Importe: 16139.36Anlisis: A04.06 Unidad: M2LOSETA CERAMICA 30X30 EN MUROS, ASENTADO CON PEGAZULEJO Y JUNTEADO CON JUNTACREST OSIMILAR; INCLUYE: CORTES, AJUSTES, DESPERDICIOS, NIVELACIN, MANO DE OBRA, LIMPIEZA YTODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES LOSETA INTERCERAMICM2$100.00 1.070000$107.0051.31% BOQUILLA PARA AZULEJOKG$10.00 0.900000$9.004.32% PEGAZULEJO CREST BLANCO 20 KGSACO$110.00 0.150000$16.507.91%Subtotal: MATERIALES$132.5063.54%MANO DE OBRA CUADRILLA No 11 (1 AZULEJERO + AYUD.)JOR$289.59/4.000000$72.4034.72%Subtotal: MANO DE OBRA$72.4034.72%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$72.40 0.030000$2.171.04% EQUIPO DE SEGURIDAD%$72.40 0.020000$1.450.70%Subtotal: EQUIPO Y HERRAMIENTA$3.621.74%Costo directo$208.52INDIRECTOS8%$16.68SUBTOTAL $225.20UTILIDAD10%$20.85PRECIO UNITARIO$246.05(* DOSCIENTOS CUARENTA Y SEIS PESOS 05/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 12.76 Importe: 3139.6Anlisis: A04.07 Unidad: M2AZULEJO 10X10 EN MUROS, ASENTADO CON PEGAZULEJO Y JUNTEADO CON JUNTACREST O SIMILAR;INCLUYE: CORTES, AJUSTES, DESPERDICIOS, NIVELACIN, MANO DE OBRA, LIMPIEZA Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES AZULEJOM2$100.00 1.000000$100.0053.67% BOQUILLA PARA AZULEJOKG$10.00 0.900000$9.004.83% PEGAZULEJO CREST BLANCO 20 KGSACO$110.00 0.150000$16.508.86%Subtotal: MATERIALES$125.5067.36%MANO DE OBRA CUADRILLA No 11 (1 AZULEJERO + AYUD.)JOR$289.59/5.000000$57.9231.09%Subtotal: MANO DE OBRA$57.9231.09%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$57.92 0.030000$1.740.93% EQUIPO DE SEGURIDAD%$57.92 0.020000$1.160.62%Subtotal: EQUIPO Y HERRAMIENTA$2.901.56%Costo directo$186.32INDIRECTOS8%$14.91SUBTOTAL $201.23UTILIDAD10%$18.63PRECIO UNITARIO$219.86(* DOSCIENTOS DIECINUEVE PESOS 86/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 44.61 Importe: 9807.95Anlisis: A05.01 Unidad: PZASUMINISTRO Y COLOCACIN DE VENTANA DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO) DE0.60 M X 2.19 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 3 MM, FIJACIN Y COLOCACIN,HERRAMIENTA MENOR.

SUBCONTRATOS VENT. ALUM. ANON. NAT. 0.60M X 2.19 MPZA$1,440.00 1.000000$1,440.00100.00%Subtotal: SUBCONTRATOS$1,440.00100.00%Costo directo$1,440.00INDIRECTOS8%$115.20SUBTOTAL $1,555.20UTILIDAD10%$144.00PRECIO UNITARIO$1,699.20(* UN MIL SEISCIENTOS NOVENTA Y NUEVE PESOS 20/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 1699.2Anlisis: A05.02 Unidad: PZASUMINISTRO Y COLOCACIN DE VENTANA DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO) DE0.60 M X 0.95 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 3 MM, FIJACIN Y COLOCACIN,HERRAMIENTA MENOR.

SUBCONTRATOS VENT. ALUM NAT.0.60 X 0.95 MPZA$670.00 1.000000$670.00100.00%Subtotal: SUBCONTRATOS$670.00100.00%Costo directo$670.00INDIRECTOS8%$53.60SUBTOTAL $723.60UTILIDAD10%$67.00PRECIO UNITARIO$790.60(* SETECIENTOS NOVENTA PESOS 60/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 790.6Anlisis: A05.03 Unidad: PZASUMINISTRO Y COLOCACIN DE VENTANA DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO) DE1.20 M X 2.00 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 3 MM, FIJACIN Y COLOCACIN,HERRAMIENTA MENOR.

BASICOS VENT. ALUM. ANON NAT. 1.20 X 2.00 MPZA$2,640.00 1.000000$2,640.00100.00%Subtotal: BASICOS$2,640.00100.00%Costo directo$2,640.00INDIRECTOS8%$211.20SUBTOTAL $2,851.20UTILIDAD10%$264.00PRECIO UNITARIO$3,115.20(* TRES MIL CIENTO QUINCE PESOS 20/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 6230.4Anlisis: A05.04 Unidad: PZASUMINISTRO Y COLOCACIN DE VENTANA DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO) DE1.22 M X 1.57 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 3 MM, FIJACIN Y COLOCACIN,HERRAMIENTA MENOR.

SUBCONTRATOS VENT. ALUM. ANON. NAT. 1.22 X 1.57 MPZA$2,100.00 1.000000$2,100.00100.00%Subtotal: SUBCONTRATOS$2,100.00100.00%Costo directo$2,100.00INDIRECTOS8%$168.00SUBTOTAL $2,268.00UTILIDAD10%$210.00PRECIO UNITARIO$2,478.00(* DOS MIL CUATROCIENTOS SETENTA Y OCHO PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 4956Anlisis: A05.05 Unidad: PZASUMINISTRO Y COLOCACIN DE VENTANA DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO) DE0.45 M X 0.75 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 3 MM, FIJACIN Y COLOCACIN,HERRAMIENTA MENOR.

SUBCONTRATOS VENT. ALUM. ANON NAT. 0.45 X 0.75 MPZA$395.00 1.000000$395.00100.00%Subtotal: SUBCONTRATOS$395.00100.00%Costo directo$395.00INDIRECTOS8%$31.60SUBTOTAL $426.60UTILIDAD10%$39.50PRECIO UNITARIO$466.10(* CUATROCIENTOS SESENTA Y SEIS PESOS 10/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 466.1Anlisis: A05.06 Unidad: PZASUMINISTRO Y COLOCACIN DE PUERTA CORREDIZA DE ALUMINIO ANODIZADO NATURAL (SEGNPROYECTO) DE 2.70 M X 2.10 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 6 MM, FIJACIN YCOLOCACIN, HERRAMIENTA MENOR.

SUBCONTRATOS PTA CORREDIZA ALUM.ANON.NAT 2.70 X 2.10PZA$6,520.00 1.000000$6,520.00100.00%Subtotal: SUBCONTRATOS$6,520.00100.00%Costo directo$6,520.00INDIRECTOS8%$521.60SUBTOTAL $7,041.60UTILIDAD10%$652.00PRECIO UNITARIO$7,693.60(* SIETE MIL SEISCIENTOS NOVENTA Y TRES PESOS 60/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 7693.6Anlisis: A05.07 Unidad: PZASUMINISTRO Y COLOCACIN DE PUERTA SIMPLE DE ALUMINIO ANODIZADO NATURAL (SEGN PROYECTO)DE 0.80 M X 2.10 M; INCLUYE: MATERIALES, MANO DE OBRA, VIDRIO 6 MM, FIJACIN YCOLOCACIN, HERRAMIENTA MENOR.

SUBCONTRATOS PTA SIMPLE ALUM. ANON.NAT. 0.80 X 2.10 MPZA$1,900.00 1.000000$1,900.00100.00%Subtotal: SUBCONTRATOS$1,900.00100.00%Costo directo$1,900.00INDIRECTOS8%$152.00SUBTOTAL $2,052.00UTILIDAD10%$190.00PRECIO UNITARIO$2,242.00(* DOS MIL DOSCIENTOS CUARENTA Y DOS PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 2242Anlisis: A05.08 Unidad: PZAPUERTA DE 0.60 M. POR 2.10 M, DE TAMBOR DE TRIPLAY DE PINO DE 1A, CON PEINAZOS DE 32X32MM A CADA 30 CMS.EN AMBOS SENTIDOS, ACABADO CON BARNIZ NATURAL, Y MARCO CON CHAMBRANASDE 1X6 PULG., DE MADERA DE CAOBA DE 1A, CON CERRADURA MODELO A52PD-TULIP-LBN DE LA MARCASCOVILL, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, ARMADO, CHAPA DE MADERA ENCANTOS, BISAGRAS, MANO DE OBRA, EQUIPO, HERRAMIENTA Y LIMPIEZA.

SUBCONTRATOS PTA TAMB TRIP PINO 1A 32MM 0.60 X 2.10PZA$3,050.00 1.000000$3,050.00100.00%Subtotal: SUBCONTRATOS$3,050.00100.00%Costo directo$3,050.00INDIRECTOS8%$244.00SUBTOTAL $3,294.00UTILIDAD10%$305.00PRECIO UNITARIO$3,599.00(* TRES MIL QUINIENTOS NOVENTA Y NUEVE PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 7198Anlisis: A05.09 Unidad: PZAPUERTA DE 0.80 M. POR 2.10 M, DE TAMBOR DE TRIPLAY DE PINO DE 1A, CON PEINAZOS DE 32X32MM A CADA 30 CMS.EN AMBOS SENTIDOS, ACABADO CON BARNIZ NATURAL, Y MARCO CON CHAMBRANASDE 1X6 PULG., DE MADERA DE CAOBA DE 1A, CON CERRADURA MODELO A52PD-TULIP-LBN DE LA MARCASCOVILL, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, ARMADO, CHAPA DE MADERA ENCANTOS, BISAGRAS, MANO DE OBRA, EQUIPO, HERRAMIENTA Y LIMPIEZA.

SUBCONTRATOS PTA TAMBOR TRIPLAY PINO 1A 0.80 X 2.10 MPZA$4,066.00 1.000000$4,066.00100.00%Subtotal: SUBCONTRATOS$4,066.00100.00%Costo directo$4,066.00 Indirectos$0.00 0.000000$0.000.00%Precio unitario$4,066.00(* CUATRO MIL SETECIENTOS NOVENTA Y SIETE PESOS 88/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 3 Importe: 14393.64Anlisis: A05.10 Unidad: PZAPUERTA DE 0.9 M. POR 2.1 M, ENTABLERADA CON MADERA DE CEDRO DE 1A, DE 3.8 CMS. DEESPESOR, Y MARCO CON MADERA DE 2.54 CMS. DE ESPESOR, PARA MURO DE 15 CMS. ACABADO CONBARNIZ POLIFORM, CON CERRADURA MODELO A52PD-TULIP-LBN DE LA MARCA SCOVILL, INCLUYE:MATERIALES, ACARREOS, CORTES, DESPERDICIOS, ARMADO, CHAPA DE MADERA EN CANTOS, BISAGRAS,MANO DE OBRA, EQUIPO, HERRAMIENTA Y LIMPIEZA.

SUBCONTRATOS PTA ENTABDMAD CED. DE 3.8 CM 0.9 X 2.10MPZA$6,800.00 1.000000$6,800.00100.00%Subtotal: SUBCONTRATOS$6,800.00100.00%Costo directo$6,800.00INDIRECTOS8%$544.00SUBTOTAL $7,344.00UTILIDAD10%$680.00PRECIO UNITARIO$8,024.00(* OCHO MIL VEINTICUATRO PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 8024Anlisis: A05.11 Unidad: PZAPUERTA CORREDIZA DE 1.35 M. POR 2.10 M, DE TAMBOR DE TRIPLAY DE PINO DE 1A, CON PEINAZOSDE 32X32 MM A CADA 30 CMS.EN AMBOS SENTIDOS, CABADO CON BARNIZ NATURAL, Y MARCO CONCHAMBRANAS DE 1X6 PULG., DE MADERA DE CAOBA DE 1A, CON CERRADURA MODELO A52PD-TULIP-LBNDE LA MARCA SCOVILL, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, ARMADO, CHAPADE MADERA EN CANTOS, BISAGRAS, MANO DE OBRA, EQUIPO, HERRAMIENTA Y LIMPIEZA.

SUBCONTRATOS PTA CORREDIZA TAMB TRIP 32MM 1.35 X 2.1MPZA$3,780.00 1.000000$3,780.00100.00%Subtotal: SUBCONTRATOS$3,780.00100.00%Costo directo$3,780.00INDIRECTOS8%$302.40SUBTOTAL $4,082.40UTILIDAD10%$378.00PRECIO UNITARIO$4,460.40(* CUATRO MIL CUATROCIENTOS SESENTA PESOS 40/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 4460.4Anlisis: A05.12 Unidad: PZAPUERTA CORREDIZA DE 1.725 M. POR 2.10 M, DE TAMBOR DE TRIPLAY DE PINO DE 1A, CONPEINAZOS DE 32X32 MM A CADA 30 CMS.EN AMBOS SENTIDOS, ACABADO CON BARNIZ NATURAL, YMARCO CON CHAMBRANAS DE 1X6 PULG., DE MADERA DE CAOBA DE 1A, CON CERRADURA MODELOA52PD-TULIP-LBN DE LA MARCA SCOVILL, INCLUYE: MATERIALES, ACARREOS, CORTES,DESPERDICIOS, ARMADO, CHAPA DE MADERA EN CANTOS, BISAGRAS, MANO DE OBRA, EQUIPO,HERRAMIENTA Y LIMPIEZA.

SUBCONTRATOS PTA CORRED TAMB TRIPL 32MM 1.725 X 2.1 MPZA$4,200.00 1.000000$4,200.00100.00%Subtotal: SUBCONTRATOS$4,200.00100.00%Costo directo$4,200.00INDIRECTOS8%$336.00SUBTOTAL $4,536.00UTILIDAD10%$420.00PRECIO UNITARIO$4,956.00(* CUATRO MIL NOVECIENTOS CINCUENTA Y SEIS PESOS 00/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 4956Anlisis: A06.01 Unidad: PZASUMINISTRO Y COLOCACIN DE W.C. TANQUE BAJO MARCA LAMOSA; INCLUYE: ACARREO, MATERIALESPARA SU FIJACION, JUNTA PROHEL, CONEXIN A LA ALIMENTACIN Y AL DESAG E, VLVULA DECONTROL, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTAEJECUCION.

MATERIALES TAZA CADET 6L S/ASTO MARFILPZA$915.00 1.000000$915.0086.03% JUNTA PROHEL GRANDE PULKESAPZA$9.16 1.000000$9.160.86% TAQUETE DE PLOMO No.3 HELVEXPZA$4.24 2.000000$8.480.80% PIJA P/WCPZA$1.87 2.000000$3.740.35% MANGUERA P/W.C. 1/2X7/8X35 FIG-67-MPZA$19.00 1.000000$19.001.79% LLAVE DE CONTROL P/COBRE 13 25-1CPZA$33.41 1.000000$33.413.14%Subtotal: MATERIALES$988.7992.96%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/4.000000$71.286.70%Subtotal: MANO DE OBRA$71.286.70%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$71.28 0.030000$2.140.20% EQUIPO DE SEGURIDAD%$71.28 0.020000$1.430.13%Subtotal: EQUIPO Y HERRAMIENTA$3.570.34%Costo directo$1,063.64INDIRECTOS8%$85.09SUBTOTAL $1,148.73UTILIDAD10%$106.36PRECIO UNITARIO$1,255.09(* UN MIL DOSCIENTOS CINCUENTA Y CINCO PESOS 09/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 2510.18Anlisis:A06.02 Unidad: PZASUMINISTRO Y COLOCACIN DE LAVABO MARCA LAMOSA MOD AUSTRAL BLANCO CHICO CON LLAVE INDIVP/LAVABO RUGO 16Q, CONTRA REJILLA Y CESPOL CROMADO, LIMPIEZA CON AGUA Y JABON, CONEXINA LA ALIMENTACIN Y AL DESAG E; INCLUYE: ACARREO, MATERIALES PARA SU FIJACION,CONEXIONES, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

MATERIALES LAVABO AZUL REY COMERCIAL CAPIZZIPZA$210.00 1.000000$210.0033.46% MEZCLADORA DE 4" C/MANERALES P/LAVPZA$150.00 1.000000$150.0023.90% MANGUERA FREGA. 13X13X55 FIG-25-MPZA$18.00 2.000000$36.005.74% CESPOL 1 SALIDA 40MM REXOLITPZA$90.00 1.000000$90.0014.34% LLAVE DE CONTROL P/COBRE 13 25-1CPZA$33.41 2.000000$66.8210.65%Subtotal: MATERIALES$552.8288.07%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/4.000000$71.2811.36%Subtotal: MANO DE OBRA$71.2811.36%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$71.28 0.030000$2.140.34% EQUIPO DE SEGURIDAD%$71.28 0.020000$1.430.23%Subtotal: EQUIPO Y HERRAMIENTA$3.570.57%Costo directo$627.67INDIRECTOS8%$50.21SUBTOTAL $677.88UTILIDAD10%$62.77PRECIO UNITARIO$740.65(* SETECIENTOS CUARENTA PESOS 65/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 1481.3Anlisis: A06.03 Unidad: PZASUMINISTRO Y COLOCACIN DE FREGADERO METLICO DE 90 X 45 CM. CON ESCURRIDERO, TIPO LADODERECHO, CON LLAVE DE NARIZ, CESPOL CROMADO, SOPORTADO POR DOS MUROS CAPUCHINOS, FORRADODE AZULEJO BLANCO DE 15 X 15 CM. EN AMBAS CARAS; INCLUYE: ACARREOS, MATERIALES PARA SUFIJACIN, PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

MATERIALES FREGADERO P/EMPOT.950.510 1C 1E DPZA$750.00 1.000000$750.0056.49% LLAVE FREG C/NIPLE EXT Y CH FIG.5-CPZA$160.00 2.000000$320.0024.10% CESPOL FREGADERO REXOLITPZA$80.00 1.000000$80.006.03% MANGUERA FREGA. 13X13X55 FIG-25-MPZA$18.00 2.000000$36.002.71% LLAVE DE CONTROL P/COBRE 13 25-1CPZA$33.41 2.000000$66.825.03%Subtotal: MATERIALES$1,252.8294.36%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/4.000000$71.285.37%Subtotal: MANO DE OBRA$71.285.37%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$71.28 0.030000$2.140.16% EQUIPO DE SEGURIDAD%$71.28 0.020000$1.430.11%Subtotal: EQUIPO Y HERRAMIENTA$3.570.27%Costo directo$1,327.67INDIRECTOS8%$106.21SUBTOTAL $1,433.88UTILIDAD10%$132.77PRECIO UNITARIO$1,566.65(* UN MIL QUINIENTOS SESENTA Y SEIS PESOS 65/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 1566.65Anlisis: A06.04 Unidad: PZASUMINISTRO Y COLOCACIN DE CALENTADOR AUTOMATICO CINSA DE 40 LTS., CLASIC-101 O SIMILAR;INCLUYE: ACARREO, INSTALACIN, PRUEBAS, CONEXIN A LAS LNEAS DE ALIMENTACIN, BASE DECONCRETO, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES CALENTADOR CINSA SEMI 40 LT C/EPZA$1,200.00 1.000000$1,200.0092.32%Subtotal: MATERIALES$1,200.0092.32%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/3.000000$95.047.31%Subtotal: MANO DE OBRA$95.047.31%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$95.04 0.030000$2.850.22% EQUIPO DE SEGURIDAD%$95.04 0.020000$1.900.15%Subtotal: EQUIPO Y HERRAMIENTA$4.750.37%Costo directo$1,299.79INDIRECTOS8%$103.98SUBTOTAL $1,403.77UTILIDAD10%$129.98PRECIO UNITARIO$1,533.75(* UN MIL QUINIENTOS TREINTA Y TRES PESOS 75/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 1533.75Anlisis: A06.05 Unidad: SALSALIDA HIDRULICA PARA LAVABO, CON TUBERIA DE COBRE DE 13 MM, INCLUYE: 1 CODO, 1 TEE, 1TEE REDUCCIN, 1 TAPN CAPA, 1 CONECTOR CUERDA EXTERIOR, MATERIALES, INSTALACIN,PRUEBAS, EQUIPO Y HERRAMIENTA.

MATERIALES TUBO COBRE T/M 13 mm x 1 mt NACOBRM$7.50 1.000000$7.507.33% CODO CaC 90x13 mm. NACOBREPZA$4.00 2.000000$8.007.82% TEE CaCaC 13 mm. NACOBREPZA$6.50 2.000000$13.0012.70% TEE CaC RED. 19X13X19 mm. NACOBREPZA$7.00 2.000000$14.0013.68% TAPON CAPA CaC 13 mm. NACOBREPZA$4.50 2.000000$9.008.79% CONECTOR CaF R/EXT 13 mm. NACOBREPZA$11.07 2.000000$22.1421.63% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.040000$2.001.95% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.080000$14.2413.91% ROLLO LIJA 25RLL$190.00 0.020000$3.803.71%Subtotal: MATERIALES$93.6891.53%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13*0.028924$8.258.06%Subtotal: MANO DE OBRA$8.258.06%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$8.25 0.030000$0.250.24% EQUIPO DE SEGURIDAD%$8.25 0.020000$0.170.17%Subtotal: EQUIPO Y HERRAMIENTA$0.420.41%Costo directo$102.35INDIRECTOS8%$8.19SUBTOTAL $110.54UTILIDAD10%$10.24PRECIO UNITARIO$120.78(* CIENTO VEINTE PESOS 78/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 241.56Anlisis: A06.06 Unidad: SALSALIDA HIDRULICA PARA LAVABO SOLO AGUA FRIA, CON TUBERIA DE COBRE DE 13 MM, INCLUYE: 1CODO, 1 TEE, 1 TEE REDUCCIN, 1 TAPN CAPA, 1 CONECTOR CUERDA EXTERIOR, MATERIALES,INSTALACIN, PRUEBAS, EQUIPO Y HERRAMIENTA.

MATERIALES TUBO COBRE T/M 13 mm x 1 mt NACOBRM$7.50 0.250000$1.883.26% CODO CaC 90x13 mm. NACOBREPZA$4.00 1.000000$4.006.93% TEE CaCaC 13 mm. NACOBREPZA$6.50 1.000000$6.5011.27% TEE CaC RED. 19X13X19 mm. NACOBREPZA$7.00 1.000000$7.0012.13% TAPON CAPA CaC 13 mm. NACOBREPZA$4.50 1.000000$4.507.80% CONECTOR CaF R/EXT 13 mm. NACOBREPZA$11.07 1.000000$11.0719.19% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.030000$1.502.60% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.060000$10.6818.51% ROLLO LIJA 25RLL$190.00 0.010000$1.903.29%Subtotal: MATERIALES$49.0384.97%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13*0.028924$8.2514.30%Subtotal: MANO DE OBRA$8.2514.30%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$8.25 0.030000$0.250.43% EQUIPO DE SEGURIDAD%$8.25 0.020000$0.170.29%Subtotal: EQUIPO Y HERRAMIENTA$0.420.73%Costo directo$57.70INDIRECTOS8%$4.62SUBTOTAL $62.32UTILIDAD10%$5.77PRECIO UNITARIO$68.09(* SESENTA Y OCHO PESOS 09/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 136.18Anlisis: A06.07 Unidad: SALSALIDA HIDRULICA PARA REGADERA CON TUBERA DE COBRE DE 13 MM. DE DIMETRO, INCLUYE: 1CODO, 3 TEE, 2 TEE REDUCCIN DE 19X13MM, 2 TAPONES CAPA , Y CONECTOR CUERDA INTERIOR, 2LLAVES DE EMPOTRAR SOLDABLES, MATERIALES, MANO DE OBRA, INSTALACIN, PRUEBAS, EQUIPO YHERRAMIENTA

MATERIALES TUBO COBRE T/M 13 mm x 1 mt NACOBRM$7.50 0.740000$5.551.78% TUBO COBRE T/M 19 mm x 1 mt NACOBRM$12.00 0.670000$8.042.58% CODO CaC 90x13 mm. NACOBREPZA$4.00 1.000000$4.001.29% TEE CaCaC 13 mm. NACOBREPZA$6.50 3.000000$19.506.26% TEE CaC RED. 19X13X19 mm. NACOBREPZA$7.00 2.000000$14.004.50% TAPON CAPA CaC 13 mm. NACOBREPZA$4.50 2.000000$9.002.89% CONECTOR CaF R/INT 13 mm. NACOBREPZA$11.00 1.000000$11.003.53% LLAVE EMP. SOLD 13 MM FIG-39-I C/MAPZA$95.00 2.000000$190.0061.04% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.075000$3.751.20% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.150000$26.708.58% ROLLO LIJA 25RLL$190.00 0.040000$7.602.44%Subtotal: MATERIALES$299.1496.10%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13*0.040494$11.553.71%Subtotal: MANO DE OBRA$11.553.71%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$11.55 0.030000$0.350.11% EQUIPO DE SEGURIDAD%$11.55 0.020000$0.230.07%Subtotal: EQUIPO Y HERRAMIENTA$0.580.19%Costo directo$311.27INDIRECTOS8%$24.90SUBTOTAL $336.17UTILIDAD10%$31.13PRECIO UNITARIO$367.30(* TRESCIENTOS SESENTA Y SIETE PESOS 30/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 367.3Anlisis: A06.08 Unidad: SALSALIDA HIDRULICA PARA W.C. CON TUBERA DE COBRE DE 13 MM. DE DIMETRO, INCLUYE: 1 CODO,1 TEE, 1 TEE REDUCCIN DE 25X13, 1 TAPN CAPA , 1 CONECTOR CUERDA EXTERIOR, 2 M. DE TUBODE COBRE DE 25 MM. PARA ALIMENTACIN, MATERIALES, MANO DE OBRA, INSTALACIN, PRUEBAS,EQUIPO Y HERRAMIENTA.

MATERIALES TUBO COBRE T/M 13 mm x 1 mt NACOBRM$7.50 0.122500$0.922.06% CODO CaC 90x13 mm. NACOBREPZA$4.00 1.000000$4.008.94% TEE CaCaC 13 mm. NACOBREPZA$6.50 1.000000$6.5014.53% TAPON CAPA CaC 13 mm. NACOBREPZA$4.50 1.000000$4.5010.06% CONECTOR CaF R/EXT 13 mm. NACOBREPZA$11.07 1.000000$11.0724.75% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.022000$1.102.46% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.033000$5.8713.13% ROLLO LIJA 25RLL$190.00 0.011000$2.094.67%Subtotal: MATERIALES$36.0580.61%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13 0.028924$8.2518.45%Subtotal: MANO DE OBRA$8.2518.45%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$8.25 0.030000$0.250.56% EQUIPO DE SEGURIDAD%$8.25 0.020000$0.170.38%Subtotal: EQUIPO Y HERRAMIENTA$0.420.94%Costo directo$44.72INDIRECTOS8%$3.58SUBTOTAL $48.30UTILIDAD10%$4.47PRECIO UNITARIO$52.77(* CINCUENTA Y DOS PESOS 77/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 2 Importe: 105.54Anlisis: A06.09 Unidad: SALSALIDA SANITARIA PARA FREGADERO CON TUBERA DE PVC DE 2" DE DIMETRO CON UN DESARROLLODE 3 M., INCLUYE: 2 CODOS DE 90 , MANO DE OBRA, INCTALACIN Y PRUEBAS.

MATERIALES CODO PVC SANIT 90X50 DUR CEMENTAR CPZA$2.50 4.000000$10.0028.28% TUBO PVC E/L 50mm x 1 mto SANIT DURM$13.17 0.550000$7.2420.48% BOTE PEGAMENTO SILER 480 grs ESPECPZA$54.00 0.125000$6.7519.09% LIMPIADOR SILER 500 mlPZA$45.00 0.060000$2.707.64%Subtotal: MATERIALES$26.6975.48%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13 0.028924$8.2523.33%Subtotal: MANO DE OBRA$8.2523.33%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$8.25 0.030000$0.250.71% EQUIPO DE SEGURIDAD%$8.25 0.020000$0.170.48%Subtotal: EQUIPO Y HERRAMIENTA$0.421.19%Costo directo$35.36INDIRECTOS8%$2.83SUBTOTAL $38.19UTILIDAD10%$3.54PRECIO UNITARIO$41.73(* CUARENTA Y UN PESOS 73/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 1 Importe: 41.73Anlisis: A06.10 Unidad: MSUMINISTRO Y TENDIDO DE TUBO SANITARIO DE PVC DE 50 MM. DE DIAMETRO; INCLUYE:ACARREOS,TENDIDO, LUBRICACIN, COPLE, JUNTEO CON PEGAMENTO PARA PVC, ALINEACIN,PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA. Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES TUBO PVC E/L 50mm x 1 mto SANIT DURM$13.17 1.050000$13.8325.82% BOTE PEGAMENTO SILER 480 grs ESPECPZA$54.00 0.125000$6.7512.60% LIMPIADOR SILER 500 mlPZA$45.00 0.060000$2.705.04% COPLE PVC SANIT DUR CEMENTAR 50 mm.PZA$2.00 0.170000$0.340.63%Subtotal: MATERIALES$23.6244.10%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/10.000000$28.5153.23%Subtotal: MANO DE OBRA$28.5153.23%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$28.51 0.030000$0.861.61% EQUIPO DE SEGURIDAD%$28.51 0.020000$0.571.06%Subtotal: EQUIPO Y HERRAMIENTA$1.432.67%Costo directo$53.56INDIRECTOS8%$4.28SUBTOTAL $57.84UTILIDAD10%$5.36PRECIO UNITARIO$63.20(* SESENTA Y TRES PESOS 20/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 8.5 Importe: 537.2Anlisis: A06.11 Unidad: MSUMINISTRO Y TENDIDO DE TUBO SANITARIO DE PVC DE 102 MM. DE DIAMETRO; INCLUYE:ACARREOS,TENDIDO, LUBRICACIN, COPLE, JUNTEO CON PEGAMENTO PARA PVC, ALINEACIN,PRUEBAS, HERRAMIENTA MENOR, MANO DE OBRA. Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

MATERIALES TUBO PVC E/L 100mm x 1 mto SANIT DUM$25.00 1.050000$26.2538.96% LIMPIADOR SILER 500 mlPZA$45.00 0.070000$3.154.67% BOTE PEGAMENTO SILER 480 grs ESPECPZA$54.00 0.130000$7.0210.42% COPLE PVC SANIT DUR CEMENTAR 110 mmPZA$6.00 0.170000$1.021.51%Subtotal: MATERIALES$37.4455.57%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/10.000000$28.5142.31%Subtotal: MANO DE OBRA$28.5142.31%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$28.51 0.030000$0.861.28% EQUIPO DE SEGURIDAD%$28.51 0.020000$0.570.85%Subtotal: EQUIPO Y HERRAMIENTA$1.432.12%Costo directo$67.38INDIRECTOS8%$5.39SUBTOTAL $72.77UTILIDAD10%$6.74PRECIO UNITARIO$79.51(* SETENTA Y NUEVE PESOS 51/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 26 Importe: 2067.26Anlisis: A06.12 Unidad: MSUMINISTRO Y TENDIDO DE TUBO DE COBRE TIPO "M" DE 51 MM. DE DIAMETRO; INCLUYE:ACARREOS, INSTALACIN, PRUEBAS, CORTES, AJUSTES, DESPERDICIOS, MATERIAL FUNDENTE,SOLDADURA, LIMPIEZA, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

MATERIALES TUBO COBRE T/M 51 mm x 1 mt NACOBRM$25.00 1.050000$26.2547.49% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.022000$1.101.99% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.033000$5.8710.62% ROLLO LIJA 25RLL$190.00 0.011000$2.093.78%Subtotal: MATERIALES$35.3163.89%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/15.000000$19.0134.39%Subtotal: MANO DE OBRA$19.0134.39%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$19.01 0.030000$0.571.03% EQUIPO DE SEGURIDAD%$19.01 0.020000$0.380.69%Subtotal: EQUIPO Y HERRAMIENTA$0.951.72%Costo directo$55.27INDIRECTOS8%$4.42SUBTOTAL $59.69UTILIDAD10%$5.53PRECIO UNITARIO$65.22(* SESENTA Y CINCO PESOS 22/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 28.72 Importe: 1873.12Anlisis: A06.13 Unidad: MSUMINISTRO Y TENDIDO DE TUBO DE COBRE TIPO "M" DE 19 MM. DE DIAMETRO; INCLUYE:ACARREOS, INSTALACIN, PRUEBAS, CORTES, AJUSTES, DESPERDICIOS, MATERIAL FUNDENTE,SOLDADURA, LIMPIEZA, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

MATERIALES TUBO COBRE T/M 19 mm x 1 mt NACOBRM$12.00 0.175000$2.106.75% PASTA PARA SOLDAR SILER 500 grsPZA$50.00 0.022000$1.103.53% CARRETE SOLD. 95-5 NACOBREPZA$178.00 0.033000$5.8718.86% ROLLO LIJA 25RLL$190.00 0.011000$2.096.72%Subtotal: MATERIALES$11.1635.86%MANO DE OBRA CUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.)JOR$285.13/15.000000$19.0161.09%Subtotal: MANO DE OBRA$19.0161.09%EQUIPO Y HERRAMIENTA HERRAMIENTA MENOR%$19.01 0.030000$0.571.83% EQUIPO DE SEGURIDAD%$19.01 0.020000$0.381.22%Subtotal: EQUIPO Y HERRAMIENTA$0.953.05%Costo directo$31.12INDIRECTOS8%$2.49SUBTOTAL $33.61UTILIDAD10%$3.11PRECIO UNITARIO$36.72(* TREINTA Y SEIS PESOS 72/100 M.N. *)Cantidad utilizada de este concepto en el presupuesto 42.5 Importe: 1560.6Anlisis: A06.14 Unidad: MSUMINISTRO Y TENDIDO DE TUBO DE COBRE TIPO "M" DE 13 MM. DE DIAMETRO; INCLUYE:ACARREOS, INSTALACIN, PRUEBAS, CORTES, AJUSTES, DESPERDICIOS, MATERIAL FUNDENTE,SOLDADURA, LIMPIEZA, HERRAMIENTA MENOR, MANO DE OBRA Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

MATERIALES TUBO COBRE T/M 13 mm x 1 mt NACOBRM$7.50 0.175000$1.314.32% PA