report from the scientific project manager

18
Tiziana Paccagnella [email protected]. emr.it COSMO GENERAl MEETING 2007 Glyfada, Greece 18-21 September Report from the Scientific Project Manager 8th COSMO GENERAL MEETING 18 – 21 September 2007 Glyfada, Greece Tiziana Paccagnella ARPA-SIM

Upload: guy

Post on 21-Jan-2016

43 views

Category:

Documents


0 download

DESCRIPTION

Report from the Scientific Project Manager. 8th COSMO GENERAL MEETING 18 – 21 September 2007 Glyfada, Greece Tiziana Paccagnella ARPA-SIM. Report from the Scientific Project Manager. Scientific activities will be presented by WP coordinators and by our colleagues. Coordination. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Report from the Scientific Project Manager

8th COSMO GENERAL MEETING18 – 21 September 2007

Glyfada, Greece

Tiziana PaccagnellaARPA-SIM

Page 2: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Report from the Scientific Project Manager

Scientific activities will be presented by WP coordinators and by our colleagues.

Page 3: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Coordination

18th Meeting of the COSMO STCZürich, December 14-15, 2006

14th Meeting of the COSMO SACZurich, MeteoSwiss 9-11 May 2007

15th Meeting of the COSMO SACOffenbach, DWD 4-5 Sept 2007

19th Meeting of the COSMO STCGlyfadat, General Meeting 2007

&WGs and Projects meetings

&Reporting

Page 4: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

SACs

14th Meeting of the COSMO SACZurich, MeteoSwiss 9-11 May 2007

Participants:Christoph SchraffMichael BaldaufMarco ArpagausPierre EckertAdriano RaspantiUlrich SchaettlerTiziana PaccagnellaMathias Rotach

Andrzej Mazur PolandVictor Pescaru RomaniaRiviv Gdaly Russia

15th Meeting of the COSMO SAC

Offenbach, DWD 4-5 Sept 2007

Participants:Christoph Schraff

Michael Baldauf

Marco ArpagausPierre Eckert

Adriano RaspantiUlrich SchaettlerTiziana PaccagnellaMathias Rotach

Andrzej Mazur PolandVictor Pescaru RomaniaMikhail Tsyrulnikov RussiaHayo Koppert Germany

Page 5: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

SACs

14th Meeting of the COSMO SACZurich, MeteoSwiss 9-11 May 2007

Participants:Christoph SchraffMichael BaldaufMarco ArpagausPierre EckertAdriano RaspantiUlrich SchaettlerTiziana PaccagnellaMathias Rotach

Andrzej Mazur PolandVictor Pescaru RomaniaRiviv Gdaly Russia

15th Meeting of the COSMO SAC

Offenbach, DWD 4-5 Sept 2007

Participants:Christoph Schraff

Michael Baldauf

Marco ArpagausPierre Eckert

Adriano RaspantiUlrich SchaettlerTiziana PaccagnellaMathias Rotach

Andrzej Mazur PolandVictor Pescaru RomaniaMikhail Tsyrulnikov RussiaHayo Koppert Germany

Page 6: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

SACs

14th Meeting of the COSMO SACZurich, MeteoSwiss 9-11 May 2007

Participants:Christoph SchraffMichael BaldaufMarco ArpagausPierre EckertAdriano RaspantiUlrich SchaettlerTiziana PaccagnellaMathias Rotach

Andrzej Mazur PolandVictor Pescaru RomaniaRiviv Gdaly Russia

Re-evaluate the COSMO strategy

on data assimilation

Page 7: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Data Assimilation

15th Meeting of the COSMO SAC

Offenbach, DWD 5 Sept 2007

Page 8: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Tuesday, September 18 (morning)

Description Name Time

Registration 08:30- 09:00

Opening General Meeting chaired by Ioannis Papageoriou  

Welcome address by the local organizer   09:00

Welcome by the chairman of the Steering Committee

Mathias Rotach  

Report from the Scientific Project Manager Tiziana Paccagnella ...-09:45

Invited Talk Chris Snyder 09:45- 10:30

Coffee near poster area (We need about 45 min to rearrange the main room) 10:30-11:15

Parallel Sessions: reporting

Working Group parallel sessions (see agenda of wg3, wg5) 10:50-13:00

Lunch 13:00-14:30

Tuesday, September 18 (afternoon)

Working Group parallel sessions (cont.) 14:30- 16:00

coffee near poster area 16.00-16:30

Projects parallel sessions 16:30- 18:30

Data Assimilation

Page 9: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

The Short Range Numerical Weather PredictionProgramme of

EUMETNET

13th SRNWP Meeting12 October 2006, Zurich (Switzerland) Three topics have been selected as SRNWP Projects that should accompany the SRNWP Programme, with a dedicated financing for each Project. They are:

- Interoperability (Uli Schaettler)The term “Interoperability” was chosen for the ability of the different modelling systems to “work together”

- European multi-model LAM EPS (Chiara Marsigli) - Model Verification (Pierre Eckert)

Jean Quiby will illustrate the present status of these projects

Page 10: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

SACs

The allocation of qualified human resources to the some of the Priority projects is still failing. Some concurrent actions must be take to overcome this problem:

Reduce the number of the projects Increase substantially the percentage of FTE per person.

For the success of the most difficult projects, full time scientists would be required. Considering the present situation, full time will not probably be possible but an high percentage (above 50%) must be allocated.

Training must be part of the project itself, of course when required. The FTEs offered by the COSMO members, if not expert on the specific topics, must have at least the appropriate background as a pre-requisite to be trained.

COSMO needs more specialists in Numerics and Physics

The projects for the next COSMO year must be planned/revised in this optic.

Page 11: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

SACs

COSMO visibility: the COSMO web site is still suffering !

Page 12: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

CO

SM

O P

rio

rity

Pro

ject

s

TACKLE DEFICIENCES IN QPF

RK

LM_Z

1DVAR FOR SATELLITE DATA

SIR

SUPPORT ACTIVITIES – WG6

UTCS

INTERPRETATION

SREPS

COMMON VERIFICATION – CONDITIONAL VERIFICATION

INTERPRETATION/ Verif. VHR

2005-2006 2006-2007

Page 13: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

 PLANNED

Oct.2006 - Sept.2007

Germany Swiss Italy Greece Poland Romania TOTAL

Support ActivitiesPL: U. Schaettler DWD 0,450 0,050 0,250 0,600 0,000 0,100 1,450

Retrievas for nudging: 1dVar for satellite radiancesP.L.: R. Hess 0,600 0,000 1,200 0,000 0,800 0,000 2,600

SIR: Sequential Importance Resampling filter PL: C. Schraff DWD 0,050 0,000 0,000 0,000 0,000 0,700 0,750

Further development of LM_ZP.L.:U. Schaettler DWD 0,300 0,400 0,700 0,300 0,500 0,000 2,200

Further development of the Runge Kutta method PL: M. Baldauf DWD 0,650 0,300 0,750 0,000 0,000 0,000 1,700

UTCS: Towards Unified Turbulence-Shallow Convection SchemePL: Dmitrii Mironov DWD 1,366 0,133 0,817 0,300 0,905 0,000 3,521

Tackle deficiencies in precipitation forecasts PL: M. Arpagaus MCH 0,550 0,650 0,450 0,400 0,400 0,800 3,250

Development of Short range ensemblePL: C.Marsigli ARPA_SIM 0,000 0,000 0,890 0,000 0,000 0,000 0,890

Advanced Interpretation of Lm outputPL: P. Eckert MCH 0,200 1,420 0,120 0,000 0,200 0,200 2,140

Implementation of an Extended Common Verification Suite - Conditional VerificationPL: A. Raspanti UGM 0,020 0,020 1,690 0,020 0,020 0,620 2,390

Totals 4,186 2,973 6,867 1,620 2,825 2,420 20,891

Page 14: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

 Evaluation at end of August 2007

Germany Swiss Italy Greece Poland RumeniaTOTAL

Support ActivitiesPL: U. Schaettler DWD 0,200 0,050 0,060 0,600 0,000 0,300 1,210

Retrievas for nudging: 1dVar for satellite radiancesP.L.: R. Hess 0,650 0,000 1,100 0,000 0,000 0,000 1,750

SIR: Sequential Importance Resampling filter PL: C. Schraff DWD              

Further development of LM_ZP.L.:U. Schaettler DWD 0,100 0,500 0,350 0,400 0,000 0,000 1,350

Further development of the Runge Kutta method PL: M. Baldauf DWD 0,400 0,110 1,040 0,000 0,000 0,000 1,550

UTCS: Towards Unified Turbulence-Shallow Convection SchemePL: Dmitrii Mironov DWD 0,400 0,000 0,033 0,133 0,139 0,000 0,705

Tackle deficiencies in precipitation forecasts PL: M. Arpagaus MCH 0,450 0,650 0,450 0,500 0,400 0,800 3,250

Development of Short range ensemblePL: C.Marsigli ARPA_SIM 0,000 0,000 1,220 0,500 0,000 0,000 1,720

Advanced Interpretation of Lm outputPL: P. Eckert MCH 0,100 1,210 0,010 0,000 0,200 0,200 1,720

Implementation of an Extended Common Verification Suite - Conditional VerificationPL: A. Raspanti UGM 0,020 0,020 1,390 0,000 0,020 0,740 2,190

Totals 2,32 2,54 5,65 2,13 0,76 2,04 15,45

Page 15: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

CO

SM

O P

rio

rity

Pro

ject

s

QPF

RK

LM_Z

1DVAR FOR SATELLITE DATA

SIR

SUPPORT ACTIVITIES – WG6

UTCS

INTERPRETATION/ Verif. VHR

SREPS

COMMON/CONDITIONAL VERIFICATION

2007 2008

GM GM

Re-designed following the outcome of the Brainstorming

UTCS

?

Page 16: Report from the Scientific Project Manager

Tuesday, September 18 (morning)

Description Name Time

Registration 08:30- 09:00

Opening General Meeting chaired by Ioannis Papageoriou  

Welcome address by the local organizer   09:00

Welcome by the chairman of the Steering Committee

Mathias Rotach  

Report from the Scientific Project Manager Tiziana Paccagnella ...-09:45

Invited Talk Chris Snyder 09:45- 10:30

Coffee near poster area (We need about 45 min to rearrange the main room) 10:30-11:15

Parallel Sessions: reporting

Working Group parallel sessions (see agenda of wg3, wg5) 10:50-13:00

Lunch 13:00-14:30

Tuesday, September 18 (afternoon)

Working Group parallel sessions (cont.) 14:30- 16:00

coffee near poster area 16.00-16:30

Projects parallel sessions 16:30- 18:30

Friday, September 21 (morning)

Planning Parallel Sessions

Working Group parallel sessions, Steering Committee Meeting 08:30-10:30

Coffee near poster area 10:30-11:00

Projects parallel sessions, Steering Committee Meeting 11:00-13:00

Lunch 13:00-14:30

Page 17: Report from the Scientific Project Manager

Tiziana [email protected]

COSMO GENERAl MEETING 2007Glyfada, Greece 18-21 September

Next steps to Projects definition: Projects formulated at the end of GM Commitments from STC members to project leaders

before October the 15th - The project leaders will interact directly with STC members as regards the allocation of FTEs on the different project tasks.

Page 18: Report from the Scientific Project Manager

Wednesday, September 19 (morning)

Current activities and plans of UKMO Clive Wilson 09:00-09:30

Current activities and plans of LACE Dijana Klariæ 09:30-10:00

Thanks to

Tuesday, September 18 (morning)

Invited Talk Chris Snyder 09:45- 10:30