report on technical board (sept. 2013) taketo uomoto chairman of tb

12
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Upload: marshall-powers

Post on 20-Jan-2018

214 views

Category:

Documents


0 download

DESCRIPTION

Technical Board ICCMC Working Groups of WG1, WG2 and WG3 is transformed to Technical Committees TC1, TC2 and TC3, respectively. There can be more TCs in the future when necessary. The ACF Technical Board (TB) consists of VP for Technical, Chairs of all TCs and one elected EC member who is an individual member.

TRANSCRIPT

Page 1: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Report on Technical Board(Sept. 2013)

Taketo UomotoChairman of TB

Page 2: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Works of TB and TC

• Technical board was not opened.• Three Technical committees have done

their works as scheduled and the details of the TC will be explained by three chairmen.

• The works are (a) revision of ACMC 2006 and (b) drafting of Level 3 documents, (c) statistical data servay.

• The final meeting of TB will be held on Sept. 11, 2013.

1st Technical Board meeting was in October 2012 in Thailand.

New STC among young researchers have been established after EC approved through e-mail discussion. 1st report will be made at TB meeting on 11th September.

Page 3: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Technical Board

• ICCMC Working Groups of WG1, WG2 and WG3 is transformed to Technical Committees TC1, TC2 and TC3, respectively.

• There can be more TCs in the future when necessary.

• The ACF Technical Board (TB) consists of VP for Technical, Chairs of all TCs and one elected EC member who is an individual member.

Page 4: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Members of Technical Board

• Members of technical board is composed by 4 categories.

• 1) Vice-president (technical) • 2) Chairmen of technical committees

(elected 3 chairmen)• 3) Chairman of the Editorial Committee• 4) Elected chairman of Technical Board Total of 6 members

Editorial Committee Chair was also elected.

Page 5: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Works of TB

• Technical Board or TB takes care of technical matters with TC (Technical Committee)

• TB will coordinate problems in different TCs when needed.

• TC will coordinate problems in different STCs when needed.

• New (STC) Sub-Technical Committee may be formed under each TC.

Page 6: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Relations of TB and TC

TechnicalBoard(TB)

TC1

TC3

TC4

TC2

STC11

STC12

(ACMC: design)

(level 3 documents)

STC21

STC22

(ACMC: construction)

(level 3 documents)

STC31

STC32

(ACMC: maintenance)

(level 3 documents)

STC41

STC42

(statistical data)

(??)

STC11, STC21 and STC31 will take a care of ACMC and level 3 documents like ICCMC’s WG1, WG2 and WG3.

STC12, STC22 and STC32 can deal with any issue other than ACMC/level 3. For every issue new STC may be created.

For works on statistical survey a body other than TC is formed (see the next slide)

Page 7: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB
Page 8: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Technical Board and Committee

• Chairman of TB may convene meetings as deemed necessary with a minimum of one meeting per year.

• Chairman of TC may convene meetings as deemed necessary with a minimum of one meeting per year.

• When difficult to meet, simplified meetings can be used through internet. Meeting through e-mails is acceptable.

Page 9: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Revision Plan of ACMCTime Frame Task

November - May 2013 TC’s draft (including drafting, circulating for comments and revision)

End of May 2013 Drafts of the revised ACMC submitted to VP (of Technical)

June 2013 Comments from TB

July 2013 Revise based on TB’s comments

August 2013 TB and EC approval

September - October 2013

Editorial Committee check

By the end of 2013(November 2013)

Publish ACMC2013

(DATA: Minutes of P&VP Meeting, April, 2013)

Page 10: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Level 3 Document

• Level 3 Document “Thailand Standard” which was presented in the previous meeting will be discussed in the last meeting.

→ “Thailand Standard for Materials and Construction – Guidelines for materials and construction of concrete structures based on Thai Standard specification” .

Masaki san knows the latest situation better than me.

Page 11: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Sub-Technical Committee (STC)

• New sub-technical committee shall be proposed by a group of members on any specified topic.

• Chairman of the STC must be approved by the TC and TB, and confirmed by EC.

• The activities of STC should be completed within a 3-year time period. The term may be extended with maximum of 2-years.

Page 12: Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

STC of Technical Committees• TC1: Design

– STC11: ACMC revision, etc.– STC12: Level 3 documents

• TC2: Materials and Construction– STC21: ACMC revision, etc.– STC22: Level 3 documents

• TC3: Maintenance– STC31: ACMC revision, etc.– STC32: Level 3 documents, etc.

• TC4: Statistical Data– STC41: Materials and production

Two new STC has been proposed by JCI will be discussed at TB meeting on 11th September.One new STC may be proposed by KCI.