republika e kosovës republika kosova ... - migracije.orgmigracije.org/files/2011, vlada rk, akcioni...

25
PLANI I VEPRIMIT PËR ZBATIMIN E STRATEGJISË PËR RIINTEGRIMIN E PERSONAVE TË RIATDHESUAR AKCIONI PLAN ZA SPORVOGJENJE STRATEGIJE ZA REINTEGRACIJU REPATRIRANIH LICA ACTION PLAN IMPLEMENTING THE STRATEGY FOR REINTEGRATION OF REPATRIATED PERSONS Republika e Kosovës Republika Kosova-Republic of Kosovo Qeveria - Vlada – Government

Upload: phungkhue

Post on 04-Jun-2018

252 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

PLANI I VEPRIMIT PËR ZBATIMIN E STRATEGJISË PËR RIINTEGRIMIN E PERSONAVE TË RIATDHESUAR

AKCIONI PLAN ZA SPORVOGJENJE STRATEGIJE ZA REINTEGRACIJU REPATRIRANIH LICA

ACTION PLAN

IMPLEMENTING THE STRATEGY FOR REINTEGRATION OF REPATRIATED PERSONS

Republika e Kosovës Republika Kosova-Republic of Kosovo

Qeveria - Vlada – Government

Page 2: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

2

Content

LEGAL FRAMEWORK 1. Implementation of the legal framework in the field of migration, reintegration and

repatriation in accordance with the international law and Acquis communautaire….....………………………………3 INSTITUTIONAL CAPACITY

2. Institutional and human resources capacity building…...............……………………….…………………………………5 INSTITUTIONAL COMMUNICATION AND COORDINATION

3. Establishing institutional communication and coordination – sharing information before and after arrival...………8 GUARANTEED SERVICES

4. Providing services in accordance with applicable legislation in the field of reintegration............................................................10 SUSTAINABLE REINTEGRATION

5. Achievement of sustainable reintegration...............................................................................................................................12 MANAGEMENT AND ADMINISTRATION OF THE FUND

6. Monitoring and assessment of implementation of the Strategy through coordination and control of activities.........17 MONITORING AND CONTROL

7. Monitoring and assessment of implementation of the Strategy through coordination and control of activities.........22

Page 3: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

Introduction Reintegration of repatriated persons is among various challenges that Kosovo society and institutions have been faced with before the war as well as after the war. Number of Kosovans who left Kosovo before, during and after the war was a considerable number and as a consequence the number of repatriated persons was considerable as well. The repatriation process in itself was proved not to be a significant problem but it has proven that the difficult work was related to the reintegration of these persons in the Kosovo society. Therefore, the need to strengthen this process was evident and measures to do so have been taken by the government officials. As a result Kosovo government has assessed the reintegration mechanism and has drafted general and specific recommendations how to improve the situation. Among key recommendations was revising the national strategy on reintegration of repatriated persons, drafting an action plan to implement the strategy, establishing a fund to support reintegration of repatriated persons, to increase the capacities of the central and local institutions as well as to improve the exchange of communications with the requesting countries. Government of Kosovo has approved the Strategy for Reintegration of Repatriated Persons and has appointed a task force to draft this action plan to implement reintegration of repatriated persons strategy, it has created a fund that will support the reintegration in the next months and years, in this regard 300 000 Euros have been already transferred to the fund and an additional 200 000 is expected to be transferred to cover needs of repatriated persons for the remaining months of 2010, however plans are been drown to secure the full amount as estimated by this plan as well as to engage the donor community to support us in this regard. A coordination mechanism at the central level has been established and made functional; each relevant ministry has appointed a staff member in charge of coordinating the whole process. On 4th of August a regulation on establishing Municipal offices for Communities and Return have been approved, this regulation establishes these offices and makes them responsible for coordination of the reintegration of repatriated persons. To make them functional MALG with the OSCE support has started a training program for these officials. First set of training is taking place and a follow-up needs assessment will be conducted.

Page 4: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

4

It’s worth highlighting that this action plan is a living document that will be revised when necessary. The methodology used to draft this plan was a participatory one, all relevant government institutions and international organizations that are operating in Kosovo were engaged and consulted furthermore close working relationship was ensured with the ECLO and its supporting projects. An estimation of roughly 5000 persons to be repatriated was the basis of this plan and as a result it was estimated that that 200 families (of 5 members) might need shelter for up to 6 months, 5000 persons will benefit roughly 43 euro for medical services while it was estimated that about ten of them will need treatment abroad, this is estimated at about 10 000 euros per person while 20 persons is estimated that will require approx 5000 euro medications per person. It has been foreseen that in average about 400-500 repatriated persons will benefit from the social scheme and pension scheme. This plan also foresees that about 300 repatriated persons will be enrolled in vocational training programs as well as the estimated number of persons employed or families supported through employment schemes and grants (through project proposals) will be around 200 families. Another forecast was taken with regards to construction of two 400,000.00 euro social housing buildings for 40 families and 30 housing units to be reconstructed per annum while rent subsidy to be provided for about 50 families. As stated above these and other estimations are done on the basis of statistics from previous years and we foresee that this number might slightly vary and that we will monitor the developments constantly and take necessary actions accordingly. Last but not least, we aim at improving our cooperation with requesting states and not only in the readmission process but as well in the reintegration of repatriated persons through migration partnerships and return assistance partnership.

Page 5: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

LEGAL FRAMEWORK

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME MEASURABLE INDICATORS

INDICATOR SOURCES

INSTITUTION RESPONSIBLE

COOPERATING

INSTITUTION

TIME LIMITS

APPROXIMATE FINANCIAL

COST

1 Implementation of the legal framework in the field of migration, reintegration and

repatriation in accordance with the international law and Acquis communautaire

1.1. Continuous review of relevant legislation in accordance with developments of the international law and Acquis Communitare

Regular review of legislation in accordance with EU standards and international law

compliance of national law is verified by MEI

Reporting to Inter-Ministerial Coordination Board as well as experts reports

Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR)

MEI, Office of Prime Minister,

In continuation

1.2. Designation of the ministries on necessary amendments to applicable legislation.

Ministries are notified on regular basis on the needs for amendments

Reference Ministries

Periodic reporting of ministries, Government reporting to Assembly

Office of Prime Minister

In continuation

1.3. Drafting and approval of required legislation

Legal laws necessary are drafted and approved

Approval by Assembly

Official Gazette

All institutions involved, Government, Assembly

All institutions involved

In continuation

Page 6: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

6

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME MEASURABLE INDICATORS

INDICATOR SOURCES

INSTITUTION RESPONSIBLE

COOPERATING

INSTITUTION

TIME LIMITS

APPROXIMATE FINANCIAL

COST

1.4. Drafting of sub-legal acts in accordance with the applicable legislation.

Sub-legal acts drafted

Approval by relevant ministers

Experts reporting

Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR)

In continuation

Page 7: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

7

INSTITUTIONAL CAPACITY

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME MEASURABLE INDICATORS

INDICATOR SOURCES

INSTITUTION RESPONSIBLE

COOPERATING

INSTITUTION

TIME LIMITS

APPROXIMATE FINANCIAL

COST

2. Institutional and human resources capacity building

2.1. Assessment of current organizational structure and existing human resources

Assessment concluded

Assessment presented to the Board

Reporting Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR, Municipalities)

OPM, MPA

Q4 2010

2.2. Establishment of Inter-Ministerial Coordination Board Secretariat with a Government’s Decision

Secretariat established

Secretariat operational and duties defined

Government’s Decision on establishing Secretariat

Government Inter-Ministerial Coordination Board

Q3 2010

2.3. According to assessment results under 2.1, responsibilities, functions and operational procedures

relevant job and procedure descriptions defined for

Relevant institutions notified on their duties

Reporting to Board

Government, Inter-Ministerial Coordination Board and

All institutions involved

Q4 2010

Page 8: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

8

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME MEASURABLE INDICATORS

INDICATOR SOURCES

INSTITUTION RESPONSIBLE

COOPERATING

INSTITUTION

TIME LIMITS

APPROXIMATE FINANCIAL

COST

of the players involved in reintegration shall be determined

all stakeholders

Municipalities

2.4. Needs assessment for training and capacity building

Assessment concluded

Assessment discussed in the Board

Reporting Inter-Ministerial Coordination Board

All institutions involved

Q1 2011

2.5. Development of training curricula for officers training dealing with reintegration issues

Curriculum development concluded

Discussed in Board

Reporting Inter-Ministerial Coordination Board -Secretariat

All institutions involved

Q4 2010-2011

2.6. Officers training dealing with reintegration issues

Officers trained

Number of officers trained

Reporting, training assessment forms

Relevant institutions and experts

All institutions involved

Q2 2011-Q4 2011

15,000.00

2.7. Provision of technical equipment and required space for work

Technical equipment and working space operational

Offices determined

Reporting All institutions involved

In continuation

20,000.00

Page 9: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

9

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME MEASURABLE INDICATORS

INDICATOR SOURCES

INSTITUTION RESPONSIBLE

COOPERATING

INSTITUTION

TIME LIMITS

APPROXIMATE FINANCIAL

COST

2.8. Opening of the office at the airport for registration (evidencing) and information of repatriated persons under the supervision of DCAM

Airport office operational

Duties determined Office staffed and operational, regular reports

Reporting to theBoard

Inter-Ministerial Coordination Board

Q4 2010 50,000.00

Page 10: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

10

INSTITUTIONAL COMMUNICATION AND COORDINATION

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

3. Establishing institutional communication and coordination – sharing information before and after arrival

3.1. Drafting a regulation on information sharing and inter-institutional coordination of actions for reintegration, involving local authorities and civil society

Regulation drafted, duties and responsibilities determined

Sharing information (correspondence), notes and requirements in the database according to regulation

Entry of cases in the database

Inter-Ministerial Coordination Board

All institutions involved, local authorities and civil society

Q4 2010

3.2. Establishing points of contacts withresponsible institution and defining their tasks in line with 2.3

Persons as contact points established and duties defined

Duties and activities performed.

List of contact points, job description and reports of the activities presented to

Inter-Ministerial Coordination Board

All institutions involved

Q3 2010

Page 11: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

11

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

the Board. 3.3. Establishing a joint electronic platform on the data of persons in the reintegration process

Database operational

Cases and requests managed and entered into the database

Database reports

MIA, MLGA, MPA

MESP, MEST, MH, MLSW, Municipalities

Q4 2010 30,000.00

Page 12: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

12

GUARANTEED SERVICES

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

4. Providing services in accordance with applicable legislation in the field of reintegration

4.1. Drafting and publishing informative leaflets for repatriated persons

Published leaflets

Designed leaflets

No of distributed leaflets

Inter-Ministerial Coordination Board

All relevant institutions

Q4 2010

4.2. Publication of information on reintegration support in the official website for the benefit of returnees and officials dealing with repatriation and reintegration process, including relevant interesting organizations.

Information uploaded in the website

Regular input by ministries Number of consultations of webpage

Updated webpage and the number of reports using information from the webpage

All institutions involved and coordinated by MIA

In continuation

4.3. Assistance the moment of arrival at Prishtina Airport and at the border crossing points

Assistance provided

No of cases assisted

Reports to the Board

MIA,MLSW MH, MLGA, Municipalities

In continuation

Page 13: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

13

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

4.4. Provision of transportation services and of temporary shelter and emergency medical assistance

Services provided

Number of requests received for the provision of transportation services and of temporary shelter and emergency medical assistance.

Reporting Inter-Ministerial Coordination Board

All institutions involved

In continuation

100,000.00 MLSW 88,000.00 to MH

4.5. Sheltering repatriated persons up to 6 (six) months in subsidized accommodation.

Persons sheltered

Number of families sheltered for up to 6 months

Reporting Inter-Ministerial Coordination Board

Municipalities, MLGA, MIA - Fund

In continuation

180,000.00 euro

Page 14: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

14

SUSTAINABLE REINTEGRATION

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

5. Achievement of sustainable reintegration

5.1. Legal reintegration through equipping repatriated persons with personal documents.

Equipping repatriated persons with personal documents

No of repatriated persons versus the number of repatriated persons equipped with personal documents

Reporting arrangements between MIA/DCAM and MIA/CRU

MIA Municipalities

In continuation

5.2. Facilitating the access to health care services.

Provision of health services to repatriated persons

Number of requests received and health care services provided

Regular Reporting

MH Municipalities

In continuation

440,000.00

5.3. Facilitating the access to

Provision of access to the

No of repatriated

Regular Reporting

MEST Municipalities

In continu

Page 15: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

15

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

public educational system at all levels (including persons pending registration)

public education system

persons registered in the public educational system

ation

5.4. Developing curricula for language training for those pupils/students in need of

curricula for language training developed

Developed curricula is used in practice

Regular reporting

MEST Municipalities

K4 2010 15,000.00

5.5. Training for teachers to facilitate psychosocial and acclimatization assistance to repatriated children

Training concluded

number of teachers trained

Regular Reporting

MEST Municipalities

In continuation

66,150.00

5.6. Organization of courses for educational language for repatriated students

Educational language courses for repatriated students conducted

number of students attending courses

Regular reporting

MEST Municipalities

In continuation

100,000.00

5.7. Assistance for continuation of studies started abroad.

Studies continued

No of repatriated students

Regular reporting

MEST In continuation

Page 16: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

16

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

continuing their studies

5.8. Equivalenting – Nostrification of certificates and diplomas (government decision issued, released from fees)

Decision issued

No of equivalenting and nostrification of diplomas

Reporting to the Board

MEST In continuation

5.9. Enrolment of repatriated persons on social schemes and family payment schemes in accordance with the applicable legislation

Repatriated persons enrolled.

Number of repatriated persons benefiting from the social schemes.

Reporting to the Board

MLSW Municipalities

In continuation

600, 000.00

5.10. Provision of employment services through active and passive policies of the labor market

Services provided

No of persons included in employment.

Regular reporting

MLSW, MEST

Municipalities, MTI

In continuation

10,000.00

5.11. Qualification and

Vocational trainings

No of persons

Regular reportin

MLSW, MEST

Municipalities

In continu

240,000.00

Page 17: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

17

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

requalification of repatriated persons by vocational training programs

provided enrolled in vocational training programs

ation

5.12. Employment of repatriated through special programs and projects

Special programs and projects implemented

Number of persons employed or families supported through employment schemes and grants (through project proposals)

Regular reporting

Inter-Ministerial Coordination Board,

Donors, Municipalities, MEST, MTI, MLSW

In continuation

400,000.00

5.13. Securing housing for repatriated families possessing no land, by building apartment buildings for non-profit rent in relevant municipalities

Housing ensured

Number of people accommodated

Regular reporting

Municipalities, Inter-Ministerial Board

MESP,MLGA,MIA,MEF

In continuation

800,000.00 euro.

5.14. Housing Number of Regular Inter- Donors, In 30,000.00

Page 18: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

18

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

Securing housing through rent subsidy programs in the rental buildings of the bonus housing market (according to the law in force)

through subsidies ensured

people accommodated

reporting Ministerial Coordination Board

MCR, Municipalities, MESP ,MLGA, MIA,MEF

continuation

5.15. Assistance in houses reconstruction for repatriated families possessing own land according the given criteria

Assistance in reconstruction provided

Number of people benefiting from this scheme

Regular reporting

Inter-Ministerial Coordination Board

Donors, all institutions involved, Municipalities,

In continuation

380,000.00

5.16. Review the possibility of using property for repatriated persons under Kosovo Property Agency (KPA) administration

Decision concluded

Negotiations and modalities identified

Reporting by relevant instutions

KPA, Inter-Ministerial Coordination Board

In continuation

Page 19: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

19

MANAGEMENT AND ADMINISTRATION OF THE FUND

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

6. Administration, determination and implementation of fund priorities in accordance with the applicable legislation and donor rules

6.1. Administration of fund efficiently and in accordance with fund priorities.

Management function is defined and acts in support to reintegration fund (RF) priorities.

Reporting Inter-Ministerial Coordination Board

All institutions involved

In continuation

6.1. Fund administration efficiently and in accordance with fund priorities.

6.1.1. Identification of structure and defining responsible authority for administration of reintegration fund.

Instructions, rules of procedures defined

Reporting to Board

Inter-Ministerial Coordination Board

All Q32010

6.1.2. Designing a guideline and internal regulations (operational) for FR management (including

Secretariat, OPM

All institutions involved

Q32010

Page 20: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

20

compliance of project costs with EU standards) 6.2. Determination of finance and fund provision

Requests and co-funding

Regulation consultations with the stakeholders involved in the reintegration, beneficiaries and donors.

Reporting Inter-Ministerial Coordination Board

Relevant stakeholders and donors

Q4 2010

6.2.1 Determination of fund financial contribution for each service sector in percentage. (for instance) (x% education , x% employment, etc)

MIA All institutions involved

In continuation

6.2.2 To set out percentage of financial participation by the national budget and external funds.

Inter-Ministerial Coordination Board

MIA, MEF

Q42010 - In continuation

6.2.3 Needs assessment and costs which may occur.

Inter-Ministerial Coordination Board

In continuation

6.2.4 To search for the requirements and needs

Secretariat of Board

All institutions

In continuation

Page 21: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

21

(technical and material) and donor priorities for funds.

involved

6.3. Determination of priorities of fund contributions.

Inter-Ministerial Coordination Board

All institutions involved

In continuation

6.3.1. To define priority groups based on specific criteria and adjust the services to be provided.

Reporting to Board (relevant national and international institutions)

Ministries, Municipalities and Board

Secretariat

Q3 2010

6.3.2. To establish criteria in conformity with urgent needs for calls of projects according to priority issues.

Ministries, Municipalities and Board

Q3 2010

6.4. Implementation of fund priorities in compliance with the applicable legislation and donor rules.

Identified projects and functional management

Number of project proposals and grants

Audit reports

All institutions involved

In continuation

6.4.1 Determination of qualification criteria for

Inter-Ministerial Coordinatio

MIA, Secretariat and

Q42010

Page 22: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

22

applications, their partner and project-proposals.

n Board Board

6.4.2 Administration of project implementation in order that control and audit are carried out in accordance with the applicable legislation regarding procurement procedures and financial regulations.

Inter-Ministerial Coordination Board

All responsible institutions

In continuation

6.5. Information to potential beneficiaries and public wide

Information and visible material

Number of requests deriving from the local level or civil servants

Inter-Ministerial Coordination Board

In continuation

6.5.1. To inform the Municipalities and potential project beneficiaries.

Secretariat/ Inter-Ministerial Coordination Board

In continuation

6.5.2. To develop visible policy and instrument for instance, logo, leaflets.

Inter-Ministerial Coordination Board

Secretariat/

Q4/2010

6.5.3. Public information on implementation of the

Inter-Ministerial Coordinatio

Secretariat /

In continuation

Page 23: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

23

Reintegration Fund n Board

Page 24: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

24

MONITORING AND CONTROL

SPECIFIC OBJECTIVES

ACTIVITIES EXPECTED

OUTCOME

MEASURABLE

INDICATORS

INDICATOR SOURCES

INSTITUTION

RESPONSIBLE

COOPERATING INSTITUTION

TIME LIMITS

APPROXIMATE

FINANCIAL COST

7. Monitoring and assessment of implementation of the Strategy through coordination and control of activities

7.1 Activities focused in proper implementation of the strategy particularly in the local level.

Inter-Ministerial Coordination Board

All relevant ministries

In continuation

7.2 Regular monthly reports by relevant Ministries towards Board on the actions concluded

Regular reports

No of reports

Reports to the Board

All relevant ministries

In continuation

7.3 Regular monthly reports by competent municipal officials to Secretariat

Regular reports

No of reports

Reports to Secretariat

Municipalities

In continuation

7.4 Regular periodic report to the Government

Regular reports

No of reports

Reports to the Government

Inter-Ministerial Coordination Board

In continuation

7.5 Identification and

Obstacles identified

Continuous

Reporting Inter-Ministerial

All relevan

In continu

Page 25: Republika e Kosovës Republika Kosova ... - migracije.orgmigracije.org/files/2011, Vlada RK, Akcioni plan za sprovodjenje... · Introduction Reintegration of repatriated persons is

ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS

25

elimination of obstacles in implementation of Action Plan for implementing Strategy on Reintegration of Repatriated Persons

and eliminated

implementation of action plan, assessed and analyzed

Coordination Board

t ministries

ation

7.6 Organization of meetings (Periodic and ad-hoc)

Meetings organized

No of organized meetings

Reports Analysis and Results

Inter-Ministerial Coordination Board

In continuation