Cortona BuildingHistoric rehabilitation of a 1950s era Woolworth's building listed on the National Register. Street level to be demised as three-four retail/restaurant spaces, with office use planned forthe second oor.

Timeline: December 2015 - May 2016

Hyatt Regency Lake Washington at Seattle’s Southport12-story hotel with 347 luxury rooms, ne dining restaurant, bar/lounge, indoor pool, day spa, and tness facilities. Includes 40,000 SF conference center and open-air wedding/special event facilities.

Timeline: October 2014 - June 2017

Southport on Lake Washington Office CampusThree, nine-story buildings consisting of 730,000 SF of Class "A" office space, featuring exible, large oor plates. Adjacent to Hyatt Regency Hotel and over 2,000 structured parking spaces with access from podium lobbies.

Timeline: January 2016 - Fall 2018

Hampton Inn & SuitesFive-story hotel with 110 rooms and underground parking. Amenities include indoor pool, roof-top deck, outdoor plaza, restaurant, and tness room.

Timeline: September 2015 - October 2016

Marriott Residence InnFive-story hotel with 146 rooms and underground/surface parking. Amenities include breakfast area, bar, laundry, and tness room.

Timeline: Spring 2016 - TBD

Sunset Terrace ApartmentsNew six-story building with 110 residential units and 2,000 SF of street front retail space. Colpitts Development is developing the market-rate project as part of the Sunset Area Transformation Plan, which also includes the adjacent Renton Highlands Library and a three-acre neighborhood park.

TTimeline: July 2016 - Late 2017

Renton Highlands LibraryNew 15,000 SF replacement library that will serve as the cornerstone of the Sunset Area Transformation Plan area. Building includes underground parking and will face a new three-acre neighborhood park across Sunset Lane.

Timeline: October 2014 - March 2016

PACCAR Parts Distribution Center

The Lofts at Second and Main

New 170,000 SF building for parts distribution on 25-acre site, adjacent to PACCAR's factory for building off-road trucks used primarily in mining.

Timeline: September 2015 - Spring 2016

New six story building with 101 residential units and 4,000 SF of street front retail space. Cosmos Development is building Downtown's rst market-rate residential project since the Great Recession.

Timeline: August 2015 - Fall 2016

Group Health Campus12-acre campus with four buildings built in two phases. Phase I consists of two buildings totaling 240,000 SF for Group Health adminstration, lab, warehouse, and pharmacy fulllment (+/-1,000 employees).

Timeline: Phase 1 June 2015 - Late 2016

CarMax RentonNew 20,000 SF showroom, office and service center within a 12-acre site for CarMax, the nation's largest retailer of used vehicles. The Renton CarMax will be the rst Puget Sound area store for the company.

TTimeline: Summer 2016 - TBD

IKEANew two-level, 406,000 SF replacement store that will feature an updated and enhanced shopping experience. The Renton IKEA is the company's only Washington State store.

Timeline: October 2015 - Spring 2017