REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 100 KVA AVR AT CTI- LEH UNDER FM PHASE-III (BATCH-II) REF No. BECIL/RD/FM PHASE III (BATCH-II)/CTI-LEH/100 KVA AVR/2019-20 Dated: 11.09.2019 Broadcast Engineering Consultants India Ltd (A Government of India Enterprise) (A Mini Ratna Company) Head Office: 14-B Ring Road, IP Estate, New Delhi- 110002 Tel: +91 11 23378823 Fax: 91 1123379885 Corporate Office: BECIL BHAWAN, C-56/A-17, Sec-62, Noida-201 307 E-mail: [email protected] Web: www.becil.com

Upload: others

Post on 26-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

REQUEST FOR PROPOSAL (RFP)

FOR SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 100 KVA AVR AT CTI- LEH UNDER FM PHASE-III (BATCH-II)

REF No. BECIL/RD/FM PHASE III (BATCH-II)/CTI-LEH/100 KVA AVR/2019-20 Dated: 11.09.2019

Broadcast Engineering Consultants India Ltd

(A Government of India Enterprise) (A Mini Ratna Company)

Head Office: 14-B Ring Road, IP Estate, New Delhi- 110002 Tel: +91 11 23378823 Fax: 91 1123379885

Corporate Office: BECIL BHAWAN, C-56/A-17, Sec-62, Noida-201 307

E-mail: [email protected]

Web: www.becil.com

Page 2: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1. About BECIL:-

Broadcast Engineering Consultants India Limited (BECIL) an ISO 9001:2008 certified, a Mini Ratna public sector

enterprise of Government of India under Ministry of Information & Broadcasting, was established on 24th

March, 1995 for providing consultancy services of International Standards for Broadcasting in transmission

and production technology including turnkey solutions in the specialized fields of Terrestrial & Satellite

Broadcasting, Cable and various IT related fields, including acoustics & Audio- Video systems & CCTV.

BECIL is appointed as system Integrator by Govt. of India for setting up of Common Transmission

Infrastructure (CTI) for Private FM Broadcaster under FM Phase-III (Batch-II) scheme of Government of India

where Prasar Bharti Infrastructure is available

2. Tender Notice :-

Broadcast Engineering Consultants India Ltd. (BECIL) invites tenders / bids from Original Equipment

Manufacturer (OEM) / Authorized Vendors for the Supply, Installation, Testing & Commissioning of 100

KVA AVR (Automatic Voltage Regulation) at FM CTI Leh as described in the Tender Document for CTI LEH as

per attached section-I.

Bidding will be conducted through Two Cover Competitive Bidding procedures and are open to all

eligible Bidders as defined in Tender Document

The TENDER is issued for “Supply, Installation, Testing & Commissioning of 100 KVA AVR

(Automatic Voltage Regulation) at FM CTI Leh for FM Phase-III (Batch-II)”. The Bidder is

responsible for completeness of the project.

Bidder shall quote the rates in Indian Rupees for the entire contract on a single responsibility basis

such that the tender price covers contractors all obligations mentioned.

The payment under this contract will be made in Indian Rupees.

Each bidder shall submit only ONE tender either by herself/himself or as a partner in a joint venture

or as a member of consortium. If a bidder or any of the partners in a joint venture or any one of the

members of consortium participate in more than one bid, the bids are liable to be rejected and EMD

will be forfeited.

Page 3: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

The bidder shall bear all costs associated with the preparation and submission of bid and BECIL will in no

case be responsible or liable for those costs, regardless of the conduct or outcome of the tender process.

Qualification requirements are specified in the Tender Document.

In case the bidder has any doubt about the meaning of anything contained in the tender

document, he/she shall seek clarification on or before specified date of submission of bid by email or

written letter to;

Alok Chauhan

Dy.Manager(Projects)

Broadcast Engineering Consultants India Limited (BECIL)

BECIL Bhawan, C – 56/ A-17, Sector – 62, Noida – 201307 (Uttar Pradesh)

Phone: 0120 – 4177865

Mobile: 9599818963

Email: [email protected]

Bidders shall have to submit refundable Earnest Money Deposit (EMD) of Rs. 10,000/- (Rupees Ten Thousand

Only) and non-refundable Tender Fee of Rs. 1,000/- (Rupees One Thousand Only) in the form of Demand Draft

Only drawn on any scheduled bank in favor of "Broadcast Engineering Consultants India Limited” Payable at

New Delhi along with the bid.

The Management of BECIL reserves the right to amend or withdraw any of the terms and conditions

contained in the Tender Document or to reject any or all the bids without giving any notice or assigning any

reason. The decision of the Chairman and Managing Director, Broadcast Engineering Consultants India Limited

in this regard shall be final and binding on all.

The successful bidder will have to deposit a Performance Security Deposit for due and proper fulfillment of

contract in the form of Account Payee Demand Draft (DD) or Bank Guarantee (BG) drawn in favor of “Broadcast

Engineering Consultants India Limited.” Payable at New Delhi equivalent to 10% of the value of order within 15

days from the date of issue of the work order failing which the respective bidder can be cancelled with

immediate effect.

EMD of successful bidder shall be discharged after receipt and acceptance of the Performance Guarantee

towards full Security Deposit. EMD of unsuccessful bidders shall be discharged after award of work to the

successful bidder. The BG must be valid for entire warranty period i.e. 24 months from the date of commissioning

or 27 months from the date of supply

Page 4: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

TABLE OF CONTENTS

A. SECTION-I: GENERAL

1.1 RFP Schedule and Critical Dates

1.2 Intent of the Request for Proposal

1.3 Procedure Terms and Conditions

1.4 Eligibility Criteria

1.5 Commercial Conditions

1.5.1 Earnest Money Deposit

1.5.2 Prices

1.5.3 Payment Terms

1.5.4 Freight and Insurance

1.5.5 Consignee

1.5.6 Delivery & Commissioning Period

1.5.7 Packing

1.5.8 Guarantee / Warranty

1.5.9 Authorization

1.5.10 Performance Bank Guarantee

1.5.11 Technical Manual

1.5.12 Penalty Clause

1.5.13 Service Tax

1.5.14 Compliance Statement

1.6 Proposal Response Format

1.7 Method of Evaluation and Award

1.7.1 Evaluation Criterion

1.7.2 Product Quality

1.7.3 Compatibility

1.7.4 Up-gradation/ Modular Design

1.7.5 Assurance of Supply

1.7.6 Quality

1.7.7 Service

1.7.8 Cost

1.7.9 Integration Experience

1.7.10 Delivery Schedule

1.7.11 Regulatory

Page 5: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

B. SECTION-II: Technical System Requirement Proposed Bill of Material & Technical Specifications

C. SECTION –III : Technical & Other particulars.

D. Section-IV : Schedule of Requirement(Technical Bid)

E. Section-V : Schedule of Requirement(Price Bid)

F. Section-VI : Vendor Information

Page 6: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION-I: GENERAL

1.1 RFP SCHEDULE AND CRITICAL DATES

The RFP tentative schedule and critical dates are shown below:

Event Date

1) RFP Issue to Prospective Bidders 11.07.19

2) Submission of Proposals/bids 20.09.19 at 14.00 hours

3) Technical opening of Bids 20.09.19 at 14.30 hours

4) Technical evaluation of proposal To be intimated

5) Opening of Financial Bid To be intimated

6) Commercial Bid evaluation To be intimated

7) Award of Purchase Order To be intimated

8) Address of Submission and Opening of bid :

Broadcast Engineering Consultant India Limited (BECIL)

BECIL BHAWAN, C-56/A-17, SECTOR-62, NOIDA-201307(U.P)

Ph. 0120-4177850, Fax. 0120-4177879

9) Tender fee can only be submitted through Demand Draft before due date of tender submission.

1.2 INTENT OF THE REQUEST FOR PROPOSAL

The intent of this RFP is Supply, Installation, Testing, Commissioning of 100 KVA AVR (Automatic

Voltage Regulation) at FM CTI Leh. Tenderers are requested to quote their best possible price.

1.3 PROCEDURE TERMS AND CONDITIONS

1.3.1 The proposal is to be submitted in two-bid basis with separate Technical and Financial bid under

separated sealed covers.

1.3.2 Bid Responses must be addressed to and submitted at the following address: The Chairman &

Managing Director, Broadcast Engineering Consultants India Ltd, C-56/A-17, Sector-62,

Noida-201 307 Tel: 0120 417 7850, Fax: +95120-4332979. The envelope should be superscripted at

the top Proposal for “Supply, Installation, Testing, Commissioning of 100 KVA AVR” at FM CTI LEH

with due dates.

1.3.3 The proposal is to be submitted in two Bid system with separate Technical & Financial Bid

through offline mode only not later than 1400 hours on 20.09.2019. Bids received beyond the

specified date will be rejected. It is the responsibility of the Bidder to confirm that the bids have been

received on time within the specified dates.

1.3.4 All bids are to remain valid for six months from the date of opening of financial bid.

Page 7: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1.3.5 BECIL reserves the right to solicit additional information from Bidders to evaluate which bid best

meets the needs of the Project. Additional information may include, but is not limited to, past

performance records, lists of available items of work will be done simultaneously with the project,

on-site visit and evaluations by BECIL personnel, or any other pertinent information.

1.4 ELIGIBILITY CRITERIA

1.4.1 The bidder should have successfully carried out SITC of AVR in last five years and should submit

the documentary proof such as work order/completion certificate etc.

1.4.2 The bidder should be registered. A copy of Company registration (Companies Act 1956,

Proprietary firm) should be submitted.

1.4.3 Letter of Authorization from OEM/ Principal manufacture to quote in the tender.

1.4.4 The bidder should submit the compliance statement duly signed by OEM/OEM Authorized

representative.

1.4.5 A separate point by point compliance statement duly signed by bidder in respect to all points

laid down in the specifications for all the equipment/item(s) must be submitted.

1.5 COMMERCIAL CONDITIONS

Terms & Conditions:

Each bidder is required to accept the following terms and conditions:-

1.5.1 Tender Fee (Non-refundable)

1000/- (Rupees One Thousand Only) for purchase of tender document in the form of demand draft drawn on any schedule bank in favor of “Broadcast Engineering Consultant India Limited” Payable at New Delhi along with BID

1.5.2 Earnest Money 10,000/-in the form of Demand Draft drawn on any scheduled bank in favor of “Broadcast Engineering Consultant India Limited” Payable at New Delhi along with BID

1.5.3 Prices Prices : FOR Destination basis at site-LEH

1.5.4 Payment Terms for INR

70% against delivery of material at site 20% against installation and testing of equipment site, certified by Project In charge BECIL 10% against PBG submission of 10% of the total work order value for a period of 24 months from the date of commissioning.

1.5.5 Freight and Insurance The Freight and insurance for the consignment from place of origin to CTI site will borne by Supplier/S.I/OEM.

1.5.6 Consignee The equipment should be consigned to Common Transmission Infrastructure(CTI) FM Private Broadcasters, Doordarshan Kendra, High Power Transmitter, Stok, Leh, J&K, India

Page 8: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1.5.7 Delivery schedule and Commissioning

Delivery 4 weeks from Date of Purchase order. Installation, testing and Commissioning has to be completed within 2 week of the delivery of the equipment subject to readiness of the site.

1.5.8 Packing The equipment should be securely packed with proper insurance to withstand transit hazards during different modes of transportation.

1.5.9 Guarantee/Warranty The equipment shall be under warranty for period of 24 months from the date of commissioning and 27 months from the date of work order.

1.5.10 Authorization Original copy of Authorization letter from OEM / Principal manufacture should be submitted.

1.5.11 Performance Bank Guarantee

The successful bidder shall have to furnish a Performance bank guarantee (PBG) within 2 weeks of release of PO in favor of Broadcast Engineering Consultants India Ltd, 14-B, Ring Road IP Estate, New Delhi – 110002 for an amount equal to 10% of order value and valid for the period of Warranty/Guarantee

1.5.12 Technical Manual Two print copies of Technical Manual / Operation Manual supplied with the equipment. One set of test certificate of each equipment has to be enclosed with shipment and one copy sent to BECIL.

1.5.13 Penalty Clause In case of late delivery of equipment, the supplier shall be liable to pay penalty @ 0.5% of the order value per week of delay or a part thereof, up to a maximum amount of 10% of order value, after which the order is liable to be cancelled.

1.5.14 Invoicing and Tax : Invoicing will be done on M/s Broadcast Engineering Consultant India Limited (BECIL), 14-B INDRAPRASTHA Estate, Ring Road, New Delhi-110002, GST No. 07AAACB2575L1ZK, Taxes as applicable as the time of invoicing/delivery.

1.5.15 Compliance Statement

A point by point full compliance statement in respect to all parameters related to the concerned equipment’s/items from the respective principle manufacturers should be submitted in the prescribed format given below at Table 1.

Page 9: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

Table 1

Compliance Statement Performa

Sr.

No

.

Sr. No. of Specification

Description of Specification

Page number of Spec. in RFP

Compliance (Yes/No)

Deviation ,if any, to the specification

Optional Items ,if any, required for the completeness of system

Features in the offered product in addition to BECIL specs

1.6 PROPOSAL RESPONSE FORMAT

The bidder are requested to use the same or similar format as given below while submitting the commercial

bids. The proposal must be submitted strictly in the following fashion as in Table 2.

a) The proposal shall be submitted through offline and Limited enquiry only.

b) Proposals shall be based only on the items contained in this RFP and its standard required accessories.

c) The RFP includes official response to pre-proposal conference questions, addenda, and any other

material published by the BECIL pursuant the RFP. The bidder is to disregard any previous draft

materials and any oral representations it may have received.

d) All responses to the requirements in Sections (list appropriate section) of this RFP must clearly state

whether the proposal will satisfy the referenced requirements, and the manner in which the

requirement will be satisfied.

e) A point by point compliance statement duly signed by bidder in respect to all points laid down in the

specifications for all the equipment/item(s) must be submitted.

Table 2

S.No Description Qty. HSN

Code

Make/Model Unit

Price

GST

Taxation

Total

Price

Total Price

Page 10: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1.7 METHOD OF EVALUATION AND AWARD

1.7.1 Evaluation Criterion The proposals will be evaluated for meeting technical

requirements and system completeness based on which

commercial analysis will be carried out. Final selection of the

proposal / equipment will be based on the merits of the

techno-commercial proposal submitted and will be decided

by the evaluation committee. Factors which will be

considered as a part of evaluation amongst others will include

the following.

1.7.2 Product Quality Only reputed industry tested equipment and solutions with

reliability will be accepted, nonstandard make/model of

equipment will disqualify the proposal technically.

1.7.3 Compatibility System is envisaged to be compatible with the other quoted

equipment.

1.7.4 Up-gradation/ Modular design System/equipment be future looking and open to Technology

up-gradations besides capable of add on facility and features

in phased manner.

1.7.5 Assurance of supply Vendor’s technical capability, Organizational stability,

reliability of equipment and ability to meet timelines.

1.7.6 Quality Equipment stability, guaranteed uptime parameters, life of

equipment.

1.7.7 Service After sales service, availability of spare parts/technical

support, warrantee offered.

1.7.8 Cost Cost of the system as proposed and the apparent future

financial implications, AMC and Total cost of Ownership.

1.7.9 Integration Experience Expertise and experience of the bidder in system / sub system

of Integration of similar nature.

1.7.10 Delivery Schedule Delivery time line will be critical parameter for evaluation

and final decision.

1.7.11 Regulatory should meet the Regulatory compliance, Safety requirements;

Environmental objectives.

Page 11: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION—II (GENERAL)

SITC OF AUTOMATIC VOLTAGE REGULATOR OF 100 KVA CAPACITY

1.0 GENERAL The unit shall be self-contained, compact, efficient and highly reliable for 100% duty cycle at full load, working round- the-clock, 365 days a year and based on field-proven design using modern technology. All materials used in the construction shall be of high quality and as per relevant Indian Standard Specifications. The manufacturer should have ISO 9008 certificate.

1.1 SCOPE

The work will include SITC OF IN DOOR, SERVO CONTROLLED AUTOMATIC VOLTAGE REGULATOR OF 415 VOLTS, 3 PHASE, 50Hz, 100 KVA capacity conforming to the technical specifications in Section – II, including the termination of cables for connections/ inter connections along with the associated work of cable lugs, compression glands, necessary power supply input/output MCCBs and commissioning at FM CTI site- LEH

1.2 SALIENT FEATURES OF AVR

1.2.1 Modular construction of control circuitry for easy replace ability. 1.2.2 Control voltage device designed using solid-state electronic circuits. 1.2.3 High-speed step-less correction of output voltage using A.C synchronous motors,

without hunting or overshooting. 1.2.4 Independent controls for each of the three phases to avoid unbalance in output

load voltage in any phase affecting the output of AVR. 1.2.5 Built-in overloads and short-circuits protection. 1.2.6 Should not introduce waveform distortion. 1.2.7 Front access for installation and servicing. 1.2.8 Compact size. (One of the base dimension be restricted to 750 mm. maximum) 1.2.9 Full complement of meters, controls, alarms and indicators. 1.2.10 All moving contacts designed to give long and trouble free service life. 1.2.11 Rugged construction and field-proven design requiring minimum maintenance. MTBF of

the equipment to be specified. 1.2.12 Suitable for continuous use in tropical climatic conditions.

1.3 GENERAL CONDITIONS

1.3.1 The 100 KVA A.V.R. offered shall generally conform to the technical specifications in Section – II

against each clause. Should a tenderer, however, desire to depart in any respect from the given specifications either on account of manufacturing practice or for any other reasons, he must specifically point out the modifications explaining in detail each and every departure he proposes to make. The Performa given in Section – II against each Clause should be completely filled in while submitting the tender.

1.3.2 The A.V.R. shall be designed for efficient and trouble free service for continuous day & night operation. All materials used in the construction shall be of high quality and conform to the IS specifications No. 9815-1981 amended to date.

1.3.3 All work shall be carried out in accordance with standard electrical practice. The units shall be designed for easy maintenance and complete safety to operating personnel.

Page 12: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1.3.4 Only easily available standard components should be used as far as possible. The tenderers should

undertake to make available spares and replacement parts as and when required for period of ten years.

1.3.5 The requirements in para 1.3.2, 1.3.3 and 1.3.4 should be noted and confirmed in the tender. 1.4 COMPLETENESS OF CONTRACT

All fittings and accessories which may not have been specifically mentioned or which the tenderer may not explicitly mention in his tender but are necessary for the operation of the A.V.R. shall be deemed to be included in the contract and be provided by the contractor without any extra charge. Adequate quantity of oil conforming to relevant standards shall also be included.

1.5 DOCUMENTS TO BE UPLOADED WITH TENDER

The tenderer shall submit the following documents copy with the tender.

1.5.1 Leaflets with illustrations relevant to the equipment offered. 1.5.2 A schedule of technical particulars shall be furnished by the manufacturer in the Performa as shown

in Section-II. 1.5.3 Work order copy of last 3 years. 1.5.4 Copy of ISO Certification 1.5.5 Type test certificate from NABL lab. 1.5.6 Minimum three work orders from Govt. departments of 100 kVA and above ratings. 1.6 DOCUMENTS TO BE SUBMITTED AFTER ACCEPTANCE OF TENDER

Following documents will be supplied to the consignee along with A.V.R. at the time of delivery:

i) Two copies of the book of instructions for the installation, operation, testing, commissioning and maintenance of A.V.R.

ii) Factory test certificates showing the results of tests actually conducted on the A.V.R. iii) Two sets of finalized drawings showing dimensions and other fixtures on the A.V.R. 1.7 DELIVERY

Delivery of the AVR ordered shall be completed within 4 weeks at FM CTI site- LEH. This period shall be effective from the date of acceptance of the tender and shall be independent of any other factors.

1.8 PACKING

The packing shall be suitable to withstand transportation hazards. A copy of packing slip giving the list of items included in the package together with the package number shall be mailed in advance to consignee.

1.9 GUARANTEE

The A.V.R. shall be guaranteed in all respects for satisfactory operation under load conditions for two years from the date of taking it into service. This should be confirmed.

Page 13: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

1.10 ERECTION

The supplier is required to install, test and commission the A.V.R. at site as SITC (Supply, installation, testing & commissioning) tender/works. All interconnection wiring work of AVR shall be the job of supplier. Mains incoming & outgoing cables at AVR input/output side also shall be terminated by supplier. Supplier shall have to arrange for CEA inspection & certification also for handing over the same to the AIR after completing all the works.

1.11 INSPECTION

The successful tenderer will have to get the A.V.R. inspected by Inspectors authorized by BECIL

and also undertake to arrange to conduct the following tests on the AVR in his workshop/factory

before dispatch. 1.11.1 TEST FOR CONTINUOUS OPERATION

The AVR shall be subjected to a continuous run for 24 hours ON load, while the input voltage is varied from min. to max. of the input voltage range & back to min. in not more than one minute. After this test the AVR shall pass the output voltage test as below.

i) OUTPUT VOLTAGE TEST ii) TEST OF RATE OF CORRECTION iii) LOCKED ROTOR TEST FOR SERVO MOTOR. 1.11.2 INSURANCE

Please refer to commercial terms. However it is stated that transit insurance and comprehensive

insurance of the AVR till it is handed over to the consignee shall be the responsibility of the tenderer. A

copy of the comprehensive insurance policy shall be handed over to consignee at the time of delivery

at site.

Page 14: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION – III TECHNICAL AND OTHER PARTICULALARS TO BE SUPPLIED BY THE TENDERERS

AGAINST BECIL REQUIREMENTS AS GIVEN BELOW General : 1. The A.V.R. shall generally conform to all provisions of IS 9815-1981 amended to date.

S. No. Item AIR specification Tenderer’s Offer with Exact value wherever required

2.0 TECHNICAL REQUIREMENTS

2.1 Capacity of AVR 100 KVA ( continuous)

2.2 Input voltage 260V to 460 V A.C Three Phase, 50Hz, 4 wire

2.3 Output Voltage 415 V +/-5% A .C Three Phase 50 Hz. (240 volts Phase to neutral), voltage shall be adjustable to +/-10 V with control located on front panel.

2.4 Voltage Regulation

No load to full load regulation should be ≤ 5V

2.5 Cable size at the Input and Output of AVR

120 Sq. mm. Aluminum Conductor cable (2 nos. per phase) and one no. 60 sq. mm. Aluminum conductor cable for neutral. The provision for cable termination and cable glands etc. to be provided accordingly. Cable will be supplied by BECIL/Vendor.

2.6 Frequency AVR should work satisfactorily with input frequency range of 50 Hz, +/-2 Hz

2.7 Distortion It should not introduce any output distortion.( To be shown on dual trace CRO )

2.8 AVR Type Indoor, free-floor standing, servo-controlled or any other state-of-the-art technology (sensing and control details to be indicated) with individual phase sensing and control for regulating unbalanced incoming voltage and suitable for unbalanced loads. The unbalance in load can be of the order of 50% of rated load. The output voltage stability with this unbalance (upto 50%) should be within +/-5% of the Nominal output voltage.

2.9 Speed of correction

6 volts/second or better.

2.10 Efficiency The efficiency of AVR shall be 95% or better

2.11 Transformer winding

Electrolytic prime grade copper.

2.12 Insulation Class As per IS amended up to date

2.13 Insulation Lever rated short duration power fluctuation withstand voltage.

As per IS amended up to date

Page 15: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

2.14 Metering & Indications

i) Digital meters shall be provided with selector switches for measurement of Phase to Phase & Phase to Neutral voltage on all three phases for Input and Output. ii) Digital ammeter in output on all three phrases. iii) Indications, on control panel shall be provided

for input/output voltage status.

2.15 Mode of operation

Facility should also be available to use AVR as a simple manually operated voltage regulator in case of failure of automatic control system. Selector switches for selection of mode Of operation (AUTO/ MANUAL) and other necessary control switches for this purpose may be provided on the front panel.

2.16 Type of Cooling OIL COOLED

2.17 Type of oil As per IS amended up to date

2.18 Electrical Protection

AVR shall be protected against over loads, short-circuit, over and surge voltage due to system faults, switching operations, and hotspot temperature. Complete details of protections (standard as well as optional) are to be furnished with the tender. MCCB of proper ratings of reputed makes (Siemens/L&T/EE only) are to be provided at the INPUT/OUTPUT.

2.19 Main Selector Switch

A four-position heavy-duty control switch shall be provided for the following operations

2.20 OFF The input supply is cut off.

2.21 TEST Input supply is through but output is cut off.

2.22 ON Input and output both are through.

2.23 BY-PASS arrangement

AVR gets isolated and the input gets directly connected to output.

2.24 Working Temperature

AVR shall work satisfactorily under ambient temperature of -20°C to 50°C and relative humidity of 95% non- condensing at 40°C.

2.25 Time-Delay Switching

An adjustable time delay device shall be provided so that the output is connected to load about 10 to 20 seconds ( adjustable) after the input is/switched on/restored after Power Supply failure or momentary interruption during which period the AVR output voltage will stabilize to the desired preset value.

Page 16: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

2.26 Designation Labels Suitable designation labels for all controls etc. shall be engraved on the panel and shall be distinctly visible.

2.27 Connections Star with insulated neutral.

2.28 Terminal arrangement

Cable end boxes for input & output to be provided for termination of 3 ½ core LT Cable suitable for 100 kVA Load.

2.29 Temp. Rise To be indicated

2.30 Component Losses

2.30.1 No load loss(Watts) at 415 V & 50 Hz frequency

To be indicated

2.30.2 Max. Loss (W) at full Load current at Winding temp. of 75°C and 415 V & also at 280 V(Phase to phase input voltage

To be indicated

2.31 Approximate Masses of Core & windings, Tank fittings accessories and Oil quantity Total Mass Kg

To be indicated

2.32 Overall Dimensions

To be indicated

2.32.1 For AVR

2.32.2 For Control Panel

2.32.3 One of the base dimensions should be restricted to 750 mm maximum

2.33 Insulation Insulation resistance between the terminals & body of the regulator shall not be less than 50 mega ohms when measured with 2500 volts meggar at room temperature not exceeding 50°C.

Page 17: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

2.34 MECHANICAL CONSTRUCTION

2.34.1 Enclosure The body of AVR shall be made of MS sheet of minimum 16 SWG thickness capable to with stand transit hazards and to provide mechanical protection to the sensitive parts.

2.34.2 Facility for movement

The AVR will be provided with sturdy wheels for ease of movement.

2.34.3 Outer Finish First quality paint after the initial primer coat shall be used to prevent rusting, corrosion etc.

2.34.4 Technical Literature

Two sets complete with circuit details.

2.35 Accessories All the accessories like earthing terminals lifting hook, terminal marking plate, diagram plate, rating plate, oil level gauge with cap, drain valve with plug or cover plate etc. as may be required for installation, operation & maintenance shall be supplied along with the AVR. Optional accessories, if any, may be quoted separately.

2.36 Special Requirements

a) This servo motor operated AVR in automode and in manual mode, is intended to be used for the power supply load of a Radio Broadcast Transmitter to maintain the LT voltage at constant level with specified tolerance. The load current shall be varying continuously above a specified current (called Carrier current and the AVR offered shall have a very good Regulation to take care of the instantaneous current variations.

b) The AVR has to work in a strong RF field laid by Broadcast transmitter system Therefore it is necessary to provide fool-proof earthing for the chasis and screening for the control Electronics including RF bypass arrangement for servo motor and other sensitive circuits of the control panel of the AVR.

c) The AVR shall be free from hunting in auto mode operation on account of line & switching surges as well as instantaneous variation in current due to modulation of broadcaster transmitter.

NOTE: 1. Even though AVR is to be supplied, installed tested & commissioned by the supplier he shall supply the instruction and drawings required for installation, testing & commissioning for the reference of the consignee.

Page 18: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION – IV

SCHEDULE OF REQUIREMENTS (TECHNICAL BID) BECIL requires the following equipment’s / services as per Technical specifications detailed under Section – I, II & III.

The present requirement is for FM Pvt. Broadcasters at FM CTI site-LEH The tenderer shall quote prices of each item separately with necessary breakup details keeping in view the following.

i. Make and Model of each item to be indicated. ii. Indenter reserves the right to choose and decide the quantity of equipment at the time of finalization of

tender.

S. No. Description of Items Qty. Make/Model Tenderer’s Offer

Rate Amount

1. Supply, Installation, Testing and Commissioning of indoor , servo controlled Automatic Voltage Regulator of 415 Volts,3 Phase, 50 Hz, 100 KVA capacity with data logger record path 100 logs (100 faults with LCD display) with all certificates, individual phase sensing and control for regulating unbalanced incoming voltage and suitable for unbalanced loads and conform to the technical specifications in Section – II including the termination of cables for connections/ inter connections along with the associated work of cable lugs, compression glands ,necessary power and one chemical earthing for AVR’s body earth. Supply input/output MCCBs and commissioning at FM CTI site-LEH.

1 Nos.

*Price to be quoted in price bid only

*Price to be quoted in price bid only

2. Insurance & Transportation and unloading at site of the above AVR.

1 JOB

* *

3. a)Installation, first filling of Transformer Oil, consumable hardware, inter-connecting control cabling with cables, input & output supply Cable connection of size 3.5x120 Sq.mm with kits to & fro from AMF panel & from Transformer. Note: (L.T.Cable for the above job will be supplied by BECIL at CTI Leh as per site requirement). b) Testing & Commissioning of the above AVR.

1 JOB 1 JOB

* *

Page 19: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

4. Book of instructions for Installation, operation, Testing, Commissioning & Maintenance including finalized drawings.

2 Sets

* *

5. TOTAL * *

6. GST * *

7. Octroi Duty/ Entry Tax(if any) * *

8. Any other charges * *

9. GRAND TOTAL Rupees * *

OPTIONAL

1. Spares(List to be endorsed) 01 set

* *

2. Charge for comprehensive AMC for 3rd, 4th & 5th year after guarantee period. (Detailed items covered under AMC for Repair /Replacement/Routine test checking / Adjustment/Measurement and Periodical Maintenance. Schedule intended to be adopted by the Tenderer shall be enclosed with technical Bid).

1 JOB

*Rate & Amount to be left blank ONLY in Technical Bid.

Page 20: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION – V SCHEDULE OF REQUIREMENTS (PRICE BID)

AIR requires the following equipment’s / services as per Technical specifications detailed under Section – I, II & III.

The present requirement is for FM Private Broadcasters at FM CTI site- LEH The tenderer shall quote prices of each item separately with necessary breakup details keeping in view the following. i) Make and Model of each item to be indicated. ii) Indenter reserves the right to choose and decide the quantity of equipment’s at the time of finalization of

tender. S. No. Description of Items Qty. Make/Model Tenderer’s Offer

Rate Amount

1. Supply, Installation, Testing and Commissioning of indoor , servo controlled Automatic Voltage Regulator of 415 Volts,3 Phase, 50 Hz, 100 KVA capacity with data logger record path 100 logs (100 faults with LCD display) with all certificates, individual phase sensing and control for regulating unbalanced incoming voltage and suitable for unbalanced loads and conform to the technical specifications in Section – II including the termination of cables for connections/ inter connections along with the associated work of cable lugs, compression glands ,necessary power and one chemical earthing for AVR’s body earth. Supply input/output MCCBs and commissioning at FM CTI site-LEH.

1 Nos.

*Price to be quoted in price bid only

*Price to be quoted in price bid only

2. Insurance & Transportation and unloading at site of the above AVR.

1 JOB

* *

3. a)Installation, first filling of Transformer Oil, consumable hardware, inter-connecting control cabling with cables, input & output supply Cable connection of size 3.5cx120 Sq.mm with kits to & fro from AMF panel & from Transformer. Note: (L.T.Cable for the above job will be supplied by BECIL at CTI Leh as per site requirement). b) Testing & Commissioning of the above AVR.

1 JOB 1 JOB

* *

Page 21: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

4. Book of instructions for Installation, operation, Testing, Commissioning & Maintenance including finalized drawings.

2 Sets

* *

5. TOTAL * *

6. GST * *

7. Octroi Duty/ Entry Tax(if any) * *

8. Any other charges * *

9. GRAND TOTAL Rupees * *

OPTIONAL

1. Spares(List to be endorsed) 01 set

* *

2. Charge for comprehensive AMC for 3rd, 4th & 5th year after guarantee period. (Detailed items covered under AMC for Repair /Replacement/Routine test checking / Adjustment/Measurement and Periodical Maintenance. Schedule intended to be adopted by the Tenderer shall be enclosed with technical Bid).

1 JOB

Page 22: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

SECTION-VI

VENDOR INFORMATION Vendor Information Short Responses can be placed within the cells provided in the tables below. Additional Information can be attached as appendices, but should be explicitly referenced from within the appropriate cells.

Vendor Information Form Company Name Name (print) Signature Title Date E-mail Phone Fax Primary Vendor Contact or Sales Representative Name and Title Address E-mail Telephone Fax Designated Technical Contact for Response Clarification and Questions Name and Title Address E-mail Telephone Fax

Page 23: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

CHECK-LIST FOR PRE-QUALIFICATION CRITERIA

S.No. CRITERIA COMPLIANCE

(Yes/No)

Type of Document to be furnished

1. Tender Fee of Rs. 1,000/- Original Demand Draft.

2. EMD of Rs. 10,000/- Original

value.

Demand Draft of total

3. The bidder should be registered. A copy of Company registration (Companies Act 1956, Proprietary firm) should be submitted.

Copy of Registration Certificate.

4. Letter of Authorization from OEM/ Principal manufacture to quote in the tender.

Copy of Letter

5. The bidder should have successfully carried out SITC of AVRs of different ratings in last five years and should submit the documentary proof such as work order/completion certificate etc.

Copy of Certificate.

6. The annual turnover of Bidder in last three

financial years (i.e. 2018-19, 2017-18 & 2016-

17) should not be less than Rs. 5.0 Crore in similar

business. Current Financial Year (2019-20) is not to

be considered.

Copy of balance sheet.

7. The net worth of the company should not be

negative and should submit net worth

certificate.

Copy of CA Certified Statement.

8. Bidder should not have a conflict of interest in

the procurement in question as specified in the

tender documents. Bidder should comply with

the code of integrity as specified in the tender

document.

Self-declaration on letter head.

9. The Bidder should not be insolvent, in

receivership, bankrupt or being wounded up, not

have its affairs administered by a court or a

judicial officer, not have its business activities

suspended and must not be the subject of legal

proceeding for any of the foregoing reasons.

Self-declaration on letter head.

Page 24: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

--

10. The technical compliance statement including

bill of material duly signed and stamped by

bidder on their letter head should be submitted

by bidder.

Self-attested as per Section-III

11. The Bidder should have registration with:

a) Registration Certificate

b) PAN & TAN,

c) GSTN

a) Self-attested Copy of

Registration Certificate

b) Self-attested Copy of Service Tax

Registration Number

c) Self-attested Copy of PAN Card &

TAN registration

12. Technical Bid Form Self-attested as per Section-IV

13. Undertaking & Acceptance Letter by the

Contractor

Self-attested a s p e r Annexure-I

14. The AVR offered by bidder should be CPCB

approved.

Type test certificate of each rating of AVR

shall be submitted.

15. The bid can be submitted by OEM directly. Original Authorization certificate / Letter

of Authorization from Principal Company

mentioning the tender reference and

other details i.e. towards after sales

support after project execution is to be

submitted.

Page 25: REQUEST FOR PROPOSAL (RFP) FOR SUPPLY, INSTALLATION ... · months from the date of commissioning and 27 months from the date of work order. 1.5.10 Authorization Original copy of Authorization

--

ANNEXURE- I

UNDERTAKING & ACCEPTANCE LETTER BY THE CONTRACTOR

(To be included in the Technical Bid)

We have carefully gone through the various terms and conditions listed in the Tender Form

(Technical & Price Bid) for Supply, Installation, Testing & Commissioning 100 KVA AVR at CTI-Leh

under FM Phase-III (Batch-II). We agree to all these conditions and are making this offer after

carefully reading the conditions and understanding the same without any kind of pressure or

influence from any source whatsoever. We hereby sign this undertaking in token of our acceptance of

various conditions listed in the tender document.

Date: …………………… Signature: .............................................

Place: …………………… Name & Designation of the Authorized Signatory: ………………………………..

Seal of the Organization:

…………………………………….. Mobile:

……………………………………..

Email: ………………………