rep-10-152-report infrared inspection for sabah gas asaga
TRANSCRIPT
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 1/14
TECHNICAL REPORT
ON
INFRARED THERMOGRAPHY
FOR
SABAH GAS TERMINAL KOTA KINABALU
by
ASAGA CORPORATION SDN BHD
09th
APRIL 2010
Report No: REP-10-152
Revision 0
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 2/14
2
TABLE OF CONTENTS
1.0 INTRODUCTION .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.0 INSTRUMENTATION .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.0 SUMMARY OF RESULTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.0 INFRARED THERMOGRAPHY SURVEY GUIDELINE .. . . . . . . . . . . . . . . . 4
5.0 EQUIPMENT LIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
6.0 REFERENCE LIST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 3/14
3
1.0 INTRODUCTION
Asaga Corporation Sdn Bhd was requested to perform an infrared
thermographic survey for Sabah Gas located within the compound. The survey was
performed on the 16th & 17th March 2010, and was assisted by representative from the
Maintenance & Facilities Department.
The prime objective of this inspection was to locate and identify areas of
abnormal heating which existed in electrical equipment in an on-line/on-load
condition at time of survey and accessible to the camera field of view.
2.0 INSTRUMENTATION
The survey was performed using a Thermoteknix VisIR infrared
thermography camera. All thermal images presented in the following report were
obtained using this camera.
3.0 SUMMARY OF RESULTS
These following faults were detected during the survey and are tabulated as
follows:
Thermogram
No.Equipment Fault Type Fault Status
TR-01 UPS 7650 No 22TSM- Neutral Cable 567-
TerminationMINOR
Table 1: Summary of Faults
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 4/14
4
4.0 INFRARED THERMOGRAPHY SURVEY
GUIDELINE
To date, there is no governing body or organization that has come up with an
international standard for the acceptance of temperature profile in infrared
thermographic technology. As a rule of thumb, the following is temperature
difference guideline used for condition acceptance.
100C – 19
0C
Areas of fault which, with continuous
monitoring, will probably be safe and failure freewithin 6 months.
1. MINOR
200C – 35
0C
Areas of fault deemed to be of serious in naturewith repairs required as soon as possible (ASAP)
2. INTERMEDIATE
>350C
Areas of fault deemed to be of serious in nature.Immediate shutdown and repair of equipment
would be required to avert fire or catastrophic
failure.
3. SEVERE
Table 2: Infrared Survey Guideline
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 5/14
5
5.0 EQUIPMENT LIST
These are the list of equipments that were inspected. Each item that has been
identified as potential problem is marked in Red bold:
No Location Panel List Good Bad Remarks
1. Bilik LV Switch
Room, Ground
Floor
MCC 7600
Panel L6 – Incoming Feeder ABC 7600C √ Ref 1
2. Panel L5 – GD 7500 √
3. Panel L4 – DB 7609 √ Ref 2
4. Panel L3 – DB 7604 NOP
5. Panel L2 – PM 5310A
6. Panel L1 – Incoming Feeder ACB 7600A √
7. Panel L/R – ACB 7600D √ Ref 3
8. Panel L/R – Bus Termination √
9. Panel R1 – Central Unit √
10. Panel R2 – DB √ Ref 5
11. Panel R3 – DB 7604 NOP
12. Panel R4 – PM 3520B √ Ref 4
13. Panel GE – 7510 √
14. Panel R6 – Incoming Feeder ACB 7600B √ Ref 6
15. Panel R7 √ 16. Panel R8 √
17. Panel R9 √
18. Panel R10 √ Ref 12
19. Panel R11 √
20. Panel L11 √ Ref 9
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 6/14
6
No Location Panel List Good Bad Remarks
21. Panel L10 √ Ref 13
22. Panel L9 √ Ref 8
23. Panel L8 √ Ref 7
24. Panel L7 √ Ref 11
25. Bilik LV Switch,
Room, Ground Floor
Panel A √
Panel B √ Ref 14,10
26. MTG 500 Switch Board Panel C √
27. Panel D √ Ref 15
Panel E √ Ref 16
28. Panel F NOP
29. DV 7702 Charger DV 7720 A Charger No 1 √
30. DV 7720B Charger No 2 √ Ref 1831. DV 7720 DC 110V DB √
32. DU 7701 Charger DU 7701A Charger No 1 √
33. DU 7701B Charger No 2 √ Ref 19
34. DU 7701A DC 24V DB √
35. DU 7700 Charger DU 7700A Charger No 1 √
36. DU 7700B Charger No 2 √
37. DU 7700A DC 24 V DB √
38. UPS 7650 UPS No 1 NOP
39. UPS No 2√
Ref 13,20
&TR-01
40. ALT Main Cubicle √
Legend
NOP - Not Operating
NA - Not Applicable / Not Accessible
* - Equipment was inspected but load was less than 30% of maximum rating, hence
the
scan result may not be reliable.
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 7/14
7
COMPONENT: 2TSM- NEUTRAL CABLE 567
Equipment UPS 7650 No 2
Created on 3/16/2010 6:27:25 PM
Location Bilik LV Switch Room
Thermoteknix VisIR 6:27:25 PM 3/16/2010 e : 1.00 Bg : 2
-20.00
100.00
-2.79
46.08
Celsius
0.00
10.00
20.00
30.00
40.00
Area 1
Max. Avg. Min.36.09 29.20 25.49
Reference Image Infra-red Image
TR-01
Condition Minor
Spot Max Temp. 36.09°C
Emissivity 1.00
Background 25.0°CReferance Temp 28°C
Difference Temp 8.0°C
Analysis
Probable Cause Likely poor contact at the termination neutral cable
Recommended Action Suggest re-tighten and cleaning the termination at the
next maintenance schedule.
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 8/14
8
6.0 REFERENCE LIST
CustomerSabah Gas Kota Kinabalu
LocationLV Switch Room
Date 16th & 17th March 2010 Air temp/Emissivity ~30.00 / 1.00
Reference 1
Thermoteknix VisIR 9:24:57 PM 3/15/2010 e : 1.00 Bg : 2
0.00
55.00
20.24
35.80
Celsius
22.00
24.00
26.0028.00
30.00
32.00
34.00
Area 1Max. Avg. Min.26.35 23.71 22.87
Reference 2
Thermoteknix VisIR 9:27:57 PM 3/15/2010 e : 1.00 Bg : 2
-5.00
70.00
19.98
44.42
Celsius
25.00
30.00
35.00
40.00
Area 1Max. Avg. Min.37.44 28.40 24.63
Reference 3
Thermoteknix VisIR 9:34:07 PM 3/15/2010 e : 1.00 Bg : 24.
-15.00
90.00
18.85
52.16
Celsius
25.00
30.00
35.00
40.00
45.00
50.00
Area 1Max. Avg. Min.60.25 30.32 25.92
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 9/14
9
Reference 4
Thermoteknix VisIR 10:41:24 PM 3/15/2010 e :
6.00
42.00
18.75
29.86
Celsius
20.00
22.00
24.00
26.00
28.00
Area 1Max. Avg. Min.21.31 20.46 19.50
Reference 5
Thermoteknix VisIR 9:36:07 PM 3/15/2010 e : 1.00 Bg : 24
-15.00
90.00
18.85
52.16
Celsius
25.00
30.00
35.00
40.00
45.00
50.00
Area 1Max. Avg. Min.39.52 30.67 25.27
Reference 6
Thermoteknix VisIR 9:53:58 PM 3/15/2010 e : 1.00 Bg : 24.-15.00
90.00
22.33
55.65
Celsius
25.00
30.00
35.00
40.00
45.00
50.00
Area 1
Max. Avg. Min.46.26 26.60 24.19
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 10/14
10
Reference 7
Thermoteknix VisIR 9:55:26 PM 3/15/2010 e : 1.00 Bg : 24.9
-15.00
90.00
22.33
55.65
Celsius
25.00
30.00
35.00
40.00
45.00
50.00
Area 1Max. Avg. Min.
45.37 25.35 23.31
Reference 8
Thermoteknix VisIR 10:21:19 PM 3/15/2010 e : 1.00 Bg : 24.9
0.00
55.00
19.42
34.98
Celsius
22.00
24.00
26.00
28.00
30.00
32.00
34.00
Area 1Max. Avg. Min.24.63 23.14 20.86
Reference 9
Thermoteknix VisIR 10:22:03 PM 3/15/2010 e : 1.00 Bg : 24.95
0.00
55.00
19.42
34.98
Celsius
22.00
24.00
26.00
28.00
30.00
32.00
34.00
Area 1
Max. Avg. Min.25.49 23.53 21.76
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 11/14
11
Reference 10
Thermoteknix VisIR 5:56:04 PM 3/16/2010 e : 1.00 Bg : 24
0.00
85.00
29.15
55.83
Celsius
35.00
40.00
45.00
50.00
Area 1Max. Avg. Min.
43.03 38.61 30.32
Reference 11
Thermoteknix VisIR 10:41:24 PM 3/15/2010 e : 1.00 Bg : 24.9
6.00
42.00
18.75
29.86
Celsius
20.00
22.00
24.00
26.00
28.00
Area 1Max. Avg. Min.21.31 20.46 19.50
Reference 12
Thermoteknix VisIR 10:50:36 PM 3/15/2010 e : 1.00 Bg : 24.95°
2.00
48.00
17.65
32.00
Celsius
20.00
22.00
24.00
26.00
28.00
30.00
Area 1Max. Avg. Min.
21.09 20.23 19.50
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 12/14
12
Reference 13
Thermoteknix VisIR 10:58:41 PM 3/15/2010 e : 1.00 Bg : 2
5.00
60.00
22.96
40.74
Celsius
25.00
30.00
35.00
Area 1Max. Avg. Min.
25.49 24.90 23.97
Reference 14
Thermoteknix VisIR 5:34:46 PM 3/16/2010 e : 1.00 Bg : 24.95
-10.00
75.00
21.62
48.30
Celsius
25.00
30.00
35.00
40.00
45.00
Area 1Max. Avg. Min.
35.70 28.37 25.49
Reference 15
Thermoteknix VisIR 5:36:57 PM 3/16/2010 e : 1.00 Bg : 24.95
-10.00
75.00
21.63
48.30
Celsius
25.00
30.00
35.00
40.00
45.00
Area 1Max. Avg. Min.32.35 26.85 24.41
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 13/14
13
Reference 16
Thermoteknix VisIR 5:41:55 PM 3/16/2010 e : 1.00 Bg : 2
-5.00
80.00
21.89
48.57
Celsius
25.00
30.00
35.00
40.00
45.00
Area 1Max. Avg. Min.32.95 28.54 24.84
Reference 17
Thermoteknix VisIR 5:58:48 PM 3/16/2010 e : 1.00 Bg : 24
-20.00
140.00
16.00
77.28
Celsius
20.00
30.00
40.00
50.00
60.00
70.00
Area 1Max. Avg. Min.54.61 34.81 25.92
Reference 18
Thermoteknix VisIR 6:06:07 PM 3/16/2010 e : 1.00 Bg : 24.9
-20.00
130.00
0.82
62.10
Celsius
10.00
20.00
30.00
40.00
50.00
Area 1Max. Avg. Min.47.49 23.55 22.21
8/8/2019 Rep-10-152-Report Infrared Inspection for Sabah Gas ASAGA
http://slidepdf.com/reader/full/rep-10-152-report-infrared-inspection-for-sabah-gas-asaga 14/14
14
Reference 19
Thermoteknix VisIR 6:19:06 PM 3/16/2010 e : 1.00 Bg : 2
-20.00
220.00
9.27
113.71
Celsius
20.00
40.00
60.00
80.00
100.00
Area 1
Max. Avg. Min.99.30 48.42 28.04
Reference 20
Thermoteknix VisIR 6:26:13 PM 3/16/2010 e : 1.00 Bg : 2
-20.00
100.00
4.19
48.63
Celsius
10.00
20.00
30.00
40.00
Area 1Max. Avg. Min.34.73 27.39 24.19