request for proposal for · eot electrically - epc engineering, procurement and construction erw...

81
Request for Pro C Volume 1: Summary and Term REQU R CRYOGE CRYOGENIC Summar IS In Depa Tirun oposal for Realization of Cryogenic Fluid circuit Cryogenic Turbo-Pump Test facility ms & Conditions UEST FOR PROPOSAL FOR REALIZATION OF ENIC FLUID CIRCUITS F TURBO-PUMP TEST FA Volume 1 ry and Terms & Condition June 2017 SRO Propulsion Complex ndian Space Research Organization artment of Space, Government of India Mahendragiri 627133 nelveli District, Tamil Nadu State, India ts of Page 1.1 FOR ACILITY ns

Upload: others

Post on 22-Oct-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    REQUEST FOR PROPOSAL

    REALIZATION

    CRYOGENIC

    CRYOGENIC

    Summary and

    ISRO Indian Space

    Department of Space, Government of India

    Tirunelveli District, Tamil Nadu State, India

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    REQUEST FOR PROPOSAL

    FOR

    REALIZATION OF

    CRYOGENIC FLUID CIRCUITS FOR

    CRYOGENIC TURBO-PUMP TEST FACILITY

    Volume 1

    Summary and Terms & Conditions

    June 2017

    ISRO Propulsion Complex Indian Space Research Organization

    Department of Space, Government of India Mahendragiri 627133

    Tirunelveli District, Tamil Nadu State, India

    Realization of Cryogenic Fluid circuits of

    Page 1.1

    FOR

    TEST FACILITY

    onditions

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    SL.No

    1.1 INTRODUCTION1.2 LOCATION

    1.2.1 GEOGRAPHICAL1.2.2 SITE

    1.3 SUMMARY OF SCOPE OF CONTRACT1.3.1 DEPARTMENT’s RESPONSIBILITY1.3.2 COMMISSIONING1.3.3 CONTRACTOR’S SCOPE

    1.3.3.1 DESIGN REVIEW1.3.3.2 RISK ANALYSIS1.3.3.3 DETAIL ENGINEERING

    1.3.3.4 PURCHASE OF MATERIALS1.3.3.5 PURCHASE OF SPARES1.3.3.6 SHOP FABRICATION1.3.3.7 INSPECTION1.3.3.8 PACKING, TRANSPORTATION, STORAGE AND

    HANDLING OF MATERIALS1.3.3.9 ONSITE CONSTRUCTION, FABRICATION AND

    1.3.3.10 INSURANCE1.3.3.11 COMMISSIONING1.3.3.12 DOCUMENTATION

    1.3.4 MUTUAL OBLIGATION1.4 SUMMARY OF SYSTEM DESCRIPTION

    1.4.1 CRYOGENIC FLUID CIRCUITS1.5 PRE-QUALIFICATION CRITERIA

    1.6 TERMS & CONDITIONS1.6.1 CONTRACT STRUCTURE

    1.6.1.1 ENTIRE AGREEMENT1.6.1.2 ASSIGNMENT1.6.1.3 EFFECTIVE DATE OF CONTRACT1.6.1.4 CANCELLATION OF CONTRAC

    1.6.1.5 CONTRACTOR’s DEFAULT LIABILITY1.6.2 SECURITY DEPOSIT1.6.3 PRICE AND PAYMENT TERM

    1.6.3.1 PRICE 1.6.3.2 TAXES AND DUT1.6.3.3 PAYMENT TERM

    1.6.3.4 MODE OF PAYMENT1.6.4 SCOPE CHANGE1.6.5 EXECUTION PERIOD

    1.6.5.1 PROGRESS REVIEW AND MONITORING1.6.5.2 LIQUIDATED DAMAGE FOR DELAYED EXECUTION1.6.5.3 FORCE MAJEURE CIRCUMSTANCE1.6.5.1 CYCLE TIME FOR APPROVAL

    1.6.6 SOURCING OF MATERIALS/ SERVICES

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    CONTENTS

    Description

    INTRODUCTION

    GEOGRAPHICAL

    SUMMARY OF SCOPE OF CONTRACT DEPARTMENT’s RESPONSIBILITY COMMISSIONING CONTRACTOR’S SCOPE DESIGN REVIEW RISK ANALYSIS DETAIL ENGINEERING

    PURCHASE OF MATERIALS PURCHASE OF SPARES SHOP FABRICATION INSPECTION PACKING, TRANSPORTATION, STORAGE AND HANDLING OF MATERIALS ONSITE CONSTRUCTION, FABRICATION AND ERECTION

    INSURANCE COMMISSIONING DOCUMENTATION MUTUAL OBLIGATION SUMMARY OF SYSTEM DESCRIPTION CRYOGENIC FLUID CIRCUITS

    QUALIFICATION CRITERIA

    CONDITIONS CONTRACT STRUCTURE ENTIRE AGREEMENT

    SSIGNMENT EFFECTIVE DATE OF CONTRACT CANCELLATION OF CONTRACT

    CONTRACTOR’s DEFAULT LIABILITY SECURITY DEPOSIT PRICE AND PAYMENT TERM

    AND DUTIES PAYMENT TERM

    MODE OF PAYMENT SCOPE CHANGE EXECUTION PERIOD PROGRESS REVIEW AND MONITORING LIQUIDATED DAMAGE FOR DELAYED EXECUTIONFORCE MAJEURE CIRCUMSTANCE CYCLE TIME FOR APPROVAL

    SOURCING OF MATERIALS/ SERVICES

    Realization of Cryogenic Fluid circuits of

    Page 1.2

    Pg No 1.9

    1.12 1.12 1.12

    1.13 1.13 1.14 1.14 1.14 1.15 1.15

    1.16 1.16 1.17 1.17 1.17

    ERECTION 1.17

    1.17 1.18 1.18 1.18 1.19 1.19 1.20

    1.23 1.23 1.23 1.23 1.23 1.23

    1.24 1.26 1.26 1.26 1.27 1.28

    1.30 1.30 1.31 1.31

    LIQUIDATED DAMAGE FOR DELAYED EXECUTION 1.32 1.32 1.33

    1.33

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    SL.No

    1.6.6.1 SELECTION OF SUB1.6.6.2 SUB-CONTRACTING

    1.6.7 INSPECTION1.6.7.1 PRIMARY INSPECTION BY THIRD PARTY INSPECTION

    AGENCY 1.6.7.2 SURVEILLANCE INSPECTION BY DEPARTMENT

    1.6.8 DELIVERY 1.6.8.1 PACKING 1.6.8.2 DELIVERY TERM

    1.6.8.3 STORAGE AND HANDLING1.6.9 INSURANCE

    1.6.10 COMPLIANCE WITH STANDARD1.6.11 SYSTEM PERFORMANCE1.6.12 WARRANTY

    1.6.12.1 DEFECT LIABILITY

    1.6.12.2 PERFORMANCE BANK GUARANTEE1.6.13 DOCUMENTATION1.6.14 CONFIDENTIALITY1.6.15 INDEMNITY AGAINST INFRINGEMENT OF

    1.6.15.1 LABOR LAW1.6.15.2 PATENT RIGHT1.6.15.3 LIMITATION OF LIABILITY

    1.6.16 SETTLEMENT OF DISPUTE1.6.16.1 ARBITRATION

    1.6.17 JURISDICTION AND APPLICABLE LAW1.6.18 LANGUAGE AND MEASURE1.6.19 CONTRACT MANAGERS1.6.20 CONTRACTOR’s FUNCTION

    1.6.20.1 EXECUTION OF WORK1.6.20.2 SUPPLY OF TOOLS, TACKLES AND OTHER MATERIALS1.6.20.3 PROTECTION OF WORK1.6.20.4 COMPLIMENTARY PROVISION TO DEPARTMENT’s

    SERVICE 1.6.20.5 CLEAN UP OF WORKSITE1.6.20.6 COORDINATION WITH OTHER CONTRACTORS AND

    INTERFACING OF WORK1.6.20.7 SITE PERSONNEL

    1.6.20.8 EMPLOYMENT OF LABORER1.6.20.9 REPORTING

    1.6.20.10 FIRST AID 1.6.20.11 WORKING AND 1.6.20.12 ELECTRICAL SAFETY REGULATION1.6.21 RIGHTS OF THE DEPARTMENT

    1.6.21.1 CHANGE AND MODIFICATION TO SPECIFICATION AND QUALIATIVE REQUIREMENT

    1.6.21.2 ILLUSTRATION AND EXPLANATION OF PLAN

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    Description

    SELECTION OF SUB-VENDOR CONTRACTING

    INSPECTION PRIMARY INSPECTION BY THIRD PARTY INSPECTION

    SURVEILLANCE INSPECTION BY DEPARTMENT

    DELIVERY TERM

    STORAGE AND HANDLING INSURANCE COMPLIANCE WITH STANDARD SYSTEM PERFORMANCE WARRANTY DEFECT LIABILITY

    PERFORMANCE BANK GUARANTEE DOCUMENTATION CONFIDENTIALITY INDEMNITY AGAINST INFRINGEMENT OF REGULATIONLABOR LAW PATENT RIGHT LIMITATION OF LIABILITY

    SETTLEMENT OF DISPUTE ARBITRATION JURISDICTION AND APPLICABLE LAW LANGUAGE AND MEASURE CONTRACT MANAGERS CONTRACTOR’s FUNCTION

    EXECUTION OF WORK SUPPLY OF TOOLS, TACKLES AND OTHER MATERIALSPROTECTION OF WORK COMPLIMENTARY PROVISION TO DEPARTMENT’s

    CLEAN UP OF WORKSITE COORDINATION WITH OTHER CONTRACTORS AND INTERFACING OF WORK SITE PERSONNEL

    EMPLOYMENT OF LABORER REPORTING

    WORKING AND SAFETY REGULATION ELECTRICAL SAFETY REGULATION RIGHTS OF THE DEPARTMENT

    CHANGE AND MODIFICATION TO SPECIFICATION AND QUALIATIVE REQUIREMENT ILLUSTRATION AND EXPLANATION OF PLAN

    Realization of Cryogenic Fluid circuits of

    Page 1.3

    Pg No 1.34 1.34

    1.35 PRIMARY INSPECTION BY THIRD PARTY INSPECTION 1.35

    1.35 1.36 1.36 1.36

    1.37 1.37 1.38 1.38 1.39 1.39

    1.40 1.40 1.41

    REGULATION 1.42 1.42 1.42 1.43

    1.43 1.43 1.44 1.44 1.44 1.44

    1.44 SUPPLY OF TOOLS, TACKLES AND OTHER MATERIALS 1.46

    1.46 COMPLIMENTARY PROVISION TO DEPARTMENT’s 1.47

    1.47 COORDINATION WITH OTHER CONTRACTORS AND 1.48

    1.48

    1.49 1.49 1.49 1.50 1.51 1.52

    CHANGE AND MODIFICATION TO SPECIFICATION AND 1.52

    1.53

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    SL.No

    1.6.21.3 DIRECTION OF WORK1.6.21.4 ORDERING MODIFICATION OF METHOD AND EQUIPMENT

    1.6.22 SAFETY, RELIABILITY AND QUALITY ASSURANCE1.6.22.1 SAFETY ASSURANCE PLAN1.6.22.2 QUALITY ASSURANCE1.6.22.3 CODE AND STANDARD FOLLOWED

    1.6.23 SUB-VENDOR DIRECTORY1.7 INSTRUCTION TO BIDDER

    1.8 MEMORENDUM OF UNDERSTANDING

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    Description

    DIRECTION OF WORK ORDERING MODIFICATION OF METHOD AND EQUIPMENT

    SAFETY, RELIABILITY AND QUALITY ASSURANCESAFETY ASSURANCE PLAN QUALITY ASSURANCE CODE AND STANDARD FOLLOWED

    VENDOR DIRECTORY INSTRUCTION TO BIDDER

    MEMORENDUM OF UNDERSTANDING

    Realization of Cryogenic Fluid circuits of

    Page 1.4

    Pg No 1.53

    ORDERING MODIFICATION OF METHOD AND EQUIPMENT 1.53

    SAFETY, RELIABILITY AND QUALITY ASSURANCE 1.54 1.54 1.55 1.56 1.56 1.57

    1.62

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    LIST OF

    No Section

    Annexure 1.1. Format for Bank Guarantee for Security Deposit (from

    indigenous supplier)

    Annexure 1.2. Format for Indemnity bond for security deposit (from CPSUs)

    Annexure 1.3. Format for Bank Guarantee for Security Deposit (from

    Indian agent on behalf of foreign supplier / Principal)

    Annexure 1.4. Format for Bank Guarantee for Advance payment (from

    indigenous supplier)

    Annexure 1.5. Format for Indemnity bond for Advance payment (from

    CPSUs)

    Annexure 1.6. Format for Performance Bank Guarantee (from

    indigenous supplier)

    Annexure 1.7. Format for Indemnity bond for Performance Bank Guarantee (from CPSUs)

    Annexure 1.8. Format for Performance Bank Guarantee (from Indian

    agent on behalf of foreign supplier / Principal)

    Annexure 1.9. Format for Performance Bank Guarantee (from fo

    supplier)

    Annexure 1.10 Format for Non

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    LIST OF FIGURES AND ANNEXURE

    Format for Bank Guarantee for Security Deposit (from

    indigenous supplier)

    Format for Indemnity bond for security deposit (from

    Format for Bank Guarantee for Security Deposit (from

    Indian agent on behalf of foreign supplier / Principal)

    for Bank Guarantee for Advance payment (from

    indigenous supplier)

    Format for Indemnity bond for Advance payment (from

    Format for Performance Bank Guarantee (from

    indigenous supplier)

    Format for Indemnity bond for Performance Bank Guarantee (from CPSUs)

    Format for Performance Bank Guarantee (from Indian

    agent on behalf of foreign supplier / Principal)

    Format for Performance Bank Guarantee (from fo

    Format for Non-disclosure agreement

    Realization of Cryogenic Fluid circuits of

    Page 1.5

    Page

    No

    Format for Bank Guarantee for Security Deposit (from 1.63

    Format for Indemnity bond for security deposit (from 1.65

    Format for Bank Guarantee for Security Deposit (from

    Indian agent on behalf of foreign supplier / Principal)

    1.67

    for Bank Guarantee for Advance payment (from 1.69

    Format for Indemnity bond for Advance payment (from 1.71

    1.72

    Format for Indemnity bond for Performance Bank 1.73

    Format for Performance Bank Guarantee (from Indian 1.77

    Format for Performance Bank Guarantee (from foreign 1.79

    1.81

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    Acronym Full form A/C Air ConditioningAERB Atomic Energy Regulatory BoardAHU Air Handling UnitANSI American National Standards InstituteAPI American Petroleum Institute

    ASME American Society of Mechanical EngineersASTM American Society of Testing and MaterialsAT Autonomous TestATEX Atmosphere

    ATS Automatic Test SimulatorBG Bank Guarantee

    BIS Bureau of Indian StandardsBL Bill of LadingBS British StandardBSP British Standard Pipe (thread)CAD Computer Aided DesignCD Compact DiscCDEC Custom Duty Exemption Certificate

    CEAS Civil, Electrical & AirCENELEC Commission of European Nations on

    CFC Cryogenic Fluid CircuitsCGA Compressed Gases Association Inc (USA)CHPI Cryogenic High Pressure InstallationCI Cast Iron

    CPM Critical Path MethodCPT Carriage Paid ToCS Carbon SteelCTPT Cryogenic TurboCSC Central Safety CommandCTR Cable Terminal Room

    DAS Data Acquisition SystemDC Direct CurrentDC Delivery ChallanDER Detail Engineering ReviewDG Diesel GeneratorDLR Dome Loaded RegulatorDN Diameter Nominal

    DP Differential PressureEDEC Excise Duty Exemption CertificateEOT Electrically-EPC Engineering, Procurement and ConstructionERW Electrical Resistance Welded (pipe)ESS Emergency Shutdown System

    FAT Final AcceptanceFCI Flow Control InstituteFEED Front-End Engineering Design

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    GLOSSARY OF ACRONYMS

    Air Conditioning Atomic Energy Regulatory Board Air Handling Unit American National Standards Institute American Petroleum Institute

    American Society of Mechanical Engineers American Society of Testing and Materials Autonomous Test Atmosphere Explosibles

    Automatic Test Simulator Bank Guarantee

    Bureau of Indian Standards Bill of Lading British Standard British Standard Pipe (thread) Computer Aided Design Compact Disc Custom Duty Exemption Certificate

    Civil, Electrical & Air-conditioning System Commission of European Nations on Electro-technical Standardization

    Cryogenic Fluid Circuits Compressed Gases Association Inc (USA) Cryogenic High Pressure Installation

    Critical Path Method Carriage Paid To Carbon Steel Cryogenic Turbo Pump Test-facility Central Safety Command Cable Terminal Room

    Data Acquisition System Direct Current Delivery Challan Detail Engineering Review Diesel Generator Dome Loaded Regulator Diameter Nominal

    Differential Pressure Excise Duty Exemption Certificate

    -operated Overhead Traveling (crane) Engineering, Procurement and Construction Electrical Resistance Welded (pipe) Emergency Shutdown System

    Final Acceptance Test Flow Control Institute

    End Engineering Design

    Realization of Cryogenic Fluid circuits of

    Page 1.6

    Standardization

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    Acronym Full form FFP Firm & Fixed PriceFFS Facility Fluid SystemFH Fire HydrantFI Foam InsulationFIM Free Issue Material

    FJB Field Junction BoxFSD Full Scale DivisionFSO Full Scale OutputGAD General Arrangement DrawingGG Gas GeneratorGH2 Gaseous Hydrogen

    GHe Gaseous HeliumGI Galvanized IronGN2 Gaseous NitrogenGO2 Gaseous OxygenGTAW Gas Tungsten Arc WeldingHART Highway Addressable Remote TerminalHAT High Altitude Test

    HAZOP Hazards and Operability (analysis)I/O Input/ Output (channels)I/P Current to Pressure (converter)ICDAS Instrumentation, Control & Data Acquisition SystemID Inner DiameterIEC International Electro

    IPA Iso Propyl AlcoholIPRC ISRO Propulsion ComplexIS Indian StandardISO International Standards OrganizationISRO Indian Space Research OrganizationJCMB Joint Contract Management Board

    LD Liquidated DamageLED Light Emitting Diode (Display)LEL Lower Explosive LimitLH2 Liquid HydrogenLN2 Liquid NitrogenLOX Liquid OxygenLS Lump-Sum

    MAWB Master Air Way BillMAWP Maximum Allowable Working PressureMCC Motor Control CentreMEOP Maximum Expected Operating PressureMS Mild Steel MSL Mean Sea Level

    MSLD Mass Spectrometer Leak DetectorNAS National Aerospace Standards (USA)NC Normally Closed

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    GLOSSARY OF ACRONYMS

    Firm & Fixed Price Facility Fluid System Fire Hydrant Foam Insulation Free Issue Material

    Field Junction Box Full Scale Division Full Scale Output General Arrangement Drawing Gas Generator Gaseous Hydrogen

    Gaseous Helium Galvanized Iron Gaseous Nitrogen Gaseous Oxygen Gas Tungsten Arc Welding Highway Addressable Remote Terminal High Altitude Test

    Hazards and Operability (analysis) Input/ Output (channels) Current to Pressure (converter) Instrumentation, Control & Data Acquisition System Inner Diameter International Electro-technical Commission

    Alcohol ISRO Propulsion Complex Indian Standard International Standards Organization Indian Space Research Organization Joint Contract Management Board

    Liquidated Damage Light Emitting Diode (Display)

    Explosive Limit Liquid Hydrogen Liquid Nitrogen Liquid Oxygen

    Master Air Way Bill Maximum Allowable Working Pressure Motor Control Centre Maximum Expected Operating Pressure

    Level

    Mass Spectrometer Leak Detector National Aerospace Standards (USA) Normally Closed

    Realization of Cryogenic Fluid circuits of

    Page 1.7

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    Acronym Full form NDT Non-Destructive TechniqueNEC National Electrical Code (USA)NH National HighwayNO Normally OpenNPT(F) (American) National Pipe Thread

    NPT(M) (American) National Pipe Thread (Male)OD Outside DiameterP&ID Process and Instrumentation DiagramPBG Performance Bank GuaranteePCC Plain Cement ConcretePCD Pitch Circle Diameter

    PCTFE Poly Chloro Tri Fluoro EthylenePDI Pre-Delivery InspectionPERT Project Evaluation and Review TechniquePFS Propellant Fluid SystemPID Proportional, Integral and Derivative (controller)PN Pressure NominalPPM Parts Per Million (by volume unless specified otherwise)

    PSR Pre-Shipment PTFE Poly Tetra Fluoro EthylenePUF Poly Urethane FoamPVTR Performance Validation Trial RunQAP Quality Assurance PlanQC Quality Control

    RBI Reserve Bank of IndiaRCC Reinforced Cement ConcreteRF Raised FaceRFP Request For ProposalRTD Resistance-RTGS Real Time Gross Settlement

    SAE Society of Automotive EngineersSD Security DepositSFS Service Fluid SystemSI Super InsulationSLR Spring-Loaded RegulatorSMAW Shielded Metal Arc WeldingSMS Structural and Mechanical System

    SOV Solenoid ValveSS Stainless SteelSWG Standard Wire GaugeSWL Safe Working LoadTANGEDCO Tamil Nadu Electricity Generation and Distribution Company Ltd TC Thermo Couple

    TIB Transformer Isolated BarrierTPI Third Party UPS Un-interrupted Power Supply

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    GLOSSARY OF ACRONYMS

    Destructive Technique National Electrical Code (USA) National Highway Normally Open (American) National Pipe Thread (Female)

    (American) National Pipe Thread (Male) Outside Diameter Process and Instrumentation Diagram Performance Bank Guarantee Plain Cement Concrete Pitch Circle Diameter

    Poly Chloro Tri Fluoro Ethylene Delivery Inspection

    Project Evaluation and Review Technique Propellant Fluid System Proportional, Integral and Derivative (controller) Pressure Nominal Parts Per Million (by volume unless specified otherwise)

    Shipment Review Poly Tetra Fluoro Ethylene Poly Urethane Foam Performance Validation Trial Run Quality Assurance Plan Quality Control

    Reserve Bank of India Reinforced Cement Concrete Raised Face Request For Proposal

    -type Temperature Detector Real Time Gross Settlement

    Society of Automotive Engineers Security Deposit Service Fluid System Super Insulation

    Loaded Regulator Shielded Metal Arc Welding

    and Mechanical System

    Solenoid Valve Stainless Steel Standard Wire Gauge Safe Working Load Tamil Nadu Electricity Generation and Distribution Company Ltd Thermo Couple

    Transformer Isolated Barrier Third Party Inspection

    interrupted Power Supply

    Realization of Cryogenic Fluid circuits of

    Page 1.8

    Parts Per Million (by volume unless specified otherwise)

    Tamil Nadu Electricity Generation and Distribution Company Ltd

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.1 INTRODUCTION

    ISRO Propulsion Complex (IPRC)

    (ISRO), Department of Space, Government of India, Mahendragiri

    627133, Tirunelveli District, Tamil Nadu

    to as “Department”) intends to establish

    facility (CTPT)” at

    tests for performance evaluation of propulsion

    launch vehicles for peaceful

    constitute the facility:

    � Buildings, Civil

    � Fluid System

    � Instrumentation

    � Safety & Fire-

    All systems other than Fluid system are separately realized by the

    Department. Fluid system comprises gas storages, gas distribution

    circuits, cryogenic storage tanks and cryogenic fluid circuits.

    are requested,

    package which

    parts of Fluid system are realized by the

    The Department

    Bidders. The Department

    Bidders after issue of

    the requirements

    Bidder’s should

    of Bidder in the pre

    The Bidders shall submit the bid

    (non-priced) bid and (ii) Price bid.

    techno-commercial bids received, evaluate the capability of Bidders with

    regard to the criteria specified in the RFP and short

    The Department

    bid techno-commercial meeting

    Department will

    Suitable Bidders

    RFP specification

    open the price bids of the Suitable

    discussion, if necessary

    based on the lowest

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    INTRODUCTION

    ISRO Propulsion Complex (IPRC), Indian Space Research Organization

    , Department of Space, Government of India, Mahendragiri

    627133, Tirunelveli District, Tamil Nadu State, India (hereinafter

    to as “Department”) intends to establish “Cryogenic Turbo

    at their premises. The facility is intended to perform

    tests for performance evaluation of propulsion sub-systems of ISRO’s

    launch vehicles for peaceful purposes. The following major systems

    constitute the facility:

    Buildings, Civil and Structural Systems

    Instrumentation, Control & Data Acquisition System

    -protection System

    All systems other than Fluid system are separately realized by the

    Fluid system comprises gas storages, gas distribution

    circuits, cryogenic storage tanks and cryogenic fluid circuits.

    through this Request For Proposal

    which includes only the Cryogenic Fluid

    Fluid system are realized by the Department.

    The Department seeks Proposals for cryogenic fluid circuits

    . The Department will organize pre-bid meeting with the

    after issue of Tender notice, to facilitate proper

    the requirements and assessment of the site conditions

    should participate in the pre-bid meeting. Non

    of Bidder in the pre-bid meeting will render their bid invalid.

    shall submit the bids in 2 parts viz (i) Techno

    priced) bid and (ii) Price bid. The Department will initially ope

    commercial bids received, evaluate the capability of Bidders with

    regard to the criteria specified in the RFP and short-list capable bidders.

    The Department, if necessary at their own discretion, will

    commercial meeting with the short-listed Capable

    Department will evaluate the techno-commercial bids and

    Bidders whose techno-commercial bids are complaint with the

    RFP specification and place them on equal footing. The Department will

    price bids of the Suitable Bidders only, hold post

    , if necessary at their own discretion, and award the

    lowest-priced bid.

    Realization of Cryogenic Fluid circuits of

    Page 1.9

    ndian Space Research Organization

    , Department of Space, Government of India, Mahendragiri

    (hereinafter referred

    Turbo-Pump Test

    . The facility is intended to perform static

    systems of ISRO’s

    The following major systems

    All systems other than Fluid system are separately realized by the

    Fluid system comprises gas storages, gas distribution

    circuits, cryogenic storage tanks and cryogenic fluid circuits. Proposals

    roposal, for the work

    luid Circuits. Other

    for cryogenic fluid circuits from capable

    bid meeting with the potential

    to facilitate proper understanding of

    the site conditions. The potential

    Non-participation

    bid meeting will render their bid invalid.

    in 2 parts viz (i) Techno-commercial

    The Department will initially open the

    commercial bids received, evaluate the capability of Bidders with

    list capable bidders.

    will organize post-

    listed Capable Bidders. The

    commercial bids and identify the

    bids are complaint with the

    and place them on equal footing. The Department will

    , hold post-bid price

    , and award the Contract

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    The execution period

    acceptance of cryogenic fluid circuits

    This RFP document comprises

    conditions and

    Volume 1. Detailed technical

    specification/ requirement

    Volume 2.

    Some of the key

    follows:

    � “Department” shall mean and include the President of India acting

    through the Director, IPRC and any representative(s) of the Department

    duly authorized

    � “Contractor” shall mean the individual or firm or company

    incorporated or not

    this RFP, undertaking the work and shall include the legal personal

    representatives of such individuals or the persons composing such firm

    or company or the successors of such firm or company and the

    permitted assignee of such individual or firm(s) or company.

    � “Party” shall mean the signatory to the Contract i.e. Department or

    Contractor or both.

    � “Sub-contractor

    Contractor engages for outsourcing certain serv

    Contract.

    � “Sub-vendor” shall mean individual or firm or company from whom the

    Contractor purchases certain material(s) related to the Contract.

    � “Contract” shall mean the formal agreement to be executed between

    the President of India and the

    choose based on the documents forming this

    thereof by the

    to therein including the specifications, designs, drawings and

    instructions issued from time to time by the Department.

    � “Date of Contract”

    becomes effective with signing by all the Parties.

    � “Site” shall mean the lan

    which work is to be executed under the

    by the Department for the purpose of carrying out the work.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    The execution period reckoned from signing of the Contract

    cryogenic fluid circuits is 15 months.

    RFP document comprises 2 Volume. Summary and

    procedure for submission of bids are

    Detailed technical description, scope of work

    requirement for Cryogenic Fluid Circuits

    Some of the key terminologies used in this document are defined as

    ” shall mean and include the President of India acting

    through the Director, IPRC and any representative(s) of the Department

    authorized on his/ her behalf.

    ” shall mean the individual or firm or company

    incorporated or not, chosen by the Department among the

    , undertaking the work and shall include the legal personal

    representatives of such individuals or the persons composing such firm

    or company or the successors of such firm or company and the

    assignee of such individual or firm(s) or company.

    ” shall mean the signatory to the Contract i.e. Department or

    Contractor or both.

    contractor” shall mean individual or firm or company whom the

    Contractor engages for outsourcing certain service(s) related to the

    ” shall mean individual or firm or company from whom the

    Contractor purchases certain material(s) related to the Contract.

    ” shall mean the formal agreement to be executed between

    the President of India and the Contractor whom the Department may

    choose based on the documents forming this RFP

    thereof by the Contractor and together with the documents as referred

    o therein including the specifications, designs, drawings and

    instructions issued from time to time by the Department.

    “Date of Contract” shall mean the date on which the Contract

    becomes effective with signing by all the Parties.

    ” shall mean the land and or other places at Mahendragiri on

    which work is to be executed under the Contract which

    by the Department for the purpose of carrying out the work.

    Realization of Cryogenic Fluid circuits of

    Page 1.10

    of the Contract to final

    ummary and Terms &

    are given in this

    , scope of work and other

    Cryogenic Fluid Circuits are given in

    used in this document are defined as

    ” shall mean and include the President of India acting

    through the Director, IPRC and any representative(s) of the Department

    ” shall mean the individual or firm or company, whether

    chosen by the Department among the Bidders to

    , undertaking the work and shall include the legal personal

    representatives of such individuals or the persons composing such firm

    or company or the successors of such firm or company and the

    assignee of such individual or firm(s) or company.

    ” shall mean the signatory to the Contract i.e. Department or

    ” shall mean individual or firm or company whom the

    ice(s) related to the

    ” shall mean individual or firm or company from whom the

    Contractor purchases certain material(s) related to the Contract.

    ” shall mean the formal agreement to be executed between

    whom the Department may

    and acceptance

    and together with the documents as referred

    o therein including the specifications, designs, drawings and

    instructions issued from time to time by the Department.

    shall mean the date on which the Contract

    d and or other places at Mahendragiri on

    which is to be allotted

    by the Department for the purpose of carrying out the work.

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    � “Test article” shall mean the propulsion

    tested at CTPT

    � “Material” shall mean all the

    forming part of the

    including raw materials, semi

    assemblies & ass

    their Sub-contract

    � “Service” shall mean all the activities performed by the Contractor for

    realizing the Cryogenic Fluid Circuits of CTPT

    detail engineering and onsite construction, fabrication, erection &

    commissioning.

    � “Specification”

    terms and conditions contained in this document

    � “Final acceptance”

    Fluid Circuits of CTPT facility

    upon successful completion of all contractual

    Contractor and commissioning including Performance

    � “RFP” shall mean this R

    Volumes.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    ” shall mean the propulsion sub-system

    CTPT and is under the scope of Department.

    shall mean all the goods/ items required for realizing and

    forming part of the Cryogenic Fluid Circuits of the CTPT

    including raw materials, semi-finished & finished products & sub

    & assemblies which are manufactured by the

    ontractor(s) or bought-out from their Sub-vendor

    shall mean all the activities performed by the Contractor for

    Cryogenic Fluid Circuits of CTPT facility including

    detail engineering and onsite construction, fabrication, erection &

    commissioning.

    “Specification” shall mean collectively all technical specification,

    terms and conditions contained in this document

    “Final acceptance” shall mean acceptance of the entire

    Fluid Circuits of CTPT facility by the Department from the Contractor

    upon successful completion of all contractual obligations by the

    Contractor and commissioning including Performance

    ” shall mean this Request for Proposal document

    Realization of Cryogenic Fluid circuits of

    Page 1.11

    system which is to be

    under the scope of Department.

    items required for realizing and

    of the CTPT facility

    finished & finished products & sub-

    which are manufactured by the Contractor or

    vendor(s).

    shall mean all the activities performed by the Contractor for

    facility including design,

    detail engineering and onsite construction, fabrication, erection &

    shall mean collectively all technical specification,

    mean acceptance of the entire Cryogenic

    by the Department from the Contractor

    obligations by the

    Contractor and commissioning including Performance Test.

    equest for Proposal document comprising 2

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.2 LOCATION

    1.2.1 GEOGRAPHICAL

    Mahendragiri is situated in Tirunelveli District, Tamil Nadu State, India.

    The nearest major towns are Nagercoil which is 25 km southward and

    Valliyoor which is 15 km northward. Mahendragiri is aside the

    Kanniyakumari

    junction at a distance of 2

    nearest major railway station is at Nagercoil which is 25 km southward.

    The nearest International airport is at Thiruvananthapuram which is 90 km

    away in south-western direction.

    which is 100 km away in north

    seaport is at Chennai which is 650 km northward.

    1.2.2 SITE

    CTPT facility site is located

    is located at about 3 km from the

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    GEOGRAPHICAL

    Mahendragiri is situated in Tirunelveli District, Tamil Nadu State, India.

    The nearest major towns are Nagercoil which is 25 km southward and

    Valliyoor which is 15 km northward. Mahendragiri is aside the

    Kanniyakumari - Madurai National Highway (NH7) near

    at a distance of 20 km northward from Kanniyakumari. The

    nearest major railway station is at Nagercoil which is 25 km southward.

    The nearest International airport is at Thiruvananthapuram which is 90 km

    western direction. The nearest seaport is at Thoothukudi

    which is 100 km away in north-eastern direction. The nearest major

    seaport is at Chennai which is 650 km northward.

    T facility site is located in IPRC’s premises at Mahendragiri. The

    is located at about 3 km from the entrance to IPRC, on a

    Realization of Cryogenic Fluid circuits of

    Page 1.12

    Mahendragiri is situated in Tirunelveli District, Tamil Nadu State, India.

    The nearest major towns are Nagercoil which is 25 km southward and

    Valliyoor which is 15 km northward. Mahendragiri is aside the

    near Kavalkinaru

    km northward from Kanniyakumari. The

    nearest major railway station is at Nagercoil which is 25 km southward.

    The nearest International airport is at Thiruvananthapuram which is 90 km

    The nearest seaport is at Thoothukudi

    eastern direction. The nearest major

    Mahendragiri. The site

    n a level terrain.

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3 SUMMARY OF SCOPE OF

    A summary of the overall

    work by the Contract

    1.3.1 DEPARTMENT’s RESPONSIBILITY

    For realization of Cryogenic Fluid circuits of CTPT facility,

    shall provide the following:

    1.3.1.1 Basic Engineering Design

    Engineering Design of the

    Diagrams (PIDs) of

    Annexure 2-B of

    document will also be given

    Upon award of the

    with the Contractor, a

    (Mahendragiri),

    participate.

    1.3.1.2 The Department shall organize the

    study of all fluid systems of the CTPT. Department will review and

    approve the specific recommendations from HAZOP study that are to be

    incorporated in Design & Engineering of Cryogenic Fluid Circuits.

    1.3.1.3 The Department will review the Detail enginee

    Contractor.

    1.3.1.4 Free-Issue Material (FIM)

    Fluid temperature sensors shall be procured by Department and free

    issued to the Contr

    1.3.1.5 Process Fluids: The Department will provide, free of

    fluids such as LH2, LOX, LN2,

    The quantity of fluids shall be reviewed an

    engineering review.

    1.3.1.6 Electrical Power Supply

    power supply for onsite construction/ fabrication/

    chargeable basis

    per kWh). Department shall not be responsible for interruptions in power

    supply from the power grid. Contractor shall make alternative power

    supply arrangements like Diesel Generator as may be required for

    execution of site works

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    SCOPE OF CONTRACT

    he overall responsibility of the Department

    work by the Contractor and the mutual obligations is given

    RESPONSIBILITY

    For realization of Cryogenic Fluid circuits of CTPT facility,

    shall provide the following:

    Engineering Design: The Department has done the

    Engineering Design of the Fluid system. Process and Instrumentation

    Diagrams (PIDs) of Cryogenic Fluid circuits are given

    of this RFP document. In addition, the

    will also be given upon award of Contract.

    the Contract, the Department will organize, in consultation

    with the Contractor, a Design Review meeting at their office

    in which the Contractor’s representative(s) shall

    The Department shall organize the Hazard and Operability

    study of all fluid systems of the CTPT. Department will review and

    approve the specific recommendations from HAZOP study that are to be

    incorporated in Design & Engineering of Cryogenic Fluid Circuits.

    The Department will review the Detail engineering to be done by the

    Issue Material (FIM): Flow meters, Surface temperature sensors and

    Fluid temperature sensors shall be procured by Department and free

    issued to the Contractor.

    : The Department will provide, free of cost,

    such as LH2, LOX, LN2, GH2, GHe and GN2 for commissioning.

    The quantity of fluids shall be reviewed and mutually agreed during detail

    engineering review.

    Electrical Power Supply: The Department will provide temporary electrical

    power supply for onsite construction/ fabrication/ erection activities

    basis at prevailing rate. (The unit rate of at present is INR 8.00

    Department shall not be responsible for interruptions in power

    from the power grid. Contractor shall make alternative power

    supply arrangements like Diesel Generator as may be required for

    execution of site works on time.

    Realization of Cryogenic Fluid circuits of

    Page 1.13

    Department, the scope of

    is given in this Section.

    For realization of Cryogenic Fluid circuits of CTPT facility, the Department

    : The Department has done the Basic

    Process and Instrumentation

    are given in Volume 2

    In addition, the Basic design

    Contract, the Department will organize, in consultation

    eview meeting at their office

    in which the Contractor’s representative(s) shall

    Hazard and Operability (HAZOP)

    study of all fluid systems of the CTPT. Department will review and

    approve the specific recommendations from HAZOP study that are to be

    incorporated in Design & Engineering of Cryogenic Fluid Circuits.

    ring to be done by the

    urface temperature sensors and

    Fluid temperature sensors shall be procured by Department and free-

    cost, the process

    , GHe and GN2 for commissioning.

    d mutually agreed during detail

    temporary electrical

    erection activities on

    at present is INR 8.00

    Department shall not be responsible for interruptions in power

    from the power grid. Contractor shall make alternative power

    supply arrangements like Diesel Generator as may be required for

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3.2 COMMISSIONING

    operating procedures,

    1.3.3 CONTRACTOR’S SCOPE

    The scope of work to be done

    Cryogenic Fluid Circuits of CTPT

    scope of work includes Design review, Analysis, Detail Engineering,

    Procurement, Fabrication, Testing, Erection and commissioning.

    scope with description and specifications

    RFP document.

    1.3.3.1 DESIGN REVIEW

    The Contractor shall review the

    award of Contract

    is to arrive at a consensus between the Department and the Contractor on

    the basic design of

    the detail engineering to be done by the Contractor. However, in case of

    dispute between the Department and the Contractor, the details of

    specified in the Contract shall be final. The design calculations are base

    on the codes/ standards mentioned in various

    In case the Contractor prefer

    Department may agree, provided that the sizes of the

    per the alternative codes/ standards

    standard ones than those specified in the Contract. In such cases where

    the Contractors employ alternative codes/ standards, it shall be their

    responsibility to submit a copy of such codes/ standards in English

    language to the Department during

    The design review shall primarily address the following.

    • Verification of P&IDs to comply with the specified functional requirements

    • Adequacy of the sizes of fluid circuits, comprising pipelines, flow components, parameters

    • Adequacy of the in

    Once the process design review is completed, the Contractor has to jointly

    own responsibility for the process design.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    (jointly with Contractor): The Department

    operating procedures, preparation of systems and test results.

    SCOPE

    The scope of work to be done by the Contractor for the

    Cryogenic Fluid Circuits of CTPT is given in this Section

    scope of work includes Design review, Analysis, Detail Engineering,

    Procurement, Fabrication, Testing, Erection and commissioning.

    with description and specifications are given in Volume 2 of this

    REVIEW

    The Contractor shall review the Basic design document submitted

    award of Contract) by the Department. The objective of the

    is to arrive at a consensus between the Department and the Contractor on

    design of Cryogenic fluid circuits and to freeze the input data for

    engineering to be done by the Contractor. However, in case of

    dispute between the Department and the Contractor, the details of

    specified in the Contract shall be final. The design calculations are base

    on the codes/ standards mentioned in various Sections of this document.

    In case the Contractor prefers to employ alternative codes/ standards, the

    Department may agree, provided that the sizes of the systems

    per the alternative codes/ standards are equal to or the next higher

    standard ones than those specified in the Contract. In such cases where

    the Contractors employ alternative codes/ standards, it shall be their

    responsibility to submit a copy of such codes/ standards in English

    the Department during Design review.

    The design review shall primarily address the following.

    Verification of P&IDs to comply with the specified functional requirements

    Adequacy of the sizes of fluid circuits, comprising pipelines, flow components, instruments, etc to comply with the specified process parameters

    Adequacy of the in-built safety features

    Once the process design review is completed, the Contractor has to jointly

    own responsibility for the process design.

    Realization of Cryogenic Fluid circuits of

    Page 1.14

    The Department shall review

    preparation of systems and test results.

    by the Contractor for the realization of

    is given in this Section briefly. The

    scope of work includes Design review, Analysis, Detail Engineering,

    Procurement, Fabrication, Testing, Erection and commissioning. Detailed

    are given in Volume 2 of this

    document submitted (on

    the Department. The objective of the Design review

    is to arrive at a consensus between the Department and the Contractor on

    e the input data for

    engineering to be done by the Contractor. However, in case of

    dispute between the Department and the Contractor, the details of Design

    specified in the Contract shall be final. The design calculations are based

    Sections of this document.

    to employ alternative codes/ standards, the

    systems chosen as

    are equal to or the next higher

    standard ones than those specified in the Contract. In such cases where

    the Contractors employ alternative codes/ standards, it shall be their

    responsibility to submit a copy of such codes/ standards in English

    Verification of P&IDs to comply with the specified functional

    Adequacy of the sizes of fluid circuits, comprising pipelines, flow instruments, etc to comply with the specified process

    Once the process design review is completed, the Contractor has to jointly

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    Upon Design review, if

    comply with the intended functional scope of the Contract

    shall carry out such changes

    1.3.3.2 RISK ANALYSIS

    The Contractor

    Operability (HAZOP)

    the Department.

    Upon risk analysis,

    with the intended functional scope of the Contract, the Contractor

    carry out such changes without

    1.3.3.3 DETAIL ENGINEERING

    Based on the approved design evolved during

    recommendation of

    engineering of the

    engineering and the documents to be submitted thereupon are given in

    Volume 2. The following general points shall be applicable:

    a. The detailed Quality Assurance Plan (QAP) for the materials/ services

    shall be provided. Th

    characteristics sought for, sample size, test procedure/ standard,

    acceptance criteria, form of record, performing agency, witnessing

    agency, reviewing agency, etc.

    b. The purchase specification of the materi

    c. The list of Sub

    the directory given in the Contract) to purchase the materials/ services

    shall be provided.

    d. The list of spares to be supplied shall be provided.

    The Contractor shall

    engineering review by the Department. However, the participation

    approval by the Department’s representatives during the Detail

    engineering review shall not absolve the Contractor

    to comply with the specification of th

    Upon Detail engineering review,

    necessary to comply with the intended functional scope of the Contract,

    the Contractor shall carry out such changes

    implications.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    review, if minor changes are found to be necessary to

    comply with the intended functional scope of the Contract

    shall carry out such changes without any Commercial implications.

    RISK ANALYSIS

    The Contractor’s representatives shall participate in

    Operability (HAZOP) study of Cryogenic fluid circuits to be organized by

    Upon risk analysis, if minor changes are found to be necessary to comply

    with the intended functional scope of the Contract, the Contractor

    carry out such changes without any Commercial implications

    DETAIL ENGINEERING

    Based on the approved design evolved during Design

    recommendation of risk analysis, the Contractor shall carry out detail

    of the Cryogenic Fluid Circuits. The scope of detail

    engineering and the documents to be submitted thereupon are given in

    Volume 2. The following general points shall be applicable:

    The detailed Quality Assurance Plan (QAP) for the materials/ services

    shall be provided. The QAP shall address such factors as

    characteristics sought for, sample size, test procedure/ standard,

    acceptance criteria, form of record, performing agency, witnessing

    agency, reviewing agency, etc.

    The purchase specification of the materials/ services shall be provided.

    The list of Sub-vendors from whom the Contractor has finalized (from

    the directory given in the Contract) to purchase the materials/ services

    shall be provided.

    The list of spares to be supplied shall be provided.

    actor shall organize a meeting at their premise

    engineering review by the Department. However, the participation

    approval by the Department’s representatives during the Detail

    engineering review shall not absolve the Contractor of their

    to comply with the specification of the Contract.

    Upon Detail engineering review, if minor changes are found to be

    necessary to comply with the intended functional scope of the Contract,

    the Contractor shall carry out such changes without any

    Realization of Cryogenic Fluid circuits of

    Page 1.15

    changes are found to be necessary to

    comply with the intended functional scope of the Contract, the Contractor

    without any Commercial implications.

    participate in Hazard and

    fluid circuits to be organized by

    if minor changes are found to be necessary to comply

    with the intended functional scope of the Contract, the Contractor shall

    implications.

    esign review and the

    analysis, the Contractor shall carry out detail

    s. The scope of detail

    engineering and the documents to be submitted thereupon are given in

    Volume 2. The following general points shall be applicable:

    The detailed Quality Assurance Plan (QAP) for the materials/ services

    such factors as object tested,

    characteristics sought for, sample size, test procedure/ standard,

    acceptance criteria, form of record, performing agency, witnessing

    als/ services shall be provided.

    vendors from whom the Contractor has finalized (from

    the directory given in the Contract) to purchase the materials/ services

    premises for detail

    engineering review by the Department. However, the participation of and

    approval by the Department’s representatives during the Detail

    of their responsibility

    if minor changes are found to be

    necessary to comply with the intended functional scope of the Contract,

    without any Commercial

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3.3.4 PURCHASE OF MATERIALS

    All the materials

    to be purchased by t

    materials are given in

    specifications for the individual items of materials to be purchased s

    made by the Contractor.

    which are not in accordance with the specification in

    subject to review and approval by the Department.

    1.3.3.5 PURCHASE OF SPARES

    The description/ quantity of spares to be supplied

    this RFP document.

    1.3.3.5.1 Spare materials for augmentation

    for the establishment of

    Contract, the spare materials

    assembled (wherever applicable) stand

    materials are meant to be stored in the Department’s inventory for

    facilitating augmentation (not under the scope of the Contractor) to

    so as to comply with unforeseen requirements in future. The spare

    materials shall also be subject to the same tests

    materials in the Contract.

    supplied are given in

    1.3.3.5.2 Spare parts and consumables for erection and commissioning

    materials used in

    deliver the spare parts and consumables to be replaced/ used during

    erection and commissioning.

    1.3.3.5.3 Spare parts and consumables for operation and maintenance

    materials used in

    also deliver the spare part

    replaced/ used during operation and maintenance over a period of 2 years

    from final acceptance

    shall be worked out, considering the causative factors such as norma

    wear & tear, fatigue cycles, cr

    spare parts allocated for this purpose shall not be consumed by the

    Contractor during erection and commissioning. In case of emergency, the

    Department may allow the Contractor to ut

    erection and commissioning and the Contractors shall replace the same

    free of cost.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    PURCHASE OF MATERIALS

    All the materials, except the FIMs listed in section 2.4.8 of volume 2

    to be purchased by the Contractor. The general specifications of the

    materials are given in Annexure 2-C of Volume 2. The detailed purchase

    specifications for the individual items of materials to be purchased s

    made by the Contractor. The purchase specifications of such materials,

    which are not in accordance with the specification in the Contract

    to review and approval by the Department.

    OF SPARES

    The description/ quantity of spares to be supplied are given in

    this RFP document.

    Spare materials for augmentation: Over and above the quantity required

    establishment of CTPT as per the requirements given in the

    Contract, the spare materials for augmentation shall be supplied as fully

    assembled (wherever applicable) stand-alone pieces. These spare

    materials are meant to be stored in the Department’s inventory for

    g augmentation (not under the scope of the Contractor) to

    so as to comply with unforeseen requirements in future. The spare

    materials shall also be subject to the same tests as specified for

    materials in the Contract. The description/ quantity

    are given in Volume 2.

    Spare parts and consumables for erection and commissioning

    materials used in Cryogenic Fluid Circuits of CTPT, the Contractor shall

    the spare parts and consumables to be replaced/ used during

    erection and commissioning.

    Spare parts and consumables for operation and maintenance

    materials used in Cryogenic Fluid Circuits of CTPT, the Contractor shall

    the spare parts and consumables, which are likely to be

    replaced/ used during operation and maintenance over a period of 2 years

    inal acceptance. The constituents and quantity of such spare parts

    shall be worked out, considering the causative factors such as norma

    wear & tear, fatigue cycles, creep, Mean Time Between Failures

    spare parts allocated for this purpose shall not be consumed by the

    Contractor during erection and commissioning. In case of emergency, the

    Department may allow the Contractor to utilize these spare parts during

    erection and commissioning and the Contractors shall replace the same

    Realization of Cryogenic Fluid circuits of

    Page 1.16

    section 2.4.8 of volume 2, are

    The general specifications of the

    The detailed purchase

    specifications for the individual items of materials to be purchased shall be

    The purchase specifications of such materials,

    the Contract, shall be

    are given in Volume 2 of

    : Over and above the quantity required

    as per the requirements given in the

    shall be supplied as fully

    alone pieces. These spare

    materials are meant to be stored in the Department’s inventory for

    g augmentation (not under the scope of the Contractor) to CTPT

    so as to comply with unforeseen requirements in future. The spare

    specified for similar

    of spares to be

    Spare parts and consumables for erection and commissioning: For the

    , the Contractor shall

    the spare parts and consumables to be replaced/ used during

    Spare parts and consumables for operation and maintenance: For the

    , the Contractor shall

    s and consumables, which are likely to be

    replaced/ used during operation and maintenance over a period of 2 years

    . The constituents and quantity of such spare parts

    shall be worked out, considering the causative factors such as normal

    eep, Mean Time Between Failures, etc. The

    spare parts allocated for this purpose shall not be consumed by the

    Contractor during erection and commissioning. In case of emergency, the

    ilize these spare parts during

    erection and commissioning and the Contractors shall replace the same

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3.3.6 SHOP FABRICATION

    As far as possible, t

    fabricated at the Contractor’

    that they can be transported by sea

    for fabrication are

    Upon completion of

    shall organize Pre

    representatives and the Third party inspection agency shall participate.

    The Contractors shall communicate, approximately 3 weeks in advance,

    the readiness of the system for

    1.3.3.7 INSPECTION

    The Contractor shall be responsible

    Party Inspection agency

    scopes of inspection are given in Volume

    charges shall be included in the cost of Cryogenic Fluid Circ

    1.3.3.8 PACKING, TRANSPORTATION, STORAGE AND HANDLING OF

    MATERIALS

    The Contractor shall be responsible for packing, transportation, storage

    and handling of materials as per Section

    1.3.3.9 ONSITE CONSTRUCTION, FABRICATION AND ERECTION

    The Contractor shall be responsible for onsite

    Cryogenic Fluid Circuits of CTPT

    & erection are given in Volume

    The works done by the Contractor during

    shall also be inspected by the TPI agency.

    The Contractor shall arrange for constructing temporary sheds/ buildings

    for storing materials of

    equipments, tools & tackles, site office, etc. The Contractor’

    shall not be permitted to reside inside t

    work. The Contractor shall arrange for transportation, accommodation,

    food, health care, communication, etc for their personnel.

    1.3.3.10 INSURANCE

    The Contractor shall be responsible for insurance as per Section

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    FABRICATION

    As far as possible, the Cryogenic Fluid Circuits of CTPT

    fabricated at the Contractor’s/ Sub-contractor’s factories to such an extent

    that they can be transported by sea/ air/ road. The detailed specification

    are given in Volume 2.

    Upon completion of shop fabrication of major systems

    shall organize Pre-delivery inspection review, in which the

    representatives and the Third party inspection agency shall participate.

    The Contractors shall communicate, approximately 3 weeks in advance,

    the readiness of the system for Pre-delivery inspection.

    shall be responsible to arrange and coordinate with Third

    Party Inspection agency for inspection as per Section 1.6.7

    inspection are given in Volume 2. The price towards TPI

    charges shall be included in the cost of Cryogenic Fluid Circ

    PACKING, TRANSPORTATION, STORAGE AND HANDLING OF

    The Contractor shall be responsible for packing, transportation, storage

    and handling of materials as per Section 1.6.8.

    ONSITE CONSTRUCTION, FABRICATION AND ERECTION

    The Contractor shall be responsible for onsite fabrication & erection

    Cryogenic Fluid Circuits of CTPT. The detailed specification

    & erection are given in Volume 2.

    The works done by the Contractor during fabrication and

    be inspected by the TPI agency.

    The Contractor shall arrange for constructing temporary sheds/ buildings

    for storing materials of Cryogenic Fluid Circuits of CTPT

    equipments, tools & tackles, site office, etc. The Contractor’

    shall not be permitted to reside inside the Department’s premises after the

    work. The Contractor shall arrange for transportation, accommodation,

    food, health care, communication, etc for their personnel.

    The Contractor shall be responsible for insurance as per Section

    Realization of Cryogenic Fluid circuits of

    Page 1.17

    Cryogenic Fluid Circuits of CTPT shall be

    factories to such an extent

    road. The detailed specifications

    of major systems, the Contractor

    ew, in which the Department’s

    representatives and the Third party inspection agency shall participate.

    The Contractors shall communicate, approximately 3 weeks in advance,

    to arrange and coordinate with Third

    1.6.7. The detailed

    The price towards TPI

    charges shall be included in the cost of Cryogenic Fluid Circuits.

    PACKING, TRANSPORTATION, STORAGE AND HANDLING OF

    The Contractor shall be responsible for packing, transportation, storage

    ONSITE CONSTRUCTION, FABRICATION AND ERECTION

    fabrication & erection of

    . The detailed specification for fabrication

    fabrication and erection at site

    The Contractor shall arrange for constructing temporary sheds/ buildings

    Cryogenic Fluid Circuits of CTPT, erection

    equipments, tools & tackles, site office, etc. The Contractor’s personnel

    he Department’s premises after the

    work. The Contractor shall arrange for transportation, accommodation,

    food, health care, communication, etc for their personnel.

    The Contractor shall be responsible for insurance as per Section 1.6.9.

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3.3.11 COMMISSIONING

    The Cryogenic Fluid Circuits of CTPT

    Department and the Contractor. The detailed scopes of

    are given in Volume

    prerequisite to final acceptance

    1.3.3.10 DOCUMENTATION

    The Contractor shall be responsible for documentation as per

    1.6.13. The detailed lists of documents to be submitted are

    Volume 2.

    1.3.4 MUTUAL OBLIGATION

    1.3.4.1 If not otherwise explicitly stated in the Contract, either Party shall be

    responsible for obtainin

    in their own country regarding the terms and conditions of this Contract.

    1.3.4.2 DEPUTATION OF REPRESENTATIVES

    In order to fulfill the obligation of th

    and the other Party shall receive the

    purposes:

    1.3.4.2.1 The Contractor’s

    participation in

    a. Design review

    b. HAZOP study

    c. Onsite fabricati

    d. Rectification of defect, if any, during the

    1.3.4.2.2 The Department’s representatives shall visit the Contractor’

    contractor’s premises for participation in

    a. Detail engineering review

    b. Inspection/ progress review d

    c. Training

    d. Pre-delivery inspection

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    COMMISSIONING

    Cryogenic Fluid Circuits of CTPT shall be commissioned jointly by the

    Department and the Contractor. The detailed scopes of

    are given in Volume 2. The satisfactory completion of Commissio

    inal acceptance.

    DOCUMENTATION

    The Contractor shall be responsible for documentation as per

    The detailed lists of documents to be submitted are

    MUTUAL OBLIGATION

    If not otherwise explicitly stated in the Contract, either Party shall be

    responsible for obtaining any Government permission/ approval required

    in their own country regarding the terms and conditions of this Contract.

    DEPUTATION OF REPRESENTATIVES

    In order to fulfill the obligation of the Contract, either Party shall depute

    and the other Party shall receive their representatives for the following

    s representatives shall visit the Department’s premise

    review

    HAZOP study

    Onsite fabrication, erection and commissioning

    Rectification of defect, if any, during the warranty period

    The Department’s representatives shall visit the Contractor’

    contractor’s premises for participation in

    engineering review

    nspection/ progress review during fabrication

    inspection

    Realization of Cryogenic Fluid circuits of

    Page 1.18

    shall be commissioned jointly by the

    Department and the Contractor. The detailed scopes of commissioning

    Commissioning is a

    The Contractor shall be responsible for documentation as per Section

    The detailed lists of documents to be submitted are given in

    If not otherwise explicitly stated in the Contract, either Party shall be

    g any Government permission/ approval required

    in their own country regarding the terms and conditions of this Contract.

    Contract, either Party shall depute

    representatives for the following

    representatives shall visit the Department’s premises for

    period

    The Department’s representatives shall visit the Contractor’s/ Sub-

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.3.4.2.3 The list of the representatives deputed as well as the period of stay shall

    be intimated by either Party to the other

    arrival.

    1.3.4.2.4 All the expenses for deputation of

    borne by themselves.

    1.3.4.2.5 The representatives of the visiting Party shall observe the laws, rules and

    regulations, which are in force in the receiving Party’s country.

    1.3.4.3 The Parties shall carry out joint technical and

    progress of execution of the Contract as required on mutually agreed

    schedules.

    1.4 SUMMARY OF SYSTEM

    This Section gives a summarized description of

    Cryogenic Fluid Circuits of CTPT

    descriptions are given

    1.4.1 CRYOGENIC FLUID

    Cryogenic Fluid Circuits of CTPT include

    Liquid Hydrogen (LH2),

    Gaseous Hydrogen (GH2)

    such as Electro

    safety relief devices, bellows/ flexible hoses, control valves, etc. The

    circuits have process measurements such as fluid/ surface temperature,

    pressure, flow rate, etc.

    LH2 SYSTEM CIRCUITS

    � SI LH2 fill circuit from LH2 road tanker to LH2 run

    and DTK 2

    � SI LH2 feed circuits from run

    different Test articles

    � SI hydrogen disposal

    interface marked.

    � SI dump circuits from LH2 runtanks DTK 230

    tank DTK 250

    � Safety relief devices

    230 and DTK 200

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    The list of the representatives deputed as well as the period of stay shall

    be intimated by either Party to the other 2 weeks prior to the date of

    All the expenses for deputation of representatives of either Party shall be

    borne by themselves.

    The representatives of the visiting Party shall observe the laws, rules and

    regulations, which are in force in the receiving Party’s country.

    The Parties shall carry out joint technical and managerial reviews on the

    progress of execution of the Contract as required on mutually agreed

    SYSTEM DESCRIPTION

    gives a summarized description of the systems constituting

    Cryogenic Fluid Circuits of CTPT in brief. The complete system

    descriptions are given Volume 2, with drawings.

    FLUID CIRCUITS

    Cryogenic Fluid Circuits of CTPT include Super-Insulated (SI)

    Liquid Hydrogen (LH2), Liquid Oxygen (LOX), Liquid Nitrogen (LN2)

    Gaseous Hydrogen (GH2) systems. These circuits have flow components

    such as Electro-Pneumatic (EP) globe valves, manual valves, filters,

    safety relief devices, bellows/ flexible hoses, control valves, etc. The

    circuits have process measurements such as fluid/ surface temperature,

    , flow rate, etc.

    CIRCUITS: These include the following:

    LH2 fill circuit from LH2 road tanker to LH2 run

    and DTK 200.

    LH2 feed circuits from run tanks DTK 230 and DTK 200 to

    different Test articles

    SI hydrogen disposal/ vent circuits from Test articles to

    interface marked.

    SI dump circuits from LH2 runtanks DTK 230 & DTK 200

    tank DTK 250 to the interface marked.

    afety relief devices, vent & other circuits for LH2 runtanks DTK

    230 and DTK 200 to the interface marked.

    Realization of Cryogenic Fluid circuits of

    Page 1.19

    The list of the representatives deputed as well as the period of stay shall

    prior to the date of

    representatives of either Party shall be

    The representatives of the visiting Party shall observe the laws, rules and

    regulations, which are in force in the receiving Party’s country.

    managerial reviews on the

    progress of execution of the Contract as required on mutually agreed

    the systems constituting

    complete system

    Insulated (SI) circuits for

    Liquid Nitrogen (LN2) and

    hese circuits have flow components

    Pneumatic (EP) globe valves, manual valves, filters,

    safety relief devices, bellows/ flexible hoses, control valves, etc. The

    circuits have process measurements such as fluid/ surface temperature,

    LH2 fill circuit from LH2 road tanker to LH2 run tanks DTK 230

    tanks DTK 230 and DTK 200 to

    from Test articles to the

    DTK 200 and Catch

    for LH2 runtanks DTK

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    LOX CIRCUITS:

    � SI LOX fill circuit from LOX

    and DTK 1

    � SI LOX f

    different Test articles

    � SI LOX disposal circuits from Test articles to

    � SI circuits from

    DTK 150

    � Safety relief devices, vent & other circuits for

    130 and DTK

    LN2 SYSTEM CIRCUITS

    � SI LN2 fill circuit from LN2 road tanker to LN2 tank DTK 300.

    � SI LN2 supply circuits from tank DTK 300 to different utilities

    � Safety relief devices, vent & other circuits for

    .GH2 SYSTEM CIRCUITS

    � SI Cold hydrogen gas feed circuit from GH2 cooler to Test articles /

    utilities.

    1.5 PRE-QUALIFICATION CRITERIA

    The Bidders capability shall be evaluated based on the following Pre

    Qualification (PQ)

    solicited in "Item Specification

    Commercial Bid (TCB). Those Bidders who comply with the PQ criteria only

    will be screened-in for opening and evaluation of Price

    to be submitted in the TCB shall be complete in all respects substantiated by

    attached documents and there shall not be any further opportunity for the

    Bidders to submit any information or document unless the

    solicits so at their own discretion.

    ambiguous information or false information or information non

    compliant with the PQ criteria shall be treated as sufficient cause to

    summarily reject such Bids.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    : These include the following:

    LOX fill circuit from LOX road tanker to LOX runtanks DTK 130

    and DTK 100.

    feed circuits from runtanks DTK 130 and DTK 1

    different Test articles

    disposal circuits from Test articles to the interface marked.

    SI circuits from LOX runtanks DTK 230 & DTK 200

    DTK 150 to the interface marked.

    Safety relief devices, vent & other circuits for LOX runtanks DTK

    30 and DTK 100 to the interface marked.

    CIRCUITS: These include the following:

    SI LN2 fill circuit from LN2 road tanker to LN2 tank DTK 300.

    SI LN2 supply circuits from tank DTK 300 to different utilities

    Safety relief devices, vent & other circuits for LN2

    CIRCUITS: These include the following:

    SI Cold hydrogen gas feed circuit from GH2 cooler to Test articles /

    QUALIFICATION CRITERIA

    The Bidders capability shall be evaluated based on the following Pre

    Qualification (PQ) criteria. The Bidders shall suitably fill-up the information

    Item Specification" and submit as part of the Techno

    Commercial Bid (TCB). Those Bidders who comply with the PQ criteria only

    in for opening and evaluation of Price Bid. The information

    to be submitted in the TCB shall be complete in all respects substantiated by

    attached documents and there shall not be any further opportunity for the

    Bidders to submit any information or document unless the

    their own discretion. Any lack of information or incomplete/

    ambiguous information or false information or information non

    compliant with the PQ criteria shall be treated as sufficient cause to

    summarily reject such Bids.

    Realization of Cryogenic Fluid circuits of

    Page 1.20

    LOX runtanks DTK 130

    eed circuits from runtanks DTK 130 and DTK 100 to

    the interface marked.

    DTK 200 and Catch tank

    LOX runtanks DTK

    SI LN2 fill circuit from LN2 road tanker to LN2 tank DTK 300.

    SI LN2 supply circuits from tank DTK 300 to different utilities

    tank DTK 300.

    SI Cold hydrogen gas feed circuit from GH2 cooler to Test articles /

    The Bidders capability shall be evaluated based on the following Pre-

    up the information

    as part of the Techno-

    Commercial Bid (TCB). Those Bidders who comply with the PQ criteria only

    Bid. The information

    to be submitted in the TCB shall be complete in all respects substantiated by

    attached documents and there shall not be any further opportunity for the

    Bidders to submit any information or document unless the Department

    Any lack of information or incomplete/

    ambiguous information or false information or information non-

    compliant with the PQ criteria shall be treated as sufficient cause to

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.5.1 Contractor's financial

    The Contractor must comply with the following financial soundness and

    previous experience criteria.

    added on the annual turnover as well as price of previously completed

    to arrive at the present value as on 31/03/2017.

    1.5.1.1 The average annual financial turnover during last 3 years ending 31/03/201

    shall be at least Rs

    1.5.1.2 The company must have made profit in at least 3 years out of 5 years ending

    31/03/2017 as per audit balance

    1.5.1.3 The price of similar works

    31/03/2017 shall be as follows:

    � 3 similar completed works costing not less than Rs

    � 2 similar completed works costing not less than Rs

    � 1 similar completed work costing not less than Rs

    “Similar completed

    systems using

    completion/ Final acceptance certificate issued by the Client in favor of

    the Contractor

    agency/ Consultant

    1.5.2 Technical capability of Contractor:

    The quantum of works completed by the Contractor put together in maximum

    of 3 work orders during last 7 years ending 31/03/2017 shall be as follows.

    The Work completion/ Final acceptance certificate issued by the Client in

    favor of the Contractor

    agency/ Consultant

    1.5.2.1 Plant piping Design, engineering, analysis, fabrication, testing and erection

    of Vacuum jacketed/ Super insulated

    Sch 5S and 150m length

    1.5.2.2 The Bidder must possess adequate & suitably qualified and experienced in

    house personnel at all levels such as managerial, supervisory & tradesmen

    level and in the area of design, procurement, fabrication & erection to

    execute the works given in this document.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    Contractor's financial soundness and previous experience

    The Contractor must comply with the following financial soundness and

    previous experience criteria. Escalation at the rate of 7% per full year may be

    on the annual turnover as well as price of previously completed

    to arrive at the present value as on 31/03/2017.

    The average annual financial turnover during last 3 years ending 31/03/201

    shall be at least Rs 4.5 Crore.

    The company must have made profit in at least 3 years out of 5 years ending

    audit balance sheets.

    The price of similar works successfully completed during last 7 years ending

    31/03/2017 shall be as follows:

    3 similar completed works costing not less than Rs 5.75

    2 similar completed works costing not less than Rs 7.0 Crore each

    1 similar completed work costing not less than Rs 11 Crore.

    completed works” shall primarily involve realization of cryogenic

    using vacuum-insulation (Tanks or pipeline).

    / Final acceptance certificate issued by the Client in favor of

    the Contractor or Inspection release note by Third Party Inspection

    agency/ Consultant must be dated between 01/04/2010 and 31/03/2017.

    Technical capability of Contractor:

    works completed by the Contractor put together in maximum

    of 3 work orders during last 7 years ending 31/03/2017 shall be as follows.

    The Work completion/ Final acceptance certificate issued by the Client in

    favor of the Contractor or Inspection release note by Third Party Inspection

    agency/ Consultant must be dated between 01/04/2010 and 31/03/2017.

    Design, engineering, analysis, fabrication, testing and erection

    Vacuum jacketed/ Super insulated cryogenic piping of at least DN80,

    0m length.

    The Bidder must possess adequate & suitably qualified and experienced in

    house personnel at all levels such as managerial, supervisory & tradesmen

    level and in the area of design, procurement, fabrication & erection to

    works given in this document.

    Realization of Cryogenic Fluid circuits of

    Page 1.21

    soundness and previous experience:

    The Contractor must comply with the following financial soundness and

    Escalation at the rate of 7% per full year may be

    on the annual turnover as well as price of previously completed works

    The average annual financial turnover during last 3 years ending 31/03/2017

    The company must have made profit in at least 3 years out of 5 years ending

    successfully completed during last 7 years ending

    5.75 Crore each Or

    Crore each Or

    Crore.

    works” shall primarily involve realization of cryogenic

    (Tanks or pipeline). The Work

    / Final acceptance certificate issued by the Client in favor of

    or Inspection release note by Third Party Inspection

    must be dated between 01/04/2010 and 31/03/2017.

    works completed by the Contractor put together in maximum

    of 3 work orders during last 7 years ending 31/03/2017 shall be as follows.

    The Work completion/ Final acceptance certificate issued by the Client in

    ote by Third Party Inspection

    must be dated between 01/04/2010 and 31/03/2017.

    Design, engineering, analysis, fabrication, testing and erection

    ing of at least DN80,

    The Bidder must possess adequate & suitably qualified and experienced in-

    house personnel at all levels such as managerial, supervisory & tradesmen

    level and in the area of design, procurement, fabrication & erection to

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.5.2.3 The Bidder must possess adequate in

    analysis tools, equipments

    infrastructures to carry out factory fabrication and required facilities for onsite

    erection.

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    The Bidder must possess adequate in-house facilities such as

    equipments, machineries, testing facility

    infrastructures to carry out factory fabrication and required facilities for onsite

    Realization of Cryogenic Fluid circuits of

    Page 1.22

    house facilities such as design &

    testing facility and other

    infrastructures to carry out factory fabrication and required facilities for onsite

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    1.6 TERMS & CONDITIONS

    General, commercial and legal terms and conditions to be incorporated in

    the Contract to be entered into between

    Contractor are given in this

    Standard formats for Bank Guarantee

    Performance Bank Guarantee

    are given in Annexure to the

    Sector Enterprises under Government of India may provide Indemnity

    bond in lieu of BG/ PBG

    1.6.1 CONTRACT STRUCTURE

    1.6.1.1 ENTIRE AGREEMENT

    The Contract to be entered into shall convey the final agreement between

    the Department and the

    complete & exclusive statement of the terms of the agreement.

    1.6.1.2 ASSIGNMENT

    The Contract shall be binding upon the successors and assignees of the

    Parties to the Contract

    either Party without prior written consent of the other. If the

    becomes insolvent or being a firm or company whether incorporated or

    not is dissolved or goes into bankruptcy or is caused to be wo

    except for re-construction purposes or carried on its business under a

    receiver, the representatives in law of the estate of the

    such receiver, liquidator or any person in whom the agreement may be

    vested shall forthwith give notic

    shall remain liable for the successful performance of the

    successors of their obligations under th

    circumstance.

    1.6.1.3 EFFECTIVE DATE OF CONTRACT

    The Contract shall become effective

    Parties. The “Date of Contract” referred to in this document shall mean the

    effective date of the Contract.

    1.6.1.5 CANCELLATION OF CONTRACT

    1.6.1.5.1 The Department will have the right, at any time, to cancel the

    either wholly or i

    Request for Proposal for Realization of Cryogenic Fluid circuits of

    Cryogenic Turbo-Pump Test facility

    Summary and Terms & Conditions

    CONDITIONS

    General, commercial and legal terms and conditions to be incorporated in

    to be entered into between the Department and the

    or are given in this Section.

    Standard formats for Bank Guarantee (BG), Indemnity bond and

    Performance Bank Guarantee (PBG) mentioned in the following

    are given in Annexure to the RFP, Volume 1. Contractors who are Public

    Sector Enterprises under Government of India may provide Indemnity

    BG/ PBG.

    CONTRACT STRUCTURE

    ENTIRE AGREEMENT

    to be entered into shall convey the final agreement between

    the Department and the Contractor on the terms and conditions and be a

    exclusive statement of the terms of the agreement.

    shall be binding upon the successors and assignees of the

    the Contract. It shall not be assigned in whole or in part by

    arty without prior written consent of the other. If the

    insolvent or being a firm or company whether incorporated or

    not is dissolved or goes into bankruptcy or is caused to be wo

    construction purposes or carried on its business under a

    receiver, the representatives in law of the estate of the Contract

    such receiver, liquidator or any person in whom the agreement may be

    vested shall forthwith give notice thereof in writing to the Department and

    shall remain liable for the successful performance of the

    successors of their obligations under the Contract

    EFFECTIVE DATE OF CONTRACT

    The Contract shall become effective from the date of signing by the

    The “Date of Contract” referred to in this document shall mean the

    effective date of the Contract.

    CANCELLATION OF CONTRACT

    The Department will have the right, at any time, to cancel the

    either wholly or in part by giving written notice 1 month in advance

    Realization of Cryogenic Fluid circuits of

    Page 1.23

    General, commercial and legal terms and conditions to be incorporated in

    Department and the

    , Indemnity bond and

    mentioned in the following Sections

    ors who are Public

    Sector Enterprises under Government of India may provide Indemnity

    to be entered into shall convey the final agreement between

    or on the terms and conditions and be a

    exclusive statement of the terms of the agreement.

    shall be binding upon the successors and assignees of the

    . It shall not be assigned in whole or in part by

    arty without prior written consent of the other. If the Contractor

    insolvent or being a firm or company whether incorporated or

    not is dissolved or goes into bankruptcy or is caused to be wound up

    construction purposes or carried on its business under a

    Contractor or any

    such receiver, liquidator or any person in whom the agreement may be

    e thereof in writing to the Department and

    shall remain liable for the successful performance of the Contractor or the

    Contract under any

    from the date of signing by the

    The “Date of Contract” referred to in this document shall mean the

    The Department will have the right, at any time, to cancel the Contract

    month in advance. The

  • Request for Proposal for

    Cryogenic Turbo

    Volume 1: Summary and Terms & C

    Contractor shall undertake to observe the instructions of the Department

    as to the winding up of the

    of their Sub-contract

    1.6.1.5.2 The Department will

    Contract either wholly or in part

    public interest.

    1.6.1.5.3 In the case of cancellation of the

    fault of the Contract

    steps to implement the Department’s instructions. The period to be

    allowed to implement shall be fixed by the Department after consultation

    with Contractor and, in general, shall not exceed 3 months.

    1.6.1.5.4 Subject to the Con

    Department will take over from the

    price, all finished parts not yet delivered to the Department, all unused

    and undamaged materials, bought

    of fabrication in the possession of the

    the Contract, except such material,

    agreement of the Department, elect to retain.

    1.6.1.5.5 The Department