renewable energy incentives: investment or entitlement? e2 tech 3 25... · 2015-03-26 · designing...
TRANSCRIPT
![Page 1: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/1.jpg)
The Regulatory Assistance Project 50 State Street, Suite 3Montpelier, VT 05602
Phone: 802-223-8199web: www.raponline.org
Renewable Energy Incentives: Investment or Entitlement?
Presentation to theENVIRONMENTAL & ENERGY TECHNOLOGY
COUNCIL OF MAINE
March 25, 2015
David Farnsworth
![Page 2: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/2.jpg)
Overview
• Some Background
– Today’s Regulatory Challenge
– US Energy Subsidies—A Snapshot
– Utility System Investment Needs
– The Utility Sector of the Future
– EPA’s Clean Power Plan
• Two Questions:
#1: Are you able to talk “Integration?”
#2: What Constitutes a “Good” DG Tariff?
2
![Page 3: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/3.jpg)
Some BackgroundToday’s Regulatory Challenge
3
Affordable Environmental
Compliance
Traditional Regulatory
Goals
Dramatic Industry Change
Comprehensive Planning
Comprehensive Planning
![Page 4: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/4.jpg)
Some BackgroundUS Energy Subsidies—A Snapshot
• Historical federal commitment to new energy sources was much greater for non renewable resources– During first 15 years of each subsidies’ the federal commitment
to oil and gas was 5X greater than to renewable and 10 x greater for nuclear than renewables
• Support for RE as an emerging technology pales in comparison to that of oil, gas and nuclear power (inflation adjusted dollars over first 15 years of subsidy life)– Nuclear Energy spending 3.3 billion– O&G subsidies averaged 1.8 billion– Renewable energy average less than 0.4 billion
http://www.naruc.org/meetingpresentations.cfm?178
![Page 5: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/5.jpg)
Snapshot: One Century ofAverage Annual Energy Subsidies
![Page 6: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/6.jpg)
Cumulative Historical Federal Subsidies
![Page 7: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/7.jpg)
Some Background
– Utility System Investment Needs
7
![Page 8: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/8.jpg)
Transforming America’s Power Industry: The Investment Challenge 2010-2030,
Brattle Group
$1.5 to $2.0 trillion
Total electric industry infrastructure investment needs by 2030. http://www.brattle.com/_documents/UploadL
ibrary/Upload725.pdf
Required New Regional Generation Capacity
![Page 9: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/9.jpg)
Natural Gas System Investment, according to DOE
• US natural gas infrastructure
• Half was built between 1940-1960
• $19.2 Billion dollars required for upgrades
J. Pershing, Director of Office of Energy Policy & Systems Analysis, US DOE, presentation to NARUC Subcommittee on Clean Coal, February 9, 2014
![Page 10: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/10.jpg)
Water System Investment Needed
• $384 billion EPA—total drinking water system infrastructure needed by 2030
• Source,
• Treatment Plant,
• Storage,
• T&D
EPA Survey Shows $384 Billion Needed for Drinking Water Infrastructure by 2030, June 4, 2013. http://yosemite.epa.gov/opa/admpress.nsf/0/F72C2FDC7D61F92085257B800057655F
![Page 11: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/11.jpg)
Regulatory Response to Utility System Investment Needed by 2030
Electricity $1.5 - 2.0 trillion
Natural Gas $19.2 billion
Drinking Water $384 billion
![Page 12: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/12.jpg)
Status Quo: What to expect if utilities and ratepayers are left alone to take on this effort
Pressure On:– Rates and ratepayers;
– Company earnings and balance sheets;
– Regulatory process (more frequent rate cases); and
– Elected and appointed officials.
Commissioner Ron Binz, former Chair CO PUC,
2010 NARUC Summer Meetings Sacramento, CA
![Page 13: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/13.jpg)
13
Where does RE (distributed and utility-scale) fit within these industry trends?
Source: Utility Dive, State of the Electric Utility 2015
Some Background
– The Utility Sector of the Future
![Page 14: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/14.jpg)
Some BackgroundClean Power Plan: Building Blocks & Beyond
14
1. Heat Rate Improvements
2. Redispatch to Gas
3. Renewable and Nuclear Generation
4. Energy Efficiency
Optimize Power Plant Operations
Electric-Sector CHP
Increase Low-GHG Generation
Retire Aging Power Plants
Establish Energy Efficiency Targets (EE, DSM, EERS)
Pursue Behavioral Efficiency Programs
Boost Appliance Standards
Boost Building Codes
![Page 15: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/15.jpg)
There are Many Other Technology & Policy Options
15
• Optimize Grid Operations
• Reduce Losses in the T&D System
• Foster New Markets for Energy Efficiency
• Adopt Procurement Requirements (“loading order”)
• Encourage Clean Distributed Generation
• Revise Capacity Market Practices
• Adopt Environmental Dispatch
• Improve Utility Resource Planning
• Adopt Cap-and-Invest Programs (e.g., RGGI)
• Revise Transmission Pricing and Access Policy
See forthcoming publication from
the National Association of
Clean Air Agencies (NACAA)
in late April
![Page 16: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/16.jpg)
Clean Power Plan
• How Will Renewable Energy Certificates trade in this new regulatory paradigm?
• Will the CPP further promote or hinder the development of RE?
• Subsidies aside, can regulators fully recognize the value of RE?
![Page 17: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/17.jpg)
The Challenge
• Given the current environment:
– RE developers will need to focus on the value and benefits they bring to the grid and society, and
– Be prepared to address the issues related to greater adoption of RE into the country’s energy mix.
![Page 18: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/18.jpg)
Two Resources
• Designing DG Tariffs Well – Linville et al, RAP
• Designing Markets to Accommodate Variable Resources: “Teaching the Duck to Fly,” Jim Lazar, RAP
![Page 19: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/19.jpg)
Strategy One: Designing Distributed Generation Tariffs Well
• Publication: Carl Linvill John Shenot Jim Lazar: http://www.raponline.org/document/download/id/6898
• Webinar: http://www.raponline.org/event/webinar-designing-distributed-generation-tariffs
![Page 20: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/20.jpg)
Designing Distributed Generation Tariffs Well
• Improvements in DG economics, • Increasing consumer preference for clean, distributed
resources, and • A favorable policy environment in many states have
combined to produce significant increases in DG adoption in the US.
• Regulators are looking for the well-designed tariff that fairly:– Compensates DG adopters for the value they provide to the
electric system;– Compensates the utility for the grid services it provides, and – Charges non-participating consumers for the value of the
services they receive.
![Page 21: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/21.jpg)
Sound Decision-Making Benefits All
• For consumers: Keep more $$, quality
• For utilities: Corporate health, purpose
• For investors: Safety, value, expectations
• For employees: Safety and welfare, pride
• For the regulatory process: Confidence
• For society: Key role for power in society
A process that promotes shifting risk rather than managing risk is inherently unstable
![Page 22: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/22.jpg)
Designing DG Tariffs Well: Twelve Points
1. Value is a two-way (or more) street
2. Consider all relevant sources of benefit and cost over the long term
3. Select & implement a valuation method
4. Cross-subsidies may flow either way, e.g.,
22
![Page 23: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/23.jpg)
Consider: Cross-Subsidies Run Both Ways
• If value of PV < compensation:– Other customers subsidize PV customers
– Under-recovery of utility’s fixed costs
– Upward pressure on rates (cross subsidy)
– Reduced utility shareholder returns
• If value of PV > compensation:– PV customers subsidize other customers
– Suppresses PV deployment
23
![Page 24: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/24.jpg)
Twelve Points
5. Extrapolating from extreme situations is misleading
6. Infant industry subsidy tradition
7. Rules matter (e.g. interconnection)
8. Be no more complicated than necessary
24
![Page 25: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/25.jpg)
Twelve Points
9. Support innovative power sector models
10.Keep incentive decision separate from rate design
11. Keep decoupling decision separate from rate design
12.Consider mechanisms for “have-nots”
25
![Page 26: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/26.jpg)
Two Resources
• Designing DG Tariffs Well – Linville et al, RAP
• Designing Markets to Accommodate Variable Resources: “Teaching the Duck to Fly,” Jim Lazar, RAP
![Page 27: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/27.jpg)
• Publication: Jim Lazar: http://www.raponline.org/featured-work/teach-the-duck-to-fly-integrating-renewable-energy
• Webinar: http://www.raponline.org/event/teaching-the-duck-to-fly
![Page 28: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/28.jpg)
California’s Duck Curve
![Page 29: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/29.jpg)
Ten Strategies To Align Loads to Resources (and Resources to Loads) with Illustrative Values
1. Targeted energy efficiency
2. Orient solar panels
3. Use solar thermal with storage.
4. Manage electric water heat
5. Require new large air conditioners to include storage
6. Retire older inflexible power plants
7. Concentrate demand charges into “ramping” hours
8. Deploy energy storage in targeted locations
9. Implement aggressive demand response programs
10.Use inter-regional exchanges of power
29
Not every strategy will be applicable to every utility.
![Page 30: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/30.jpg)
What Causes This Challenge?
Variable Loads: we’ve had those forever.
Wind: Variable supply.
Solar: Predictably NOT available for late PM
peak demand.
30
![Page 31: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/31.jpg)
Strategy 1: Targeted Energy Efficiency
Focus efforts on EE measures with afternoon peak orientation.
31
5% of total usage by 2020;
3:1 ratio between on-peak and off-peak savings.
Kitchen lighting is a great example.
A/C is huge.
![Page 32: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/32.jpg)
Strategy 1: Targeted Energy Efficiency
Focus efforts on EE measures with afternoon peak orientation.
32
0
500
1000
1500
2000
2500
3000
3500
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Post Strategy Total Load
Post Strategy Net Load
Original Net Load
Original Total Load
![Page 33: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/33.jpg)
Strategy 2: Orient Solar Panels to the West
Fixed-axis solar panels produce a more valuable output if oriented to the West.
33
100 MW shift out of AM into PM hours, out of ~700 total rooftop solar assumed.
6 PM
![Page 34: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/34.jpg)
Strategy 2: Orient Solar Panels to the West
34
0
500
1000
1500
2000
2500
3000
3500
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Post Strategy Total Load
Post Strategy Net Load
Post Strategy 1 Total Load
Post Strategy 1 Net Load
![Page 35: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/35.jpg)
Strategy 3: Use Solar Thermal In Place of Some Solar PV
Solar thermal energy is more expensive, but can be stored for a few hours at low cost.
35
Substitute 100 MW of solar thermal for 100 MW of utility-scale PV, out of 1,500 MW of utility-scale solar total assumed.
![Page 36: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/36.jpg)
Strategy 3: Use Solar Thermal In Place of Some Solar PV
36
0
500
1000
1500
2000
2500
3000
3500
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Post Strategy Total Load
Post Strategy Net Load
Pre-Strategy Total Load
Pre-Strategy Net Load
![Page 37: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/37.jpg)
Strategy 4: Control Electric Water Heating
Install grid control of electric water heating;
Supercharge during low-cost hours.
37
Illustrative utility has ~12% of state load; assume it can gain control over 5% of the electric water heaters in the state, for 300 MWh of load shifting.
![Page 38: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/38.jpg)
Strategy 4: Control Electric Water Heating
38
0
500
1000
1500
2000
2500
3000
3500
4000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Post Strategy Total Load
Post Strategy Net Load
Pre-Strategy Total Load
Pre-Strategy Net Load
![Page 39: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/39.jpg)
How Did We Do?
Pre-Strategy, without Solar/Wind: 73% LF
Pre-Strategy, with Solar/Wind: 63% LF
Post-Strategy, with Solar/Wind: 83% LFHourly Ramp: 340 MW vs. 400 today, and 550 w/o strategies
39
![Page 40: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/40.jpg)
Teaching the Duck to Fly
Requesting Permission for Take-Off
![Page 41: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/41.jpg)
Recommendations
• Given– Today’s Regulatory Challenges;
– Uncertainty Associated with Energy Subsidies;
– Utility System Investment Needs;
– Changes to the Utility Sector; and
– EPA’s Clean Power Plan
• Identify RE’s Strengths and Benefits– Get ahead of the Integration challenge
– Be prepared to support development of tariffs that recognize the benefits of RE
41
![Page 42: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/42.jpg)
Thank You!
![Page 43: Renewable Energy Incentives: Investment or Entitlement? E2 Tech 3 25... · 2015-03-26 · Designing Distributed Generation Tariffs Well •Improvements in DG economics, •Increasing](https://reader033.vdocuments.net/reader033/viewer/2022050505/5f972754e115c56a1a074339/html5/thumbnails/43.jpg)
About RAP
The Regulatory Assistance Project (RAP) is a global, non-profit team of experts that focuses on the long-term economic and environmental sustainability of the power and natural gas sectors. RAP has deep expertise in regulatory and market policies that:
Promote economic efficiency Protect the environment Ensure system reliability Allocate system benefits fairly among all consumers
Learn more about RAP at www.raponline.org
David Farnsworth: [email protected]
43