COUNTY GOVERNMENT OF WAJIR Department of Roads, Transport and Public Works P.O Box 9    70200, Wajir County REPORT ON THE ASSESSMENTS OF ROAD CONDITIONS IN WAJI R SOUTH SUB-COUNTY COMPILED BY: ABDIRAHIM MOHAMED SENIOR SUPERINTEDING ENGINEER WAJIR SOUTH DATE: 29TH NOVEMBER,2015 Sign ............................................

Upload: abdirahim-mohamed

Post on 26-Feb-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 1/6

COUNTY GOVERNMENT OF WAJIR

Department of Roads, Transport and Public WorksP.O Box 9  –  70200, Wajir County

REPORT ON THE ASSESSMENTS OF ROAD CONDITIONS IN WAJIRSOUTH SUB-COUNTY

COMPILED BY:

ABDIRAHIM MOHAMED

SENIOR SUPERINTEDING ENGINEER

WAJIR SOUTH

DATE: 29TH NOVEMBER,2015

Sign ............................................

Page 2: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 2/6

Page 3: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 3/6

  This has negatively impacted on the economy of the county as a whole.

.

Large trucks including The county government vehicles are seen stuck in the

mud.

(Wajir county Low loader even wasn't spared by the mud ) These challenges have made the county unattractive to investors who rely

mostly on good road network.

Objective of the report

  Identify The Most Critical roads that require urgent attention

Page 4: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 4/6

RESULT

LOCATION ROAD CONDITION RECOMMENDATION

Qanjara - Habaswein The road just outsideqanjara town towardshabaswin is in bad

condition. approximately3km section is flooded. The section is currentlyimpassable.

3KM Gravel spot Fillingincluding provision ofside drains

Dilmanyale- Abakore Approximately 2kmsection of the road isflooded with a lot of bigdepressions. Alot

2km Gravel spot Fillings

Mathax Libax The main road entering

the town from Laghboqolis completely cut off.

Approximately 2km ofthe existing gravel hasbeen washed out

2 Km gravelling and

proper side darins andmeter drains

Abaqkore Town The main Road in thetown completely coveredwith water. The stagnant

water is producing badsmell and also is abreeding ground forMosquitoes

1.5KM

ABAKORE-SARIF The Road is relatively in

good condition

N/A

SARIF - DADAJABULLA The road is the most

affected during the rainyseason, this is due to the

black cotton soil. Themost affected part issarif - Hatle Road , but

in general the whole roadis in bad condition

25KM

DIIF- AGTALEHEL The road is in poorcondition, the road was

completely closed formore than two weeks The Road is sub-dividedinto Agtalehel- Abaq finRoad and Abaq Halul -Hara Road

15KM

DIIF - ALIO ISMAIL Approximately 50 mstream passes across theroad even at the slightest 60M

Page 5: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 5/6

drop of rain

GULED DERE-

AMBALASH

 The road section is very

narrow due to heavybushes . A lot of sharpcorners that can cause

head-on collision.

35KM

Hubsoy Town The existing drift has

failed because of overtopping and seepage ofwater under the drift.

A new 60 m drift and

provision of side drainsfor the existing gravel 2km approach and exit tothe drift

Dilmanyale Town A lot of sag and crests

curves along the verticalprofile of the road.

 This has createdcatchment areasespecially on the sagareas of the road.Stagnant water along thecarriageway and also theside drains createsbreeding grounds formosquitoes.

1.k KM of Cut and Fill

and provision of sidedrains .

Gravel Spot filling of1km

Habaswein- Uthole Road The road has alot of

depression points thatform catchment areasand ponds.

Approximately 2k Gravel

Spot Filling

Laga Dima The existing drift has

structurally failed andhas now created a newoutlet channel for thestream.

 The section is completelyimpassable during heavyrains due to the highvelocity of the runningwater.

60km Drift , demolition

of the existing drift.

Embankment especiallyat the approach and exit.

Gabions at the inlet andoutlet

Arablow The main road hasapproximately 2km

section that is in poorcondition. Alot ofpotholes and rutting can

be seen.

2km Gravelling

Page 6: Report on Road Assesment  for wajir south sub county 2015 to 2016

7/25/2019 Report on Road Assesment for wajir south sub county 2015 to 2016

http://slidepdf.com/reader/full/report-on-road-assesment-for-wajir-south-sub-county-2015-to-2016 6/6

CONCLUSION

 The road conditions in wajir south sub-county are generally alarmingconsidering the vital role these roads play in contributing to the economy ofwajir county. Urgent and critical action need to be taken to salvage theseroads.