republika e kosovës republika kosova ... - migracije.orgmigracije.org/files/2011, vlada rk, akcioni...
TRANSCRIPT
PLANI I VEPRIMIT PËR ZBATIMIN E STRATEGJISË PËR RIINTEGRIMIN E PERSONAVE TË RIATDHESUAR
AKCIONI PLAN ZA SPORVOGJENJE STRATEGIJE ZA REINTEGRACIJU REPATRIRANIH LICA
ACTION PLAN
IMPLEMENTING THE STRATEGY FOR REINTEGRATION OF REPATRIATED PERSONS
Republika e Kosovës Republika Kosova-Republic of Kosovo
Qeveria - Vlada – Government
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
2
Content
LEGAL FRAMEWORK 1. Implementation of the legal framework in the field of migration, reintegration and
repatriation in accordance with the international law and Acquis communautaire….....………………………………3 INSTITUTIONAL CAPACITY
2. Institutional and human resources capacity building…...............……………………….…………………………………5 INSTITUTIONAL COMMUNICATION AND COORDINATION
3. Establishing institutional communication and coordination – sharing information before and after arrival...………8 GUARANTEED SERVICES
4. Providing services in accordance with applicable legislation in the field of reintegration............................................................10 SUSTAINABLE REINTEGRATION
5. Achievement of sustainable reintegration...............................................................................................................................12 MANAGEMENT AND ADMINISTRATION OF THE FUND
6. Monitoring and assessment of implementation of the Strategy through coordination and control of activities.........17 MONITORING AND CONTROL
7. Monitoring and assessment of implementation of the Strategy through coordination and control of activities.........22
Introduction Reintegration of repatriated persons is among various challenges that Kosovo society and institutions have been faced with before the war as well as after the war. Number of Kosovans who left Kosovo before, during and after the war was a considerable number and as a consequence the number of repatriated persons was considerable as well. The repatriation process in itself was proved not to be a significant problem but it has proven that the difficult work was related to the reintegration of these persons in the Kosovo society. Therefore, the need to strengthen this process was evident and measures to do so have been taken by the government officials. As a result Kosovo government has assessed the reintegration mechanism and has drafted general and specific recommendations how to improve the situation. Among key recommendations was revising the national strategy on reintegration of repatriated persons, drafting an action plan to implement the strategy, establishing a fund to support reintegration of repatriated persons, to increase the capacities of the central and local institutions as well as to improve the exchange of communications with the requesting countries. Government of Kosovo has approved the Strategy for Reintegration of Repatriated Persons and has appointed a task force to draft this action plan to implement reintegration of repatriated persons strategy, it has created a fund that will support the reintegration in the next months and years, in this regard 300 000 Euros have been already transferred to the fund and an additional 200 000 is expected to be transferred to cover needs of repatriated persons for the remaining months of 2010, however plans are been drown to secure the full amount as estimated by this plan as well as to engage the donor community to support us in this regard. A coordination mechanism at the central level has been established and made functional; each relevant ministry has appointed a staff member in charge of coordinating the whole process. On 4th of August a regulation on establishing Municipal offices for Communities and Return have been approved, this regulation establishes these offices and makes them responsible for coordination of the reintegration of repatriated persons. To make them functional MALG with the OSCE support has started a training program for these officials. First set of training is taking place and a follow-up needs assessment will be conducted.
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
4
It’s worth highlighting that this action plan is a living document that will be revised when necessary. The methodology used to draft this plan was a participatory one, all relevant government institutions and international organizations that are operating in Kosovo were engaged and consulted furthermore close working relationship was ensured with the ECLO and its supporting projects. An estimation of roughly 5000 persons to be repatriated was the basis of this plan and as a result it was estimated that that 200 families (of 5 members) might need shelter for up to 6 months, 5000 persons will benefit roughly 43 euro for medical services while it was estimated that about ten of them will need treatment abroad, this is estimated at about 10 000 euros per person while 20 persons is estimated that will require approx 5000 euro medications per person. It has been foreseen that in average about 400-500 repatriated persons will benefit from the social scheme and pension scheme. This plan also foresees that about 300 repatriated persons will be enrolled in vocational training programs as well as the estimated number of persons employed or families supported through employment schemes and grants (through project proposals) will be around 200 families. Another forecast was taken with regards to construction of two 400,000.00 euro social housing buildings for 40 families and 30 housing units to be reconstructed per annum while rent subsidy to be provided for about 50 families. As stated above these and other estimations are done on the basis of statistics from previous years and we foresee that this number might slightly vary and that we will monitor the developments constantly and take necessary actions accordingly. Last but not least, we aim at improving our cooperation with requesting states and not only in the readmission process but as well in the reintegration of repatriated persons through migration partnerships and return assistance partnership.
LEGAL FRAMEWORK
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME MEASURABLE INDICATORS
INDICATOR SOURCES
INSTITUTION RESPONSIBLE
COOPERATING
INSTITUTION
TIME LIMITS
APPROXIMATE FINANCIAL
COST
1 Implementation of the legal framework in the field of migration, reintegration and
repatriation in accordance with the international law and Acquis communautaire
1.1. Continuous review of relevant legislation in accordance with developments of the international law and Acquis Communitare
Regular review of legislation in accordance with EU standards and international law
compliance of national law is verified by MEI
Reporting to Inter-Ministerial Coordination Board as well as experts reports
Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR)
MEI, Office of Prime Minister,
In continuation
1.2. Designation of the ministries on necessary amendments to applicable legislation.
Ministries are notified on regular basis on the needs for amendments
Reference Ministries
Periodic reporting of ministries, Government reporting to Assembly
Office of Prime Minister
In continuation
1.3. Drafting and approval of required legislation
Legal laws necessary are drafted and approved
Approval by Assembly
Official Gazette
All institutions involved, Government, Assembly
All institutions involved
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
6
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME MEASURABLE INDICATORS
INDICATOR SOURCES
INSTITUTION RESPONSIBLE
COOPERATING
INSTITUTION
TIME LIMITS
APPROXIMATE FINANCIAL
COST
1.4. Drafting of sub-legal acts in accordance with the applicable legislation.
Sub-legal acts drafted
Approval by relevant ministers
Experts reporting
Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR)
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
7
INSTITUTIONAL CAPACITY
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME MEASURABLE INDICATORS
INDICATOR SOURCES
INSTITUTION RESPONSIBLE
COOPERATING
INSTITUTION
TIME LIMITS
APPROXIMATE FINANCIAL
COST
2. Institutional and human resources capacity building
2.1. Assessment of current organizational structure and existing human resources
Assessment concluded
Assessment presented to the Board
Reporting Relevant institutions (MIA, MEST, MLSW, MESP, MLGA, MH, MCR, Municipalities)
OPM, MPA
Q4 2010
2.2. Establishment of Inter-Ministerial Coordination Board Secretariat with a Government’s Decision
Secretariat established
Secretariat operational and duties defined
Government’s Decision on establishing Secretariat
Government Inter-Ministerial Coordination Board
Q3 2010
2.3. According to assessment results under 2.1, responsibilities, functions and operational procedures
relevant job and procedure descriptions defined for
Relevant institutions notified on their duties
Reporting to Board
Government, Inter-Ministerial Coordination Board and
All institutions involved
Q4 2010
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
8
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME MEASURABLE INDICATORS
INDICATOR SOURCES
INSTITUTION RESPONSIBLE
COOPERATING
INSTITUTION
TIME LIMITS
APPROXIMATE FINANCIAL
COST
of the players involved in reintegration shall be determined
all stakeholders
Municipalities
2.4. Needs assessment for training and capacity building
Assessment concluded
Assessment discussed in the Board
Reporting Inter-Ministerial Coordination Board
All institutions involved
Q1 2011
2.5. Development of training curricula for officers training dealing with reintegration issues
Curriculum development concluded
Discussed in Board
Reporting Inter-Ministerial Coordination Board -Secretariat
All institutions involved
Q4 2010-2011
2.6. Officers training dealing with reintegration issues
Officers trained
Number of officers trained
Reporting, training assessment forms
Relevant institutions and experts
All institutions involved
Q2 2011-Q4 2011
15,000.00
2.7. Provision of technical equipment and required space for work
Technical equipment and working space operational
Offices determined
Reporting All institutions involved
In continuation
20,000.00
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
9
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME MEASURABLE INDICATORS
INDICATOR SOURCES
INSTITUTION RESPONSIBLE
COOPERATING
INSTITUTION
TIME LIMITS
APPROXIMATE FINANCIAL
COST
2.8. Opening of the office at the airport for registration (evidencing) and information of repatriated persons under the supervision of DCAM
Airport office operational
Duties determined Office staffed and operational, regular reports
Reporting to theBoard
Inter-Ministerial Coordination Board
Q4 2010 50,000.00
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
10
INSTITUTIONAL COMMUNICATION AND COORDINATION
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
3. Establishing institutional communication and coordination – sharing information before and after arrival
3.1. Drafting a regulation on information sharing and inter-institutional coordination of actions for reintegration, involving local authorities and civil society
Regulation drafted, duties and responsibilities determined
Sharing information (correspondence), notes and requirements in the database according to regulation
Entry of cases in the database
Inter-Ministerial Coordination Board
All institutions involved, local authorities and civil society
Q4 2010
3.2. Establishing points of contacts withresponsible institution and defining their tasks in line with 2.3
Persons as contact points established and duties defined
Duties and activities performed.
List of contact points, job description and reports of the activities presented to
Inter-Ministerial Coordination Board
All institutions involved
Q3 2010
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
11
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
the Board. 3.3. Establishing a joint electronic platform on the data of persons in the reintegration process
Database operational
Cases and requests managed and entered into the database
Database reports
MIA, MLGA, MPA
MESP, MEST, MH, MLSW, Municipalities
Q4 2010 30,000.00
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
12
GUARANTEED SERVICES
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
4. Providing services in accordance with applicable legislation in the field of reintegration
4.1. Drafting and publishing informative leaflets for repatriated persons
Published leaflets
Designed leaflets
No of distributed leaflets
Inter-Ministerial Coordination Board
All relevant institutions
Q4 2010
4.2. Publication of information on reintegration support in the official website for the benefit of returnees and officials dealing with repatriation and reintegration process, including relevant interesting organizations.
Information uploaded in the website
Regular input by ministries Number of consultations of webpage
Updated webpage and the number of reports using information from the webpage
All institutions involved and coordinated by MIA
In continuation
4.3. Assistance the moment of arrival at Prishtina Airport and at the border crossing points
Assistance provided
No of cases assisted
Reports to the Board
MIA,MLSW MH, MLGA, Municipalities
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
13
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
4.4. Provision of transportation services and of temporary shelter and emergency medical assistance
Services provided
Number of requests received for the provision of transportation services and of temporary shelter and emergency medical assistance.
Reporting Inter-Ministerial Coordination Board
All institutions involved
In continuation
100,000.00 MLSW 88,000.00 to MH
4.5. Sheltering repatriated persons up to 6 (six) months in subsidized accommodation.
Persons sheltered
Number of families sheltered for up to 6 months
Reporting Inter-Ministerial Coordination Board
Municipalities, MLGA, MIA - Fund
In continuation
180,000.00 euro
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
14
SUSTAINABLE REINTEGRATION
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
5. Achievement of sustainable reintegration
5.1. Legal reintegration through equipping repatriated persons with personal documents.
Equipping repatriated persons with personal documents
No of repatriated persons versus the number of repatriated persons equipped with personal documents
Reporting arrangements between MIA/DCAM and MIA/CRU
MIA Municipalities
In continuation
5.2. Facilitating the access to health care services.
Provision of health services to repatriated persons
Number of requests received and health care services provided
Regular Reporting
MH Municipalities
In continuation
440,000.00
5.3. Facilitating the access to
Provision of access to the
No of repatriated
Regular Reporting
MEST Municipalities
In continu
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
15
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
public educational system at all levels (including persons pending registration)
public education system
persons registered in the public educational system
ation
5.4. Developing curricula for language training for those pupils/students in need of
curricula for language training developed
Developed curricula is used in practice
Regular reporting
MEST Municipalities
K4 2010 15,000.00
5.5. Training for teachers to facilitate psychosocial and acclimatization assistance to repatriated children
Training concluded
number of teachers trained
Regular Reporting
MEST Municipalities
In continuation
66,150.00
5.6. Organization of courses for educational language for repatriated students
Educational language courses for repatriated students conducted
number of students attending courses
Regular reporting
MEST Municipalities
In continuation
100,000.00
5.7. Assistance for continuation of studies started abroad.
Studies continued
No of repatriated students
Regular reporting
MEST In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
16
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
continuing their studies
5.8. Equivalenting – Nostrification of certificates and diplomas (government decision issued, released from fees)
Decision issued
No of equivalenting and nostrification of diplomas
Reporting to the Board
MEST In continuation
5.9. Enrolment of repatriated persons on social schemes and family payment schemes in accordance with the applicable legislation
Repatriated persons enrolled.
Number of repatriated persons benefiting from the social schemes.
Reporting to the Board
MLSW Municipalities
In continuation
600, 000.00
5.10. Provision of employment services through active and passive policies of the labor market
Services provided
No of persons included in employment.
Regular reporting
MLSW, MEST
Municipalities, MTI
In continuation
10,000.00
5.11. Qualification and
Vocational trainings
No of persons
Regular reportin
MLSW, MEST
Municipalities
In continu
240,000.00
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
17
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
requalification of repatriated persons by vocational training programs
provided enrolled in vocational training programs
ation
5.12. Employment of repatriated through special programs and projects
Special programs and projects implemented
Number of persons employed or families supported through employment schemes and grants (through project proposals)
Regular reporting
Inter-Ministerial Coordination Board,
Donors, Municipalities, MEST, MTI, MLSW
In continuation
400,000.00
5.13. Securing housing for repatriated families possessing no land, by building apartment buildings for non-profit rent in relevant municipalities
Housing ensured
Number of people accommodated
Regular reporting
Municipalities, Inter-Ministerial Board
MESP,MLGA,MIA,MEF
In continuation
800,000.00 euro.
5.14. Housing Number of Regular Inter- Donors, In 30,000.00
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
18
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
Securing housing through rent subsidy programs in the rental buildings of the bonus housing market (according to the law in force)
through subsidies ensured
people accommodated
reporting Ministerial Coordination Board
MCR, Municipalities, MESP ,MLGA, MIA,MEF
continuation
5.15. Assistance in houses reconstruction for repatriated families possessing own land according the given criteria
Assistance in reconstruction provided
Number of people benefiting from this scheme
Regular reporting
Inter-Ministerial Coordination Board
Donors, all institutions involved, Municipalities,
In continuation
380,000.00
5.16. Review the possibility of using property for repatriated persons under Kosovo Property Agency (KPA) administration
Decision concluded
Negotiations and modalities identified
Reporting by relevant instutions
KPA, Inter-Ministerial Coordination Board
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
19
MANAGEMENT AND ADMINISTRATION OF THE FUND
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
6. Administration, determination and implementation of fund priorities in accordance with the applicable legislation and donor rules
6.1. Administration of fund efficiently and in accordance with fund priorities.
Management function is defined and acts in support to reintegration fund (RF) priorities.
Reporting Inter-Ministerial Coordination Board
All institutions involved
In continuation
6.1. Fund administration efficiently and in accordance with fund priorities.
6.1.1. Identification of structure and defining responsible authority for administration of reintegration fund.
Instructions, rules of procedures defined
Reporting to Board
Inter-Ministerial Coordination Board
All Q32010
6.1.2. Designing a guideline and internal regulations (operational) for FR management (including
Secretariat, OPM
All institutions involved
Q32010
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
20
compliance of project costs with EU standards) 6.2. Determination of finance and fund provision
Requests and co-funding
Regulation consultations with the stakeholders involved in the reintegration, beneficiaries and donors.
Reporting Inter-Ministerial Coordination Board
Relevant stakeholders and donors
Q4 2010
6.2.1 Determination of fund financial contribution for each service sector in percentage. (for instance) (x% education , x% employment, etc)
MIA All institutions involved
In continuation
6.2.2 To set out percentage of financial participation by the national budget and external funds.
Inter-Ministerial Coordination Board
MIA, MEF
Q42010 - In continuation
6.2.3 Needs assessment and costs which may occur.
Inter-Ministerial Coordination Board
In continuation
6.2.4 To search for the requirements and needs
Secretariat of Board
All institutions
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
21
(technical and material) and donor priorities for funds.
involved
6.3. Determination of priorities of fund contributions.
Inter-Ministerial Coordination Board
All institutions involved
In continuation
6.3.1. To define priority groups based on specific criteria and adjust the services to be provided.
Reporting to Board (relevant national and international institutions)
Ministries, Municipalities and Board
Secretariat
Q3 2010
6.3.2. To establish criteria in conformity with urgent needs for calls of projects according to priority issues.
Ministries, Municipalities and Board
Q3 2010
6.4. Implementation of fund priorities in compliance with the applicable legislation and donor rules.
Identified projects and functional management
Number of project proposals and grants
Audit reports
All institutions involved
In continuation
6.4.1 Determination of qualification criteria for
Inter-Ministerial Coordinatio
MIA, Secretariat and
Q42010
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
22
applications, their partner and project-proposals.
n Board Board
6.4.2 Administration of project implementation in order that control and audit are carried out in accordance with the applicable legislation regarding procurement procedures and financial regulations.
Inter-Ministerial Coordination Board
All responsible institutions
In continuation
6.5. Information to potential beneficiaries and public wide
Information and visible material
Number of requests deriving from the local level or civil servants
Inter-Ministerial Coordination Board
In continuation
6.5.1. To inform the Municipalities and potential project beneficiaries.
Secretariat/ Inter-Ministerial Coordination Board
In continuation
6.5.2. To develop visible policy and instrument for instance, logo, leaflets.
Inter-Ministerial Coordination Board
Secretariat/
Q4/2010
6.5.3. Public information on implementation of the
Inter-Ministerial Coordinatio
Secretariat /
In continuation
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
23
Reintegration Fund n Board
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
24
MONITORING AND CONTROL
SPECIFIC OBJECTIVES
ACTIVITIES EXPECTED
OUTCOME
MEASURABLE
INDICATORS
INDICATOR SOURCES
INSTITUTION
RESPONSIBLE
COOPERATING INSTITUTION
TIME LIMITS
APPROXIMATE
FINANCIAL COST
7. Monitoring and assessment of implementation of the Strategy through coordination and control of activities
7.1 Activities focused in proper implementation of the strategy particularly in the local level.
Inter-Ministerial Coordination Board
All relevant ministries
In continuation
7.2 Regular monthly reports by relevant Ministries towards Board on the actions concluded
Regular reports
No of reports
Reports to the Board
All relevant ministries
In continuation
7.3 Regular monthly reports by competent municipal officials to Secretariat
Regular reports
No of reports
Reports to Secretariat
Municipalities
In continuation
7.4 Regular periodic report to the Government
Regular reports
No of reports
Reports to the Government
Inter-Ministerial Coordination Board
In continuation
7.5 Identification and
Obstacles identified
Continuous
Reporting Inter-Ministerial
All relevan
In continu
ACTION PLAN STRATEGY ON REINTEGRATION OF REPATRIATED PERSONS
25
elimination of obstacles in implementation of Action Plan for implementing Strategy on Reintegration of Repatriated Persons
and eliminated
implementation of action plan, assessed and analyzed
Coordination Board
t ministries
ation
7.6 Organization of meetings (Periodic and ad-hoc)
Meetings organized
No of organized meetings
Reports Analysis and Results
Inter-Ministerial Coordination Board
In continuation