report cemorokandang_oct 24 2011

6
Drive Test Report for new site Drive Test Report for New Site General The purpose of this drive test report is to make sure that the new site operates properly after installed by BSS team. The coverage and handoff of the site is tested. The site info is shown in the following table: Table 1-1 Site information No Site_ID Sitename Cluster Remark Status 1 CEMOROKANDANG Cemorokandang MLG_01 Normal Done 二 Implement personnel ZTE Engineer: Nober and Fachrur SMG Engineer:Not necessaryAll rights reserved. No part of the documentation may be reproduced, transmitted, transcribed, or translated into any language, in any form or by any means, without prior written permission of ZTE Corporation. - 1 -

Upload: fachrur-rasyid-ishaq

Post on 19-Aug-2015

217 views

Category:

Documents


4 download

DESCRIPTION

Report Cemorokandang_Oct 24 2011

TRANSCRIPT

Drive Test Report for new siteDrive Test Report for New Site1 GeneralThepurposeofthisdrivetestreportistomakesurethatthenewsiteoperatesproperlyafterinstalled by BSS team. The coverage and handoff of the site is tested. The site info is shown in thefollowing table:Table 1-1 Site informationNo Site_ID Sitename Cluster Remark Status1 CEMOROKANDANG Cemorokandang MLG_01 Normal Done2 Implement personnelZT ngineer: !ober and "achrurS#$ ngineer:!ot necessary3 The result of Drive test3.1 Cemorokandang 800Mh"igure %-1-1 &' power plot of Site (emorokandang )**#h+,ll rights reserved. !o part of the documentation may be reproduced- transmitted- transcribed- ortranslated into any language- in any form or by any means- without prior written permission ofZT (orporation.- 1 - Drive Test Report for new site"igure %-1-.T' power plot of site Cemorokandang )**#h+ "igure %-1-% Strongest c/0o plot of Site Cemorokandang )**#h+,ll rights reserved. !o part of the documentation may be reproduced- transmitted- transcribed- ortranslated into any language- in any form or by any means- without prior written permission ofZT (orporation.- . - Drive Test Report for new site"igure %-1-1 Best 2! plot of site Cemorokandang )**#h+"igure %-1-3 ""& plot of site of Cemorokandang )**#h+morokandang14**#h+,ll rights reserved. !o part of the documentation may be reproduced- transmitted- transcribed- ortranslated into any language- in any form or by any means- without prior written permission ofZT (orporation.- % - Drive Test Report for new site! SummariationThere is cable swap at )**#h+. The result of drive test show the coverage is normal.No Test Items Expeted !00M"# At$al Res$lt %Conl$s&onRemark1 Call 'et$p '$ess Rate (Or&g&nat&on)* +,- 100 - .ass/ Call Drop Rate (CDR) 0 /- 0 - .ass1 Call 'et$p '$ess Rate (Term&nat&on)* +,- 100 - .ass2 Call 'et$p t&me (Term&nat&on)0 3 se 14+!5 s .ass5 E6Io +0-area*71/d8+3403 - .ass3 19 Data T:ro$g:p$t (do;nload)* ,0 k